Escolar Documentos
Profissional Documentos
Cultura Documentos
EXPEDIENTE TECNICO
RESUMEN DE METRADOS
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
01.00
CODIGO
01.01.00
01.02.00
01.03.00
01.04.00
01.05.00
OBRAS PRELIMINARES
DESCRIPCION
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
TOPOGRAFIA Y GEOREFERENCIACION
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL DURANTE LA
EJECUCIN DE LA OBRA
RESTAURACION DE CERCOS
REUBICACION DE POSTES DE MEDIA Y BAJA TENSION
02.00
CODIGO
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
MOVIMIENTO DE TIERRAS
03.00
CODIGO
03.01.00
AFIRMADOS
04.00
CODIGO
04.01.00
04.02.00
PAVIMENTO ASFALTICO
05.00
CODIGO
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
05.08.00
05.09.00
06.00
CODIGO
06.01.00
06.02.00
06.03.00
06.04.00
DESCRIPCION
DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS
TALA Y RETIRO DE ARBOLES
EXCAVACION PARA EXPLANACIONES NO CLASIFICADA
TERRAPLENES
PREPARACION Y MEJORAMIENTO DE SUELOS DE LA CAPA DE
SUBRASANTE EMPLEANDO UNICAMENTE MATERIAL ADICIONADO
DESCRIPCION
AFIRMADO
DESCRIPCION
IMPRIMACION ASFALTICA
PAVIMENTO DE CONCRETO ASFALTICO CALIENTE
DESCRIPCION
EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN EN SECO
RELLENOS PARA ESTRUCTURAS CON MATERIAL PROPIO
RELLENO CON MATERIAL GRANULAR DE CANTERA
MAMPOSTERIA DE PIEDRA ASENTADA CON MEZCLA 1:3
CONCRETO CICLOPEO F'C=140 KG/CM2 + 30% P.G.
TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 0.60 M. DE
DIAMETRO
CUNETA TRIANGULAR REVESTIDA DE CONCRETO (0.75 x 0.50 M.)
COMPUERTA METALICA TIPO TARJETA
EMBOQUILLADO DE PIEDRA
UNIDAD
GLB
GLB
GLB
GLB
GLB
METRADO
1.00
1.00
1.00
1.00
1.00
UNIDAD
HA
UND
M3
M3
M3
METRADO
5.30
120.00
64,519.25
6,480.81
960.49
UNIDAD
M3
METRADO
7,943.77
UNIDAD
M2
M3
METRADO
37,898.79
1,875.06
UNIDAD
M3
M3
M3
M3
M3
M
METRADO
2,096.61
146.04
88.52
52.00
1,614.43
232.50
M3
UND
M3
992.31
31.00
29.76
TRANSPORTE
DESCRIPCION
TRANSPORTE DE MATERIALES GRANULARES ENTRE CIENTO VEINTE
METROS (120 M.) Y MIL METROS (1000 M.)
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS
MAYORES A MIL METROS (1000 M.)
TRANSPORTE DE MEZCLA ASFALTICA ENTRE CIENTO VEINTE METROS
(120 M.) Y MIL METROS (1000 M.)
TRANSPORTE DE MEZCLA ASFALTICA PARA DISTANCIAS MAYORES A MIL
METROS (1000 M.)
UNIDAD
M3K
METRADO
4,932.38
M3K
153,678.27
M3K
937.53
M3K
1,734.68
EXPEDIENTE TECNICO
RESUMEN DE METRADOS
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
06.05.00
TRANSPORTE DE ESCOMBROS
795,779.07
EXPEDIENTE TECNICO
RESUMEN DE METRADOS
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
07.00
CODIGO
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
07.06.00
07.07.00
08.00
CODIGO
08.01.00
08.01.01
08.01.02
08.02.00
08.02.01
08.02.02
08.03.00
08.03.01
08.04.00
08.04.01
08.05.00
08.05.01
08.05.02
PROTECCION AMBIENTAL
08.05.03
08.05.04
DESCRIPCION
PROGRAMA DE EDUCACION AMBIENTAL
EDUCACION AMBIENTAL A POBLADORES
EDUCACION AMBIENTAL A TRABAJADORES
SEALIZACION AMBIENTAL
CARTELES MAYORES
CARTELES MENORES
PROGRAMA DE SEGUIMIENTO Y/O VIGILANCIA
PROGRAMA DE SEGUIMIENTO Y/O VIGILANCIA
PROGRAMA DE CONTINGENCIAS
CONTINGENCIAS POR IMPACTO AMBIENTAL
PROGRAMA DE ABANDONO DE OBRA
REFORESTACIN ESTABILIZAR TALUDES
REACONDICIONAMIENTO DEL REA DEL CAMPAMENTO Y PATIO DE
MQUINAS
REACONDICIONAMIENTO DE CANTERAS Y ACCESOS
COMPACTACIN DE MATERIAL EXCEDENTE Y NIVELACIN DEL
BOTADERO
UNIDAD
UND
UND
M2
UND
M2
M
UND
METRADO
40.00
2.00
3.44
3.00
1,305.10
464.34
6.00
UNIDAD
METRADO
UND
UND
2.00
1.00
UND
UND
2.00
2.00
MES
4.00
GLB
1.00
HA
HA
0.50
0.18
HA
M3
1.00
59,268.43
EXPEDIENTE TECNICO
1.01
GLB
1.00
1.02
TOPOGRAFIA Y GEOREFERENCIACION
GLB
1.00
1.03
GLB
1.00
1.04
RESTAURACION DE CERCOS
GLB
1.00
1.05
GLB
1.00
EXPEDIENTE TECNICO
HA
UND
M
DESCRIPCION
ROCE Y LIMPIEZA
LARGO
5,300.53
ANCHO
10.00
5.30
PARCIAL
53,005.30
2.02
UND
120.00
2.03
M3
64,519.25
2.04
TERRAPLENES
M3
6,480.81
KM - KM.
0.00 - .5.30
2.05
VOLUMENES
CORTE
RELLENO
M3
M3
64,519.25
6,480.81
CLASIFICACIN DE CORTE
MS
M3
60.00%
38,711.55
RS
M3
40.00%
25,807.70
CLASIFICACIN DE RELLENO
RF
P. CORTE
CANTERA
M3
0.00%
-
M3
100.00%
6,480.81
M3
0.00%
-
ELIMINAR
M3
58,038.44
LONGITUD
(m)
300.53
SUBRASANTE
(m)
7.39
ESPESOR
(m)
0.40
VOLUMEN
(m3)
960.49
960.49
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
0.902
0.219
3.441
0.000
10.655
0.000
5.231
0.000
4.790
0.000
5.787
0.000
6.744
0.000
5.826
0.000
5.841
0.000
4.625
0.086
0.045
7.713
0.021
7.964
0.026
6.423
0.000
5.759
1.439
7.048
0.207
5.667
1.937
1.658
4.565
0.872
5.502
1.233
5.549
0.627
3.408
0.744
2.124
1.171
1.913
6.002
3.749
3.802
4.263
2.278
6.009
0.498
6.536
0.214
17.180
0.079
16.949
0.000
17.085
0.000
29.820
9.300
29.882
8.730
22.217
0.000
7.509
0.000
2.219
0.157
2.544
0.099
2.519
0.081
1.185
0.461
0.996
0.538
0.000
9.001
0.389
10.614
0.636
10.666
0.738
9.013
0.668
4.962
0.249
4.879
0.335
3.046
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
5.708
0.273
5.71
0.27
46.452
0.000
52.16
0.27
85.620
0.000
137.78
0.27
13.467
0.000
151.25
0.27
38.668
0.000
189.91
0.27
62.655
0.000
252.57
0.27
62.850
0.000
315.42
0.27
17.629
0.000
333.05
0.27
36.514
0.284
369.56
0.56
46.695
73.886
416.26
74.44
0.070
15.713
416.33
90.16
0.098
28.630
416.43
118.79
0.174
78.957
416.60
197.74
8.700
73.381
425.30
271.12
6.503
47.605
431.80
318.73
10.718
34.698
442.52
353.43
19.906
7.339
462.43
360.77
19.509
3.865
481.94
364.63
65.082
10.378
547.02
375.01
36.816
5.339
583.83
380.35
25.768
8.451
609.60
388.80
21.563
36.302
631.16
425.10
56.610
92.881
687.77
517.98
41.684
29.969
729.46
547.95
41.499
10.625
770.96
558.57
9.496
0.511
780.45
559.09
237.150
2.776
1,017.60
561.86
131.273
0.288
1,148.88
562.15
39.258
0.000
1,188.13
562.15
234.525
44.053
1,422.66
606.20
66.119
18.917
1,488.78
625.12
463.281
73.546
1,952.06
698.67
297.255
0.000
2,249.31
698.67
97.275
1.487
2,346.59
700.15
13.059
0.665
2,359.65
700.82
11.431
0.385
2,371.08
701.20
18.518
2.567
2,389.60
703.77
1.013
0.440
2,390.61
704.21
9.497
86.172
2,400.11
790.38
3.885
185.828
2,403.99
976.21
1.977
38.899
2,405.97
1,015.11
4.219
57.245
2,410.19
1,072.35
2.618
24.659
2,412.81
1,097.01
2.876
29.251
2,415.68
1,126.26
4.781
61.513
2,420.46
1,187.78
2.055
12.868
2,422.52
1,200.64
