Escolar Documentos
Profissional Documentos
Cultura Documentos
REV
: : :
PT. PUPUK ISKANDAR MUDA CO2 GAS COOLER AFTER 62-DC-151/62-EA-114 JT.011.071.W.PIM
Date : Rev.
No.
TITLE
Status (Code)
Rev. No.
Status (Code)
Rev. No.
Status (Code)
MECHANICAL CALCULATION
1 TS-ENG-CAL-62DC151-011-01
13-Feb-12
13-Feb-12
2 3 4 5 6 7 8 9
GENERAL ASSEMBLY PRESSURE PART 1 OF 2 PRESSURE PART 2 OF 2 TUBE BUNDLE NOZZLE DETAIL EXTERNAL DETAIL NAME PLATE DETAIL TEMPLATE DETAIL
0 0 0 0 0 0 0 0
15-Feb-12
26-Mar-12 15-Feb-12
28-Feb-12 28-Feb-12
PROCEDURE
10 11 12 13 14 15 16 17 18 19 20 TSTSTSTSTSTSTSTSTSTSTSQCQCQCQCQCQCQCQCQCQCQCPCPCPCPCPCPCPCPCPCPCPC071 071 071 071 071 071 071 071 071 071 071 11 11 11 11 11 11 11 11 11 11 11 -01 -02 -03 -04 -05 -06 -07 -08 -09 -010 -011
QUALITY ASSURANCE MANUAL INSPECTION TEST PLAN WPS/WPQ RECORDS (WELDING PLAN) HYDROSTATIC TEST PROCEDURE FABRICATION PROCEDURE TUBE EXPAND PROCEDURE HEAT TREATMENT PROCEDURE DIMENSIONAL CHECK PROCEDURE SURFACE PREPARATION AND PAINTING PROCEDURE BOLT TIGHTENING PROCEDURE DEGREASING AND CLEANING PROCEDURE
0 0 0 0 0 0 0 0 0 0 1
1-Feb-12 1-Feb-12 1-Feb-12 1-Feb-12 1-Feb-12 1-Feb-12 1-Feb-12 1-Feb-12 1-Feb-12 1-Feb-12 5-Mar-12
28-Feb-12 28-Feb-12
B B
1 1
5-Mar-12 5-Mar-12
5-Mar-12 5-Mar-12
28-Feb-12
5-Mar-12
5-Mar-12
28-Feb-12
5-Mar-12
5-Mar-12
Page 1 of 1