Escolar Documentos
Profissional Documentos
Cultura Documentos
Semana
: Residencial ALLPA
:
1
26/09 - 20/09
Residencial ALLPA
1
26/09 - 20/09
Descripcin
Fase
Corte
M.Obra
1
2
3
401
402
403
404
501
502
503
504
505
506
507
508
509
510
511
601
602
603
604
605
606
Nota:
Materiales
Programado
M.Obra
1,037.02
1,176.19
884.06
-
3,097.27
Programado
Materiales
0.53
-
0.53
Totales
1,037.55
1,176.19
884.06
3,097.80
Residencial ALLPA
1
26/09 - 20/09
Detalle
Al corte
Anterior
Actual
Programado
Acumulado
Mano de Obra
Material
Equipo
Subcontratos
0.00
36.00
0.00
0.00
0.00
36.00
0.00
0.00
TOTAL en Soles(s/IGV)
36.00
36.00
Anterior
Actual
3,097.27
3,698.59
578.46
2,188.58
0.00
10,726.71
ALES
Programado
Acumulado
0.00
Residencial ALLPA
1
26/09 - 20/09
Semana
Parcial
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Programado (S/.)
(%)
Acumulado
10,726.71
19,453.37
25,140.71
27,752.68
34,753.92
30,873.06
35,237.50
82,377.44
117,207.72
90,986.60
88,598.20
72,053.90
81,037.02
103,026.02
81,801.42
60,976.98
45,424.88
56,274.56
44,869.65
59,097.81
46,340.18
8,369.42
168.68
0.88%
1.59%
2.06%
2.27%
2.84%
2.53%
2.88%
6.74%
9.59%
7.44%
7.25%
5.89%
6.63%
8.43%
6.69%
4.99%
3.72%
4.60%
3.67%
4.83%
3.79%
0.68%
0.01%
1,222,548.43
100.00%
Avance Econmico
Acance Fsico
s/.
s/.
10,726.71
30,180.07
55,320.78
83,073.47
117,827.39
148,700.45
183,937.95
266,315.39
383,523.12
474,509.72
563,107.92
635,161.82
716,198.84
819,224.86
901,026.28
962,003.26
1,007,428.14
1,063,702.70
1,108,572.34
1,167,670.15
1,214,010.33
1,222,379.75
1,222,548.43
Al Corte (S/.)
Actual
36.00
3000
80000
Acumulado
0.00%
0.25%
6.54%
36.00
3,036.00
83,036.00
1,400,000.00
1,200,000.00
1,000,000.00
800,000.00
600,000.00
400,000.00
200,000.00
83,036.00
6.79%
1,400,000.00
1,200,000.00
1,000,000.00
800,000.00
Programado
Ejecutado
600,000.00
400,000.00
200,000.00
0.00
1
10 11 12 13 14 15 16 17 18 19 20 21 22 23
Programado
Ejecutado
Residencial ALLPA
CONTROL DIARIO DE PRODUCCION POR FASES
Fase
Descripcin
26/09 - 20/09
Und
Presupuesto Base
Met
P.U. (S/.)
Corte
Parcial (S/.)
P.U. (S/.)
hh
3.2240
16.96
54.68
16.96
OPERARIO
hh
52.7400
14.14
745.74
14.14
OFICIAL
hh
39.1200
12.40
485.09
12.40
PEON
hh
47.6200
11.21
533.82
11.21
KG
0.3200
2.90
0.93
2.90
Material
CLAVOS C/S CABEZA (PROMEDIO)
TRABAJOS PERMANENTES
Mano de Obra
CAPATAZ
hh
75.5968
16.96
1,282.12
16.96
OPERARIO
hh
113.0000
14.14
1,597.82
14.14
OFICIAL
hh
529.0000
12.40
6,559.60
12.40
PEON
hh
1,781.0148
11.21
19,965.18
11.21
CAPATAZ
hh
47.7180
16.96
809.30
16.96
OFICIAL
hh
19.1616
12.40
237.60
12.40
PEON
hh
623.5527
11.21
6,990.03
11.21
MOVIMIENTO DE TIERRAS
Mano de Obra
401 SOLADOS
Mano de Obra
CAPATAZ
hh
1.9162
16.96
32.50
16.96
OPERARIO
hh
19.1616
14.14
270.95
14.14
OFICIAL
hh
9.5808
12.40
118.80
12.40
PEON
hh
76.6464
11.21
859.21
11.21
bls
37.8442
14.40
544.96
14.40
HORMIGON
M3
15.6886
16.00
251.02
16.00
Material
402 CALZADURA
Mano de Obra
CAPATAZ
hh
11.4839
16.96
194.77
16.96
OPERARIO
hh
172.3799
14.14
2,437.45
14.14
OFICIAL
hh
118.1865
12.40
1,465.51
12.40
PEON
hh
433.4967
11.21
4,859.50
11.21
ALAMBRE NEGRO N8
KG
24.0000
2.90
69.60
2.90
KG
11.5200
2.90
33.41
2.90
M3
38.6080
40.00
1,544.32
40.00
HORMIGON
M3
91.4400
16.00
1,463.04
16.00
bls
457.2000
14.40
6,583.68
14.40
Material
403 CIMENTACION
Mano de Obra
CAPATAZ
hh
2.6199
16.96
44.43
16.96
OPERARIO
hh
28.6061
14.14
404.49
14.14
OFICIAL
hh
27.5395
12.40
341.49
12.40
PEON
hh
130.7221
11.21
1,465.39
11.21
ALAMBRE NEGRO N8
KG
4.1000
2.90
11.89
2.90
KG
3.1200
2.90
9.05
2.90
M3
0.6080
40.00
24.32
40.00
M3
24.8196
40.00
992.78
40.00
HORMIGON
M3
38.6694
16.00
618.71
16.00
bls
156.2760
14.40
2,250.37
14.40
Material
404 PAVIMENTOS
Mano de Obra
CAPATAZ
hh
24.1508
16.96
409.60
16.96
OPERARIO
hh
160.1192
14.14
2,264.09
14.14
OFICIAL
hh
109.8461
12.40
1,362.09
12.40
PEON
hh
516.0585
11.21
5,785.02
11.21
ALAMBRE NEGRO N8
KG
0.4965
2.90
1.44
2.90
KG
0.4965
2.90
1.44
2.90
KG
13.6825
2.82
38.58
2.82
ARENA FINA
M3
0.3200
35.00
11.20
35.00
TIERRA DE CHACRA
M3
4.0000
50.00
200.00
50.00
M3
1.0000
55.00
55.00
55.00
ARENA GRUESA
M3
3.4266
35.00
119.93
35.00
AFIRMADO
M3
56.9517
35.00
1,993.31
35.00
UND
200.0000
0.56
112.00
0.56
Material
bls
8.0000
14.40
115.20
14.40
M3
45.2693
194.00
8,782.24
194.00
M3
45.2693
30.00
1,358.08
30.00
501 CIMENTACION/CISTERNA
Mano de Obra
CAPATAZ
hh
5.5956
16.96
94.90
16.96
OPERARIO
hh
55.5727
14.14
785.80
14.14
OFICIAL
hh
40.7199
12.40
504.93
12.40
PEON
hh
75.1388
11.21
842.31
11.21
KG
32.4585
2.90
94.13
2.90
ALAMBRE NEGRO N8
KG
5.0000
2.90
14.50
2.90
KG
7.5000
2.90
21.75
2.90
KG
1,402.2072
2.82
3,954.22
2.82
M3
0.4000
55.00
22.00
55.00
ARENA GRUESA
M3
0.2500
35.00
8.75
35.00
bls
5.0000
14.40
72.00
14.40
M3
73.9437
200.00
14,788.74
200.00
M3
71.7900
30.00
2,153.70
30.00
CAPATAZ
hh
44.2312
16.96
750.16
16.96
OPERARIO
hh
33.9743
14.14
480.40
14.14
OFICIAL
hh
22.9196
12.40
284.20
12.40
PEON
hh
113.7856
11.21
1,275.54
11.21
Material
502 SEMISOTANO EV
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
198.3250
2.90
575.14
2.90
KG
8,567.6400
2.82
24,160.74
2.82
M3
100.3632
200.00
20,072.64
200.00
M3
97.4400
30.00
2,923.20
30.00
CAPATAZ
hh
68.2931
16.96
1,158.25
16.96
OPERARIO
hh
40.3533
14.14
570.60
14.14
OFICIAL
hh
67.3428
12.40
835.05
12.40
PEON
hh
203.3716
11.21
2,279.80
11.21
503 SEMISOTANO EH
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
128.7138
2.90
373.27
2.90
KG
5,560.4340
2.82
15,680.42
2.82
UND
2,101.2000
1.57
3,298.88
1.57
M3
53.3746
200.00
10,674.92
200.00
M3
51.8200
30.00
1,554.60
30.00
CAPATAZ
hh
17.0302
16.96
288.83
16.96
OPERARIO
hh
47.9282
14.14
677.70
14.14
OFICIAL
hh
51.9282
12.40
643.91
12.40
PEON
hh
118.6454
11.21
1,330.01
11.21
KG
111.4030
2.90
323.07
2.90
ALAMBRE NEGRO N8
KG
4.5500
2.90
13.20
2.90
KG
5.2000
2.90
15.08
2.90
KG
4,812.6096
2.82
13,571.56
2.82
M3
5.8500
55.00
321.75
55.00
ARENA GRUESA
M3
3.5000
35.00
122.50
35.00
bls
62.5000
14.40
900.00
14.40
M3
41.1794
200.00
8,235.88
200.00
M3
39.9800
30.00
1,199.40
30.00
CAPATAZ
hh
73.0774
16.96
1,239.39
16.96
OPERARIO
hh
26.9493
14.14
381.06
14.14
OFICIAL
hh
35.2859
12.40
437.55
12.40
PEON
hh
170.5574
11.21
1,911.95
11.21
Material
Material
ALAMBRE NEGRO N16
KG
95.7739
2.90
277.74
2.90
KG
4,137.4368
2.82
11,667.57
2.82
UND
2,062.0600
1.57
3,237.43
1.57
M3
45.2479
200.00
9,049.58
200.00
M3
43.9300
30.00
1,317.90
30.00
CAPATAZ
hh
13.8697
16.96
235.23
16.96
OPERARIO
hh
16.3277
14.14
230.87
14.14
OFICIAL
hh
16.3277
12.40
202.46
12.40
PEON
hh
65.3122
11.21
732.15
11.21
Material
ALAMBRE NEGRO N16
KG
77.6530
2.90
225.19
2.90
KG
3,354.6096
2.82
9,460.00
2.82
M3
41.1794
200.00
8,235.88
200.00
M3
39.9800
30.00
1,199.40
30.00
CAPATAZ
hh
58.0356
16.96
984.28
16.96
OPERARIO
hh
25.1693
14.14
355.89
14.14
OFICIAL
hh
34.0992
12.40
422.83
12.40
PEON
hh
166.9974
11.21
1,872.04
11.21
Material
ALAMBRE NEGRO N16
KG
94.6602
2.90
274.51
2.90
KG
4,089.3228
2.82
11,531.89
2.82
UND
2,062.0600
1.57
3,237.43
1.57
M3
44.3312
200.00
8,866.24
200.00
M3
43.0400
30.00
1,291.20
30.00
CAPATAZ
hh
13.8697
16.96
235.23
16.96
OPERARIO
hh
16.3277
14.14
230.87
14.14
OFICIAL
hh
16.3277
12.40
202.46
12.40
PEON
hh
65.3122
11.21
732.15
11.21
2.90
Material
ALAMBRE NEGRO N16
KG
77.6530
2.90
225.19
KG
3,354.6096
2.82
9,460.00
2.82
M3
41.1794
200.00
8,235.88
200.00
M3
39.9800
30.00
1,199.40
30.00
CAPATAZ
hh
53.6559
16.96
910.00
16.96
OPERARIO
hh
27.0560
14.14
382.57
14.14
OFICIAL
hh
35.4993
12.40
440.19
12.40
PEON
hh
171.6241
11.21
1,923.91
11.21
Material
ALAMBRE NEGRO N16
KG
98.4098
2.90
285.39
2.90
KG
4,251.3012
2.82
11,988.67
2.82
UND
2,062.0600
1.57
3,237.43
1.57
M3
45.9071
200.00
9,181.42
200.00
M3
44.5700
30.00
1,337.10
30.00
CAPATAZ
hh
8.5781
16.96
145.48
16.96
OPERARIO
hh
9.8850
14.14
139.77
14.14
OFICIAL
hh
9.8850
12.40
122.57
12.40
PEON
hh
39.5407
11.21
443.25
11.21
2.90
Material
ALAMBRE NEGRO N16
KG
48.1568
2.90
139.65
KG
2,080.3716
2.82
5,866.65
2.82
M3
24.8951
200.00
4,979.02
200.00
M3
24.1700
30.00
725.10
30.00
CAPATAZ
hh
26.2909
16.96
445.89
16.96
OPERARIO
hh
30.2017
14.14
427.05
14.14
OFICIAL
hh
30.2717
12.40
375.37
12.40
PEON
hh
147.4984
11.21
1,653.46
11.21
2.90
Material
ALAMBRE NEGRO N16
KG
70.2330
2.90
203.68
KG
3,034.0656
2.82
8,556.06
2.82
M3
0.1000
55.00
5.50
55.00
35.00
ARENA GRUESA
M3
0.1000
35.00
3.50
UND
1,662.4200
1.57
2,610.00
1.57
bls
0.5000
14.40
7.20
14.40
M3
37.5229
200.00
7,504.58
200.00
M3
36.4300
30.00
1,092.90
30.00
hh
85.6389
16.96
1,452.44
16.96
OPERARIO
hh
655.6913
14.14
9,271.47
14.14
OFICIAL
hh
14.6430
12.40
181.57
12.40
PEON
hh
307.8569
11.21
3,451.08
11.21
2.90
Material
ALAMBRE NEGRO N16
KG
18.7500
2.90
54.38
KG
898.6680
2.82
2,534.24
2.82
ARENA FINA
M3
14.2800
35.00
499.80
35.00
HORMIGON
M3
3.5483
16.00
56.77
16.00
bls
115.0028
14.40
1,656.04
14.40
M3
10.3000
200.00
2,060.00
200.00
M3
10.0000
30.00
300.00
30.00
hh
140.8748
16.96
2,389.24
16.96
OPERARIO
hh
1,182.4154
14.14
16,719.35
14.14
OFICIAL
hh
45.3420
12.40
562.24
12.40
PEON
hh
675.2704
11.21
7,569.78
11.21
KG
0.0150
2.90
0.04
2.90
ALAMBRE NEGRO N8
KG
0.1000
2.90
0.29
2.90
KG
0.0650
2.90
0.19
2.90
KG
634.7136
2.82
1,789.89
2.82
ARENA FINA
M3
46.9333
35.00
1,642.67
35.00
M3
0.4512
55.00
24.82
55.00
ARENA GRUESA
M3
8.3315
35.00
291.60
35.00
HORMIGON
M3
1.9040
16.00
30.46
16.00
UND
8,870.1000
0.56
4,967.26
0.56
405.8985
14.40
5,844.94
14.40
Material
bls
hh
92.7457
16.96
1,572.97
16.96
OPERARIO
hh
767.1162
14.14
10,847.02
14.14
OFICIAL
hh
27.0000
12.40
334.80
12.40
PEON
hh
483.7429
11.21
5,422.76
11.21
KG
0.1000
2.90
0.29
2.90
Material
ALAMBRE NEGRO N8
KG
472.0572
2.82
1,331.20
2.82
ARENA FINA
M3
37.1290
35.00
1,299.52
35.00
M3
0.1512
55.00
8.32
55.00
ARENA GRUESA
M3
0.0960
35.00
3.36
35.00
HORMIGON
M3
1.9040
16.00
30.46
16.00
bls
280.7963
14.40
4,043.47
14.40
hh
89.9355
16.96
1,525.31
16.96
OPERARIO
hh
793.2656
14.14
11,216.78
14.14
OFICIAL
hh
28.1940
12.40
349.61
12.40
PEON
hh
500.3195
11.21
5,608.58
11.21
KG
0.1000
2.90
0.29
2.90
KG
437.4000
2.82
1,233.47
2.82
ARENA FINA
M3
38.0708
35.00
1,332.48
35.00
M3
0.1512
55.00
8.32
55.00
ARENA GRUESA
M3
0.0960
35.00
3.36
35.00
HORMIGON
M3
2.6040
16.00
41.66
16.00
bls
291.5042
14.40
4,197.66
14.40
Material
ALAMBRE NEGRO N8
hh
74.9759
16.96
1,271.59
16.96
OPERARIO
hh
651.7506
14.14
9,215.75
14.14
OFICIAL
hh
22.6860
12.40
281.31
12.40
PEON
hh
417.1414
11.21
4,676.16
11.21
KG
417.8952
2.82
1,178.46
2.82
ARENA FINA
M3
33.6445
35.00
1,177.56
35.00
HORMIGON
M3
0.3500
16.00
5.60
16.00
bls
245.3519
14.40
3,533.07
14.40
CAPATAZ
hh
2.0046
16.96
34.00
16.96
OPERARIO
hh
20.0460
14.14
283.45
14.14
OFICIAL
hh
6.6820
12.40
82.86
12.40
PEON
hh
40.0920
11.21
449.43
11.21
Material
Material
ARENA FINA
M3
3.6751
35.00
128.63
35.00
bls
27.9976
14.40
403.17
14.40
Salida Diaria
Corte
Met.Actual
Parcial (S/.)
Ju
Vi
Sa
Lu
Ma
Mi
Saldo
Residencial ALLPA
PROGRAMACION INICIAL POR FASES
Fase
Descripcin
1
26/09 - 20/09
Und
Base
Parcial (S/.)
26/09-29/09
0.57
30/09-06/10
0.43
Mano de Obra
CAPATAZ
hh
54.68
31.17
23.51
OPERARIO
hh
745.74
425.07
320.67
OFICIAL
hh
485.09
276.50
208.59
PEON
hh
533.82
304.28
229.54
KG
0.93
0.53
0.40
0.04
0.04
51.28
Material
CLAVOS C/S CABEZA (PROMEDIO)
TRABAJOS PERMANENTES
Mano de Obra
CAPATAZ
hh
1,282.12
51.28
OPERARIO
hh
1,597.82
63.91
63.91
OFICIAL
hh
6,559.60
262.38
262.38
PEON
hh
19,965.18
798.61
798.61
0.11
0.21
169.95
MOVIMIENTO DE TIERRAS
Mano de Obra
CAPATAZ
hh
809.30
89.02
OFICIAL
hh
237.60
26.14
49.90
PEON
hh
6,990.03
768.90
1,467.91
0.40
401 SOLADOS
Mano de Obra
CAPATAZ
hh
32.50
13.00
OPERARIO
hh
270.95
108.38
OFICIAL
hh
118.80
47.52
PEON
hh
859.21
343.68
bls
544.96
217.98
HORMIGON
M3
251.02
100.41
Material
402 CALZADURA
0.13
Mano de Obra
CAPATAZ
hh
194.77
25.32
OPERARIO
hh
2,437.45
316.87
OFICIAL
hh
1,465.51
190.52
PEON
hh
4,859.50
631.74
ALAMBRE NEGRO N8
KG
69.60
9.05
KG
33.41
4.34
M3
1,544.32
200.76
HORMIGON
M3
1,463.04
190.20
bls
6,583.68
855.88
Material
403 CIMENTACION
Mano de Obra
CAPATAZ
hh
44.43
OPERARIO
hh
404.49
OFICIAL
hh
341.49
PEON
hh
1,465.39
ALAMBRE NEGRO N8
KG
11.89
KG
9.05
M3
24.32
M3
992.78
HORMIGON
M3
618.71
bls
2,250.37
Material
404 PAVIMENTOS
Mano de Obra
CAPATAZ
hh
409.60
OPERARIO
hh
2,264.09
OFICIAL
hh
1,362.09
PEON
hh
5,785.02
ALAMBRE NEGRO N8
KG
1.44
KG
1.44
KG
38.58
ARENA FINA
M3
11.20
TIERRA DE CHACRA
M3
200.00
M3
55.00
ARENA GRUESA
M3
119.93
AFIRMADO
M3
1,993.31
UND
112.00
bls
115.20
M3
8,782.24
M3
1,358.08
Material
0.10
501 CIMENTACION/CISTERNA
Mano de Obra
CAPATAZ
hh
94.90
9.49
OPERARIO
hh
785.80
78.58
OFICIAL
hh
504.93
50.49
PEON
hh
842.31
84.23
KG
94.13
9.41
ALAMBRE NEGRO N8
KG
14.50
1.45
KG
21.75
2.18
KG
3,954.22
395.42
M3
22.00
2.20
ARENA GRUESA
M3
8.75
0.88
bls
72.00
7.20
M3
14,788.74
1,478.87
M3
2,153.70
215.37
CAPATAZ
hh
750.16
OPERARIO
hh
480.40
OFICIAL
hh
284.20
PEON
hh
1,275.54
Material
502 SEMISOTANO EV
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
575.14
KG
24,160.74
M3
20,072.64
M3
2,923.20
CAPATAZ
hh
1,158.25
OPERARIO
hh
570.60
OFICIAL
hh
835.05
PEON
hh
2,279.80
503 SEMISOTANO EH
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
373.27
KG
15,680.42
UND
3,298.88
M3
10,674.92
M3
1,554.60
CAPATAZ
hh
288.83
OPERARIO
hh
677.70
OFICIAL
hh
643.91
PEON
hh
1,330.01
KG
323.07
ALAMBRE NEGRO N8
KG
13.20
KG
15.08
KG
13,571.56
M3
321.75
ARENA GRUESA
M3
122.50
bls
900.00
M3
8,235.88
M3
1,199.40
CAPATAZ
hh
1,239.39
OPERARIO
hh
381.06
OFICIAL
hh
437.55
PEON
hh
1,911.95
Material
Material
ALAMBRE NEGRO N16
KG
277.74
KG
11,667.57
UND
3,237.43
M3
9,049.58
M3
1,317.90
CAPATAZ
hh
235.23
OPERARIO
hh
230.87
OFICIAL
hh
202.46
PEON
hh
732.15
Material
ALAMBRE NEGRO N16
KG
225.19
KG
9,460.00
M3
8,235.88
M3
1,199.40
CAPATAZ
hh
984.28
OPERARIO
hh
355.89
OFICIAL
hh
422.83
PEON
hh
1,872.04
Material
ALAMBRE NEGRO N16
KG
274.51
KG
11,531.89
UND
3,237.43
M3
8,866.24
M3
1,291.20
CAPATAZ
hh
235.23
OPERARIO
hh
230.87
OFICIAL
hh
202.46
PEON
hh
732.15
Material
ALAMBRE NEGRO N16
KG
225.19
KG
9,460.00
M3
8,235.88
M3
1,199.40
CAPATAZ
hh
910.00
OPERARIO
hh
382.57
OFICIAL
hh
440.19
PEON
hh
1,923.91
Material
ALAMBRE NEGRO N16
KG
285.39
KG
11,988.67
UND
3,237.43
M3
9,181.42
M3
1,337.10
CAPATAZ
hh
145.48
OPERARIO
hh
139.77
OFICIAL
hh
122.57
PEON
hh
443.25
Material
ALAMBRE NEGRO N16
KG
139.65
KG
5,866.65
M3
4,979.02
M3
725.10
CAPATAZ
hh
445.89
OPERARIO
hh
427.05
OFICIAL
hh
375.37
PEON
hh
1,653.46
Material
ALAMBRE NEGRO N16
KG
203.68
KG
8,556.06
M3
5.50
ARENA GRUESA
M3
3.50
UND
2,610.00
bls
7.20
M3
7,504.58
M3
1,092.90
CAPATAZ
hh
1,452.44
OPERARIO
hh
9,271.47
OFICIAL
hh
181.57
PEON
hh
3,451.08
Material
ALAMBRE NEGRO N16
KG
54.38
KG
2,534.24
ARENA FINA
M3
499.80
HORMIGON
M3
56.77
bls
1,656.04
M3
2,060.00
M3
300.00
hh
2,389.24
OPERARIO
hh
16,719.35
OFICIAL
hh
562.24
PEON
hh
7,569.78
KG
0.04
ALAMBRE NEGRO N8
KG
0.29
KG
0.19
KG
1,789.89
ARENA FINA
M3
1,642.67
M3
24.82
ARENA GRUESA
M3
291.60
Material
HORMIGON
M3
30.46
UND
4,967.26
bls
5,844.94
hh
1,572.97
OPERARIO
hh
10,847.02
OFICIAL
hh
334.80
PEON
hh
5,422.76
KG
0.29
Material
ALAMBRE NEGRO N8
KG
1,331.20
ARENA FINA
M3
1,299.52
M3
8.32
ARENA GRUESA
M3
3.36
HORMIGON
M3
30.46
bls
4,043.47
hh
1,525.31
OPERARIO
hh
11,216.78
OFICIAL
hh
349.61
PEON
hh
5,608.58
KG
0.29
KG
1,233.47
ARENA FINA
M3
1,332.48
M3
8.32
ARENA GRUESA
M3
3.36
HORMIGON
M3
41.66
bls
4,197.66
CAPATAZ
hh
1,271.59
OPERARIO
hh
9,215.75
OFICIAL
hh
281.31
PEON
hh
4,676.16
KG
1,178.46
ARENA FINA
M3
1,177.56
HORMIGON
M3
5.60
bls
3,533.07
CAPATAZ
hh
34.00
OPERARIO
hh
283.45
OFICIAL
hh
82.86
PEON
hh
449.43
ARENA FINA
M3
128.63
bls
403.17
Material
ALAMBRE NEGRO N8
Material
Material
10
07/10-13/10
14/10-20/10
21/10-27/10
28/10-03/11
04/11-10/11
11/11-17/11
18/11-23/11
24/11-30/11
0.04
0.04
0.05
0.05
0.05
0.05
0.05
0.05
51.28
51.28
64.11
64.11
64.11
64.11
64.11
64.11
63.91
63.91
79.89
79.89
79.89
79.89
79.89
79.89
262.38
262.38
327.98
327.98
327.98
327.98
327.98
327.98
798.61
798.61
998.26
998.26
998.26
998.26
998.26
998.26
0.21
0.21
0.21
0.05
169.95
169.95
169.95
40.47
49.90
49.90
49.90
11.88
1,467.91
1,467.91
1,467.91
349.50
0.40
0.20
0.10
0.30
13.00
6.50
108.38
54.19
47.52
23.76
343.68
171.84
217.98
108.99
100.41
50.20
0.40
0.40
0.07
77.91
77.91
13.63
974.98
974.98
170.62
586.20
586.20
102.59
1,943.80
1,943.80
340.17
27.84
27.84
4.87
13.36
13.36
2.34
617.73
617.73
108.10
585.22
585.22
102.41
2,633.47
2,633.47
460.86
4.44
13.33
40.45
121.35
34.15
102.45
0.20
0.20
0.20
0.17
146.54
439.62
1.19
3.57
0.91
2.72
2.43
7.30
99.28
297.83
61.87
185.61
225.04
675.11
0.13
18.98
18.98
18.98
16.13
12.34
157.16
157.16
157.16
133.59
102.15
100.99
100.99
100.99
85.84
65.64
168.46
168.46
168.46
143.19
109.50
18.83
18.83
18.83
16.00
12.24
2.90
2.90
2.90
2.47
1.89
4.35
4.35
4.35
3.70
2.83
790.84
790.84
790.84
672.22
514.05
4.40
4.40
4.40
3.74
2.86
1.75
1.75
1.75
1.49
1.14
14.40
14.40
14.40
12.24
9.36
2,957.75
2,957.75
2,957.75
2,514.09
1,922.54
430.74
430.74
430.74
366.13
279.98
0.03
0.17
0.20
0.20
0.20
0.20
22.50
127.53
150.03
150.03
150.03
150.03
14.41
81.67
96.08
96.08
96.08
96.08
8.53
48.31
56.84
56.84
56.84
56.84
38.27
216.84
255.11
255.11
255.11
255.11
17.25
97.77
115.03
115.03
115.03
115.03
724.82
4,107.33
4,832.15
4,832.15
4,832.15
4,832.15
602.18
3,412.35
4,014.53
4,014.53
4,014.53
4,014.53
87.70
496.94
584.64
584.64
584.64
584.64
0.08
0.50
0.42
92.66
579.13
486.47
45.65
285.30
239.65
66.80
417.53
350.72
182.38
1,139.90
957.52
29.86
186.64
156.77
1,254.43
7,840.21
6,585.78
263.91
1,649.44
1,385.53
853.99
5,337.46
4,483.47
124.37
777.30
652.93
0.27
0.55
0.18
77.98
158.86
51.99
182.98
372.74
121.99
173.86
354.15
115.90
359.10
731.51
239.40
87.23
177.69
58.15
3.56
7.26
2.38
4.07
8.29
2.71
3,664.32
7,464.36
2,442.88
86.87
176.96
57.92
33.08
67.38
22.05
243.00
495.00
162.00
2,223.69
4,529.73
1,482.46
323.84
659.67
215.89
0.27
0.55
334.64
681.66
102.89
209.58
118.14
240.65
516.23
1,051.57
74.99
152.76
3,150.24
6,417.16
874.11
1,780.59
2,443.39
4,977.27
355.83
724.85
0.09
0.55
21.17
129.38
20.78
126.98
18.22
111.35
65.89
402.68
20.27
123.85
851.40
5,203.00
741.23
4,529.73
107.95
659.67
0.09
88.59
32.03
38.05
168.48
24.71
1,037.87
291.37
797.96
116.21
11
12
13
14
15
16
17
18
01/12-07/12
08/12-14/12
15/12-21/12
22/12-28/12
29/12-04/01
05/01-11/01
12/01-18/01
19/01-25/01
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
64.11
64.11
64.11
64.11
64.11
64.11
64.11
64.11
79.89
79.89
79.89
79.89
79.89
79.89
79.89
79.89
327.98
327.98
327.98
327.98
327.98
327.98
327.98
327.98
998.26
998.26
998.26
998.26
998.26
998.26
998.26
998.26
0.30
0.30
13.33
13.33
121.35
121.35
102.45
102.45
439.62
439.62
3.57
3.57
2.72
2.72
7.30
7.30
297.83
297.83
185.61
185.61
675.11
675.11
0.07
0.40
0.40
0.13
28.67
163.84
163.84
53.25
158.49
905.64
905.64
294.33
95.35
544.84
544.84
177.07
404.95
2,314.01
2,314.01
752.05
0.10
0.58
0.58
0.19
0.10
0.58
0.58
0.19
2.70
15.43
15.43
5.02
0.78
4.48
4.48
1.46
14.00
80.00
80.00
26.00
3.85
22.00
22.00
7.15
8.40
47.97
47.97
15.59
139.53
797.32
797.32
259.13
7.84
44.80
44.80
14.56
8.06
46.08
46.08
14.98
614.76
3,512.90
3,512.90
1,141.69
95.07
543.23
543.23
176.55
0.18
223.09
68.59
78.76
344.15
49.99
2,100.16
582.74
1,628.92
237.22
0.36
84.68
83.11
72.89
263.57
81.07
3,405.60
2,964.92
431.78
0.55
0.36
541.35
354.34
195.74
128.12
232.56
152.22
1,029.62
673.93
150.98
98.82
6,342.54
4,151.48
1,780.59
1,165.47
4,876.43
3,191.85
710.16
464.83
0.27
0.55
0.18
63.51
129.38
42.34
62.33
126.98
41.56
54.66
111.35
36.44
197.68
402.68
131.79
60.80
123.85
40.53
2,554.20
5,203.00
1,702.80
2,223.69
4,529.73
1,482.46
323.84
659.67
215.89
0.18
0.55
0.27
163.80
500.50
245.70
68.86
210.41
103.29
79.23
242.10
118.85
346.30
1,058.15
519.46
51.37
156.96
77.06
2,157.96
6,593.77
3,236.94
582.74
1,780.59
874.11
1,652.66
5,049.78
2,478.98
240.68
735.41
361.02
0.55
0.45
80.01
65.47
76.87
62.90
67.41
55.16
243.79
199.46
76.81
62.84
3,226.66
2,639.99
2,738.46
2,240.56
398.81
326.30
0.45
0.45
0.10
200.65
200.65
44.59
192.17
192.17
42.71
168.92
168.92
37.54
744.06
744.06
165.35
91.66
91.66
20.37
3,850.23
3,850.23
855.61
2.48
2.48
0.55
1.58
1.58
0.35
1,174.50
1,174.50
261.00
3.24
3.24
0.72
3,377.06
3,377.06
750.46
491.81
491.81
109.29
0.27
0.45
0.28
645.09
1,075.16
668.99
4,514.22
7,523.71
4,681.42
151.80
253.01
157.43
2,043.84
3,406.40
2,119.54
0.01
0.02
0.01
0.08
0.13
0.08
0.05
0.09
0.05
483.27
805.45
501.17
443.52
739.20
459.95
6.70
11.17
6.95
78.73
131.22
81.65
8.22
13.71
8.53
1,341.16
2,235.27
1,390.83
1,578.13
2,630.22
1,636.58
0.27
0.55
0.18
424.70
865.13
283.13
2,928.70
5,965.86
1,952.46
90.40
184.14
60.26
1,464.15
2,982.52
976.10
0.08
0.16
0.05
359.42
732.16
239.62
350.87
714.74
233.91
2.25
4.58
1.50
0.91
1.85
0.60
8.22
16.75
5.48
1,091.74
2,223.91
727.82
0.55
838.92
6,169.23
192.29
3,084.72
0.16
678.41
732.86
4.58
1.85
22.91
2,308.71
0.20
6.80
56.69
16.57
89.89
25.73
80.63
19
20
21
22
23
26/01-01/02
02/02-08/02
09/02-15/02
16/02-22/02
23/02-29/02
1.00
0.05
0.04
0.03
0.02
64.11
51.28
38.46
25.64
79.89
63.91
47.93
31.96
327.98
262.38
196.79
131.19
998.26
798.61
598.96
399.30
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.07
0.40
0.40
0.13
101.67
580.98
580.98
188.82
649.00
3,708.59
3,708.59
1,205.29
12.71
72.63
72.63
23.60
241.58
1,380.43
1,380.43
448.64
3.81
21.75
21.75
7.07
177.40
1,013.70
1,013.70
329.45
34.99
199.92
199.92
64.97
3.97
22.71
22.71
7.38
115.92
662.42
662.42
215.29
144.20
824.00
824.00
267.80
21.00
120.00
120.00
39.00
1.00
1.00
1.00
0.45
1.00
686.39
5,047.55
157.32
2,523.86
0.13
555.06
599.62
3.74
1.51
18.75
1,888.95
0.09
0.55
0.36
114.44
699.37
457.77
829.42
5,068.66
3,317.67
1.00
25.32
154.72
101.27
420.85
2,571.89
1,683.42
106.06
648.15
424.25
105.98
647.66
423.92
0.50
3.08
2.02
317.98
1,943.19
1,271.91
0.20
0.20
0.20
0.10
0.10
6.80
6.80
6.80
3.40
3.40
56.69
56.69
56.69
28.35
28.35
16.57
16.57
16.57
8.29
8.29
89.89
89.89
89.89
44.94
44.94
25.73
25.73
25.73
12.86
12.86
80.63
80.63
80.63
40.32
40.32
1.00
Residencial ALLPA
RESUMEN DE PROGRAMACION POR RUBROS PRINCIPALES
Fase
1
401
402
403
404
501
502
503
504
Descripcin
TRABAJOS PRELIMINARES Y PROVISIONALES