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
0.803
4.471
0.000
13.723
0.593
10.986
4.461
1.451
7.638
0.000
9.180
0.000
12.110
0.000
25.092
0.000
25.245
0.000
27.723
0.000
29.033
0.000
24.471
0.000
29.544
0.000
28.083
0.000
19.821
0.000
1.319
2.163
0.842
2.703
0.818
2.347
0.759
1.753
0.711
2.458
1.161
3.066
1.034
1.296
3.335
0.132
9.239
0.000
8.540
0.047
6.294
2.921
8.271
0.342
8.130
0.505
8.177
0.484
11.553
0.891
12.621
1.795
11.937
3.447
14.672
4.650
7.775
8.999
5.234
8.016
9.633
1.982
26.564
6.712
28.497
6.909
26.229
3.802
18.134
1.180
10.982
2.727
11.013
7.277
10.575
3.313
5.763
0.048
2.721
0.159
1.800
0.040
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
4.013
86.183
2,426.53
1,286.83
2.963
117.043
2,429.49
1,403.87
25.268
58.912
2,454.76
1,462.78
60.495
6.873
2,515.25
1,469.66
40.918
0.000
2,556.17
1,469.66
161.098
0.000
2,717.27
1,469.66
372.015
0.000
3,089.28
1,469.66
6.795
0.000
3,096.08
1,469.66
257.689
0.000
3,353.77
1,469.66
283.778
0.000
3,637.55
1,469.66
173.753
0.000
3,811.30
1,469.66
364.736
0.000
4,176.04
1,469.66
576.270
0.000
4,752.31
1,469.66
479.040
0.000
5,231.35
1,469.66
211.395
20.492
5,442.74
1,490.15
7.545
16.102
5,450.29
1,506.25
2.500
7.210
5,452.79
1,513.46
7.883
19.421
5,460.67
1,532.88
2.586
7.019
5,463.25
1,539.90
8.359
23.369
5,471.61
1,563.27
8.284
15.600
5,479.90
1,578.87
21.840
6.764
5,501.74
1,585.63
62.865
0.625
5,564.60
1,586.26
42.961
0.108
5,607.56
1,586.37
112.490
21.323
5,720.05
1,607.69
145.650
30.913
5,865.70
1,638.60
13.654
0.668
5,879.36
1,639.27
67.957
3.905
5,947.32
1,643.18
98.648
6.513
6,045.96
1,649.69
120.870
12.723
6,166.83
1,662.41
122.790
24.831
6,289.62
1,687.24
133.043
38.354
6,422.67
1,725.60
112.230
64.654
6,534.90
1,790.25
42.120
52.195
6,577.02
1,842.45
100.527
64.049
6,677.54
1,906.49
268.469
61.090
6,946.01
1,967.58
142.221
33.332
7,088.23
2,000.92
183.907
34.100
7,272.14
2,035.02
294.545
31.337
7,566.68
2,066.35
291.150
37.014
7,857.83
2,103.37
145.802
62.827
8,003.64
2,166.19
72.773
33.820
8,076.41
2,200.01
81.690
15.921
8,158.10
2,215.94
16.671
0.385
8,174.77
2,216.32
13.721
0.572
8,188.49
2,216.89
48.375
11.406
8,236.87
2,228.30
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
3.038
1.164
7.391
0.956
8.093
0.827
7.490
0.299
4.796
1.891
2.733
3.552
0.995
1.388
0.332
1.902
0.089
4.579
0.294
0.854
1.553
0.030
1.167
1.038
1.682
0.888
4.188
0.004
5.288
0.000
6.491
0.000
4.784
0.000
3.419
0.217
0.113
3.659
0.137
3.460
1.556
0.253
1.077
0.841
0.506
0.859
0.179
1.310
0.324
0.747
3.368
0.116
2.607
0.029
0.915
0.271
1.080
0.165
2.225
0.109
2.049
0.171
1.631
0.231
0.939
0.576
3.153
2.306
2.996
2.313
2.186
2.566
2.562
0.324
3.779
0.062
4.862
0.576
4.604
0.729
5.325
0.469
6.329
0.168
6.872
0.087
4.046
0.085
3.317
0.204
3.309
0.207
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
47.020
9.056
8,283.89
2,237.35
7.602
0.829
8,291.49
2,238.18
77.910
5.334
8,369.40
2,243.52
61.425
10.374
8,430.82
2,253.89
37.643
25.783
8,468.47
2,279.67
18.638
23.400
8,487.10
2,303.07
6.630
15.584
8,493.73
2,318.66
1.332
19.470
8,495.07
2,338.13
2.612
35.149
8,497.68
2,373.28
18.465
8.375
8,516.14
2,381.65
17.749
6.603
8,533.89
2,388.26
9.894
6.338
8,543.79
2,394.59
29.348
4.225
8,573.13
2,398.82
24.489
0.010
8,597.62
2,398.83
28.450
0.000
8,626.07
2,398.83
63.247
0.000
8,689.32
2,398.83
36.007
0.902
8,725.33
2,399.73
17.655
18.360
8,742.98
2,418.09
1.245
33.722
8,744.23
2,451.81
8.460
17.588
8,752.69
2,469.40
13.163
5.182
8,765.85
2,474.58
7.913
8.053
8,773.76
2,482.64
3.420
10.274
8,777.18
2,492.91
2.513
9.744
8,779.69
2,502.65
18.458
4.088
8,798.15
2,506.74
29.873
0.687
8,828.02
2,507.43
17.610
1.421
8,845.63
2,508.85
9.975
2.065
8,855.61
2,510.92
16.523
1.298
8,872.13
2,512.21
21.368
1.326
8,893.50
2,513.54
18.398
1.904
8,911.90
2,515.44
6.112
1.818
8,918.01
2,517.26
31.187
20.809
8,949.19
2,538.07
2.213
1.575
8,951.41
2,539.65
20.745
18.507
8,972.15
2,558.15
26.757
15.431
8,998.91
2,573.59
63.405
3.657
9,062.31
2,577.24
79.259
5.545
9,141.57
2,582.79
7.823
1.022
9,149.40
2,583.81
49.643
5.675
9,199.04
2,589.48
58.268
3.017
9,257.31
2,592.50
8.356
0.153
9,265.66
2,592.65
102.260
1.526
9,367.92
2,594.18
67.760
2.520
9,435.68
2,596.70
5.274
0.310
9,440.96
2,597.01
24.068
7.588
9,465.02
2,604.60
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
1.505
1.395
4.953
0.439
3.857
0.400
1.167
0.927
2.078
0.273
2.678
0.122
3.188
0.019
3.324
0.004
3.237
0.442
4.455
0.041
4.176
0.049
3.990
0.037
2.841
0.071
2.813
0.099
3.278
0.179
4.073
0.085
5.522
0.000
4.736
0.000
3.522
0.040
7.722
0.024
4.433
0.020
3.657
0.314
4.778
0.076
5.240
0.062
8.186
0.000
5.027
2.386
4.974
2.364
1.197
0.952
4.208
0.279
3.708
0.628
3.554
0.495
4.514
0.055
4.334
0.040
2.748
0.463
3.267
0.116
5.888
0.000
5.925
3.244
4.733
1.738
4.209
0.703
3.645
0.177
0.155
4.000
0.119
4.255
0.683
1.565
0.756
1.571
4.151
0.494
19.898
0.000
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
32.288
8.687
9,497.31
2,613.29
44.048
3.974
9,541.36
2,617.26
25.118
6.286
9,566.48
2,623.55
16.223
5.684
9,582.70
2,629.23
23.775
1.871
9,606.47
2,631.10
29.325
0.668
9,635.80
2,631.77
14.472
0.048
9,650.27
2,631.82
18.223
1.174
9,668.49
2,632.99
76.920
4.576
9,745.41
2,637.57
86.310
0.853
9,831.72
2,638.42
3.368
0.034
9,835.09
2,638.45
31.337
0.469
9,866.43
2,638.92
7.847
0.224
9,874.28
2,639.15
21.997
0.951
9,896.27
2,640.10
73.500
2.501
9,969.77
2,642.60
95.940
0.805
10,065.71
2,643.40
102.570
0.000
10,168.28
2,643.40
82.575
0.379
10,250.86
2,643.78
38.410
0.207
10,289.27
2,643.99
19.253
0.066
10,308.52
2,644.06
40.448
1.582
10,348.97
2,645.64
13.149
0.576
10,362.12
2,646.21
1.983
0.026
10,364.10
2,646.24
43.537
0.190
10,407.64
2,646.43
65.142
11.145
10,472.78
2,657.58
0.695
0.313
10,473.47
2,657.89
61.710
31.415
10,535.18
2,689.30
41.647
8.987
10,576.83
2,698.29
18.158
1.971
10,594.99
2,700.26
32.368
4.742
10,627.36
2,705.00
44.711
2.888
10,672.07
2,707.89
88.470
0.900
10,760.54
2,708.79
52.293
3.519
10,812.83
2,712.31
15.732
1.435
10,828.56
2,713.75
45.773
0.549
10,874.34
2,714.30
59.063
15.366
10,933.40
2,729.66
53.288
23.599
10,986.69
2,753.26
20.306
5.252
11,006.99
2,758.51
21.434
2.275
11,028.43
