note : enter data in cell marked Building Code Requirements for Structural Concrete (ACI 318-08) and As primary Commentary reinforcement. av
only
Bracing plate and Anchor to be welded to reinforcement.
Vu
Data : 0.5d d h 1 1 = 0.75 (11.8.3.1) Ah(horizontal stirrups or ties) 731.84 Kn in ok in 200 mm ok Kn 11.81 * 348.51 d mm 5076 ) * 399.31 d 221.15 + ) mm mm ok assumed value , since bar dia is not known * 50 2 mm mm =
( 25 mm clearance from both sides )
Strength of concrete fc Strength of reinforement fy Service Dead Load Vsdl Service Live Load Vsll
Factored Horizontal force Nucenter 0 if data not available
psi psi Kn Kn Kn in
The vertical factored load to be carried is = = 1.4 * 25.00 Kips = 123.4 0.75 + = = 1.7 * 52.00 Kn Kips
123.4 Vu
548.88 164.53
Vn
250
mm
9.84
Al / Wb 250
2) Determine shear span 'a' with 25 mm max clearance at beam end.Beam reaction is assumed at third point of bearing plate, to simulate rotation of supported Girder and triangular distribution of stress under bearing pad. av > 2 * bl /3 or Av = bl / 2 + 25 135 = = mm = 133 125 5.31 mm mm in = = 5.25 4.92 ok in in
use av =
maximum
3)
In absence of roller or low-friction support pad , a horizontal tensile force of Nuc = = .: Adopt Nuc 0.2 0.2 * * = 1.60 123.20 24.64 * = Kips ( 25.00 + 24.64 = 52.00 ) Kips 109.60 = Kn 109.60
For normal weight concrete . Check Vn (11.8.3.2.1) < (480 + 0.08fc')bwd 164.53 < 0.2fc'bwd 164.53 d
13.72
480 11.81 *
+ d in * in
0.08
= = = >= = (
= 11.81 * =
mm
500
mm
19.69
in
d d
= =
in in mm
Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India.
Date :
Abq Consultants
Civil & Structural Design Engineers.
1 of 34
22/7/2011
Total depth
21.97
in
558
mm 10.00 mm in = 254 mm
If a 45 slope is used then the corbel depth outside of the bearing area will be This is Check (11.8.1-a) >= 0.5 d = 10.00 in = 254
av / d < 1
5.31 20.00
0.266
<
1.00
ok
The total shear friction is found from equation Avf = Vu * ff * fy = 123.4 0.75 * * 1.40 Where ff is the friction factor. For monolithic construction - for normal concrete ff = 1.40 1000 * 60191 Mu 5.31 = 58.70 + kip-ft = Vu * 24.64 = av + * ( Nuc * (h-d) 20.00 ) = 1.95 in2 = 1259.69 mm2
21.97 Kn.m
79.58
Find Af using conventional flexural design method or coservatively use jud = 0.85d Af = Mu / ( * fy * ju * d ) The Tensi;e force Nuc = An = Nuc fy = 24.64 0.75 = 58.70 0.75 kips * * * * 12000 60191 * 0.85 *
Note : for all design calculations = 0.75 = 20.00 0.918 in2 = 592.15
(11.8.3.1) mm2
requires an additional steel area. 1000 60191 = 0.546 in2 = 352.14 mm2
24.64
Thus from the above two equation, the total steel area at top of the bracket must not be less than As nor less than As nor less than Asmin >= 3* fc' bw d fy = nor less than Asmin >= 200 bw d / fy As mm = = dia 200 * 11.81 * 60191 Therefore adopt provide 20 1.848 4 in2 nos bars = 1192 area = mm2 1.9478 in2 = 1256.6 mm2 ok 20.00 = 0.785 in2 = 506 mm2 0.839 in2 = 541 mm2 = 3* 5076 ^ 0.5 * 11.81 * 20.00 >= 2 3 Avf + An = 2 * 3 1.95 + 0.546 = 1.848 in2 = 1192 mm2 >= Af + An >= 0.918 + 0.546 = 1.464 in2 = 944 mm2
60191
Closed hoop steel / stirrups or ties Ah having a total area not less than 0.5(As - An) must be provided. Thus Ah provide = 10 0.5 mm = * dia 2.67 ( 1.848 6 0.546 area = = 67.73 ) = 0.7304 mm 0.651 in2 = in2 = 420
( 11.8.4)
mm2 ok
nos bars in
471.24 mm2
11.8.4 - Total area, Ah, of closed stirrups or ties parallel to primary tension reinforcement shall not be less than 0.5(Asc- An). Distribute Ah uniformly within (2/3)d adjacent to primary tension reinforcement.
Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India.-www.abqconsultants.com
Date :
Abq Consultants
Civil & Structural Design Engineers.
1 of 34
22/7/2011
Width of Corbel = 300 mm 250 wide X 200 long 270 135 X 25 thk
(Total height)
4 / 20
6 / 10 1 5 / 10 1
Concrete grade = 35 Mpa Steel Grade (Primary and Secondary) = 415 Mpa
0
270
Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India.-www.abqconsultants.com
574