ANNEXURE I CONSTRUCTION OF MAIN FACTORY SHED SCHEDULE OF STRUCTURAL & CIVIL WORK TECHNICAL DATA AND SCHEDULE: Sl.

. No. A-I STRUCTURAL WORK 1 Floor Area considered 2 Span 3 Bay 4 Apex Height 5 Eave Height A-2 CIVIL WORK 1 Flooring Standard concrete cast on brick soling 1:2:4 2 Column foundation RCC 1:2:4 3 Brick work 4 Plaster inside and outside 5 Surface Drain 350mm wide x 450mm deep all around the building with RCC covers at appropriate locations. 6 P.V.C./C.I. Down Pipe 7 Door & Window (Steel) 8 Opening in processing room with M S welded mesh 3x1x6x110 fixed in steel framework. 9 General plumbing 10 Roofing G.I. Sheet 11 Painting Lime inside & Snowcem outside Work Specification 14640 Sq.Ft As shown in the drawing -DO-DO-DO-

TOTAL COST RS

9516000