2,760.79
36.397
37.908
11,064.82
2,798.70
0.115
3.289
11,064.94
2,801.98
4.005
27.569
11,068.94
2,829.55
0.575
1.187
11,069.52
2,830.74
22.572
9.000
11,092.09
2,839.74
240.480
4.680
11,332.57
2,844.42
361.575
0.000
11,694.15
2,844.42
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
16.260
0.000
9.513
0.439
12.419
0.361
11.739
7.518
15.591
21.018
17.531
15.046
16.385
12.072
16.610
0.250
12.795
0.000
12.102
0.622
11.271
0.139
16.839
0.125
15.489
0.107
9.021
0.025
8.972
0.026
8.981
0.466
10.430
0.022
9.270
1.349
9.191
1.436
8.678
3.101
11.994
2.663
12.194
2.669
11.810
0.360
19.700
0.188
19.038
0.150
12.815
0.000
8.490
0.746
5.300
1.538
4.844
0.591
7.056
0.994
8.760
1.691
13.275
0.889
18.074
0.306
5.568
0.691
4.238
5.698
8.094
5.476
19.340
1.642
17.105
0.286
16.385
0.233
23.466
0.001
14.930
0.000
14.352
0.008
4.595
2.765
5.201
1.968
5.169
0.909
28.107
0.000
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
257.730
4.159
11,951.88
2,848.58
219.315
7.579
12,171.19
2,856.16
241.575
74.644
12,412.77
2,930.80
178.684
176.750
12,591.45
3,107.55
114.667
118.283
12,706.12
3,225.83
169.575
128.455
12,875.69
3,354.29
164.970
58.368
13,040.66
3,412.66
147.023
1.184
13,187.68
3,413.84
124.485
2.946
13,312.17
3,416.79
116.865
3.605
13,429.03
3,420.39
140.550
1.251
13,569.58
3,421.64
161.640
1.099
13,731.22
3,422.74
121.484
0.620
13,852.71
3,423.36
0.783
0.002
13,853.49
3,423.36
179.520
4.661
14,033.01
3,428.02
107.133
2.552
14,140.14
3,430.58
88.264
5.820
14,228.41
3,436.40
6.018
0.860
14,234.43
3,437.26
172.855
41.581
14,407.28
3,478.84
206.715
54.607
14,614.00
3,533.44
9.651
2.016
14,623.65
3,535.46
110.438
13.203
14,734.08
3,548.66
157.545
2.596
14,891.63
3,551.26
25.179
0.208
14,916.81
3,551.47
297.821
1.329
15,214.63
3,552.79
167.240
5.548
15,381.87
3,558.34
29.647
4.652
15,411.52
3,563.00
50.715
10.085
15,462.23
3,573.08
59.498
7.508
15,521.73
3,580.59
79.080
12.719
15,600.81
3,593.31
110.175
12.221
15,710.98
3,605.53
63.606
2.297
15,774.59
3,607.82
188.446
7.529
15,963.04
3,615.35
76.483
47.212
16,039.52
3,662.56
27.129
23.289
16,066.65
3,685.85
137.168
33.717
16,203.82
3,719.57
143.389
7.187
16,347.21
3,726.76
35.683
0.524
16,382.89
3,727.28
398.505
2.217
16,781.39
3,729.50
370.171
0.009
17,151.56
3,729.51
10.512
0.003
17,162.08
3,729.51
94.733
13.135
17,256.81
3,742.65
19.580
8.963
17,276.39
3,751.61
31.119
8.180
17,307.51
3,759.79
332.760
8.612
17,640.27
3,768.40
389.401
0.000
18,029.67
3,768.40
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
15.050
0.000
12.794
0.000
6.198
0.068
7.430
0.130
9.251
3.330
9.594
3.797
11.757
0.000
7.107
2.427
23.891
0.000
16.845
0.000
17.258
0.000
15.744
0.002
21.393
0.000
21.636
0.000
17.391
0.000
15.984
0.000
12.302
0.000
7.779
0.000
5.024
0.006
14.658
0.000
16.668
0.000
22.062
0.000
14.321
0.000
13.427
0.000
13.313
0.000
12.299
0.000
7.133
0.000
4.479
0.687
3.155
0.355
0.578
1.687
0.000
2.753
0.240
1.971
0.285
1.661
0.257
1.095
0.057
1.428
0.024
3.509
0.131
3.054
0.810
3.113
1.190
3.704
2.451
0.892
5.304
0.005
2.924
1.053
2.763
1.260
2.756
5.914
16.160
1.785
15.020
4.698
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
27.203
0.000
18,056.87
3,768.40
94.958
0.322
18,151.83
3,768.72
68.138
0.938
18,219.97
3,769.66
83.400
16.390
18,303.37
3,786.05
23.942
8.578
18,327.31
3,794.63
79.629
13.416
18,406.94
3,808.04
188.640
22.993
18,595.58
3,831.04
309.975
22.993
18,905.55
3,854.03
250.157
0.000
19,155.71
3,854.03
131.602
0.000
19,287.31
3,854.03
165.008
0.009
19,452.32
3,854.04
180.653
0.009
19,632.97
3,854.05
5.830
0.000
19,638.80
3,854.05
390.270
0.000
20,029.07
3,854.05
52.115
0.000
20,081.19
3,854.05
97.260
0.000
20,178.45
3,854.05
58.324
0.000
20,236.77
3,854.05
26.828
0.012
20,263.60
3,854.06
196.815
0.057
20,460.41
3,854.12
27.316
0.000
20,487.73
3,854.12
159.877
0.000
20,647.61
3,854.12
181.913
0.000
20,829.52
3,854.12
63.541
0.000
20,893.06
3,854.12
6.137
0.000
20,899.20
3,854.12
63.528
0.000
20,962.72
3,854.12
97.155
0.000
21,059.88
3,854.12
37.528
2.104
21,097.41
3,856.22
51.664
6.681
21,149.07
3,862.90
37.320
19.345
21,186.39
3,882.25
5.775
42.063
21,192.17
3,924.31
1.940
36.177
21,194.11
3,960.49
1.006
6.594
21,195.11
3,967.08
2.708
13.055
21,197.82
3,980.14
1.568
11.951
21,199.39
3,992.09
0.319
18.430
21,199.71
4,010.52
0.371
14.916
21,200.08
4,025.43
3.443
21.386
21,203.52
4,046.82
9.998
32.291
21,213.52
4,079.11
18.203
21.771
21,231.72
4,100.88
38.775
4.249
21,270.49
4,105.13
39.192
4.775
21,309.69
4,109.91
1.345
0.518
21,311.03
4,110.42
55.185
67.965
21,366.22
4,178.39
189.150
72.938
21,555.37
4,251.33
311.790
61.418
21,867.16
4,312.75
326.235
44.508
22,193.39
4,357.25
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
17.604
0.000
17.373
0.000
15.441
0.000
11.159
0.000
11.712
0.042
11.421
0.054
9.450
2.846
10.830
3.268
11.802
4.910
4.314
7.392
0.980
5.777
0.735
5.679
0.605
4.726
3.269
0.732
4.670
0.017
2.361
1.168
3.590
0.145
2.712
0.227
1.695
0.905
1.520
1.121
3.260
0.577
2.994
1.024
2.999
1.010
3.140
0.223
5.403
0.004
8.003
1.260
12.869
0.000
9.603
0.176
6.336
0.532
1.538
2.251
3.695
4.210
4.404
4.159
8.015
2.531
20.153
0.534
26.409
0.000
28.194
0.000
20.787
0.000
13.017
0.000
12.996
0.000
11.952
0.000
8.384
0.080
4.176
12.875
3.873
11.933
1.620
1.065
2.453
0.599
6.690
0.027
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
66.246
0.000
22,259.64
4,357.25
101.920
0.000
22,361.56
4,357.25
132.998
0.000
22,494.56
4,357.25
114.353
0.199
22,608.91
4,357.45
1.400
0.006
22,610.31
4,357.46
103.092
13.571
22,713.40
4,371.03
33.746
9.638
22,747.15
4,380.67
75.500
25.846
22,822.65
4,406.51
80.580
58.273
22,903.23
4,464.79
26.468
62.380
22,929.69
4,527.17
2.355
14.907
22,932.05
4,542.07
4.858
35.748
22,936.91
4,577.82
21.840
29.158
22,958.75
4,606.98
34.618
3.094
22,993.36
4,610.07
35.153
5.613
23,028.52
4,615.69
16.304
3.408
23,044.82
4,619.09
14.241
0.796
23,059.06
4,619.89
18.994
4.622
23,078.06
4,624.51
2.218
1.324
23,080.27
4,625.84
23.895
8.043
23,104.17
4,633.88
31.268
7.584
23,135.44
4,641.46
0.255
0.082
23,135.69
4,641.55
30.429
5.791
23,166.12
4,647.34
49.901
1.256
23,216.02
4,648.59
55.747
4.980
23,271.77
4,653.57
104.355
5.968
23,376.12
4,659.54