Mano de Obra
Material
Equipo
Subcontrato
TRABAJOS PERMANENTES
Mano de Obra
Material
Equipo
Subcontrato
MOVIMIENTO DE TIERRAS
Mano de Obra
Material
Equipo
Subcontrato
SOLADOS
Mano de Obra
Material
Equipo
Subcontrato
CALZADURA
Mano de Obra
Material
Equipo
Subcontrato
CIMENTACION
Mano de Obra
Material
Equipo
Subcontrato
PAVIMENTOS
Mano de Obra
Material
Equipo
Subcontrato
CIMENTACION/CISTERNA
Mano de Obra
Material
Equipo
Subcontrato
SEMISOTANO EV
Mano de Obra
Material
Equipo
Subcontrato
SEMISOTANO EH
Mano de Obra
Material
Equipo
Subcontrato
1ER PISO EV
Mano de Obra
Material
Equipo
Subcontrato
1
26/09-29/09
0.57
1,037.02
3,321.58
31.11
2
30/09-06/10
0.43
782.31
2,505.75
23.47
0.04
1,176.19
338.00
481.69
468.18
0.11
884.06
39.01
65.66
1,720.40
1,281.46
841.73
210.89
0.04
1,176.19
338.00
481.69
468.18
0.21
1,687.76
74.47
125.36
3,284.40
0.40
512.58
336.69
84.36
8,957.23
10,971.40
1,244.02
0.13
1,164.44
1,426.28
161.72
Parcial (S/)
1,819.33
5,827.33
54.58
29,404.72
8,450.00
12,042.14
11,704.50
8,036.93
354.62
596.95
15,640.00
2,255.80
4,243.99
361.80
9,820.80
17,577.40
1,415.84
4,008.20
2,227.94
23,445.80
66.84
1,242.07
2,790.30
63,324.47
355.50
21,997.45
4,843.70
46,649.57
235.72
23,191.31
2,940.45
32,647.43
88.21
10,166.76
0.10
222.79
2,344.58
6.68
124.21
505
506
507
508
509
510
511
601
602
603
604
605
606
1ER PISO EH
Mano de Obra
Material
Equipo
Subcontrato
2DO PISO EV
Mano de Obra
Material
Equipo
Subcontrato
2DO PISO EH
Mano de Obra
Material
Equipo
Subcontrato
3ER PISO EV
Mano de Obra
Material
Equipo
Subcontrato
3ER PISO EH
Mano de Obra
Material
Equipo
Subcontrato
4TO PISO EV
Mano de Obra
Material
Equipo
Subcontrato
4TO PISO EH
Mano de Obra
Material
Equipo
Subcontrato
TERMINACION SEMISOTANO
Mano de Obra
Material
Equipo
Subcontrato
TERMINACION 1ER PISO
Mano de Obra
Material
Equipo
Subcontrato
TERMINACION 2DO PISO
Mano de Obra
Material
Equipo
Subcontrato
TERMINACION 3ER PISO
Mano de Obra
Material
Equipo
Subcontrato
TERMINACION 4TO PISO
Mano de Obra
Material
Equipo
Subcontrato
TERMINACION EXTERIORES
3,969.95
41,408.08
202.92
24,598.13
1,400.71
26,272.49
172.64
9,086.76
3,635.04
39,280.66
188.13
20,388.89
1,400.71
26,403.11
42.02
9,086.76
3,656.67
39,489.26
194.38
19,471.47
851.07
16,152.52
104.61
5,641.42
2,901.77
28,750.92
163.47
10,293.50
14,356.56
19,828.69
670.86
12,006.65
27,240.61
28,997.23
2,047.98
42,858.73
18,177.55
16,106.66
1,486.61
31,801.79
18,700.28
14,363.51
1,549.40
28,029.67
15,444.81
11,674.62
1,435.49
27,697.87
Mano de Obra
Material
Equipo
Subcontrato
Mano de Obra
Material
Equipo
Subcontrato
TOTAL (c/IGV)
(%)
TOTAL ACUMULADO (c/IGV)
849.74
563.61
145.77
186,964.13
523,625.10
25,076.78
328,911.93
1,222,548.43
100.00%
3,097.27
3,698.59
578.46
2,188.58
10,726.71
0.88%
10,726.71
5,546.07
7,025.78
883.28
3,876.79
19,453.37
1.59%
30,180.07
1
26/09 - 20/09
3
07/10-13/10
4
14/10-20/10
5
21/10-27/10
0.04
1,176.19
338.00
481.69
468.18
0.21
1,687.76
74.47
125.36
3,284.40
0.40
512.58
336.69
84.36
0.04
1,176.19
338.00
481.69
468.18
0.21
1,687.76
74.47
125.36
3,284.40
0.20
256.29
168.35
42.18
0.05
1,470.24
422.50
602.11
585.23
0.21
1,687.76
74.47
125.36
3,284.40
0.40
3,582.89
4,388.56
497.61
0.40
3,582.89
4,388.56
497.61
0.07
627.01
768.00
87.08
6
28/10-03/11
0.05
1,470.24
422.50
602.11
585.23
0.05
401.85
17.73
29.85
782.00
7
04/11-10/11
0.05
1,470.24
422.50
602.11
585.23
8
11/11-17/11
0.05
1,470.24
422.50
602.11
585.23
9
18/11-23/11
0.05
1,470.24
422.50
602.11
585.23
0.10
225.58
424.40
36.18
0.20
445.59
4,689.16
13.37
248.41
0.20
445.59
4,689.16
13.37
248.41
0.03
83.71
1,899.73
10.66
659.92
0.20
445.59
4,689.16
13.37
248.41
0.17
474.35
10,765.16
60.43
3,739.57
0.17
378.75
3,985.79
11.36
211.15
0.20
558.06
12,664.89
71.10
4,399.49
0.13
289.63
3,047.95
8.69
161.47
0.20
558.06
12,664.89
71.10
4,399.49
0.08
387.50
3,731.97
18.86
1,855.30
0.20
558.06
12,664.89
71.10
4,399.49
0.50
2,421.85
23,324.79
117.86
11,595.66
0.27
793.92
8,814.81
23.82
2,745.03
0.20
558.06
12,664.89
71.10
4,399.49
0.42
2,034.35
19,592.82
99.00
9,740.35
0.55
1,617.25
17,956.09
48.52
5,591.72
0.27
1,071.89
11,180.18
54.79
6,641.50
0.09
126.06
2,364.52
15.54
817.81
7,405.01
9,826.88
1,202.38
4,000.99
25,140.71
2.06%
55,320.78
7,232.43
11,558.27
1,170.86
4,660.92
27,752.68
2.27%
83,073.47
4,704.94
16,719.29
888.35
7,857.61
34,753.92
2.84%
117,827.39
2,808.89
17,090.91
714.42
5,977.87
30,873.06
2.53%
148,700.45
2,705.42
19,867.31
700.75
7,001.49
35,237.50
2.88%
183,937.95
5,244.07
45,226.99
814.89
19,325.40
82,377.44
6.74%
266,315.39
7,103.43
64,605.40
927.23
27,776.09
117,207.72
9.59%
383,523.12
10
24/11-30/11
11
01/12-07/12
Semanas
12
08/12-14/12
0.05
1,470.24
422.50
602.11
585.23
0.05
1,470.24
422.50
602.11
585.23
0.05
1,470.24
422.50
602.11
585.23
0.30
676.74
1,273.20
108.54
0.30
676.74
1,273.20
108.54
0.30
676.74
1,273.20
108.54
0.07
687.46
1,230.42
99.11
280.57
0.18
529.28
5,876.54
15.88
1,830.02
13
15/12-21/12
14
22/12-28/12
15
29/12-04/01
0.05
1,470.24
422.50
602.11
585.23
0.05
1,470.24
422.50
602.11
585.23
0.05
1,470.24
422.50
602.11
585.23
0.40
3,928.32
7,030.96
566.34
1,603.28
0.40
3,928.32
7,030.96
566.34
1,603.28
0.13
1,276.70
2,285.06
184.06
521.07
16
05/01-11/01
0.05
1,470.24
422.50
602.11
585.23
0.55
2,183.47
22,774.44
111.61
13,528.97
0.55
770.39
14,449.87
94.95
4,997.72
0.09
327.15
3,535.26
16.93
1,835.00
0.18
714.59
7,453.45
36.53
4,427.66
0.36
504.26
9,458.10
62.15
3,271.23
0.55
1,999.27
21,604.36
103.47
11,213.89
0.27
378.19
7,128.84
11.35
2,453.43
0.36
1,308.61
14,141.04
67.73
7,340.00
0.55
770.39
14,521.71
23.11
4,997.72
0.18
658.20
7,108.07
34.99
3,504.86
0.18
252.13
4,752.56
7.56
1,635.62
0.55
2,011.17
21,719.09
106.91
10,709.31
0.55
468.09
8,883.89
57.54
3,102.78
0.27
987.30
10,662.10
52.48
5,257.30
0.45
382.98
7,268.63
47.08
2,538.64
0.45
1,305.80
12,937.91
73.56
4,632.08
0.45
1,305.80
12,937.91
73.56
4,632.08
0.10
290.18
2,875.09
16.35
1,029.35
0.27
7,354.96
7,829.25
552.95
11,571.86
0.45
12,258.27
13,048.75
921.59
19,286.43
0.28
7,627.37
8,119.22
573.43
12,000.44
0.27
4,907.94
4,348.80
401.38
8,586.48
5,957.27
48,331.81
950.02
22,776.93
90,986.60
7.44%
474,509.72
5,743.29
47,340.45
924.14
21,951.44
88,598.20
7.25%
563,107.92
5,571.64
38,696.93
935.58
16,708.38
72,053.90
5.89%
635,161.82
8,129.94
42,809.00
1,340.45
17,636.21
81,037.02
6.63%
716,198.84
15,429.60
46,151.36
1,894.52
26,188.37
103,026.02
8.43%
819,224.86
16,311.01
28,694.23
1,781.32
25,024.79
81,801.42
6.69%
901,026.28
14,295.72
15,765.61
1,593.27
22,201.50
60,976.98
4.99%
962,003.26
17
12/01-18/01
0.05
1,470.24
422.50
602.11
585.23
18
19/01-25/01
0.05
1,470.24
422.50
602.11
585.23
19
26/01-01/02
0.05
1,470.24
422.50
602.11
585.23
20
02/02-08/02
0.04
1,176.19
338.00
481.69
468.18
21
09/02-15/02
0.03
882.14
253.50
361.26
351.14
22
16/02-22/02
0.02
588.09
169.00
240.84
234.09
23
23/02-29/02
0.55
9,997.65
8,858.66
817.63
17,490.98
0.18
3,271.96
2,899.20
267.59
5,724.32
0.55
10,285.15
7,899.93
852.17
15,416.32
0.20
0.07
1,004.96
1,388.01
46.96
840.47
0.40
5,742.62
7,931.48
268.34
4,802.66
0.40
5,742.62
7,931.48
268.34
4,802.66
0.13
1,866.35
2,577.73
87.21
1,560.86
0.45
8,415.13
6,463.58
697.23
12,613.35
0.09
1,390.03
1,050.72
129.19
2,492.81
0.20
0.55
8,494.65
6,421.04
789.52
15,233.83
0.20
0.36
5,560.13
4,202.86
516.78
9,971.23
0.20
0.10
0.10
11,467.89
9,281.16
1,419.74
18,076.21
45,424.88
3.72%
1,007,428.14
169.95
112.72
29.15
169.95
112.72
29.15
169.95
112.72
29.15
169.95
112.72
29.15
84.97
56.36
14.58
84.97
56.36
14.58
15,197.30
11,334.35
1,751.02
21,725.87
56,274.56
4.60%
1,063,702.70
12,450.30
9,437.53
1,504.65
16,531.85
44,869.65
3.67%
1,108,572.34
15,583.41
14,803.24
1,568.70
20,504.67
59,097.81
4.83%
1,167,670.15
12,354.85
12,500.56
1,175.54
15,125.03
46,340.18
3.79%
1,214,010.33
2,539.42
2,803.09
342.63
1,794.95
8,369.42
0.68%
1,222,379.75
84.97
56.36
14.58
168.68
0.01%
1,222,548.43
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Residencial ALLPA
CONTROL DE HH POR FASES
Fase
1.00
26/09 - 20/09
Descripcin
Und
Base
1.00
Met
2.00
26/09-29/09
0.57
30/09-06/10
0.43
CAPATAZ
hh
3.22
1.84
1.39
OPERARIO
hh
52.74
30.06
22.68
OFICIAL
hh
39.12
22.30
16.82
PEON
hh
47.62
27.14
20.48
0.04
0.04
3.02
TRABAJOS PERMANENTES
CAPATAZ
hh
75.60
3.02
OPERARIO
hh
113.00
4.52
4.52
OFICIAL
hh
529.00
21.16
21.16
PEON
hh
1,781.01
71.24
71.24
CAPATAZ
hh
47.72
OPERARIO
hh
OFICIAL
hh
19.16
2.11
4.02
PEON
hh
623.55
68.59
130.95
CAPATAZ
hh
1.92
0.77
OPERARIO
hh
19.16
7.66
OFICIAL
hh
9.58
3.83
PEON
hh
76.65
30.66
MOVIMIENTO DE TIERRAS
0.11
0.21
5.25
10.02
0.40
401 SOLADOS
0.13
402 CALZADURA
CAPATAZ
hh
11.48
1.49
OPERARIO
hh
172.38
22.41
OFICIAL
hh
118.19
15.36
PEON
hh
433.50
56.35
403 CIMENTACION
CAPATAZ
hh
2.62
OPERARIO
hh
28.61
OFICIAL
hh
27.54
PEON
hh
130.72
CAPATAZ
hh
24.15
OPERARIO
hh
160.12
OFICIAL
hh
109.85
PEON
hh
516.06
CAPATAZ
hh
5.60
0.56
OPERARIO
hh
55.57
5.56
OFICIAL
hh
40.72
4.07
PEON
hh
75.14
7.51
CAPATAZ
hh
44.23
OPERARIO
hh
33.97
OFICIAL
hh
22.92
PEON
hh
113.79
CAPATAZ
hh
68.29
OPERARIO
hh
40.35
OFICIAL
hh
67.34
PEON
hh
203.37
404 PAVIMENTOS
0.10
501 CIMENTACION/CISTERNA
502 SEMISOTANO EV
503 SEMISOTANO EH
hh
17.03
OPERARIO
hh
47.93
OFICIAL
hh
51.93
PEON
hh
118.65
CAPATAZ
hh
73.08
OPERARIO
hh
26.95
OFICIAL
hh
35.29
PEON
hh
170.56
CAPATAZ
hh
13.87
OPERARIO
hh
16.33
OFICIAL
hh
16.33
PEON
hh
65.31
CAPATAZ
hh
58.04
OPERARIO
hh
25.17
OFICIAL
hh
34.10
PEON
hh
167.00
CAPATAZ
hh
13.87
OPERARIO
hh
16.33
OFICIAL
hh
16.33
PEON
hh
65.31
CAPATAZ
hh
53.66
OPERARIO
hh
27.06
OFICIAL
hh
35.50
PEON
hh
171.62
CAPATAZ
hh
8.58
OPERARIO
hh
9.89
OFICIAL
hh
9.89
PEON
hh
39.54
CAPATAZ
hh
26.29
OPERARIO
hh
30.20
OFICIAL
hh
30.27
PEON
hh
147.50
hh
85.64
OPERARIO
hh
655.69
OFICIAL
hh
14.64
PEON
hh
307.86
hh
140.87
OPERARIO
hh
1,182.42
OFICIAL
hh
45.34
PEON
hh
675.27
hh
92.75
OPERARIO
hh
767.12
OFICIAL
hh
27.00
PEON
hh
483.74
hh
89.94
OPERARIO
hh
793.27
OFICIAL
hh
28.19
PEON
hh
500.32
hh
74.98
OPERARIO
hh
651.75
OFICIAL
hh
22.69
PEON
hh
417.14
hh
2.00
OPERARIO
hh
20.05
OFICIAL
hh
6.68
PEON
hh
40.09
CAPATAZ
hh
1,035.41
10.11
17.25
OPERARIO
hh
4,946.04
34.58
62.83
OFICIAL
hh
1,357.59
45.57
65.27
PEON
hh
7,371.32
166.97
317.19
257.23
462.54
257.23
719.78
TOTAL (HH)
TOTAL (HH) ACUMULADAS
1,400.00
1,200.00
1,000.00
800.00
600.00
400.00
200.00
0.00
1 2 3 4 5 6 7 8 9 10111213
3.00
4.00
5.00
6.00
7.00
8.00
9.00
07/10-13/10
14/10-20/10
21/10-27/10
28/10-03/11
04/11-10/11
11/11-17/11
18/11-23/11
0.04
0.04
0.05
0.05
0.05
0.05
0.05
3.02
3.02
3.78
3.78
3.78
3.78
3.78
4.52
4.52
5.65
5.65
5.65
5.65
5.65
21.16
21.16
26.45
26.45
26.45
26.45
26.45
71.24
71.24
89.05
89.05
89.05
89.05
89.05
0.21
0.21
0.21
0.05
10.02
10.02
10.02
2.39
4.02
4.02
4.02
0.96
130.95
130.95
130.95
31.18
0.40
0.20
0.77
0.38
7.66
3.83
3.83
1.92
30.66
15.33
0.40
0.40
0.07
4.59
4.59
0.80
68.95
68.95
12.07
47.27
47.27
8.27
173.40
173.40
30.34
0.10
0.26
2.86
2.75
13.07
0.20
0.20
0.20
0.17
0.13
1.12
1.12
1.12
0.95
0.73
11.11
11.11
11.11
9.45
7.22
8.14
8.14
8.14
6.92
5.29
15.03
15.03
15.03
12.77
9.77
0.03
0.17
0.20
0.20
0.20
0.20
1.33
7.52
8.85
8.85
8.85
8.85
1.02
5.78
6.79
6.79
6.79
6.79
0.69
3.90
4.58
4.58
4.58
4.58
3.41
19.34
22.76
22.76
22.76
22.76
0.08
0.50
0.42
5.46
34.15
28.68
3.23
20.18
16.95
5.39
33.67
28.28
16.27
101.69
85.42
0.27
0.55
4.60
9.37
12.94
26.36
14.02
28.56
32.03
65.25
0.27
19.73
7.28
9.53
46.05
0.09
1.25
1.47
1.47
5.88
19.52
20.47
23.24
15.96
18.82
51.37
92.25
89.44
34.61
21.89
22.90
45.56
71.92
67.36
84.43
83.21
50.79
38.91
41.71
78.73
101.63
421.27
409.36
284.71
155.76
137.85
245.53
327.48
617.48
602.47
393.35
232.53
221.28
421.19
568.39
1,337.26
1,939.73
2,333.08
2,565.61
2,786.88
3,208.07
3,776.45
Series1
121314151617181920212223
10.00
11.00
12.00
13.00
14.00
15.00
16.00
24/11-30/11
01/12-07/12
08/12-14/12
15/12-21/12
22/12-28/12
29/12-04/01
05/01-11/01
0.05
0.05
0.05
0.05
0.05
0.05
0.05
3.78
3.78
3.78
3.78
3.78
3.78
3.78
5.65
5.65
5.65
5.65
5.65
5.65
5.65
26.45
26.45
26.45
26.45
26.45
26.45
26.45
89.05
89.05
89.05
89.05
89.05
89.05
89.05
0.30
0.30
0.30
0.79
0.79
0.79
8.58
8.58
8.58
8.26
8.26
8.26
39.22
39.22
39.22
0.07
0.40
0.40
0.13
1.69
9.66
9.66
3.14
11.21
64.05
64.05
20.82
7.69
43.94
43.94
14.28
36.12
206.42
206.42
67.09
0.18
3.07
8.63
9.35
21.36
0.55
0.18
40.19
13.15
14.82
4.85
19.41
6.35
93.81
30.70
0.55
0.36
7.63
4.99
8.98
5.88
8.98
5.88
35.92
23.51
0.09
0.55
0.36
5.22
31.92
20.89
2.27
13.84
9.06
3.07
18.75
12.28
15.03
91.85
60.12
0.27
0.55
0.18
3.74
7.63
2.50
4.41
8.98
2.94
4.41
8.98
2.94
17.63
35.92
11.76
0.18
0.55
0.27
9.66
29.51
14.49
4.87
14.88
7.31
6.39
19.52
9.58
30.89
94.39
46.34
0.55
0.45
4.72
3.86
5.44
4.45
5.44
4.45
21.75
17.79
0.45
0.45
0.10
11.83
11.83
2.63
13.59
13.59
3.02
13.62
13.62
3.03
66.37
66.37
14.75
0.27
0.45
0.28
38.04
63.39
39.44
319.25
532.09
331.08
12.24
20.40
12.70
182.32
303.87
189.08
0.27
25.04
207.12
7.29
130.61
60.68
58.38
44.44
50.17
81.65
82.14
70.90
48.93
43.21
48.35
92.95
414.29
572.14
546.87
75.52
70.10
70.05
98.29
110.29
74.76
49.46
294.38
291.96
291.32
423.37
608.30
526.38
423.49
479.50
463.66
454.16
664.78
1,214.54
1,255.43
1,090.71
4,255.95
4,719.61
5,173.77
5,838.55
7,053.08
8,308.51
9,399.22
17.00
18.00
19.00
20.00
21.00
22.00
23.00
12/01-18/01
19/01-25/01
26/01-01/02
02/02-08/02
09/02-15/02
16/02-22/02
23/02-29/02
0.05
0.05
0.05
0.04
0.03
0.02
3.78
3.78
3.78
3.02
2.27
1.51
5.65
5.65
5.65
4.52
3.39
2.26
26.45
26.45
26.45
21.16
15.87
10.58
89.05
89.05
89.05
71.24
53.43
35.62
0.55
0.18
51.01
16.69
421.91
138.08
14.85
4.86
266.06
87.07
0.07
0.40
0.40
0.13
5.99
34.26
34.26
11.13
45.90
262.28
262.28
85.24
1.03
5.86
5.86
1.90
21.55
123.14
123.14
40.02
0.55
0.45
49.46
40.47
436.30
356.97
15.51
12.69
275.18
225.14
0.09
0.55
0.36
6.75
41.24
26.99
58.66
358.46
234.63
2.04
12.48
8.17
37.54
229.43
150.17
0.20
0.20
0.20
0.20
0.10
0.10
0.40
0.40
0.40
0.40
0.20
0.20
4.01
4.01
4.01
4.01
2.00
2.00
1.34
1.34
1.34
1.34
0.67
0.67
8.02
8.02
8.02
8.02
4.01
4.01
54.79
70.34
57.39
78.92
63.92
12.85
0.20
427.56
584.04
471.18
629.27
504.31
89.50
2.00
41.30
48.15
43.54
40.83
31.23
13.15
0.67
355.11
459.32
381.31
431.83
334.76
79.65
4.01
878.76
1,161.85
953.43
1,180.85
934.21
195.15
6.88
10,277.99
11,439.84
12,393.26
13,574.11
14,508.32
14,703.47
14,710.36
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
14,710.36
Residencial ALLPA
VALORIZACIONES DE OBRA
Fase
Partida
Und
OBRAS PROVISIONALES
001.01
001.02
001.03
GBL
M
GBL
TRABAJOS PERMANENTES
002.01
GBL
002.02
GBL
002.03
GBL
002.04
GBL
002.05
LIMPIEZA DE OBRA
GBL
002.06
EST
002.07
M3
MOVIMIENTO DE TIERRAS
003.01
M3
003.02
M3
003.03
M3
003.04
M2
003.06
M3
401
SOLADOS
004.01
402
M2
CALZADURA
004.07
M3
004.08
M2
403
CIMENTACION
004.02
M3
004.03
M2
004.04
M3
004.05
M2
004.06
M3
404
Descripcin
PAVIMENTOS
003.05
M2
003.07
M2
006.01
M2
006.02
006.03
006.04
006.05
006.06
006.07
BRUADO DE RAMPAS
M2
012.02.02.01
012.02.02.02
012.02.02.03
012.02.02.04
012.02.02.05
012.02.02.06
013.04.01
013.04.02
M
UND
M
UND
501
CIMENTACION/CISTERNA
005.01.01
M3
005.01.02
M2
005.01.03
KG
005.09.01
M3
005.09.02
M2
005.09.03
KG
005.13.03
M2
012.01.03.01
UND
012.01.03.02
UND
012.01.03.03
UND
012.01.03.04
UND
012.01.03.05
GBL
502
SEMISOTANO EV
005.02.01
M3
005.02.02
M2
005.02.03
M2
005.02.04
KG
005.03.01
M3
005.03.02
M2
005.03.03
M2
005.03.04
KG
005.04.01
M3
005.04.03
M2
005.04.04
KG
012.01.01.06
PTO
012.02.01.01
012.02.05.01
PTO
012.02.05.02
PTO
013.05.03
SALIDA DE TOMACORRIENTES
PTO
013.06.02
PTO
503
SEMISOTANO EH
005.05.01
M3
005.05.03
M2
005.05.04
KG
005.06.01
M3
005.06.02
M2
005.06.03
005.06.04
UND
005.07.01
M3
005.07.02
M2
005.07.03
KG
005.08.01
M3
005.08.02
M2
005.08.03
KG
005.13.01
GBL
005.13.02
M2
012.01.01.06
PTO
012.02.05.01
PTO
012.02.05.02
PTO
012.02.06.02
UND
012.02.06.03
UND
012.03.01
PTO
012.03.04
ML
KG
013.05.01
SALIDA DE ALUMBRADO
PTO
013.05.03
SALIDA DE TOMACORRIENTES
PTO
013.06.01
PTO
013.06.02
PTO
013.06.03
PTO
013.06.04
PTO
013.07.07
PTO
013.07.08
PTO
013.07.09
PTO
013.07.10
PTO
013.08.02
PTO
013.08.03
PTO
013.08.04
PTO
013.08.05
PTO
504
1ER PISO EV
005.03.01
M3
005.03.02
M2
005.03.04
KG
005.04.01
M3
005.04.02
M2
005.04.04
KG
005.12.01
M3
005.12.02
M2
005.12.03
KG
005.12.04
GBL
005.12.05
M2
KG
005.12.06
505
1ER PISO EH
005.05.01
M3
005.05.02
M2
005.05.04
KG
005.06.01
M3
005.06.02
M2
005.06.03
005.06.04
UND
005.07.01
M3
005.07.02
M2
005.07.03
KG
005.08.01
M3
005.08.02
M2
005.08.03
KG
005.13.01
GBL
012.01.01.06
PTO
012.02.05.01
PTO
012.02.05.02
PTO
012.03.01
PTO
012.03.04
ML
013.05.01
SALIDA DE ALUMBRADO
PTO
013.05.03
SALIDA DE TOMACORRIENTES
PTO
013.06.01
PTO
013.06.02
PTO
013.06.05
PTO
013.06.06
PTO
013.07.07
PTO
KG
013.07.08
PTO
013.07.09
PTO
013.07.10
PTO
013.08.01
PTO
013.08.02
PTO
013.08.03
PTO
013.08.04
PTO
506
2DO PISO EV
005.03.01
M3
005.03.02
M2
005.03.04
KG
005.04.01
M3
005.04.02
M2
005.04.04
KG
507
2DO PISO EH
005.05.01
M3
005.05.02
M2
005.05.04
KG
005.06.01
M3
005.06.02
M2
005.06.03
005.06.04
UND
005.07.01
M3
005.07.02
M2
005.07.03
KG
005.08.01
M3
005.08.02
M2
005.08.03
KG
005.13.01
GBL
012.01.01.06
PTO
012.02.05.01
PTO
012.02.05.02
PTO
012.03.01
PTO
012.03.04
ML
013.05.01
SALIDA DE ALUMBRADO
PTO
013.05.03
SALIDA DE TOMACORRIENTES
PTO
013.06.01
PTO
013.06.02
PTO
013.06.05
PTO
013.06.06
PTO
013.07.07
PTO
013.07.08
PTO
013.07.09
PTO
013.07.10
PTO
013.08.02
PTO
013.08.03
PTO
013.08.04
PTO
508
KG
3ER PISO EV
005.03.01
M3
005.03.02
M2
005.03.04
KG
005.04.01
M3
005.04.02
M2
005.04.04
KG
509
3ER PISO EH
005.05.01
M3
005.05.02
M2
005.05.04
KG
005.06.01
M3
005.06.02
M2
005.06.03
005.06.04
UND
005.07.01
M3
005.07.02
M2
005.07.03
KG
005.08.01
M3
005.08.02
M2
005.08.03
KG
005.13.01
GBL
012.01.01.06
PTO
012.02.05.01
PTO
012.02.05.02
PTO
012.03.01
PTO
012.03.04
ML
013.05.01
SALIDA DE ALUMBRADO
PTO
013.05.03
SALIDA DE TOMACORRIENTES
PTO
013.06.01
PTO
013.06.02
PTO
013.06.05
PTO
013.06.06
PTO
013.07.08
PTO
013.08.02
PTO
013.08.03
PTO
013.08.04
PTO
510
KG
4TO PISO EV
005.03.01
M3
005.03.02
M2
005.03.04
KG
005.04.01
M3
005.04.02
M2
005.04.04
KG
511
4TO PISO EH
005.05.01
M3
005.05.02
M2
005.05.04
KG
005.06.01
M3
005.06.02
M2
005.06.03
005.06.04
UND
005.10.01
M3
005.10.02
M2
005.10.03
KG
005.13.01
GBL
012.01.03.06
GBL
012.02.05.01
PTO
013.05.01
SALIDA DE ALUMBRADO
PTO
013.06.06
PTO
013.08.02
PTO
KG
601
602
SEMISOTANO
004.09
M2
005.11.01
M3
005.11.02
M2
005.11.03
KG
007.01
M2
007.04
KG
008.03
M2
008.04
TARRAJEO DE CIELORASO
M2
008.05
M2
008.06
TARRAJEO IMPERMEABILIZADO
M2
008.07
VESTIDURA DE DERRAMES
ML
008.08
M2
008.09
GBL
009.01
CONTRAPISO E=5 CM
M2
010.01
010.02
011.01
011.02
M2
012.01.01.01
012.01.01.02
012.01.01.05
012.01.01.07
GBL
012.01.02.04
UND
012.01.02.05
UND
012.01.02.06
UND
012.01.02.07
UND
012.02.03.01
012.02.03.02
012.02.04.02
012.02.06.01
013.01.02
013.01.03
013.01.04
013.01.08
TUBERIA PVC P 50 mm
013.01.09
TUBERIA PVC P 35 mm
013.01.10
TUBERIA PVC P 25 mm
013.01.11
TUBERIA PVC P 20 mm
013.02.01
UND
013.03.03
UND
013.03.05
UND
013.03.06
UND
013.03.07
UND
013.03.08
UND
013.03.09
013.03.10
013.03.12
GBL
013.05.02
PTO
013.07.01
PTO
013.07.02
PTO
013.07.05
PTO
013.07.06
PTO
1ER PISO
M
GBL
M
M
007.01
M2
007.02
M2
007.03
M2
007.04
KG
008.01
M2
008.02
M2
008.03
M2
008.04
TARRAJEO DE CIELORASO
M2
008.05
M2
008.07
VESTIDURA DE DERRAMES
ML
008.09
GBL
009.01
CONTRAPISO E=5 CM
M2
009.02
M2
009.03
SARDINEL DE DUCHA
010.01
010.02
011.01
011.02
M2
012.01.01.01
012.01.01.02
012.01.01.03
012.01.01.04
012.01.01.05
012.01.01.07
GBL
012.01.02.01
UND
012.01.02.02
UND
012.01.02.03
UND
012.01.02.04
UND
012.01.02.05
UND
012.01.02.08
UND
012.02.04.01
012.02.04.02
012.02.06.01
GBL
012.03.02
UND
012.03.03
UND
012.03.05
GBL
013.01.01
013.01.02
013.01.05
013.01.06
013.01.07
013.01.08
TUBERIA PVC P 50 mm
013.01.09
TUBERIA PVC P 35 mm
013.01.10
TUBERIA PVC P 25 mm
013.01.11
TUBERIA PVC P 20 mm
013.02.02
UND
013.03.01
UND
013.03.02
UND
013.03.03
UND
013.03.05
UND
013.03.06
UND
013.03.07
UND
013.03.08
UND
013.03.11
BANCO DE MEDIDORES
GBL
M
M
013.03.12
GBL
013.05.02
PTO
013.07.03
PTO
013.07.04
PTO
603
2DO PISO
007.01
M2
007.02
M2
007.04
KG
008.02
M2
008.03
M2
008.04
TARRAJEO DE CIELORASO
M2
008.05
M2
008.07
VESTIDURA DE DERRAMES
ML
008.09
GBL
009.01
CONTRAPISO E=5 CM
M2
009.02
M2
009.03
SARDINEL DE DUCHA
011.01
011.02
M2
012.01.01.01
012.01.01.02
012.01.01.03
012.01.01.04
012.01.01.05
012.01.01.07
GBL
012.01.02.02
UND
012.01.02.03
UND
012.01.02.04
UND
012.01.02.08
UND
012.02.04.01
012.02.04.02
012.02.06.01
GBL
012.03.02
UND
012.03.03
UND
012.03.05
GBL
013.01.02
013.01.06
013.01.08
TUBERIA PVC P 50 mm
013.01.09
TUBERIA PVC P 35 mm
013.01.10
TUBERIA PVC P 25 mm
013.01.11
TUBERIA PVC P 20 mm
013.02.02
UND
013.03.04
UND
013.03.05
UND
013.03.06
UND
013.03.07
UND
013.03.08
UND
013.03.12
GBL
PTO
013.05.02
604
M
M
3ER PISO
007.01
M2
007.02
M2
007.04
KG
008.02
M2
008.03
M2
008.04
TARRAJEO DE CIELORASO
M2
008.05
M2
008.07
VESTIDURA DE DERRAMES
ML
008.09
GBL
009.01
CONTRAPISO E=5 CM
M2
009.02
M2
009.03
SARDINEL DE DUCHA
011.01
011.02
M2
012.01.01.01
012.01.01.02
012.01.01.03
012.01.01.04
012.01.01.07
GBL
012.01.02.02
UND
012.01.02.03
UND
012.01.02.04
UND
012.01.02.08
UND
012.02.04.01
012.02.04.02
012.02.06.01
GBL
012.03.03
UND
012.03.05
GBL
013.01.02
013.01.06
013.01.08
TUBERIA PVC P 50 mm
013.01.09
TUBERIA PVC P 35 mm
013.01.10
TUBERIA PVC P 25 mm
013.01.11
TUBERIA PVC P 20 mm
013.02.03
UND
013.03.05
UND
013.03.06
UND
013.03.07
UND
013.03.08
UND
013.03.12
GBL
013.05.02
PTO
605
M
M
4TO PISO
007.01
M2
007.02
M2
007.04
KG
008.02
M2
008.03
M2
008.04
TARRAJEO DE CIELORASO
M2
008.07
VESTIDURA DE DERRAMES
ML
008.09
GBL
009.01
CONTRAPISO E=5 CM
M2
009.02
M2
012.01.01.04
012.01.01.05
012.01.01.07
GBL
012.01.02.03
UND
012.01.02.04
UND
012.02.04.01
012.02.04.02
012.02.04.03
012.02.06.01
GBL
012.03.03
UND
012.03.05
GBL
013.01.02
013.01.06
013.01.11
TUBERIA PVC P 20 mm
013.02.04
TABLERO ASCENSOR
UND
013.03.06
UND
013.03.07
UND
013.03.08
UND
013.03.12
GBL
606
M
M
EXTERIORES
009.01
CONTRAPISO E=5 CM
M2
1
26/09 - 20/09
Met
P.U.
