Você está na página 1de 2

PROJECT NAME

LOCCATION/STRUCTURE
Bar bending schedule for 10Rm
Bar
Mark
(1)

B1

Shape of Bar
(2)

0.96

Description
(3)

Bar Dia
(in mm)
(4)

Spacing
c/c
(in
mm) (5)

No.
(6)

Length
Rmt (7)

Dia Wise Wt Reinforcement


(in Kg.)

Total
Length
Rmt (6x7)

8 mm
750.680

0.96

Raft bottom

150

67

28.365

1900.455

0.22

Raft top

12

150

67

26.885

1801.295

Distributor in
bottom and Top

10

200

266

9.92

2638.72

10 mm

Remarks

12 mm

16mm

20mm

26.445

B3

0.22

1599.55

26.445

B9

24.6
9.92

B1

10.35

20

200

266

10.35

2753.10

Raft bottom over


lap

16

200

67

0.60

40.20

Raft Top over


lap

20

200

67

0.50

33.50

1625.452
6800.157
63.3552

0.60
B3
0.50

82.745
750.680

Total Wt in MT

1625.452

1599.550

63.355

10.922

6882.902

25mm

Você também pode gostar