Escolar Documentos
Profissional Documentos
Cultura Documentos
D P / M D
D E P / G S /E T U D E S
+----------------------------------------------------------------------------------------------------------------------------------------------+
|
R E N S E I G N E M E N T S
G E O L O G I Q U E
S
S U R
LE
P U I T S : ONIZ 312
Z O N E : HZN
|
+----------------------------------------------------------------------------------------------------------------------------------------------+
| Coord. plate forme : Xpf = 833136.77 | Altitude : Zsol : 135.446m
DDF: 19/10/2008
|
|(Lambert sud algerie) Ypf = 141314.67 |
Zt
: 145m
DFF: 31/02/2009
|
|
|
|
|
+----------------------------------------------------------------------------------------------------------------------------------------------+
|
T O P S
D E S
F
O R M A T I O N S
|
+--------+------------+------------+-----------+---------+----------+-----------+-----------+-----------+------------+----------+--------------+
|ETAGES->| T.ARGILEUX | T.A.G
| T.ERUPTIF | Q.HAMRA | G.E.A
|
A.E.G
|
Z_ALT
|
Cm Re
|
Cm Ra
|
Cm R2
|
FOND
|
|
| MD
| TVD | MD
| TVD | MD | TVD | MD | TVD| MD | TVD |
MD | TVD | MD | TVD | MD | TVD | MD | TVD | MD | TVD | MD |
TVD |
+--------+------+-----+------+-----+-----+-----+----+----+-----+----+-----+-----+-----+-----+-----+-----+-----+------+-----+-----+-----+-------+
|TOIT (m)| 3180 |3177 | 3367 |3343
|-----|-----|----|----|-----|-----|-----|-----|-----|-----| --- | --- |
3453 | 3396 |-----|-----| 4442 | 3450 |
+--------+------+-----+------+-----+-----------+----+----+----------+-----------+-----------+-----------+-----+------+-----+-----+-----+-------+
|C.Abs(m)|-3035 |-3032|-3222 |3198|-----|-----|----|----|-----|-----|-----|-----|-----|-----| --- |
--- |-3308|-3251 |-----|-----|-4297 | -3305 |
+--------+------+-----+------+-----+-----------+----+----+----------+-----------+-----------+-----------+------------+-----------+-----+-------+
|Epai.(m)| --- | 166 | --- | 53
|-----|-----|----|----|-----|-----|-----|-----|-----|-----| --- | --- |
--- | 54 |-----|-----| --- | --- |
+--------+------+-----+------+-----+-----+-----+----+----+-----+-----
+-----+-----+-----+-----+-----+-----+-----+---- -+-----+-----+-----+-------+
ALBIEN : 1036m A 1378m Epais. = 342m.
LD2
: 2584m A 2637m Epais. = 53m.
TS3
: 2978m A 3177m Epais. = 199m. EN TVD.
DENSITE DE BOUE (PHASE RESERVOIR) : 1.29 g/Cm2
KOP = 2991m
FOND TVD : 3450.2m CS , 3450m CE DRAIN D2-ID ; AZIMUT = N319
INCLINAISON = 9020' ; VS : 1161.99m.
FOND MD : 4442m CS + CE.