112.358
0.834
23,488.48
4,660.38
79.695
3.354
23,568.18
4,663.73
39.368
13.183
23,607.54
4,676.91
26.160
30.605
23,633.70
4,707.52
6.872
6.727
23,640.57
4,714.24
51.555
26.312
23,692.13
4,740.56
281.670
29.037
23,973.80
4,769.59
259.417
2.819
24,233.22
4,772.41
241.809
0.000
24,475.03
4,772.41
244.905
0.000
24,719.93
4,772.41
136.348
0.000
24,856.28
4,772.41
0.520
0.000
24,856.80
4,772.41
23.613
0.000
24,880.41
4,772.41
101.678
0.379
24,982.09
4,772.79
62.798
61.366
25,044.89
4,834.16
8.629
25.195
25,053.52
4,859.35
49.042
109.939
25,102.56
4,969.29
3.519
1.362
25,106.08
4,970.65
37.813
2.453
25,143.89
4,973.11
81.158
0.137
25,225.05
4,973.24
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
9.542
0.002
8.222
0.063
9.153
0.000
10.223
0.000
11.507
0.000
6.207
0.041
3.587
2.395
4.200
0.780
7.881
0.029
9.794
0.006
10.734
0.008
10.245
0.037
8.198
0.860
15.008
0.008
29.403
0.509
42.360
0.351
37.548
0.000
21.641
0.105
43.229
0.000
52.689
0.000
52.650
0.000
50.565
0.000
16.625
0.000
2.138
0.608
1.854
1.804
0.029
11.792
0.066
12.011
0.210
7.794
1.124
6.081
1.128
6.046
9.224
1.057
12.971
0.257
12.014
0.173
12.083
0.162
14.883
12.900
22.196
8.342
22.643
8.748
22.562
7.823
22.190
2.974
22.971
0.000
23.643
0.000
22.614
0.000
14.622
0.000
9.213
0.775
9.110
0.082
9.773
0.209
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
88.815
0.308
25,313.86
4,973.55
46.746
0.161
25,360.61
4,973.71
44.748
0.000
25,405.36
4,973.71
217.290
0.000
25,622.65
4,973.71
111.436
0.244
25,734.08
4,973.96
36.324
8.560
25,770.41
4,982.52
38.933
15.040
25,809.34
4,997.55
60.405
3.832
25,869.74
5,001.39
88.373
0.166
25,958.12
5,001.55
102.638
0.066
26,060.75
5,001.62
36.094
0.073
26,096.85
5,001.69
152.695
7.036
26,249.54
5,008.73
232.050
8.223
26,481.59
5,016.95
444.105
4.898
26,925.70
5,021.85
717.630
8.147
27,643.33
5,030.00
520.081
2.164
28,163.41
5,032.16
206.657
0.347
28,370.07
5,032.51
324.345
0.497
28,694.41
5,033.01
419.495
0.000
29,113.91
5,033.01
2.107
0.000
29,116.01
5,033.01
62.600
0.000
29,178.61
5,033.01
335.948
0.000
29,514.56
5,033.01
93.810
2.880
29,608.37
5,035.89
9.049
5.180
29,617.42
5,041.07
13.053
89.313
29,630.47
5,130.38
0.076
18.018
29,630.55
5,148.40
1.380
93.814
29,631.93
5,242.21
6.354
62.635
29,638.28
5,304.85
0.529
2.700
29,638.81
5,307.55
103.515
67.292
29,742.33
5,374.84
131.444
7.373
29,873.77
5,382.21
95.426
1.556
29,969.20
5,383.77
6.217
0.082
29,975.41
5,383.85
140.153
64.317
30,115.57
5,448.17
178.069
96.646
30,293.64
5,544.81
224.190
80.953
30,517.83
5,625.76
24.297
8.438
30,542.12
5,634.20
199.701
45.646
30,741.82
5,679.85
323.959
20.211
31,065.78
5,700.06
131.754
0.000
31,197.54
5,700.06
231.285
0.000
31,428.82
5,700.06
186.180
0.000
31,615.00
5,700.06
119.175
3.671
31,734.18
5,703.73
91.613
4.060
31,825.79
5,707.79
94.410
1.378
31,920.20
5,709.17
68.875
2.094
31,989.08
5,711.26
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
7.211
0.336
7.418
0.260
7.610
0.381
9.330
0.158
8.261
0.623
12.881
0.038
10.280
0.255
16.889
0.000
5.964
0.009
1.253
1.150
1.763
0.790
11.766
0.001
13.976
0.001
16.250
0.002
18.819
0.000
18.855
0.000
24.837
0.000
24.011
0.000
21.123
0.000
15.504
0.001
16.055
0.006
14.583
0.000
4.394
0.004
3.120
0.370
3.123
0.367
3.192
0.346
7.052
0.000
7.167
1.282
8.157
0.216
15.174
0.000
24.372
0.000
24.843
0.000
30.075
0.000
32.867
0.000
38.514
0.000
25.010
0.000
9.185
0.000
9.134
0.000
6.734
0.000
5.112
0.000
9.275
0.192
19.011
0.000
26.190
0.000
15.051
0.000
12.855
0.000
16.145
0.000
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
13.816
0.533
32,002.89
5,711.80
150.270
6.073
32,153.16
5,717.87
37.411
1.128
32,190.57
5,719.00
49.104
2.065
32,239.68
5,721.06
105.705
3.131
32,345.38
5,724.19
57.842
0.693
32,403.22
5,724.89
203.828
1.812
32,607.05
5,726.70
228.525
0.085
32,835.58
5,726.78
58.670
8.927
32,894.25
5,735.71
5.638
3.437
32,899.88
5,739.15
67.643
3.747
32,967.53
5,742.90
20.979
0.002
32,988.51
5,742.90
126.492
0.012
33,115.00
5,742.91
348.686
0.019
33,463.68
5,742.93
2.147
0.000
33,465.83
5,742.93
218.460
0.000
33,684.29
5,742.93
71.733
0.000
33,756.02
5,742.93
159.389
0.000
33,915.41
5,742.93
366.270
0.009
34,281.68
5,742.94
272.460
0.057
34,554.14
5,742.99
41.866
0.008
34,596.01
5,743.00
94.883
0.019
34,690.89
5,743.02
35.990
1.697
34,726.88
5,744.72
0.125
0.014
34,727.01
5,744.73
1.200
0.128
34,728.21
5,744.86
51.218
1.639
34,779.42
5,746.50
71.093
6.073
34,850.52
5,752.57
14.818
1.372
34,865.33
5,753.94
210.749
1.848
35,076.08
5,755.79
378.178
0.000
35,454.26
5,755.79
21.507
0.000
35,475.77
5,755.79
274.590
0.000
35,750.36
5,755.79
109.361
0.000
35,859.72
5,755.79
232.879
0.000
36,092.60
5,755.79
635.235
0.000
36,727.83
5,755.79
341.940
0.000
37,069.77
5,755.79
3.398
0.000
37,073.17
5,755.79
76.392
0.000
37,149.56
5,755.79
18.686
0.000
37,168.25
5,755.79
49.238
0.623
37,217.49
5,756.42
282.855
1.819
37,500.34
5,758.23
452.010
0.000
37,952.35
5,758.23
412.410
0.000
38,364.76
5,758.23
146.116
0.000
38,510.88
5,758.23
138.154
0.000
38,649.03
5,758.23
182.580
0.000
38,831.61
5,758.23
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
20.372
0.000
19.955
0.000
19.482
0.072
31.728
0.000
42.968
0.000
59.990
0.000
62.178
0.000
65.450
0.000
17.546
0.000
16.136
0.000
9.098
0.056
5.745
0.124
1.128
1.008
4.749
2.050
5.100
2.173
4.766
3.171
9.353
4.316
7.311
2.709
7.574
1.391
24.042
0.000
25.151
0.304
15.243
2.629
11.348
3.774
11.384
2.400
11.675
3.064
18.399
2.913
21.941
0.842
0.000
0.000
0.000
0.000
4.397
0.139
3.249
0.209
2.010
0.753
8.435
2.566
17.664
1.067
9.197
0.078
11.799
0.000
16.529
0.000
12.419
0.000
13.071
0.000
4.728
0.000
3.885
0.137
6.792
0.039
8.373
0.000
6.455
0.033
5.643
0.111
4.674
0.381
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
43.996
0.000
38,875.61
5,758.23
154.157
0.267
39,029.76
5,758.50
512.100
0.682
39,541.86
5,759.18
382.740
0.000
39,924.60
5,759.18
502.018
0.000
40,426.62
5,759.18
109.340
0.000
40,535.96
5,759.18
1162.048
0.000
41,698.01
5,759.18
773.389
0.000
42,471.40
5,759.18
22.954
0.000
42,494.35
5,759.18
126.165
0.265
42,620.52
5,759.45
19.622
0.225
42,640.14
5,759.67
25.279
3.944
42,665.42
5,763.62
25.782
12.709
42,691.20
