Você está na página 1de 82

Application: Operations Process Flow Analysis

You can customize this template by filling in a simple form, without editing a spreadsheet.
A customizable template is a flexible model that you can adapt to your situation by filling in a simple form, without editing
a spreadsheet or its formulas. For example, you can specify time range and time grain; number and names of items in a
dimension (such as your products and product families); and include or exclude major features. The resulting spreadsheet
matches your needs better than any standard template.
Get a customized version of this template on our website.

ModelSheet provides you with customized templates in three ways.


1. Order a customized version of this template.
Click "+" for more information.
Explore our customized templates at http://www.modelsheetsoft.com/store.aspx
2. If you want more customizations, retain ModelSheet Software to build them for you.
Click "+" for more information.
Learn more about consulting services at http://www.modelsheetsoft.com/consult.aspx
3. Use the ModelSheet Authoring Environment to build and customize your spreadsheet models.
The ModelSheet Authoring Environment is a SaaS application for developing and maintaining business models and
delivering them in conventional spreadsheets.
Click "+" to learn more about ModelSheet technology that makes customized template possible.
We have more to tell you about ModelSheet and we'd like to hear about your needs for templates and models.
Please visit our website at www.modelsheetsoft.com
or contact us at info@modelsheetsoft.com.

Description of the Operations Process Flow Application


Below is a sample of the kind of dynamic (manufacturing or business) process flow that this model can simulate.
Process Flow

Process 1

Process 2

Process 3

Finshed
Goods A

Sales
Goods A
Market
Demand

Rework 2

Process 4

Finshed
Goods B

Sales
Goods B

The process flow is described by a transition rates between processes that can vary with time.
The model tracks yield units and percent and scrap units and percent for each process stage.
Each process has capacity limits determined by the number of pieces of processing equipment.
Transition rates can vary with time. This particular model has transition rates that are constant over time.
You can input outsourced units into any stage in the flow.
(The model inserts outsourced units only in Process 1 and in finished goods inventory at the first time step.)
Tracks processing costs by process stage by type of cost input by time period.
Reports costs per unit in/processing/out and aggregate costs in/processing/out for each stage.
Allocate cost less salvage value of scrapped units to good output units at each processing stage.
ModelSheet is a trademark of ModelSheet Software, LLC

page 1 of 82

Application: Operations Process Flow Analysis


Separate worksheets show costs with and without breakout of material/labor/captial expense/overhead.
Tracks accumulated cost of a good unit entering and exiting each stage by type of cost by time period.
Tracks units scrapped and cost of scrap at each process state by time period.
Reports costs and accumulated costs per unit, by cost type and by time period.
Cost of a good unit entering a process stage
Cost of a processing a unit at a process stage
Cost of a good unit exiting a process stage
Cost of scarpped units at each process stage
Allocates cost less salvage value of scrapped units to good output units at each processing stage.
Separate worksheets show costs with and without breakout of material/labor/captial expense/overhead.
Sales
Sales of Products A and B are driven by market demand and limited by available finished units.
You can sell the output of any process stage. (In this particular model, only output of two stages are sold.)
Financial results: Model include prices, revenue COGS, and gross margin for units sold.
Scenarios
Handles multiple scenarios to compare alternative processes.
This model has two scenarios in which Scenario 2 raises yields and increases input costs in Process 3.
The model includes Excel charts that provide graphical views of key variables. These charts are part
of the model, and they are included by default in exported Excel workbooks. You can add more charts,
import them, and the new charts will be included in exported Excel workbooks.
As you explore the model, we suggest that you
Read some of the Excel comments that are attached to Analysis Variables throughout the workbook.
These comments also appear in ModelSheet in convenient places.
View worksheet "Formulas" which shows the named variables and symbolic formulas of the model
in a compact and readable form. The symbolic formulas are not active in this Excel workbook, but they
give you some idea how the model works, and how it looks in ModelSheet.
Suggestions for using this model
1. Use this workbook as-is to model business or manufacturing process flows. You can change the data in the
dark blue input cells. You can change the display names of dimension items and variables in dark blue cells
on the worksheet "Labels."
2. Customize this Excel workbook to make the model fit your process flow. For example:
Add or remove process stages, and change which stages yield finished goods.
Change the transition matrix or make it depend on time or any process parameters.
3. Use ModelSheet to edit the formulas in this model, using named variables, symbolic formulas (and far fewer
formulas), segmentation dimensions and time series, without ever touching a cell address -- and end up with
a conventional Excel workbook.
To obtain a trial account for ModelSheet, go the the ModelSheet website below and request a trial account.

Technical notes
ModelSheet is a trademark of ModelSheet Software, LLC

page 2 of 82

Application: Operations Process Flow Analysis


These facts should help you understand how production units flow through the model.
At each process stage, units available for processing (UNITS AVAILABLE IN) are either sent for processing
(UNITS IN) or, if processing capacity is exceeded, sent to buffer inventory storage (UNITS BUFFER STOCK).
The Processing capacity (UNITS CAPACITY) of each stage is determined by the number of PROCESSING
STATIONS times the CAPACITY/STATION.
The units that enter each processing stage either emerge as good output units (UNITS OUT), or as scrap
(SCRAP UNITS). YIELD % of the units come out good and SCRAP % units come out as scrap.
At the end of each time period, good units are either sold (UNITS SOLD), or routed by the stage transition
matrix (TRANSITION %) to other processing stages for use in the next time period (UNITS AVAILABLE IN).
The number of units sold is the minimum of the units available for sale at the end of each time period
(UNITS OUT), and the amount of market demand (UNITS DEMAND).
The operation can purchase work-in-process units for any processing stage at the start of any time period
(PURCHASED UNITS IN). In this model, the operation purchases material inputs for stage one in each time
period, and it purchases finished goods in the first time period to fill the distribution channel.
The model has two scenarios (SCENARIO) that have different scrap rates and different processing costs
in process stage 3.
These facts should help you understand how the costs flow through the model.
The value of work in process inventory that enters each stage (WIP IN) plus the PROCESS COST equals the
value of good units out (WIP OUT) plus the value of scrap (SCRAP COST).
Worksheet UNIT COSTS shows cost allocated per production unit for each unit stock or unit flow
in the model.
The costs are presented in two levels of detail.
Worksheet COST FLOW shows the flow of costs with costs of all types aggregated together.
Worksheet COST FLOW DETAIL shows the flow of costs with material, labor, overhead, and allocations
of fixed expense broken out for each cost variable.
This Excel workbook was generated by ModelSheet on July 2, 2009, except for this worksheet of comments.
Copyright 2009 ModelSheet Software, LLC
ModelSheet and the ModelSheet logo are registered trademarks of ModelSheet Software, LLC.

ModelSheet is a trademark of ModelSheet Software, LLC

page 3 of 82

Process Analysis
Abc
Scenario 1
Input Data
Company Name

Abc

Project Name

Process Analysis

Scenario (1, 2 or 3)

Transition Rates
Units and Capacity
Processing Costs
Sales Input Data

Process Analysis
Abc
Scenario 1
Input Data

Process Analysis
Abc
Scenario 1
Transitions
Transition Matrix
Stage 1

Stage 2

Stage 3

Total

Transition %
Stage 1

0.0%

0.0%

0.0%

0.0%

Stage 2

0.0%

0.0%

0.0%

0.0%

Stage 3

0.0%

0.0%

0.0%

0.0%

Total

0.0%

0.0%

0.0%

0.0%

Process Yields
Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Jul 2009

Yield %
Stage 1

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

Stage 2

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

Stage 3

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

Total

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

Stage 1

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Stage 2

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Stage 3

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Total

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Scrap %

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

100.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Process Analysis
Abc
Scenario 1
Units
Good Units Out
Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Units Out
Stage 1

Stage 2

Stage 3

Total

Good Units In
Other Units Processed
Sales and Demand

Analysis

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

Process Analysis
Abc
Scenario 1
Utilization
Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Capacity Utilization %
Stage 1