Parcial
(S/.)
(S/.)
Anterior
Metrado
1.00
4,410.90
16.00
38.69
4,410.90
619.04
1.00
2,671.49
2,671.49
1.00
3,432.48
3,432.48
1.00
4,188.96
4,188.96
1.00
3,624.31
3,624.31
1.00
2,520.00
2,520.00
1.00
6,026.50
6,026.50
1.00
29,871.00
29,871.00
468.18
26.44
12,378.68
2,409.48
97.00
24.84
101.60
30.39
3,087.62
920.00
18.29
16,826.80
119.76
8.52
1,020.36
40.00
28.14
1,125.60
119.76
19.48
2,332.92
101.60
180.69
18,358.10
96.00
29.32
2,814.72
5.80
121.45
704.41
6.00
22.91
137.46
1.60
184.19
294.70
16.00
28.82
461.12
41.93
125.53
5,263.47
292.06
11.15
3,256.47
292.06
13.95
4,074.24
292.06
54.63
15,955.24
49.65
11.20
556.08
96.38
2.43
234.20
58.41
4.27
249.41
96.38
5.41
521.42
58.41
6.02
351.63
17.92
8.84
158.41
42.90
28.88
1,238.95
6.50
41.48
269.62
11.30
26.64
301.03
31.60
22.59
713.84
6.40
16.06
102.78
4.00
264.73
1,058.92
30.00
34.75
1,042.50
2.00
1,365.14
2,730.28
Actual
Parcial
Metrado
Acumulada
Parcial
Metrado
67.79
253.39
17,177.31
50.00
29.07
1,453.50
1,111.34
3.92
4,356.45
4.00
289.47
1,157.88
11.30
38.40
433.92
187.00
3.92
733.04
40.00
12.89
515.60
1.00
111.31
111.31
2.00
95.26
190.52
1.00
80.26
80.26
1.00
500.00
500.00
1.00
278.33
278.33
41.45
248.64
10,306.13
32.00
37.18
1,189.76
200.41
38.25
7,665.68
2,244.24
3.92
8,797.42
9.17
274.07
2,513.22
29.46
38.18
1,124.78
66.44
41.20
2,737.33
1,895.26
3.92
7,429.42
46.82
269.32
12,609.56
395.80
40.18
15,903.24
3,793.50
3.92
14,870.52
7.00
73.62
515.34
15.00
28.22
423.30
4.00
74.39
297.56
1.00
60.08
60.08
24.00
81.84
1,964.16
1.00
55.37
55.37
16.79
277.80
4,664.26
115.20
46.63
5,371.78
2,233.52
3.92
8,755.40
22.31
268.72
5,995.14
244.85
29.95
7,333.26
2,346.07
3.92
9,196.59
2,040.00
2.19
4,467.60
11.10
265.46
2,946.61
24.55
38.89
954.75
487.96
3.92
1,912.80
1.62
334.83
542.42
14.44
48.54
700.92
81.00
3.92
317.52
0.20
1,920.00
384.00
87.50
15.75
1,378.13
38.00
73.62
2,797.56
56.00
74.39
4,165.84
12.00
60.08
720.96
6.00
86.31
517.86
1.00
65.26
65.26
22.00
79.78
1,755.16
24.00
11.62
278.88
28.00
80.05
2,241.40
54.00
81.84
4,419.36
11.00
58.82
647.02
7.00
55.37
387.59
1.00
55.37
55.37
1.00
61.13
61.13
2.00
76.99
153.98
4.00
84.53
338.12
2.00
76.99
153.98
2.00
64.39
128.78
15.00
57.68
865.20
1.00
54.72
54.72
1.00
55.25
55.25
1.00
61.27
61.27
5.88
274.07
1,611.53
62.55
38.18
2,388.16
874.00
3.92
3,426.08
34.10
269.32
9,183.81
304.22
38.04
11,572.53
2,232.12
3.92
8,749.91
5.00
318.36
1,591.80
11.00
37.60
413.60
750.00
3.92
2,940.00
4.00
278.33
1,113.32
12.00
41.86
502.32
600.00
3.92
2,352.00
16.80
277.80
4,667.04
111.20
44.40
4,937.28
2,217.91
3.92
8,694.21
21.62
268.72
5,809.73
240.24
29.95
7,195.19
1,346.82
3.92
5,279.53
2,002.00
2.19
4,384.38
3.00
265.46
796.38
16.96
38.89
659.57
140.68
3.92
551.47
2.51
334.83
840.42
22.39
48.54
1,086.81
125.55
3.92
492.16
0.20
1,920.00
384.00
36.00
73.62
2,650.32
56.00
74.39
4,165.84
12.00
60.08
720.96
22.00
79.78
1,755.16
24.00
11.62
278.88
94.00
80.05
7,524.70
49.00
81.84
4,010.16
12.00
58.82
705.84
6.00
55.37
332.22
4.00
51.92
207.68
10.00
62.14
621.40
2.00
76.99
153.98
4.00
84.53
338.12
2.00
76.99
153.98
2.00
64.39
128.78
1.00
132.44
132.44
4.00
57.68
230.72
2.00
54.72
109.44
2.00
55.25
110.50
5.88
274.07
1,611.53
62.55
38.18
2,388.16
874.00
3.92
3,426.08
34.10
269.32
9,183.81
304.22
38.04
11,572.53
2,232.12
3.92
8,749.91
16.80
277.80
4,667.04
111.20
44.40
4,937.28
2,217.91
3.92
8,694.21
21.62
268.72
5,809.73
240.24
29.95
7,195.19
1,346.82
3.92
5,279.53
2,002.00
2.19
4,384.38
3.00
265.46
796.38
16.96
38.89
659.57
140.68
3.92
551.47
1.62
334.83
542.42
14.44
48.54
700.92
81.00
3.92
317.52
0.20
1,920.00
384.00
20.00
73.62
1,472.40
34.00
74.39
2,529.26
8.00
60.08
480.64
12.00
79.78
957.36
16.00
11.62
185.92
79.00
80.05
6,323.95
45.00
81.84
3,682.80
10.00
58.82
588.20
4.00
55.37
221.48
4.00
51.92
207.68
12.00
62.14
745.68
2.00
76.99
153.98
4.00
84.53
338.12
2.00
76.99
153.98
2.00
64.39
128.78
4.00
57.68
230.72
1.00
54.72
54.72
1.00
55.25
55.25
5.88
274.07
1,611.53
62.55
38.18
2,388.16
874.00
3.92
3,426.08
34.10
269.32
9,183.81
304.22
38.04
11,572.53
2,232.12
3.92
8,749.91
17.60
277.80
4,889.28
119.63
44.40
5,311.57
2,331.44
3.92
9,139.24
21.62
268.72
5,809.73
240.24
29.95
7,195.19
1,346.82
3.92
5,279.53
2,002.00
2.19
4,384.38
3.00
265.46
796.38
14.96
38.89
581.79
140.68
3.92
551.47
2.35
334.83
786.85
20.95
48.54
1,016.91
117.45
3.92
460.40
0.20
1,920.00
384.00
18.00
73.62
1,325.16
36.00
74.39
2,678.04
8.00
60.08
480.64
10.00
79.78
797.80
14.00
11.62
162.68
90.00
80.05
7,204.50
22.00
81.84
1,800.48
4.00
58.82
235.28
4.00
55.37
221.48
4.00
51.92
207.68
6.00
62.14
372.84
4.00
84.53
338.12
4.00
57.68
230.72
1.00
54.72
54.72
1.00
55.25
55.25
3.80
274.07
1,041.47
37.50
38.18
1,431.75
602.46
3.92
2,361.64
20.37
269.32
5,486.05
190.30
38.04
7,239.01
1,323.81
3.92
5,189.34
13.80
277.80
3,833.64
97.46
44.40
4,327.22
1,633.22
3.92
6,402.22
17.43
268.72
4,683.79
193.70
29.95
5,801.32
864.10
3.92
3,387.27
1,614.00
2.19
3,534.66
5.20
307.30
1,597.96
45.00
40.63
1,828.35
312.00
3.92
1,223.04
0.20
1,920.00
384.00
1.00
193.01
193.01
7.00
74.39
520.73
49.00
80.05
3,922.45
6.00
62.14
372.84
1.00
57.68
57.68
50.69
18.51
938.27
10.00
289.47
2,894.70
80.00
38.86
3,108.80
750.00
3.92
2,940.00
71.39
71.40
5,097.25
82.10
3.05
250.41
116.43
20.24
2,356.54
269.40
23.43
6,312.04
5.85
26.36
154.21
75.00
23.22
1,741.50
43.00
11.56
497.08
473.00
7.91
3,741.43
0.20
1,400.00
280.00
15.74
23.34
367.37
57.49
11.05
635.26
85.08
17.38
1,478.69
19.70
17.04
335.69
1.44
41.24
59.39
12.00
28.30
339.60
10.00
59.53
595.30
46.10
10.10
465.61
0.20
518.92
103.78
6.00
61.00
366.00
5.00
35.94
179.70
1.00
122.00
122.00
2.00
154.95
309.90
21.20
64.10
1,358.92
52.80
29.69
1,567.63
2.70
23.57
63.64
0.20
518.74
103.75
15.00
36.66
549.90
8.00
24.62
196.96
8.00
22.64
181.12
5.30
16.14
85.54
2.65
11.63
30.82
2.65
9.16
24.27
12.65
8.68
109.80
1.00
3,333.92
3,333.92
7.00
96.70
676.90
2.00
69.13
138.26
9.00
25.85
232.65
3.00
19.63
58.89
2.00
19.63
39.26
10.00
82.09
820.90
10.00
61.76
617.60
0.20
500.00
100.00
5.00
62.85
314.25
2.00
90.62
181.24
2.00
90.62
181.24
1.00
84.84
84.84
2.00
69.42
138.84
458.54
71.40
32,739.76
28.35
86.10
2,440.94
122.43
72.92
8,927.60
559.92
3.05
1,707.76
183.65
17.65
3,241.42
221.54
21.81
4,831.79
477.97
20.24
9,674.11
257.20
23.43
6,026.20
5.85
26.36
154.21
258.50
11.56
2,988.26
0.20
1,400.00
280.00
259.20
23.34
6,049.73
27.20
18.87
513.26
4.00
20.19
80.76
9.00
11.05
99.45
30.00
17.38
521.40
32.50
17.04
553.80
1.44
41.24
59.39
2.65
28.30
75.00
6.15
59.53
366.11
21.40
14.22
304.31
31.60
11.41
360.56
30.60
10.10
309.06
0.20
518.92
103.78
1.00
107.27
107.27
4.00
79.90
319.60
4.00
69.90
279.60
21.00
61.00
1,281.00
4.00
35.94
143.76
2.00
184.63
369.26
34.45
29.04
1,000.43
19.80
23.57
466.69
0.20
518.74
103.75
2.00
69.90
139.80
14.00
61.00
854.00
0.25
318.92
79.73
30.00
49.97
1,499.10
120.00
36.66
4,399.20
21.30
14.24
303.31
2.65
13.47
35.70
10.00
35.72
357.20
30.30
16.14
489.04
2.65
11.63
30.82
2.65
9.16
24.27
67.65
8.68
587.20
2.00
1,366.96
2,733.92
1.00
494.52
494.52
2.00
157.26
314.52
3.00
96.70
290.10
1.00
69.13
69.13
10.00
25.85
258.50
3.00
19.63
58.89
2.00
19.63
39.26
1.00
1,290.80
1,290.80
0.20
500.00
100.00
1.00
62.85
62.85
1.00
74.84
74.84
1.00
84.84
84.84
371.26
71.40
26,507.96
8.82
86.10
759.40
437.09
3.05
1,333.12
100.99
21.81
2,202.59
477.97
20.24
9,674.11
257.20
23.43
6,026.20
5.85
26.36
154.21
215.50
11.56
2,491.18
0.20
1,400.00
280.00
245.78
23.34
5,736.51
27.20
18.87
513.26
4.00
20.19
80.76
19.70
17.04
335.69
1.44
41.24
59.39
2.65
28.30
75.00
2.65
59.53
157.75
21.40
14.22
304.31
31.60
11.41
360.56
21.60
10.10
218.16
0.20
518.92
103.78
4.00
79.90
319.60
4.00
69.90
279.60
18.00
61.00
1,098.00
2.00
184.63
369.26
34.45
29.04
1,000.43
19.80
23.57
466.69
0.20
518.74
103.75
2.00
69.90
139.80
14.00
61.00
854.00
0.25
318.92
79.73
45.25
36.66
1,658.87
2.65
13.47
35.70
5.30
16.14
85.54
2.65
11.63
30.82
2.65
9.16
24.27
32.65
8.68
283.40
2.00
1,366.96
2,733.92
3.00
86.70
260.10
1.00
69.13
69.13
2.00
25.85
51.70
3.00
19.63
58.89
2.00
19.63
39.26
0.20
500.00
100.00
1.00
62.85
62.85
343.35
71.40
24,515.19
8.82
86.10
759.40
405.00
3.05
1,235.25
115.99
21.81
2,529.74
486.40
20.24
9,844.74
255.20
23.43
5,979.34
5.85
26.36
154.21
215.50
11.56
2,491.18
0.20
1,400.00
280.00
249.72
23.34
5,828.46
37.20
18.87
701.96
4.00
20.19
80.76
30.60
17.04
521.42
1.62
41.24
66.81
2.65
28.30
75.00
2.65
59.53
157.75
23.00
14.22
327.06
25.60
11.41
292.10
0.20
518.92
103.78
4.00
79.90
319.60
2.00
69.90
139.80
8.00
61.00
488.00
2.00
184.63
369.26
5.30
29.04
153.91
23.85
23.57
562.14
0.20
518.74
103.75
6.00
61.00
366.00
0.25
318.92
79.73
7.95
36.66
291.45
2.65
13.47
35.70
5.30
16.14
85.54
2.65
11.63
30.82
2.65
9.16
24.27
32.65
8.68
283.40
2.00
1,366.96
2,733.92
4.00
69.13
276.52
4.00
25.85
103.40
3.00
19.63
58.89
2.00
19.63
39.26
0.20
500.00
100.00
1.00
62.85
62.85
281.82
71.40
20,121.95
54.65
86.10
4,705.37
386.94
3.05
1,180.17
260.20
21.81
5,674.96
325.30
20.24
6,584.07
193.70
23.43
4,538.39
129.20
11.56
1,493.55
0.20
1,400.00
280.00
222.86
23.34
5,201.55
5.00
18.87
94.35
16.05
11.41
183.13
29.80
10.10
300.98
0.20
518.92
103.78
2.00
69.90
139.80
10.00
61.00
610.00
12.35
29.04
358.64
30.35
23.57
715.35
13.90
19.42
269.94
0.20
518.74
103.75
8.00
61.00
488.00
0.25
318.92
79.73
39.65
36.66
1,453.57
9.65
13.47
129.99
7.65
8.68
66.40
1.00
1,016.96
1,016.96
5.00
25.85
129.25
4.00
19.63
78.52
3.00
19.63
58.89
0.20
500.00
100.00
66.82
23.34
1,559.58
S/.
1,064,577.95
S/.
S/.
S/.
Acumulada
Saldo
Parcial
Metrado
Parcial
S/.
Residencial ALLPA
Control Semanal de mano de obra
Detalle
1
26/09 - 20/09
Und
Presupuesto Base
Met
Parcial (S/.)
P.U. (S/.)
P.U. (S/.)
CAPATAZ
hh
1,035.41
16.96
17,560.52
16.96
OPERARIO
hh
4,946.04
14.14
69,936.95
14.14
OFICIAL
hh
1,357.59
12.40
16,834.12
12.40
PEON
hh
7,371.32
11.21
82,632.48
11.21
S/.
186,964.07
Corte
Metrado
Saldo
Anterior (S/.)
Actual (S/.)
Acumulado (S/.)
0.00
0.00
0.00
17,560.52
0.00
0.00
0.00
69,936.95
0.00
0.00
0.00
16,834.12
0.00
0.00
0.00
82,632.48
0.00
0.00
186,964.07
0.00
Residencial ALLPA
Control Semanal de materiales principales
Detalle
Und
Presupuesto Base
Met
P.U. (S/.)
KG
1,052.21
2.90
ALAMBRE NEGRO N8
KG
38.45
2.90
KG
28.22
2.90
KG
47,519.03
2.82
VAR
VAR
VAR
VAR
VAR
ARENA FINA
M3
174.05
35.00
ARENA GRUESA
M3
15.80
35.00
HORMIGON
M3
156.11
16.00
M3
39.22
40.00
M3
24.82
40.00
M3
8.10
55.00
AFIRMADO
M3
56.95
35.00
TIERRA DE CHACRA
M3
4.00
50.00
bls
2,093.87
14.40
M3
45.27
194.00
M3
559.42
200.00
M3
588.40
30.00
UND
9,070.10
0.56
UND
9,949.80
1.57
GBL
1.00
3,500.00
GBL
1.00
2,000.00
GBL
1.00
3,500.00
S/.
1
26/09 - 20/09
Presupuesto Base
Almacn (semanal)
Parcial (S/.)
Anterior
Ingreso (und)
Stock (und)
Corte
Stock min (und)
P.U. (S/.)
Met.Anterior
3,051.41
2.90
111.49
2.90
81.84
2.90
134,003.66
2.82
6,091.86
35.00
553.00
35.00
2,497.73
16.00
1,568.64
40.00
992.78
40.00
445.70
55.00
1,993.31
35.00
200.00
50.00
30,151.74
14.40
8,782.24
194.00
111,884.78
200.00
17,651.98
30.00
5,079.26
0.56
15,621.19
1.57
3,500.00
3,500.00
2,000.00
2,000.00
3,500.00
3,500.00
349,762.62
Salida Diaria
Corte
Met. Actual
Met. Acumulado
S/.
Actual (S/.)
Ju
Vi
Sa
Lu
Ma
Saldo
Mi
1,052.21
38.45
28.22
47,519.03
174.05
15.80
156.11
39.22
24.82
8.10
56.95
4.00
2,093.87
45.27
559.42
588.40
9,070.10
9,949.80
1.00
1.00
1.00
S/.
#REF!
Residencial ALLPA
CONTROL SEMANAL DE MATERIALES PARA INSTALACIONES SANITARIAS
Detalle
1
26/09 - 20/09
Und
Presupuesto Base
Met
P.U. (S/.)
Parcial (S/.)
UND
9.00
18.00
162.00
UND
6.00
125.00
750.00
UND
1.00
500.00
500.00
UND
17.42
12.00
209.09
UND
7.00
16.00
111.94
UND
99.50
6.90
686.53
UND
44.84
12.00
538.02
UND
76.85
16.00
1229.64
UND
5.82
56.00
325.75
UND
123.15
1.00
123.15
UND
36.34
4.00
145.37
UND
6.36
44.00
279.84
UND
36.67
1.10
40.34
UND
5.02
4.00
20.07
UND
16.41
5.00
82.03
UND
61.95
2.50
154.88
UND
44.08
6.00
264.48
UND
4.24
39.00
165.36
UND
5.79
12.00
69.48
UND
21.23
3.00
63.69
UND
69.14
2.00
138.27
UND
16.02
6.00
96.11
UND
0.49
2.69
1.31
UND
6.83
3.00
20.50
UND
35.71
5.00
178.53
UND
41.81
7.00
292.64
UND
0.49
9.00
4.38
UND
2.24
3.00
6.72
UND
11.06
5.00
55.30
UND
3.96
12.00
47.46
UND
1.37
18.00
24.57
UND
72.76
9.00
654.85
UND
35.71
2.00
71.41
UND
45.93
2.60
119.43
UND
0.83
3.00
2.50
UND
9.65
6.00
57.90
UND
8.66
8.50
73.57
UND
59.28
16.50
978.12
UND
7.92
26.00
205.92
UND
187.80
0.90
169.02
UND
21.78
1.60
34.85
UND
9.75
0.90
8.78
UND
38.79
1.20
46.55
UND
10.82
1.90
20.57
UND
16.38
0.45
7.37
UND
18.02
0.50
9.01
UND
63.90
0.90
57.51
UND
9.90
1.50
14.85
UND
5.99
8.00
47.88
UND
2.00
105.00
UND
1.00
78.00
78.00
UND
105.00
20.00
2100.00
UND
16.00
26.00
416.00
UND
12.00
31.00
372.00
UND
1.00
45.00
45.00
UND
175.10
1.20
210.12
UND
9.90
1.35
13.37
UND
175.10
1.20
210.12
UND
9.90
1.35
13.37
UND
210.00
3.00
630.00
UND
32.00
4.00
128.00
UND
24.00
6.00
144.00
UND
3.00
9.00
27.00
UND
210.00
1.00
210.00
UND
32.00
1.30
41.60
UND
24.00
1.70
40.80
UND
3.00
2.50
7.50
UND
21.71
1.80
39.09
UND
28.56
12.00
342.74
UND
32.13
10.00
321.35
UND
11.21
8.00
89.70
UND
7.08
6.00
42.47
UND
1.00
75.00
75.00
UND
1.00
50.00
50.00
UND
2.00
65.00
130.00
UND
6.00
50.00
300.00
UND
1.00
35.00
35.00
UND
86.40
9.00
777.61
UND
45.82
12.50
572.73
UND
25.72
19.00
488.64
UND
21.45
32.00
686.40
UND
7.34
48.00
352.30
UND
76.23
1.50
114.34
UND
13.16
1.30
17.11
UND
9.87
1.15
11.35
UND
21.45
2.50
53.63
UND
3.99
3.20
12.77
UND
3.99
6.00
23.94
UND
229.74
1.20
275.69
UND
59.50
1.50
89.25
UND
19.74
2.20
43.43
UND
21.45
4.80
102.96
UND
14.99
7.00
104.90
UND
21.45
4.80
102.96
UND
68.17
0.75
51.13
UND
82.18
1.00
82.18
UND
17.15
2.00
34.30
UND
21.45
2.90
62.21
UND
4.50
10.00
45.00
S/.
19,794.51
210.00
Almacn (semanal)
Anterior
Ingreso (und)
Stock (und)
Corte
Stock min (und)
P.U. (S/.)
18.00
125.00
500.00
12.00
16.00
6.90
12.00
16.00
56.00
1.00
4.00
44.00
1.10
4.00
5.00
2.50
6.00
39.00
12.00
3.00
2.00
6.00
2.69
3.00
5.00
7.00
9.00
3.00
5.00
12.00
18.00
9.00
2.00
2.60
3.00
6.00
8.50
16.50
26.00
0.90
1.60
0.90
1.20
1.90
0.45
0.50
0.90
1.50
8.00
Anterior (S/.)
Actual (S/.)
105.00
78.00
20.00
26.00
31.00
45.00
1.20
1.35
1.20
1.35
3.00
4.00
6.00
9.00
1.00
1.30
1.70
2.50
1.80
12.00
10.00
8.00
6.00
75.00
50.00
65.00
50.00
35.00
9.00
12.50
19.00
32.00
48.00
1.50
1.30
1.15
2.50
3.20
6.00
1.20
1.50
2.20
4.80
7.00
4.80
0.75
1.00
2.00
2.90
10.00
S/.
Salida Diaria
Acumulado (S/.)
Ju
Vi
Sa
Saldo
Lu
Ma
Mi
162.00
750.00
500.00
209.09
111.94
686.53
538.02
1,229.64
325.75
123.15
145.37
279.84
40.34
20.07
82.03
154.88
264.48
165.36
69.48
63.69
138.27
96.11
1.31
20.50
178.53
292.64
4.38
6.72
55.30
47.46
24.57
654.85
71.41
119.43
2.50
57.90
73.57
978.12
205.92
169.02
34.85
8.78
46.55
20.57
7.37
9.01
57.51
14.85
47.88
210.00
78.00
2,100.00
416.00
372.00
45.00
210.12
13.37
210.12
13.37
630.00
128.00
144.00
27.00
210.00
41.60
40.80
7.50
39.09
342.74
321.35
89.70
42.47
75.00
50.00
130.00
300.00
35.00
777.61
572.73
488.64
686.40
352.30
114.34
17.11
11.35
53.63
12.77
23.94
275.69
89.25
43.43
102.96
104.90
102.96
51.13
82.18
34.30
62.21
45.00
S/.
19,794.51
Residencial ALLPA
CONTROL SEMANAL DE MATERIALES PARA INSTALACIONES ELECTRICAS
Detalle
1
26/09 - 20/09
Und
Presupuesto Base
Met
P.U. (S/.)
Parcial (S/.)
ML
33.00
22.00
726.00
UND
2.00
12.00
24.00
ML
35.36
0.90
31.82
ML
8665.34
1.40
12131.48
ML
42.00
2.00
84.00
ML
17.60
3.50
61.60
ML
250.64
3.30
827.10
CABLE TW 16 MM2
ML
33.00
5.50
181.50
ML
135.41
1.60
216.65
ML
26.40
2.20
58.08
ML
751.91
3.70
2782.05
ML
99.00
7.00
693.00
UND
4.00
75.00
300.00
HELICOIDAL DE 3.00 MT
UND
2.00
250.00
500.00
UND
2.00
190.00
380.00
UND
1.00
2900.00
2900.00
UND
4.00
1200.00
4800.00
UND
2.00
1200.00
2400.00
UND
1.00
900.00
900.00
UND
36.00
5.00
180.00
UND
527.60
2.75
1450.90
UND
415.00
2.75
1141.25
UND
3.00
45.00
135.00
UND
88.80
7.50
666.00
UND
8.00
38.00
304.00
UND
2.00
85.00
170.00
UND
1.00
350.00
350.00
UND
10.00
55.00
550.00
UND
11.00
1.20
13.20
UND
16.00
1.20
19.20
UND
2.00
36.00
72.00
ML
10.00
55.00
550.00
ML
10.00
45.00
450.00
ACCESORIOS)
SOPORTES METALICOS PARA MONTANTES ELECTRICAS
GBL
1.00
500.00
500.00
UND
1120.05
3.00
3360.16
UND
102.52
4.00
410.07
UND
19.81
7.00
138.67
UND
106.42
11.00
1170.59
UND
3.50
40.00
140.00
UND
1783.48
0.60
1070.09
UND
125.06
1.60
200.10
UND
5.66
3.00
16.98
UND
17.51
5.50
96.32
UND
2.00
29.00
58.00
UND
1113.95
0.45
501.28
UND
114.11
0.55
62.76
UND
19.81
1.00
19.81
UND
106.42
3.10
329.90
UND
3.30
7.50
24.75
UND
1804.23
0.30
541.27
UND
125.06
0.40
50.02
UND
5.66
0.60
3.40
UND
17.51
1.00
17.51
UND
1.00
5.00
5.00
S/.
44,765.50
Almacn (semanal)
Anterior
Ingreso (und)
Corte
Stock (und)
P.U. (S/.)
Anterior (S/.)
Actual (S/.)
0.00
22.00
0.00
0.00
12.00
0.00
0.00
0.90
0.00
0.00
1.40
0.00
0.00
2.00
0.00
0.00
3.50
0.00
0.00
3.30
0.00
0.00
5.50
0.00
0.00
1.60
0.00
0.00
2.20
0.00
0.00
3.70
0.00
0.00
7.00
0.00
0.00
75.00
0.00
0.00
250.00
0.00
0.00
190.00
0.00
0.00
2,900.00
0.00
0.00
1,200.00
0.00
0.00
1,200.00
0.00
0.00
900.00
0.00
0.00
5.00
0.00
0.00
2.75
0.00
0.00
2.75
0.00
0.00
45.00
0.00
0.00
7.50
0.00
0.00
38.00
0.00
0.00
85.00
0.00
0.00
350.00
0.00
0.00
55.00
0.00
0.00
1.20
0.00
0.00
1.20
0.00
0.00
36.00
0.00
0.00
55.00
0.00
0.00
45.00
0.00
0.00
500.00
0.00
0.00
3.00
0.00
0.00
4.00
0.00
0.00
7.00
0.00
0.00
11.00
0.00
0.00
40.00
0.00
0.00
0.60
0.00
0.00
1.60
0.00
0.00
3.00
0.00
0.00
5.50
0.00
0.00
29.00
0.00
0.00
0.45
0.00
0.00
0.55
0.00
0.00
1.00
0.00
0.00
3.10
0.00
0.00
7.50
0.00
0.00
0.30
0.00
0.00
0.40
0.00
0.00
0.60
0.00
0.00
1.00
0.00
0.00
5.00
0.00
S/.
0.00
Salida Diaria
Acumulado (S/.)