5,776.33
6.037
2.452
42,697.24
5,778.78
49.328
25.314
42,746.57
5,804.09
60.199
30.245
42,806.77
5,834.34
95.582
38.175
42,902.35
5,872.51
148.845
38.842
43,051.19
5,911.36
316.155
13.178
43,367.35
5,924.53
491.925
2.880
43,859.27
5,927.41
110.698
7.615
43,969.97
5,935.03
60.081
13.706
44,030.05
5,948.73
113.655
29.245
44,143.71
5,977.98
15.668
3.517
44,159.37
5,981.50
188.561
35.504
44,347.94
6,017.00
123.056
10.852
44,470.99
6,027.85
109.703
3.988
44,580.69
6,031.84
0.000
0.000
44,580.69
6,031.84
21.983
0.658
44,602.68
6,032.50
8.643
0.373
44,611.32
6,032.87
20.350
3.527
44,631.67
6,036.40
104.445
31.443
44,736.11
6,067.84
260.985
34.418
44,997.10
6,102.26
205.604
8.303
45,202.70
6,110.56
49.245
0.173
45,251.95
6,110.74
141.638
0.000
45,393.59
6,110.74
106.482
0.000
45,500.07
6,110.74
33.684
0.000
45,533.75
6,110.74
149.254
0.000
45,683.00
6,110.74
13.906
0.210
45,696.91
6,110.95
53.364
0.833
45,750.27
6,111.78
75.855
0.185
45,826.13
6,111.96
61.386
0.129
45,887.52
6,112.09
10.404
0.117
45,897.92
6,112.21
51.585
2.331
45,949.50
6,114.54
24.014
9.683
45,973.52
6,124.23
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
1.080
2.068
1.080
2.081
0.930
2.356
9.119
0.000
11.297
0.009
7.584
0.000
8.247
0.000
12.104
0.000
14.981
0.000
33.402
0.000
68.729
0.000
70.797
0.000
89.846
0.000
81.357
0.000
44.438
0.000
19.218
0.000
19.232
0.000
19.296
0.000
12.855
1.152
12.407
4.046
10.323
6.572
8.621
6.575
10.956
0.585
12.731
0.000
11.829
0.019
12.063
0.011
14.442
0.000
14.343
0.000
14.529
0.000
14.531
0.000
16.425
0.000
15.123
0.000
14.163
0.010
6.887
0.184
6.416
0.201
5.834
0.278
10.058
0.000
14.324
0.000
21.455
0.000
24.651
0.000
20.897
0.000
20.661
0.000
12.902
0.000
20.598
0.000
26.849
0.000
33.002
0.000
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
0.043
0.079
45,973.56
6,124.30
1.621
3.390
45,975.18
6,127.69
50.243
11.160
46,025.43
6,138.85
86.202
0.036
46,111.63
6,138.89
109.082
0.049
46,220.71
6,138.94
158.310
0.000
46,379.02
6,138.94
58.101
0.000
46,437.12
6,138.94
58.095
0.000
46,495.22
6,138.94
241.913
0.000
46,737.13
6,138.94
493.086
0.000
47,230.21
6,138.94
721.626
0.000
47,951.84
6,138.94
346.265
0.000
48,298.11
6,138.94
486.986
0.000
48,785.09
6,138.94
628.973
0.000
49,414.06
6,138.94
312.453
0.000
49,726.52
6,138.94
0.769
0.000
49,727.29
6,138.94
2.755
0.000
49,730.04
6,138.94
160.755
5.457
49,890.79
6,144.40
126.308
24.622
50,017.10
6,169.02
60.836
26.924
50,077.94
6,195.94
44.015
28.940
50,121.95
6,224.88
195.765
67.832
50,317.72
6,292.71
236.865
5.542
50,554.58
6,298.26
120.243
0.088
50,674.83
6,298.34
2.485
0.003
50,677.31
6,298.35
132.525
0.052
50,809.84
6,298.40
143.925
0.000
50,953.76
6,298.40
6.424
0.000
50,960.19
6,298.40
0.581
0.000
50,960.77
6,298.40
147.271
0.000
51,108.04
6,298.40
157.740
0.000
51,265.78
6,298.40
16.927
0.005
51,282.70
6,298.40
93.081
0.813
51,375.79
6,299.22
27.176
0.745
51,402.96
6,299.96
36.220
1.342
51,439.18
6,301.30
79.455
1.317
51,518.64
6,302.62
121.905
0.000
51,640.54
6,302.62
178.890
0.000
51,819.43
6,302.62
230.528
0.000
52,049.96
6,302.62
219.129
0.000
52,269.09
6,302.62
7.854
0.000
52,276.94
6,302.62
335.625
0.000
52,612.57
6,302.62
334.995
0.000
52,947.56
6,302.62
474.465
0.000
53,422.03
6,302.62
598.500
0.000
54,020.53
6,302.62
125.214
0.000
54,145.74
6,302.62
EXPEDIENTE TECNICO
AREA (M2)
CORTE
RELLENO
32.265
0.000
30.803
0.000
32.873
0.000
35.115
0.000
30.765
0.000
29.471
0.000
27.023
0.000
23.856
0.000
18.437
0.000
12.834
0.000
11.817
0.000
10.578
0.000
5.931
0.127
15.315
0.000
17.187
0.000
26.913
0.098
17.424
1.380
17.286
1.446
13.283
3.753
9.912
3.248
19.209
1.268
27.405
0.087
30.704
0.000
31.466
0.000
28.581
0.000
22.575
0.000
19.791
0.000
12.423
0.000
11.361
0.026
9.911
0.021
5.426
0.031
2.679
0.718
3.513
1.324
14.660
0.209
37.943
0.000
33.144
0.000
41.715
0.000
51.128
0.000
92.052
0.000
90.071
0.000
55.968
0.000
32.042
1.511
29.073
1.742
7.635
1.778
0.000
0.000
0.000
0.000
VOLUMEN (M3)
VOLUMEN ACUMULADO
CORTE
RELLENO
CORTE
RELLENO
194.343
0.000
54,340.08
6,302.62
318.375
0.000
54,658.46
6,302.62
339.938
0.000
54,998.40
6,302.62
329.400
0.000
55,327.80
6,302.62
94.389
0.000
55,422.19
6,302.62
476.405
0.000
55,898.59
6,302.62
321.603
0.000
56,220.19
6,302.62
155.594
0.000
56,375.79
6,302.62
156.353
0.000
56,532.14
6,302.62
18.118
0.000
56,550.26
6,302.62
95.515
0.000
56,645.77
6,302.62
165.090
1.203
56,810.86
6,303.82
212.460
1.203
57,023.32
6,305.03
67.263
0.000
57,090.59
6,305.03
129.235
0.272
57,219.82
6,305.30
221.685
7.001
57,441.51
6,312.30
3.037
0.234
57,444.54
6,312.53
303.010
48.823
57,747.55
6,361.36
138.715
39.666
57,886.27
6,401.02
117.052
17.197
58,003.32
6,418.22
233.070
6.418
58,236.39
6,424.64
290.543
0.412
58,526.93
6,425.05
310.845
0.000
58,837.78
6,425.05
300.233
0.000
59,138.01
6,425.05
255.780
0.000
59,393.79
6,425.05
56.813
0.000
59,450.60
6,425.05
117.871
0.000
59,568.47
6,425.05
179.260
0.186
59,747.73
6,425.24
52.392
0.110
59,800.13
6,425.35
76.680
0.246
59,876.81
6,425.59
40.523
3.548
59,917.33
6,429.14
24.474
7.646
59,941.80
6,436.79
109.898
8.783
60,051.70
6,445.57
526.020
1.980
60,577.72
6,447.55
710.865
0.000
61,288.59
6,447.55
277.877
0.000
61,566.46
6,447.55
119.581
0.000
61,686.04
6,447.55
715.898
0.000
62,401.94
6,447.55
58.370
0.000
62,460.31
6,447.55
1413.580
0.000
63,873.89
6,447.55
386.362
6.284
64,260.25
6,453.83
37.280
1.880
64,297.53
6,455.71
183.540
16.674
64,481.07
6,472.39
38.175
8.422
64,519.25
6,480.81
0.000
0.000
64,519.25
6,480.81
64,519.25
6,480.81
EXPEDIENTE TECNICO
03.00 AFIRMADOS
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
3.01
AFIRMADO
7,943.77
METRADOS
EXPEDIENTE TECNICO
03.00 AFIRMADOS
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
3.01
AFIRMADO
M3
7,943.77
LONG.
(m)
5,300.53
SECCION
TIPICA
---
A
6.95
DIMENSIONES (m)
B
C
0.20
0.75
D
0.50
PARCIAL 1
VOLUMEN
(m3)
7,685.77
7,685.77
AREA
(m2)
15.00
ESPESOR
(m)
0.20
PARCIAL 2
VOLUMEN
(m3)
258.00
258.00
PARCIAL 1
PARCIAL 2
M3
M3
7,685.77
258.00
TOTAL
M3
7,943.77
METRADOS
EXPEDIENTE TECNICO
IMPRIMACION ASFALTICA
M2
37,898.79
M3
1,875.06
ANCHO DE
LONG.
LA VIA
(m)
5,300.53
7.15
PARCIAL 1
04.02.00
VOLUMEN
(m2)
37,898.79
37,898.79
LONG.
