Escolar Documentos
Profissional Documentos
Cultura Documentos
Contents:
1.Tool description 2.Route and site details 3.Cell Information and cross sector verification 4.Methodology 5.KPI summary 6.Coverage plot 7.Quality plot 8.Handover Plot
9.Throughput snap
10.Conclusion
Page 2
1. Tool description
Page 3
55.480219
-4.754361 LATITUDE SITE ADRESS SWAP OUT DATE TEST DATE TRACE FILE Mahe 7/27/2012 7/27/2012 Huawei_Team01_Mahe_Euro Hotel_G900_SC-BCCHLocked_IDLE_27_July_2012_SSV.log
Page 4
Page 5
4. Methodology:
Page 6
5. KPI Summary
CS Call Completion Statistics KPI REFERENCE TEST METHOD Count/ Site Description Total Completed/P REMARKS ercentage
Total Call Attempts Call Setup Success Rate Call Drop Rate Handover Success Rate 2G RxLev (dBm) 2G RxQual (Class)
Handover Testing Sector1 <=> Sector2 Sector1 <=> Sector3 Sector2 <=> Sector3 Sector1 <=> Sector1U Sector2 <=> Sector2U G900 OK OK OK N/A N/A
SHORTCALL MS3 SHORTCALL MS3 SHORTCALL MS3 SHORTCALL MS3 >-75 dBm <4
U2100 N/A N/A N/A OK OK
N/A
OK
Page 7
6. Coverage Plot
Idle Mode
Connected Mode
Page 8
Idle Mode
Connected Mode
Euro Hotel Sector 1 signal is reflected off nearby mountain and is the reason for spot coverage in sector 0 direction. As it is a reflected signal it is weak and that area is covered by Baie Lazare sector 1 in the connected mode due to terrain as shown .
Page 9
6. Coverage Plot
Idle Mode
Connected Mode
Page 10
6. Coverage Plot
Page 11
7. Quality Plot
Page 12
8. Handover Plot
Page 13
9. Throughput Snap
Page 14
9. Throughput Snap
Page 15
10. Conclusion
After feeder swap the GSM services are normal according to drive test analysis
Page 16
Thank you
www.huawei.com