0%

0%

0%

0%

0%

0%

0%

0%

Stage 2

0%

0%

0%

0%

0%

0%

0%

0%

Stage 3

0%

0%

0%

0%

0%

0%

0%

0%

Total

0%

0%

0%

0%

0%

0%

0%

0%

Stage 1

31,000

28,000

31,000

90,000

30,000

31,000

30,000

91,000

Stage 2

31,000

28,000

31,000

90,000

30,000

31,000

30,000

91,000

Stage 3

31,000

28,000

31,000

90,000

30,000

31,000

30,000

91,000

Total

93,000

84,000

93,000

270,000

90,000

93,000

90,000

273,000

Stage 1

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

Stage 2

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

Stage 3

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

Total

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

Stage 1

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Stage 2

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Stage 3

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Total

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

Units Capacity

Capacity/Station/Day

Processing Stations

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

31,000

31,000

30,000

92,000

31,000

30,000

31,000

92,000

31,000

31,000

30,000

92,000

31,000

30,000

31,000

92,000

31,000

31,000

30,000

92,000

31,000

30,000

31,000

92,000

93,000

93,000

90,000

276,000

93,000

90,000

93,000

276,000

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

1,000

1,000

1,000

3,000

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

Process Analysis
Abc
Scenario 1
Unit Cost
Processing Cost/Unit
Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Stage 1

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 2

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 3

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Process Cost/Unit

Cost/Input Unit
Cost/Output Unit
Scrap

Analysis

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Process Analysis
Abc
Scenario 1
Cost Flow
Processing Costs
Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process Cost

Cost of Input Units


Cost of Output Units
Scrap

Analysis

1
w

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Process Analysis
Abc
Scenario 1
Unit Cost Detail
Processing Cost/Unit
Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total
Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 1

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 2

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 3

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Process Cost/Unit
Stage 1

Stage 2

Stage 3

Cost/Input Unit
Cost/Unit Purch'd In

WIP/Unit In
Stage 1

Stage 2

Stage 3

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total
Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total
Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Cost/Output Unit
WIP/Unit Out
Stage 1

Stage 2

Stage 3

COGS/Unit
Stage 1

Stage 2

Stage 3

Total
Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Scrap Cost/Unit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Scrap Salvage $/Unit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Cost/Unit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Scrap Salvage $/Unit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Cost/Unit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Scrap Salvage $/Unit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Cost/Unit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Scrap Salvage $/Unit

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

Scrap
Stage 1

Scrap Net Cost/Unit


Stage 2

Scrap Net Cost/Unit


Stage 3

Scrap Net Cost/Unit


Total

Scrap Net Cost/Unit

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

Process Analysis
Abc
Scenario 1
Cost Flow Detail
Processing Costs
Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Material

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Process Cost
Stage 1

Stage 2

Stage 3

Fixed Expense

Cost of Input Units


Cost Purch'd Units In

WIP Available In
Stage 1

Stage 2

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Material

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Material

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

WIP In
Stage 1

Stage 2

Stage 3

Cost of Output Units


WIP Out
Stage 1

Stage 2

Stage 3
Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Material

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Material

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Cost

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Salvage Value

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Net Cost

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Cost

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Salvage Value

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Net Cost

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Cost

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Salvage Value

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Net Cost

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Cost

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Salvage Value

$0

$0

$0

$0

$0

$0

$0

$0

Scrap Net Cost

$0

$0

$0

$0

$0

$0

$0

$0

Cost of Goods
Stage 1

Stage 2

Stage 3

Scrap
Stage 1

Stage 2

Stage 3

Total

Scrap Cost
Stage 1
Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Material

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

Stage 3

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Process Analysis
Abc
Scenario 1
Financials
Revenue Model
Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Revenue

Units Sold
Stage 1

Stage 2

Stage 3

Total

Selling Price
Stage 1

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 2

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 3

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

0%

0%

0%

0%

0%

0%

0%

0%

Stage 2

0%

0%

0%

0%

0%

0%

0%

0%

Stage 3

0%

0%

0%

0%

0%

0%

0%

0%

Total

0%

0%

0%

0%

0%

0%

0%

0%

Costs
Cost of Goods

Contribution Margins
Gross Margin

Gross Margin %

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

Process Analysis
Abc
Scenario 1
Formulas
Variable

Display As

Capacity_Util_pct

Capacity Utilization %

Dimension Index
Process

COGS

Cost of Goods

Process, Cost_Types

Data:

COGS_per_U

COGS/Unit

Process, Cost_Types

Roll-up:

Company_Name

Company Name

Cost_per_U_Purchd_In

Cost/Unit Purch'd In

Process

Roll-up:

Data:
Roll-up:

Process

Data:

Fixed Expense/Station

Process

Data:

Fixed_Expense

Fixed Expense

Process

Data:

Gross_Margin

Gross Margin

Process

Data:

Gross_Margin_pct

Gross Margin %

Process

Roll-up:

Ident

Ident

ProcessY, Process

Data:

Labor_Overhead_pct

Labor Overhead %

Global

Data:

Proc_Cost_per_U

Process Cost/Unit

Process, Cost_Types

Proc_Cost_per_U_Sc1

Process Cost/U Scenario 1

Process, Cost_Types.OH

Cost_Purchd_U_In

Cost Purch'd Units In

FG_Inven_Targ_Periods

FG Inventory Target Periods

Fixed_Exp_per_Station

Process, Cost_Types

Roll-up:
@Jan 2009:
Data:
Roll-up:

Proc_Cost_per_U_Sc2

Process Cost/U Scenario 2

Process, Cost_Types.OH
Process, Cost_Types

@Jan 2009:
Data:
Roll-up:

Proc_Cost_per_U_Sc3

Process Cost/U Scenario 3

Process, Cost_Types.OH
Process, Cost_Types

@Jan 2009:
Data:
Roll-up:

Process_Cost

Process Cost

Process, Cost_Types

Data:

Process_Yield_pct

Yield %

ProcessX

Data:

Process_Yield_pct_Sc1

Yield % Scenario 1

ProcessX

Data:

Process_Yield_pct_Sc2

Yield % Scenario 2

ProcessX

Data:

Process_Yield_pct_Sc3

Yield % Scenario 3

ProcessX

Data:

Project_Name

Project Name

Revenue

Revenue

Scenario

Scenario (1, 2 or 3)

Scrap_Cost

Process

Data:

Scrap Cost

Process, Cost_Types

Data:

Scrap_Cost_per_U

Scrap Cost/Unit

Process, Cost_Types

Roll-up:

Scrap_Net_Cost

Scrap Net Cost

Process

Data:

Scrap_Net_Cost_per_U

Scrap Net Cost/Unit

Process

Data:

Scrap_pct

Scrap %

ProcessX

Scrap_Salvage_Value

Scrap Salvage Value

Process

Scrap_Salvage_Value_per_U

Scrap Salvage $/Unit

Process

Roll-up:
Data:
Data:
Roll-up:

Selling_Price

Selling Price

Process

@Jan 2009:
Data:
Roll-up:

Station_Capacity_Day

Capacity/Station/Day

Process

Data:

Stations

Processing Stations

Process

Data:

Transition_pct

Transition %

Process, ProcessX

Data:

Transition_pct_Sc1

Transition % Scenario 1

Transition_pct_Sc2

Transition % Scenario 2

Transition_pct_Sc3

Transition % Scenario 3

Units_Avail_In

Units Available In

Process

Data:

Units_Buffer_Stock

Units Buffer Stock

Process

Data:

Units_Capacity

Units Capacity

Process

Data:

Units_Demand

Units Demand

Units_In

Units In

Process

Data:

Units_Out

Units Out

Process

Data:

Units_Purchd_In_Day

Purch'd Units In / Day

Process

Data:

Units_Scrap

Units Scrap

Process

Data:

Units_Sold

Units Sold

Process

Data:

WIP_Avail_In

WIP Available In

Process, Cost_Types

Data:

WIP_Buffer_Stock

WIP_Buffer Stock

Process

Data:

WIP_In

WIP In

Process, Cost_Types

Data:

WIP_Out

WIP Out

Process, Cost_Types

Data:

WIP_per_U_In

WIP/Unit In

Process, Cost_Types

Roll-up:

