PROPOSED RESIDENTTIAL BUNGALOW Anilao Proper, Mabini, Batangas Owner : Mr.

a nd Mrs, Emmanuel Buenviaje Bill of Quantities and Cost Estimate as 0f 27 August 2012 Item / Description Additional Works

Unit

Quantity Material

Labor

Total Unit

Amount

PR0P0SED TWO STOREY RESIDENCE Anna Belinda Canlas Bill of Quantities and Cost Estimate as of 03/16/2010 Item / Description I. GENERAL REQUIREMENTS A. Mobilization / Demobilization/Clean-up B. Permits & licenses 1. Building permits 2. Cert. of Occupancy (including requirements thereof) 3. Other Related Permits/Fees Village Mis. Fees ( Brgy., Surveyor's Cert., Tahanan Fees) 1. Brgy Certificates 2. Surveyor's Fee 3. Engineering Fees (Civil, Electrical,Sanitary)*** C. Temporary Facilities & Utilities 1. Warehouse, Quarters (Off-site Housing) Sub-total General Requirements II. BUILDING CONSTRUCTION A. Civil Works 1. Layout & Staking 2. Excavation a. Structural Excavation b. Manual Excavation/ trimming 3. Grading & levelling 4. Gravel bedding 5. Backfilling & compaction 6. Soil Poisoning 6. Initial Site Development Works

Unit

Quantity

Material Cost

Labor Cost

Total Unit cost

Amount

lot lot lot lot lot lot lot

1.00 1.00 1.00 1.00 1.00 1.00 1.00

lot

lot cu.m. cu.m. sq.m. cu.m. cu.m. sq.m ls

Sub-total Civil Works B. Structural Works 1. Foundation/footings Concrete 4000 psi Rebars Formworks 2. Columns Concrete 4000 psi Rebars Formworks 3. Slab on Fill Concrete 3000 psi Rebars Formworks 4. Footing Tie Beams (FTB) Concrete 2500 psi Rebars Formworks 5. Suspended Beams & Girders Concrete 3000 psi Rebars Formworks 6. Suspended Slabs Concrete 3000 psi Rebars Formworks 7. Stairs Concrete 3000 psi Rebars Formworks Sub-total Structural Works III. ARCHITECTURAL WORKS A. Masonry Works

cu.m. kgs. sq.m. cu.m. kgs. sq.m. cu.m. kgs. sq.m. cu.m. kgs. sq.m. cu.m. kgs. sq.m. cu.m. kgs. sq.m. cu.m. kgs. sq.m.

11.87 592.89 28.84 8.27 2350.50 137.83 9.50 429.60

6.16 1067.75 77.27 5.79 1493.73 77.22 8.19 2348.59 81.95

1. 5" CHB (including mortars) non-load bearing 2. 4" CHB (including mortars) non-load bearing B. Finishing Works FLOOR FINISHES- all areas specified in BOQ): 1. 100 X 200 Laminated Wood 2. 600 X 600 Homogeneous Tiles 3. 400 X 400 Vitrified Ceramic Tiles 4. 5 Pebbles Wash Out 5. 300 X 300 Glaze Ceramic Tiles 6. Paver Stone WALL FINISHES- all areas specified in BOQ 1. Plain Cement Plaster Painted Finish 2. 300 X 300 Glaze Ceramic Tiles 3. Stoneworks 4. Base Board 100mm high Wood w/ paint C.Plastering Works 1. Plain Cement Plaster D. Ceiling Works 1. Rubbed concrete ceiling 2. Hardiflex/Gypsum board moisturized ceiling 3. Hardiflex/Gypsum board ceiling paint finish 4.Spandrell Panel

sq.m. sq.m.

156.40 144.83

sq.m. sq.m. sq.m. sq.m. sq.m. sq.m.

sq.m. sq.m. sq.m. l.m.

sq.m.

662.70

sq.m. sq.m. sq.m. sq.m.

1. Door Locksets (Yale locksets) a. Main door lockset b. Bedroom Locksets c. Toilet and Baths 2. Loose pin hinges (Stanley)

sets sets sets sets

F. Roofing Works with Insulation 1.Rib-type roofing sheets and accessries 2. Fabrication steel trusses with 50x100 C-purlins G. Doors and Windows A. Doors (All door sashes from 2x5 Yakal wood) D-1 Wood panel door w\ wood frame ( .90 X 2.10 m.) D-1A Wood flush door w\ wood frame (.90 X 2.10 m.) SD-1 Sliding door w\ Aluminum frame (2.40 X 2.10 m.) SD-2 Sliding door w\ Aluminum frame (1.40 X 2.10 m.) SD-3 Sliding door w\ Aluminum frame (2.60 X 2.10m.) D-4 Wood flush door w\ wood frame (.80 X 2.10 m.) D-5 Wood flush door w\ wood frame (.80 X 2.10 m.) D-6 Wood flush door w/wood frame (.70x2.10m.) B. Windows (Powder Coated Alum. White) W-1 3.50mm. Clear glass w\ Aluminum frame (1.15 X 1.20 m.) W-2 3.5 mm. clear glass w\ Aluminum frame (.95 X 1.20 m.) W-3 3.5 mm. clear glass w\ Aluminum frame (1.6 X .60 m.) W-4 3.5 mm. Fixed glass w\ Aluminum frame (.40 X 3.40 m.) W-5 3.5 mm. clear glass w\ Aluminum frame (1.7 X 1.2 m. ) W-6 3.5mm. Clear glass w\ Aluminum frame (.65 X .60 m.) W-7 3.5 mm. Fixed glass w\ Aluminum frame (.45 X 1.90m. ) W-8 3.5mm. Fixed glass w\ Aluminum frame ( 1.40 X 1.40 m.) H. Metal Works

sq.m. sq.m.

pc. pc. pcs. pcs. pc. pcs. pcs. pcs.

pcs. pcs. pcs. pcs. pcs. pcs. pcs. pcs.

1. 75mm stainless steel rail I. Cabinet Works J. Modular Kitchen System K. Stair System L. Waterproofing Works Sub- total Architectural Works IV. Plumbing Works V. Electrical Works ands Finishings VI. Plumbing Fixtures VII. Site Develoment Works VIII. Water Tank and Accessories IX. Cistern Certified True Copy of Cost Estimate: Prepared by: TRADECON SYSTEMA/Arch. Voltaire Villa Vitug

l.m. l.m. l.m. ls sq.m.

ls ls ls ls ls ls