Ju
Vi
Sa
Saldo
Lu
Ma
Mi
0.00
726.00
0.00
24.00
0.00
31.82
0.00
12,131.48
0.00
84.00
0.00
61.60
0.00
827.10
0.00
181.50
0.00
216.65
0.00
58.08
0.00
2,782.05
0.00
693.00
0.00
300.00
0.00
500.00
0.00
380.00
0.00
2,900.00
0.00
4,800.00
0.00
2,400.00
0.00
900.00
0.00
180.00
0.00
1,450.90
0.00
1,141.25
0.00
135.00
0.00
666.00
0.00
304.00
0.00
170.00
0.00
350.00
0.00
550.00
0.00
13.20
0.00
19.20
0.00
72.00
0.00
550.00
0.00
450.00
0.00
500.00
0.00
3,360.16
0.00
410.07
0.00
138.67
0.00
1,170.59
0.00
140.00
0.00
1,070.09
0.00
200.10
0.00
16.98
0.00
96.32
0.00
58.00
0.00
501.28
0.00
62.76
0.00
19.81
0.00
329.90
0.00
24.75
0.00
541.27
0.00
50.02
0.00
3.40
0.00
17.51
0.00
5.00
0.00
S/.
44,765.50
Residencial ALLPA
CONTROL SEMANAL DE MATERIALES TIPO CONSUMIBLES
Detalle
1
26/09 - 20/09
Und
Presupuesto Base
Met
P.U. (S/.)
Parcial (S/.)
ASFALTO RC-250
gln
15.42
12.00
185.05
KG
10.00
7.00
70.00
lt
0.74
29.00
21.40
lt
41.80
26.00
1,086.68
45.54
UND
0.08
600.00
THINNER STANDAR
gln
0.80
17.00
13.60
GASOLINA 84 OCTANOS
gln
140.85
11.00
1,549.35
TIZA
KG
10.00
3.00
30.00
M3
172.27
13.00
2,239.45
PETROLEO DIESEL # 2
gln
212.59
10.00
2,125.88
gln
1.60
33.00
52.80
M2
15.42
5.00
77.10
M2
91.88
8.50
780.94
CINTA TEFLON
UND
42.40
1.20
50.88
UND
8.85
10.00
88.50
UND
5.00
280.00
1,400.00
S/.
9,817.17
Almacn (semanal)
Anterior
Ingreso (und)
Corte
Stock (und)
-3.00
P.U. (S/.)
Anterior (S/.)
12.00
Actual (S/.)
36.00
7.00
29.00
26.00
600.00
17.00
11.00
3.00
13.00
10.00
33.00
5.00
8.50
1.20
10.00
280.00
S/.
36.00
Salida Diaria
Acumulado (S/.)
36.00
Ju
Vi
Sa
Saldo
Lu
Ma
Mi
3.00
149.05
70.00
21.40
1,086.68
45.54
13.60
1,549.35
30.00
2,239.45
2,125.88
52.80
77.10
780.94
50.88
88.50
1,400.00
36.00
S/.
9,781.17
Residencial ALLPA
CONTROL SEMANAL DE MATERIALES TIPO ADITIVOS
Detalle
1
26/09 - 20/09
Und
Presupuesto Base
Met
P.U. (S/.)
Parcial (S/.)
IMPERMEABILIZANTE
KG
43.90
16.00
702.40
KG
2.40
60.00
144.00
KG
2.40
90.00
216.00
SELLADOR VULKEM
gln
0.88
180.00
157.70
EUCOROD 1/4"
ML
61.33
0.05
3.07
S/.
1,223.16
Almacn (semanal)
Anterior
Ingreso (und)
Corte
Stock (und)
P.U. (S/.)
Anterior (S/.)
Actual (S/.)
0.00
16.00
0.00
0.00
60.00
0.00
0.00
90.00
0.00
0.00
180.00
0.00
0.00
0.05
0.00
S/.
0.00
Salida Diaria
Acumulado (S/.)
Ju
Vi
Sa
Saldo
Lu
Ma
Mi
0.00
702.40
0.00
144.00
0.00
216.00
0.00
157.70
0.00
3.07
0.00
S/.
1,223.16
Residencial ALLPA
CONTROL SEMANAL DE SUBCONTRATOS
Detalle
1
26/09 - 20/09
Und
Presupuesto Base
Met
P.U. (S/.)
Corte
Parcial (S/.)
UND
38,142.88
1.00
38,142.88
UND
43,378.80
1.00
43,378.80
SUBCONTRATISTA DE ENCOFRADOS
M2
68,728.42
1.00
68,728.42
SUBCONTRATISTA FIERRO
KG
42,087.60
0.80
33,670.08
M2
1,526.36
71.40
108,982.10
M2
100.64
86.10
8,665.10
M3
468.18
25.00
11,704.50
M3
920.00
17.00
15,640.00
S/.
328,911.88
Anterior (S/.)
0.00
Corte
Saldo
Actual (S/.)
0.00
Acumulado (S/.)
0.00
38,142.88
0.00
43,378.80
0.00
68,728.42
0.00
33,670.08
0.00
108,982.10
0.00
8,665.10
0.00
11,704.50
0.00
15,640.00
0.00
328,911.88
Residencial ALLPA
CONTROL SEMANAL DE EQUIPOS
Detalle
1
26/09 - 20/09
Und
Presupuesto Base
Met
HERRAMIENTAS MANUALES
P.U. (S/.)
Corte
Parcial (S/.)
%MO
1.00
5,735.25
5,735.25
MIRA TOPOGRAFICA
HE
65.00
2.00
130.00
TEODOLITO
HE
31.00
10.00
310.00
NIVEL
HE
96.00
5.00
480.00
HM
512.00
20.00
10,240.00
HM
4.67
25.00
116.82
HE
2,303.28
1.00
2,303.28
HM
15.33
15.00
229.94
HM
27.25
30.00
817.47
HM
197.07
8.00
1,576.53
HM
210.32
18.00
3,785.72
S/.
25,725.00
Anterior (S/.)
0.00
Corte
Saldo
Actual (S/.)
0.00
Acumulado (S/.)
0.00
5,735.25
0.00
130.00
0.00
310.00
0.00
480.00
0.00
10,240.00
0.00
116.82
0.00
2,303.28
0.00
229.94
0.00
817.47
0.00
1,576.53
0.00
3,785.72
0.00
25,725.00
Residencial ALLPA
CONTROL SEMANAL DE MATERIALES VARIOS
Detalle
1
26/09 - 20/09
Und
Presupuesto Base
Met
P.U. (S/.)
Parcial (S/.)
P2
660.28
4.00
MADERA (REGLAS)
P2
220.54
4.00
2,641.13
882.17
MADERA ANDAMIAJE
P2
2,870.31
3.50
10,046.09
TRIPLAY DE 4'x8'x 6 mm
PLN
2.72
33.00
89.76
UND
60.00
32.00
1,920.00
M2
3,847.72
19.00
73,106.68
M2
200.41
20.00
4,008.20
MES
8.00
315.00
2,520.00
FLETE
VJE
30.00
80.00
2,400.00
S/.
97,614.03
26/09 - 20/09
Corte
Anterior (S/.)
Saldo
Actual (S/.)
Acumulado (S/.)
0.00
0.00
0.00
2,641.13
0.00
882.17
0.00
10,046.09
0.00
89.76
0.00
1,920.00
0.00
73,106.68
0.00
4,008.20
0.00
2,520.00
0.00
2,400.00
0.00
97,614.03
Residencial ALLPA
CATALOGO DE INSUMOS
Recurso
1
26/09 - 20/09
Unidad
P.U. (S/.)
Base
Corte
CAPATAZ
hh
16.96
16.96
OPERARIO
hh
14.14
14.14
OFICIAL
hh
12.40
12.40
PEON
hh
11.21
11.21
KG
2.90
2.90
ALAMBRE NEGRO N8
KG
2.90
2.90
KG
2.90
2.90
KG
2.82
2.82
ARENA FINA
M3
35.00
35.00
TIERRA DE CHACRA
M3
50.00
50.00
M3
55.00
55.00
ARENA GRUESA
M3
35.00
35.00
M3
40.00
40.00
M3
40.00
40.00
ML
22.00
22.00
UND
12.00
12.00
ML
0.90
0.90
ML
1.40
1.40
ML
2.00
2.00
ML
3.50
3.50
ML
3.30
3.30
CABLE TW 16 MM2
ML
5.50
5.50
ML
1.60
1.60
ML
2.20
2.20
ML
3.70
3.70
ML
7.00
7.00
UND
18.00
18.00
UND
75.00
75.00
HELICOIDAL DE 3.00 MT
UND
250.00
250.00
UND
190.00
190.00
UND
2,900.00
2,900.00
UND
1,200.00
1,200.00
PLANO)
TABLERO TD2 (EMPOTRABLE C/INTERRUPTORES PLUG IN SEGUN
PLANO)
CAJA FO.GO. PESADO C/TAPA 100X100X50 MM
UND
1,200.00
1,200.00
UND
5.00
5.00
UND
2.75
2.75
UND
2.75
2.75
UND
45.00
45.00
UND
7.50
7.50
UND
38.00
38.00
UND
85.00
85.00
UND
350.00
350.00
UND
55.00
55.00
UND
1.20
1.20
UND
1.20
1.20
gln
12.00
12.00
UND
0.56
0.56
UND
1.57
1.57
bls
14.40
14.40
M3
194.00
194.00
M3
200.00
200.00
ASFALTO RC-250
M3
30.00
30.00
UND
36.00
36.00
KG
16.00
16.00
UND
900.00
900.00
lt
29.00
29.00
lt
26.00
26.00
CINTA TEFLON
UND
1.20
1.20
UND
600.00
600.00
MES
315.00
315.00
M2
19.00
19.00
M2
20.00
20.00
KG
60.00
60.00
KG
90.00
90.00
SELLADOR VULKEM
gln
180.00
180.00
EUCOROD 1/4"
ML
0.05
0.05
IMPERMEABILIZANTE
TABLERO PARA ASCENSOR (SEGUN EETT)
THINNER STANDAR
gln
17.00
17.00
UND
125.00
125.00
UND
10.00
10.00
UND
500.00
500.00
FLETE
VJE
80.00
80.00
GASOLINA 84 OCTANOS
gln
11.00
11.00
HORMIGON
M3
16.00
16.00
AFIRMADO
M3
35.00
35.00
KG
7.00
7.00
TIZA
KG
3.00
3.00
M3
13.00
13.00
UND
32.00
32.00
M2
5.00
5.00
M2
8.50
8.50
MADERA ANDAMIAJE
P2
3.50
3.50
P2
4.00
4.00
MADERA (REGLAS)
P2
4.00
4.00
TRIPLAY DE 4'x8'x 6 mm
PLN
33.00
33.00
GBL
3,500.00
3,500.00
GBL
2,000.00
2,000.00
PROVISIONALES
PANELES,
MALLA Y ACCESORIOS PARA PROTECCION
EDIFICACIONES
VECINAS
MALLA
EXPANDED
METAL (ROLLO X 25 MT)
GBL
3,500.00
3,500.00
UND
280.00
280.00
PETROLEO DIESEL # 2
gln
10.00
10.00
gln
33.00
33.00
ML
55.00
55.00
ML
45.00
45.00
ACCESORIOS)
COLGADOR TIPO CLEVIS P/TUBERIA 4 "
UND
12.00
12.00
UND
16.00
16.00
GBL
500.00
500.00
UND
1.20
1.20
UND
1.35
1.35
UND
1.20
1.20
UND
1.35
1.35
UND
3.00
3.00
UND
4.00
4.00
UND
6.00
6.00
UND
9.00
9.00
UND
1.00
1.00
UND
1.30
1.30
UND
1.70
1.70
UND
2.50
UND
1.80
2.50
1.80
UND
12.00
12.00
UND
10.00
10.00
UND
8.00
8.00
UND
6.00
6.00
UND
75.00
75.00
UND
50.00
50.00
UND
65.00
65.00
UND
50.00
50.00
UND
35.00
35.00
UND
9.00
9.00
UND
12.50
12.50
UND
19.00
19.00
UND
32.00
32.00
UND
48.00
48.00
UND
1.50
1.50
UND
1.30
1.30
UND
1.15
1.15
UND
2.50
2.50
UND
3.20
3.20
UND
6.00
6.00
UND
1.20
1.20
UND
1.50
1.50
UND
2.20
2.20
UND
4.80
4.80
UND
7.00
7.00
UND
4.80
4.80
UND
0.75
0.75
UND
1.00
1.00
UND
2.00
2.00
UND
2.90
2.90
UND
10.00
10.00
UND
3.00
3.00
UND
4.00
4.00
UND
7.00
7.00
UND
11.00
11.00
UND
40.00
40.00
UND
0.60
0.60
UND
1.60
1.60
UND
3.00
3.00
UND
5.50
5.50
UND
29.00
29.00
UND
0.45
0.45
UND
0.55
0.55
UND
1.00
1.00
UND
3.10
3.10
UND
7.50
7.50
UND
0.30
0.30
UND
0.40
0.40
UND
0.60
0.60
UND
1.00
1.00
UND
5.00
5.00
UND
6.90
6.90
UND
12.00
12.00
UND
16.00
16.00
UND
56.00
56.00
UND
1.00
1.00
UND
4.00
4.00
UND
44.00
44.00
UND
1.10
1.10
UND
4.00
4.00
UND
5.00
5.00
UND
2.50
2.50
UND
6.00
6.00
UND
39.00
39.00
UND
12.00
12.00
UND
3.00
3.00
UND
2.00
2.00
UND
6.00
6.00
UND
2.69
2.69
UND
3.00
3.00
UND
5.00
5.00
UND
7.00
7.00
UND
9.00
9.00
UND
3.00
3.00
UND
5.00
5.00
UND
12.00
12.00
UND
18.00
18.00
UND
9.00
9.00
UND
2.00
2.00
UND
2.60
2.60
UND
3.00
3.00
UND
6.00
6.00
UND
8.50
8.50
UND
16.50
16.50
UND
26.00
26.00
UND
0.90
0.90
UND
1.60
1.60
UND
0.90
0.90
UND
1.20
1.20
UND
1.90
1.90
UND
0.45
0.45
UND
0.50
0.50
UND
0.90
0.90
UND
1.50
1.50
UND
8.00
8.00
UND
105.00
105.00
UND
78.00
78.00
UND
20.00
20.00
UND
26.00
26.00
UND
31.00
31.00
UND
45.00
45.00
HERRAMIENTAS MANUALES
%MO
5,735.25
5,735.25
MIRA TOPOGRAFICA
HE
2.00
2.00
TEODOLITO
HE
10.00
10.00
NIVEL
HE
5.00
5.00
HM
20.00
20.00
HM
25.00
25.00
HE
1.00
1.00
HM
15.00
15.00
HM
30.00
30.00
HM
8.00
8.00
HM
18.00
18.00
UND
1.00
1.00
UND
1.00
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
1.00
1.00
SUBCONTRATISTA FIERRO
KG
0.80
0.80
M2
71.40
71.40
M2
86.10
86.10
M3
25.00
25.00
M3
17.00
17.00
Residencial ALLPA
PLANTILLA DE CRONOGRAMA BASE POR FASES
Fase
1
2
3
401
402
403
404
501
502
503
504
505
506
507
508
509
510
511
601
602
603
604
605
606
Descripcin
1
26/09 - 20/09
1.00
2.00
3.00
4.00
07/10-13/10
14/10-20/10
26/09-29/09
0.57
30/09-06/10
0.43
0.04
0.04
0.04
0.04
0.11
0.21
0.21
0.21
0.40
0.40
0.20
0.13
0.40
0.40
0.10
0.20
0.20
0.03
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
21/10-27/10
28/10-03/11
04/11-10/11
11/11-17/11
18/11-23/11
24/11-30/11
01/12-07/12
08/12-14/12
0.05
0.05
0.21
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.10
0.30
0.30
0.30
0.07
0.07
0.20
0.17
0.13
0.17
0.20
0.20
0.20
0.20
0.08
0.50
0.42
0.27
0.55
0.18
0.27
0.55
0.18
0.09
0.55
0.36
0.09
0.55
0.36
0.27
0.55
0.18
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
15/12-21/12
22/12-28/12
29/12-04/01
05/01-11/01
12/01-18/01
19/01-25/01
26/01-01/02
02/02-08/02
0.05
0.05
0.05
0.40
0.40
0.13
0.05
0.05
0.05
0.05
0.04
0.07
0.40
0.18
0.55
0.27
0.55
0.45
0.45
0.45
0.10
0.27
0.45
0.28
0.27
0.55
0.18
0.55
0.20
0.45
0.09
0.55
0.20
0.20
21.00
22.00
23.00
09/02-15/02
16/02-22/02
23/02-29/02
0.03
0.02
0.40
0.13
0.36
0.20
0.10
0.10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
CAPATAZ
OPERARIO
OFICIAL
PEON
hh
hh
hh
hh
3.2240
52.7400
39.1200
47.6200
16.96
14.14
12.40
11.21
54.68
745.74
485.09
533.82
Material
CLAVOS C/S CABEZA (PROMEDIO)
THINNER STANDAR
MADERA TORNILLO LARGA
TRIPLAY DE 4'x8'x 6 mm
PANELES, TECHOS Y ACCESORIOS PARA INSTALACIONES PROVISIONALES
PANELES, TECHOS, APARATOS Y ACCESORIOS PARA SSHH PROVISIONALES
PINTURA ESMALTE SINTETICO
KG
gln
P2
PLN
GBL
GBL
gln
0.3200
0.8000
42.5600
2.7200
1.0000
1.0000
1.6000
2.90
17.00
4.00
33.00
3,500.00
2,000.00
33.00
0.93
13.60
170.24
89.76
3,500.00
2,000.00
52.80
hh
hh
hh
hh
75.5968
113.0000
529.0000
1,781.0148
16.96
14.14
12.40
11.21
1,282.12
1,597.82
6,559.60
19,965.18
MES
VJE
KG
GBL
8.0000
30.0000
10.0000
1.0000
315.00
80.00
3.00
3,500.00
2,520.00
2,400.00
30.00
3,500.00
HE
HE
HE
HM
65.0000
31.0000
96.0000
512.0000
2.00
10.00
5.00
20.00
130.00
310.00
480.00
10,240.00
M3
468.1800
25.00
11,704.50
hh
hh
hh
47.7180
19.1616
623.5527
16.96
12.40
11.21
809.30
237.60
6,990.03
gln
M3
9.5808
19.1712
11.00
13.00
105.39
249.23
HM
15.3293
15.00
229.94
M3
920.0000
17.00
15,640.00
TRABAJOS PERMANENTES
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Material
UNIDAD PORTATIL DISAL 280 KG
FLETE
TIZA
PANELES, MALLA Y ACCESORIOS PARA PROTECCION EDIFICACIONES VECINAS
Equipo
MIRA TOPOGRAFICA
TEODOLITO
NIVEL
WINCHE ELECTRICO 2 BALDES CAP. 300 KG
Subcontrato
ACARREO Y ELIMINACION DE EXCEDENTES
MOVIMIENTO DE TIERRAS
Mano de Obra
CAPATAZ
OFICIAL
PEON
Material
GASOLINA 84 OCTANOS
AGUA PARA LA OBRA
Equipo
COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP
Subcontrato
EXCAVACION ELIMINADA CON EQUIPO
401 SOLADOS
Mano de Obra
hh
hh
hh
hh
1.9162
19.1616
9.5808
76.6464
16.96
14.14
12.40
11.21
32.50
270.95
118.80
859.21
bls
gln
M3
M3
37.8442
3.5928
15.6886
0.4790
14.40
11.00
16.00
13.00
544.96
39.52
251.02
6.23
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
HM
9.5808
18.00
172.45
hh
hh
hh
hh
11.4839
172.3799
118.1865
433.4967
16.96
14.14
12.40
11.21
194.77
2,437.45
1,465.51
4,859.50
ALAMBRE NEGRO N8
CLAVOS C/S CABEZA (PROMEDIO)
PIEDRA MEDIANA DE RIO
CEMENTO PORTLAND TIPO I (42.5KG)
GASOLINA 84 OCTANOS
HORMIGON
AGUA PARA LA OBRA
MADERA TORNILLO LARGA
PETROLEO DIESEL # 2
KG
KG
M3
bls
gln
M3
M3
P2
gln
24.0000
11.5200
38.6080
457.2000
25.4000
91.4400
3.6576
225.6000
4.8000
2.90
2.90
40.00
14.40
11.00
16.00
13.00
4.00
10.00
69.60
33.41
1,544.32
6,583.68
279.40
1,463.04
47.55
902.40
48.00
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
HM
54.1833
18.00
975.30
hh
hh
hh
hh
2.6199
28.6061
27.5395
130.7221
16.96
14.14
12.40
11.21
44.43
404.49
341.49
1,465.39
KG
KG
M3
M3
bls
gln
M3
M3
4.1000
3.1200
0.6080
24.8196
156.2760
6.1276
38.6694
1.0211
2.90
2.90
40.00
40.00
14.40
11.00
16.00
13.00
11.89
9.05
24.32
992.78
2,250.37
67.40
618.71
13.27
CAPATAZ
OPERARIO
OFICIAL
PEON
Material
402 CALZADURA
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Material
403 CIMENTACION
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Material
ALAMBRE NEGRO N8
CLAVOS C/S CABEZA (PROMEDIO)
PIEDRA MEDIANA DE RIO
PIEDRA GRANDE DE RIO
CEMENTO PORTLAND TIPO I (42.5KG)
GASOLINA 84 OCTANOS
HORMIGON
AGUA PARA LA OBRA
P2
gln
61.3000
1.1000
4.00
10.00
245.20
11.00
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
HM
16.3403
18.00
294.13
hh
hh
hh
hh
24.1508
160.1192
109.8461
516.0585
16.96
14.14
12.40
11.21
409.60
2,264.09
1,362.09
5,785.02
KG
KG
KG
M3
M3
M3
M3
ML
UND
UND
UND
UND
gln
UND
bls
M3
M3
UND
KG
lt
UND
gln
ML
gln
M3
M3
M2
P2
P2
gln
UND
UND
UND
UND
UND
UND
0.4965
0.4965
13.6825
0.3200
4.0000
1.0000
3.4266
33.0000
2.0000
4.0000
2.0000
2.0000
15.4208
200.0000
8.0000
45.2693
45.2693
2.0000
6.4000
0.3320
0.0759
0.8761
61.3305
58.4120
56.9517
70.0944
15.4208
19.8600
13.1427
0.4965
10.5000
3.0000
10.5000
3.0000
2.2400
11.0600
2.90
2.90
2.82
35.00
50.00
55.00
35.00
22.00
12.00
75.00
250.00
190.00
12.00
0.56
14.40
194.00
30.00
36.00
16.00
26.00
600.00
180.00
0.05
11.00
35.00
13.00
5.00
4.00
4.00
10.00
7.00
3.00
1.00
0.60
6.90
12.00
1.44
1.44
38.58
11.20
200.00
55.00
119.93
726.00
24.00
300.00
500.00
380.00
185.05
112.00
115.20
8,782.24
1,358.08
72.00
102.40
8.63
45.54
157.70
3.07
642.53
1,993.31
911.23
77.10
79.44
52.57
4.97
73.50
9.00
10.50
1.80
15.46
132.72
404 PAVIMENTOS
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Material
ALAMBRE NEGRO N8
CLAVOS C/S CABEZA (PROMEDIO)
FIERRO CORRUGADO (PROMEDIO)
ARENA FINA
TIERRA DE CHACRA
PIEDRA CHANCADA DE 1/2"
ARENA GRUESA
CABLE DE COBRE DESNUDO 2/0AWG (70 MM2)
CONECTOR DE BRONCE PARA BARRA 5/8"- 3/4"
DOSIS QUIMICA CAJA DE 5 KG
HELICOIDAL DE 3.00 MT
BARRA DE COBRE 3/4" CON PUNTA 2.40 MT
ASFALTO RC-250
LAD.ARCILLA TIPO IV KK 18H 9X13X24 CM
CEMENTO PORTLAND TIPO I (42.5KG)
CONCRETO PREMEZCLADO T.I F'c=175 Kg/cm2
SERVICIO DE BOMBA P/CONCR. PREMEZCLADO
CAJA DE CONCRETO PARA POZO DE TIERRA
IMPERMEABILIZANTE
PEGAMENTO PARA TUBERIA PVC
DISCO DE CORTE DIAMANTADO DIAM 12"
SELLADOR VULKEM
EUCOROD 1/4"
GASOLINA 84 OCTANOS
AFIRMADO
AGUA PARA LA OBRA
TECNOPOR 2.48X1.25 MT E=1"
MADERA TORNILLO LARGA
MADERA (REGLAS)
PETROLEO DIESEL # 2
TUBO PVC SAP IE 1 1/4" (35 mm) x 3 mt
CURVA PVC SAP IE 1 1/4" (35 mm)
UNION PVC SAP IE 1 1/4" (35 mm)
CONEXION A CAJA PVC SAP IE 1 1/4" (35 mm)
TUBERIA PVC SAL 2 " x 3 mt
TUBERIA PVC SAL 3 " x 3 mt
UND
UND
UND
UND
UND
UND
3.9550
1.3650
2.2400
11.0600
3.9550
1.3650
16.00
56.00
3.00
5.00
12.00
18.00
63.28
76.44
6.72
55.30
47.46
24.57
HM
HM
HM
4.6728
27.2492
23.3648
25.00
30.00
8.00
116.82
817.48
186.92
UND
UND
2,598.2000
1,410.0000
1.00
1.00
2,598.20
1,410.00
5.5956
55.5727
40.7199
75.1388
16.96
14.14
12.40
11.21
94.90
785.80
504.93
842.31
KG
KG
KG
KG
M3
M3
bls
M3
M3
M2
KG
KG
UND
gln
M3
P2
gln
UND
UND
UND
HM
HM
32.4585
5.0000
7.5000
1,402.2072
0.4000
0.2500
5.0000
73.9437
71.7900
11.3000
2.4000
2.4000
1.0000
0.1500
0.0090
202.5000
3.0650
1.0000
1.0000
2.0000
14.9864
1.3333
2.90
2.90
2.90
2.82
55.00
35.00
14.40
200.00
30.00
19.00
60.00
90.00
500.00
11.00
13.00
4.00
10.00
75.00
50.00
65.00
8.00
18.00
94.13
14.50
21.75
3,954.22
22.00
8.75
72.00
14,788.74
2,153.70
214.70
144.00
216.00
500.00
1.65
0.12
810.00
30.65
75.00
50.00
130.00
119.89
24.00
M2
KG
203.4000
1,298.3400
1.00
0.80
203.40
1,038.67
501 CIMENTACION/CISTERNA
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Material
ALAMBRE NEGRO N16
ALAMBRE NEGRO N8
CLAVOS C/S CABEZA (PROMEDIO)
FIERRO CORRUGADO (PROMEDIO)
PIEDRA CHANCADA DE 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5KG)
CONCRETO PREMEZCLADO T.I F'c=210 Kg/cm2
SERVICIO DE BOMBA P/CONCR. PREMEZCLADO
ENCOFRADO METALICO INCLUIDOS CONSUMIBLES (PROMEDIO)
CEMENTO MARINO LIQUIDO EUCO (IMPRIMANTE)
CEMENTO MARINO DENSO EUCO (ACABADO)
VORTEX PLANCHA LAC 0.80X0.80X1/4"
GASOLINA 84 OCTANOS
AGUA PARA LA OBRA
MADERA TORNILLO LARGA
PETROLEO DIESEL # 2
ROMPEAGUAS FO.GO. 4"X55 CM
ROMPEAGUAS FO.GO. 1 1/4"X55 CM
ROMPEAGUAS FO.GO. 2 1/2"X55 CM
VIBRADOR DE CONCRETO 4 HP 1 1/2"
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
Subcontrato
SUBCONTRATISTA DE ENCOFRADOS
SUBCONTRATISTA FIERRO
502 SEMISOTANO EV
hh
hh
hh
hh
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Material
ALAMBRE NEGRO N16
FIERRO CORRUGADO (PROMEDIO)
ALAMBRE TW 4 MM2 (12 AWG)
CAJA RECT.GALV.PESADA 4"x2"x2" (100x55x40 mm)
CAJA CUAD.GALV.4"x4"x2"(100x100x40 mm)TAPA GANG
CONCRETO PREMEZCLADO T.I F'c=210 Kg/cm2
SERVICIO DE BOMBA P/CONCR. PREMEZCLADO
PEGAMENTO PARA TUBERIA PVC
CINTA TEFLON
ENCOFRADO METALICO INCLUIDOS CONSUMIBLES (PROMEDIO)
ENCOFRADO CARAVISTA INCLUIDOS CONSUMIBLES (PROMEDIO)
PETROLEO DIESEL # 2
CODO DE FO.GO. ISO-I DE 1/2" X 90
TAPON MACHO DE Fo. GALV. DE 1/2"
TUBO PVC SAP C-10 EC 1/2" x 5 mt
TUBO PVC SAP C-10 EC 3/4" x 5 mt
TUBO PVC SAP C-10 EC 1 " x 5 mt
TUBO PVC SAP C-10 EC 2 " x 5 mt
REDUCCION PVC SAP C-10 SP 3/4" A 1/2"
CODO PVC SAP C-10 SP 1/2" x 90
CODO PVC SAP C-10 SP 3/4" x 90
CODO PVC SAP C-10 SP 2 " x 90
TEE PVC SAP C-10 SP 1/2"
TEE PVC SAP C-10 SP 3/4"
TEE PVC SAP C-10 SP 2 "
TUBO PVC SAP IE 3/4" (20 mm) x 3 mt
CURVA PVC SAP IE 3/4" (20 mm)
UNION PVC SAP IE 3/4" (20 mm)
CONEXION A CAJA PVC SAP IE 3/4" (20 mm)
TUBERIA PVC SAL 2 " x 3 mt
TUBERIA PVC SAL 4 " x 3 mt
CODO PVC SAL 2 " x 90
CODO PVC SAL 4 " x 90
CODO PVC SAL 2 " x 45
CODO PVC SAL 4 " x 45
CODO PVC SAL VENTILACION 4" x 2"
RAMAL YEE SIMPLE PVC SAL 2 "
RAMAL YEE SIMPLE PVC SAL 4 "
RAMAL YEE DOBLE PVC SAL 4 "
RAMAL YEE SIMPLE PVC SAL 4" A 2 "
RAMAL TEE SIMPLE PVC SAL 2 "
RAMAL TEE SIMPLE PVC SAL 4 "
hh
hh
hh
hh
KG
KG
ML
UND
UND
M3
M3
lt
UND
M2
M2
gln
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
44.2312
33.9743
22.9196
113.7856
16.96
14.14
12.40
11.21
750.16
480.40
284.20
1,275.54
198.3250
8,567.6400
384.0000
20.2000
4.8000
100.3632
97.4400
0.9700
0.7000
523.7000
200.4100
36.2055
7.0000
7.0000
3.5000
1.4000
0.7000
3.1500
1.4000
10.5000
3.5000
9.0000
1.7500
1.7500
4.5000
40.6000
62.0000
40.6000
62.0000
2.0080
0.5000
2.7900
0.3200
0.7600
0.1040
0.3400
1.2840
0.6400
0.1200
0.4400
1.3520
0.3320
2.90
2.82
1.40
2.75
7.50
200.00
30.00
26.00
1.20
19.00
20.00
10.00
1.20
1.20
9.00
12.50
19.00
48.00
1.50
1.20
1.50
7.00
0.75
1.00
10.00
3.00
0.60
0.45
0.30
6.90
16.00
1.00
4.00
1.10
4.00
5.00
2.50
6.00
12.00
3.00
2.00
6.00
575.14
24,160.74
537.60
55.55
36.00
20,072.64
2,923.20
25.22
0.84
9,950.30
4,008.20
362.06
8.40
8.40
31.50
17.50
13.30
151.20
2.10
12.60
5.25
63.00
1.31
1.75
45.00
121.80
37.20
18.27
18.60
13.86
8.00
2.79
1.28
0.84
0.42
1.70
3.21
3.84
1.44
1.32
2.70
1.99
UND
UND
UND
0.1200
1.5080
0.9520
3.00
9.00
2.60
0.36
13.57
2.48
HM
33.9743
8.00
271.79
Subcontrato
SUBCONTRATISTA DE INSTALACIONES SANITARIAS
SUBCONTRATISTA DE INSTALACIONES ELECTRICAS
SUBCONTRATISTA DE ENCOFRADOS
SUBCONTRATISTA FIERRO
UND
UND
M2
KG
805.0000
1,120.0000
13,726.0500
7,933.0000
1.00
1.00
1.00
0.80
805.00
1,120.00
13,726.05
6,346.40
68.2931
40.3533
67.3428
203.3716
16.96
14.14
12.40
11.21
1,158.25
570.60
835.05
2,279.80
128.7138
5,560.4340
1,443.8600
87.6000
50.0000
14.8000
2,101.2000
53.3746
51.8200
0.2440
8.4320
3.8000
399.0400
12.0000
91.8750
19.9520
56.7000
3.3000
56.7000
3.3000
6.0000
1.0000
19.0000
7.6000
3.8000
7.6000
57.0000
19.0000
9.5000
9.5000
2.90
2.82
1.40
2.75
2.75
7.50
1.57
200.00
30.00
29.00
26.00
1.20
19.00
32.00
8.50
10.00
1.20
1.35
1.20
1.35
50.00
35.00
9.00
12.50
19.00
1.50
1.20
1.50
0.75
1.00
373.27
15,680.42
2,021.40
240.90
137.50
111.00
3,298.88
10,674.92
1,554.60
7.08
219.23
4.56
7,581.76
384.00
780.94
199.52
68.04
4.46
68.04
4.46
300.00
35.00
171.00
95.00
72.20
11.40
68.40
28.50
7.13
9.50
503 SEMISOTANO EH
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Material
ALAMBRE NEGRO N16
FIERRO CORRUGADO (PROMEDIO)
ALAMBRE TW 4 MM2 (12 AWG)
CAJA RECT.GALV.PESADA 4"x2"x2" (100x55x40 mm)
CAJA OCTOG.GALV.PESADA 4"x4"x2" (100x40 mm)
CAJA CUAD.GALV.4"x4"x2"(100x100x40 mm)TAPA GANG
LADRILLO DE ARCILLA P/TECHO 15X30X30 CM
CONCRETO PREMEZCLADO T.I F'c=210 Kg/cm2
SERVICIO DE BOMBA P/CONCR. PREMEZCLADO
PEGAMENTO PARA TUBERIA CPVC
PEGAMENTO PARA TUBERIA PVC
CINTA TEFLON
ENCOFRADO METALICO INCLUIDOS CONSUMIBLES (PROMEDIO)
PRUEBAS DE CALIDAD DE CONCRETO ROTURA
TECNOPOR 2.48X1.25 MT E=2"
PETROLEO DIESEL # 2
CODO DE FO.GO. ISO-I DE 1/2" X 90
CODO DE FO.GO. ISO-I DE 3/4" X 90
TAPON MACHO DE Fo. GALV. DE 1/2"
TAPON MACHO DE Fo. GALV. DE 3/4"
MANGUITO TUBERIA SCH40 PARA PASE 4"
MANGUITO TUBERIA SCH40 PARA PASE 2"
TUBO PVC SAP C-10 EC 1/2" x 5 mt
TUBO PVC SAP C-10 EC 3/4" x 5 mt
TUBO PVC SAP C-10 EC 1 " x 5 mt
REDUCCION PVC SAP C-10 SP 3/4" A 1/2"
CODO PVC SAP C-10 SP 1/2" x 90
CODO PVC SAP C-10 SP 3/4" x 90
TEE PVC SAP C-10 SP 1/2"
TEE PVC SAP C-10 SP 3/4"
hh
hh
hh
hh
KG
KG
ML
UND
UND
UND
UND
M3
M3
lt
lt
UND
M2
UND
M2
gln
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
196.7970
23.7900
279.2500
30.0000
194.2000
30.0000
285.0000
30.0000
26.8720
7.0000
35.8800
4.4800
10.6400
1.4560
4.7600
17.9760
8.9600
1.6800
6.1600
18.6240
4.6480
1.6800
21.1120
13.3280
19.3400
2.6400
62.1000
7.2600
3.0000
12.6800
3.6080
5.0400
6.0060
21.1000
3.3000
3.00
4.00
0.60
1.60
0.45
0.55
0.30
0.40
6.90
16.00
1.00
4.00
1.10
4.00
5.00
2.50
6.00
12.00
3.00
2.00
6.00
3.00
9.00
2.60
16.50
26.00
0.90
1.60
0.90
1.20
1.90
0.45
0.50
0.90
1.50
590.39
95.16
167.55
48.00
87.39
16.50
85.50
12.00
185.42
112.00
35.88
17.92
11.70
5.82
23.80
44.94
53.76
20.16
18.48
37.25
27.89
5.04
190.01
34.65
319.11
68.64
55.89
11.62
2.70
15.22
6.86
2.27
3.00
18.99
4.95
HM
11.3007
8.00
90.41
UND
UND
M2
KG
7,148.0000
5,610.0000
6,314.4700
5,148.5500
1.00
1.00
1.00
0.80
