Você está na página 1de 20

NEWSPAPER AGENCY

Team Members: Anshum Tayal(220071) Harneet Singh(220099) Malika Singh(220120) Vikas Kaushik(220408)

AGENDA

BRIEF DESCRIPTION DIAGRAM BEST PRACTICES LESSON LEARNED

BRIEF DESCRIPTION

INTRODUCTION:
The basic scenario of the project was to develop a software for a newspaper agency.

UML DIAGRAM

STRUCTURAL DIAGRAM

BEHAVIOURIAL DIAGRAM

Er Diagram Class Diagram Object Diagram Component Diagram Deployment Diagram Use Diagram DFD Diagram Activity Diagram

INTERACTION DIAGRAM

Sequential Diagram Collaboration Diagram

ER DIAGRAM

DFD-Level 0

DFD-Level 1

DFD-Level 2

SEQUENCE DIAGRAM

ACTIVITY DIAGRAM

CLASS DIAGRAM

OBJECT DIAGRAM

COLLABORATION DIAGRAM

DEPLOYMENT DIAGRAM

DATABASE DIAGRAM

COMPONENT DIAGRAM

TEST PROCEDURE
Agency generates local distributor Purchase order LD has entered its order including the extra quantity and order period. Test Description Agency user logged in with valid credentials

Agency personnel starts purchase order request for the distributor

Expected Result Agency user is login in system, Login Successfully message is shown Purchase Request for the user is started for a particular date or a period. Total quantity for newspaper = default quantity+ extra quantity All PO requests that come after a stipulated time should not be catered for next day's order. Alert should be generated if the Total Value of Order exceeds the Security deposit with the The PO generated must quote the Onum, Date,PaperName, TotalQuality. The final purchas

DEFECT LIFE CYCLE


D E FE C T I D D E F E C T D E SC R I P T I O N T E ST E R E X C E P T E D R E SU L T D E F E C T ST A T U S A l l or dr es f or a Di spl ay al l or der s on 1 di spl ay page. Once you si gn out f r om any of t he page, i t shoul d not be abl e t o navi gat e back t o t he 2 pr evi ous page Once you ar e on t he Di st r i but or page or t he A gency page shoul d not be abl e t o go back t o t he Logi n page by pr essi ng 3 t he B ack but t on Di st r i but or shoul d not be abl e t o pl ace an or der f or a pr evi ous 4 dat e. M al i ka Si ngh Di st r i but or can onl y pl ace or der s f or t he f ut ur e dat es onl y T he r ecei ved st ock Recei ve st ock shoul d have have or der ed 5 quant i t y M anual di t r i but i obn at LD shoul d have quot ed 6 quant i t y M al i ka Si ngh V i kas K aushi k shoul d di spl ay t he r ecei ved quant i t y and or der ed quant i t y bot h. M anual di t r i but i obn at LD shoul d have quot ed quant i t y di spl ayed. Whenever t he A gency col l ect i ve col l ect i ve or der amount OP E N OP E N OP E N V i kas K aushi k Navi gat i on f r om Di st r i but or page/ A gency page t o Logi n page can happen onl y by pr essi ng Si gnout but t on OP E N V i kas K aushi k once t he user has si gned out he shoul d not be abl e t o navi gat e back t o t he pr evi ous page. OP E N M al i ka Si ngh par t i cul ar day shoul d be di spl ayed OP E N

BEST PRACTICES

LISTENER CODING STANDARD/NAMING CONVENTIONS PROJECT TRACKER CODE OPTIMIZATION AGILE (CHANGING REQUIREMENTS) MVC ARCHITECTURE

LESSON LEARNT
ASSUMPTIONS COMMUNICATION

CLIENT COMMUNICATION TEAM COMMUNICATION

DEVELOPEMENT WITH USER PERSPECTIVE

Você também pode gostar