Great cities need great buildings. Over time, these iconic buildings become visual statements of the era and the place they represent.
Capital Gate is a building unlike any other; it was conceived to provide our countrys capital with a tower that signifies the citys progress and evolution. The towers distinctive futuristic design, aesthetic splendour and technical excellence make it a modern marvel and a celebration of human achievement that reflects Abu Dhabis dynamism. I invite you to learn more about this remarkable building and I hope to welcome you soon to Capital Gate and to Abu Dhabi. Sultan Bin Tahnoon Al Nahyan Chairrman
CAPItAL GAte
CAPItAL GAte
VIsIon
In A CIty of InfInIte PossIbILItIes, who wILL stAnd out from the Crowd?
CAPItAL GAte
CAPItAL GAte
ArrIVAL
CAPItAL GAte
CAPItAL GAte
fIrst sIGht
10
CAPItAL GAte
CAPItAL GAte
11
CAPItAL GAte
12
CAPITAL GATE
CAPItAL GAte
14
CAPITAL GATE
CAPITAL GATE
15
CAPItAL GAte
those whose InnAte quALItIes meAn thAt they wILL ALwAys be reCoGnIsed.
16
CAPItAL GAte
CAPItAL GAte
17
AdneC
ConneCted to the AwArd wInnInG Abu dhAbI nAtIonAL exhIbItIon Centre, we Are At the heArt of busIness LIfe In Abu dhAbI
18
CAPItAL GAte
CAPItAL GAte
19
CAPItAL Centre
CAPItAL GAte Is the sIGnAture tower of the CAPItAL Centre And AdneC deVeLoPments
20
CAPITAL GATE
CAPITAL GATE
21
AmenItIes
22
CAPITAL GATE
CAPITAL GATE
23
wIth the fIVe-stAr hyAtt CAPItAL GAte hoteL on-sIte, we offer A ComPLete enVIronment for An eLIte busIness CommunIty
24
CAPITAL GATE
CAPITAL GATE
25
offICe fLoor
26
CAPItAL GAte
CAPItAL GAte
27
VIew out
28
CAPItAL GAte
CAPItAL GAte
29
ConneCted
20 minutes
YAS ISLAND SAADIYYAT ISLAND
PORT ZAYED
To Dubai
15 minutes
Abu Dhabi Airport MADINAT ZAYED
eR oa
AL KHALIDIYAH Fo u
rth
10 minutes
Al Bateen Airport
Road
Al
a Rah
Bea
ch
ch
Co rn i
rn
Emirates Palace
MUSSALA EL EID
Ro a
twofour54 DIPLOMATIC AL MUSHRIF Shk. Zayed DISTRICT Sports City Shk. ZayedGrand Mosque Khaleej Al Arab i Street (30th St reet)
Airport
Less than 5 mins Hyatt Capital Gate The Abu Dhabi National Exhibition Centre Abu Dhabi Hall Aloft Abu Dhabi Capital Centre Embassies District Less than 10 mins Sheikh Zayed Grand Mosque Zayed Sports City twofour54 Armed Forces Officers Club Al Bateen Executive Airport Approx 15 mins Abu Dhabi Golf Course Abu Dhabi International Airport Al Raha Beach Musafah Industrial City Approx 20 mins Downtown Abu Dhabi Emirates Palace The Corniche Saadiyat Island Yas Island Yas Marina Circuit Port Zayed
AD N EC
Al Karma
C AP I TAL C E N T R E
h Street
Al Kh
alee
j Al A
rabi S
t re e
30th
S t re e
30
CAPITAL GATE
CAPITAL GATE
31
SITE PLAN
Gate 8
mah Al Khara St h Street reet (24t )
Gate 7
Residential
e 33rd Stre
Premier Inn
Mixed Use
Commercial
Coral
aloft Hotel
Capital Plaza
Gate 5 Concourse
1st Street
Rotana
Element Aruba
Atrium
Rotana
Rotana Centro
Gate 1
Mixed Use
Millenium Hotel
VIP Entrance
Khaleej Al Arabi Street (aka 30th Street or Coast Road) To Abu Dhabi (Emirates Palace) Marina Bridge To Abu Dhabi Airport, Dubai
