I PERTAHUN 2010
NO.
A
I
ANALISA 001
URAIAN
B
PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan
Dolken Kayu 8 - 10/400 cm
Semen Portland
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Residu
Tenaga
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
ANALISA 002
ANALISA 003
ANALISA 004
JUMLAH matrial
JUMLAH upah
TOTAL harga
G=(CXE)
H = (C X F )
I=(G+H)
150,440.00
1.250
2.500
0.005
0.009
0.072
0.060
0.400
btg
kg
m
m
m
kg
lt
0.200
0.400
0.020
0.020
oh
oh
oh
oh
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
401,390.00
1.250
2.500
1.200
0.009
0.072
0.060
0.450
btg
kg
m
m
m
kg
lt
0.200
0.400
0.020
0.020
oh
oh
oh
oh
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
btg
kg
kg
m
m
kg
0.200
0.300
0.020
0.020
oh
oh
oh
oh
0.00
59,000.00
0.00
210,000.00
210,000.00
0.00
m
kg
m
0.100
0.100
0.010
0.005
oh
oh
oh
oh
1.250
0.180
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
2.000
0.080
0.150
0.060
btg
m
kg
kg
kg
m
m
m
bh
lbr
bh
m
bh
lbr
2.000
1.000
2.000
oh
oh
oh
401,390.00
0.00
120,940.00
0.00
118,000.00
0.00
1,050.00
1,890.00
0.00
0.00
0.00
0.00
0.00
0.00
0.012
0.020
0.007
0.00
Rp
Rp
Rp
Rp
120,940.00
1.000
2.000
25.000
0.005
0.009
0.060
150,440.00
0.00
147,500.00
252,000.00
1,890.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147,500.00
1,050.00
1,890.00
-
0.00
0.00
0.00
0.00
ANALISA 005
KOEF
2,117,500.00
0.00
0.00
0.00
0.00
59,000.00
0.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,065,000.00
0.00
21,000.00
31,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,117,500.00
Kepala Tukang
Mandor
ANALISA 006
ANALISA 009
ANALISA 011
Tali Ijuk
Tenaga
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
2.000
1.000
0.200
0.050
oh
oh
oh
oh
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
0.00
btg
m
kg
lbr
1.500
1.000
0.150
0.050
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
btg
m
kg
kg
m
m
lbr
lbr
2.000
1.000
0.200
0.050
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
m
kg
btg
2.000
0.050
oh
oh
btg
kg
2.000
1.000
0.200
0.050
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
m
m
1.000
0.050
oh
oh
0.00
0.00
0.00
0.00
0.00
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.667
0.333
1,078,800.00
0.00
0.00
0.00
0.00
0.00
0.150
0.090
0.010
0.00
0.00
0.00
0.00
1,062,000.00
6,300.00
10,500.00
0.00
0.00
0.00
1.000
0.250
0.00
-
0.00
0.186
0.300
1.000
0.00
1,078,800.00
1.250
0.186
0.300
18.000
0.030
0.050
1.500
1.350
0.00
0.00
0.00
0.00
0.00
0.00
0.100
0.050
636,300.00
0.00
3.000
0.276
0.700
1.500
0.00
0.00
0.00
0.00
619,500.00
6,300.00
10,500.00
0.00
ANALISA 013
btg
m
kg
kg
m
m
lbr
ANALISA 012
1.700
0.210
0.300
10.500
0.030
0.050
1.500
636,300.00
ANALISA 010
0.00
0.00
ANALISA 008
oh
oh
ANALISA 007
0.300
0.050
0.00
0.00
0.00
-
0.00
ANALISA 014
II
ANALISA 015
ANALISA 016
ANALISA 017
ANALISA 018
ANALISA 019
ANALISA 020
ANALISA 021
PEKERJAAN TANAH
1 m Pek. Galian Tanah Biasa Max Kedalaman 1 m'
Tenaga
Pekerja
Tukang Gali
Kepala Tukang
Mandor
1 m Pek. Galian Tanah Biasa Max Kedalaman 2 m'
Tenaga
Pekerja
Tukang Gali
Kepala Tukang
Mandor
1 m Pek. Galian Tanah Biasa Max Kedalaman 3 m'
Tenaga
Pekerja
Tukang Gali
Kepala Tukang
Mandor
1 m Pek. Galian Tanah Keras Max Kedalaman 1 m'
Tenaga
Pekerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 024
ANALISA 025
oh
oh
0.00
0.00
0.400
0.040
oh
oh
oh
oh
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.052
oh
oh
oh
oh
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.823
0.000
0.000
0.083
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.300
0.000
0.000
0.010
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.200
0.00
0.00
0.500
0.000
0.000
0.050
0.00
0.00
0.192
0.000
0.000
0.019
0.00
0.00
0.192
0.000
0.000
0.050
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.050
0.000
0.000
0.005
0.00
0.00
1 m Pek. Stripping 1 m
0.00
0.00
0.625
0.000
0.000
0.062
0.00
0.00
0.735
0.000
0.000
0.073
0.00
0.00
0.525
0.00
-
0.00
1.250
0.000
0.000
0.125
Tenaga
Pekerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 023
6.667
0.033
Tenaga
Pekerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 022
0.00
0.00
ANALISA 026
III
ANALISA 027
ANALISA 029
IV
ANALISA 030
ANALISA 031
ANALISA 032
1.200
0.150
0.000
0.000
0.015
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
m
m
m
kg
kg
kg
m
kg
lt
kg
0.800
0.500
0.050
0.040
oh
oh
oh
oh
0.00
210,000.00
210,000.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
m
1.500
0.600
0.060
0.075
oh
oh
oh
oh
1.100
136.000
0.544
m
kg
m
1.500
0.600
0.060
0.075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.650
0.200
0.020
0.030
oh
oh
oh
oh
0.00
0.00
0.00
0.00
bh
kg
m
0.650
0.200
0.020
0.030
oh
oh
oh
oh
0.00
59,000.00
0.00
bh
kg
m
0.320
0.100
0.010
0.015
oh
oh
oh
oh
0.00
8,024,000.00
0.00
8,024,000.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
1,944,050.00
0.00
1,944,050.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
1,309,800.00
0.00
1,309,800.00
0.00
0.00
0.00
0.00
0.00
847,830.00
70.000
14.370
0.040
23,128,000.00
1,309,800.00
140.000
22.200
0.102
0.00
0.00
23,128,000.00
0.00
1,944,050.00
bh
kg
m
2,934,050.00
8,024,000.00
140.000
32.950
0.091
0.00
0.00
16,800.00
26,250.00
2,891,000.00
0.00
0.00
0.00
0.00
0.00
0.00
23,128,000.00
1.100
392.000
0.314
0.00
2,934,050.00
0.016
0.080
0.125
49.000
34.500
0.700
0.270
0.120
0.090
0.200
0.00
0.00
PEKERJAAN PONDASI
1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang
Bahan
Pasir Urug Darat
Pasir Beton
Koral Beton
Semen Portland
Besi Beton
Kawat Beton
Kayu Kaso 5 / 7 (borneo)
Paku
Minyak Bekisting
Plamuur Tembok
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 028
0.00
0.00
59,000.00
0.00
0.00
0.00
847,830.00
0.00
0.00
0.00
0.00
0.00
847,830.00
ANALISA 033
V
ANALISA 034
ANALISA 035
ANALISA 036
ANALISA 037
ANALISA 038
ANALISA 039
ANALISA 040
571,120.00
70.000
9.680
0.045
bh
kg
m
0.320
0.100
0.010
0.015
oh
oh
oh
oh
6.480
0.019
kg
m
0.200
0.150
0.015
0.010
oh
oh
oh
oh
4.320
0.022
kg
m
0.200
0.150
0.015
0.010
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
59,000.00
0.00
kg
m
m
0.200
0.150
0.015
0.010
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
m
0.200
0.150
0.015
0.010
oh
oh
oh
oh
59,000.00
0.00
0.00
kg
m
m
0.200
0.150
0.015
0.010
oh
oh
oh
oh
0.007
0.007
0.015
kg
m
m
0.200
oh
0.00
254,880.00
254,880.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
108,560.00
108,560.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
177,000.00
177,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.009
0.009
0.009
254,880.00
177,000.00
3.000
0.005
0.019
0.00
254,880.00
0.00
108,560.00
1.840
0.006
0.014
382,320.00
254,880.00
0.200
0.150
0.015
0.010
0.00
382,320.00
0.00
254,880.00
kg
m
m
571,120.00
0.00
571,120.00
0.00
382,320.00
4.320
0.003
0.013
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Tukang Batu
Kepala Tukang
Mandor
ANALISA 041
ANALISA 042
ANALISA 043
ANALISA 044
ANALISA 045
ANALISA 046
ANALISA 047
ANALISA 048
0.150
0.015
0.010
oh
oh
oh
14.280
0.023
kg
m
0.250
0.200
0.020
0.0125
oh
oh
oh
oh
10.800
0.026
kg
m
0.250
0.200
0.020
0.0125
oh
oh
oh
oh
0.00
0.00
0.00
842,520.00
59,000.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.250
0.200
0.020
0.0125
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
0.250
0.200
0.020
0.0125
oh
oh
oh
oh
59,000.00
0.00
kg
m
0.250
0.200
0.020
0.0125
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
m
0.250
0.200
0.020
0.0125
oh
oh
oh
oh
59,000.00
0.00
kg
m
0.300
0.200
0.020
0.013
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
0.300
0.200
0.020
0.013
oh
oh
oh
oh
430,110.00
59,000.00
0.00
0.00
368,160.00
368,160.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
914,500.00
914,500.00
0.00
0.00
0.00
0.00
0.00
693,250.00
11.750
0.035
0.00
430,110.00
0.00
914,500.00
15.500
0.013
512,120.00
0.00
0.009
0.009
0.018
0.00
512,120.00
0.00
368,160.00
6.240
0.030
637,200.00
430,110.00
7.290
0.028
0.00
637,200.00
0.00
512,120.00
kg
m
842,520.00
637,200.00
8.680
0.028
0.00
842,520.00
0.00
59,000.00
0.00
0.00
693,250.00
0.00
0.00
0.00
0.00
0.00
693,250.00
ANALISA 049
ANALISA 050
ANALISA 051
ANALISA 052
ANALISA 053
ANALISA 054
ANALISA 055
ANALISA 056
ANALISA 057
559,320.00
9.480
0.038
kg
m
0.300
0.200
0.020
0.013
oh
oh
oh
oh
59,000.00
0.00
kg
m
0.300
0.200
0.020
0.013
oh
oh
oh
oh
0.00
0.00
0.00
0.00
59,000.00
0.00
kg
m
0.320
0.250
0.025
0.015
oh
oh
oh
oh
14.150
0.039
kg
m
0.320
0.250
0.025
0.015
oh
oh
oh
oh
11.380
0.042
kg
m
0.320
0.250
0.025
0.015
oh
oh
oh
oh
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
59,000.00
0.00
kg
m
0.150
0.070
0.007
0.008
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
0.150
0.070
0.007
0.008
oh
oh
oh
oh
59,000.00
0.00
kg
0.00
0.00
0.00
0.00
59,000.00
0.00
671,420.00
0.00
483,210.00
483,210.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
417,130.00
417,130.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
334,530.00
334,530.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
671,420.00