WIP_per_U_Out

WIP/Unit Out

Process, Cost_Types

Roll-up:

Formula / Data
if(Units_Capacity=0, 0, Units_In/Units_Capacity)
WIP_Out*if(Units_Out=0, 0, Units_Sold/Units_Out)
if(Units_Sold=0, 0, COGS/Units_Sold)

preve(0)
if(Units_Purchd_In_Day=0, 0, Cost_Purchd_U_In/Units_Purchd_In_Day)
Cost_per_U_Purchd_In*Units_Purchd_In_Day/periods_per("day")

preve(0)
Fixed_Exp_per_Station*Stations
Revenue-COGS
if(Revenue=0, 0, Gross_Margin/Revenue)
if(dimitemnum("Process")=dimitemnum("ProcessY"), 1, 0)
preve(0)
if(Scenario=1, Proc_Cost_per_U_Sc1, if(Scenario=2, Proc_Cost_per_U_Sc2, if(Scenario=3, Proc_Cost_per_U_Sc3, "error")))
Labor_Overhead_pct*Proc_Cost_per_U_Sc1["Cost_Types.Labor"]
if(diminfo("Cost_Types", 4)="Fixed_Exp", if(Units_In=0, 0, Fixed_Expense/Units_In), preve(0))
ifm(isleafd("Process"), sum(rangedru("Cost_Types")), if(Units_In=0, 0, Process_Cost/Units_In))
Labor_Overhead_pct*Proc_Cost_per_U_Sc2["Cost_Types.Labor"]
if(diminfo("Cost_Types", 4)="Fixed_Exp", if(Units_In=0, 0, Fixed_Expense/Units_In), preve(0))
ifm(isleafd("Process"), sum(rangedru("Cost_Types")), if(Units_In=0, 0, Process_Cost/Units_In))
Labor_Overhead_pct*Proc_Cost_per_U_Sc3["Cost_Types.Labor"]
if(diminfo("Cost_Types", 4)="Fixed_Exp", if(Units_In=0, 0, Fixed_Expense/Units_In), preve(0))
ifm(isleafd("Process"), sum(rangedru("Cost_Types")), if(Units_In=0, 0, Process_Cost/Units_In))
if(diminfo("Cost_Types", 4)="Fixed_Exp", var(Fixed_Expense), Proc_Cost_per_U*Units_In)
if(Scenario=1, Process_Yield_pct_Sc1, if(Scenario=2, Process_Yield_pct_Sc2, if(Scenario=3, Process_Yield_pct_Sc3, "error")))
preve(1)
preve(1)
preve(1)

Selling_Price*Units_Sold

(WIP_In+Process_Cost)*Scrap_pct
if(Units_Scrap=0, 0, Scrap_Cost/Units_Scrap)
Scrap_Cost-Scrap_Salvage_Value
Scrap_Cost_per_U-Scrap_Salvage_Value_per_U
1-Process_Yield_pct
Scrap_Salvage_Value_per_U*Units_Scrap
preve(0)
if(Units_Scrap=0, 0, Scrap_Salvage_Value/Units_Scrap)
2*last(WIP_per_U_Out)
preve(1)
if(Units_Sold=0, 0, Revenue/Units_Sold)
preve(1000)
preve(1)
if(Scenario=1, Transition_pct_Sc1, if(Scenario=2, Transition_pct_Sc2, if(Scenario=3, Transition_pct_Sc3, "error")))

preve(0, matmult(Units_Out-Units_Sold, Transition_pct, "Process", "ProcessX"))+preve(0, Units_Buffer_Stock)+Units_Purchd_In_Day


Units_Avail_In-Units_In+preve(0, Units_Buffer_Stock)
Station_Capacity_Day/periods_per("day")*Stations

min(Units_Capacity, Units_Avail_In)
matmult(Ident, Process_Yield_pct, "ProcessY", "ProcessX")*Units_In
preve(0)
Units_In*matmult(Ident, Scrap_pct, "ProcessY", "ProcessX")
max(0, min(Units_Out, Units_Demand))

preve(0, Matmult(Transition_pct, WIP_Out-COGS, "ProcessX", "Process"))+if(diminfo("Cost_Types", 0)="Material", var(Cost_per_U_Purchd_In*Units_Purchd_In_Day), 0)

if(Units_Avail_In=0, 0, (Units_Avail_In-Units_In)/Units_Avail_In)*WIP_Avail_In+preve(0)
WIP_Avail_In*if(Units_Avail_In=0, 0, Units_In/Units_Avail_In)
WIP_In+Process_Cost-if(WIP_Avail_In["Cost_Types"]+Process_Cost["Cost_Types"]=0, 0, (WIP_Avail_In+Process_Cost)/(WIP_Avail_In["Cost_Types"]+Process_Cost["Cost_Types"])*Scrap_Salvage_Value_per_U)*Units_Scrap

if(Units_In=0, 0, WIP_In/Units_In)
If(Units_Out=0, 0, WIP_Out/Units_Out)

Process Analysis
Abc
Scenario 1
Default Shadow
Scrap_Cost_1
Lvl 1

Jan 2009

Feb 2009

Mar 2009

Stage 1

$0

$0

$0

Stage 2

$0

$0

$0

Stage 3

$0

$0

Total

$0

Stage 1
Stage 2

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1
Material

Labor

Fixed Exp

OH

Stage 2
Material

Labor

Fixed Exp

OH

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3
Material

Labor

Fixed Exp

OH

Total
Material

Labor

Fixed Exp

OH

Scrap_Cost_2

Lvl 1

Jan 2009

Feb 2009

Mar 2009

Stage 1

$0

$0

$0

Stage 2

$0

$0

$0

Stage 3

$0

$0

Total

$0

Stage 1
Stage 2

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1
Material

Labor

Fixed Exp

OH

Stage 2
Material

Labor

Fixed Exp

OH

Stage 3
Material
Stage 1

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total
Stage 1

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Stage 2

$0

$0

$0

$0

$0

$0

$0

$0

Stage 3

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Jan 2009

Feb 2009

Mar 2009

Apr 2009

May 2009

Jun 2009

Labor

Fixed Exp

OH

Total
Material

Labor

Fixed Exp

OH

Units_In_1
1/1/2009

2/1/2009

3/1/2009

Q1 2009
1/1/2009

4/1/2009

5/1/2009

6/1/2009

Q2 2009
4/1/2009

Units_In_2
Jan 2009
Jan 2009
Units_Avail_In_1

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Units_Avail_In_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Units_Out_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Units_Out_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Process_Yield_pct_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Process_Yield_pct_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Units_Sold_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Units_Sold_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Units_Demand_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Units_Demand_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Units_Buffer_Stock_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Units_Buffer_Stock_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Process_Cost_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Process_Cost_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Proc_Cost_per_U_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Proc_Cost_per_U_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Units_Scrap_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Units_Scrap_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Revenue_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Revenue_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

COGS_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

COGS_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

COGS_per_U_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

COGS_per_U_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Scrap_Cost_per_U_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Scrap_Cost_per_U_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Scrap_Cost_3
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Scrap_Cost_4
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Gross_Margin_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Gross_Margin_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Gross_Margin_pct_1
Jan 2009
1/1/2009

Feb 2009
2/1/2009

Mar 2009
3/1/2009

Q1 2009
1/1/2009

Apr 2009
4/1/2009

May 2009
5/1/2009

Jun 2009
6/1/2009

Q2 2009
4/1/2009

Gross_Margin_pct_2
Jan 2009
Jan 2009

Feb 2009
Feb 2009

Mar 2009
Mar 2009

Q1 2009
Jan 2009

Apr 2009
Apr 2009

May 2009
May 2009

Jun 2009
Jun 2009

Q2 2009
Apr 2009

Jul 2009

Aug 2009

Sep 2009

Q3 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0
$0

Oct 2009

Nov 2009

Dec 2009

Q4 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Jul 2009

Aug 2009

Sep 2009

Q3 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0
$0

Oct 2009

Nov 2009

Dec 2009

Q4 2009

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

7/1/2009
Jul 2009
Jul 2009

8/1/2009
Aug 2009
Aug 2009

9/1/2009
Sep 2009
Sep 2009

7/1/2009
Q3 2009
Jul 2009

10/1/2009
Oct 2009
Oct 2009

11/1/2009
Nov 2009
Nov 2009

12/1/2009
Dec 2009
Dec 2009

Q4 2009
10/1/2009
Q4 2009
Oct 2009

Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009

Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009

Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009

Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009

Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009

Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009

Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009

Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009

Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009
Jul 2009
7/1/2009
Jul 2009
Jul 2009

Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009
Aug 2009
8/1/2009
Aug 2009
Aug 2009

Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009
Sep 2009
9/1/2009
Sep 2009
Sep 2009

Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009
Q3 2009
7/1/2009
Q3 2009
Jul 2009

Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009
Oct 2009
10/1/2009
Oct 2009
Oct 2009

Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009
Nov 2009
11/1/2009
Nov 2009
Nov 2009

Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009
Dec 2009
12/1/2009
Dec 2009
Dec 2009

Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009
Q4 2009
10/1/2009
Q4 2009
Oct 2009

Process Analysis
Abc
Scenario 1
Default Variables
Ident
Lvl 1

Stage 1

Stage 2

Stage 3

Stage 1

Stage 2

Stage 3

Scrap Cost/Unit
Lvl 1

Jan 2009

Feb 2009

Mar 2009

Q1 2009

Apr 2009

May 2009

Jun 2009

Q2 2009

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Stage 1

Stage 2

Stage 3

Total

Jul 2009

Aug 2009

Sep 2009

Q3 2009

Oct 2009

Nov 2009

Dec 2009

Q4 2009

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Process Analysis
Abc
Scenario 1
Labels
Variable

Display Label

Capacity_Util_pct

Capacity Utilization %

COGS

Cost of Goods

COGS_per_U

COGS/Unit

Company_Name

Company Name

Cost_per_U_Purchd_In

Cost/Unit Purch'd In

Cost_Purchd_U_In

Cost Purch'd Units In

FG_Inven_Targ_Periods

FG Inventory Target Periods

Fixed_Exp_per_Station

Fixed Expense/Station

Fixed_Expense

Fixed Expense

Gross_Margin

Gross Margin

Gross_Margin_pct

Gross Margin %

Ident

Ident

Labor_Overhead_pct

Labor Overhead %

Proc_Cost_per_U

Process Cost/Unit

Proc_Cost_per_U_Sc1

Process Cost/U Scenario 1

Proc_Cost_per_U_Sc2

Process Cost/U Scenario 2

Proc_Cost_per_U_Sc3

Process Cost/U Scenario 3

Process_Cost

Process Cost

Process_Yield_pct

Yield %

Process_Yield_pct_Sc1

Yield % Scenario 1

Process_Yield_pct_Sc2

Yield % Scenario 2

Process_Yield_pct_Sc3

Yield % Scenario 3

Project_Name

Project Name

Revenue

Revenue

Scenario

Scenario (1, 2 or 3)

Scrap_Cost

Scrap Cost

Scrap_Cost_per_U

Scrap Cost/Unit

Scrap_Net_Cost

Scrap Net Cost

Scrap_Net_Cost_per_U

Scrap Net Cost/Unit

Scrap_pct

Scrap %

Scrap_Salvage_Value

Scrap Salvage Value

Scrap_Salvage_Value_per_U

Scrap Salvage $/Unit

Selling_Price

Selling Price

Station_Capacity_Day

Capacity/Station/Day

Stations

Processing Stations

Transition_pct

Transition %

Transition_pct_Sc1

Transition % Scenario 1

Transition_pct_Sc2

Transition % Scenario 2

Transition_pct_Sc3

Transition % Scenario 3

Units_Avail_In

Units Available In

Units_Buffer_Stock

Units Buffer Stock

Units_Capacity

Units Capacity

Units_Demand

Units Demand

Units_In

Units In

Units_Out

Units Out

Units_Purchd_In_Day

Purch'd Units In / Day

Units_Scrap

Units Scrap

Units_Sold

Units Sold

WIP_Avail_In

WIP Available In

WIP_Buffer_Stock

WIP_Buffer Stock

WIP_In

WIP In

WIP_Out

WIP Out

WIP_per_U_In

WIP/Unit In

WIP_per_U_Out

WIP/Unit Out

Dimension (item)

Display Item As

Total As

Level As

Cost_Types

Cost Types

Total

Cost_Types

Material

Material

Labor

Labor

Fixed_Exp

Fixed Exp

OH

OH

Process

Process

Stage_1

Stage 1

Stage_2

Stage 2

Stage_3

Stage 3

ProcessX

ProcessX

Stage_1

Stage 1

Stage_2

Stage 2

Stage_3

Stage 3

ProcessY

Stage_1

ProcessY

Stage 1

Cost_Types

Total

Process
Lvl 1

Total

ProcessX

Lvl 1

Total

ProcessY

Lvl 1

Stage_2

Stage 2

Stage_3

Stage 3

Comment
Percentage of processing capacity utilized for each stage, by time period
Cost of units sold as finished goods from out put of each stage, segmented by cost factor
(material, labor, fixed expense, overhead), by time period
Cost per unit of units sold as finished goods as output of each stage, segmented by cost
factor (material, labor, fixed expense, overhead), by time period
Cost per unit of purchased input units entered into each state, by time period
Cost of purchased input units entered into each state, segmented by cost factor (material,
labor, fixed expense, overhead) by time period
Target finished goods inventory for each stage, expressed as number of periods of sales, by
time period
Fixed expense per processing station, for each stage, per time period
Fixed expense for each stage, per time period
Gross margin amount (revenue - cost of goods) for finished goods sold as output from each
stage, by time period
Gross margin percent = gross margin / revenue
An "identify matrix" that switches index variables, enabling matrix multiplication of 2-index
variables using function matmult. Used in definitions of variable Units_Out and Units_Scrap.
Overhead rate on labor expense, by process stage, by time period
Processing cost per unit for units processed at each stage, segmented by cost factors
(material, labor, fixed expense, overhead), by time period
Processing cost per unit for units processed at each stage, segmented by cost factors
(material, labor, fixed expense, overhead), by time period, for scenario 1
Processing cost per unit for units processed at each stage, segmented by cost factors
(material, labor, fixed expense, overhead), by time period, for scenario 2
Processing cost per unit for units processed at each stage, segmented by cost factors
(material, labor, fixed expense, overhead), by time period, for scenario 3
Processing cost at each stage, segmented by process stage, by time period
Pecentage of input units that exit as good units for each processing stage, by time period
Pecentage of input units that exit as good units for each processing stage, by time period, for
scenario 1
Pecentage of input units that exit as good units for each processing stage, by time period, for
scenario 2
Pecentage of input units that exit as good units for each processing stage, by time period, for
scenario 3
Revenue from selling finished good output of each stage, by time period
Specifies which scenario to use in the model. Affects assumptions for processing costs per
unit, transition probabilities, and yield rates.
Cost imputed to scrap at each stage, segmented by cost factor (material, labor, fixed
expense, overhead) by time period
Cost per unit imputed to scrapped units at each stage, segmented by cost factor (material,
labor, fixed expense, overhead) by time period
Cost of scrap less salvage value of scrap at each stage, segmented by cost factor (material,
labor, fixed expense, overhead) by time period
Cost of scrap less salvage value of scrap at each stage, segmented by cost factor (material,
labor, fixed expense, overhead) by time period
Percentage of units input that become scrap at each stage, by time period
Salvage value of units scrapped at each stage, segmented by cost factor (material, labor,
fixed expense, overhead) by time period
Salvage value per unit of units scrapped at each stage, by time period
Price of finished goods units sold from output of each stage, by time period
Units processing capacity for each stage per station per day

