Rail Express

IN BRIEF

CARDIFF ELECTRICS

GREAT Western Railway ran its first electric service from Cardiff on December 5, when No. 800031 formed the 08.50 Cardiff-Paddington – regular journeys following from January 6.

Network Rail worked over the Christmas period to finalise the electrification project

You’re reading a preview, subscribe to read more.

More from Rail Express

Rail Express4 min read
50 More JNA-X Box Wagons For GBRf
GB Railfreight and Porterbrook have signed a contract for the lease of a further 50 of the revised JNA-X variant of the ubiquitous JNA (UIC code Ealnos) box wagon, to be built by Greenbrier/ Astra Rail and delivered in the third quarter of 2024. Intr
Rail Express11 min read
Why Batteries Could Be Included
THE issue of traction power for trains, both existing and new-build, is one that is set to dominate discussions for some time. In many cases, electric trains are the preferred choice, however this is not always possible. A lack of coherent electrific
Rail Express7 min read
Production Lines Stop At Litchurch Lane
ALSTOM has demobilised the production lines at Derby Litchurch Lane and is now consulting with staff, trade unions and its supply chain to provide as much certainty as it can regarding its future. This follows the conclusion of the construction of th

Related Books & Audiobooks