0.00
548,700.00
9.300
834,850.00
334,530.00
5.670
0.023
0.00
834,850.00
0.00
417,130.00
7.070
0.021
1,100,350.00
483,210.00
0.320
0.250
0.025
0.015
0.00
1,100,350.00
0.00
671,420.00
kg
m
468,460.00
834,850.00
8.190
0.045
0.00
468,460.00
0.00
1,100,350.00
18.650
0.035
559,320.00
559,320.00
0.00
468,460.00
7.940
0.039
0.00
548,700.00
0.00
548,700.00
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 058
ANALISA 059
ANALISA 060
ANALISA 061
ANALISA 062
ANALISA 063
ANALISA 064
ANALISA 065
0.018
0.260
0.200
0.020
0.013
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
417,130.00
7.070
0.021
kg
m
0.260
0.200
0.020
0.013
oh
oh
oh
oh
59,000.00
0.00
kg
m
0.057
0.038
0.038
0.002
oh
oh
oh
oh
0.00
0.00
0.00
0.00
59,000.00
0.00
kg
kg
0.050
0.020
0.002
0.005
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
kg
0.450
0.200
0.020
0.025
oh
oh
oh
oh
0.00
0.00
kg
m
0.250
0.100
0.010
0.015
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
0.150
0.070
0.007
0.008
oh
oh
oh
oh
0.500
2.900
0.006
kg
kg
m
0.300
0.200
0.020
0.015
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.2250
org
0.00
59,000.00
0.00
0.00
254,880.00
254,880.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
254,880.00
254,880.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
29,500.00
29,500.00
0.00
0.00
0.00
0.00
0.00
0.00
472,000.00
kg
m
0.00
0.00
0.00
29,500.00
8.0000
0.0260
0.00
254,880.00
4.320
0.016
0.00
0.00
0.00
254,880.00
4.320
0.016
29,500.00
0.00
0.440
11.500
0.00
29,500.00
0.00
0.00
0.144
15.000
417,130.00
417,130.00
0.00
29,500.00
0.500
0.002
0.00
59,000.00
0.00
0.00
472,000.00
472,000.00
0.00
0.00
0.00
Tukang Batu
Kepala Tukang
Mandor
1 m Plesteran Dinding 1 : 5 + ACIAN
Bahan
Semen Portland
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
VI
ANALISA 066
0.00
1.100
6.000
20.000
2.000
0.300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
6.000
18.000
2.000
0.300
oh
oh
oh
oh
0.00
6.000
18.000
2.000
0.300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
0.350
1.050
0.105
0.018
oh
oh
oh
oh
0.00
m
kg
0.350
1.050
0.105
0.018
oh
oh
oh
oh
0.00
0.00
0.00
0.00
1.000
2.500
0.250
0.050
oh
oh
oh
oh
0.00
0.00
1.000
2.500
0.250
0.050
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
Bahan
Papan Kayu Jati
Tenaga
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.035
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.040
0.00
0.00
0.050
0.00
0.00
0.00
0.036
0.050
0.00
0.00
0.036
0.050
0.00
0.00
0.00
0.00
0.00
0.00
1.200
0.00
1.200
318,600.00
0.00
ANALISA 073
0.00
0.00
0.00
0.00
ANALISA 072
org
org
org
org
0.00
0.00
0.00
0.00
318,600.00
0.00
ANALISA 071
0.2250
0.1525
0.0100
0.0080
318,600.00
59,000.00
0.00
ANALISA 070
kg
m
ANALISA 069
5.4000
0.0280
0.00
0.00
0.00
ANALISA 068
org
org
org
PEKERJAAN KAYU
1m Pasang Kusen Pintu dan Jendela Kayu Jati
Bahan
Kayu Balok Jati
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 067
0.1525
0.0100
0.0080
0.00
0.00
0.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 074
Lem Kayu
Plywood 4 mm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Lem Kayu
Plywood 4 mm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 081
0.035
0.800
2.000
0.200
0.040
oh
oh
oh
oh
0.064
1.000
3.000
0.300
0.300
oh
oh
oh
oh
0.064
1.000
3.000
0.300
0.500
oh
oh
oh
oh
0.0196
0.030
0.300
1.000
m
kg
lt
Lbr
0.600
2.000
0.200
0.030
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.150
m
kg
0.500
2.000
0.200
0.025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.150
m
kg
0.500
2.000
0.200
0.025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.600
2.000
0.200
0.030
0.00
0.00
m
kg
lt
Lbr
0.00
0.00
0.00
0.0196
0.030
0.300
1.000
0.00
0.00
0.00
ANALISA 080
oh
oh
oh
oh
0.00
0.00
ANALISA 079
0.800
2.000
0.200
0.040
0.00
0.00
ANALISA 078
ANALISA 077
0.035
0.00
0.00
0.00
0.00
ANALISA 076
oh
oh
oh
oh
ANALISA 075
0.800
2.000
0.200
0.040
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 082
ANALISA 083
Lem Kayu
Plywood 4 mm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Lem Kayu
Plywood 4 mm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0196
0.300
0.300
1.000
m
kg
lt
lbr
0.600
2.000
0.200
0.030
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
lt
lbr
0.600
2.000
0.200
0.030
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
lt
lbr
lbr
0.800
2.500
0.250
0.040
oh
oh
oh
oh
0.0196
0.300
0.800
1.000
0.500
m
kg
lt
lbr
lbr
0.800
2.500
0.250
0.040
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.800
2.500
0.250
0.040
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
0.0196
0.300
0.800
0.500
0.500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
lt
lbr
lbr
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
lt
lbr
lbr
0.00
0.00
0.00
0.00
0.00
0.00
0.0196
0.300
0.800
1.000
0.500
0.00
0.00
0.0196
0.300
0.800
1.000
0.500
0.00
0.00
0.00
0.00
0.00
0.00
0.0196
0.300
0.300
1.000
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 088
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
ANALISA 087
0.600
2.000
0.200
0.030
0.00
0.00
0.00
0.00
ANALISA 086
m
kg
lt
lbr
ANALISA 085
0.0196
0.030
0.300
1.000
ANALISA 084
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 089
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 092
ANALISA 093
ANALISA 094
ANALISA 095
0.0196
0.300
1.200
1.000
1.000
m
kg
lt
lbr
lbr
1.000
2.600
0.260
0.050
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
lt
lbr
lbr
1.000
2.600
0.260
0.050
oh
oh
oh
oh
1.100
15.000
0.800
4.000
12.000
1.200
0.200
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
kg
4.000
12.000
1.200
0.200
oh
oh
oh
oh
0.00
0.00
0.00
m
kg
kg
4.000
12.000
1.200
0.200
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
kg
4.000
12.000
1.200
0.200
oh
oh
oh
oh
0.00
0.00
0.00
m
kg
0.100
0.100
0.010
0.005
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.012
0.150
0.00
0.00
1.100
15.000
0.800
0.00
0.00
0.00
0.00
0.00
1.100
15.000
0.800
0.00
0.00
1.100
15.000
0.800
0.00
0.00
0.00
0.00
0.00
0.00
0.00
kg
0.00
0.00
0.0196
0.300
1.200
1.000
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 091
oh
oh
oh
oh
ANALISA 090
0.800
2.500
0.250
0.040
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 096
ANALISA 097
ANALISA 104
0.014
0.150
m
kg
0.100
0.100
0.010
0.005
oh
oh
oh
oh
0.00
0.00
m
kg
0.100
0.100
0.010
0.005
oh
oh
oh
oh
0.014
0.150
m
kg
0.100
0.100
0.010
0.005
oh
oh
oh
oh
0.165
0.200
m
kg
0.120
0.120
0.012
0.006
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
m
kg
0.150
0.250
0.025
0.075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
0.100
0.200
0.025
0.005
oh
oh
oh
oh
0.00
0.00
Bahan
Balok Kayu Kamper
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.012
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0072
0.050
0.00
0.00
0.00
0.00
0.012
0.100
0.00
0.00
0.120
0.120
0.012
0.006
0.00
0.00
0.00
0.00
m
kg
0.00
0.00
0.165
0.200
0.00
0.00
0.00
0.00
0.014
0.150
0.00
0.00
ANALISA 103
0.00
0.00
0.00
0.00
ANALISA 102
oh
oh
oh
oh
0.00
0.00
0.00
ANALISA 101
0.100
0.100
0.010
0.005
0.00
0.00
ANALISA 100
m
kg
ANALISA 099
0.012
0.150
ANALISA 098
0.00
0.00
0.00
0.00
ANALISA 111
m
kg
0.150
0.250
0.025
0.075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
0.200
0.300
0.030
0.010
oh
oh
oh
oh
0.00
0.00
m
kg
0.200
0.300
0.030
0.010
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
0.200
0.300
0.030
0.010
oh
oh
oh
oh
0.00
0.00
m
kg
0.250
0.350
0.035
0.0125
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
0.250
0.350
0.035
0.0125
oh
oh
oh
oh
0.027
0.200
m
kg
0.250
0.350
0.035
0.0125
oh
oh
oh
oh
0.0072
0.050
m
kg
0.100
0.200
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.027
0.200
0.00
0.00
0.00
0.00
0.027
0.200
0.00
0.00
0.023
0.150
0.00
0.00
0.00
0.00
0.023
0.150
0.00
0.00
0.023
0.150
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 112
0.012
0.100
0.00
ANALISA 110
0.00
0.00
0.00
0.00
ANALISA 109
oh
oh
oh
oh
0.00
ANALISA 108
0.150
0.250
0.025
0.075
0.00
ANALISA 107
kg
ANALISA 106
0.100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Kepala Tukang
Mandor
ANALISA 113
ANALISA 114
ANALISA 115
ANALISA 116
ANALISA 117
ANALISA 118
ANALISA 119
oh
oh
0.00
0.00
0.0072
0.050
m
kg
0.100
0.200
0.025
0.005
oh
oh
oh
oh
0.0110
0.050
m
kg
0.110
0.220
0.022
0.005
oh
oh
oh
oh
0.0110
0.050
m
kg
0.110
0.220
0.022
0.005
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
m
kg
0.100
0.100
0.010
0.050
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
0.100
0.100
0.010
0.050
oh
oh
oh
oh
0.00
0.00
m
m
kg
0.150
0.450
0.045
0.075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
m
kg
0.150
0.450
0.045
0.075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0195
0.007
0.100
0.00
0.00
0.00
0.00
0.0195
0.007
0.100
0.00
0.00
0.0088
0.060
0.00
0.00
0.00
0.00
0.0086
0.060
0.00
0.00
0.150
0.250
0.025
0.075
0.00
0.00
0.00
0.00
m
kg
0.00
0.00
0.0145
0.060
0.00
0.00
0.00
0.00
ANALISA 120
0.025
0.005
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 121
ANALISA 122
ANALISA 126