Capital Marina
32
CAPITAL GATE
SChEduLE OF AREAS
FLOOR PLANS
Level 15
Floor area: Gross 1,291 sq m Net 1,029 sq m
Level 14
Floor area: Gross 1,305 sq m Net 1,025 sq m
Level 13
Floor area: Gross 1,308 sq m Net 1,047 sq m
Level 12
Floor area: Gross 1,391 sq m Net 1,040 sq m
Level 11
Floor area: Gross 1,317 sq m Net 1,056 sq m
Level 10
Floor area: Gross 1,391 sq m Net 1,041 sq m
Level 09
Floor area: Gross 1,305 sq m Net 1,040 sq m
Level 08
Floor area: Gross 1,306 sq m Net 1,025 sq m
Level 07
Floor area: Gross 1,298 sq m Net 1,033 sq m
Level 06
Floor area: Gross 1,305 sq m Net 1,024 sq m
Level 05
Floor area: Gross 1,293 sq m Net 1,027 sq m
Level 04
Floor area: Gross 1,293 sq m Net 1,012 sq m
Level 03
Floor area: Gross 1,283 sq m Net 1,008 sq m
Level 02
Floor area: Gross 1,287 sq m Net 994 sq m
33
CAPITAL GATE
34
CAPITAL GATE
CAPITAL GATE
35
Area
Area
36
CAPITAL GATE
CAPITAL GATE
37
Area
Area
Manager 01
Informal Meeting
Manager 01
Manager 03
Workstations 24 PAX
Reception/ Waiting
Lift Lobby Reception/ Waiting Fax/copy area Meeting (6 PAX) Fax/copy Boardroom (14 PAX) Meeting (4 PAX) Workstations (6 PAX)
Meeting (4 PAX)
Store Room
Seating
Fax/copy area
Workstations 18 PAX
Pantry/ Breakout
Pantry/ Breakout
38
CAPITAL GATE
CAPITAL GATE
39
SummAry SPECIfICATION
Shell and Core Commercial Office Space (Level 2 to 15)
STRUCTURAL Design Loads Office area superimposed Dead Load = 2.4kPa, Live Load = 5.0kPa Cladding Fully unitised facade curtain walling system is made up from 2 storey height diamonds which make up the free form facade comprising double glazed factory sealed triangular glass units and steel section frames. Dimensional Information Floor to floor height: 4.00m (4000mm) Floor to ceiling height: 2.50m 2.75m (2500mm2750mm) Ceiling to void average: 80m (800mm) Raised floor height: 15m (150mm) All dimensions are approximate ELECTRICAL SERVICES General All common area lighting, power, two escape staircases and lifts are fed from the landlords distribution network. One passenger lift and one service lift for office levels are backed up by standby generator power, for use in case of emergency. All life safety systems and essential services are backed up by the standby generator. In addition, some of the life safety system and essential system outlets are backed up by uninterrupted power supply (UPS) to ensure availability of power at all times. Power supply The building is supplied at 11KV from an Abu Dhabi Distribution Company (ADDC) primary substation and network to basement sub-station. Power is transformed to the operating voltage of 415 volts by 5, 1500KVA transformers installed in the substation. Main distribution boards (MDBs) are fed from the transformers installed in the basement low voltage (LV) switchgear room, adjacent to the substation. MDBs distribute power to the development, through cable routes, rising bus bars, sub-main distribution boards (SMDBs) and distribution boards (DBs).