Number of processing stations at each processing stage, by time period


Percent of good units output from stage A that goes to stage B for the next time period, for all
pairs of processes A and B, by time period
Percent of good units output from stage A that goes to stage B for the next time period, for all
pairs of processes A and B, by time period, for scenario 1
Percent of good units output from stage A that goes to stage B for the next time period, for all
pairs of processes A and B, by time period, for scenario 2
Percent of good units output from stage A that goes to stage B for the next time period, for all
pairs of processes A and B, by time period, for scenario 3
Good units available to enter each processing stage, by time period
Good units in buffer stock available to ente each processign stage, by time period
Units processing capacity for each stage, per time period
Market demand for units of finished goods output from each stage, by time period
Good units input to each processing stage, by time period
Good units output from each processing stage, by time period.
WIP Units purchased externally as input to each stage, by time period
Units scrapped during processing at each stage, by time period
Good output units sold as finished goods at each processing stage, by time period
Value of work in process inventory available to enter each processing stage, segmented by
cost factor (material, labor, fixed expense, overhead) by time period
Value of units in buffer stock available to enter each processing stage, segmented by cost
factor (material, labor, fixed expense, overhead) by time period
Value of units of work in process inventory that enter each processing stage, segmented by
cost factor (material, labor, fixed expense, overhead) by time period
Value of units of work in process inventory that exit each processing stage as good units,
segmented by cost factor (material, labor, fixed expense, overhead) by time period
Value per unit of work in process inventory that enters each processing stage, segmented by
cost factor (material, labor, fixed expense, overhead) by time period
Value per unit of work in process inventory that exits each processing stage as good units,
segmented by cost factor (material, labor, fixed expense, overhead) by time period

Comment
A list of the types of costs that are tracked separately in the analysis.
Cost of purchased input units are assigned to "Material".
Fixed overhead costs aer assigned to "Fixed_Exp".

A list of the process stages in the process flow

A duplicate list of process stages in the process flow. This list is needed so that some
variables can have two dimensions consisting of process stages, because ModelSheet does
not permit the same dimension to be used two times in a variable.

A duplicate list of process stages in the process flow. This list is needed so that some
variables can have two dimensions consisting of process stages, because ModelSheet does
not permit the same dimension to be used two times in a variable.

0
0
0
0
Jan 2009
1/1/2009
0
0
0
0
Jan 2009
1/1/2009
0
0
0
0
Jan 2009
1/1/2009
100.0%
100.0%
100.0%
100.0%
Jan 2009
1/1/2009
0
0
0
0
Jan 2009
1/1/2009
0
0
0
0
Jan 2009
1/1/2009
0
0
0
0
Jan 2009
1/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Feb 2009
2/1/2009
0
0
0
0
Feb 2009
2/1/2009
0
0
0
0
Feb 2009
2/1/2009
100.0%
100.0%
100.0%
100.0%
Feb 2009
2/1/2009
0
0
0
0
Feb 2009
2/1/2009
0
0
0
0
Feb 2009
2/1/2009
0
0
0
0
Feb 2009
2/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Mar 2009
3/1/2009
0
0
0
0
Mar 2009
3/1/2009
0
0
0
0
Mar 2009
3/1/2009
100.0%
100.0%
100.0%
100.0%
Mar 2009
3/1/2009
0
0
0
0
Mar 2009
3/1/2009
0
0
0
0
Mar 2009
3/1/2009
0
0
0
0
Mar 2009
3/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Apr 2009
4/1/2009
0
0
0
0
Apr 2009
4/1/2009
0
0
0
0
Apr 2009
4/1/2009
100.0%
100.0%
100.0%
100.0%
Apr 2009
4/1/2009
0
0
0
0
Apr 2009
4/1/2009
0
0
0
0
Apr 2009
4/1/2009
0
0
0
0
Apr 2009
4/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
May 2009
5/1/2009
0
0
0
0
May 2009
5/1/2009
0
0
0
0
May 2009
5/1/2009
100.0%
100.0%
100.0%
100.0%
May 2009
5/1/2009
0
0
0
0
May 2009
5/1/2009
0
0
0
0
May 2009
5/1/2009
0
0
0
0
May 2009
5/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Jun 2009
6/1/2009
0
0
0
0
Jun 2009
6/1/2009
0
0
0
0
Jun 2009
6/1/2009
100.0%
100.0%
100.0%
100.0%
Jun 2009
6/1/2009
0
0
0
0
Jun 2009
6/1/2009
0
0
0
0
Jun 2009
6/1/2009
0
0
0
0
Jun 2009
6/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Jul 2009
7/1/2009
0
0
0
0
Jul 2009
7/1/2009
0
0
0
0
Jul 2009
7/1/2009
100.0%
100.0%
100.0%
100.0%
Jul 2009
7/1/2009
0
0
0
0
Jul 2009
7/1/2009
0
0
0
0
Jul 2009
7/1/2009
0
0
0
0
Jul 2009
7/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Aug 2009
8/1/2009
0
0
0
0
Aug 2009
8/1/2009
0
0
0
0
Aug 2009
8/1/2009
100.0%
100.0%
100.0%
100.0%
Aug 2009
8/1/2009
0
0
0
0
Aug 2009
8/1/2009
0
0
0
0
Aug 2009
8/1/2009
0
0
0
0
Aug 2009
8/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Sep 2009
9/1/2009
0
0
0
0
Sep 2009
9/1/2009
0
0
0
0
Sep 2009
9/1/2009
100.0%
100.0%
100.0%
100.0%
Sep 2009
9/1/2009
0
0
0
0
Sep 2009
9/1/2009
0
0
0
0
Sep 2009
9/1/2009
0
0
0
0
Sep 2009
9/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Jan 2009 Feb 2009 Mar 2009 Apr 2009 May 2009 Jun 2009 Jul 2009 Aug 2009 Sep 2009
1/1/2009 2/1/2009 3/1/2009 4/1/2009 5/1/2009 6/1/2009 7/1/2009 8/1/2009 9/1/2009
ZZZ_Ranges!Units_In_Process_Stage_1
ZZZ_Ranges!Units_In_Process_Stage_2
ZZZ_Ranges!Units_In_Process_Stage_3
ZZZ_Ranges!Units_In_Process
ZZZ_Ranges!Units_In_Time_Period
ZZZ_Ranges!Units_In_Date
ZZZ_Ranges!Units_Avail_In_Process_Stage_1
Units!Units_Avail_In_1
Units!Units_Avail_In_2
Units!Units_Avail_In_3
Units!Units_Avail_In_4
Units!Units_Avail_In_5
Units!Units_Avail_In_6
Units!Units_Avail_In_7
Units!Units_Avail_In_8
Units!Units_Avail_In_9
Units!Units_Avail_In_10
Units!Units_Avail_In_11
Units!Units_Avail_In_12
ZZZ_Ranges!Units_Avail_In_Process_Stage_2
ZZZ_Ranges!Units_Avail_In_Process_Stage_3
ZZZ_Ranges!Units_Avail_In_Process
ZZZ_Ranges!Units_Avail_In_Time_Period
ZZZ_Ranges!Units_Avail_In_Date
ZZZ_Ranges!Units_Out_Process_Stage_1
ZZZ_Ranges!Units_Out_Process_Stage_2
ZZZ_Ranges!Units_Out_Process_Stage_3
ZZZ_Ranges!Units_Out_Process
ZZZ_Ranges!Units_Out_Time_Period
ZZZ_Ranges!Units_Out_Date
ZZZ_Ranges!Process_Yield_pct_ProcessX_Stage_1
Transitions!Process_Yield_pct_1
Transitions!Process_Yield_pct_2