ANALISA 128
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
m
kg
0.150
0.450
0.045
0.075
oh
oh
oh
oh
0.00
0.00
0.00
m
m
kg
lt
lbr
0.200
0.600
0.060
0.010
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
kg
0.600
1.800
0.180
0.030
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.400
0.050
lbr
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.025
0.075
0.0075
0.0013
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PEKERJAAN BETON
1 m Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.00
0.00
0.00
0.00
0.00
0.00
m'
oh
oh
oh
oh
10.000
0.026
0.044
kg
m
m
1.150
0.020
0.002
0.006
oh
oh
oh
oh
218.000
0.520
0.870
kg
m
m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
604,700.00
59,000.00
210,000.00
210,000.00
0.00
604,700.00
590,000.00
5,460.00
9,240.00
0.00
0.00
0.00
0.00
13,153,900.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.021
0.021
0.0020
0.0010
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bahan
Plywood 4 mm
Paku Biasa " - 1"
0.00
0.00
0.007
0.100
0.150
0.00
0.00
0.00
0.00
0.00
0.0195
0.007
0.100
0.560
1.000
0.00
0.00
0.0195
0.007
0.100
0.00
0.00
0.00
0.00
Bahan
Kayu Profil
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
VII
ANALISA 127
0.150
0.450
0.045
0.075
0.00
0.00
0.00
ANALISA 125
m
m
kg
ANALISA 124
0.0195
0.007
0.100
ANALISA 123
0.00
12,862,000.00
109,200.00
182,700.00
0.00
13,153,900.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 129
173.000
0.570
0.870
kg
m
m
1.650
0.250
0.025
0.080
oh
oh
oh
oh
59,000.00
210,000.00
210,000.00
kg
m
m
1.650
0.250
0.025
0.080
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
m
1.650
0.250
0.025
0.080
oh
oh
oh
oh
352.000
0.560
0.700
kg
m
m
1.650
0.250
0.025
0.080
oh
oh
oh
oh
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
1.650
0.250
0.025
0.080
oh
oh
oh
oh
59,000.00
210,000.00
210,000.00
kg
m
m
1.650
0.250
0.025
0.080
oh
oh
oh
oh
0.00
16,803,500.00
16,520,000.00
94,500.00
189,000.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
21,032,600.00
20,768,000.00
117,600.00
147,000.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
21,264,600.00
21,063,000.00
88,200.00
113,400.00
0.00
0.00
0.00
0.00
23,036,500.00
386.000
0.470
0.780
13,961,000.00
21,264,600.00
kg
m
m
0.00
13,688,000.00
109,200.00
163,800.00
21,032,600.00
357.000
0.420
0.540
10,509,400.00
16,803,500.00
280.000
0.450
0.900
0.00
10,207,000.00
119,700.00
182,700.00
13,961,000.00
232.000
0.520
0.780
11,919,100.00
10,509,400.00
ANALISA 136
0.00
0.00
0.00
0.00
ANALISA 135
oh
oh
oh
oh
0.00
11,623,000.00
98,700.00
197,400.00
ANALISA 134
1.650
0.250
0.025
0.080
11,919,100.00
59,000.00
210,000.00
210,000.00
ANALISA 133
kg
m
m
1 m Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 132
197.000
0.470
0.940
0.00
0.00
0.00
0.00
ANALISA 131
oh
oh
oh
oh
ANALISA 130
1.650
0.250
0.025
0.080
59,000.00
210,000.00
210,000.00
0.00
23,036,500.00
22,774,000.00
98,700.00
163,800.00
0.00
0.00
0.00
0.00
28,494,100.00
0.00
28,494,100.00
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 137
ANALISA 139
ANALISA 140
ANALISA 141
ANALISA 142
ANALISA 143
kg
m
m
1.650
0.250
0.025
0.080
oh
oh
oh
oh
59,000.00
210,000.00
210,000.00
28,261,000.00
77,700.00
155,400.00
0.00
0.00
0.00
0.00
ANALISA 138
479.000
0.370
0.740
28,494,100.00
479.000
0.370
0.740
2.460
kg
m
m
gln
1.650
0.250
0.025
0.080
oh
oh
oh
oh
336.000
0.540
0.810
kg
m
m
2.000
0.350
0.035
1.000
oh
oh
oh
oh
59,000.00
210,000.00
210,000.00
0.00
59,000.00
210,000.00
210,000.00
2.000
0.350
0.035
1.000
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
m
2.000
0.350
0.035
1.000
oh
oh
oh
oh
59,000.00
210,000.00
210,000.00
kg
m
m
2.000
0.350
0.035
1.000
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
m
m
2.000
0.350
0.035
1.000
oh
oh
oh
oh
400.000
0.480
0.800
1.200
kg
m
m
kg
59,000.00
210,000.00
210,000.00
0.00
21,930,200.00
21,653,000.00
92,400.00
184,800.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
23,868,800.00
23,600,000.00
100,800.00
168,000.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
36,503,400.00
36,285,000.00
109,200.00
109,200.00
0.00
0.00
0.00
0.00
23,868,800.00
59,000.00
210,000.00
210,000.00
0.00
17,463,000.00
36,503,400.00
615.000
0.520
0.520
0.00
17,169,000.00
98,700.00
195,300.00
23,868,800.00
400.000
0.480
0.800
20,107,500.00
21,930,200.00
367.000
0.440
0.880
0.00
19,824,000.00
113,400.00
170,100.00
17,463,000.00
kg
m
m
28,494,100.00
20,107,500.00
291.000
0.470
0.930
0.00
28,261,000.00
77,700.00
155,400.00
0.00
0.00
0.00
0.00
0.00
23,600,000.00
100,800.00
168,000.00
0.00
0.00
23,868,800.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 144
ANALISA 151
ANALISA 152
1.050
m'
0.050
0.030
0.0035
0.002
oh
oh
oh
oh
1.050
m'
0.550
0.350
0.003
oh
oh
oh
1.050
m'
0.550
0.350
0.003
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m'
0.00
0.00
0.00
m'
0.550
0.350
0.003
oh
oh
oh
0.00
kg
kg
0.007
0.007
0.0007
0.0003
oh
oh
oh
oh
0.00
0.00
0.00
kg
kg
0.005
0.005
0.0005
0.0003
oh
oh
oh
oh
0.00
kg
kg
0.025
0.025
0.0025
0.0015
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.020
0.805
0.00
0.00
1.050
0.010
0.00
0.00
0.00
1.050
0.015
0.00
0.00
1.050
0.00
0.00
0.00
oh
oh
oh
0.00
0.00
0.550
0.350
0.003
0.00
0.00
0.00
1.050
0.00
0.00
0.00
ANALISA 150
oh
oh
oh
oh
0.00
0.00
ANALISA 149
0.050
0.030
0.003
0.002
0.00
0.00
ANALISA 148
m'
ANALISA 147
1.050
0.00
0.00
0.00
0.00
ANALISA 146
oh
oh
oh
oh
ANALISA 145
2.000
0.350
0.035
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 153
ANALISA 154
ANALISA 155
ANALISA 156
ANALISA 157
ANALISA 158
ANALISA 159
1 m Pasang Bekisting
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
0.040
0.400
0.200
0.350
2.000
m
kg
lt
lbr
btg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.300
0.330
0.0330
0.0060
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
0.1500
0.2000
0.2000
0.0170
org
org
org
org
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
lt
0.300
0.260
0.0260
0.0050
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
lt
0.300
0.260
0.0260
0.0050
oh
oh
oh
oh
0.040
0.400
0.200
0.015
0.350
2.000
m
kg
lt
m
lbr
btg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.300
0.330
0.0330
0.0060
oh
oh
oh
oh
0.00
0.00
0.00
0.040
0.400
0.200
0.018
0.350
2.000
m
kg
lt
m
lbr
btg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.320
0.330
0.0330
0.0060
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.040
0.400
0.200
0.015
0.350
6.000
m
kg
lt
m
lbr
btg
Tenaga
Pekerja
0.320
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.040
0.300
0.100
0.00
0.00
0.00
0.00
0.040
0.300
0.100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0882
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Tukang Batu
Kepala Tukang
Mandor
ANALISA 160
ANALISA 161
ANALISA 162
ANALISA 163
ANALISA 164
0.330
0.033
0.006
oh
oh
oh
0.040
0.400
0.200
0.015
0.350
6.000
4.000
m
kg
lt
m
lbr
btg
bh
0.320
0.330
0.033
0.006
oh
oh
oh
oh
0.030
0.400
0.150
0.015
0.350
2.000
m
kg
lt
m
lbr
btg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.320
0.330
0.033
0.006
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.900
0.350
1.040
1.050
0.245
0.165
oh
oh
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
lt
kg
kg
kg
m
m
4.850
0.350
1.560
1.400
0.331
0.170
oh
oh
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
m
kg
lt
kg
kg
kg
m
m
m
lbr
btg
7.300
oh
0.00
19,330,000.00
0.00
0.00
0.00
0.00
0.00
19,057,000.00
109,200.00
163,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
19,330,000.00
0.00
0.00
0.00
0.00
0.00
19,057,000.00
109,200.00
163,800.00
0.00
0.00
0.00
0.00
0.00
0.00
19,330,000.00
0.400
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.150
3.500
20.000
0.00
19,330,000.00
0.270
2.000
0.600
200.000
3.000
323.000
0.520
0.780
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19,330,000.00
m
kg
lt
kg
kg
kg
m
m
0.00
0.00
0.200
1.500
0.400
150.000
2.250
323.000
0.520
0.780
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19,057,000.00
109,200.00
163,800.00
0.00
0.00
0.00
0.00
19,330,000.00
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
ANALISA 165
ANALISA 166
ANALISA 167
ANALISA 168
0.350
3.300
2.100
0.570
0.250
oh
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
19,330,000.00
0.320
3.200
1.600
200.000
3.000
323.000
0.520
0.780
0.140
2.800
16.000
m
kg
lt
kg
kg
kg
m
m
m
lbr
btg
5.960
0.350
2.800
1.400
0.455
0.208
oh
oh
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
m
kg
lt
kg
kg
kg
m
m
m
lbr
btg
5.800
0.350
2.800
1.050
0.420
0.185
oh
oh
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
m
kg
lt
kg
kg
kg
m
m
m
lbr
btg
5.600
0.350
2.640
1.050
0.400
0.193
oh
oh
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
lt
kg
kg
kg
m
m
m
lbr
btg
5.600
oh
19,330,000.00
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
19,330,000.00
0.00
0.00
0.00
0.00
0.00
19,057,000.00
109,200.00
163,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19,330,000.00
0.250
3.000
1.200
200.000
3.000
323.000
0.520
0.780
