Escolar Documentos
Profissional Documentos
Cultura Documentos
Identificao do Material:
Data de Entrega:
Perido de Ensaio:
Massa da Amostra:
Peneiras (mm)
25
19
12.5
9.5
6.3
4.75
2.36
1.18
600 m
300 m
150 m
< 75m
Fundo
Total
0.005
1.000
2
0.000
0.027
0.586
0.312
0.071
Brita 1
10/4/2012
27/09/2012 02/10/2012
M = 1.000 g M = 1.000 g
% em Massa
Retida (b)
1
2
0
0
6
3
59
59
27
31
7
7
0.004
1
0
1.000
100.00
100.00
Mdulo de Finura
Dimenso Mxima (mm)
0
100
Acumulada
0
5
63
93
100
100
100
100
100
100
100
100
100
698
6.98
19 mm
Peneiras (mm)
25
19
12.5
9.5
6.3
4.75
2.36
1.18
600 m
300 m
150 m
< 75m
Fundo
Total
0.003
0.000
0.000
0.052
0.250
0.173
0.018
0.004
0.500
Areia Mdia
10/4/2012
27/09/2012 02/10/2012
M = 500 g M = 500 g
% em Massa
Retida (b)
1
2
0.002
1
0
0.001
0
0
0.009
0
2
0.266
10
53
0.198
50
40
0.015
35
3
0.002
4
0
0.007
1
1
0.500
100.00
100.00
Mdulo de Finura
Dimenso Mxima (mm)
Acumulada
1
0
1
32
45
19
2
1
100
1
1
2
33
78
97
99
100
210
2.10
4,75 mm