Transitions!Process_Yield_pct_3
Transitions!Process_Yield_pct_4
Transitions!Process_Yield_pct_5
Transitions!Process_Yield_pct_6
Transitions!Process_Yield_pct_7
Transitions!Process_Yield_pct_8
Transitions!Process_Yield_pct_9
Transitions!Process_Yield_pct_10
Transitions!Process_Yield_pct_11
Transitions!Process_Yield_pct_12
ZZZ_Ranges!Process_Yield_pct_ProcessX_Stage_2
ZZZ_Ranges!Process_Yield_pct_ProcessX_Stage_3
ZZZ_Ranges!Process_Yield_pct_ProcessX
ZZZ_Ranges!Process_Yield_pct_Time_Period
ZZZ_Ranges!Process_Yield_pct_Date
ZZZ_Ranges!Units_Sold_Process_Stage_1
ZZZ_Ranges!Units_Sold_Process_Stage_2
ZZZ_Ranges!Units_Sold_Process_Stage_3
ZZZ_Ranges!Units_Sold_Process
ZZZ_Ranges!Units_Sold_Time_Period
ZZZ_Ranges!Units_Sold_Date
ZZZ_Ranges!Units_Demand_Process_Stage_1
ZZZ_Ranges!Units_Demand_Process_Stage_2
ZZZ_Ranges!Units_Demand_Process_Stage_3
ZZZ_Ranges!Units_Demand_Process
ZZZ_Ranges!Units_Demand_Time_Period
ZZZ_Ranges!Units_Demand_Date
ZZZ_Ranges!Units_Buffer_Stock_Process_Stage_1
ZZZ_Ranges!Units_Buffer_Stock_Process_Stage_2
ZZZ_Ranges!Units_Buffer_Stock_Process_Stage_3
ZZZ_Ranges!Units_Buffer_Stock_Process
ZZZ_Ranges!Units_Buffer_Stock_Time_Period
ZZZ_Ranges!Units_Buffer_Stock_Date
ZZZ_Ranges!Process_Cost_Process_Stage_1_Cost_Types_Material
ZZZ_Ranges!Process_Cost_1
ZZZ_Ranges!Process_Cost_2
ZZZ_Ranges!Process_Cost_3
ZZZ_Ranges!Process_Cost_4
ZZZ_Ranges!Process_Cost_5
ZZZ_Ranges!Process_Cost_6
ZZZ_Ranges!Process_Cost_7
ZZZ_Ranges!Process_Cost_8
ZZZ_Ranges!Process_Cost_9
ZZZ_Ranges!Process_Cost_10
ZZZ_Ranges!Process_Cost_11
ZZZ_Ranges!Process_Cost_12
ZZZ_Ranges!Process_Cost_Process_Stage_1_Cost_Types_Labor
ZZZ_Ranges!Process_Cost_Process_Stage_1_Cost_Types_Fixed_Exp
ZZZ_Ranges!Process_Cost_Process_Stage_1_Cost_Types_OH
ZZZ_Ranges!Process_Cost_Process_Stage_1_Cost_Types
ZZZ_Ranges!Process_Cost_Process_Stage_1
ZZZ_Ranges!Process_Cost_Process_Stage_2_Cost_Types_Material
ZZZ_Ranges!Process_Cost_Process_Stage_2_Cost_Types_Labor
ZZZ_Ranges!Process_Cost_Process_Stage_2_Cost_Types_Fixed_Exp
ZZZ_Ranges!Process_Cost_Process_Stage_2_Cost_Types_OH
ZZZ_Ranges!Process_Cost_Process_Stage_2_Cost_Types

ZZZ_Ranges!Process_Cost_Process_Stage_2
ZZZ_Ranges!Process_Cost_Process_Stage_3_Cost_Types_Material
ZZZ_Ranges!Process_Cost_Process_Stage_3_Cost_Types_Labor
ZZZ_Ranges!Process_Cost_Process_Stage_3_Cost_Types_Fixed_Exp
ZZZ_Ranges!Process_Cost_Process_Stage_3_Cost_Types_OH
ZZZ_Ranges!Process_Cost_Process_Stage_3_Cost_Types
ZZZ_Ranges!Process_Cost_Process_Stage_3
ZZZ_Ranges!Process_Cost_Process
ZZZ_Ranges!Process_Cost_Time_Period
ZZZ_Ranges!Process_Cost_Date
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_1_Cost_Types_Material
ZZZ_Ranges!Proc_Cost_per_U_1
ZZZ_Ranges!Proc_Cost_per_U_2
ZZZ_Ranges!Proc_Cost_per_U_3
ZZZ_Ranges!Proc_Cost_per_U_4
ZZZ_Ranges!Proc_Cost_per_U_5
ZZZ_Ranges!Proc_Cost_per_U_6
ZZZ_Ranges!Proc_Cost_per_U_7
ZZZ_Ranges!Proc_Cost_per_U_8
ZZZ_Ranges!Proc_Cost_per_U_9
ZZZ_Ranges!Proc_Cost_per_U_10
ZZZ_Ranges!Proc_Cost_per_U_11
ZZZ_Ranges!Proc_Cost_per_U_12
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_1_Cost_Types_Labor
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_1_Cost_Types_Fixed_Exp
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_1_Cost_Types_OH
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_1_Cost_Types
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_1
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_2_Cost_Types_Material
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_2_Cost_Types_Labor
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_2_Cost_Types_Fixed_Exp
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_2_Cost_Types_OH
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_2_Cost_Types
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_2
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_3_Cost_Types_Material
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_3_Cost_Types_Labor
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_3_Cost_Types_Fixed_Exp
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_3_Cost_Types_OH
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_3_Cost_Types
ZZZ_Ranges!Proc_Cost_per_U_Process_Stage_3
ZZZ_Ranges!Proc_Cost_per_U_Process
ZZZ_Ranges!Proc_Cost_per_U_Time_Period
ZZZ_Ranges!Proc_Cost_per_U_Date
ZZZ_Ranges!Units_Scrap_Process_Stage_1
ZZZ_Ranges!Units_Scrap_Process_Stage_2
ZZZ_Ranges!Units_Scrap_Process_Stage_3
ZZZ_Ranges!Units_Scrap_Process
ZZZ_Ranges!Units_Scrap_Time_Period
ZZZ_Ranges!Units_Scrap_Date
ZZZ_Ranges!Revenue_Process_Stage_1
Financials!Revenue_1
Financials!Revenue_2
Financials!Revenue_3
Financials!Revenue_4
Financials!Revenue_5
Financials!Revenue_6

Financials!Revenue_7
Financials!Revenue_8
Financials!Revenue_9
Financials!Revenue_10
Financials!Revenue_11
Financials!Revenue_12
ZZZ_Ranges!Revenue_Process_Stage_2
ZZZ_Ranges!Revenue_Process_Stage_3
ZZZ_Ranges!Revenue_Process
ZZZ_Ranges!Revenue_Time_Period
ZZZ_Ranges!Revenue_Date
ZZZ_Ranges!COGS_Process_Stage_1_Cost_Types_Material
ZZZ_Ranges!COGS_1
ZZZ_Ranges!COGS_2
ZZZ_Ranges!COGS_3
ZZZ_Ranges!COGS_4
ZZZ_Ranges!COGS_5
ZZZ_Ranges!COGS_6
ZZZ_Ranges!COGS_7
ZZZ_Ranges!COGS_8
ZZZ_Ranges!COGS_9
ZZZ_Ranges!COGS_10
ZZZ_Ranges!COGS_11
ZZZ_Ranges!COGS_12
ZZZ_Ranges!COGS_Process_Stage_1_Cost_Types_Labor
ZZZ_Ranges!COGS_Process_Stage_1_Cost_Types_Fixed_Exp
ZZZ_Ranges!COGS_Process_Stage_1_Cost_Types_OH
ZZZ_Ranges!COGS_Process_Stage_1_Cost_Types
ZZZ_Ranges!COGS_Process_Stage_1
ZZZ_Ranges!COGS_Process_Stage_2_Cost_Types_Material
ZZZ_Ranges!COGS_Process_Stage_2_Cost_Types_Labor
ZZZ_Ranges!COGS_Process_Stage_2_Cost_Types_Fixed_Exp
ZZZ_Ranges!COGS_Process_Stage_2_Cost_Types_OH
ZZZ_Ranges!COGS_Process_Stage_2_Cost_Types
ZZZ_Ranges!COGS_Process_Stage_2
ZZZ_Ranges!COGS_Process_Stage_3_Cost_Types_Material
ZZZ_Ranges!COGS_Process_Stage_3_Cost_Types_Labor
ZZZ_Ranges!COGS_Process_Stage_3_Cost_Types_Fixed_Exp
ZZZ_Ranges!COGS_Process_Stage_3_Cost_Types_OH
ZZZ_Ranges!COGS_Process_Stage_3_Cost_Types
ZZZ_Ranges!COGS_Process_Stage_3
ZZZ_Ranges!COGS_Process
ZZZ_Ranges!COGS_Time_Period
ZZZ_Ranges!COGS_Date
ZZZ_Ranges!COGS_per_U_Process_Stage_1_Cost_Types_Material
ZZZ_Ranges!COGS_per_U_1
ZZZ_Ranges!COGS_per_U_2
ZZZ_Ranges!COGS_per_U_3
ZZZ_Ranges!COGS_per_U_4
ZZZ_Ranges!COGS_per_U_5
ZZZ_Ranges!COGS_per_U_6
ZZZ_Ranges!COGS_per_U_7
ZZZ_Ranges!COGS_per_U_8
ZZZ_Ranges!COGS_per_U_9
ZZZ_Ranges!COGS_per_U_10
ZZZ_Ranges!COGS_per_U_11