0.105
2.500
14.000
0.00
0.00
0.00
0.00
0.00
0.00
19,057,000.00
109,200.00
163,800.00
0.00
0.00
0.00
19,330,000.00
0.240
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.160
2.800
24.000
19,330,000.00
0.00
0.00
0.00
0.00
0.00
19,057,000.00
109,200.00
163,800.00
0.00
0.00
0.00
19,330,000.00
0.320
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.120
2.800
32.000
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19,057,000.00
109,200.00
163,800.00
0.00
0.00
0.00
0.00
19,330,000.00
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
ANALISA 169
ANALISA 173
ANALISA 175
m
kg
kg
kg
kg
m
m
0.060
0.020
0.020
0.020
0.006
0.003
oh
oh
oh
oh
oh
oh
0.003
0.200
3.600
0.050
5.500
0.009
0.015
m
kg
kg
kg
kg
m
m
0.100
0.330
0.033
0.033
0.010
0.005
oh
oh
oh
oh
oh
oh
25.000
bh
0.150
0.075
0.008
0.008
oh
oh
oh
oh
25.000
bh
0.150
0.075
0.008
0.008
oh
oh
oh
oh
12.000
bh
0.150
0.060
0.006
0.008
oh
oh
oh
oh
5.000
8.000
0.032
bh
kg
m
0.400
0.200
0.020
0.002
oh
oh
oh
oh
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
210,000.00
210,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
329,540.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
472,000.00
0.00
59,000.00
0.00
0.00
472,000.00
0.00
472,000.00
0.00
0.00
0.00
0.00
0.00
472,000.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
324,500.00
1,890.00
3,150.00
0.00
bh
kg
m
239,150.00
329,540.00
5.000
8.000
0.032
0.00
0.00
0.00
0.00
0.00
236,000.00
1,260.00
1,890.00
ANALISA 174
0.002
0.010
3.000
0.450
4.000
0.006
0.009
239,150.00
ANALISA 172
0.00
0.00
0.00
0.00
0.00
VIII
ANALISA 171
oh
oh
oh
oh
oh
ANALISA 170
0.350
2.300
1.400
0.405
0.202
0.00
472,000.00
0.00
0.00
472,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 176
ANALISA 177
ANALISA 178
ANALISA 179
ANALISA 180
ANALISA 181
ANALISA 182
oh
oh
oh
oh
0.00
0.00
0.00
0.00
4.000
8.000
0.032
bh
kg
m
0.400
0.200
0.020
0.002
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
lbr
kg
0.140
0.067
0.007
0.007
oh
oh
oh
oh
0.00
0.00
lbr
kg
0.140
0.075
0.008
0.008
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
0.140
0.075
0.008
0.008
oh
oh
oh
oh
0.00
0.00
lbr
kg
0.140
0.070
0.007
0.007
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
0.140
0.070
0.007
0.007
oh
oh
oh
oh
0.350
0.120
lbr
kg
0.140
0.070
0.007
0.007
oh
oh
oh
oh
0.420
0.120
lbr
kg
0.140
0.070
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.750
0.120
0.00
0.00
0.00
0.00
0.600
0.120
0.00
0.00
0.600
0.120
0.00
0.00
0.00
0.00
0.500
0.120
472,000.00
0.00
0.600
0.050
0.00
0.00
472,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
472,000.00
ANALISA 183
0.400
0.200
0.020
0.002
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Kepala Tukang
Mandor
ANALISA 184
ANALISA 188
0.510
0.120
lbr
kg
0.140
0.067
0.007
0.007
oh
oh
oh
oh
0.800
0.120
lbr
kg
0.140
0.067
0.007
0.007
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.140
0.067
0.007
0.007
oh
oh
oh
oh
0.00
0.00
lbr
kg
0.140
0.067
0.007
0.007
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
0.140
0.067
0.007
0.007
oh
oh
oh
oh
0.00
0.00
lbr
kg
0.140
0.067
0.007
0.007
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
0.140
0.067
0.007
0.007
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.570
0.120
0.00
0.00
0.00
0.00
0.490
0.120
0.00
0.00
0.460
0.120
0.00
0.00
0.00
0.00
0.380
0.120
0.00
0.00
lbr
kg
0.00
0.00
0.00
0.00
0.370
0.120
0.00
0.00
0.00
0.00
ANALISA 192
oh
oh
oh
oh
0.00
0.00
0.00
ANALISA 191
0.140
0.067
0.007
0.007
0.00
0.00
ANALISA 190
lbr
kg
ANALISA 189
0.440
0.120
0.00
ANALISA 187
0.00
0.00
ANALISA 186
oh
oh
ANALISA 185
0.007
0.007
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 193
ANALISA 194
ANALISA 195
ANALISA 196
ANALISA 197
ANALISA 198
ANALISA 199
ANALISA 200
2.400
6.000
lbr
kg
0.084
0.125
0.013
0.004
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.400
6.000
lbr
bh
0.084
0.125
0.013
0.004
oh
oh
oh
oh
0.00
0.00
lbr
bh
0.084
0.125
0.013
0.004
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
lbr
bh
0.084
0.125
0.013
0.004
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
bh
0.084
0.125
0.013
0.004
oh
oh
oh
oh
1.200
6.000
lbr
bh
0.084
0.125
0.013
0.004
oh
oh
oh
oh
1.200
6.000
lbr
bh
0.084
0.125
0.013
0.004
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
bh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.100
6.000
0.00
0.00
0.00
0.00
0.100
0.150
0.013
0.004
0.00
0.00
lbr
bh
0.00
0.00
0.00
0.00
1.100
6.000
0.00
0.00
1.200
6.000
0.00
0.00
0.00
0.00
2.050
6.000
0.00
0.00
0.00
0.00
2.100
6.000
0.00
0.00
0.00
0.00
0.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 201
ANALISA 205
ANALISA 206
ANALISA 208
0.200
0.100
0.010
0.010
oh
oh
oh
oh
6.900
0.350
0.030
0.500
lbr
lbr
kg
bh
0.200
0.300
0.003
0.010
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
0.200
0.100
0.010
0.001
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.166
0.250
0.025
0.008
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
kg
m
kg
0.400
0.200
0.020
0.020
oh
oh
oh
oh
0.00
0.00
lbr
kg
kg
0.125
0.250
0.025
0.006
oh
oh
oh
oh
1.100
0.050
lbr
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.250
0.150
0.015
0.013
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
lbr
0.00
0.00
1.100
0.00
0.00
0.00
0.00
2.000
0.050
0.0035
0.00
0.00
3.500
0.050
10.800
0.032
1.000
0.00
0.00
0.00
0.00
0.00
0.00
60.000
0.200
0.00
0.00
1.020
0.200
0.00
0.00
0.00
0.00
Bahan
Genteng Sirap
Paku Biasa " - 1"
0.00
0.00
0.00
lbr
bh
ANALISA 204
11.000
0.030
0.00
0.00
0.00
0.00
ANALISA 203
oh
oh
oh
oh
ANALISA 202
0.084
0.125
0.013
0.004
0.00
0.00
0.00
ANALISA 209
0.050
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.250
0.150
0.015
0.013
oh
oh
oh
oh
ANALISA 210
ANALISA 211
ANALISA 212
ANALISA 216
0.400
0.060
0.050
0.004
Lbr
kg
kg
m
0.125
0.250
0.025
0.006
oh
oh
oh
oh
Lbr
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.120
0.060
0.006
0.006
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.300
0.040
Lbr
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
0.070
0.008
0.006
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.015
0.075
0.008
0.006
oh
oh
oh
oh
1.200
0.040
m
kg
0.100
1.000
0.010
0.010
oh
oh
oh
oh
1.050
0.150
0.050
0.005
0.008
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bahan
Pelat Asbes tebal 5 mm
Paku
Tenaga
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
lbr
kg
0.00
0.00
1.100
0.010
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
org
org
org
org
0.00
0.00
0.00
0.1875
0.2250
0.0375
0.0105
0.00
0.00
m
kg
0.00
0.00
0.00
0.0210
0.2200
0.00
0.00
m
kg
0.00
0.00
0.00
0.00
0.00
Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1"
0.00
0.00
0.00
0.00
0.00
0.00
0.700
0.020
Bahan
Sisalation / Alluminium Foil
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
IX
ANALISA 215
0.00
0.00
0.00
0.00
0.00
Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa " - 1"
Bahan
Nok standar 40 cm 18, swg 22
Paku Hak Pnjang 15 cm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 214
0.00
Bahan
Atap Alluminium Gelombang tebal 0.55
Paku Hak Pnjang 15 cm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 213
0.00
0.00
0.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 217
1.100
0.010
lbr
kg
0.030
0.070
0.007
0.0015
oh
oh
oh
oh
0.00
0.00
lbr
kg
0.060
0.120
0.012
0.0030
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
0.060
0.100
0.010
0.0030
oh
oh
oh
oh
0.00
0.00
lbr
kg
0.060
0.100
0.010
0.0030
oh
oh
oh
oh
0.00
0.00
0.00
0.00
lbr
kg
0.070
0.100
0.010
0.0035
oh
oh
oh
oh
0.00
0.00
lbr
kg
0.070
0.100
0.010
0.0035
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
lbr
kg
0.070
0.100
0.010
0.0035
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.360
0.030
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.360
0.030
0.00
0.00
0.360
0.030
0.00
0.00
0.00
0.00
1.500
0.050
0.00
0.00
5.800
0.050
0.00
0.00
0.00
0.00
11.500
0.050
0.00
0.00
ANALISA 224
0.00
0.00
0.00
0.00
ANALISA 223
oh
oh
oh
oh
0.00
0.00
0.00
ANALISA 222
0.030
0.070
0.007
0.0015
0.00
0.00
0.00
ANALISA 221
lbr
kg
ANALISA 220
1.100
0.010
0.00
0.00
0.00
0.00
ANALISA 219
oh
oh
oh
oh
ANALISA 218
0.030
0.070
0.007
0.0015
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 225
ANALISA 226
0.360
0.030
lbr
kg
0.070
0.100
0.010
0.0035
oh
oh
oh
oh
0.00
0.00
lbr
kg
0.070
0.100
0.010
0.0035
oh
oh
oh
oh
0.360
0.030
lbr
kg
0.070
0.100
0.010
0.0035
oh
oh
oh
oh
0.024
0.010
0.050
m
kg
kg
0.200
0.600
0.060
0.0100
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
lbr
kg
kg
0.200
0.600
0.060
0.0100
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
lbr
kg
0.600
0.100
0.010
0.0030
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.350
0.030
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.024
0.010
0.050
0.00
0.00
0.200
0.600
0.060
0.0100
0.00
0.00
0.00
0.00
lbr
kg
kg
0.00
0.00
0.024
0.010
0.050
0.00
0.00
0.00
0.00
0.360
0.030
0.00
0.00
ANALISA 232
0.00
0.00
0.00
0.00
ANALISA 231
oh
oh
oh
oh
0.00
0.00
0.00
ANALISA 230
0.070
0.100
