Você está na página 1de 3

1.

BSC6900 uplink frequency scan


1) Select the testing cellright click and choose configure frequency scan

2)

Change the start time 2 minute later than the current time to make sure the system have enough time to prepare the test, set the duration to 5 minute. Select all P-GSM900 frequency, and click start.

3)

After the Execuation Succeed message, close the configure frequency scan task, and right click the cell to choose Query Frequency Scan immediately.

4)

After 5 minute, the result will be appear, select all and copy to Excel and make the chart. (Normally only use Main Average and Sub Average.

Você também pode gostar