7,148.00
5,610.00
6,314.47
4,118.84
17.0302
47.9282
51.9282
16.96
14.14
12.40
288.83
677.70
643.91
hh
hh
hh
PEON
hh
118.6454
11.21
1,330.01
KG
KG
KG
KG
M3
M3
bls
M3
M3
M2
gln
M3
P2
gln
HM
HM
111.4030
4.5500
5.2000
4,812.6096
5.8500
3.5000
62.5000
41.1794
39.9800
366.7700
2.1000
0.1260
95.8600
19.4885
25.6609
9.3332
2.90
2.90
2.90
2.82
55.00
35.00
14.40
200.00
30.00
19.00
11.00
13.00
4.00
10.00
8.00
18.00
323.07
13.20
15.08
13,571.56
321.75
122.50
900.00
8,235.88
1,199.40
6,968.63
23.10
1.64
383.44
194.89
205.29
168.00
M2
KG
6,601.8600
4,456.1200
1.00
0.80
6,601.86
3,564.90
hh
hh
hh
hh
73.0774
26.9493
35.2859
170.5574
16.96
14.14
12.40
11.21
1,239.39
381.06
437.55
1,911.95
95.7739
4,137.4368
2,337.2400
140.4000
105.0000
23.8000
2,062.0600
45.2479
43.9300
0.2440
8.9810
3.6000
390.7900
12.0000
19.5395
54.7000
3.3000
54.7000
3.3000
2.90
2.82
1.40
2.75
2.75
7.50
1.57
200.00
30.00
29.00
26.00
1.20
19.00
32.00
10.00
1.20
1.35
1.20
1.35
277.74
11,667.57
3,272.14
386.10
288.75
178.50
3,237.43
9,049.58
1,317.90
7.08
233.51
4.32
7,425.01
384.00
195.40
65.64
4.46
65.64
4.46
Material
ALAMBRE NEGRO N16
ALAMBRE NEGRO N8
CLAVOS C/S CABEZA (PROMEDIO)
FIERRO CORRUGADO (PROMEDIO)
PIEDRA CHANCADA DE 1/2"
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5KG)
CONCRETO PREMEZCLADO T.I F'c=210 Kg/cm2
SERVICIO DE BOMBA P/CONCR. PREMEZCLADO
ENCOFRADO METALICO INCLUIDOS CONSUMIBLES (PROMEDIO)
GASOLINA 84 OCTANOS
AGUA PARA LA OBRA
MADERA TORNILLO LARGA
PETROLEO DIESEL # 2
VIBRADOR DE CONCRETO 4 HP 1 1/2"
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
Subcontrato
SUBCONTRATISTA DE ENCOFRADOS
SUBCONTRATISTA FIERRO
KG
KG
ML
UND
UND
UND
UND
M3
M3
lt
lt
UND
M2
UND
gln
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
18.0000
7.2000
3.6000
7.2000
54.0000
18.0000
9.0000
9.0000
285.8500
22.3440
471.0000
28.0000
284.1000
24.0000
478.5000
28.0000
26.8720
7.0000
35.8800
4.4800
10.6400
1.4560
4.7600
17.9760
8.9600
1.6800
6.1600
18.6240
4.6480
1.6800
21.1120
13.3280
19.3400
2.6400
62.1000
7.2600
3.0000
12.6800
3.6080
5.0400
6.0060
21.1000
3.3000
9.00
12.50
19.00
1.50
1.20
1.50
0.75
1.00
3.00
4.00
0.60
1.60
0.45
0.55
0.30
0.40
6.90
16.00
1.00
4.00
1.10
4.00
5.00
2.50
6.00
12.00
3.00
2.00
6.00
3.00
9.00
2.60
16.50
26.00
0.90
1.60
0.90
1.20
1.90
0.45
0.50
0.90
1.50
162.00
90.00
68.40
10.80
64.80
27.00
6.75
9.00
857.55
89.38
282.60
44.80
127.85
13.20
143.55
11.20
185.42
112.00
35.88
17.92
11.70
5.82
23.80
44.94
53.76
20.16
18.48
37.25
27.89
5.04
190.01
34.65
319.11
68.64
55.89
11.62
2.70
15.22
6.86
2.27
3.00
18.99
4.95
HM
10.4780
8.00
83.82
UND
UND
7,038.0000
8,475.0000
1.00
1.00
7,038.00
8,475.00
SUBCONTRATISTA DE ENCOFRADOS
SUBCONTRATISTA FIERRO
M2
KG
6,020.3600
3,830.9600
1.00
0.80
6,020.36
3,064.77
hh
hh
hh
hh
13.8697
16.3277
16.3277
65.3122
16.96
14.14
12.40
11.21
235.23
230.87
202.46
732.15
KG
KG
M3
M3
M2
gln
77.6530
3,354.6096
41.1794
39.9800
366.7700
18.3385
2.90
2.82
200.00
30.00
19.00
10.00
225.19
9,460.00
8,235.88
1,199.40
6,968.63
183.39
HM
16.3277
8.00
130.62
M2
KG
6,601.8600
3,106.1200
1.00
0.80
6,601.86
2,484.90
hh
hh
hh
hh
58.0356
25.1693
34.0992
166.9974
16.96
14.14
12.40
11.21
984.28
355.89
422.83
1,872.04
94.6602
4,089.3228
2,004.6200
119.2000
89.0000
25.0000
2,062.0600
44.3312
43.0400
0.1360
6.1380
2.0000
382.8400
12.0000
19.1420
30.2000
1.8000
30.2000
1.8000
2.90
2.82
1.40
2.75
2.75
7.50
1.57
200.00
30.00
29.00
26.00
1.20
19.00
32.00
10.00
1.20
1.35
1.20
1.35
274.51
11,531.89
2,806.47
327.80
244.75
187.50
3,237.43
8,866.24
1,291.20
3.94
159.59
2.40
7,273.96
384.00
191.42
36.24
2.43
36.24
2.43
KG
KG
ML
UND
UND
UND
UND
M3
M3
lt
lt
UND
M2
UND
gln
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
10.0000
4.0000
2.0000
4.0000
30.0000
10.0000
5.0000
5.0000
241.8750
25.5440
405.7500
32.0000
241.0000
27.2000
409.5000
32.0000
16.7580
4.2500
22.9200
2.7200
6.4600
0.8840
2.8900
10.9140
5.4400
1.0200
3.7400
11.4160
2.8220
1.0200
12.8180
8.0920
11.1600
1.4400
34.6000
3.9600
2.0000
7.2800
1.9680
3.3600
3.2760
11.8000
1.8000
9.00
12.50
19.00
1.50
1.20
1.50
0.75
1.00
3.00
4.00
0.60
1.60
0.45
0.55
0.30
0.40
6.90
16.00
1.00
4.00
1.10
4.00
5.00
2.50
6.00
12.00
3.00
2.00
6.00
3.00
9.00
2.60
16.50
26.00
0.90
1.60
0.90
1.20
1.90
0.45
0.50
0.90
1.50
90.00
50.00
38.00
6.00
36.00
15.00
3.75
5.00
725.63
102.18
243.45
51.20
108.45
14.96
122.85
12.80
115.63
68.00
22.92
10.88
7.11
3.54
14.45
27.29
32.64
12.24
11.22
22.83
16.93
3.06
115.36
21.04
184.14
37.44
31.14
6.34
1.80
8.74
3.74
1.51
1.64
10.62
2.70
HM
9.8847
8.00
79.08
UND
UND
4,142.0000
7,420.0000
1.00
1.00
4,142.00
7,420.00
SUBCONTRATISTA DE ENCOFRADOS
SUBCONTRATISTA FIERRO
M2
KG
5,797.7600
3,786.4100
1.00
0.80
5,797.76
3,029.13
hh
hh
hh
hh
13.8697
16.3277
16.3277
65.3122
16.96
14.14
12.40
11.21
235.23
230.87
202.46
732.15
KG
KG
M3
M3
M2
gln
HM
77.6530
3,354.6096
41.1794
39.9800
366.7700
18.3385
16.3277
2.90
2.82
200.00
30.00
19.00
10.00
8.00
225.19
9,460.00
8,235.88
1,199.40
6,968.63
183.39
130.62
M2
KG
6,601.8600
3,106.1200
1.00
0.80
6,601.86
2,484.90
hh
hh
hh
hh
53.6559
27.0560
35.4993
171.6241
16.96
14.14
12.40
11.21
910.00
382.57
440.19
1,923.91
98.4098
4,251.3012
1,700.6200
103.6000
94.0000
14.4000
2,062.0600
45.9071
44.5700
0.1140
5.8180
1.8000
395.7800
12.0000
19.7890
26.5000
1.5000
26.5000
1.5000
9.0000
2.90
2.82
1.40
2.75
2.75
7.50
1.57
200.00
30.00
29.00
26.00
1.20
19.00
32.00
10.00
1.20
1.35
1.20
1.35
9.00
285.39
11,988.67
2,380.87
284.90
258.50
108.00
3,237.43
9,181.42
1,337.10
3.31
151.27
2.16
7,519.82
384.00
197.89
31.80
2.03
31.80
2.03
81.00
KG
KG
ML
UND
UND
UND
UND
M3
M3
lt
lt
UND
M2
UND
gln
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
3.6000
1.8000
3.6000
27.0000
9.0000
4.5000
4.5000
194.0750
15.9440
357.2500
20.0000
193.2000
17.6000
361.0000
20.0000
17.4520
4.5000
23.5200
2.8800
6.8400
0.9360
3.0600
11.5560
5.7600
1.0800
3.9600
12.0160
2.9880
1.0800
13.5720
8.5680
9.4400
1.2000
29.0000
3.3000
1.7500
6.1500
1.6400
2.9400
2.7300
9.9000
1.5000
12.50
19.00
1.50
1.20
1.50
0.75
1.00
3.00
4.00
0.60
1.60
0.45
0.55
0.30
0.40
6.90
16.00
1.00
4.00
1.10
4.00
5.00
2.50
6.00
12.00
3.00
2.00
6.00
3.00
9.00
2.60
16.50
26.00
0.90
1.60
0.90
1.20
1.90
0.45
0.50
0.90
1.50
45.00
34.20
5.40
32.40
13.50
3.38
4.50
582.23
63.78
214.35
32.00
86.94
9.68
108.30
8.00
120.42
72.00
23.52
11.52
7.52
3.74
15.30
28.89
34.56
12.96
11.88
24.03
17.93
3.24
122.15
22.28
155.76
31.20
26.10
5.28
1.58
7.38
3.12
1.32
1.37
8.91
2.25
HM
10.5846
8.00
84.68
UND
UND
M2
4,018.0000
6,160.0000
6,144.3600
1.00
1.00
1.00
4,018.00
6,160.00
6,144.36
SUBCONTRATISTA FIERRO
KG
3,936.3900
0.80
3,149.11
hh
hh
hh
hh
8.5781
9.8850
9.8850
39.5407
16.96
14.14
12.40
11.21
145.48
139.77
122.57
443.25
KG
KG
M3
M3
M2
gln
48.1568
2,080.3716
24.8951
24.1700
227.8000
11.3900
2.90
2.82
200.00
30.00
19.00
10.00
139.65
5,866.65
4,979.02
725.10
4,328.20
113.90
HM
9.8850
8.00
79.08
M2
KG
4,100.4000
1,926.2700
1.00
0.80
4,100.40
1,541.02
hh
hh
hh
hh
26.2909
30.2017
30.2717
147.4984
16.96
14.14
12.40
11.21
445.89
427.05
375.37
1,653.46
70.2330
3,034.0656
0.1000
0.1000
686.0000
39.2000
50.0000
6.0000
1,662.4200
0.5000
37.5229
36.4300
1.3700
336.1600
0.0100
12.0000
16.8080
68.6000
11.1860
147.0000
2.90
2.82
55.00
35.00
1.40
2.75
2.75
7.50
1.57
14.40
200.00
30.00
26.00
19.00
13.00
32.00
10.00
3.00
4.00
0.60
203.68
8,556.06
5.50
3.50
960.40
107.80
137.50
45.00
2,610.00
7.20
7,504.58
1,092.90
35.62
6,387.04
0.13
384.00
168.08
205.80
44.74
88.20
KG
KG
M3
M3
ML
UND
UND
UND
UND
bls
M3
M3
lt
M2
M3
UND
gln
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
14.0000
68.6000
11.6000
147.0000
14.0000
2.4290
0.8750
2.1000
0.5600
1.3300
0.1820
0.5950
2.2470
1.1200
0.2100
0.7700
2.1000
0.5810
0.2100
2.6390
1.6660
1.60
0.45
0.55
0.30
0.40
6.90
16.00
1.00
4.00
1.10
4.00
5.00
2.50
6.00
12.00
3.00
2.00
6.00
3.00
9.00
2.60
22.40
30.87
6.38
44.10
5.60
16.76
14.00
2.10
2.24
1.46
0.73
2.98
5.62
6.72
2.52
2.31
4.20
3.49
0.63
23.75
4.33
HM
9.5528
8.00
76.42
UND
UND
M2
KG
385.0000
2,485.0000
5,176.0400
2,809.3200
1.00
1.00
1.00
0.80
385.00
2,485.00
5,176.04
2,247.46
hh
hh
hh
hh
85.6389
655.6913
14.6430
307.8569
16.96
14.14
12.40
11.21
1,452.44
9,271.47
181.57
3,451.08
KG
KG
M3
ML
ML
ML
ML
ML
ML
ML
ML
UND
18.7500
898.6680
14.2800
10.0000
69.0000
42.0000
17.6000
16.5000
26.4000
26.4000
49.5000
5.0000
2.90
2.82
35.00
0.90
1.40
2.00
3.50
3.30
1.60
2.20
3.70
18.00
54.38
2,534.24
499.80
9.00
96.60
84.00
61.60
54.45
42.24
58.08
183.15
90.00
UND
UND
UND
UND
UND
UND
UND
UND
bls
M3
M3
KG
lt
UND
M2
UND
gln
M3
KG
M3
P2
P2
UND
gln
ML
ML
UND
UND
GBL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
1.0000
15.0000
6.0000
9.0000
2.0000
7.0000
2.0000
3.0000
115.0028
10.3000
10.0000
37.5000
2.8345
2.8000
80.0000
0.7000
1.7395
3.5483
1.0000
11.4400
420.9918
22.2599
1.0000
4.0000
10.0000
10.0000
17.4240
6.9960
0.2000
12.0000
1.0000
12.0000
1.0000
0.8991
3.9600
3.3000
9.6810
10.0000
2.5200
10.0000
2.4000
2.4000
18.4400
10.0000
3.6000
10.0000
13.8300
2.4000
2,900.00
5.00
2.75
2.75
38.00
55.00
1.20
1.20
14.40
200.00
30.00
16.00
26.00
1.20
19.00
10.00
11.00
16.00
7.00
13.00
3.50
4.00
280.00
10.00
55.00
45.00
12.00
16.00
500.00
3.00
9.00
1.00
2.50
10.00
8.00
6.00
9.00
32.00
48.00
2.50
3.20
6.00
1.20
4.80
7.00
4.80
0.75
2.00
2,900.00
75.00
16.50
24.75
76.00
385.00
2.40
3.60
1,656.04
2,060.00
300.00
600.00
73.70
3.36
1,520.00
7.00
19.13
56.77
7.00
148.72
1,473.47
89.04
280.00
40.00
550.00
450.00
209.09
111.94
100.00
36.00
9.00
12.00
2.50
8.99
31.68
19.80
87.13
320.00
120.96
25.00
7.68
14.40
22.13
48.00
25.20
48.00
10.37
4.80
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
10.0000
20.8275
0.9275
6.5275
7.1050
30.2650
0.2650
1.8650
1.2800
20.8275
0.9275
6.5275
7.1050
30.2650
0.2650
1.8650
1.2800
0.9450
18.4800
4.4520
7.9200
6.3600
13.2000
4.2400
0.9990
15.8400
0.9990
0.2700
3.6000
2.0000
1.0000
6.0000
2.90
3.00
4.00
7.00
11.00
0.60
1.60
3.00
5.50
0.45
0.55
1.00
3.10
0.30
0.40
0.60
1.00
12.00
16.00
56.00
4.00
44.00
6.00
39.00
5.00
7.00
2.00
6.00
8.00
105.00
78.00
20.00
29.00
62.48
3.71
45.69
78.16
18.16
0.42
5.60
7.04
9.37
0.51
6.53
22.03
9.08
0.11
1.12
1.28
11.34
295.68
249.31
31.68
279.84
79.20
165.36
5.00
110.88
2.00
1.62
28.80
210.00
78.00
120.00
HE
HM
HM
88.5949
4.0000
6.6430
1.00
8.00
18.00
88.59
32.00
119.57
UND
UND
M2
KG
M2
2,378.1000
2,491.3000
1,440.0000
750.0000
71.3900
1.00
1.00
1.00
0.80
71.40
2,378.10
2,491.30
1,440.00
600.00
5,097.25
hh
hh
hh
140.8748
1,182.4154
45.3420
16.96
14.14
12.40
2,389.24
16,719.35
562.24
hh
PEON
675.2704
11.21
7,569.78
0.0150
0.1000
0.0650
634.7136
46.9333
0.4512
8.3315
4.9150
32.0000
132.0000
33.0000
76.1200
396.0000
99.0000
4.0000
2.0000
10.0000
2.8000
6.0000
1.0000
2.0000
1.0000
3.0000
2.0000
3.0000
8,870.1000
405.8985
3.0584
10.5000
2.0000
2.9500
8.4560
1.9040
2.2500
23.7714
744.0118
8.2000
57.6695
1.0000
0.0525
0.2000
70.0000
12.0000
8.0000
2.0000
70.0000
2.90
2.90
2.90
2.82
35.00
55.00
35.00
0.90
1.40
3.30
5.50
1.60
3.70
7.00
18.00
1,200.00
5.00
2.75
2.75
38.00
85.00
350.00
55.00
1.20
1.20
0.56
14.40
26.00
1.20
125.00
10.00
11.00
16.00
7.00
13.00
3.50
4.00
4.00
280.00
10.00
500.00
3.00
4.00
6.00
9.00
1.00
0.04
0.29
0.19
1,789.89
1,642.67
24.82
291.60
4.42
44.80
435.60
181.50
121.79
1,465.20
693.00
72.00
2,400.00
50.00
7.70
16.50
38.00
170.00
350.00
165.00
2.40
3.60
4,967.26
5,844.94
79.52
12.60
250.00
29.50
93.02
30.46
15.75
309.03
2,604.04
32.80
230.68
280.00
0.53
100.00
210.00
48.00
48.00
18.00
70.00
Material
ALAMBRE NEGRO N16
ALAMBRE NEGRO N8
CLAVOS C/S CABEZA (PROMEDIO)
FIERRO CORRUGADO (PROMEDIO)
ARENA FINA
PIEDRA CHANCADA DE 1/2"
ARENA GRUESA
ALAMBRE TW 2.50 MM2 (14 AWG)
ALAMBRE TW 4 MM2 (12 AWG)
CABLE TW 10 MM2 (8 AWG)
CABLE TW 16 MM2
ALAMBRE THW 12 AWG (4 MM2)
CABLE THW # 8 AWG (10 MM2)
CABLE THW # 6 AWG (16 MM2)
GRIFO DE BRONCE 1/2"
TABLERO TD1 (EMPOTRABLE C/INTERRUPTORES PLUG IN SEGUN PLANO)
CAJA FO.GO. PESADO C/TAPA 100X100X50 MM
CAJA RECT.GALV.PESADA 4"x2"x2" (100x55x40 mm)
CAJA OCTOG.GALV.PESADA 4"x4"x2" (100x40 mm)
CAJA FO.GO. PESADO C/TAPA 250X250X100 MM
CAJA FO.GO. PESADO C/TAPA 650X350X150 MM
CAJA FO.GO. PESADO C/TAPA 1000X1000X200 MM
CAJA FO.GO. PESADO C/TAPA 350X350X150 MM
TAPA CIEGA P/CAJA RECTANGULAR
TAPA CIEGA P/CAJA OCTOGONAL
LAD.ARCILLA TIPO IV KK 18H 9X13X24 CM
CEMENTO PORTLAND TIPO I (42.5KG)
PEGAMENTO PARA TUBERIA PVC
CINTA TEFLON
MEDIDOR DE AGUA TIPO CHORRO MULTIPLE DIAMETRO 1"
FORMADOR DE EMPAQUETADURA 1/32 GLN
GASOLINA 84 OCTANOS
HORMIGON
HIPOCLORITO DE CALCIO 70%
AGUA PARA LA OBRA
MADERA ANDAMIAJE
MADERA TORNILLO LARGA
MADERA (REGLAS)
MALLA EXPANDED METAL (ROLLO X 25 MT)
PETROLEO DIESEL # 2
SOPORTES METALICOS PARA MONTANTES ELECTRICAS
UNION UNIVERSAL DE FO.GO. 1/2"
UNION UNIVERSAL DE FO.GO. 3/4"
UNION UNIVERSAL DE FO.GO. 1 "
UNION UNIVERSAL DE FO.GO. 1 1/4"
NIPLE DE FO.GO DE 1/2" x 1 1/2"
KG
KG
KG
KG
M3
M3
M3
ML
ML
ML
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
bls
lt
UND
UND
UND
gln
M3
KG
M3
P2
P2
P2
UND
gln
GBL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
12.0000
8.0000
2.0000
7.0620
11.3685
6.5934
0.8745
2.0295
6.4260
6.6360
4.4940
6.1500
0.5565
15.8000
4.2800
3.2100
6.1500
0.5300
0.5300
12.2400
6.4200
6.1500
0.7950
6.1500
9.1800
15.8000
4.8100
6.1500
37.8600
0.9275
0.9275
63.1050
3.5000
16.1600
0.2650
0.2650
10.5300
2.0000
37.8600
0.9275
0.9275
63.1050
3.3000
16.1600
0.2650
0.2650
10.5300
1.0000
1.30
1.70
2.50
1.80
12.00
10.00
8.00
6.00
9.00
12.50
19.00
32.00
48.00
1.50
1.30
1.15
2.50
3.20
6.00
1.20
2.20
4.80
7.00
4.80
0.75
1.00
2.00
2.90
3.00
4.00
7.00
11.00
40.00
0.60
1.60
3.00
5.50
29.00
0.45
0.55
1.00
3.10
7.50
0.30
0.40
0.60
1.00
5.00
15.60
13.60
5.00
12.71
136.42
65.93
7.00
12.18
57.83
82.95
85.39
196.80
26.71
23.70
5.56
3.69
15.38
1.70
3.18
14.69
14.12
29.52
5.57
29.52
6.89
15.80
9.62
17.84
113.58
3.71
6.49
694.16
140.00
9.70
0.42
0.80
57.92
58.00
17.04
0.51
0.93
195.63
24.75
4.85
0.11
0.16
10.53
5.00
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
6.9300
12.0575
5.1675
7.3260
10.3350
7.3260
1.9800
3.4450
0.7950
35.0000
6.0000
4.0000
1.0000
12.00
16.00
4.00
5.00
7.00
2.00
6.00
8.50
8.00
20.00
26.00
31.00
45.00
83.16
192.92
20.67
36.63
72.35
14.65
11.88
29.28
6.36
700.00
156.00
124.00
45.00
HE
HM
HM
718.6348
0.2460
28.3420
1.00
8.00
18.00
718.63
1.97
510.16
UND
UND
M2
M2
3,189.0750
4,488.9500
458.5400
28.3500
1.00
1.00
71.40
86.10
3,189.08
4,488.95
32,739.76
2,440.94
hh
hh
hh
hh
92.7457
767.1162
27.0000
483.7429
16.96
14.14
12.40
11.21
1,572.97
10,847.02
334.80
5,422.76
KG
KG
M3
M3
M3
ML
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
0.1000
472.0572
37.1290
0.1512
0.0960
4.9150
4.0000
49.7750
5.8300
149.3250
2.0000
2.0000
2.8000
4.0000
3.0000
1.0000
2.0000
3.0000
2.90
2.82
35.00
55.00
35.00
0.90
1.40
3.30
1.60
3.70
1,200.00
5.00
2.75
2.75
45.00
38.00
1.20
1.20
0.29
1,331.20
1,299.52
8.32
3.36
4.42
5.60
164.26
9.33
552.50
2,400.00
10.00
7.70
11.00
135.00
38.00
2.40
3.60
bls
lt
UND
UND
UND
gln
M3
KG
M3
P2
P2
P2
UND
gln
GBL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
280.7963
1.6694
8.8000
2.0000
2.6800
8.0534
1.9040
2.2500
14.4258
590.5650
2.2000
44.5779
1.0000
0.0400
0.2000
64.0000
12.0000
8.0000
64.0000
12.0000
8.0000
7.0620
11.3685
6.5934
0.8745
0.8745
4.5360
6.6360
4.4940
2.6500
0.5565
15.8000
4.2800
3.2100
2.6500
0.5300
0.5300
8.6400
6.4200
2.6500
0.7950
2.6500
6.4800
15.8000
4.8100
2.6500
13.7550
0.9275
14.40
26.00
1.20
125.00
10.00
11.00
16.00
7.00
13.00
3.50
4.00
4.00
280.00
10.00
500.00
3.00
4.00
6.00
1.00
1.30
1.70
1.80
12.00
10.00
8.00
6.00
9.00
12.50
19.00
32.00
48.00
1.50
1.30
1.15
2.50
3.20
6.00
1.20
2.20
4.80
7.00
4.80
0.75
1.00
2.00
2.90
3.00
4.00
4,043.47
43.40
10.56
250.00
26.80
88.59
30.46
15.75
187.54
2,066.98
8.80
178.31
280.00
0.40
100.00
192.00
48.00
48.00
64.00
15.60
13.60
12.71
136.42
65.93
7.00
5.25
40.82
82.95
85.39
84.80
26.71
23.70
5.56
3.69
6.63
1.70
3.18
10.37
14.12
12.72
5.57
12.72
4.86
15.80
9.62
7.69
41.27
3.71
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
0.9275
17.6925
6.5300
0.2650
0.2650
2.7925
13.7550
0.9275
0.9275
17.6925
6.5300
0.2650
0.2650
2.7925
6.9300
12.0575
5.1675
7.3260
10.3350
7.3260
1.9800
3.4450
0.7950
32.0000
6.0000
4.0000
7.00
11.00
0.60
1.60
3.00
5.50
0.45
0.55
1.00
3.10
0.30
0.40
0.60
1.00
12.00
16.00
4.00
5.00
7.00
2.00
6.00
8.50
8.00
20.00
26.00
31.00
6.49
194.62
3.92
0.42
0.80
15.36
6.19
0.51
0.93
54.85
1.96
0.11
0.16
2.79
83.16
192.92
20.67
36.63
72.35
14.65
11.88
29.28
6.36
640.00
156.00
124.00
HE
HM
HM
453.3126
0.2460
27.0000
1.00
8.00
18.00
453.31
1.97
486.00
UND
UND
M2
M2
2,910.8250
1,623.6000
371.2600
8.8200
1.00
1.00
71.40
86.10
2,910.83
1,623.60
26,507.96
759.40
hh
hh
hh
hh
89.9355
793.2656
28.1940
500.3195
16.96
14.14
12.40
11.21
1,525.31
11,216.78
349.61
5,608.58
KG
KG
M3
M3
M3
0.1000
437.4000
38.0708
0.1512
0.0960
2.90
2.82
35.00
55.00
35.00
0.29
1,233.47
1,332.48
8.32
3.36
ML
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
bls
lt
UND
UND
UND
gln
M3
KG
M3
P2
P2
P2
UND
gln
GBL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
4.9150
4.0000
8.7450
5.8300
26.2350
2.0000
4.0000
2.8000
4.0000
4.0000
2.0000
3.0000
291.5042
1.0823
4.4000
2.0000
1.4600
8.4216
2.6040
2.2500
14.9020
597.8368
2.2000
47.0790
1.0000
0.0400
0.2000
28.0000
4.0000
8.0000
28.0000
4.0000
8.0000
7.5900
1.7490
7.9421
0.8745
0.8745
5.3760
4.8300
2.6500
0.5565
12.8000
4.6000
3.4500
2.6500
0.5300
0.5300
0.90
1.40
3.30
1.60
3.70
1,200.00
5.00
2.75
2.75
38.00
1.20
1.20
14.40
26.00
1.20
125.00
10.00
11.00
16.00
7.00
13.00
3.50
4.00
4.00
280.00
10.00
500.00
3.00
4.00
6.00
1.00
1.30
1.70
1.80
12.00
10.00
8.00
6.00
12.50
19.00
32.00
48.00
1.50
1.30
1.15
2.50
3.20
6.00
4.42
5.60
28.86
9.33
97.07
2,400.00
20.00
7.70
11.00
152.00
2.40
3.60
4,197.66
28.14
5.28
250.00
14.60
92.64
41.66
15.75
193.73
2,092.43
8.80
188.32
280.00
0.40
100.00
84.00
16.00
48.00
28.00
5.20
13.60
13.66
20.99
79.42
7.00
5.25
67.20
91.77
84.80
26.71
19.20
5.98
3.97
6.63
1.70
3.18
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
6.9000
2.6500
0.7950
2.6500
12.8000
5.1300
2.6500
13.7550
0.9275
0.9275
4.6375
6.5300
0.2650
0.2650
0.9275
13.7550
0.9275
0.9275
4.6375
6.5300
0.2650
0.2650
0.9275
8.3475
1.8550
0.7950
8.8245
1.5900
8.8245
2.3850
0.5300
0.7950
14.0000
2.0000
4.0000
2.20
4.80
7.00
4.80
1.00
2.00
2.90
3.00
4.00
7.00
11.00
0.60
1.60
3.00
5.50
0.45
0.55
1.00
3.10
0.30
0.40
0.60
1.00
12.00
16.00
4.00
5.00
7.00
2.00
6.00
8.50
8.00
20.00
26.00
31.00
15.18
12.72
5.57
12.72
12.80
10.26
7.69
41.27
3.71
6.49
51.01
3.92
0.42
0.80
5.10
6.19
0.51
0.93
14.38
1.96
0.11
0.16
0.93
100.17
29.68
3.18
44.12
11.13
17.65
14.31
4.51
6.36
280.00
52.00
124.00
HE
HM
HM
478.9324
0.2460
28.1940
1.00
8.00
18.00
478.93
1.97
507.49
UND
UND
M2
M2
1,680.9750
1,074.1000
343.3500
8.8200
1.00
1.00
71.40
86.10
1,680.98
1,074.10
24,515.19
759.40
74.9759
16.96
1,271.59
hh
OPERARIO
OFICIAL
PEON
Material
FIERRO CORRUGADO (PROMEDIO)
ARENA FINA
ALAMBRE TW 2.50 MM2 (14 AWG)
CABLE TW 10 MM2 (8 AWG)
ALAMBRE THW 12 AWG (4 MM2)
CABLE THW # 8 AWG (10 MM2)
CAJA FO.GO. PESADO C/TAPA 100X100X50 MM
CAJA RECT.GALV.PESADA 4"x2"x2" (100x55x40 mm)
CAJA OCTOG.GALV.PESADA 4"x4"x2" (100x40 mm)
TAPA CIEGA P/CAJA RECTANGULAR
TAPA CIEGA P/CAJA OCTOGONAL
CEMENTO PORTLAND TIPO I (42.5KG)
TABLERO PARA ASCENSOR (SEGUN EETT)
PEGAMENTO PARA TUBERIA PVC
CINTA TEFLON
FORMADOR DE EMPAQUETADURA 1/32 GLN
GASOLINA 84 OCTANOS
HORMIGON
HIPOCLORITO DE CALCIO 70%
AGUA PARA LA OBRA
MADERA ANDAMIAJE
MADERA (REGLAS)
MALLA EXPANDED METAL (ROLLO X 25 MT)
SOPORTES METALICOS PARA MONTANTES ELECTRICAS
UNION UNIVERSAL DE FO.GO. 1/2"
UNION UNIVERSAL DE FO.GO. 3/4"
NIPLE DE FO.GO DE 1/2" x 1 1/2"
NIPLE DE FO.GO DE 3/4" x 1 1/2"
ABRAZADERA DE Fo.Go. 4" CON PERNOS Y TARUGOS
ABRAZADERA DE Fo.Go. 3" CON PERNOS Y TARUGOS
ABRAZADERA DE Fo.Go. 2" CON PERNOS Y TARUGOS
TUBO PVC SAP C-10 EC 1/2" x 5 mt
TUBO PVC SAP C-10 EC 3/4" x 5 mt
REDUCCION PVC SAP C-10 SP 3/4" A 1/2"
CODO PVC SAP C-10 SP 1/2" x 90
TEE PVC SAP C-10 SP 1/2"
TEE PVC SAP C-10 SP 3/4"
TUBO PVC SAP IE 3/4" (20 mm) x 3 mt
TUBO PVC SAP IE 2 " (50 mm) x 3 mt
CURVA PVC SAP IE 3/4" (20 mm)
CURVA PVC SAP IE 2 " (50 mm)
UNION PVC SAP IE 3/4" (20 mm)
UNION PVC SAP IE 2 " (50 mm)
CONEXION A CAJA PVC SAP IE 3/4" (20 mm)
hh
hh
hh
651.7506
22.6860
417.1414
14.14
12.40
11.21
9,215.75
281.31
4,676.16
KG
M3
ML
ML
ML
ML
UND
UND
UND
UND
UND
bls
UND
lt
UND
UND
gln
M3
KG
M3
P2
P2
UND
GBL
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
417.8952
33.6445
10.6150
43.6150
21.2300
130.8450
5.0000
3.0000
4.0000
3.0000
4.0000
245.3519
1.0000
1.1112
4.0000
1.0600
6.8108
0.3500
2.2500
13.0253
516.9060
33.8092
1.0000
0.2000
36.0000
4.0000
36.0000
4.0000
4.0755
10.1066
4.6287
6.2580
3.3705
8.0250
11.9200
8.9400
8.0250
6.0550
13.8775
1.7300
1.9825
6.0550
13.8775
1.7300
2.82
35.00
0.90
3.30
1.60
3.70
5.00
2.75
2.75
1.20
1.20
14.40
900.00
26.00
1.20
10.00
11.00
16.00
7.00
13.00
3.50
4.00
280.00
500.00
3.00
4.00
1.00
1.30
12.00
10.00
8.00
9.00
12.50
1.50
1.20
0.75
1.00
3.00
11.00
0.60
5.50
0.45
3.10
0.30
1,178.46
1,177.56
9.55
143.93
33.97
484.13
25.00
8.25
11.00
3.60
4.80
3,533.07
900.00
28.89
4.80
10.60
74.92
5.60
15.75
169.33
1,809.17
135.24
280.00
100.00
108.00
16.00
36.00
5.20
48.91
101.07
37.03
56.32
42.13
12.04
14.30
6.71
8.03
18.17
152.65
1.04
10.90
2.72
43.02
0.52
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
1.9825
4.8650
10.6225
4.3225
0.0556
1.8525
5.0040
0.4865
1.0425
11.2295
3.7050
0.4865
11.2295
0.8340
3.0350
1.2350
18.0000
2.0000
1.00
6.90
12.00
16.00
1.00
4.00
2.00
2.69
3.00
5.00
7.00
9.00
2.00
3.00
6.00
8.50
20.00
26.00
1.98
33.57
127.47
69.16
0.06
7.41
10.01
1.31
3.13
56.15
25.94
4.38
22.46
2.50
18.21
10.50
360.00
52.00
HE
HM
563.8022
22.6860
1.00
18.00
563.80
408.35
UND
UND
M2
M2
1,849.7000
1,020.8500
281.8200
54.6500
1.00
1.00
71.40
86.10
1,849.70
1,020.85
20,121.95
4,705.37
hh
hh
hh
hh
2.0046
20.0460
6.6820
40.0920
16.96
14.14
12.40
11.21
34.00
283.45
82.86
449.43
ARENA FINA
CEMENTO PORTLAND TIPO I (42.5KG)
GASOLINA 84 OCTANOS
AGUA PARA LA OBRA
MADERA (REGLAS)
M3
bls
gln
M3
P2
3.6751
27.9976
2.0046
0.1336
2.0046
35.00
14.40
11.00
13.00
4.00
128.63
403.17
22.05
1.74
8.02
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
HM
6.6820
18.00
120.28
1.00
5,734.82
5,734.82
VARIOS
HERRAMIENTAS MANUALES
%MO
Fase
Descripcin
Und
Metrado
P.U.