0.010
0.0035
0.00
0.00
ANALISA 229
lbr
kg
ANALISA 228
0.360
0.030
ANALISA 227
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 233
ANALISA 234
ANALISA 240
0.00
0.00
0.00
0.00
1.100
0.010
m'
kg
0.050
0.050
0.005
0.0030
oh
oh
oh
oh
0.00
0.00
m
kg
lbr
0.270
0.400
0.040
0.0135
oh
oh
oh
oh
0.012
0.060
1.100
m
kg
lbr
0.180
0.320
0.032
0.0090
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
lbr
0.260
0.400
0.040
0.0130
oh
oh
oh
oh
0.00
0.00
0.00
PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok
Bahan
Kloset Duduk / Monoblok
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Kloset Jongkok Porselen
Bahan
Kloset Jongkok Porselen
Semen Portland
Pasir Pasang
Tenaga
Pekerja
m
kg
lbr
0.310
0.470
0.047
0.0155
oh
oh
oh
oh
0.00
0.00
0.00
0.00
3.300
1.100
0.001
0.1600
oh
oh
oh
oh
1.000
6.000
0.010
bh
kg
m
1.000
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
bh
30% Dari bahan
0.00
0.00
0.00
0.00
0.00
0.027
0.060
11.500
0.00
0.00
0.023
0.060
5.800
0.00
0.00
0.00
0.00
0.023
0.060
0.390
0.00
0.00
X
ANALISA 239
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
ANALISA 238
0.150
0.500
0.050
0.0075
0.00
0.00
0.00
0.00
1 m Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan
Balok Kayu Borneo
Paku
Asbes
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 237
m'
kg
bh
lbr
ANALISA 236
3.600
0.150
1.000
1.500
ANALISA 235
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
354,000.00
0.00
59,000.00
0.00
0.00
0.00
354,000.00
0.00
0.00
354,000.00
Tukang Batu
Kepala Tukang
Mandor
ANALISA 241
ANALISA 242
ANALISA 243
ANALISA 244
bh
bh
kg
m
1.000
1.500
0.300
0.1100
oh
oh
oh
oh
354,000.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
1.000
1.000
0.100
0.1000
0.00
0.00
59,000.00
0.00
oh
oh
oh
oh
1.000
1.450
0.150
0.1000
oh
oh
oh
oh
1.000
6.000
0.010
bh
kg
m
2.100
0.750
0.070
0.1100
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
m
kg
m
bh
kg
6.000
3.000
0.300
0.3000
oh
oh
oh
oh
0.000
0.075
0.750
0.2500
oh
oh
oh
oh
354,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
7,080,000.00
0.00
7,080,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
bh
20% harga Badkip
0.00
0.00
354,000.00
0.00
7,080,000.00
0.400
120.000
0.300
360.000
6.000
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
1.800
2.700
0.540
0.1100
354,000.00
354,000.00
1.000
bh
18% Harga Bak
0.00
0.00
0.00
354,000.00
0.00
0.00
1.000
bh
12% Harga Urinoir
6.000
kg
0.010
m
354,000.00
354,000.00
1.000
bh
30% Harga Urinoir
6.000
kg
0.010
m
0.00
0.00
0.00
354,000.00
0.00
ANALISA 247
1.000
7.000
6.000
0.010
0.00
0.00
0.00
ANALISA 246
oh
oh
oh
ANALISA 245
1.500
1.500
0.1600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 248
ANALISA 249
ANALISA 254
0.00
0.00
0.00
0.00
1.600
0.680
0.013
0.011
bh
kg
m
m
0.060
0.030
0.003
0.0025
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
bh
kg
m
m
0.080
0.040
0.004
0.0070
oh
oh
oh
oh
0.00
0.00
0.00
0.00
bh
m
kg
m
m
0.140
0.070
0.007
0.0070
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
bh
m
kg
m
m
0.380
0.190
0.019
0.0190
oh
oh
oh
oh
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
Bahan
Bata merah kelas I
0.145
m
Semen Portland
44.000
kg
Pasir Pasang
0.070
m
Batu Kerikil
0.070
m
Besi Beton
1.600
kg
Pasir Beton
0.060
m
Tenaga
Pekerja
3.200
oh
Tukang Batu
1.015
oh
Kepala Tukang
0.0015
oh
Mandor
0.0160
oh
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan
Bata merah kelas I
0.250
m
Semen Portland
77.000
kg
Pasir Pasang
0.130
m
Batu Kerikil
0.020
m
Besi Beton
2.600
kg
Pasir Beton
0.090
m
Tenaga
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
51,330.00
0.00
231,280.00
0.00
0.00
231,280.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
607,700.00
0.00
0.00
607,700.00
0.00
0.00
0.00
0.00
0.00
0.00
2,608,600.00
0.00
59,000.00
0.00
0.00
0.00
210,000.00
0.00
2,608,600.00
0.00
2,596,000.00
0.00
0.00
0.00
12,600.00
0.00
0.00
0.00
0.00
4,561,900.00
0.00
59,000.00
0.00
0.00
0.00
210,000.00
0.00
0.00
51,330.00
0.00
0.00
607,700.00
1.100
0.550
10.300
0.061
0.069
40,120.00
231,280.00
1.100
0.270
3.920
0.056
0.024
0.00
0.00
40,120.00
0.00
0.00
51,330.00
1.600
0.870
0.014
0.014
0.00
40,120.00
ANALISA 253
oh
oh
oh
oh
0.00
0.00
0.00
ANALISA 252
3.000
4.500
0.900
0.9000
0.00
ANALISA 251
1.000
bh
12% Harga Bak
ANALISA 250
0.00
0.00
4,543,000.00
0.00
0.00
0.00
18,900.00
0.00
4,561,900.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 255
ANALISA 256
ANALISA 260
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.054
0.090
0.0090
0.0270
0.00
0.00
oh
oh
oh
oh
0.054
0.090
0.0090
0.0270
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.108
0.180
0.0180
0.0054
0.108
0.180
0.0180
0.0054
0.00
0.00
0.135
0.225
0.0225
0.0068
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
0.00
Bahan
Pipa PVC D 1/2"
Perlengkapan
0.00
1.200
m'
35% Harga Pipa
6,751,200.00
0.00
0.00
Bahan
Pipa Galvanis D 4"
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 262
0.054
0.090
0.0090
0.0270
0.00
0.00
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 261
0.00
0.00
0.00
0.00
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
6,726,000.00
0.00
0.00
0.00
25,200.00
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
6,751,200.00
0.00
59,000.00
0.00
0.00
0.00
210,000.00
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 259
0.00
0.00
0.00
0.00
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 258
oh
oh
oh
oh
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I
0.371
m
Semen Portland
114.000
kg
Pasir Pasang
0.184
m
Batu Koral
0.033
m
Besi Beton
4.850
kg
Pasir Beton
0.120
m
Tenaga
Pekerja
2.160
oh
Tukang Batu
0.720
oh
Kepala Tukang
0.0720
oh
Mandor
0.1080
oh
Tukang Gali
0.1000
oh
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 257
1.420
0.473
0.0470
0.0710
0.00
0.00
0.00
0.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 263
ANALISA 267
0.00
0.00
0.00
0.00
1.200
m'
35% Harga Pipa
0.036
0.060
0.0060
0.0018
0.00
0.00
oh
oh
oh
oh
0.036
0.060
0.0060
0.0018
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.054
0.090
0.0090
0.0027
0.036
0.060
0.0060
0.0018
0.00
0.00
0.081
0.135
0.0135
0.0041
0.00
0.00
0.081
0.135
0.0135
0.0041
0.00
0.00
bh
set
0.030
0.300
0.0300
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
0.00
0.00
1.200
m'
35% Harga Pipa
0.00
0.00
ANALISA 270
oh
oh
oh
oh
0.00
0.00
0.00
ANALISA 269
0.036
0.060
0.0060
0.0018
0.00
0.00
ANALISA 268
1.200
m'
35% Harga Pipa
0.00
ANALISA 266
0.00
0.00
0.00
0.00
ANALISA 265
oh
oh
oh
oh
ANALISA 264
0.036
0.060
0.0060
0.0018
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mandor
ANALISA 271
ANALISA 272
ANALISA 273
XI
ANALISA 274
ANALISA 275
ANALISA 279
1.000
1.000
20.000
0.050
bh
set
kg
m
0.050
0.500
0.0500
0.0025
oh
oh
oh
oh
1.000
0.025
bh
bh
0.010
0.100
0.0100
0.0050
oh
oh
oh
oh
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.010
0.100
0.0100
0.0050
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
kg
0.006
0.060
0.0060
0.0003
oh
oh
oh
oh
0.00
0.650
0.650
0.0650
0.0320
oh
oh
oh
oh
0.00
0.00
0.00
0.00
1.050
1.050
0.1050
0.00525
oh
oh
oh
oh
0.00
0.00
1.022
1.200
0.1200
0.0060
oh
oh
oh
oh
0.00
0.00
0.00
0.00
1.200
1.200
0.1200
0.0060
oh
oh
oh
oh
0.00
Bahan
Pintu Lipat
Tenaga
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
0.00
0.00
0.00
0.00
1.000
0.00
0.00
1.000
0.00
0.00
0.00
1.000
0.00
0.00
1.100
0.080
0.00
0.00
0.00
0.00
bh
1,180,000.00
0.00
1.000
0.00
0.00
0.00
1,180,000.00
0.00
1,180,000.00
ANALISA 278
0.00
ANALISA 277
oh
ANALISA 276
0.0015
0.00
0.00
0.00
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
ANALISA 280
1.050
1.500
0.105
0.0052
oh
oh
oh
oh
1.000
1.050
1.050
0.105
0.0052
oh
oh
oh
oh
1.000
0.350
0.350
0.035
0.00175
oh
oh
oh
oh
1.000
0.350
0.350
0.035
0.00175
oh
oh
oh
oh
11.500
m'
1.200
1.200
0.012
0.0006
oh
oh
oh
oh
1.100
0.020
0.0018
m
kg
m
0.100
0.100
0.010
0.0005
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.100
0.100
0.010
0.0005
0.00
0.00
m
kg
m
0.00
0.00
0.00
1.100
0.020
0.0018
0.00
0.00
0.00
ANALISA 288
ANALISA 287
1.000
0.00
0.00
0.00
0.00
ANALISA 286
oh
oh
oh
oh
0.00
0.00
ANALISA 285
0.080
0.800
0.080
0.004
0.00
0.00
ANALISA 284
ANALISA 283
1.000
0.00
0.00
0.00
0.00
ANALISA 282
oh
oh
oh
oh
ANALISA 281
1.050
1.050
0.1050
0.0052
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Kawat Kassa
Paku Biasa " - 1"
Papan Kayu Kamper
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 289
Besi Strip
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.100
0.020
0.0018
m
kg
m
0.100
0.100
0.010
0.0005
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m
kg
m
0.200
0.200
0.020
0.0010
oh
oh
oh
oh
0.500
0.015
0.0096
0.2500
Lbr
kg
m
kg
0.150
0.400
0.025
0.00125
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.040
0.400
0.025
0.00125
oh
oh
oh
oh
0.00
0.00
0.00
0.00
Lbr
kg
m
kg
0.150
0.250
0.025
0.00125
oh
oh
oh
oh
0.300
0.100
0.0190
0.5000
Lbr
kg
m
kg
0.150
0.250
0.025
0.00125
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
0.00