ZZZ_Ranges!COGS_per_U_12
ZZZ_Ranges!COGS_per_U_Process_Stage_1_Cost_Types_Labor
ZZZ_Ranges!COGS_per_U_Process_Stage_1_Cost_Types_Fixed_Exp
ZZZ_Ranges!COGS_per_U_Process_Stage_1_Cost_Types_OH
ZZZ_Ranges!COGS_per_U_Process_Stage_1_Cost_Types
ZZZ_Ranges!COGS_per_U_Process_Stage_1
ZZZ_Ranges!COGS_per_U_Process_Stage_2_Cost_Types_Material
ZZZ_Ranges!COGS_per_U_Process_Stage_2_Cost_Types_Labor
ZZZ_Ranges!COGS_per_U_Process_Stage_2_Cost_Types_Fixed_Exp
ZZZ_Ranges!COGS_per_U_Process_Stage_2_Cost_Types_OH
ZZZ_Ranges!COGS_per_U_Process_Stage_2_Cost_Types
ZZZ_Ranges!COGS_per_U_Process_Stage_2
ZZZ_Ranges!COGS_per_U_Process_Stage_3_Cost_Types_Material
ZZZ_Ranges!COGS_per_U_Process_Stage_3_Cost_Types_Labor
ZZZ_Ranges!COGS_per_U_Process_Stage_3_Cost_Types_Fixed_Exp
ZZZ_Ranges!COGS_per_U_Process_Stage_3_Cost_Types_OH
ZZZ_Ranges!COGS_per_U_Process_Stage_3_Cost_Types
ZZZ_Ranges!COGS_per_U_Process_Stage_3
ZZZ_Ranges!COGS_per_U_Process
ZZZ_Ranges!COGS_per_U_Time_Period
ZZZ_Ranges!COGS_per_U_Date
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_1_Cost_Types_Material
ZZZ_Ranges!Scrap_Cost_per_U_1
ZZZ_Ranges!Scrap_Cost_per_U_2
ZZZ_Ranges!Scrap_Cost_per_U_3
ZZZ_Ranges!Scrap_Cost_per_U_4
ZZZ_Ranges!Scrap_Cost_per_U_5
ZZZ_Ranges!Scrap_Cost_per_U_6
ZZZ_Ranges!Scrap_Cost_per_U_7
ZZZ_Ranges!Scrap_Cost_per_U_8
ZZZ_Ranges!Scrap_Cost_per_U_9
ZZZ_Ranges!Scrap_Cost_per_U_10
ZZZ_Ranges!Scrap_Cost_per_U_11
ZZZ_Ranges!Scrap_Cost_per_U_12
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_1_Cost_Types_Labor
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_1_Cost_Types_Fixed_Exp
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_1_Cost_Types_OH
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_1_Cost_Types
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_1
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_2_Cost_Types_Material
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_2_Cost_Types_Labor
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_2_Cost_Types_Fixed_Exp
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_2_Cost_Types_OH
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_2_Cost_Types
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_2
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_3_Cost_Types_Material
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_3_Cost_Types_Labor
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_3_Cost_Types_Fixed_Exp
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_3_Cost_Types_OH
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_3_Cost_Types
ZZZ_Ranges!Scrap_Cost_per_U_Process_Stage_3
ZZZ_Ranges!Scrap_Cost_per_U_Process
ZZZ_Ranges!Scrap_Cost_per_U_Time_Period
ZZZ_Ranges!Scrap_Cost_per_U_Date
ZZZ_Ranges!Scrap_Cost_Process_Stage_1_Cost_Types_Material
ZZZ_Ranges!Scrap_Cost_1

ZZZ_Ranges!Scrap_Cost_2
ZZZ_Ranges!Scrap_Cost_3
ZZZ_Ranges!Scrap_Cost_4
ZZZ_Ranges!Scrap_Cost_5
ZZZ_Ranges!Scrap_Cost_6
ZZZ_Ranges!Scrap_Cost_7
ZZZ_Ranges!Scrap_Cost_8
ZZZ_Ranges!Scrap_Cost_9
ZZZ_Ranges!Scrap_Cost_10
ZZZ_Ranges!Scrap_Cost_11
ZZZ_Ranges!Scrap_Cost_12
ZZZ_Ranges!Scrap_Cost_Process_Stage_1_Cost_Types_Labor
ZZZ_Ranges!Scrap_Cost_Process_Stage_1_Cost_Types_Fixed_Exp
ZZZ_Ranges!Scrap_Cost_Process_Stage_1_Cost_Types_OH
ZZZ_Ranges!Scrap_Cost_Process_Stage_1_Cost_Types
ZZZ_Ranges!Scrap_Cost_Process_Stage_1
ZZZ_Ranges!Scrap_Cost_Process_Stage_2_Cost_Types_Material
ZZZ_Ranges!Scrap_Cost_Process_Stage_2_Cost_Types_Labor
ZZZ_Ranges!Scrap_Cost_Process_Stage_2_Cost_Types_Fixed_Exp
ZZZ_Ranges!Scrap_Cost_Process_Stage_2_Cost_Types_OH
ZZZ_Ranges!Scrap_Cost_Process_Stage_2_Cost_Types
ZZZ_Ranges!Scrap_Cost_Process_Stage_2
ZZZ_Ranges!Scrap_Cost_Process_Stage_3_Cost_Types_Material
ZZZ_Ranges!Scrap_Cost_Process_Stage_3_Cost_Types_Labor
ZZZ_Ranges!Scrap_Cost_Process_Stage_3_Cost_Types_Fixed_Exp
ZZZ_Ranges!Scrap_Cost_Process_Stage_3_Cost_Types_OH
ZZZ_Ranges!Scrap_Cost_Process_Stage_3_Cost_Types
ZZZ_Ranges!Scrap_Cost_Process_Stage_3
ZZZ_Ranges!Scrap_Cost_Process
ZZZ_Ranges!Scrap_Cost_Time_Period
ZZZ_Ranges!Scrap_Cost_Date
ZZZ_Ranges!Gross_Margin_Process_Stage_1
Financials!Gross_Margin_1
Financials!Gross_Margin_2
Financials!Gross_Margin_3
Financials!Gross_Margin_4
Financials!Gross_Margin_5
Financials!Gross_Margin_6
Financials!Gross_Margin_7
Financials!Gross_Margin_8
Financials!Gross_Margin_9
Financials!Gross_Margin_10
Financials!Gross_Margin_11
Financials!Gross_Margin_12
ZZZ_Ranges!Gross_Margin_Process_Stage_2
ZZZ_Ranges!Gross_Margin_Process_Stage_3
ZZZ_Ranges!Gross_Margin_Process
ZZZ_Ranges!Gross_Margin_Time_Period
ZZZ_Ranges!Gross_Margin_Date
ZZZ_Ranges!Gross_Margin_pct_Process_Stage_1
Financials!Gross_Margin_pct_1
Financials!Gross_Margin_pct_2
Financials!Gross_Margin_pct_3
Financials!Gross_Margin_pct_4
Financials!Gross_Margin_pct_5
Financials!Gross_Margin_pct_6