(m)
5,300.53
SECCION
TIPICA
---
DIMENSIONES (m)
ANCHO
ESPESOR
7.00
0.05
VOLUMEN
(m3)
1,875.06
1,875.06
EXPEDIENTE TECNICO
CANTIDAD
M3
2,096.61
LARGO
ANCHO
ALTURA
AREA
PARCIAL
SUB TOTAL
(m)
(m)
(m)
(m2)
(m3)
(m3)
1.97
1.74
3.42
2.18
3.64
7.92
ALCANTARILLAS TMC
TMC 24
CABEZAL
31.00
CAJA TOMA
106.08
31.00
CUERPO
245.54
31.00
273.42
A-01
0+056.02
7.00
1.20
1.05
8.82
A-02
0+190.15
7.00
1.20
1.05
8.82
A-03
0+251.05
7.00
1.20
1.05
8.82
A-04
0+418.91
7.00
1.20
1.05
8.82
A-05
0+662.82
7.00
1.20
1.05
8.82
A-06
0+742.21
7.00
1.20
1.05
8.82
A-07
1+000.00
7.00
1.20
1.05
8.82
A-08
1+060.94
7.00
1.20
1.05
8.82
A-09
1+087.80
7.00
1.20
1.05
8.82
A-10
1+185.21
7.00
1.20
1.05
8.82
A-11
1+207.59
7.00
1.20
1.05
8.82
A-12
1+235.79
7.00
1.20
1.05
8.82
A-13
1+275.45
7.00
1.20
1.05
8.82
A-14
1+455.77
7.00
1.20
1.05
8.82
A-15
1+486.57
7.00
1.20
1.05
8.82
A-16
1+740.01
7.00
1.20
1.05
8.82
A-17
1+837.55
7.00
1.20
1.05
8.82
A-18
2+018.55
7.00
1.20
1.05
8.82
A-19
2+296.62
7.00
1.20
1.05
8.82
A-20
2+924.53
7.00
1.20
1.05
8.82
A-21
2+983.07
7.00
1.20
1.05
8.82
A-22
3+626.79
7.00
1.20
1.05
8.82
A-23
3+747.01
7.00
1.20
1.05
8.82
A-24
3+937.50
7.00
1.20
1.05
8.82
A-25
4+146.08
7.00
1.20
1.05
8.82
A-26
4+182.46
7.00
1.20
1.05
8.82
1.05
8.82
A-27
4+340.00
7.00
1.20
A-28
4+457.09
7.00
1.20
1.05
8.82
A-29
4+488.00
7.00
1.20
1.05
8.82
A-30
4+940.37
7.00
1.20
1.05
8.82
A-31
5+209.05
7.00
1.20
1.05
8.82
MURO DE MAPOSTERIA
28.00
00+385.00
00+390.0
5.00
0.70
0.50
1.75
00+630.00
00+645.0
15.00
0.70
0.50
5.25
00+725.00
00+735.0
10.00
0.70
0.50
3.50
METRADOS
EXPEDIENTE TECNICO
01+115.00
01+125.0
10.00
0.70
0.50
3.50
01+732.00
01+737.0
5.00
0.70
0.50
1.75
02+645.00
02+650.0
5.00
0.70
0.50
1.75
02+655.00
02+665.0
10.00
0.70
0.50
3.50
02+825.00
02+830.0
5.00
0.70
0.50
1.75
04+240.00
04+255.0
15.00
0.70
0.50
5.25
55.00
1.20
1.12
73.92
533.57
00+070.00
00+125.0
00+625.00
00+630.0
5.00
1.20
1.12
6.72
00+680.00
00+690.0
10.00
1.20
1.12
13.44
00+735.00
00+805.0
70.00
1.20
1.12
94.08
01+065.00
01+085.0
20.00
1.20
1.12
26.88
01+210.00
01+225.0
15.00
1.20
1.12
20.16
01+755.00
01+790.0
35.00
1.20
1.12
47.04
02+010.00
02+070.0
60.00
1.20
1.12
80.64
02+155.00
02+162.0
7.00
1.20
1.12
9.41
02+190.00
02+220.0
30.00
1.20
1.12
40.32
02+380.00
02+390.0
10.00
1.20
1.12
13.44
02+665.00
02+675.0
10.00
1.20
1.12
13.44
02+705.00
02+720.0
15.00
1.20
1.12
20.16
02+850.00
02+855.0
5.00
1.20
1.12
6.72
03+195.00
03+205.0
10.00
1.20
1.12
13.44
03+390.00
03+405.0
15.00
1.20
1.12
20.16
03+550.00
03+555.0
5.00
1.20
1.12
6.72
05+020.00
05+040.0
20.00
1.20
1.12
26.88
784.00
00+180.00
00+215.0
35.00
1.40
1.60
78.40
00+355.00
00+385.0
30.00
1.40
1.60
67.20
00+425.00
00+460.0
35.00
1.40
1.60
78.40
01+870.00
01+910.0
40.00
1.40
1.60
89.60
02+270.00
02+280.0
10.00
1.40
1.60
22.40
02+830.00
02+850.0
20.00
1.40
1.60
44.80
03+470.00
03+500.0
30.00
1.40
1.60
67.20
04+255.00
04+265.0
10.00
1.40
1.60
22.40
05+040.00
05+180.0
140.00
1.40
1.60
313.60
CALZADURA DE MURO
126.00
00+425.00
00+445.0
20.00
1.40
1.50
42.00
01+870.00
01+910.0
40.00
1.40
1.50
84.00
TOTAL
2,096.61
METRADOS
EXPEDIENTE TECNICO
CANTIDAD
M3
146.04
LARGO
ANCHO
ALTURA
AREA
PARCIAL
SUB TOTAL
(m)
(m)
(m)
(m2)
(m3)
(m3)
ALCANTARILLAS TMC
TMC 24
31.00
146.04
A-01
0+056.02
7.00
0.673
4.71
A-02
0+190.15
7.00
0.673
4.71
4.71
A-03
0+251.05
7.00
0.673
A-04
0+418.91
7.00
0.673
4.71
A-05
0+662.82
7.00
0.673
4.71
A-06
0+742.21
7.00
0.673
4.71
A-07
1+000.00
7.00
0.673
4.71
A-08
1+060.94
7.00
0.673
4.71
A-09
1+087.80
7.00
0.673
4.71
A-10
1+185.21
7.00
0.673
4.71
A-11
1+207.59
7.00
0.673
4.71
A-12
1+235.79
7.00
0.673
4.71
A-13
1+275.45
7.00
0.673
4.71
A-14
1+455.77
7.00
0.673
4.71
A-15
1+486.57
7.00
0.673
4.71
A-16
1+740.01
7.00
0.673
4.71
A-17
1+837.55
7.00
0.673
4.71
A-18
2+018.55
7.00
0.673
4.71
A-19
2+296.62
7.00
0.673
4.71
A-20
2+924.53
7.00
0.673
4.71
A-21
2+983.07
7.00
0.673
4.71
A-22
3+626.79
7.00
0.673
4.71
A-23
3+747.01
7.00
0.673
4.71
A-24
3+937.50
7.00
0.673
4.71
A-25
4+146.08
7.00
0.673
4.71
A-26
4+182.46
7.00
0.673
4.71
A-27
4+340.00
7.00
0.673
4.71
A-28
4+457.09
7.00
0.673
4.71
A-29
4+488.00
7.00
0.673
4.71
A-30
4+940.37
7.00
0.673
4.71
A-31
5+209.05
TOTAL
7.00
0.673
4.71
146.04
METRADOS
EXPEDIENTE TECNICO
CANTIDAD
M3
88.52
LARGO
ANCHO
ESPESOR
AREA
PARCIAL
SUB TOTAL
(m)
(m)
(m)
(m2)
(m3)
(m3)
0.20
3.6020
0.72
ALCANTARILLAS TMC
TMC 24
31.00
CABEZAL
31.00
22.33
CUERPO
66.19
A-01
0+056.02
7.00
0.305
2.14
A-02
0+190.15
7.00
0.305
2.14
A-03
0+251.05
7.00
0.305
2.14
A-04
0+418.91
7.00
0.305
2.14
A-05
0+662.82
7.00
0.305
2.14
A-06
0+742.21
7.00
0.305
2.14
A-07
1+000.00
7.00
0.305
2.14
A-08
1+060.94
7.00
0.305
2.14
A-09
1+087.80
7.00
0.305
2.14
A-10
1+185.21
7.00
0.305
2.14
A-11
1+207.59
7.00
0.305
2.14
A-12
1+235.79
7.00
0.305
2.14
A-13
1+275.45
7.00
0.305
2.14
A-14
1+455.77
7.00
0.305
2.14
A-15
1+486.57
7.00
0.305
2.14
A-16
1+740.01
7.00
0.305
2.14
A-17
1+837.55
7.00
0.305
2.14
A-18
2+018.55
7.00
0.305
2.14
A-19
2+296.62
7.00
0.305
2.14
A-20
2+924.53
7.00
0.305
2.14
A-21
2+983.07
7.00
0.305
2.14
A-22
3+626.79
7.00
0.305
2.14
A-23
3+747.01
7.00
0.305
2.14
A-24
3+937.50
7.00
0.305
2.14
A-25
4+146.08
7.00
0.305
2.14
A-26
4+182.46
7.00
0.305
2.14
A-27
4+340.00
7.00
0.305
2.14
A-28
4+457.09
7.00
0.305
2.14
A-29
4+488.00
7.00
0.305
2.14
A-30
4+940.37
7.00
0.305
2.14
A-31
5+209.05
7.00
0.305
2.14
TOTAL
88.52
METRADOS
EXPEDIENTE TECNICO
CANTIDAD
M3
LARGO
ANCHO
ALTURA
AREA
PARCIAL
SUB TOTAL
(m)
(m)
(m)
(m2)
(m3)
(m3)
52.00
00+385.00
00+390.0
5.00
1.30
0.65
3.25
00+630.00
00+645.0
15.00
1.30
0.65
9.75
00+725.00
00+735.0
10.00
1.30
0.65
6.50
01+115.00
01+125.0
10.00
1.30
0.65
6.50
01+732.00
01+737.0
5.00
1.30
0.65
3.25
02+645.00
02+650.0
5.00
1.30
0.65
3.25
02+655.00
02+665.0
10.00
1.30
0.65
6.50
02+825.00
02+830.0
5.00
1.30
0.65
3.25
04+240.00
04+255.0
15.00
1.30