0.00
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.300
0.100
0.0190
0.5000
0.00
0.00
Lbr
kg
m
kg
0.00
0.00
0.00
0.00
0.00
0.500
0.015
0.0190
0.3000
0.00
0.00
1.100
0.020
0.0250
0.00
0.00
0.00
0.00
0.00
ANALISA 294
0.00
0.00
0.00
0.00
ANALISA 293
oh
oh
oh
oh
0.00
0.00
0.00
ANALISA 292
0.100
0.100
0.010
0.0005
0.00
0.00
0.00
ANALISA 291
m
kg
m
ANALISA 290
1.100
0.020
0.0018
0.00
0.00
0.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 296
ANALISA 297
ANALISA 298
ANALISA 299
ANALISA 300
ANALISA 301
ANALISA 302
ANALISA 303
ANALISA 304
0.060
0.600
0.060
0.003
oh
oh
oh
oh
1.000
bh
0.010
0.500
0.010
0.005
oh
oh
oh
oh
1.000
bh
0.005
0.500
0.005
0.0025
oh
oh
oh
oh
1.000
bh
0.005
0.500
0.005
0.00025
oh
oh
oh
oh
1.000
bh
0.015
0.150
0.015
0.00075
oh
oh
oh
oh
1.000
bh
0.010
0.100
0.010
0.00050
oh
oh
oh
oh
1.000
bh
0.020
0.200
0.020
0.01000
oh
oh
oh
oh
1.000
bh
0.015
0.150
0.015
0.00075
oh
oh
oh
oh
1.000
bh
0.015
0.150
0.015
0.00075
oh
oh
oh
oh
1.000
bh
0.050
0.500
0.050
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mandor
ANALISA 305
ANALISA 306
ANALISA 307
ANALISA 308
ANALISA 309
ANALISA 310
ANALISA 311
ANALISA 312
ANALISA 313
ANALISA 314
0.00250
oh
0.00
0.00
1.000
bh
0.020
0.200
0.020
0.001
oh
oh
oh
oh
0.00
bh
0.050
0.500
0.050
0.0025
oh
oh
oh
oh
0.00
bh
0.010
0.100
0.010
0.0005
oh
oh
oh
oh
bh
0.060
0.600
0.060
0.0030
oh
oh
oh
oh
0.00
bh
0.025
0.250
0.025
0.00125
oh
oh
oh
oh
0.015
0.150
0.015
0.00075
oh
oh
oh
oh
0.00
0.015
0.150
0.015
0.00075
oh
oh
oh
oh
1.100
m
oh
oh
oh
oh
0.00
0.0250
0.250
0.0250
0.00125
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.100
0.00
0.00
0.0165
0.165
0.0165
0.00080
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.100
0.00
0.00
1.100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
0.00
0.00
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bahan
Kaca Cermin
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
ANALISA 315
ANALISA 316
ANALISA 317
ANALISA 318
XIII
ANALISA 319
ANALISA 320
ANALISA 321
ANALISA 322
1.100
0.0150
0.150
0.0150
0.00075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.100
0.0150
0.150
0.0150
0.00075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.0165
0.165
0.0165
0.00080
oh
oh
oh
oh
0.00
0.0150
0.150
0.0150
0.00075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.0150
0.150
0.0150
0.00075
oh
oh
oh
oh
0.00
6.630
9.800
0.0215
bh
kg
m
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.125
0.0125
0.0130
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2700
0.130
0.0130
0.0135
oh
oh
oh
oh
0.00
59,000.00
0.00
bh
0.00
59,000.00
0.00
590,000.00
0.00
613,600.00
0.00
613,600.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
481,440.00
6.630
578,200.00
0.00
590,000.00
0.00
0.00
0.00
0.00
0.00
0.00
613,600.00
26.500
10.400
0.0135
0.00
0.00
578,200.00
0.00
0.00
590,000.00
11.870
10.000
0.0215
0.00
0.00
0.00
0.00
578,200.00
Bahan
Ubin Abu -abu 40 x40 cm
Semen Portland
Pasir Pasang
0.00
0.00
1.100
0.00
0.00
0.00
1.100
0.00
0.00
1.100
0.00
0.00
Bahan
Ubin Warna 40 x 40 cm
0.00
0.00
481,440.00
ANALISA 323
ANALISA 324
ANALISA 325
ANALISA 326
ANALISA 327
ANALISA 328
Semen Portland
Pasir Pasang
Semen Warna
8.160
0.0230
0.9000
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
oh
oh
oh
oh
59,000.00
0.00
0.00
481,440.00
0.00
0.00
0.00
0.00
0.00
0.00
493,240.00
Bahan
Ubin Warna 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
11.870
8.360
0.0230
0.9000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
oh
oh
oh
oh
Bahan
Ubin Warna 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
26.500
8.760
0.0230
0.9000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2700
0.130
0.0130
0.0135
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
516,840.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
oh
oh
oh
oh
Bahan
Ubin Teraso 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
1.870
10.000
0.0215
1.5400
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.125
0.0125
0.0130
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2500
0.120
0.0125
0.0125
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
0.2600
oh
578,200.00
590,000.00
11.870
10.000
0.0215
1.5000
0.00
0.00
578,200.00
0.00
0.00
590,000.00
578,200.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.00
0.00
590,000.00
0.00
0.00
519,200.00
590,000.00
6.930
9.800
0.0215
1.3000
0.00
0.00
519,200.00
0.00
0.00
Bahan
Ubin Granito 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
516,840.00
519,200.00
bh
kg
m
kg
0.00
0.00
516,840.00
0.00
0.00
493,240.00
0.00
493,240.00
0.00
0.00
Bahan
Ubin Teraso 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
590,000.00
0.00
0.00
0.00
590,000.00
Tukang Batu
Kepala Tukang
Mandor
ANALISA 329
ANALISA 330
ANALISA 331
ANALISA 332
ANALISA 333
ANALISA 334
ANALISA 335
0.125
0.0125
0.0130
oh
oh
oh
Bahan
Ubin Teralux Kerang 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
6.250
8.800
0.0215
1.3000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
oh
oh
oh
oh
0.00
0.00
0.00
519,200.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
11.807
10.000
0.0215
1.1250
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6720
0.224
0.0220
0.0340
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.7000
0.340
0.0340
0.0350
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
oh
oh
oh
oh
0.00
59,000.00
0.00
bh
0.00
92,040.00
92,040.00
3.530
0.00
0.00
92,040.00
0.00
0.00
0.00
0.00
0.00
590,000.00
92,040.00
5.300
1.560
0.0040
0.00
0.00
590,000.00
0.00
0.00
519,200.00
590,000.00
11.870
10.000
0.0215
1.5000
0.00
0.00
519,200.00
0.00
0.00
483,210.00
519,200.00
6.250
8.800
0.0215
1.3000
0.00
0.00
483,210.00
0.00
0.00
590,000.00
483,210.00
5.600
8.190
0.0450
1.0000
0.00
0.00
590,000.00
0.00
0.00
519,200.00
590,000.00
Bahan
Ubin Teralux Kerang 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
0.00
0.00
519,200.00
0.00
0.00
Bahan
Plint Ubin PC Abu -abu 10 x 30 cm
0.00
0.00
92,040.00
ANALISA 336
ANALISA 337
ANALISA 338
ANALISA 339
ANALISA 340
ANALISA 341
Semen Portland
Pasir Pasang
1.560
0.0030
kg
m
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
oh
oh
oh
oh
59,000.00
0.00
92,040.00
0.00
0.00
0.00
0.00
0.00
92,040.00
Bahan
Plint Ubin PC Abu - abu 10 x 40 cm
Semen Portland
Pasir Pasang
2.650
1.560
0.0030
bh
kg
m
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
70,800.00
5.300
1.200
0.0030
0.1900
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0800
0.040
0.0040
0.0040
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0800
0.040
0.0040
0.0040
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
0.0800
0.040
0.0040
oh
oh
oh
92,040.00
70,800.00
2.650
1.200
0.0030
0.1000
0.00
0.00
92,040.00
0.00
0.00
70,800.00
92,040.00
3.530
1.560
0.0030
0.1900
0.00
0.00
70,800.00
0.00
0.00
97,350.00
70,800.00
2.650
1.200
0.0030
0.1000
0.00
0.00
97,350.00
0.00
0.00
70,800.00
97,350.00
3.330
1.650
0.0032
0.1000
0.00
0.00
70,800.00
0.00
0.00
92,040.00
0.00
92,040.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
70,800.00
0.00
0.00
0.00
0.00
0.00
70,800.00
Mandor
ANALISA 342
ANALISA 343
ANALISA 344
ANALISA 345
ANALISA 346
ANALISA 347
ANALISA 348
0.0040
oh
0.00
70,800.00
Bahan
Plint Ubin Granito 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
2.650
1.200
0.0030
0.1000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
3.330
1.650
0.0032
0.1000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
oh
oh
oh
oh
Bahan
Plint Ubin Teralux Kerang 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
3.330
1.650
0.0032
0.1000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.9000
0.090
0.0090
0.0045
oh
oh
oh
oh
Bahan
Plint Ubin Teralux Marmer 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
2.500
1.650
0.0032
0.1000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
97,350.00
0.00
97,350.00
0.00
0.00
97,350.00
bh
kg
97,350.00
97,350.00
3.330
1.650
0.00
0.00
97,350.00
0.00
0.00
0.00
0.00
0.00
0.00
97,350.00
97,350.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.00
0.00
97,350.00
0.00
0.00
97,350.00
97,350.00
1.700
1.650
0.0032
0.1000
0.00
0.00
97,350.00
0.00
0.00
Bahan
Plint Ubin Teralux Marmer 10 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna
97,350.00
97,350.00
2.500
1.650
0.0032
0.1000
0.00
0.00
97,350.00
0.00
0.00
70,800.00
97,350.00
Bahan
Plint Ubin Granito 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
0.00
0.00
70,800.00
0.00
0.00
Bahan
Plint Ubin Teralux Marmer 10 x 30 cm
Semen Portland
0.00
97,350.00
0.00
97,350.00
ANALISA 349
ANALISA 350
ANALISA 351
ANALISA 352
ANALISA 353
ANALISA 354
ANALISA 355
Pasir Pasang
Semen Warna
0.0032
0.1000
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bahan
Bahan Teraso Cor
0.0036
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.0036
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
m
kg
m
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2700
0.150
0.0150
0.0135
oh
oh
oh
oh
Bahan
