Escolar Documentos
Profissional Documentos
Cultura Documentos
Ps : Possible Pb : Probable
o Regency
Note : A = Harvested Area (Ha) B = ProducDon (Ton/Year) Biomass Potential Of Palm Waste of Palm Production (Ton) Empty Bounch 2,570,769.75 Fiber 1,285,384.88 Shell 701,119.03 Energy Potential of Palm (Mio K.Cal) Empty Bounch 3,599,077.66 Fiber 3,599,077.66 Cangkang 2,769,420.15
Waste Of Palm (ber and shell) used as bahan bakar for boiler in more than 91 POMs (Palm Oil Mills) which spreaded in several Regencies. The use of steam for boiler is equivalent to 55 MVA of Steam Power Plant (PLTU).
262.135 1,933,804
170.026,5 200.473,3
910.453 1.092.541,6
III.2 RURAL ELECTRIFICATION Total of Villages Total of Electried Villages Total of Unelectried Villages Ratio of Electried Villages Ratio of ElectricaDon : 5,856 : 4,607 : 1,249 : 78.66 % : 77.56 %
III.3 DEVELOPMENT of ELECTRIC POWER PLANT 1. On Going : PLTA Asahan I 2 x 90 MW (IPP) : 180 MW PLTU Sumut Unit 1 (PLN) : 200 MW PLTU Sumut Unit 2 (PLN) : 200 MW PLTU Meulaboh 2 x 100 MW (PLN) : 200 MW Jumlah : 780 MW
2. AddiDonal Prospect The year of 2014 OperaDon : PLTU Kuala Tanjung, 2 x 125 MW (IPP) PLTU P. Susu 3 dan 4, 2 x 200 MW (PLN) PLTP Sarulla Unit 1, 3 x 110 MW (IPP) PLTP Sarulla Unit 2, 2 x 55 MW (IPP) PLTP Sorik Merapi, 1 x 55 MW (IPP) PLTA Asahan III, 2 x 87 MW PLTU Nias, 2 x 7 MW Total : 250 MW : 400 MW : 330 MW : 110 MW : 55 MW : 147 MW : 14 MW : 1,333 MW
Project
Name
Parlilitan
Parluasan
Pakkat
Aek
Hutaraja
Aek
Silau
Aek
Sipultak
Aek
Hasang-1
Aek
Hasang-2
Capacity
(MW)
7.5
4.2
10
5
10
15
10
6
Status
Commissioning
Development
Development
Development
Development
Development
Plan
Plan
Regency
Humbahas
Tobasa
Humbahas
Humbahas
Simalungun
Tobasa
Tobasa
Tobasa
Remark
IPP
IPP
IPP
IPP
IPP
IPP
IPP
IPP
Total
67.7
4.
CapDve
Power
1.
Industrial
Sector
PLTD
=
123
unit,
Installed
Capacity
=
248,785
MW
PLTU
=
22
unit,
Installed
Capacity
=
61,652
MW
PLTA
=
1
unit,
Installed
Capacity
=
603
MW
PLTM
=
6
unit,
Installed
Capacity
=
6,244
MW
Total
of
Installed
Capacity
=
919,681
MW
2.
Household
Sector
PLTMH
=
41
unit,
Installed
Capacity
=
0,833
MW
(833
KW)
5. List
of
Power
Plant
Supplied
To
Sumatera
Utara
Electrical
System
(Status
for
January
2010)
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Name
of
Power
Planet
PLTG/U
Belawan
PLTG
Paya
Pasir
PLTG
Glugur
PLTD
TiD
Kuning
PLTA
Sipansihaporas
PLTA
Renun
PLTU
Labuhan
Angin
PLTP
Sibayak
PLTM
Kombih
I,II
PLTM
Boho
PLTM
Silang
PLTM
Sibundong
PLTM
Batang
Gadis
I
&
II
PLTM
Raisan
I
&
II
PLTD
Gunung
Sitoli
PLTD
T.
Dalam
Total
Installed
Capacity
(MW)
1.077
123
100
24,8
50
82
230
12
3
0,2
0,75
0,75
0,90
1,5
9,89
2,81
1.718
Medan
Medan
Medan
Medan
Tapanuli
Tengah
Dairi
Tapanuli
Tengah
Karo
Pakpak
Barat
Samosir
Humbahas
Humbahas
Madina
Tapanuli
Utara
Nias
Nias
selatan
LocaDon
IV.4
NO
1
2
3
4
5
6
7
8
- SPBU - Agen Premium & Solar - Agen LPG - Pangkalan Minyak Tanah
Serdang Bedagai 60
Agen LPG -PSO (3 Kg) = 168 unit Agen LPG-Non PSO (12.850 Kg) = 54 unit
NO
1
2
3
Jenis
Premium
Kerosine
Solar
Total
Tahun
2007
1.053.943
653.015
775.924
2.482.882