0.65
9.75
TOTAL
5.05
52.00
52.00
CANTIDAD
M3
1,614.43
LARGO
ANCHO
ALTURA
AREA
PARCIAL
SUB TOTAL
(m)
(m)
(m)
(m2)
(m3)
(m3)
ALCANTARILLAS TMC
TMC 24
175.77
CABEZALES
31.00
1.590
49.29
CAJA
31.00
4.080
126.48
55.00
1.530
84.15
607.41
00+070.00
00+125.0
00+625.00
00+630.0
5.00
1.530
7.65
00+680.00
00+690.0
10.00
1.530
15.30
00+735.00
00+805.0
70.00
1.530
107.10
01+065.00
01+085.0
20.00
1.530
30.60
01+210.00
01+225.0
15.00
1.530
22.95
01+755.00
01+790.0
35.00
1.530
53.55
02+010.00
02+070.0
60.00
1.530
91.80
02+155.00
02+162.0
7.00
1.530
10.71
02+190.00
02+220.0
30.00
1.530
45.90
02+380.00
02+390.0
10.00
1.530
15.30
02+665.00
02+675.0
10.00
1.530
15.30
02+705.00
02+720.0
15.00
1.530
22.95
02+850.00
02+855.0
5.00
1.530
7.65
03+195.00
03+205.0
10.00
1.530
15.30
03+390.00
03+405.0
15.00
1.530
22.95
03+550.00
03+555.0
5.00
1.530
7.65
05+020.00
05+040.0
20.00
1.530
30.60
METRADOS
EXPEDIENTE TECNICO
705.25
00+180.00
00+215.0
35.00
2.015
70.53
00+355.00
00+385.0
30.00
2.015
60.45
00+425.00
00+460.0
35.00
2.015
70.53
01+870.00
01+910.0
40.00
2.015
80.60
02+270.00
02+280.0
10.00
2.015
20.15
02+830.00
02+850.0
20.00
2.015
40.30
03+470.00
03+500.0
30.00
2.015
60.45
04+255.00
04+265.0
10.00
2.015
20.15
05+040.00
05+180.0
140.00
2.015
282.10
CALZADURA DE MURO
126.00
00+425.00
00+445.0
20.00
1.40
1.50
42.00
01+870.00
01+910.0
40.00
1.40
1.50
84.00
TOTAL
5.06
1,614.43
CANTIDAD
LARGO
PARCIAL
(m)
(m)
232.50
SUB TOTAL
(m)
ALCANTARILLA TMC 24
232.50
A-01
0+056.02
1.00
7.50
7.50
A-02
0+190.15
1.00
7.50
7.50
A-03
0+251.05
1.00
7.50
7.50
A-04
0+418.91
1.00
7.50
7.50
A-05
0+662.82
1.00
7.50
7.50
A-06
0+742.21
1.00
7.50
7.50
A-07
1+000.00
1.00
7.50
7.50
A-08
1+060.94
1.00
7.50
7.50
A-09
1+087.80
1.00
7.50
7.50
A-10
1+185.21
1.00
7.50
7.50
A-11
1+207.59
1.00
7.50
7.50
A-12
1+235.79
1.00
7.50
7.50
A-13
1+275.45
1.00
7.50
7.50
A-14
1+455.77
1.00
7.50
7.50
A-15
1+486.57
1.00
7.50
7.50
A-16
1+740.01
1.00
7.50
7.50
A-17
1+837.55
1.00
7.50
7.50
A-18
2+018.55
1.00
7.50
7.50
A-19
2+296.62
1.00
7.50
7.50
A-20
2+924.53
1.00
7.50
7.50
A-21
2+983.07
1.00
7.50
7.50
A-22
3+626.79
1.00
7.50
7.50
A-23
3+747.01
1.00
7.50
7.50
A-24
3+937.50
1.00
7.50
7.50
A-25
4+146.08
1.00
7.50
7.50
A-26
4+182.46
1.00
7.50
7.50
A-27
4+340.00
1.00
7.50
7.50
METRADOS
EXPEDIENTE TECNICO
A-28
4+457.09
1.00
7.50
7.50
A-29
4+488.00
1.00
7.50
7.50
A-30
4+940.37
1.00
7.50
7.50
A-31
5+209.05
1.00
7.50
7.50
TOTAL
5.07
232.50
CANTIDAD
M3
ANCHO
LARGO
AREA
PARCIAL
(m)
(m)
(m2)
(m3)
992.31
SUB TOTAL
(m)
992.31
0+000.0
5+300.6
1.00
5,300.56
0.1669
884.66
0+500.0
0+550.0
1.00
50.00
0.1669
8.35
1+035.0
1+045.0
1.00
10.00
0.1669
1.67
1+180.0
1+190.0
1.00
10.00
0.1669
1.67
1+490.0
1+590.0
1.00
100.00
0.1669
16.69
2+470.0
2+540.0
1.00
70.00
0.1669
11.68
3+045.0
3+090.0
1.00
45.00
0.1669
7.51
3+350.0
3+370.0
1.00
20.00
0.1669
3.34
3+700.0
3+790.0
1.00
90.00
0.1669
15.02
3+900.0
3+930.0
1.00
30.00
0.1669
5.01
4+080.0
4+100.0
1.00
20.00
0.1669
3.34
4+390.0
4+400.0
1.00
10.00
0.1669
1.67
4+540.0
4+590.0
1.00
50.00
0.1669
8.35
4+650.0
4+700.0
1.00
50.00
0.1669
8.35
4+750.0
4+780.0
1.00
30.00
0.1669
5.01
4+840.0
4+860.0
1.00
20.00
0.1669
3.34
4+920.0
4+960.0
1.00
40.00
0.1669
6.68
TOTAL
992.31
METRADOS
EXPEDIENTE TECNICO
CANTIDAD
UND
PARCIAL
(m3)
ALCANTARILLA TMC 24
(m3)
31.00
A-01
0+056.02
1.00
1.00
A-02
0+190.15
1.00
1.00
A-03
0+251.05
1.00
1.00
A-04
0+418.91
1.00
1.00
A-05
0+662.82
1.00
1.00
A-06
0+742.21
1.00
1.00
A-07
1+000.00
1.00
1.00
A-08
1+060.94
1.00
1.00
A-09
1+087.80
1.00
1.00
A-10
1+185.21
1.00
1.00
A-11
1+207.59
1.00
1.00
A-12
1+235.79
1.00
1.00
A-13
1+275.45
1.00
1.00
A-14
1+455.77
1.00
1.00
A-15
1+486.57
1.00
1.00
A-16
1+740.01
1.00
1.00
A-17
1+837.55
1.00
1.00
A-18
2+018.55
1.00
1.00
A-19
2+296.62
1.00
1.00
A-20
2+924.53
1.00
1.00
A-21
2+983.07
1.00
1.00
A-22
3+626.79
1.00
1.00
A-23
3+747.01
1.00
1.00
A-24
3+937.50
1.00
1.00
A-25
4+146.08
1.00
1.00
A-26
4+182.46
1.00
1.00
A-27
4+340.00
1.00
1.00
A-28
4+457.09
1.00
1.00
A-29
4+488.00
1.00
1.00
A-30
4+940.37
1.00
1.00
A-31
5+209.05
1.00
1.00
TOTAL
SUB TOTAL
31.00
METRADOS
31.00
EXPEDIENTE TECNICO
EMBOQUILLADO DE PIEDRA
UBICACIN
M3
CANTIDAD
ANCHO
LARGO
ESPESOR
PARCIAL
(m)
(m)
(m)
(m3)
ALCANTARILLA TMC 24
SUB TOTAL
(m3)
29.76
A-01
0+056.02
1.00
1.20
4.00
0.20
0.96
A-02
0+190.15
1.00
1.20
4.00
0.20
0.96
A-03
0+251.05
1.00
1.20
4.00
0.20
0.96
A-04
0+418.91
1.00
1.20
4.00
0.20
0.96
A-05
0+662.82
1.00
1.20
4.00
0.20
0.96
A-06
0+742.21
1.00
1.20
4.00
0.20
0.96
A-07
1+000.00
1.00
1.20
4.00
0.20
0.96
A-08
1+060.94
1.00
1.20
4.00
0.20
0.96
A-09
1+087.80
1.00
1.20
4.00
0.20
0.96
A-10
1+185.21
1.00
1.20
4.00
0.20
0.96
A-11
1+207.59
1.00
1.20
4.00
0.20
0.96
A-12
1+235.79
1.00
1.20
4.00
0.20
0.96
A-13
1+275.45
1.00
1.20
4.00
0.20
0.96
A-14
1+455.77
1.00
1.20
4.00
0.20
0.96
A-15
1+486.57
1.00
1.20
4.00
0.20
0.96
A-16
1+740.01
1.00
1.20
4.00
0.20
0.96
A-17
1+837.55
1.00
1.20
4.00
0.20
0.96
A-18
2+018.55
1.00
1.20
4.00
0.20
0.96
A-19
2+296.62
1.00
1.20
4.00
0.20
0.96
A-20
2+924.53
1.00
1.20
4.00
0.20
0.96
A-21
2+983.07
1.00
1.20
4.00
0.20
0.96
A-22
3+626.79
1.00
1.20
4.00
0.20
0.96
A-23
3+747.01
1.00
1.20
4.00
0.20
0.96
A-24
3+937.50
1.00
1.20
4.00
0.20
0.96
A-25
4+146.08
1.00
1.20
4.00
0.20
0.96
A-26
4+182.46
1.00
1.20
4.00
0.20
0.96
A-27
4+340.00
1.00
1.20
4.00
0.20
0.96
A-28
4+457.09
1.00
1.20
4.00
0.20
0.96
A-29
4+488.00
1.00
1.20
4.00
0.20
0.96
A-30
4+940.37
1.00
1.20
4.00
0.20
0.96
A-31
5+209.05
1.00
1.20
4.00
0.20
0.96
TOTAL
29.76
29.76
METRADOS
EXPEDIENTE TECNICO
06.00 TRANSPORTE
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
6.01
TRANSPORTE DE MATERIALES GRANULARES ENTRE CIENTO VEINTE METROS (120 M.) Y MIL METROS (1000 M.)M3K
6.02
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES A MIL METROS (1000 M.)
M3K
4,932.38
153,678.27
CANTERAS
UBIC.