Power Feed Office Areas are provided with 63 Amp three phase power supply for smaller units and 100 Amp three phase power supply for larger units, locally for each office unit with a local Isolator (based on three offices per floor). These are fed from the sub main distribution boards in the electrical room (each floor), through a KWH meter provided in the meter room. Each tenant will provide a distribution board as per their load requirements and connected to the local Isolator provided by the Landlord. Tenant supplied distribution boards are as per ADDC/ Abu Dhabi Water and Electricity Authority (ADWEA) regulations. Tenants will obtain the necessary approvals from the authorities for their layouts and power distribution requirements. KWH meters shall be provided by ADDC/ADWEA Authorities after tenant fit-out completion and inspections of the electrical installation are carried out by ADDC/ADWEA. No separate provision for power backed by standby generator has been made for the tenant areas except the emergency lighting. MECHANICAL SERVICES HVAC System General Fresh air ventilation, fan coil unit (FCU) systems, fresh air handling units (AHUs), smoke extract ventilation system, variable volume air-conditioning system, and chilled water (CW) system are provided. The cooling requirement is served by TABREED district chilled water network, facilitated by an energy transfer station at the basement and level 1 of the building as the primary supply of cold water network consisting of two units of rated heat exchangers. The resulting or secondary chilled water lines will be metered as being conveyed by four rated pumps serving AHUs and FCUs mounted at all floors of the building. Office Areas The office areas including basement, ground and mezzanine are served by centralised AHUs (2 Nos.) located at Level 1. The office areas are provided with the following service stub-outs, including supply and return air ducts (for the public areas in each floor) and metered chilled water supply and return lines (provisions only inside the office areas), that are interfaced with building management system (BMS) control. FCUs for each office area will be provided by the tenant. The cooling criteria is based on the following data: A) Average year round summer and winter design conditions in offices are to be maintained at 230C and 21C 1C, with relative humidity set at 50% 5% and; B) The outdoor ventilation rate is 8.0 l/s/ person with approx. 8 12 air changes per hour (ACH).
PLUMBING AND DRAINAGE General Sanitary wares, water tanks, domestic water systems, soil/waste/vent and overflows, irrigation system and rainwater system have been included. The main source of the buildings potable water, from the ADWEA distribution line, is stored in a tank at the basement floor, which undergoes a filtration system. The concrete water tank is a double compartment type, allocated for domestic water, fire protection system, and irrigation source. Aside from preliminary filtration, the domestic water passes through a proven anti-legionella chemical dosing system. Water tanks are provided at basement, level 1 and level 17, with compliance to ADDC requirements of minimum 2 days consumption storage. The plumbing system consists of metered cold water (CW) network, filter cooled cold water supply (FCCWS) and centralised hot water (HW) distribution. The FCCWS will be available for guest rooms at hotel floors and kitchen facilities at all designated floors. The HW network for the office toilets, hotel and dining area is enhanced with heat tracing system for fast acquisition of hot water and uniform water temperature supply of 55C. The drainage system is laid at all areas where water service is available and tapped to the main drainage point. The drainage at guest floors is provided with a noise barrier or acoustic lagging isolator for low noise emission. Office Area Separate toilets for male and female are present on each office floor. Each office area is provided with: A) Cold water stub-out with meter provision to be applied to ADWEA when occupied and; B) Soil, waste, and vent pipes for future pantry or toilet provisions.
FIRE FIGHTING General Sprinkler installation, external hydrant system, manual fire protection system or fire extinguishing, gas fire suppression system, fire alarms, and fire detectors have been included. The building consists of manual and automatic firefighting equipment for complete building protection. The fire sprinkler system is entirely independent from the hydrant network as required by Abu Dhabi Civil Defense Authority (ADCDA). All floors are provided with accepted zonal fire sprinkler suppression with individual zonal control valve. Each floor has four fire hose cabinets (FHC) at the common area, which can accommodate up to 30m standard radius of service. All electrical rooms are supplied with either automatic fire extinguishers or FM 200 or foam type fire suppression systems. Office Area The office areas are fitted with the following: A) Upright sprinkler heads for fire fighting and; B) Recessed sprinkler stub outs. OTHER SERVICES Fire Alarm and Public Address Evacuation systems Smoke detectors have been provided within each office area. Smoke detectors are provided with approx. two meters of additional cable for lowering in to the ceilings. Voice evacuation speakers are provided within each office space, for announcements. Emergency Lighting Sufficient emergency lights are provided with additional length of cable to lower in to the ceilings, together with one wall mounted type exit light for installing above the entrance/exit door for each office space. All the emergency and exit lights are backed up by the central battery system, which is backed up by the standby generator.