Base
hh
3.2240
16.96
OPERARIO
hh
52.7400
14.14
OFICIAL
hh
39.1200
12.40
PEON
hh
47.6200
11.21
KG
0.3200
2.90
GBL
1.0000
3,500.00
GBL
1.0000
2,000.00
CONSUMIBLES
GBL
1.0000
66.40
Material
TRABAJOS PERMANENTES
Mano de Obra
CAPATAZ
hh
75.5968
16.96
OPERARIO
hh
113.0000
14.14
OFICIAL
hh
529.0000
12.40
PEON
hh
1,781.0148
11.21
315.00
Material
UNIDAD PORTATIL DISAL 280 KG
MES
8.0000
FLETE
VJE
30.0000
80.00
GBL
1.0000
3,500.00
CONSUMIBLES
GBL
1.0000
30.00
MIRA TOPOGRAFICA
HE
65.0000
2.00
TEODOLITO
HE
31.0000
10.00
Equipo
NIVEL
HE
96.0000
5.00
HM
512.0000
20.00
M3
468.1800
25.00
CAPATAZ
hh
47.7180
16.96
OFICIAL
hh
19.1616
12.40
PEON
hh
623.5527
11.21
GBL
1.0000
354.62
HM
15.3293
15.00
M3
920.0000
17.00
Subcontrato
ACARREO Y ELIMINACION DE EXCEDENTES
MOVIMIENTO DE TIERRAS
Mano de Obra
Material
CONSUMIBLES
Equipo
COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP
Subcontrato
EXCAVACION ELIMINADA CON EQUIPO
401 SOLADOS
Mano de Obra
CAPATAZ
hh
1.9162
16.96
OPERARIO
hh
19.1616
14.14
OFICIAL
hh
9.5808
12.40
PEON
hh
76.6464
11.21
bls
37.8442
14.40
HORMIGON
M3
15.6886
16.00
Material
CONSUMIBLES
GBL
1.0000
45.75
HM
9.5808
18.00
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
402 CALZADURA
Mano de Obra
CAPATAZ
hh
11.4839
16.96
OPERARIO
hh
172.3799
14.14
OFICIAL
hh
118.1865
12.40
PEON
hh
433.4967
11.21
ALAMBRE NEGRO N8
KG
24.0000
2.90
KG
11.5200
2.90
M3
38.6080
40.00
HORMIGON
M3
91.4400
16.00
bls
457.2000
14.40
CONSUMIBLES
GBL
1.0000
374.95
HM
54.1833
18.00
Material
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
403 CIMENTACION
Mano de Obra
CAPATAZ
hh
2.6199
16.96
OPERARIO
hh
28.6061
14.14
OFICIAL
hh
27.5395
12.40
PEON
hh
130.7221
11.21
ALAMBRE NEGRO N8
KG
4.1000
2.90
KG
3.1200
2.90
M3
0.6080
40.00
M3
24.8196
40.00
HORMIGON
M3
38.6694
16.00
bls
156.2760
14.40
CONSUMIBLES
GBL
1.0000
91.67
HM
16.3403
18.00
Material
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
404 PAVIMENTOS
Mano de Obra
CAPATAZ
hh
24.1508
16.96
OPERARIO
hh
160.1192
14.14
OFICIAL
hh
109.8461
12.40
PEON
hh
516.0585
11.21
ALAMBRE NEGRO N8
KG
0.4965
2.90
KG
0.4965
2.90
KG
13.6825
2.82
ARENA FINA
M3
0.3200
35.00
TIERRA DE CHACRA
M3
4.0000
50.00
M3
1.0000
55.00
ARENA GRUESA
M3
3.4266
35.00
AFIRMADO
M3
56.9517
35.00
UND
200.0000
0.56
Material
bls
8.0000
14.40
M3
45.2693
194.00
M3
45.2693
30.00
CONSUMIBLES
GBL
1.0000
1,866.42
ADITIVOS
GBL
1.0000
263.17
MATERIAL IISS
GBL
1.0000
430.58
GBL
1.0000
2,096.80
MATERIAL IIEE
Equipo
EQUIPO DE CORTE DE CONCRETO
HM
4.6728
25.00
HM
27.2492
30.00
HM
23.3648
8.00
UND
2,598.2000
1.00
UND
1,410.0000
1.00
Subcontrato
501 CIMENTACION/CISTERNA
Mano de Obra
CAPATAZ
hh
5.5956
16.96
OPERARIO
hh
55.5727
14.14
OFICIAL
hh
40.7199
12.40
PEON
hh
75.1388
11.21
KG
32.4585
2.90
ALAMBRE NEGRO N8
KG
5.0000
2.90
KG
7.5000
2.90
KG
1,402.2072
2.82
M3
0.4000
55.00
ARENA GRUESA
M3
0.2500
35.00
Material
bls
5.0000
14.40
M3
73.9437
200.00
M3
71.7900
30.00
M2
11.3000
19.00
CONSUMIBLES
GBL
1.0000
32.42
ADITIVOS
GBL
1.0000
360.00
GBL
1.0000
755.00
HM
14.9864
8.00
HM
1.3333
18.00
MATERIAL IISS
Equipo
Subcontrato
SUBCONTRATISTA DE ENCOFRADOS
M2
203.4000
1.00
SUBCONTRATISTA FIERRO
KG
1,298.3400
0.80
CAPATAZ
hh
44.2312
16.96
OPERARIO
hh
33.9743
14.14
OFICIAL
hh
22.9196
12.40
PEON
hh
113.7856
11.21
KG
198.3250
2.90
KG
8,567.6400
2.82
M3
100.3632
200.00
M3
97.4400
30.00
M2
523.7000
19.00
M2
200.4100
20.00
CONSUMIBLES
GBL
1.0000
388.12
MATERIAL IISS
GBL
1.0000
421.11
502 SEMISOTANO EV
Mano de Obra
Material
ALAMBRE NEGRO N16
MATERIAL IIEE
GBL
1.0000
825.02
HM
33.9743
8.00
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
SUBCONTRATISTA DE INSTALACIONES SANITARIAS
UND
805.0000
1.00
UND
1,120.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
13,726.0500
1.00
SUBCONTRATISTA FIERRO
KG
7,933.0000
0.80
CAPATAZ
hh
68.2931
16.96
OPERARIO
hh
40.3533
14.14
OFICIAL
hh
67.3428
12.40
PEON
hh
203.3716
11.21
503 SEMISOTANO EH
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
128.7138
2.90
KG
5,560.4340
2.82
UND
2,101.2000
1.57
M3
53.3746
200.00
M3
51.8200
30.00
M2
399.0400
19.00
CONSUMIBLES
GBL
1.0000
1,211.33
MATERIAL IISS
GBL
1.0000
2,277.10
MATERIAL IIEE
GBL
1.0000
3,613.29
HM
11.3007
8.00
UND
7,148.0000
1.00
UND
5,610.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,314.4700
1.00
SUBCONTRATISTA FIERRO
KG
5,148.5500
0.80
CAPATAZ
hh
17.0302
16.96
OPERARIO
hh
47.9282
14.14
OFICIAL
hh
51.9282
12.40
PEON
hh
118.6454
11.21
KG
111.4030
2.90
ALAMBRE NEGRO N8
KG
4.5500
2.90
KG
5.2000
2.90
KG
4,812.6096
2.82
M3
5.8500
55.00
ARENA GRUESA
M3
3.5000
35.00
bls
62.5000
14.40
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
CONSUMIBLES
GBL
1.0000
219.63
HM
25.6609
8.00
HM
9.3332
18.00
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
Equipo
Subcontrato
SUBCONTRATISTA DE ENCOFRADOS
M2
6,601.8600
1.00
SUBCONTRATISTA FIERRO
KG
4,456.1200
0.80
CAPATAZ
hh
73.0774
16.96
OPERARIO
hh
26.9493
14.14
OFICIAL
hh
35.2859
12.40
PEON
hh
170.5574
11.21
Material
ALAMBRE NEGRO N16
KG
95.7739
2.90
KG
4,137.4368
2.82
UND
2,062.0600
1.57
M3
45.2479
200.00
M3
43.9300
30.00
M2
390.7900
19.00
CONSUMIBLES
GBL
1.0000
440.31
MATERIAL IISS
GBL
1.0000
1,912.92
MATERIAL IIEE
GBL
1.0000
5,695.62
HM
10.4780
8.00
UND
7,038.0000
1.00
UND
8,475.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,020.3600
1.00
SUBCONTRATISTA FIERRO
KG
3,830.9600
0.80
CAPATAZ
hh
13.8697
16.96
OPERARIO
hh
16.3277
14.14
OFICIAL
hh
16.3277
12.40
PEON
hh
65.3122
11.21
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
77.6530
2.90
KG
3,354.6096
2.82
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
CONSUMIBLES
GBL
1.0000
183.39
HM
16.3277
8.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,601.8600
1.00
SUBCONTRATISTA FIERRO
KG
3,106.1200
0.80
CAPATAZ
hh
58.0356
16.96
OPERARIO
hh
25.1693
14.14
OFICIAL
hh
34.0992
12.40
PEON
hh
166.9974
11.21
KG
94.6602
2.90
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
4,089.3228
UND
2,062.0600
2.82
1.57
M3
44.3312
200.00
M3
43.0400
30.00
M2
382.8400
19.00
CONSUMIBLES
GBL
1.0000
357.35
MATERIAL IISS
GBL
1.0000
1,116.04
MATERIAL IIEE
GBL
1.0000
4,948.04
HM
9.8847
8.00
UND
4,142.0000
1.00
UND
7,420.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
5,797.7600
1.00
SUBCONTRATISTA FIERRO
KG
3,786.4100
0.80
CAPATAZ
hh
13.8697
16.96
OPERARIO
hh
16.3277
14.14
OFICIAL
hh
16.3277
12.40
PEON
hh
65.3122
11.21
2.90
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
77.6530
KG
3,354.6096
2.82
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
CONSUMIBLES
GBL
1.0000
183.39
HM
16.3277
8.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,601.8600
1.00
SUBCONTRATISTA FIERRO
KG
3,106.1200
0.80
CAPATAZ
hh
53.6559
16.96
OPERARIO
hh
27.0560
14.14
OFICIAL
hh
35.4993
12.40
PEON
hh
171.6241
11.21
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
98.4098
2.90
KG
4,251.3012
2.82
UND
2,062.0600
1.57
M3
45.9071
200.00
M3
44.5700
30.00
M2
395.7800
19.00
CONSUMIBLES
GBL
1.0000
354.63
MATERIAL IISS
GBL
1.0000
1,063.25
GBL
1.0000
4,137.55
HM
10.5846
8.00
UND
4,018.0000
1.00
MATERIAL IIEE
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
SUBCONTRATISTA DE INSTALACIONES SANITARIAS
UND
6,160.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,144.3600
1.00
SUBCONTRATISTA FIERRO
KG
3,936.3900
0.80
CAPATAZ
hh
8.5781
16.96
OPERARIO
hh
9.8850
14.14
OFICIAL
hh
9.8850
12.40
PEON
hh
39.5407
11.21
2.90
Material
ALAMBRE NEGRO N16
KG
48.1568
KG
2,080.3716
2.82
M3
24.8951
200.00
M3
24.1700
30.00
M2
227.8000
19.00
CONSUMIBLES
GBL
1.0000
113.90
HM
9.8850
8.00
SUBCONTRATISTA DE ENCOFRADOS
M2
4,100.4000
1.00
SUBCONTRATISTA FIERRO
KG
1,926.2700
0.80
CAPATAZ
hh
26.2909
16.96
OPERARIO
hh
30.2017
14.14
OFICIAL
hh
30.2717
12.40
PEON
hh
147.4984
11.21
2.90
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
70.2330
KG
3,034.0656
2.82
M3
0.1000
55.00
35.00
ARENA GRUESA
M3
0.1000
UND
1,662.4200
1.57
bls
0.5000
14.40
M3
37.5229
200.00
M3
36.4300
30.00
M2
336.1600
19.00
CONSUMIBLES
GBL
1.0000
203.83
MATERIAL IISS
GBL
1.0000
93.84
MATERIAL IIEE
GBL
1.0000
1,698.79
HM
9.5528
8.00
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
SUBCONTRATISTA DE INSTALACIONES SANITARIAS
UND
385.0000
1.00
UND
2,485.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
5,176.0400
1.00
SUBCONTRATISTA FIERRO
KG
2,809.3200
0.80
hh
85.6389
16.96
OPERARIO
hh
655.6913
14.14
OFICIAL
hh
14.6430
12.40
PEON
hh
307.8569
11.21
Material
ALAMBRE NEGRO N16
KG
18.7500
2.90
KG
898.6680
2.82
ARENA FINA
M3
14.2800
35.00
HORMIGON
M3
3.5483
16.00
bls
115.0028
14.40
M3
10.3000
200.00
M3
10.0000
30.00
M2
80.0000
19.00
ADITIVOS
GBL
1.0000
600.00
CONSUMIBLES
GBL
1.0000
291.91
MATERIAL IISS
GBL
1.0000
2,969.38
GBL
1.0000
5,443.66
HE
88.5949
1.00
HM
4.0000
8.00
HM
6.6430
18.00
UND
2,378.1000
1.00
UND
2,491.3000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
1,440.0000
1.00
SUBCONTRATISTA FIERRO
KG
750.0000
0.80
M2
71.3900
71.40
MATERIAL IIEE
Equipo
Subcontrato
hh
140.8748
16.96
OPERARIO
hh
1,182.4154
14.14
OFICIAL
hh
45.3420
12.40
PEON
hh
675.2704
11.21
KG
0.0150
2.90
ALAMBRE NEGRO N8
KG
0.1000
2.90
KG
0.0650
2.90
KG
634.7136
2.82
ARENA FINA
M3
46.9333
35.00
M3
0.4512
55.00
ARENA GRUESA
M3
8.3315
35.00
HORMIGON
M3
1.9040
16.00
UND
8,870.1000
0.56
14.40
Material
bls
405.8985
CONSUMIBLES
GBL
1.0000
524.20
MATERIAL IISS
GBL
1.0000
3,139.55
GBL
1.0000
7,593.80
HE
718.6348
1.00
HM
0.2460
8.00
HM
28.3420
18.00
UND
3,189.0750
1.00
UND
4,488.9500
1.00
M2
458.5400
71.40
M2
28.3500
86.10
MATERIAL IIEE
Equipo
hh
92.7457
16.96
OPERARIO
hh
767.1162
14.14
OFICIAL
hh
27.0000
12.40
PEON
hh
483.7429
11.21
2.90
Material
ALAMBRE NEGRO N8
KG
0.1000
KG
472.0572
2.82
ARENA FINA
M3
37.1290
35.00
M3
0.1512
55.00
ARENA GRUESA
M3
0.0960
35.00
HORMIGON
M3
1.9040
16.00
bls
280.7963
14.40
CONSUMIBLES
GBL
1.0000
357.29
MATERIAL IISS
GBL
1.0000
2,720.76
MATERIAL IIEE
GBL
1.0000
3,777.90
HE
453.3126
1.00
HM
0.2460
8.00
HM
27.0000
18.00
UND
2,910.8250
1.00
UND
1,623.6000
1.00
M2
371.2600
71.40
M2
8.8200
86.10
Equipo
Subcontrato
hh
89.9355
16.96
OPERARIO
hh
793.2656
14.14
OFICIAL
hh
28.1940
12.40
PEON
hh
500.3195
11.21
2.90
Material
ALAMBRE NEGRO N8
KG
0.1000
KG
437.4000
2.82
ARENA FINA
M3
38.0708
35.00
M3
0.1512
55.00
ARENA GRUESA
M3
0.0960
35.00
HORMIGON
M3
2.6040
16.00
bls
291.5042
14.40
CONSUMIBLES
GBL
1.0000
334.79
MATERIAL IISS
GBL
1.0000
1,662.06
MATERIAL IIEE
GBL
1.0000
2,979.87
HE
478.9324
1.00
HM
0.2460
8.00
HM
28.1940
18.00
UND
1,680.9750
1.00
UND
1,074.1000
1.00
M2
343.3500
71.40
M2
8.8200
86.10
Equipo
Subcontrato
Mano de Obra
CAPATAZ
hh
74.9759
16.96
OPERARIO
hh
651.7506
14.14
OFICIAL
hh
22.6860
12.40
hh
417.1414
11.21
KG
417.8952
2.82
ARENA FINA
M3
33.6445
35.00
HORMIGON
M3
0.3500
16.00
bls
245.3519
14.40
CONSUMIBLES
GBL
1.0000
288.54
MATERIAL IISS
GBL
1.0000
1,311.75
MATERIAL IIEE
GBL
1.0000
1,955.23
HE
563.8022
1.00
HM
22.6860
18.00
UND
1,849.7000
1.00
UND
1,020.8500
1.00
M2
281.8200
71.40
M2
54.6500
86.10
PEON
Material
Equipo
Subcontrato
hh
2.0046
16.96
OPERARIO
hh
20.0460
14.14
OFICIAL
hh
6.6820
12.40
PEON
hh
40.0920
11.21
Material
ARENA FINA
M3
3.6751
35.00
bls
27.9976
14.40
CONSUMIBLES
GBL
1.0000
23.79
HM
6.6820
18.00
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
VARIOS
HERRAMIENTAS MANUALES
%MO
1.00
5,734.82
P2
660.2825
4.00
MADERA (REGLAS)
P2
220.5428
4.00
MADERA ANDAMIAJE
P2
2,870.3114
3.50
5.0000
280.00
UND
TRIPLAY DE 4'x8'x 6 mm
PLN
2.7200
33.00
UND
60.0000
32.00
0.00
Parcial
Base
Vi
Sa
54.68
745.74
485.09
533.82
0.00
0.93
3,500.00
2,000.00
66.40
1,282.12
1,597.82
6,559.60
19,965.18
0.00
2,520.00
2,400.00
3,500.00
30.00
0.00
130.00
310.00
480.00
10,240.00
11,704.50
809.30
237.60
6,990.03
0.00
354.62
0.00
229.94
0.00
15,640.00
32.50
270.95
118.80
859.21
0.00
544.96
251.02
0.3
Lu
Ma
Mi
Ju
45.75
0.00
172.45
194.77
2,437.45
1,465.51
4,859.50
0.00
69.60
33.41
1,544.32
1,463.04
6,583.68
374.95
0.00
975.30
44.43
404.49
341.49
1,465.39
0.00
11.89
9.05
24.32
992.78
618.71
2,250.37
91.67
0.00
294.13
409.60
2,264.09
1,362.09
5,785.02
0.00
1.44
1.44
38.58
11.20
200.00
55.00
119.93
1,993.31
112.00
115.20
8,782.24
1,358.08
1,866.42
263.17
430.58
2,096.80
0.00
116.82
817.48
186.92
0.00
2,598.20
1,410.00
94.90
785.80
504.93
842.31
0.00
94.13
14.50
21.75
3,954.22
22.00
8.75
72.00
14,788.74
2,153.70
214.70
32.42
360.00
755.00
119.89
24.00
0.00
203.40
1,038.67
750.16
480.40
284.20
1,275.54
0.00
575.14
24,160.74
20,072.64
2,923.20
9,950.30
4,008.20
388.12
421.11
825.02
0.00
271.79
0.00
805.00
1,120.00
13,726.05
6,346.40
1,158.25
570.60
835.05
2,279.80
0.00
373.27
15,680.42
3,298.88
10,674.92
1,554.60
7,581.76
1,211.33
2,277.10
3,613.29
0.00
90.41
0.00
7,148.00
5,610.00
6,314.47
4,118.84
288.83
677.70
643.91
1,330.01
0.00
323.07
13.20
15.08
13,571.56
321.75
122.50
900.00
8,235.88
1,199.40
6,968.63
219.63
205.29
168.00
0.00
6,601.86
3,564.90
1,239.39
381.06
437.55
1,911.95
0.00
277.74
11,667.57
3,237.43
9,049.58
1,317.90
7,425.01
440.31
1,912.92
5,695.62
0.00
83.82
0.00
7,038.00
8,475.00
6,020.36
3,064.77
235.23
230.87
202.46
732.15
0.00
225.19
9,460.00
8,235.88
1,199.40
6,968.63
183.39
0.00
130.62
0.00
6,601.86
2,484.90
984.28
355.89
422.83
1,872.04
0.00
274.51
11,531.89
3,237.43
8,866.24
1,291.20
7,273.96
357.35
1,116.04
4,948.04
0.00
79.08
0.00
4,142.00
7,420.00
5,797.76
3,029.13
235.23
230.87
202.46
732.15
0.00
225.19
9,460.00
8,235.88
1,199.40
6,968.63
183.39
130.62
0.00
6,601.86
2,484.90
910.00
382.57
440.19
1,923.91
0.00
285.39
11,988.67
3,237.43
9,181.42
1,337.10
7,519.82
354.63
1,063.25
4,137.55
0.00
84.68
0.00
4,018.00
6,160.00
6,144.36
3,149.11
145.48
139.77
122.57
443.25
0.00
139.65
5,866.65
4,979.02
725.10
4,328.20
113.90
0.00
79.08
0.00
4,100.40
1,541.02
445.89
427.05
375.37
1,653.46
0.00
203.68
8,556.06
5.50
3.50
2,610.00
7.20
7,504.58
1,092.90
6,387.04
203.83
93.84
1,698.79
0.00
76.42
0.00
385.00
2,485.00
5,176.04
2,247.46
1,452.44
9,271.47
181.57
3,451.08
0.00
54.38
2,534.24
499.80
56.77
1,656.04
2,060.00
300.00
1,520.00
600.00
291.91
2,969.38
5,443.66
0.00
88.59
32.00
119.57
0.00
2,378.10
2,491.30
1,440.00
600.00
5,097.25
2,389.24
16,719.35
562.24
7,569.78
0.00
0.04
0.29
0.19
1,789.89
1,642.67
24.82
291.60
30.46
4,967.26
5,844.94
524.20
3,139.55
7,593.80
0.00
718.63
1.97
510.16
0.00
3,189.08
4,488.95
32,739.76
2,440.94
1,572.97
10,847.02
334.80
5,422.76
0.00
0.29
1,331.20
1,299.52
8.32
3.36
30.46
4,043.47
357.29
2,720.76
3,777.90
0.00
453.31
1.97
486.00
0.00
2,910.83
1,623.60
26,507.96
759.40
1,525.31
11,216.78
349.61
5,608.58
0.00
0.29
1,233.47
1,332.48
8.32
3.36
41.66
4,197.66
334.79
1,662.06
2,979.87
0.00
478.93
1.97
507.49
0.00
1,680.98
1,074.10
24,515.19
759.40
1,271.59
9,215.75
281.31
4,676.16
0.00
1,178.46
1,177.56
5.60
3,533.07
288.54
1,311.75
1,955.23
0.00
563.80
408.35
0.00
1,849.70
1,020.85
20,121.95
4,705.37
34.00
283.45
82.86
449.43
0.00
128.63
403.17
23.79
0.00
120.28
5,734.82
2,641.13
882.17
10,046.09
1,400.00
89.76
1,920.00
1064577.94
1064577.94
0.00
0
0
0
0
0
0.3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Fase
Descripcin
Und
Presupuesto Base
Met
P.U. (S/.)
