The Railway Magazine

SCOTRAIL PROGRESS

Standing on the concourse of Glasgow Central it is easy to assess how well the ser vice is per forming. There are no anxious groups waiting for departure platforms to be announced and arriving commuters march confidently towards their destination. The announcements are routine and free of constant apologies. It is 08.30 on Tuesday, May 21, 2019 – the second day of a new timetable which has inaugurated substantial changes.

ScotRail operations director David Simpson permits himself a moment of satisfaction as his phone relates the Public Performance Measure (PPM) is standing at 96% in the heart of the morning peak. To entertain The RM so early in a new timetable is his vote of confidence that the troubled start to the franchise is now over and progress is being made.

Wholesale driver migration to other train operating companies such as TransPennine Express, which is expanding from Liverpool to Glasgow via the west coast and Edinburgh via Newcastle, has resulted in massive recruitment and training programmes.

Late provision of rolling stock (witness the production problems of the ‘pocket rocket’ 2+4 HST conversion programme from Wabtec) and the Class 385s’ window curvature ‘phantom signal images’ predicament form but a small selection of the problems affecting reliability in recent months. The stop-gap Class 365s drafted in to cover for the Class 385s required even more traction training.

The 07.59 from East Kilbride arrives on time at 08.31 to disgorge an astounding number of passengers. It is now rostered for three two-car Class 156s, a diesel vestige among a plethora of electric services and a likely candidate for the next steps in what has so far been a rolling electrification programme.

Mr Simpson’s experience stretches back to management training in mid-1980s British Rail and has recently included route manager with Network Rail Scotland when many of the infrastructure improvement plans, from which ScotRail is now benefiting, were hatched, as well as a spell with Caledonian Sleepers during its planned re-equipment.

‘Noisy and slow’

David points out there are now five routes from Glasgow to Edinburgh and everyone and which provided such a noisy and slow Class 156 climb from Uddingston on the 1-in-100, and steeper, incline to Benhar Summit. This obstacle is now surmounted with no more than a purr from modern Class 385 electric units.

You’re reading a preview, subscribe to read more.

More from The Railway Magazine

The Railway Magazine2 min read
Colne Valley Viaduct crosses the Grand Union Canal
DECK construction work for HS2’s 2.1-mile long Colne Valley Viaduct has just over half-a-mile to go after it reached the point where the structure crosses the Grand Union Canal at the end of March. By the time of it bridging the waterway near Denham
The Railway Magazine3 min read
Steam Loco Fleet Strengthened
THE Aln Valley Railway’s (AVR) steam locomotive fleet has been boosted by the news that the Northumberland line will be the new home for Hudswell Clark 0-6-0ST, Renishaw Ironworks No.6, works number 1366 built in 1919. The locomotive, along with fell
The Railway Magazine7 min read
Void Filled After Derailment
FOLLOWING the derailment of a Northern Rail Class 195 on March 22 near Grangeover-Sands, Network Rail has undertaken extensive repairs to the permanent way which took a month, the line reopening on April 22. Two Class 195s – Nos. 195104/133 – were wo

Related