Telecommunication State-of-the-art passive connectivity solutions allow tenants to deploy a full range of telecommunications services from the UAEs leading service providers. Optical fibre connections with up to 10G capacity are available to tenants for connections to service providers. Tenants must install their own I.T. infrastructure in their office areas. Tenants will be required to: Install and maintain the structured cabling and network infrastructure within their leased space. Install and manage server room /data centre as required for their business. Install and manage their own back office, voice and application server systems. Obtain services from the telecommunications service providers directly. Additional services, including voice, data, high speed data links, video and television access, may be requested from ADNEC, although tenants are advised that these may be subject to leasing agreements and availability. Security Security system has been provided with 24 hour physical security presence incorporating CCTV surveillance of the main entrances, lift lobbies and external areas. Tenants will use security access cards in conjunction with proximity readers to access the security barriers and at each of the main entrance points. Lifts Passenger Three passenger lifts are provided for office floors, serving Ground floor to Level 16. Each lift is 1600kg (21 person) capacity. One lift is backed up by generator power for use in case of mains power failure. Lifts Service /Goods One office floor service lift of 1600kg capacity is provided. Ceilings All suspended ceilings incorporating plasterboard and/or ceiling tiles is by the tenant. Floors Fully accessible raised access flooring (600 x 600 tiles) with an overall floor depth of 150mm allowing 110mm clear void may be provided. CURRENTLY UNDER REVIEW. Walls Unplastered block and steel columns with cementitous fireproofing to be clad or painted by the tenant. Floor power All power reticulation, floor boxes, general purpose outlets and connections to DBs are by the tenant. Lighting All lighting and connections to DBs are by the tenant. Toilet & Pantry High quality finishes including tiling to floor and walls, ceilings, recessed lighting, ablution facilities and marble vanity tops are provided.
ADNEC Group is an international venue development and business management company. ADNEC Groups portfolio currently includes the Abu Dhabi National Exhibition Centre, ExCeL London, Al Ain Convention Centre and a number of hospitality projects, including Aloft Abu Dhabi and Hyatt at Capital Centre. In addition ADNEC Group is master developer of the Capital Centre project, the worlds first fully interconnected exhibition lifestyle destination. ADNEC Group is developing its network both through acquisition and construction; the companys objective is to become the worlds leading venue provider to the international exhibitions, conferences and live events industries by providing consistently high standards of venue facilities, management and client relationships and capitalising on the synergies which exist within a global venue network. ADNEC Groups Executive Office is located in Abu Dhabi, the capital city of the United Arab Emirates.
Owner & Developer Architects & Main Consultant Project Manager Main Contractor Steelworks Landscape Architect Interior Design Interior Design
ADNEC RMJM Mace Intl. Al Habtoor Engineering Enterprises Eversendai RMJM Strata (Hotel) RPW (Office) RMJM ID
Leasing agent
The developers and their agents give notice that: these particulars are set out as a general outline only, for the guidance of intending purchasers or lessees and do not constitute, nor constitute part of an offer or contract; all descriptions, dimensions, references to condition and necessary permission for use in occupation and other details are given without responsibility, and any intending purchasers or tenants should not rely on them as statements of fact, but must satisfy themselves by inspection or otherwise as to the correctness of each of them. April 2012.
CAPITALGATE.AE
Designed by Wordsearch