hh
3.2240
16.96
OPERARIO
hh
52.7400
14.14
OFICIAL
hh
39.1200
12.40
PEON
hh
47.6200
11.21
KG
0.3200
2.90
CAPATAZ
hh
75.5968
16.96
OPERARIO
hh
113.0000
14.14
OFICIAL
hh
529.0000
12.40
PEON
hh
1,781.0148
11.21
Material
CLAVOS C/S CABEZA (PROMEDIO)
TRABAJOS PERMANENTES
Mano de Obra
Material
UNIDAD PORTATIL DISAL 280 KG
MES
8.0000
315.00
FLETE
VJE
30.0000
80.00
MIRA TOPOGRAFICA
HE
65.0000
2.00
TEODOLITO
HE
31.0000
10.00
Equipo
NIVEL
HE
96.0000
5.00
HM
512.0000
20.00
M3
468.1800
25.00
CAPATAZ
hh
47.7180
16.96
OFICIAL
hh
19.1616
12.40
PEON
hh
623.5527
11.21
HM
15.3293
15.00
M3
920.0000
17.00
Subcontrato
ACARREO Y ELIMINACION DE EXCEDENTES
MOVIMIENTO DE TIERRAS
Mano de Obra
Equipo
COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP
Subcontrato
EXCAVACION ELIMINADA CON EQUIPO
401 SOLADOS
Mano de Obra
CAPATAZ
hh
1.9162
16.96
OPERARIO
hh
19.1616
14.14
OFICIAL
hh
9.5808
12.40
PEON
hh
76.6464
11.21
bls
37.8442
14.40
HORMIGON
M3
15.6886
16.00
HM
9.5808
18.00
Material
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
402 CALZADURA
Mano de Obra
CAPATAZ
hh
11.4839
16.96
OPERARIO
hh
172.3799
14.14
OFICIAL
hh
118.1865
12.40
PEON
hh
433.4967
11.21
KG
24.0000
2.90
KG
11.5200
2.90
M3
38.6080
40.00
HORMIGON
M3
91.4400
16.00
bls
457.2000
14.40
HM
54.1833
18.00
Material
ALAMBRE NEGRO N8
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
403 CIMENTACION
Mano de Obra
CAPATAZ
hh
2.6199
16.96
OPERARIO
hh
28.6061
14.14
OFICIAL
hh
27.5395
12.40
PEON
hh
130.7221
11.21
ALAMBRE NEGRO N8
KG
4.1000
2.90
KG
3.1200
2.90
M3
0.6080
40.00
M3
24.8196
40.00
HORMIGON
M3
38.6694
16.00
bls
156.2760
14.40
HM
16.3403
18.00
Material
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
404 PAVIMENTOS
Mano de Obra
CAPATAZ
hh
24.1508
16.96
OPERARIO
hh
160.1192
14.14
OFICIAL
hh
109.8461
12.40
PEON
hh
516.0585
11.21
ALAMBRE NEGRO N8
KG
0.4965
2.90
KG
0.4965
2.90
KG
13.6825
2.82
ARENA FINA
M3
0.3200
35.00
TIERRA DE CHACRA
M3
4.0000
50.00
M3
1.0000
55.00
ARENA GRUESA
M3
3.4266
35.00
AFIRMADO
M3
56.9517
35.00
UND
200.0000
0.56
Material
bls
8.0000
14.40
M3
45.2693
194.00
M3
45.2693
30.00
HM
4.6728
25.00
HM
27.2492
30.00
HM
23.3648
8.00
UND
2,598.2000
1.00
UND
1,410.0000
1.00
Equipo
Subcontrato
501 CIMENTACION/CISTERNA
Mano de Obra
CAPATAZ
hh
5.5956
16.96
OPERARIO
hh
55.5727
14.14
OFICIAL
hh
40.7199
12.40
hh
75.1388
11.21
KG
32.4585
2.90
ALAMBRE NEGRO N8
KG
5.0000
2.90
KG
7.5000
2.90
KG
1,402.2072
2.82
M3
0.4000
55.00
ARENA GRUESA
M3
0.2500
35.00
bls
5.0000
14.40
M3
73.9437
200.00
M3
71.7900
30.00
M2
11.3000
19.00
HM
14.9864
8.00
HM
1.3333
18.00
PEON
Material
Equipo
Subcontrato
SUBCONTRATISTA DE ENCOFRADOS
M2
203.4000
1.00
SUBCONTRATISTA FIERRO
KG
1,298.3400
0.80
CAPATAZ
hh
44.2312
16.96
OPERARIO
hh
33.9743
14.14
OFICIAL
hh
22.9196
12.40
PEON
hh
113.7856
11.21
2.90
502 SEMISOTANO EV
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
198.3250
KG
8,567.6400
2.82
M3
100.3632
200.00
M3
97.4400
30.00
M2
523.7000
19.00
M2
200.4100
20.00
HM
33.9743
8.00
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
SUBCONTRATISTA DE INSTALACIONES SANITARIAS
UND
805.0000
1.00
UND
1,120.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
13,726.0500
1.00
SUBCONTRATISTA FIERRO
KG
7,933.0000
0.80
CAPATAZ
hh
68.2931
16.96
OPERARIO
hh
40.3533
14.14
OFICIAL
hh
67.3428
12.40
PEON
hh
203.3716
11.21
503 SEMISOTANO EH
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
128.7138
2.90
KG
5,560.4340
2.82
UND
2,101.2000
1.57
M3
53.3746
200.00
M3
51.8200
30.00
M2
399.0400
19.00
HM
11.3007
8.00
UND
7,148.0000
1.00
UND
5,610.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,314.4700
1.00
SUBCONTRATISTA FIERRO
KG
5,148.5500
0.80
CAPATAZ
hh
17.0302
16.96
OPERARIO
hh
47.9282
14.14
OFICIAL
hh
51.9282
12.40
hh
118.6454
11.21
KG
111.4030
2.90
ALAMBRE NEGRO N8
KG
4.5500
2.90
KG
5.2000
2.90
KG
4,812.6096
2.82
M3
5.8500
55.00
ARENA GRUESA
M3
3.5000
35.00
bls
62.5000
14.40
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
HM
25.6609
8.00
HM
9.3332
18.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,601.8600
1.00
SUBCONTRATISTA FIERRO
KG
4,456.1200
0.80
CAPATAZ
hh
73.0774
16.96
OPERARIO
hh
26.9493
14.14
OFICIAL
hh
35.2859
12.40
PEON
hh
170.5574
11.21
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
PEON
Material
Equipo
Subcontrato
Material
ALAMBRE NEGRO N16
KG
95.7739
2.90
KG
4,137.4368
2.82
UND
2,062.0600
1.57
M3
45.2479
200.00
M3
43.9300
30.00
M2
390.7900
19.00
HM
10.4780
8.00
UND
7,038.0000
1.00
UND
8,475.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,020.3600
1.00
SUBCONTRATISTA FIERRO
KG
3,830.9600
0.80
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
hh
13.8697
16.96
OPERARIO
hh
16.3277
14.14
OFICIAL
hh
16.3277
12.40
PEON
hh
65.3122
11.21
2.90
Material
ALAMBRE NEGRO N16
KG
77.6530
KG
3,354.6096
2.82
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
HM
16.3277
8.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,601.8600
1.00
SUBCONTRATISTA FIERRO
KG
3,106.1200
0.80
CAPATAZ
hh
58.0356
16.96
OPERARIO
hh
25.1693
14.14
OFICIAL
hh
34.0992
12.40
PEON
hh
166.9974
11.21
KG
94.6602
2.90
2.82
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
FIERRO CORRUGADO (PROMEDIO)
KG
4,089.3228
UND
2,062.0600
1.57
M3
44.3312
200.00
M3
43.0400
30.00
M2
382.8400
19.00
HM
9.8847
8.00
UND
4,142.0000
1.00
UND
7,420.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
5,797.7600
1.00
SUBCONTRATISTA FIERRO
KG
3,786.4100
0.80
CAPATAZ
hh
13.8697
16.96
OPERARIO
hh
16.3277
14.14
OFICIAL
hh
16.3277
12.40
PEON
hh
65.3122
11.21
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
77.6530
2.90
KG
3,354.6096
2.82
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
HM
16.3277
8.00
M2
6,601.8600
1.00
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
SUBCONTRATISTA DE ENCOFRADOS
SUBCONTRATISTA FIERRO
KG
3,106.1200
0.80
CAPATAZ
hh
53.6559
16.96
OPERARIO
hh
27.0560
14.14
OFICIAL
hh
35.4993
12.40
PEON
hh
171.6241
11.21
Material
ALAMBRE NEGRO N16
KG
98.4098
2.90
KG
4,251.3012
2.82
UND
2,062.0600
1.57
M3
45.9071
200.00
M3
44.5700
30.00
M2
395.7800
19.00
HM
10.5846
8.00
UND
4,018.0000
1.00
UND
6,160.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,144.3600
1.00
SUBCONTRATISTA FIERRO
KG
3,936.3900
0.80
CAPATAZ
hh
8.5781
16.96
OPERARIO
hh
9.8850
14.14
OFICIAL
hh
9.8850
12.40
PEON
hh
39.5407
11.21
2.90
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
48.1568
KG
2,080.3716
2.82
M3
24.8951
200.00
M3
24.1700
30.00
M2
227.8000
19.00
HM
9.8850
8.00
SUBCONTRATISTA DE ENCOFRADOS
M2
4,100.4000
1.00
SUBCONTRATISTA FIERRO
KG
1,926.2700
0.80
CAPATAZ
hh
26.2909
16.96
OPERARIO
hh
30.2017
14.14
OFICIAL
hh
30.2717
12.40
PEON
hh
147.4984
11.21
2.90
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
70.2330
KG
3,034.0656
2.82
M3
0.1000
55.00
35.00
ARENA GRUESA
M3
0.1000
UND
1,662.4200
1.57
bls
0.5000
14.40
M3
37.5229
200.00
M3
36.4300
30.00
M2
336.1600
19.00
HM
9.5528
8.00
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
SUBCONTRATISTA DE INSTALACIONES SANITARIAS
UND
385.0000
1.00
UND
2,485.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
5,176.0400
1.00
SUBCONTRATISTA FIERRO
KG
2,809.3200
0.80
hh
85.6389
16.96
OPERARIO
hh
655.6913
14.14
OFICIAL
hh
14.6430
12.40
hh
307.8569
11.21
2.90
PEON
Material
ALAMBRE NEGRO N16
KG
18.7500
KG
898.6680
2.82
ARENA FINA
M3
14.2800
35.00
HORMIGON
M3
3.5483
16.00
bls
115.0028
14.40
M3
10.3000
200.00
M3
10.0000
30.00
M2
80.0000
19.00
HE
88.5949
1.00
HM
4.0000
8.00
HM
6.6430
18.00
UND
2,378.1000
1.00
UND
2,491.3000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
1,440.0000
1.00
SUBCONTRATISTA FIERRO
KG
750.0000
0.80
M2
71.3900
71.40
Equipo
Subcontrato
hh
140.8748
16.96
OPERARIO
hh
1,182.4154
14.14
OFICIAL
hh
45.3420
12.40
PEON
hh
675.2704
11.21
KG
0.0150
2.90
ALAMBRE NEGRO N8
KG
0.1000
2.90
KG
0.0650
2.90
KG
634.7136
2.82
ARENA FINA
M3
46.9333
35.00
M3
0.4512
55.00
ARENA GRUESA
M3
8.3315
35.00
HORMIGON
M3
1.9040
16.00
UND
8,870.1000
0.56
bls
405.8985
14.40
HE
718.6348
1.00
Material
HM
0.2460
8.00
HM
28.3420
18.00
UND
3,189.0750
1.00
UND
4,488.9500
1.00
M2
458.5400
71.40
M2
28.3500
86.10
Subcontrato
hh
92.7457
16.96
OPERARIO
hh
767.1162
14.14
OFICIAL
hh
27.0000
12.40
PEON
hh
483.7429
11.21
2.90
Material
ALAMBRE NEGRO N8
KG
0.1000
KG
472.0572
2.82
ARENA FINA
M3
37.1290
35.00
M3
0.1512
55.00
ARENA GRUESA
M3
0.0960
35.00
HORMIGON
M3
1.9040
16.00
bls
280.7963
14.40
HE
453.3126
1.00
HM
0.2460
8.00
HM
27.0000
18.00
UND
2,910.8250
1.00
UND
1,623.6000
1.00
M2
371.2600
71.40
M2
8.8200
86.10
Equipo
Subcontrato
hh
89.9355
16.96
OPERARIO
hh
793.2656
14.14
OFICIAL
hh
28.1940
12.40
hh
500.3195
11.21
2.90
PEON
Material
ALAMBRE NEGRO N8
KG
0.1000
KG
437.4000
2.82
ARENA FINA
M3
38.0708
35.00
M3
0.1512
55.00
ARENA GRUESA
M3
0.0960
35.00
HORMIGON
M3
2.6040
16.00
bls
291.5042
14.40
HE
478.9324
1.00
HM
0.2460
8.00
HM
28.1940
18.00
UND
1,680.9750
1.00
UND
1,074.1000
1.00
M2
343.3500
71.40
M2
8.8200
86.10
Equipo
Subcontrato
hh
74.9759
16.96
OPERARIO
hh
651.7506
14.14
OFICIAL
hh
22.6860
12.40
PEON
hh
417.1414
11.21
KG
417.8952
2.82
ARENA FINA
M3
33.6445
35.00
HORMIGON
M3
0.3500
16.00
bls
245.3519
14.40
HE
563.8022
1.00
HM
22.6860
18.00
UND
1,849.7000
1.00
UND
1,020.8500
1.00
M2
281.8200
71.40
M2
54.6500
86.10
Material
Equipo
Subcontrato
hh
2.0046
16.96
OPERARIO
hh
20.0460
14.14
OFICIAL
hh
6.6820
12.40
hh
40.0920
11.21
PEON
Material
ARENA FINA
M3
3.6751
35.00
bls
27.9976
14.40
HM
6.6820
18.00
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
Presupuesto Base
Parcial (S/.)
54.68
745.74
485.09
533.82
0.93
1,282.12
1,597.82
6,559.60
19,965.18
2,520.00
2,400.00
130.00
310.00
480.00
10,240.00
11,704.50
809.30
237.60
6,990.03
229.94
15,640.00
32.50
270.95
118.80
859.21
544.96
251.02
172.45
194.77
2,437.45
1,465.51
4,859.50
69.60
33.41
1,544.32
1,463.04
6,583.68
975.30
44.43
404.49
341.49
1,465.39
11.89
9.05
24.32
992.78
618.71
2,250.37
294.13
409.60
2,264.09
1,362.09
5,785.02
1.44
1.44
38.58
11.20
200.00
55.00
119.93
1,993.31
112.00
115.20
8,782.24
1,358.08
116.82
817.48
186.92
2,598.20
1,410.00
94.90
785.80
504.93
842.31
94.13
14.50
21.75
3,954.22
22.00
8.75
72.00
14,788.74
2,153.70
214.70
119.89
24.00
203.40
1,038.67
750.16
480.40
284.20
1,275.54
575.14
24,160.74
20,072.64
2,923.20
9,950.30
4,008.20
271.79
805.00
1,120.00
13,726.05
6,346.40
1,158.25
570.60
835.05
2,279.80
373.27
15,680.42
3,298.88
10,674.92
1,554.60
7,581.76
90.41
7,148.00
5,610.00
6,314.47
4,118.84
288.83
677.70
643.91
1,330.01
323.07
13.20
15.08
13,571.56
321.75
122.50
900.00
8,235.88
1,199.40
6,968.63
205.29
168.00
6,601.86
3,564.90
1,239.39
381.06
437.55
1,911.95
277.74
11,667.57
3,237.43
9,049.58
1,317.90
7,425.01
83.82
7,038.00
8,475.00
6,020.36
3,064.77
235.23
230.87
202.46
732.15
225.19
9,460.00
8,235.88
1,199.40
6,968.63
130.62
6,601.86
2,484.90
984.28
355.89
422.83
1,872.04
274.51
11,531.89
3,237.43
8,866.24
1,291.20
7,273.96
79.08
4,142.00
7,420.00
5,797.76
3,029.13
235.23
230.87
202.46
732.15
225.19
9,460.00
8,235.88
1,199.40
6,968.63
130.62
6,601.86
2,484.90
910.00
382.57
440.19
1,923.91
285.39
11,988.67
3,237.43
9,181.42
1,337.10
7,519.82
84.68
4,018.00
6,160.00
6,144.36
3,149.11
145.48
139.77
122.57
443.25
139.65
5,866.65
4,979.02
725.10
4,328.20
79.08
4,100.40
1,541.02
445.89
427.05
375.37
1,653.46
203.68
8,556.06
5.50
3.50
2,610.00
7.20
7,504.58
1,092.90
6,387.04
76.42
385.00
2,485.00
5,176.04
2,247.46
1,452.44
9,271.47
181.57
3,451.08
54.38
2,534.24
499.80
56.77
1,656.04
2,060.00
300.00
1,520.00
88.59
32.00
119.57
2,378.10
2,491.30
1,440.00
600.00
5,097.25
2,389.24
16,719.35
562.24
7,569.78
0.04
0.29
0.19
1,789.89
1,642.67
24.82
291.60
30.46
4,967.26
5,844.94
718.63
1.97
510.16
3,189.08
4,488.95
32,739.76
2,440.94
1,572.97
10,847.02
334.80
5,422.76
0.29
1,331.20
1,299.52
8.32
3.36
30.46
4,043.47
453.31
1.97
486.00
2,910.83
1,623.60
26,507.96
759.40
1,525.31
11,216.78
349.61
5,608.58
0.29
1,233.47
1,332.48
8.32
3.36
41.66
4,197.66
478.93
1.97
507.49
1,680.98
1,074.10
24,515.19
759.40
1,271.59
9,215.75
281.31
4,676.16
1,178.46
1,177.56
5.60
3,533.07
563.80
408.35
1,849.70
1,020.85
20,121.95
4,705.37
34.00
283.45
82.86
449.43
128.63
403.17
120.28
hh
3.2240
16.96
OPERARIO
hh
52.7400
14.14
OFICIAL
hh
39.1200
12.40
PEON
hh
47.6200
11.21
KG
0.3200
2.90
THINNER STANDAR
gln
0.8000
17.00
P2
42.5600
4.00
TRIPLAY DE 4'x8'x 6 mm
PLN
2.7200
33.00
GBL
1.0000
3,500.00
GBL
1.0000
2,000.00
gln
1.6000
33.00
Material
TRABAJOS PERMANENTES
Mano de Obra
CAPATAZ
hh
75.5968
16.96
OPERARIO
hh
113.0000
14.14
OFICIAL
hh
529.0000
12.40
PEON
hh
1,781.0148
11.21
Material
UNIDAD PORTATIL DISAL 280 KG
MES
8.0000
315.00
FLETE
VJE
30.0000
80.00
TIZA
KG
10.0000
3.00
GBL
1.0000
3,500.00
MIRA TOPOGRAFICA
HE
65.0000
2.00
TEODOLITO
HE
31.0000
10.00
NIVEL
HE
96.0000
5.00
HM
512.0000
20.00
M3
468.1800
25.00
CAPATAZ
hh
47.7180
16.96
OFICIAL
hh
19.1616
12.40
PEON
hh
623.5527
11.21
Subcontrato
ACARREO Y ELIMINACION DE EXCEDENTES
MOVIMIENTO DE TIERRAS
Mano de Obra
Material
GASOLINA 84 OCTANOS
gln
9.5808
11.00
M3
19.1712
13.00
HM
15.3293
15.00
M3
920.0000
17.00
Equipo
COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP
Subcontrato
EXCAVACION ELIMINADA CON EQUIPO
401 SOLADOS
Mano de Obra
CAPATAZ
hh
1.9162
16.96
OPERARIO
hh
19.1616
14.14
OFICIAL
hh
9.5808
12.40
PEON
hh
76.6464
11.21
Material
bls
37.8442
14.40
GASOLINA 84 OCTANOS
gln
3.5928
11.00
HORMIGON
M3
15.6886
16.00
M3
0.4790
13.00
HM
9.5808
18.00
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
402 CALZADURA
Mano de Obra
CAPATAZ
hh
11.4839
16.96
OPERARIO
hh
172.3799
14.14
OFICIAL
hh
118.1865
12.40
PEON
hh
433.4967
11.21
KG
24.0000
2.90
KG
11.5200
2.90
M3
38.6080
40.00
bls
457.2000
14.40
GASOLINA 84 OCTANOS
gln
25.4000
11.00
HORMIGON
M3
91.4400
16.00
M3
3.6576
13.00
P2
225.6000
4.00
PETROLEO DIESEL # 2
gln
4.8000
10.00
HM
54.1833
18.00
Material
ALAMBRE NEGRO N8
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
403 CIMENTACION
Mano de Obra
CAPATAZ
hh
2.6199
16.96
OPERARIO
hh
28.6061
14.14
OFICIAL
hh
27.5395
12.40
PEON
hh
130.7221
11.21
ALAMBRE NEGRO N8
KG
4.1000
2.90
KG
3.1200
2.90
M3
0.6080
40.00
M3
24.8196
40.00
bls
156.2760
14.40
GASOLINA 84 OCTANOS
gln
6.1276
11.00
HORMIGON
M3
38.6694
16.00
M3
1.0211
13.00
P2
61.3000
4.00
PETROLEO DIESEL # 2
gln
1.1000
10.00
HM
16.3403
18.00
Material
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
404 PAVIMENTOS
Mano de Obra
CAPATAZ
hh
24.1508
16.96
OPERARIO
hh
160.1192
14.14
OFICIAL
hh
109.8461
12.40
PEON
hh
516.0585
11.21
ALAMBRE NEGRO N8
KG
0.4965
2.90
KG
0.4965
2.90
Material
KG
13.6825
2.82
ARENA FINA
M3
0.3200
35.00
TIERRA DE CHACRA
M3
4.0000
50.00
M3
1.0000
55.00
ARENA GRUESA
M3
3.4266
35.00
ML
33.0000
22.00
UND
2.0000
12.00
UND
4.0000
75.00
HELICOIDAL DE 3.00 MT
UND
2.0000
250.00
UND
2.0000
190.00
gln
15.4208
12.00
UND
200.0000
0.56
ASFALTO RC-250
LAD.ARCILLA TIPO IV KK 18H 9X13X24 CM
CEMENTO PORTLAND TIPO I (42.5KG)
bls
8.0000
14.40
M3
45.2693
194.00
M3
45.2693
30.00
UND
2.0000
36.00
IMPERMEABILIZANTE
KG
6.4000
16.00
lt
0.3320
26.00
UND
0.0759
600.00
180.00
gln
0.8761
EUCOROD 1/4"
ML
61.3305
0.05
GASOLINA 84 OCTANOS
gln
58.4120
11.00
AFIRMADO
M3
56.9517
35.00
M3
70.0944
13.00
M2
15.4208
5.00
P2
19.8600
4.00
MADERA (REGLAS)
P2
13.1427
4.00
PETROLEO DIESEL # 2
gln
0.4965
10.00
UND
10.5000
7.00
UND
3.0000
3.00
UND
10.5000
1.00
UND
3.0000
0.60
UND
2.2400
6.90
UND
11.0600
12.00
UND
3.9550
16.00
UND
1.3650
56.00
UND
2.2400
3.00
UND
11.0600
5.00
UND
3.9550
12.00
UND
1.3650
18.00
HM
4.6728
25.00
HM
27.2492
30.00
HM
23.3648
8.00
UND
2,598.2000
1.00
UND
1,410.0000
1.00
Subcontrato
501 CIMENTACION/CISTERNA
Mano de Obra
CAPATAZ
hh
5.5956
16.96
OPERARIO
hh
55.5727
14.14
OFICIAL
hh
40.7199
12.40
PEON
hh
75.1388
11.21
Material
KG
32.4585
2.90
ALAMBRE NEGRO N8
KG
5.0000
2.90
KG
7.5000
2.90
KG
1,402.2072
2.82
M3
0.4000
55.00
ARENA GRUESA
M3
0.2500
35.00
bls
5.0000
14.40
M3
73.9437
200.00
M3
71.7900
30.00
M2
11.3000
19.00
KG
2.4000
60.00
KG
2.4000
90.00
UND
1.0000
500.00
GASOLINA 84 OCTANOS
gln
0.1500
11.00
M3
0.0090
13.00
P2
202.5000
4.00
PETROLEO DIESEL # 2
gln
3.0650
10.00
UND
1.0000
75.00
UND
1.0000
50.00
UND
2.0000
65.00
HM
14.9864
8.00
HM
1.3333
18.00
Subcontrato
SUBCONTRATISTA DE ENCOFRADOS
M2
203.4000
1.00
SUBCONTRATISTA FIERRO
KG
1,298.3400
0.80
CAPATAZ
hh
44.2312
16.96
OPERARIO
hh
33.9743
14.14
OFICIAL
hh
22.9196
12.40
PEON
hh
113.7856
11.21
502 SEMISOTANO EV
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
198.3250
2.90
KG
8,567.6400
2.82
ML
384.0000
1.40
UND
20.2000
2.75
UND
4.8000
7.50
M3
100.3632
200.00
M3
97.4400
30.00
lt
0.9700
26.00
CINTA TEFLON
UND
0.7000
1.20
M2
523.7000
19.00
M2
200.4100
20.00
PETROLEO DIESEL # 2
gln
36.2055
10.00
UND
7.0000
1.20
UND
7.0000
1.20
UND
3.5000
9.00
UND
1.4000
12.50
UND
0.7000
19.00
UND
3.1500
48.00
UND
1.4000
1.50
UND
10.5000
1.20
UND
3.5000
1.50
UND
9.0000
7.00
UND
1.7500
UND
1.7500
0.75
1.00
UND
4.5000
10.00
UND
40.6000
3.00
UND
62.0000
0.60
UND
40.6000
0.45
UND
62.0000
0.30
UND
2.0080
6.90
UND
0.5000
16.00
UND
2.7900
1.00
UND
0.3200
4.00
UND
0.7600
1.10
UND
0.1040
4.00
UND
0.3400
5.00
UND
1.2840
2.50
UND
0.6400
6.00
UND
0.1200
12.00
UND
0.4400
3.00
UND
1.3520
2.00
UND
0.3320
6.00
UND
0.1200
3.00
UND
1.5080
9.00
UND
0.9520
2.60
HM
33.9743
8.00
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
SUBCONTRATISTA DE INSTALACIONES SANITARIAS
UND
805.0000
1.00
UND
1,120.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
13,726.0500
1.00
SUBCONTRATISTA FIERRO
KG
7,933.0000
0.80
CAPATAZ
hh
68.2931
16.96
OPERARIO
hh
40.3533
14.14
OFICIAL
hh
67.3428
12.40
PEON
hh
203.3716
11.21
503 SEMISOTANO EH
Mano de Obra
Material
ALAMBRE NEGRO N16
KG
128.7138
2.90
KG
5,560.4340
2.82
ML
1,443.8600
1.40
UND
87.6000
2.75
UND
50.0000
2.75
UND
14.8000
7.50
UND
2,101.2000
1.57
M3
53.3746
200.00
M3
51.8200
30.00
lt
0.2440
29.00
26.00
lt
8.4320
CINTA TEFLON
UND
3.8000
1.20
M2
399.0400
19.00
UND
12.0000
32.00
M2
91.8750
8.50
PETROLEO DIESEL # 2
gln
19.9520
10.00
UND
56.7000
1.20
UND
3.3000
1.35
UND
56.7000
1.20
UND
3.3000
1.35
UND
6.0000
50.00
UND
1.0000
35.00
UND
19.0000
9.00
UND
7.6000
12.50
UND
3.8000
19.00
UND
7.6000
1.50
UND
57.0000
1.20
UND
19.0000
1.50
UND
9.5000
0.75
UND
9.5000
1.00
UND
196.7970
3.00
UND
23.7900
4.00
UND
279.2500
0.60
UND
30.0000
1.60
UND
194.2000
0.45
UND
30.0000
0.55
UND
285.0000
0.30
UND
30.0000
0.40
UND
26.8720
6.90
UND
7.0000
16.00
UND
35.8800
1.00
UND
4.4800
4.00
UND
10.6400
1.10
UND
1.4560
4.00
UND
4.7600
5.00
UND
17.9760
2.50
UND
8.9600
6.00
UND
1.6800
12.00
UND
6.1600
3.00
UND
18.6240
2.00
UND
4.6480
6.00
UND
1.6800
3.00
UND
21.1120
9.00
UND
13.3280
2.60
UND
19.3400
16.50
UND
2.6400
26.00
UND
62.1000
0.90
UND
7.2600
1.60
UND
3.0000
0.90
UND
12.6800
1.20
UND
3.6080
1.90
UND
5.0400
0.45
UND
6.0060
0.50
UND
21.1000
0.90
UND
3.3000
1.50
HM
11.3007
8.00
UND
7,148.0000
1.00
UND
5,610.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,314.4700
1.00
SUBCONTRATISTA FIERRO
KG
5,148.5500
0.80
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
hh
17.0302
16.96
OPERARIO
hh
47.9282
14.14
OFICIAL
hh
51.9282
12.40
PEON
hh
118.6454
11.21
KG
111.4030
2.90
ALAMBRE NEGRO N8
KG
4.5500
2.90
KG
5.2000
2.90
KG
4,812.6096
2.82
M3
5.8500
55.00
ARENA GRUESA
M3
3.5000
35.00
bls
62.5000
14.40
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
GASOLINA 84 OCTANOS
gln
2.1000
11.00
M3
0.1260
13.00
P2
95.8600
4.00
PETROLEO DIESEL # 2
gln
19.4885
10.00
HM
25.6609
8.00
HM
9.3332
18.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,601.8600
1.00
SUBCONTRATISTA FIERRO
KG
4,456.1200
0.80
CAPATAZ
hh
73.0774
16.96
OPERARIO
hh
26.9493
14.14
OFICIAL
hh
35.2859
12.40
PEON
hh
170.5574
11.21
Material
Subcontrato
Material
ALAMBRE NEGRO N16
KG
95.7739
2.90
KG
4,137.4368
2.82
ML
2,337.2400
1.40
UND
140.4000
2.75
UND
105.0000
2.75
UND
23.8000
7.50
UND
2,062.0600
1.57
M3
45.2479
200.00
M3
43.9300
30.00
lt
0.2440
29.00
lt
8.9810
26.00
CINTA TEFLON
UND
3.6000
1.20
M2
390.7900
19.00
UND
12.0000
32.00
gln
19.5395
10.00
UND
54.7000
1.20
UND
3.3000
1.35
UND
54.7000
1.20
UND
3.3000
1.35
UND
18.0000
9.00
PETROLEO DIESEL # 2
UND
7.2000
12.50
UND
3.6000
19.00
UND
7.2000
1.50
UND
54.0000
1.20
UND
18.0000
1.50
UND
9.0000
0.75
UND
9.0000
1.00
UND
285.8500
3.00
UND
22.3440
4.00
UND
471.0000
0.60
UND
28.0000
1.60
UND
284.1000
0.45
UND
24.0000
0.55
UND
478.5000
0.30
UND
28.0000
0.40
UND
26.8720
6.90
UND
7.0000
16.00
UND
35.8800
1.00
UND
4.4800
4.00
UND
10.6400
1.10
UND
1.4560
4.00
UND
4.7600
5.00
UND
17.9760
2.50
UND
8.9600
6.00
UND
1.6800
12.00
UND
6.1600
3.00
UND
18.6240
2.00
UND
4.6480
6.00
UND
1.6800
3.00
UND
21.1120
9.00
UND
13.3280
2.60
UND
19.3400
16.50
UND
2.6400
26.00
UND
62.1000
0.90
UND
7.2600
1.60
UND
3.0000
0.90
UND
12.6800
1.20
UND
3.6080
1.90
UND
5.0400
0.45
UND
6.0060
0.50
UND
21.1000
0.90
UND
3.3000
1.50
HM
10.4780
8.00
UND
7,038.0000
1.00
UND
8,475.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,020.3600
1.00
SUBCONTRATISTA FIERRO
KG
3,830.9600
0.80
CAPATAZ
hh
13.8697
16.96
OPERARIO
hh
16.3277
14.14
OFICIAL
hh
16.3277
12.40
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
PEON
hh
65.3122
11.21
Material
ALAMBRE NEGRO N16
KG
77.6530
2.90
KG
3,354.6096
2.82
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
PETROLEO DIESEL # 2
gln
18.3385
10.00
HM
16.3277
8.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,601.8600
1.00
SUBCONTRATISTA FIERRO
KG
3,106.1200
0.80
CAPATAZ
hh
58.0356
16.96
OPERARIO
hh
25.1693
14.14
OFICIAL
hh
34.0992
12.40
PEON
hh
166.9974
11.21
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
94.6602
2.90
KG
4,089.3228
2.82
ML
2,004.6200
1.40
UND
119.2000
2.75
UND
89.0000
2.75
UND
25.0000
7.50
UND
2,062.0600
1.57
M3
44.3312
200.00
M3
43.0400
30.00
lt
0.1360
29.00
lt
6.1380
26.00
CINTA TEFLON
UND
2.0000
1.20