TUBAGES REALISES :
~~~~~~~~~~~~~~~~~~
+--------+--------+---------------------------------------------------------------+-------------------+-----------------------+
|
|
|
COTE SABOTs (m)
|
Etage
|
|
| PHASE | TUBAGE +------+------+-------+------+------------+--------------+------+
Formation
|
OBSERVATIONS
|
|
|
| MD CS| MD CE|TVD CS |TVD CE| Incli.(deg.)|
Azimut (Deg.N)| VS(m)|
Assise
|
|
+--------+---------+------+------+-------+------+------------+--------------+------+-------------------+-----------------------+
| 24"
| 18"5/8 | --- | --- | 504 | --- |
---|
-----| --- | SENONIEN ANHYDRIT.|
|
+--------+---------+------+------+-------+------+------------+--------------+------+-------------------+-----------------------+
| 17"1/2 | 13"3/8 | --- | --- | 2289 | --- |
---|
-----| --- | DOGGER LAGUNAIRE |
|
+--------+---------+------+------+-------+------+------------+--------------+------+-------------------+-----------------------+
| 12"1/4 |
9"5/8 | 3300 |
|3287.9 | ---- |
27.90' |
320
| 74 |
TRIAS ARGILEUX |
|
+--------+---------+------+------+-------+------+------------+--------------+------+-------------------+-----------------------+
| 8"3/8 |
7"
| 3453 |3460.4|3396.8 |3400.5|
5989'
|
320
| 178.5| AU TOIT DU Ra (D2)|
|
+--------+---------+------+------+-------+------+------------+--------------+------+-------------------+-----------------------+
|
|
|
DE
DE
3359m
3099m
2823m
2717m
2608m
DE
DE
DE
DE
|
|
|
=======================================================================
============================================================+
|
C A R A C T E R I S T I Q U E S
P E T R O P H
Y S I Q U E S
D U
R E S E R V O I R
|
+===============================+======================================
=============+==============================================+
|
D E C O U P A G E
|
R E S U L T A T S - C A R O T
T E
|
I N T E R P R E T A T I O N - E L A N
|
+=======+===============+=======+=========+=========+========+=======+=
======+======+=============+=======+========+=======+=======+
| DRAIN | TOIT_____ MUR |EPAIS. |EPAIS.EFF| PERMEA. | PHIE. | So
|
Sw | SILT.| INTER.INTER |EPAI.EF| PHIE | Sw
| VCL |
|
|
(metres)
| (m) |
(m)
|
(md) | (%)
| (%) |
(%) | (m) |
| (m) | (%)
| (%) | (%) |
+-------+---------------+-------+---------+---------+--------+------+-------+------+-------------+-------+--------+-------+-------+
|
MD | 3453 --- 3507 | 54
|
|
|
|
|
|
| 3460 - 3507 | 42.50 |
06
| 10
| 10
|
+ D2 --+---------------+-------+---------+---------+--------+------+-------+------+-------------+-------+--------+-------+-------+
|
TVD| 3396 --- 3419 | 23
|
|
|
|
|
|
|
|
|
|
|
|
+-------+---------------+-------+---------+---------+--------+------+-------+------+-------------+-------+--------+-------+-------+
|
MD | 3507 --- 4442 | 935 |
|
|
|
|
|
| 3507 - 4442 | 253.46|
07
| 19
| 11
|
+ ID --+---------------+-------+---------+---------+--------+------+-------+------+-------------+-------+--------+-------+-------+
|
TVD| 3419 --- 3450 | 31
|
|
|
|
|
|
|
|
|
|
|
|
+-------+---------------+-------+---------+---------+--------+------+-------+------+-------------+-------+--------+-------+-------+
PROBLEME DE FORAGE
-----------------PHASE 8" 1/2: RESERVOIR TOPE 21.5m PLUS BAS QUE LA PREVISIONS.
PHASE 6": OBJECTIFTOPE 23m PLUS BAS QUE LA PREVISIONS.
(CHANGEMENT D'OBJECTIF DU D1 AU L'ID DECISION PED)
SUITE AU DECALAGE IMPORTANT DES TOPS DE FORMATION.
APARTITION DE ROCHES VOLCANIQUES ALTERES 3633m 3679m
(3845.50m ET
9"5/8
4428m
7"
3452m
4437m
3460m
4445m
3460m
4132m
3460m
MCFL
4437m
4149m
3460m
3440m
2536m
4342m
3468m
DEBIT = 4.95m3/h
DATE
INTERVALLE
~~~~
~~~~~~~~~~
3290m
6"
26-NOVEMBRE-2008
A
1850m
16-DECEMBRE-2008
3460m
19-DECEMBRE-2008
2536m
14-JANVIER-2009
IP
TYPE
CBL-GR-CCL
LDL-CNL-HCAL-GR
CBL-VDL-GR-CCL
DSI-HCAL-GR 7"
14-JANVIER-2009
AIT-HCAL-GR 7"
14-JANVIER-2009
HNGS-RATIOS 6"
15-JANVIER-2009
3460m
19-JANVIER-2009
AIT-DSI-TLD-
26-JANVIER-2009
UDI-GR 7"
25-JANVIER-2009
XPT-GR 6"
UBI 6"