Ubin Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
5.0000
11.3800
0.0420
1.5000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0900
0.090
0.0090
0.0045
oh
oh
oh
oh
5.000
1.650
0.0032
0.1200
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0900
0.090
0.0090
0.0045
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
97,350.00
0.00
97,350.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
97,350.00
0.00
97,350.00
0.00
0.00
0.00
0.00
0.00
0.00
50,150.00
0.00
59,000.00
671,420.00
97,350.00
bh
kg
0.00
0.00
671,420.00
0.00
0.00
97,350.00
5.000
0.850
0.00
671,420.00
5.000
1.650
0.0032
0.1000
0.00
0.00
0.00
0.00
0.00
0.00
1.0500
14.1400
0.0400
0.00
0.00
0.00
0.00
Bahan
Bahan Teraso Cor
0.00
0.00
0.00
50,150.00
0.00
50,150.00
ANALISA 356
ANALISA 357
ANALISA 358
ANALISA 359
ANALISA 360
ANALISA 361
Pasir Pasang
Semen Warna
0.0022
0.0800
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0900
0.090
0.0090
0.0045
oh
oh
oh
oh
3.500
0.080
bh
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0800
0.080
0.0080
0.0040
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
671,420.00
50.000
11.380
0.042
1.500
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
0.6200
0.350
0.0350
oh
oh
oh
671,420.00
671,420.00
35.000
11.380
0.042
1.500
0.00
0.00
671,420.00
0.00
0.00
671,420.00
671,420.00
16.000
11.380
0.042
1.500
0.00
0.00
671,420.00
0.00
0.00
671,420.00
671,420.00
25.000
11.380
0.042
1.500
0.00
0.00
671,420.00
0.00
0.00
671,420.00
671,420.00
44.000
11.380
0.042
1.500
0.00
0.00
671,420.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
671,420.00
0.00
0.00
0.00
0.00
0.00
671,420.00
Mandor
ANALISA 362
ANALISA 363
ANALISA 364
ANALISA 365
ANALISA 366
ANALISA 367
ANALISA 368
0.0300
oh
0.00
671,420.00
Bahan
Ubin Keramik 33 x 33 cm
Semen Portland
Pasir Pasang
Semen Warna
10.000
11.380
0.042
1.500
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
10.000
11.380
0.042
1.500
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
Bahan
Mozaik 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
12.000
14.150
0.039
2.000
bh
kg
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
Bahan
Feltex 100% Wool - T - 21
Lem Vinyl
1.050
0.350
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.1700
0.170
0.0170
0.0085
oh
oh
oh
oh
1.050
0.350
m
kg
0.00
59,000.00
0.00
0.00
Tenaga
834,850.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
834,850.00
0.00
0.00
0.00
0.00
0.00
0.00
834,850.00
834,850.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.00
0.00
834,850.00
0.00
0.00
671,420.00
834,850.00
1.052
14.150
0.039
2.000
0.00
0.00
671,420.00
0.00
0.00
Bahan
Marmer
Semen Portland
Pasir Pasang
Semen Warna
671,420.00
671,420.00
33.000
11.380
0.042
1.500
0.00
0.00
671,420.00
0.00
0.00
671,420.00
671,420.00
Bahan
Ubin Keramik 33 x 33 cm anti slip
Semen Portland
Pasir Pasang
Semen Warna
0.00
0.00
671,420.00
0.00
0.00
Bahan
Carpet 80% Wool, 20% Nylon
Lem Vinyl
0.00
0.00
0.00
0.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 369
ANALISA 370
ANALISA 371
ANALISA 372
0.1700
0.170
0.0170
0.0085
oh
oh
oh
oh
Bahan
Underlyer, tebal 6 mm / Rubber Corrugated
1.050
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.1200
0.120
0.0120
0.0060
oh
oh
oh
oh
1.050
0.350
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.1700
0.170
0.0170
0.0085
oh
oh
oh
oh
ANALISA 374
m
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6500
0.350
0.0350
0.0325
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.6200
0.500
0.0500
0.0300
oh
oh
oh
oh
83.000
9.300
0.018
1.500
bh
kg
m
kg
0.6200
0.500
0.0500
0.0300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
0.6000
0.450
0.0450
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
45.000
9.300
0.018
1.500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.6000
0.450
0.0450
0.0300
0.00
0.00
bh
kg
m
kg
0.00
0.00
0.00
45.000
9.300
0.018
1.500
0.00
0.00
bh
kg
m
kg
0.00
0.00
0.00
0.00
0.00
1.050
0.600
Bahan
Porselen 15 x 15 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 375
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bahan
Carpet
Lem Vinyl
Bahan
Porselen 11 x 11 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.00
0.00
Bahan
Porselen 11 x 11 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 373
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mandor
ANALISA 376
ANALISA 380
0.6000
0.450
0.0450
0.0300
oh
oh
oh
oh
25.000
9.300
0.018
1.500
bh
kg
m
kg
0.6000
0.450
0.0450
0.0300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6000
0.450
0.0450
0.0300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
bh
kg
m
kg
0.6000
0.450
0.0450
0.0300
oh
oh
oh
oh
50.000
9.300
0.018
1.500
bh
kg
m
kg
0.6000
0.450
0.0450
0.0300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6000
0.450
0.0450
0.0300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
0.6000
0.100
0.0450
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.000
9.300
0.018
1.500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
0.00
0.00
0.00
0.00
0.00
0.00
45.000
9.300
0.018
1.500
0.00
0.00
100.000
9.300
0.018
1.500
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
kg
0.00
0.00
100.000
9.300
0.018
1.500
0.00
0.00
0.00
0.00
0.00
ANALISA 382
bh
kg
m
kg
ANALISA 381
50.000
9.300
0.018
1.500
0.00
ANALISA 379
0.00
ANALISA 378
oh
ANALISA 377
0.0300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Mandor
ANALISA 383
ANALISA 387
oh
oh
oh
oh
1.020
12.440
0.025
1.500
m
kg
m
kg
0.7200
0.650
0.0650
0.0350
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
bh
kg
m
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
1.050
11.750
0.035
bh
kg
m
0.6200
0.350
0.0350
0.0300
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1500
0.150
0.0150
0.0075
oh
oh
oh
oh
0.00
0.00
0.00
bh
kg
0.1500
0.150
0.0150
0.0075
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Bahan
Vinyl Asbes 30 x 30 cm
Lem Vinyl
bh
kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.050
0.350
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.050
0.350
0.00
0.00
bh
kg
0.00
0.00
0.00
0.00
0.00
11.050
0.350
0.00
0.00
1.050
11.750
0.035
0.00
0.00
0.00
0.00
0.00
0.00
bh
kg
m
0.00
0.00
80.000
12.440
0.025
0.00
0.00
0.00
0.00
0.00
ANALISA 390
0.6000
0.125
0.0125
0.0300
0.00
0.00
0.00
0.00
ANALISA 389
bh
kg
m
kg
ANALISA 388
50.000
9.300
0.018
1.500
0.00
ANALISA 386
0.00
ANALISA 385
oh
ANALISA 384
0.0300
0.00
0.00
0.00
0.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 391
ANALISA 395
0.00
0.00
0.00
0.00
1.100
0.250
m
kg
0.7500
0.170
0.0170
0.0085
oh
oh
oh
oh
0.00
0.00
kg
0.1200
0.120
0.0120
0.0060
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
0.1200
0.120
0.0120
0.0060
oh
oh
oh
oh
0.00
m
kg
0.1200
0.120
0.0120
0.0060
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
0.1500
0.000
0.0000
0.0025
oh
oh
oh
oh
0.00
kg
0.1500
0.000
0.0000
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
kg
0.1500
0.000
0.0000
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.050
0.00
0.00
0.00
0.050
0.00
0.00
0.050
0.00
0.00
0.00
0.002
0.050
0.00
0.00
5.000
0.00
0.00
0.00
0.00
3.000
0.00
0.00
ANALISA 399
oh
oh
oh
oh
0.00
0.00
0.00
ANALISA 398
0.1500
0.150
0.0150
0.0075
0.00
0.00
PEKERJAAN PENGECATAN
1 m Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
ANALISA 397
bh
kg
1 m Plint Kayu 2 x 10 cm
Bahan
Papan Kayu Jati
Paku Skrup 3.5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
XIV
ANALISA 396
11.050
0.350
0.00
ANALISA 394
0.00
0.00
0.00
0.00
ANALISA 393
oh
oh
oh
oh
ANALISA 392
0.1500
0.150
0.0150
0.0075
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sabun
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
ANALISA 400
ANALISA 404
ANALISA 405
ANALISA 406
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
40.000
10.000
kg
lt
0.00
0.00
0.00
0.00
0.00
0.00
sewa / Hr
1.6000
1.600
0.8000
0.5000
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.080
0.020
0.010
kg
kg
kg
0.0400
0.040
0.0040
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
kg
kg
kg
0.0700
0.075
0.0075
0.0025
oh
oh
oh
oh
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
0.200
0.150
0.170
0.260
kg
kg
kg
kg
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0700
0.009
0.0060
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.200
0.150
0.170
0.350
kg
kg
kg
kg
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0700
0.105
0.0040
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.200
0.150
0.170
0.350
kg
kg
kg
kg
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0700
0.105
0.0040
0.0025
oh
oh
oh
oh
lt
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.360
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
0.00
0.00
0.00
0.00
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
0.00
0.00
0.150
0.170
0.170
0.00
0.00
0.00
0.00
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Teak Oil
Tenaga
0.00
ANALISA 403
0.1500
0.000
0.0000
0.0025
0.00
ANALISA 402
kg
1 m Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2 .
