CONTENT
MODEL OF BULDING
ABOUT PROJECT BUILDING MATERIAL DESIGN SPECIFICATIONS REINFORCEMENT CURING
MODEL OF BULDING
ABOUT PROJECT
Location : Lalkothi ,Jaipur
Total Cost
Area Date of Start
: Rs. 70.93Crores
: 23000m : 26.01.2011
Completion Period
Construction Company
: 3 Years
: Rajasthan State Road Development & Construction
Corporation LTD
Building material
Cement:
1. Portland Slag Cement 2. Portland Pozzolana Cement 3. Ordinary Portland Cement
Relevant IS
3 Days Strength
IS:269
16 Mpa
IS:8112
23Mpa
IS:12269
27Mpa
7 Days Strength
22Mpa
33Mpa
37Mpa
28 Days strength
33Mpa
43Mpa
53Mpa
Fineness
225Sq.m/Kg
225Sq.m /Kg
225Sq.m/Kg
Sand: 1. Coarse sand: size greater than 0.6 mm and less than 2 mm. 2. Fine sand : size greater than 0.2 mm and less than 0.6 mm 3. Medium sand: size greater than 0.06 mm and less than 0.2 mm.
Aggregate:
1. Fine Aggregates: Most of which passes through 4.75 mm I.S. sieve and retained on 150 micron.
2. Coarse Aggregates: Most of which passes through 63 mm I.S. sieve and retained on 4.75 micron.
DESIGN SPECIFICATIONS
CEMENT,SAND & AGGREGATE RATIO :
CEMENT : 1 : SAND 1.88 : AGGREGATE : 3.53
Reinforcement
Reinforcement Details :
Raft Top main Reinforcement- #16mm@200mmc/c Raft Bottom main Reinforcement - #16mm@200mmc/c Raft Extra Reinforcement - #12mm, #20mm, & #25mm,as per requirement. #32mm Ties or Distribution Reinforcement - #8mm@200mmc/c
Reinforcement
Column Footing
Curing
ANY QUERIES??