ACCESO
km
AFIRMADO
GARACHUPAMPA
CANTERA I
0+000.0
1+600.0
15.00
0.00
100,000.00
20,000.00
100,000.00
12,000.00
0.00
8,000.00
CONCRETO
GARACHUPAMPA
0+000.0
15.00
100,000.00
100,000.00
0.00
NOMBRE
CAPACIDAD CAPACIDAD
BRUTA
NETA
OVER
7,943.77
M3
RATIO
1498.67
M3/KM
88.52
M3
MAMPOSTERIA DE PIEDRA
52.00
M3
1,614.43
M3
992.31
M3
29.76
M3
2.70
M3
23.22
M3
0.75
M3
TOTAL
2,803.69
M3
RATIO
528.95
M3/KM
1,875.06
M3
FIN
TRANSPORTE DE AFIRMADO
CENTRO DE
GRAVEDAD
LONGITUD
DEL TRAMO
1.00
1498.67
VOLUMEN
DISTANCIA DE
TRANSPORTE
MOMENTO DE
TRANSPORTE
749.34
15+.50
11,614.73
12,364.07
1498.67
749.34
16+.50
2+000.0
3+000.0
2+500.0
1.00
1498.67
749.34
17+.50
13,113.40
3+000.0
4+000.0
3+500.0
1.00
1498.67
749.34
18+.50
13,862.74
4+000.0
5+000.0
4+500.0
1.00
1498.67
749.34
19+.50
14,612.08
5+000.0
5+300.5
5+150.3
0.30
1498.67
1,185.69
20+.15
23,892.01
CANTERA I (50%)
0+000.0
1+000.0
0+500.0
1.00
1498.67
749.34
01+.10
824.27
1+500.0
1.00
1498.67
749.34
00+.10
74.93
1+000.0
2+000.0
1.00
RATIO
METRADOS
EXPEDIENTE TECNICO
06.00 TRANSPORTE
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
2+000.0
3+000.0
2+500.0
1.00
1498.67
749.34
00+.90
674.40
3+000.0
4+000.0
3+500.0
1.00
1498.67
749.34
01+.90
1,423.74
4+000.0
5+000.0
4+500.0
1.00
1498.67
749.34
02+.90
2,173.08
5+000.0
5+300.5
5+150.3
0.30
1498.67
225.20
03+.55
TOTAL
8,904.26
799.51
95,428.97
METRADOS
EXPEDIENTE TECNICO
06.00 TRANSPORTE
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
0+500.0
1.00
528.95
264.47
15+.50
4,099.33
1+000.0
2+000.0
1+500.0
1.00
528.95
264.47
16+.50
4,363.80
2+000.0
3+000.0
2+500.0
1.00
528.95
264.47
17+.50
4,628.27
3+000.0
4+000.0
3+500.0
1.00
528.95
264.47
18+.50
4,892.75
4+000.0
5+000.0
4+500.0
1.00
528.95
264.47
19+.50
5,157.22
5+000.0
5+300.5
5+150.3
0.30
528.95
79.48
20+.15
1,601.58
TOTAL
1,401.85
24,742.95
1,875.06
TOTAL
20+.50
1,875.06
38,438.73
38,438.73
CANTERA I
D menor 1 km = 4,932.38
D mayor 1 km = 153,678.27
DISTANCIA MEDIA DE TRANSPORTE = 12.62
6.03
TRANSPORTE DE MEZCLA ASFALTICA ENTRE CIENTO VEINTE METROS (120 M.) Y MIL METROS (1000 M.)
M3K
937.53
6.04
TRANSPORTE DE MEZCLA ASFALTICA PARA DISTANCIAS MAYORES A MIL METROS (1000 M.)
M3K
1,734.68
PLANTA DE ASFALTO
NOMBRE
PLANTA
GARACHUPAMPA
UBIC.
ACCESO
km
5+300.5
0.20
CONCRETO ASFALTICO
ASFALTO
RATIO
PROGRESIVAS
INICIO
FIN
1,875.06
M3
353.75
M3/KM
TRANSPORTE DE AFIRMADO
CENTRO DE
GRAVEDAD
LONGITUD
DEL TRAMO
RATIO
VOLUMEN
DISTANCIA DE
TRANSPORTE
1.00
353.75
176.87
05+.00
884.47
1.00
353.75
176.87
04+.00
707.59
2+500.0
1.00
353.75
176.87
03+.00
530.72
353.84
176.97
2+000.0
3+000.0
3+000.0
4+000.0
3+500.0
1.00
353.75
176.87
02+.00
4+000.0
5+000.0
4+500.0
1.00
353.75
176.87
01+.00
5+000.0
5+300.5
5+150.3
0.30
353.75
53.16
00+.35
TOTAL
MOMENTO DE
TRANSPORTE
937.53
18.62
2,672.21
D menor 1 km = 937.53
D mayor 1 km = 1,734.68
DISTANCIA MEDIA DE TRANSPORTE = 1.85
METRADOS
EXPEDIENTE TECNICO
06.00 TRANSPORTE
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
METRADOS
EXPEDIENTE TECNICO
06.00 TRANSPORTE
PROYECTO : ASFALTADO DE LA CARRETERA HUAYOCHACA - CAJAY
TRAMO : HUAYOCHACA - CAJAY
UBICACIN : DPTO. ANCASH, PROV. HUARI, DIST. CAJAY
6.05
TRANSPORTE DE ESCOMBROS
M3K
BOTADERO
ACCESO
UBIC.
km
0+000.0
10+000.0
795,779.07
CAPACIDAD
M3
4,424.02
4,424.02
M3
146.04
M3
2,242.65
M3
44.92
PROGRESIVA
C.G.
EXCEDENTE EXCAVACION
DE CORTE
PARA OA
(M3)
(M3)
INICIO
FIN
0+000.0
1+000.0
500.00
6,145.63
44.92
1+000.0
2+000.0
1500.00
4,563.93
44.92
2+000.0
3+000.0
2500.00
8,216.62
44.92
3+000.0
4+000.0
3500.00
13,826.46
4+000.0
5+000.0
4500.00
18,032.92
5+000.0
5+300.5
5150.27
7,252.88
TOTAL
2,096.61
58,038.44
BOTADERO
ACCESO
UBIC.
km
M3/KM
MOMENTO
DE
TRANSPORT
E
10.50
65,000.8
DM
KM
11.50
53,001.8
12.50
103,269.2
44.92
13.50
187,263.5
44.92
14.50
262,128.6
1005.41
1,229.99
15.15
0+000.0
10.00
125,115.2
795,779.07
METRADOS
EXPEDIENTE TECNICO
P-1A
UND
DESCRIPCION
UBICACIN
SEAL CURVA PRONUNCIADA A LA DERECHA
CANT
LARGO
ANCHO
40.00
PARCIAL
3.00
3.00
P-1B
3.00
3.00
P-2A
3.00
3.00
P-2B
3.00
3.00
P-3A
8.00
8.00
P-3B
14.00
8.00
P-4A
6.00
6.00
TOTAL
7.02
40.00
SEALES REGLAMENTARIAS
R-30
DESCRIPCION
VELOCIDAD MAXIMA
UND
UBICACIN
0+000.00
5+300.53
CANT
LARGO
ANCHO
PARCIAL
1.0
1.0
1.00
1.00
2.00
TOTAL
7.03
SEAL INFORMATIVA
I-18
I-5
DESCRIPCION
LOCALIZACION
HUAYOCHACA
CAJAY
SEAL DE DESTINO
CAJAY - HUARI
M2
UBICACIN
CANT
LARGO
ANCHO
DESCRIPCION
SEAL DESTINO
PARCIAL
1.0
1.0
1.7
1.7
0.7
0.7
1.19
1.19
5+300.53
1.0
1.45
0.73
1.06
3.44
I-5
3.44
0+000.00
4+900.00
TOTAL
7.04
2.00
UND
CANT
1.0
LARGO
ANCHO
PARCIAL
1.00
METRADOS
3.00
EXPEDIENTE TECNICO
LOCALIZACION
TOTAL
2.0
METRADOS
EXPEDIENTE TECNICO
M2
CANTIDAD
ANCHO
LARGO
(m)
(m)
PORCENTAJE
PARCIAL
(m2)
5+300.5
1,305.10
SUB TOTAL
(m2)
1,305.10
2.00
0.10
5,300.53
1.00
1,060.11
1.00
0.10
5,300.50
0.38
198.77
PI-10
1.00
0.10
48.48
1.00
4.85
PI-17
1.00
0.10
57.32
1.00
5.73
PI-24
1.00
0.10
16.29
1.00
1.63
PI-25
1.00
0.10
16.35
1.00
1.63
PI-38
1.00
0.10
22.84
1.00
2.28
PI-39
1.00
0.10
21.43
1.00
2.14
PI-47
1.00
0.10
26.92
1.00
2.69
PI-48
1.00
0.10
24.04
1.00
2.40
PI-51
1.00
0.10
25.73
1.00
2.57
PI-52
1.00
0.10
25.75
1.00
2.57
PI-60
1.00
0.10
22.31
1.00
2.23
PI-61
1.00
0.10
22.31
1.00
2.23
PI-72
1.00
0.10
20.07
1.00
2.01
PI-73
1.00
0.10
20.06
1.00
2.01
PI-75
1.00
0.10
25.51
1.00
2.55
PI-76
1.00
0.10
25.50
1.00
2.55
PI-77
1.00
0.10
20.65
1.00
2.07
PI-78
1.00
0.10
20.67
1.00
2.07
5+300.5
TOTAL
7.06
1,305.10
M
UBICACIN
CANT
LARGO
ANCHO
464.34
PARCIAL
464.34
42.82
PI-25
PI-38
58.00
PI-39
PI-47
66.29
PI-48
PI-51
66.96
PI-52
PI-60
57.97
PI-61
PI-72
52.20
PI-73
PI-75
66.34
PI-76
METRADOS
EXPEDIENTE TECNICO
PI-77
PI-78
TOTAL
464.34
METRADOS