Bahan
Pasir Silika
BBM
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
ANALISA 401
0.050
0.00
0.00
0.00
Pekerja
Tukang Cat
Kepala Tukang
Mandor
ANALISA 407
0.350
lt
0.1000
0.000
0.0000
0.0060
oh
oh
oh
oh
0.00
lt
kg
Lbr
bh
0.1600
0.160
0.0160
0.0025
oh
oh
oh
oh
0.100
0.100
0.260
kg
kg
kg
0.0200
0.063
0.0063
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
Lbr
ikat
m
kg
0.1500
0.001
0.0001
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
0.0400
0.005
0.0005
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
m
kg
0.0200
0.200
0.0020
0.0025
oh
oh
oh
oh
0.00
0.00
0.00
0.00
Bahan
Meni Besi
Kuas
kg
bh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.100
0.010
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.200
0.200
0.00
0.00
0.00
0.00
0.00
0.00
0.002
0.300
0.00
0.00
0.100
0.250
0.002
0.150
0.00
0.00
0.00
0.150
0.050
0.100
0.010
0.00
0.00
ANALISA 414
0.00
0.00
0.00
0.00
ANALISA 413
oh
oh
oh
oh
0.00
0.00
0.00
0.00
ANALISA 412
0.0400
0.063
0.0630
0.0025
0.00
0.00
0.00
0.00
1 m Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
Plamir
Cat Dasar
Cat Tembok vinilex
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
ANALISA 411
lt
lt
Lbr
ANALISA 410
0.150
0.372
2.000
0.00
0.00
0.00
0.00
ANALISA 409
oh
oh
oh
oh
ANALISA 408
0.0400
0.063
0.0630
0.0025
0.00
0.00
0.00
0.00
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
ANALISA 415
ANALISA 419
0.100
0.010
0.002
kg
bh
m
0.2500
0.225
0.0225
0.0075
oh
oh
oh
oh
0.00
0.00
0.00
0.100
0.100
0.040
0.040
0.010
0.002
kg
kg
kg
kg
lt
m
0.0060
0.006
0.0225
0.0075
oh
oh
oh
oh
0.300
kg
0.0060
0.060
0.0120
0.0060
oh
oh
oh
oh
0.110
0.170
0.080
kg
kg
kg
0.5000
0.800
0.3000
0.2000
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.300
kg
0.4000
0.700
0.2000
0.2000
oh
oh
oh
oh
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um
Bahan
Cat Dasar
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.00
0.00
0.00
0.00
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um
Bahan
Cat Dasar
Cat Antara
Cat Penutup
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.00
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um
Bahan
Meni Besi
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
ANALISA 418
0.00
0.00
0.00
0.00
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um
Bahan
Meni ( Read Lead ) A
Meni ( Read Lead ) B
Alluminium C
Alluminium B
Pengencer
Perancah Kayu
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
ANALISA 417
oh
oh
oh
oh
ANALISA 416
0.0200
0.200
0.0200
0.0100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NO
JENIS UPAH
SPESIFIKASI
harga real
Pekerja
Kenek
Tukang gali
Kepala tukang batu
Tukang batu
Kepala tukang kayu
Tukang kayu
Kepala tukang besi
Tukang besi
Kepala tukang cat
Tukang Cat
Tukang aspalt
Mandor/ pengawas
Instalator
Pembantu instalator
Tukang babat rumput
Tukang taman
Kepala tukang pasang pipa
Tukang pasang pipa
Operator alat besar
Pembantu operator alat besar
Tukang las
NO
JENIS BAHAN
Akustik 30 x 30 cm
Akustik 30 x 60 cm
Akustik Arm Strong Ukuran 30 x 120 cm
Akustik Armstrom 60 x 120cm
Alang - alang
Alluminium B
Alluminium C
Ampelas
Asbes
Asbes Gelombang
Atap Alluminium Gelombang tebal 0.55
Badkip
Bahan Teraso Cor
Bak Teraso
Bak cuci Stainless steel
Bak cuci Teraso
Bak Fiberglass
Balok Kayu Borneo
Balok Kayu Jati
Balok Kayu Kamper
SATUAN
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
oh
SPESIFIKASI
harga real
SATUAN
lbr
lbr
lbr
lbr
ikat
Kg
Kg
Lbr
lbr
lbr
m2
bh
m3
bh
bh
bh
bh
m3
m3
m3
m3
bh
Door Closer
Door Holder
Door Stop
Engsel Angin
Engsel Jendela
Engsel Pintu
Feltex 100% Wool - T - 21
Flincote / Meni Besi
Floor Hardener Ferrovax
Formika 4' x 3'
Formtie / penjaga jarak bekisting
Genteng Aspal
Genteng Beton
Genteng Bubung Kodok
Genteng Bubung Palentong
Genteng Decra Bond
Genteng Kodok
Genteng Metal
Genteng Palentong
btg
Bh
Kg
Kg
m3
m3
m3
Kg
m3
m3
Bh
Bh
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
m2
m2
vinilex
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
btg
btg
btg
Bh
Bh
Bh
Bh
Bh
Bh
m2
Kg
Kg
lbr
bh
lbr
lbr
bh
bh
lbr
bh
lbr
bh
bh
lbr
lbr
m3
m2
m2
bh
m2
m2
m2
m2
m2
Bh
m3
Kg
m3
Kg
m2
Kg
m2
m2
m2
Kg
m3
m3
m3
m3
m3
m3
m'
m3
Bh
Bh
Bh
Bh
Bh
bh
bh
bh
hr
Rp
210,000.00 m3
bh
Bh
Bh
Bh
bh
Bh
Bh
Bh
Bh
Kg
Lt
Kg
m'
bh
Kg
M2
Kg
Kg
Lt
lt
Kg
bh
lbr
m2
lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m3
m3
m3
m3
lbr
m2
Rp
210,000.00 m3
m3
Kg
m3
m3
Kg
lbr
lbr
Ltr
Ltr
Ltr
m3
Kg
m2
m2
m2
m2
bh
m'
bh
Kg
Kg
Bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
bh
Bh
Bh
Bh
Bh
Bh
Bh
m'
bh
gln
Bh
Lt
Ltr
m2
lbr
Kg
bh
Kg
Kg
Kg
Rp
59,000.00 Kg
Kg
Kg
Lbr
lbr
lbr
Lbr
Lbr
m2
Kg
lbr
Bh
Kg
m2
Kg
Ltr
lbr
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
bh
m2
Ltr
bh
bh
bh
bh
m2
m3
set
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
No.
I
001
002
003
004
005
006
007
008
009
010
011
012
013
014
II
015
016
017
018
019
020
021
022
023
024
025
026
III
027
028
029
IV
030
031
032
033
V
034
035
036
037
038
039
040
041
042
043
044
045
046
047
048
049
050
051
052
053
054
055
056
057
058
059
060
061
062
063
064
065
VI
066
067
068
069
070
071
072
073
074
075
076
077
078
079
080
081
082
083
084
085
086
087
088
089
090
091
092
093
094
095
096
097
098
099
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
VII
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
VIII
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
IX
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
X
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
XI
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
XII
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
XIII
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
XIV
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
Jumlah Total
Keterangan
PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m
1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m
1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank
1 m Pek. Kantor Direksi Keet , dengan lantai plesteran
1 m Pembuatan Gudang Semen dan Alat - alat
1 m Pembuatan Rumah Jaga / Konstruksi Kayu
Membersihkan Lapangan dan Perataan
1 m Pembuatan Bedeng Buruh
1 m Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm
1 m Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm
1 m Pembuatan Jalan Sementara
1 m Bongkaran Beton Bertulang
1 m Bongkaran Dinding Tembok Bata Merah
PEKERJAAN TANAH
1 m Pek. Galian Tanah Biasa Max Kedalaman 1 m'
1 m Pek. Galian Tanah Biasa Max Kedalaman 2 m'
1 m Pek. Galian Tanah Biasa Max Kedalaman 3 m'
1 m Pek. Galian Tanah Keras Max Kedalaman 1 m'
1 m Pek. Galian Tanah Cadas Max Kedalaman 1 m'
1 m Pek. Galian Tanah Lumpur Max Kedalaman 1 m'
1 m Pek. Stripping 1 m
1 m Pembuangan Tanah sejauh 150 m
1 m Urugan Tanah Kembali
1 m Pemadatan tanah
1 m Pek. Urugan Pasir
1 m Pemasangan Lapisan ijuk
PEKERJAAN PONDASI
1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang
1 m Pasangan Batu kali 1 Pc : 3Ps
1 m Pasangan Batu kali 1 Pc : 5Ps
PEKERJAAN DINDING
1 m Pasangan Bata Merah 1Pc : 3Ps 1 Bata
1 m Pasangan Bata Merah 1Pc : 5Ps 1 Bata
1 m Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, t
Jumlah Total
Volume Sat
m'
m'
m'
m'
m'
m2
m
m'
m2
m
m2
m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m'
m3
m3
m2
m2
m2
Jumlah Harga
Material
Jumlah Harga
Upah
Jumlah
150,440.00
401,390.00
120,940.00
0.00
2,117,500.00
636,300.00
0.00
0.00
1,078,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
2,934,050.00
23,128,000.00
8,024,000.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
1,944,050.00
1,309,800.00
847,830.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m2
571,120.00
0.00
Rp0
Rp0
Rp0
m2
382,320.00
254,880.00
254,880.00
108,560.00
177,000.00
0.00
0.00
842,520.00
637,200.00
512,120.00
430,110.00
368,160.00
0.00
914,500.00
693,250.00
559,320.00
468,460.00
1,100,350.00
834,850.00
671,420.00
483,210.00
417,130.00
334,530.00
548,700.00
417,130.00
29,500.00
0.00
0.00
254,880.00
254,880.00
29,500.00
472,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m3
m
m2
m2
m
m'
m2
m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m2
m'
m'
m'
m'
m'
m'
m'
m2
m
m2
m
3
3
55.8 m
m3
m
m'
m'
m'
m'
m'
m'
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
604,700.00
13,153,900.00
11,919,100.00
10,509,400.00
13,961,000.00
16,803,500.00
21,032,600.00
21,264,600.00
23,036,500.00
28,494,100.00
28,494,100.00
20,107,500.00
17,463,000.00
21,930,200.00
23,868,800.00
36,503,400.00
23,868,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00 Rp1,121,998,500
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0 Rp1,121,998,500
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
kg
kg
kg
m2
m
m2
m
m'
m'
m'
m'
m'
m'
m'
m'
m2
m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19,330,000.00
19,330,000.00
19,330,000.00
19,330,000.00
19,330,000.00
19,330,000.00
19,330,000.00
239,150.00
329,540.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
0.00
0.00
472,000.00
472,000.00
472,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m2
m2
m
m'
m'
m'
m'
m'
m'
m'
m'
m'
m2
m
m'
m'
m'
m'
m'
m2
m
m2
m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m2
m2
m
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
354,000.00
354,000.00
354,000.00
0.00
354,000.00
0.00
7,080,000.00
0.00
0.00
40,120.00
51,330.00
231,280.00
607,700.00
2,608,600.00
4,561,900.00
6,751,200.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m'
m'
m'
unit
unit
unit
unit
kg
m2
m
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
0.00
0.00
0.00
0.00
1,180,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
m2
m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
578,200.00
590,000.00
613,600.00
481,440.00
493,240.00
516,840.00
519,200.00
590,000.00
578,200.00
590,000.00
519,200.00
590,000.00
483,210.00
519,200.00
590,000.00
92,040.00
92,040.00
92,040.00
70,800.00
97,350.00
70,800.00
92,040.00
70,800.00
70,800.00
97,350.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m2
m2
m
m'
m'
m'
m'
m2
m
97,350.00
97,350.00
97,350.00
97,350.00
97,350.00
0.00
0.00
0.00
671,420.00
97,350.00
97,350.00
50,150.00
0.00
671,420.00
671,420.00
671,420.00
671,420.00
671,420.00
671,420.00
671,420.00
671,420.00
834,850.00
834,850.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
0.00
m
0.00
2
m
0.00
2
m
0.00
2
m
Kebersihan Sa 2.
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
m
0.00
2
sional, tebal 200 um m
0.00
2
m
r, tebal 200 um
0.00
2
sional, tebal 200 um m
0.00
2
m tebal 200 um 0.00
m 1 Lapis Cat Mutakhir,
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
m2
m