Plan Lev Est SE-5143
Plan Lev Est SE-5143
QUANTIDADE
CONCRETO FCK=10MPa
9.26m
CONCRETO FCK=30MPa
426.10m
FORMA COMUM
208.42m
FORMA MADEIRIT
2058.78m
AO CA-50
42610.06kg
ESCAVAO
177.95m
COMPACTAO
185.17m
BOTA-FORA
66.36m
REATERRO
111.59m
CIMBRAMENTO
5314.84m
PETROBRS GUARAREMA
Local : SE-5143001
Obs.:
Data :
Folga de escavao
0.05 m
PEA
blocos
blococ met.
0.35 m
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
ESCAVA.
un
m3
m2
m3
m3
28.00
0.50
0.50
0.50
3.00
0.50
0.50
0.50
TOTAL
6/27/2012
Folha :
1
INFRAESTRUTURA
BLOCOS
C.MAGRO COMPAC.
m2
B.FORA
m3
REATERRO
m3
3.500
0.375
28.00
3.00
20.510
2.198
0.350
0.038
7.00
0.75
3.85
0.41
16.660
1.785 AO
3.875
31.00
22.708
0.388
7.75
4.26
18.445
387.500
PETROBRS
GUARAREMA
Local : SE-5143001
Obs.:
Data :
cintas
cinta
cinta
cinta
cinta
Folha :
1
INFRAESTRUTURA
CINTAS
Folga de escavao
0.05 m
PEA
6/27/2012
0.45 m
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
ESCAVA.
C.MAGRO
COMPAC.
B.FORA
REATERRO
un
m3
m2
m3
m3
m2
m3
m3
4.00
35.70
0.60
0.30
1.00
27.00
0.60
0.30
6.00
18.35
0.60
0.30
1.00
12.80
0.60
0.30
1.00
3.00
0.60
0.30
TOTAL
25.704
4.860
19.818
2.304
0.540
-
85.68
16.20
66.06
7.68
1.80
-
74.970
14.175
57.803
6.720
1.575
-
4.284
0.810
3.303
0.384
0.090
-
85.68
16.20
66.06
7.68
1.80
-
29.99
5.67
23.12
2.69
0.63
-
44.982
8.505
34.682
4.032
0.945
AO
53.226
177.42
155.243
8.871
177.42
62.10
93.146
5,322.600
QUADRO DE QUANTIDADES
Obra:
PETROBRS Local :
GUARAREMA
Data :
Folha :
6/27/2012
SE-5143001
Obs.:
PEA
vigas
vigas
vigas
vigas
ESTRUTURA
VIGAS
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
CIMBRAMENTO
P DIREITO
ARMAO
taxa m/kg
un
m3
m2
m2
KG
100
7.0
12.80
0.60
0.30
7.0
12.80
0.60
0.30
4.0
43.90
0.60
0.30
4.0
43.90
0.60
0.30
1
TOTAL
16.128
16.128
31.608
31.608
-
107.52
107.52
210.72
210.72
-
180.10
198.91
352.96
389.83
-
95.47
636.48
1,121.80
3.35
3.70
3.35
3.70
1,612.80
1,612.80
3,160.80
3,160.80
-
9,547.20
QUADRO DE QUANTIDADES
Obra:
PETROBRS Local :
GUARAREMA
SE-5143001
Data :
Folha :
6/27/2012
1
Obs.:
ESTRUTURA
PEA
pilares 30x40
pilares 30x30
pilares 30x40
pilares 30x30
QUANT.
DIM.
COMP.
LARG.
ALT.
CONCRETO
FORMA
ARMAO
taxa m/kg
un
m3
m2
KG
100
14.0
0.40
0.30
3.35
14.0
0.30
0.30
3.35
14.0
0.40
0.30
3.70
4.0
0.30
0.30
3.70
TOTAL
PILAR METLICO
4.0
3.00
5.628
4.221
6.216
1.332
-
65.66
56.28
72.52
17.76
-
562.80
422.10
621.60
133.20
-
17.40
212.22
1,739.70
QUADRO DE QUANTIDADES
Obra:
PETROBRS
GUARAREMA
Local : SE-5143001
Data :
Folha :
6/27/2012
Obs.:
ESTRUTURA
LAJES
PEA
laje 1 pav
laje 2 pav
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
CIMBRAMENTO
P DIREITO
ARMAO
taxa m/kg
un
m3
m2
m3
KG
100
1.0
45.30
12.90
0.15
1.0
45.30
12.90
0.15
87.656
87.656
-
584.37
584.37
-
1,957.64
2,162.17
-
175.31
1,168.74
4,119.81
TOTAL
3.35
3.70
8,765.55
8,765.55
-
17,531.10
QUADRO DE QUANTIDADES
Obra:
PETROBRS
GUARAREMA
Local : SE-5143001
Data :
Folha :
6/27/2012
Obs.:
Laje Convencional
PEA
laje de piso
laje de piso
laje de piso
ESTRUTURA
LAJES
m
0.10 m
Pre-laje :
Capeamento :
QUANT.
COMP.
LARG.
ALT.
CONCRETO
FORMA
CONCRETO
Pre-Laje
CIMBRAMENTO
P DIREITO
ARMAO
taxa m/kg
un
m3
m2
m3
m2
m3
KG
100
1.0
42.40
12.80
1.0
3.00
1.50
1.0
39.05
5.30
TOTAL
54.272
0.450
20.697
-
542.72
4.50
206.97
-
5,427.20
45.00
2,069.65
-
75.42
754.19
7,541.85
LEVANTAMENTO DE QUANTIDADES
Local :
Obra: PETROBRS
GUARAREMA
Data :
6/27/2012 Folha :
SE-5143001
Obs.:
1
ESTRUTURA :
Ld
4
3
2
1
ESCADA EM CONCRETO
QD
(E). Laje
L
PEA
QUANT.
COMP.(C)
(un)
(m)
(m)
(m)
(m)
(un)
escada 1
1.0
12.80
1.50
0.10
0.18
0.30
23.00
2.949
23.49
294.94
41.77
escada 2
1.0
9.25
1.50
0.10
0.18
0.30
23.00
2.452
17.85
245.16
31.47
--
TOTAL
CONCRETO
FORMA
ARMAO
CIMBRAMENTO
(m3)
(m2)
100 kg/m
(m3)
5.40
41.34
540.11
73.24