M2
382.8400
19.00
UND
12.0000
32.00
gln
19.1420
10.00
UND
30.2000
1.20
UND
1.8000
1.35
UND
30.2000
1.20
UND
1.8000
1.35
UND
10.0000
9.00
UND
4.0000
12.50
UND
2.0000
19.00
UND
4.0000
1.50
UND
30.0000
1.20
UND
10.0000
1.50
UND
5.0000
0.75
UND
5.0000
1.00
UND
241.8750
3.00
UND
25.5440
4.00
UND
405.7500
0.60
UND
32.0000
1.60
UND
241.0000
0.45
UND
27.2000
0.55
UND
409.5000
0.30
PETROLEO DIESEL # 2
UND
32.0000
UND
16.7580
0.40
6.90
UND
4.2500
16.00
UND
22.9200
1.00
UND
2.7200
4.00
UND
6.4600
1.10
UND
0.8840
4.00
UND
2.8900
5.00
UND
10.9140
2.50
UND
5.4400
6.00
UND
1.0200
12.00
UND
3.7400
3.00
UND
11.4160
2.00
UND
2.8220
6.00
UND
1.0200
3.00
UND
12.8180
9.00
UND
8.0920
2.60
UND
11.1600
16.50
UND
1.4400
26.00
UND
34.6000
0.90
UND
3.9600
1.60
UND
2.0000
0.90
UND
7.2800
1.20
UND
1.9680
1.90
UND
3.3600
0.45
UND
3.2760
0.50
UND
11.8000
0.90
UND
1.8000
1.50
HM
9.8847
8.00
UND
4,142.0000
1.00
UND
7,420.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
5,797.7600
1.00
SUBCONTRATISTA FIERRO
KG
3,786.4100
0.80
CAPATAZ
hh
13.8697
16.96
OPERARIO
hh
16.3277
14.14
OFICIAL
hh
16.3277
12.40
PEON
hh
65.3122
11.21
2.90
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
KG
77.6530
KG
3,354.6096
2.82
M3
41.1794
200.00
M3
39.9800
30.00
M2
366.7700
19.00
PETROLEO DIESEL # 2
gln
18.3385
10.00
HM
16.3277
8.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,601.8600
1.00
SUBCONTRATISTA FIERRO
KG
3,106.1200
0.80
Subcontrato
Mano de Obra
CAPATAZ
hh
53.6559
16.96
OPERARIO
hh
27.0560
14.14
OFICIAL
hh
35.4993
12.40
hh
171.6241
11.21
PEON
Material
ALAMBRE NEGRO N16
KG
98.4098
2.90
KG
4,251.3012
2.82
ML
1,700.6200
1.40
UND
103.6000
2.75
UND
94.0000
2.75
UND
14.4000
7.50
UND
2,062.0600
1.57
M3
45.9071
200.00
M3
44.5700
30.00
lt
0.1140
29.00
lt
5.8180
26.00
CINTA TEFLON
UND
1.8000
1.20
M2
395.7800
19.00
UND
12.0000
32.00
gln
19.7890
10.00
UND
26.5000
1.20
UND
1.5000
1.35
UND
26.5000
1.20
UND
1.5000
1.35
UND
9.0000
9.00
UND
3.6000
12.50
UND
1.8000
19.00
UND
3.6000
1.50
UND
27.0000
1.20
UND
9.0000
1.50
UND
4.5000
0.75
UND
4.5000
1.00
UND
194.0750
3.00
UND
15.9440
4.00
UND
357.2500
0.60
UND
20.0000
1.60
UND
193.2000
0.45
UND
17.6000
0.55
UND
361.0000
0.30
UND
20.0000
0.40
UND
17.4520
6.90
UND
4.5000
16.00
UND
23.5200
1.00
UND
2.8800
4.00
UND
6.8400
1.10
UND
0.9360
4.00
UND
3.0600
5.00
UND
11.5560
2.50
UND
5.7600
6.00
UND
1.0800
12.00
UND
3.9600
3.00
UND
12.0160
2.00
UND
2.9880
6.00
UND
1.0800
3.00
PETROLEO DIESEL # 2
UND
13.5720
UND
8.5680
9.00
2.60
UND
9.4400
16.50
UND
1.2000
26.00
UND
29.0000
0.90
UND
3.3000
1.60
UND
1.7500
0.90
UND
6.1500
1.20
UND
1.6400
1.90
UND
2.9400
0.45
UND
2.7300
0.50
UND
9.9000
0.90
UND
1.5000
1.50
HM
10.5846
8.00
UND
4,018.0000
1.00
UND
6,160.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
6,144.3600
1.00
SUBCONTRATISTA FIERRO
KG
3,936.3900
0.80
CAPATAZ
hh
8.5781
16.96
OPERARIO
hh
9.8850
14.14
OFICIAL
hh
9.8850
12.40
hh
39.5407
11.21
2.90
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
PEON
Material
ALAMBRE NEGRO N16
KG
48.1568
KG
2,080.3716
2.82
M3
24.8951
200.00
M3
24.1700
30.00
M2
227.8000
19.00
PETROLEO DIESEL # 2
gln
11.3900
10.00
HM
9.8850
8.00
SUBCONTRATISTA DE ENCOFRADOS
M2
4,100.4000
1.00
SUBCONTRATISTA FIERRO
KG
1,926.2700
0.80
CAPATAZ
hh
26.2909
16.96
OPERARIO
hh
30.2017
14.14
OFICIAL
hh
30.2717
12.40
PEON
hh
147.4984
11.21
KG
70.2330
2.90
KG
3,034.0656
2.82
M3
0.1000
55.00
ARENA GRUESA
M3
0.1000
35.00
ML
686.0000
1.40
UND
39.2000
2.75
UND
50.0000
2.75
UND
6.0000
7.50
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
Material
ALAMBRE NEGRO N16
1,662.4200
1.57
bls
0.5000
14.40
M3
37.5229
200.00
M3
36.4300
30.00
UND
1.3700
26.00
M2
lt
336.1600
19.00
M3
0.0100
13.00
UND
12.0000
32.00
gln
16.8080
10.00
UND
68.6000
3.00
UND
11.1860
4.00
UND
147.0000
0.60
UND
14.0000
1.60
UND
68.6000
0.45
UND
11.6000
0.55
UND
147.0000
0.30
UND
14.0000
0.40
UND
2.4290
6.90
UND
0.8750
16.00
UND
2.1000
1.00
UND
0.5600
4.00
UND
1.3300
1.10
UND
0.1820
4.00
UND
0.5950
5.00
UND
2.2470
2.50
UND
1.1200
6.00
UND
0.2100
12.00
UND
0.7700
3.00
UND
2.1000
2.00
UND
0.5810
6.00
UND
0.2100
3.00
UND
2.6390
9.00
UND
1.6660
2.60
HM
9.5528
8.00
UND
385.0000
1.00
UND
2,485.0000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
5,176.0400
1.00
SUBCONTRATISTA FIERRO
KG
2,809.3200
0.80
PETROLEO DIESEL # 2
Equipo
VIBRADOR DE CONCRETO 4 HP 1 1/2"
Subcontrato
hh
85.6389
16.96
OPERARIO
hh
655.6913
14.14
OFICIAL
hh
14.6430
12.40
PEON
hh
307.8569
11.21
2.90
Material
ALAMBRE NEGRO N16
KG
18.7500
KG
898.6680
2.82
ARENA FINA
M3
14.2800
35.00
ML
10.0000
0.90
ML
69.0000
1.40
ML
42.0000
2.00
ML
17.6000
3.50
ML
16.5000
3.30
ML
26.4000
1.60
ML
26.4000
2.20
ML
49.5000
3.70
UND
5.0000
18.00
UND
1.0000
2,900.00
UND
15.0000
5.00
UND
6.0000
2.75
UND
9.0000
2.75
UND
2.0000
38.00
UND
7.0000
55.00
UND
2.0000
1.20
UND
3.0000
1.20
bls
115.0028
14.40
M3
10.3000
200.00
M3
10.0000
30.00
IMPERMEABILIZANTE
KG
37.5000
16.00
lt
2.8345
26.00
CINTA TEFLON
UND
2.8000
1.20
M2
80.0000
19.00
UND
0.7000
10.00
GASOLINA 84 OCTANOS
gln
1.7395
11.00
HORMIGON
M3
3.5483
16.00
KG
1.0000
7.00
M3
11.4400
13.00
MADERA ANDAMIAJE
P2
420.9918
3.50
MADERA (REGLAS)
P2
22.2599
4.00
UND
1.0000
280.00
gln
4.0000
10.00
ML
10.0000
55.00
ML
10.0000
45.00
UND
17.4240
12.00
UND
6.9960
16.00
GBL
0.2000
500.00
UND
12.0000
3.00
UND
1.0000
9.00
UND
12.0000
1.00
UND
1.0000
2.50
UND
0.8991
10.00
UND
3.9600
8.00
UND
3.3000
6.00
UND
9.6810
9.00
UND
10.0000
32.00
UND
2.5200
48.00
UND
10.0000
2.50
UND
2.4000
3.20
UND
2.4000
6.00
UND
18.4400
1.20
UND
10.0000
4.80
UND
3.6000
7.00
UND
10.0000
4.80
UND
13.8300
0.75
UND
2.4000
2.00
UND
10.0000
2.90
UND
20.8275
3.00
UND
0.9275
4.00
UND
6.5275
7.00
UND
7.1050
11.00
UND
30.2650
0.60
UND
0.2650
1.60
UND
1.8650
3.00
UND
1.2800
5.50
UND
20.8275
0.45
UND
0.9275
0.55
UND
6.5275
1.00
UND
7.1050
3.10
UND
30.2650
0.30
UND
0.2650
0.40
UND
1.8650
0.60
UND
1.2800
1.00
UND
0.9450
12.00
UND
18.4800
16.00
UND
4.4520
56.00
UND
7.9200
4.00
UND
6.3600
44.00
UND
13.2000
6.00
UND
4.2400
39.00
UND
0.9990
5.00
UND
15.8400
7.00
UND
0.9990
2.00
UND
0.2700
6.00
UND
3.6000
8.00
UND
2.0000
105.00
UND
1.0000
78.00
UND
6.0000
20.00
HE
88.5949
1.00
HM
4.0000
8.00
HM
6.6430
18.00
UND
2,378.1000
1.00
UND
2,491.3000
1.00
SUBCONTRATISTA DE ENCOFRADOS
M2
1,440.0000
1.00
SUBCONTRATISTA FIERRO
KG
750.0000
0.80
M2
71.3900
71.40
Equipo
Subcontrato
hh
140.8748
16.96
OPERARIO
hh
1,182.4154
14.14
OFICIAL
hh
45.3420
12.40
PEON
hh
675.2704
11.21
KG
0.0150
2.90
ALAMBRE NEGRO N8
KG
0.1000
2.90
KG
0.0650
2.90
KG
634.7136
2.82
ARENA FINA
M3
46.9333
35.00
M3
0.4512
55.00
Material
ARENA GRUESA
M3
8.3315
35.00
ML
4.9150
0.90
ML
32.0000
1.40
ML
132.0000
3.30
CABLE TW 16 MM2
ML
33.0000
5.50
ML
76.1200
1.60
ML
396.0000
3.70
ML
99.0000
7.00
UND
4.0000
18.00
UND
2.0000
1,200.00
UND
10.0000
5.00
UND
2.8000
2.75
UND
6.0000
2.75
UND
1.0000
38.00
UND
2.0000
85.00
UND
1.0000
350.00
UND
3.0000
55.00
UND
2.0000
1.20
UND
3.0000
1.20
UND
8,870.1000
0.56
405.8985
14.40
bls
lt
3.0584
26.00
CINTA TEFLON
UND
10.5000
1.20
UND
2.0000
125.00
UND
2.9500
10.00
GASOLINA 84 OCTANOS
gln
8.4560
11.00
HORMIGON
M3
1.9040
16.00
KG
2.2500
7.00
M3
23.7714
13.00
MADERA ANDAMIAJE
P2
744.0118
3.50
P2
8.2000
4.00
MADERA (REGLAS)
P2
57.6695
4.00
UND
1.0000
280.00
gln
0.0525
10.00
GBL
0.2000
500.00
UND
70.0000
3.00
UND
12.0000
4.00
UND
8.0000
6.00
UND
2.0000
9.00
UND
70.0000
1.00
UND
12.0000
1.30
UND
8.0000
1.70
UND
2.0000
2.50
UND
7.0620
1.80
UND
11.3685
12.00
UND
6.5934
10.00
UND
0.8745
8.00
UND
2.0295
6.00
UND
6.4260
9.00
UND
6.6360
12.50
UND
4.4940
19.00
UND
6.1500
32.00
UND
0.5565
48.00
UND
15.8000
1.50
UND
4.2800
1.30
UND
3.2100
1.15
UND
6.1500
2.50
UND
0.5300
3.20
UND
0.5300
6.00
UND
12.2400
1.20
UND
6.4200
2.20
UND
6.1500
4.80
UND
0.7950
7.00
UND
6.1500
4.80
UND
9.1800
0.75
UND
15.8000
1.00
UND
4.8100
2.00
UND
6.1500
2.90
UND
37.8600
3.00
UND
0.9275
4.00
UND
0.9275
7.00
UND
63.1050
11.00
UND
3.5000
40.00
UND
16.1600
0.60
UND
0.2650
1.60
UND
0.2650
3.00
UND
10.5300
5.50
UND
2.0000
29.00
UND
37.8600
0.45
UND
0.9275
0.55
UND
0.9275
1.00
UND
63.1050
3.10
UND
3.3000
7.50
UND
16.1600
0.30
UND
0.2650
0.40
UND
0.2650
0.60
UND
10.5300
1.00
UND
1.0000
5.00
UND
6.9300
12.00
UND
12.0575
16.00
UND
5.1675
4.00
UND
7.3260
5.00
UND
10.3350
7.00
UND
7.3260
2.00
UND
1.9800
6.00
UND
3.4450
8.50
UND
0.7950
8.00
UND
35.0000
20.00
UND
6.0000
26.00
UND
4.0000
31.00
UND
1.0000
45.00
1.00
Equipo
ANDAMIO METALICO 1.30X2.50X1.80 MT
HE
718.6348
HM
0.2460
8.00
HM
28.3420
18.00
UND
3,189.0750
1.00
UND
4,488.9500
1.00
M2
458.5400
71.40
Subcontrato
M2
28.3500
86.10
hh
92.7457
16.96
OPERARIO
hh
767.1162
14.14
OFICIAL
hh
27.0000
12.40
PEON
hh
483.7429
11.21
2.90
Material
ALAMBRE NEGRO N8
KG
0.1000
KG
472.0572
2.82
ARENA FINA
M3
37.1290
35.00
M3
0.1512
55.00
ARENA GRUESA
M3
0.0960
35.00
ML
4.9150
0.90
ML
4.0000
1.40
ML
49.7750
3.30
ML
5.8300
1.60
ML
149.3250
3.70
UND
2.0000
1,200.00
UND
2.0000
5.00
UND
2.8000
2.75
UND
4.0000
2.75
UND
3.0000
45.00
UND
1.0000
38.00
UND
2.0000
1.20
UND
3.0000
1.20
bls
280.7963
14.40
26.00
lt
1.6694
CINTA TEFLON
UND
8.8000
1.20
UND
2.0000
125.00
UND
2.6800
10.00
GASOLINA 84 OCTANOS
gln
8.0534
11.00
HORMIGON
M3
1.9040
16.00
KG
2.2500
7.00
M3
14.4258
13.00
MADERA ANDAMIAJE
P2
590.5650
3.50
P2
2.2000
4.00
MADERA (REGLAS)
P2
44.5779
4.00
UND
1.0000
280.00
PETROLEO DIESEL # 2
gln
0.0400
10.00
GBL
0.2000
500.00
UND
64.0000
3.00
UND
12.0000
4.00
UND
8.0000
6.00
UND
64.0000
1.00
UND
12.0000
1.30
UND
8.0000
1.70
UND
7.0620
1.80
UND
11.3685
12.00
UND
6.5934
10.00
UND
0.8745
8.00
UND
0.8745
6.00
UND
4.5360
9.00
UND
6.6360
12.50
UND
4.4940
19.00
UND
2.6500
32.00
UND
0.5565
48.00
UND
15.8000
1.50
UND
4.2800
1.30
UND
3.2100
1.15
UND
2.6500
2.50
UND
0.5300
3.20
UND
0.5300
6.00
UND
8.6400
1.20
UND
6.4200
2.20
UND
2.6500
4.80
UND
0.7950
7.00
UND
2.6500
4.80
UND
6.4800
0.75
UND
15.8000
1.00
UND
4.8100
2.00
UND
2.6500
2.90
UND
13.7550
3.00
UND
0.9275
4.00
UND
0.9275
7.00
UND
17.6925
11.00
UND
6.5300
0.60
UND
0.2650
1.60
UND
0.2650
3.00
UND
2.7925
5.50
UND
13.7550
0.45
UND
0.9275
0.55
UND
0.9275
1.00
UND
17.6925
3.10
UND
6.5300
0.30
UND
0.2650
0.40
UND
0.2650
0.60
UND
2.7925
1.00
UND
6.9300
12.00
UND
12.0575
16.00
UND
5.1675
4.00
UND
7.3260
5.00
UND
10.3350
7.00
UND
7.3260
2.00
UND
1.9800
6.00
UND
3.4450
8.50
UND
0.7950
8.00
UND
32.0000
20.00
UND
6.0000
26.00
UND
4.0000
31.00
1.00
Equipo
ANDAMIO METALICO 1.30X2.50X1.80 MT
HE
453.3126
HM
0.2460
8.00
HM
27.0000
18.00
UND
2,910.8250
1.00
UND
1,623.6000
1.00
M2
371.2600
71.40
Subcontrato
M2
8.8200
86.10
hh
89.9355
16.96
OPERARIO
hh
793.2656
14.14
OFICIAL
hh
28.1940
12.40
PEON
hh
500.3195
11.21
2.90
Material
ALAMBRE NEGRO N8
KG
0.1000
KG
437.4000
2.82
ARENA FINA
M3
38.0708
35.00
M3
0.1512
55.00
ARENA GRUESA
M3
0.0960
35.00
ML
4.9150
0.90
ML
4.0000
1.40
ML
8.7450
3.30
ML
5.8300
1.60
ML
26.2350
3.70
UND
2.0000
1,200.00
UND
4.0000
5.00
UND
2.8000
2.75
UND
4.0000
2.75
UND
4.0000
38.00
UND
2.0000
1.20
UND
3.0000
1.20
bls
291.5042
14.40
26.00
lt
1.0823
CINTA TEFLON
UND
4.4000
1.20
UND
2.0000
125.00
UND
1.4600
10.00
GASOLINA 84 OCTANOS
gln
8.4216
11.00
HORMIGON
M3
2.6040
16.00
KG
2.2500
7.00
M3
14.9020
13.00
MADERA ANDAMIAJE
P2
597.8368
3.50
P2
2.2000
4.00
MADERA (REGLAS)
P2
47.0790
4.00
UND
1.0000
280.00
PETROLEO DIESEL # 2
gln
0.0400
10.00
GBL
0.2000
500.00
UND
28.0000
3.00
UND
4.0000
4.00
UND
8.0000
6.00
UND
28.0000
1.00
UND
4.0000
1.30
UND
8.0000
1.70
UND
7.5900
1.80
UND
1.7490
12.00
UND
7.9421
10.00
UND
0.8745
8.00
UND
0.8745
6.00
UND
5.3760
12.50
UND
4.8300
19.00
UND
2.6500
32.00
UND
0.5565
48.00
UND
12.8000
1.50
UND
4.6000
1.30
UND
3.4500
1.15
UND
2.6500
2.50
UND
0.5300
3.20
UND
0.5300
6.00
UND
6.9000
2.20
UND
2.6500
4.80
UND
0.7950
7.00
UND
2.6500
4.80
UND
12.8000
1.00
UND
5.1300
2.00
UND
2.6500
2.90
UND
13.7550
3.00
UND
0.9275
4.00
UND
0.9275
7.00
UND
4.6375
11.00
UND
6.5300
0.60
UND
0.2650
1.60
UND
0.2650
3.00
UND
0.9275
5.50
UND
13.7550
0.45
UND
0.9275
0.55
UND
0.9275
1.00
UND
4.6375
3.10
UND
6.5300
0.30
UND
0.2650
0.40
UND
0.2650
0.60
UND
0.9275
1.00
UND
8.3475
12.00
UND
1.8550
16.00
UND
0.7950
4.00
UND
8.8245
5.00
UND
1.5900
7.00
UND
8.8245
2.00
UND
2.3850
6.00
UND
0.5300
8.50
UND
0.7950
8.00
UND
14.0000
20.00
UND
2.0000
26.00
UND
4.0000
31.00
1.00
Equipo
ANDAMIO METALICO 1.30X2.50X1.80 MT
HE
478.9324
HM
0.2460
8.00
HM
28.1940
18.00
UND
1,680.9750
1.00
UND
1,074.1000
1.00
M2
343.3500
71.40
M2
8.8200
86.10
Subcontrato
CAPATAZ
hh
74.9759
16.96
OPERARIO
hh
651.7506
14.14
OFICIAL
hh
22.6860
12.40
PEON
hh
417.1414
11.21
KG
417.8952
2.82
ARENA FINA
M3
33.6445
35.00
ML
10.6150
0.90
ML
43.6150
3.30
ML
21.2300
1.60
ML
130.8450
3.70
Material
UND
5.0000
5.00
UND
3.0000
2.75
UND
4.0000
2.75
UND
3.0000
1.20
UND
4.0000
1.20
245.3519
14.40
UND
1.0000
900.00
lt
1.1112
26.00
CINTA TEFLON
UND
4.0000
1.20
UND
1.0600
10.00
GASOLINA 84 OCTANOS
gln
6.8108
11.00
HORMIGON
M3
0.3500
16.00
bls
KG
2.2500
7.00
M3
13.0253
13.00
MADERA ANDAMIAJE
P2
516.9060
3.50
MADERA (REGLAS)
P2
33.8092
4.00
UND
1.0000
280.00
GBL
0.2000
500.00
UND
36.0000
3.00
UND
4.0000
4.00
UND
36.0000
1.00
UND
4.0000
1.30
UND
4.0755
12.00
UND
10.1066
10.00
UND
4.6287
8.00
UND
6.2580
9.00
UND
3.3705
12.50
UND
8.0250
1.50
UND
11.9200
1.20
UND
8.9400
0.75
UND
8.0250
1.00
UND
6.0550
3.00
UND
13.8775
11.00
UND
1.7300
0.60
UND
1.9825
5.50
UND
6.0550
0.45
UND
13.8775
3.10
UND
1.7300
0.30
UND
1.9825
1.00
UND
4.8650
6.90
UND
10.6225
12.00
UND
4.3225
16.00
UND
0.0556
1.00
UND
1.8525
4.00
UND
5.0040
2.00
UND
0.4865
2.69
UND
1.0425
3.00
UND
11.2295
5.00
UND
3.7050
7.00
UND
0.4865
9.00
UND
11.2295
2.00
UND
0.8340
3.00
UND
3.0350
6.00
UND
1.2350
8.50
UND
18.0000
20.00
UND
2.0000
26.00
HE
563.8022
1.00
HM
22.6860
18.00
UND
1,849.7000
1.00
UND
1,020.8500
1.00
M2
281.8200
71.40
M2
54.6500
86.10
Subcontrato
hh
2.0046
16.96
OPERARIO
hh
20.0460
14.14
OFICIAL
hh
6.6820
12.40
PEON
hh
40.0920
11.21
Material
ARENA FINA
M3
3.6751
35.00
bls
27.9976
14.40
GASOLINA 84 OCTANOS
gln
2.0046
11.00
M3
0.1336
13.00
MADERA (REGLAS)
P2
2.0046
4.00
HM
6.6820
18.00
1.00
5,734.82
Equipo
MEZCLADORA CONCRETO TAMBOR 18HP 11P3
VARIOS
HERRAMIENTAS MANUALES
%MO
54.68
745.74
485.09
533.82
0.00
0.93
13.60
170.24
89.76
3,500.00
2,000.00
52.80
1,282.12
1,597.82
6,559.60
19,965.18
0.00
2,520.00
2,400.00
30.00
3,500.00
0.00
130.00
310.00
480.00
10,240.00
11,704.50
809.30
237.60
6,990.03
0.00
105.39
249.23
0.00
229.94
0.00
15,640.00
32.50
270.95
118.80
859.21
0.00
544.96
39.52
251.02
6.23
0.00
172.45
194.77
2,437.45
1,465.51
4,859.50
0.00
69.60
33.41
1,544.32
6,583.68
279.40
1,463.04
47.55
902.40
48.00
0.00
975.30
44.43
404.49
341.49
1,465.39
0.00
11.89
9.05
24.32
992.78
2,250.37
67.40
618.71
13.27
245.20
11.00
0.00
294.13
409.60
2,264.09
1,362.09
5,785.02
0.00
1.44
1.44
38.58
11.20
200.00
55.00
119.93
726.00
24.00
300.00
500.00
380.00
185.05
112.00
115.20
8,782.24
1,358.08
72.00
102.40
8.63
45.54
157.70
3.07
642.53
1,993.31
911.23
77.10
79.44
52.57
4.97
73.50
9.00
10.50
1.80
15.46
132.72
63.28
76.44
6.72
55.30
47.46
24.57
0.00
116.82
817.48
186.92
0.00
2,598.20
1,410.00
94.90
785.80
504.93
842.31
0.00
94.13
14.50
21.75
3,954.22
22.00
8.75
72.00
14,788.74
2,153.70
214.70
144.00
216.00
500.00
1.65
0.12
810.00
30.65
75.00
50.00
130.00
119.89
24.00
0.00
203.40
1,038.67
750.16
480.40
284.20
1,275.54
0.00
575.14
24,160.74
537.60
55.55
36.00
20,072.64
2,923.20
25.22
0.84
9,950.30
4,008.20
362.06
8.40
8.40
31.50
17.50
13.30
151.20
2.10
12.60
5.25
63.00
1.31
1.75
45.00
121.80
37.20
18.27
18.60
13.86
8.00
2.79
1.28
0.84
0.42
1.70
3.21
3.84
1.44
1.32
2.70
1.99
0.36
13.57
2.48
0.00
271.79
0.00
805.00
1,120.00
13,726.05
6,346.40
1,158.25
570.60
835.05
2,279.80
0.00
373.27
15,680.42
2,021.40
240.90
137.50
111.00
3,298.88
10,674.92
1,554.60
7.08
219.23
4.56
7,581.76
384.00
780.94
199.52
68.04
4.46
68.04
4.46
300.00
35.00
171.00
95.00
72.20
11.40
68.40
28.50
7.13
9.50
590.39
95.16
167.55
48.00
87.39
16.50
85.50
12.00
185.42
112.00
35.88
17.92
11.70
5.82
23.80
44.94
53.76
20.16
18.48
37.25
27.89
5.04
190.01
34.65
319.11
68.64
55.89
11.62
2.70
15.22
6.86
2.27
3.00
18.99
4.95
0.00
90.41
0.00
7,148.00
5,610.00
6,314.47
4,118.84
288.83
677.70
643.91
1,330.01
0.00
323.07
13.20
15.08
13,571.56
321.75
122.50
900.00
8,235.88
1,199.40
6,968.63
23.10
1.64
383.44
194.89
205.29
168.00
0.00
6,601.86
3,564.90
1,239.39
381.06
437.55
1,911.95
0.00
277.74
11,667.57
3,272.14
386.10
288.75
178.50
3,237.43
9,049.58
1,317.90
7.08
233.51
4.32
7,425.01
384.00
195.40
65.64
4.46
65.64
4.46
162.00
90.00
68.40
10.80
64.80
27.00
6.75
9.00
857.55
89.38
282.60
44.80
127.85
13.20
143.55
11.20
185.42
112.00
35.88
17.92
11.70
5.82
23.80
44.94
53.76
20.16
18.48
37.25
27.89
5.04
190.01
34.65
319.11
68.64
55.89
11.62
2.70
15.22
6.86
2.27
3.00
18.99
4.95
0.00
83.82
0.00
7,038.00
8,475.00
6,020.36
3,064.77
235.23
230.87
202.46
732.15
0.00
225.19
9,460.00
8,235.88
1,199.40
6,968.63
183.39
0.00
130.62
0.00
6,601.86
2,484.90
984.28
355.89
422.83
1,872.04
0.00
274.51
11,531.89
2,806.47
327.80
244.75
187.50
3,237.43
8,866.24
1,291.20
3.94
159.59
2.40
7,273.96
384.00
191.42
36.24
2.43
36.24
2.43
90.00
50.00
38.00
6.00
36.00
15.00
3.75
5.00
725.63
102.18
243.45
51.20
108.45
14.96
122.85
12.80
115.63
68.00
22.92
10.88
7.11
3.54
14.45
27.29
32.64
12.24
11.22
22.83
16.93
3.06
115.36
21.04
184.14
37.44
31.14
6.34
1.80
8.74
3.74
1.51
1.64
10.62
2.70
0.00
79.08
0.00
4,142.00
7,420.00
5,797.76
3,029.13
235.23
230.87
202.46
732.15
0.00
225.19
9,460.00
8,235.88
1,199.40
6,968.63
183.39
130.62
0.00
6,601.86
2,484.90
910.00
382.57
440.19
1,923.91
0.00
285.39
11,988.67
2,380.87
284.90
258.50
108.00
3,237.43
9,181.42
1,337.10
3.31
151.27
2.16
7,519.82
384.00
197.89
31.80
2.03
31.80
2.03
81.00
45.00
34.20
5.40
32.40
13.50
3.38
4.50
582.23
63.78
214.35
32.00
86.94
9.68
108.30
8.00
120.42
72.00
23.52
11.52
7.52
3.74
15.30
28.89
34.56
12.96
11.88
24.03
17.93
3.24
122.15
22.28
155.76
31.20
26.10
5.28
1.58
7.38
3.12
1.32
1.37
8.91
2.25
0.00
84.68
0.00
4,018.00
6,160.00
6,144.36
3,149.11
145.48
139.77
122.57
443.25
0.00
139.65
5,866.65
4,979.02
725.10
4,328.20
113.90
0.00
79.08
0.00
4,100.40
1,541.02
445.89
427.05
375.37
1,653.46
0.00
203.68
8,556.06
5.50
3.50
960.40
107.80
137.50
45.00
2,610.00
7.20
7,504.58
1,092.90
35.62
6,387.04
0.13
384.00
168.08
205.80
44.74
88.20
22.40
30.87
6.38
44.10
5.60
16.76
14.00
2.10
2.24
1.46
0.73
2.98
5.62
6.72
2.52
2.31
4.20
3.49
0.63
23.75
4.33
0.00
76.42
0.00
385.00
2,485.00
5,176.04
2,247.46
1,452.44
9,271.47
181.57
3,451.08
0.00
54.38
2,534.24
499.80
9.00
96.60
84.00
61.60
54.45
42.24
58.08
183.15
90.00
2,900.00
75.00
16.50
24.75
76.00
385.00
2.40
3.60
1,656.04
2,060.00
300.00
600.00
73.70
3.36
1,520.00
7.00
19.13
56.77
7.00
148.72
1,473.47
89.04
280.00
40.00
550.00
450.00
209.09
111.94
100.00
36.00
9.00
12.00
2.50
8.99
31.68
19.80
87.13
320.00
120.96
25.00
7.68
14.40
22.13
48.00
25.20
48.00
10.37
4.80
29.00
62.48
3.71
45.69
78.16
18.16
0.42
5.60
7.04
9.37
0.51
6.53
22.03
9.08
0.11
1.12
1.28
11.34
295.68
249.31
31.68
279.84
79.20
165.36
5.00
110.88
2.00
1.62
28.80
210.00
78.00
120.00
0.00
88.59
32.00
119.57
0.00
2,378.10
2,491.30
1,440.00
600.00
5,097.25
2,389.24
16,719.35
562.24
7,569.78
0.00
0.04
0.29
0.19
1,789.89
1,642.67
24.82
291.60
4.42
44.80
435.60
181.50
121.79
1,465.20
693.00
72.00
2,400.00
50.00
7.70
16.50
38.00
170.00
350.00
165.00
2.40
3.60
4,967.26
5,844.94
79.52
12.60
250.00
29.50
93.02
30.46
15.75
309.03
2,604.04
32.80
230.68
280.00
0.53
100.00
210.00
48.00
48.00
18.00
70.00
15.60
13.60
5.00
12.71
136.42
65.93
7.00
12.18
57.83
82.95
85.39
196.80
26.71
23.70
5.56
3.69
15.38
1.70
3.18
14.69
14.12
29.52
5.57
29.52
6.89
15.80
9.62
17.84
113.58
3.71
6.49
694.16
140.00
9.70
0.42
0.80
57.92
58.00
17.04
0.51
0.93
195.63
24.75
4.85
0.11
0.16
10.53
5.00
83.16
192.92
20.67
36.63
72.35
14.65
11.88
29.28
6.36
700.00
156.00
124.00
45.00
0.00
718.63
1.97
510.16
0.00
3,189.08
4,488.95
32,739.76
2,440.94
1,572.97
10,847.02
334.80
5,422.76
0.00
0.29
1,331.20
1,299.52
8.32
3.36
4.42
5.60
164.26
9.33
552.50
2,400.00
10.00
7.70
11.00
135.00
38.00
2.40
3.60
4,043.47
43.40
10.56
250.00
26.80
88.59
30.46
15.75
187.54
2,066.98
8.80
178.31
280.00
0.40
100.00
192.00
48.00
48.00
64.00
15.60
13.60
12.71
136.42
65.93
7.00
5.25
40.82
82.95
85.39
84.80
26.71
23.70
5.56
3.69
6.63
1.70
3.18
10.37
14.12
12.72
5.57
12.72
4.86
15.80
9.62
7.69
41.27
3.71
6.49
194.62
3.92
0.42
0.80
15.36
6.19
0.51
0.93
54.85
1.96
0.11
0.16
2.79
83.16
192.92
20.67
36.63
72.35
14.65
11.88
29.28
6.36
640.00
156.00
124.00
0.00
453.31
1.97
486.00
0.00
2,910.83
1,623.60
26,507.96
759.40
1,525.31
11,216.78
349.61
5,608.58
0.00
0.29
1,233.47
1,332.48
8.32
3.36
4.42
5.60
28.86
9.33
97.07
2,400.00
20.00
7.70
11.00
152.00
2.40
3.60
4,197.66
28.14
5.28
250.00
14.60
92.64
41.66
15.75
193.73
2,092.43
8.80
188.32
280.00
0.40
100.00
84.00
16.00
48.00
28.00
5.20
13.60
13.66
20.99
79.42
7.00
5.25
67.20
91.77
84.80
26.71
19.20
5.98
3.97
6.63
1.70
3.18
15.18
12.72
5.57
12.72
12.80
10.26
7.69
41.27
3.71
6.49
51.01
3.92
0.42
0.80
5.10
6.19
0.51
0.93
14.38
1.96
0.11
0.16
0.93
100.17
29.68
3.18
44.12
11.13
17.65
14.31
4.51
6.36
280.00
52.00
124.00
0.00
478.93
1.97
507.49
0.00
1,680.98
1,074.10
24,515.19
759.40
1,271.59
9,215.75
281.31
4,676.16
0.00
1,178.46
1,177.56
9.55
143.93
33.97
484.13
25.00
8.25
11.00
3.60
4.80
3,533.07
900.00
28.89
4.80
10.60
74.92
5.60
15.75
169.33
1,809.17
135.24
280.00
100.00
108.00
16.00
36.00
5.20
48.91
101.07
37.03
56.32
42.13
12.04
14.30
6.71
8.03
18.17
152.65
1.04
10.90
2.72
43.02
0.52
1.98
33.57
127.47
69.16
0.06
7.41
10.01
1.31
3.13
56.15
25.94
4.38
22.46
2.50
18.21
10.50
360.00
52.00
0.00
563.80
408.35
0.00
1,849.70
1,020.85
20,121.95
4,705.37
34.00
283.45
82.86
449.43
0.00
128.63
403.17
22.05
1.74
8.02
0.00
120.28
5,734.82