Financials!Gross_Margin_pct_7
Financials!Gross_Margin_pct_8
Financials!Gross_Margin_pct_9
Financials!Gross_Margin_pct_10
Financials!Gross_Margin_pct_11
Financials!Gross_Margin_pct_12
ZZZ_Ranges!Gross_Margin_pct_Process_Stage_2
ZZZ_Ranges!Gross_Margin_pct_Process_Stage_3
ZZZ_Ranges!Gross_Margin_pct_Process
ZZZ_Ranges!Gross_Margin_pct_Time_Period
ZZZ_Ranges!Gross_Margin_pct_Date

0
0
0
0
Oct 2009
10/1/2009
0
0
0
0
Oct 2009
10/1/2009
0
0
0
0
Oct 2009
10/1/2009
100.0%
100.0%
100.0%
100.0%
Oct 2009
10/1/2009
0
0
0
0
Oct 2009
10/1/2009
0
0
0
0
Oct 2009
10/1/2009
0
0
0
0
Oct 2009
10/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Nov 2009
11/1/2009
0
0
0
0
Nov 2009
11/1/2009
0
0
0
0
Nov 2009
11/1/2009
100.0%
100.0%
100.0%
100.0%
Nov 2009
11/1/2009
0
0
0
0
Nov 2009
11/1/2009
0
0
0
0
Nov 2009
11/1/2009
0
0
0
0
Nov 2009
11/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

0
0
0
0
Dec 2009
12/1/2009
0
0
0
0
Dec 2009
12/1/2009
0
0
0
0
Dec 2009
12/1/2009
100.0%
100.0%
100.0%
100.0%
Dec 2009
12/1/2009
0
0
0
0
Dec 2009
12/1/2009
0
0
0
0
Dec 2009
12/1/2009
0
0
0
0
Dec 2009
12/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Oct 2009
10/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Oct 2009
10/1/2009
0
0
0
0
Oct 2009
10/1/2009
$0
$0
$0
$0

$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Nov 2009
11/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Nov 2009
11/1/2009
0
0
0
0
Nov 2009
11/1/2009
$0
$0
$0
$0

$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Dec 2009
12/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Dec 2009
12/1/2009
0
0
0
0
Dec 2009
12/1/2009
$0
$0
$0
$0

Oct 2009
10/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Oct 2009
10/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

Nov 2009
11/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Nov 2009
11/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

Dec 2009
12/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Dec 2009
12/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

$0.00
$0.00
$0.00
$0.00
Oct 2009
10/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Oct 2009
10/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

$0.00
$0.00
$0.00
$0.00
Nov 2009
11/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Nov 2009
11/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

$0.00
$0.00
$0.00
$0.00
Dec 2009
12/1/2009
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Dec 2009
12/1/2009
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$0
$0
$0
Oct 2009
10/1/2009
$0
$0
$0
$0
Oct 2009
10/1/2009
0%
0%
0%
0%
Oct 2009
10/1/2009

$0
$0
$0
$0
$0
$0
$0
$0
Nov 2009
11/1/2009
$0
$0
$0
$0
Nov 2009
11/1/2009
0%
0%
0%
0%
Nov 2009
11/1/2009

$0
$0
$0
$0
$0
$0
$0
$0
Dec 2009
12/1/2009
$0
$0
$0
$0
Dec 2009
12/1/2009
0%
0%
0%
0%
Dec 2009
12/1/2009

Company_Name[]|
Abc
Project_Name[]|
Process Analysis
Scenario[]|
1 Transition_pct_Sc1["ProcessX.Stage_1",
0 Transition_pct_Sc1["ProcessX.Stage_1
"Process.Stage_1"]|=
Process_Yield_pct_Sc1["ProcessX.Stage_1",
1 Process_Yield_pct_Sc1["ProcessX.Stage_1",
1 Process_Yield_pct_Sc1["ProcessX.Stage_1",
DATE(2009,3,1)]|=C35
1 Process_Yield_pct_Sc1["ProcessX.Stage_1",
DATE(2009,4,1)]|=D35
1 Process_Yield_pct_Sc1["ProcessX.Stag
DATE(2009,5,1)]|=F35 DATE(2009,6,1)
Process_Yield_pct_Sc1["ProcessX.Stage_3",
1 Process_Yield_pct_Sc1["ProcessX.Stage_3",
1 Process_Yield_pct_Sc2["ProcessX.Stage_1",
DATE(2009,11,1)]|=N37
1 Process_Yield_pct_Sc2["ProcessX.Stage_1",
DATE(2009,12,1)]|=O37
1 Process_Yield_pct_Sc2["ProcessX.Stag
DATE(2009,1,1)]|=1 DATE(2009,2,1)
Process_Yield_pct_Sc2["ProcessX.Stage_3",
1 Process_Yield_pct_Sc2["ProcessX.Stage_3",
1 Process_Yield_pct_Sc2["ProcessX.Stage_3",
DATE(2009,7,1)]|=H43
1 Process_Yield_pct_Sc2["ProcessX.Stage_3",
DATE(2009,8,1)]|=J43
1 Process_Yield_pct_Sc2["ProcessX.Stag
DATE(2009,9,1)]|=K43 DATE(2009,10,1
Process_Yield_pct_Sc3["ProcessX.Stage_3",
1 Process_Yield_pct_Sc3["ProcessX.Stage_3",
1 Process_Yield_pct_Sc3["ProcessX.Stage_3",
DATE(2009,3,1)]|=C49
1 Process_Yield_pct_Sc3["ProcessX.Stage_3",
DATE(2009,4,1)]|=D49
1 Process_Yield_pct_Sc3["ProcessX.Stag
DATE(2009,5,1)]|=F49 DATE(2009,6,1)
Units_Purchd_In_Day["Process.Stage_2",
0 Units_Purchd_In_Day["Process.Stage_2",
DATE(2009,10,1)]|=L60
0 Units_Purchd_In_Day["Process.Stage_2",
DATE(2009,11,1)]|=N60
0 Units_Purchd_In_Day["Process.Stage_3",
DATE(2009,12,1)]|=O60
0 Units_Purchd_In_Day["Process.Stage_
DATE(2009,1,1)]|=0
Stations["Process.Stage_2",
1 Stations["Process.Stage_2",
DATE(2009,6,1)]|=G66
1 Stations["Process.Stage_2",
DATE(2009,7,1)]|=H66
1 Stations["Process.Stage_2",
DATE(2009,8,1)]|=J66
1 Stations["Process.Stage_2",
DATE(2009,9,1)]|=K66DATE(200
Station_Capacity_Day["Process.Stage_2",
1000 Station_Capacity_Day["Process.Stage_2",
1000
DATE(2009,2,1)]|=B72
Station_Capacity_Day["Process.Stage_2",
1000
DATE(2009,3,1)]|=C72
Station_Capacity_Day["Process.Stage_2",
1000
DATE(2009,4,1)]|=D72
Station_Capacity_Day["Process.Stage_
DATE(2009,5,1)]|=
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0
"Cost_Types.Material",
DATE(2009,10,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0
"Cost_Types.Material",
DATE(2009,11,1)]|=if("Material"="Fixed_
Proc_Cost_per_U_Sc1["Process.Stage
"Cost_Types.Labo
DATE(2009,12,1)
if(Units!N32=0, 0
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,6,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,7,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage
if(Units!H32=0,
DATE(2009,8,1)]|=if("O
"Cost_Types.OH",
0, 'Costif(Un
Flow
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
0
"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,2,1)]|=if("Fixed_Exp"="Fixed_Exp",
0
"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage
DATE(2009,3,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,4,1
if(Units!C33=
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0
"Cost_Types.Material",
DATE(2009,10,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0
"Cost_Types.Material",
DATE(2009,11,1)]|=if("Material"="Fixed_
Proc_Cost_per_U_Sc1["Process.Stage
"Cost_Types.Labo
DATE(2009,12,1)
if(Units!N34=0, 0
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,6,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,7,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage
if(Units!H34=0,
DATE(2009,8,1)]|=if("O
"Cost_Types.OH",
0, 'Costif(Un
Flow
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
0
"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,2,1)]|=if("Fixed_Exp"="Fixed_Exp",
0
"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage
DATE(2009,3,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,4,1
if(Units!C32=
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0
"Cost_Types.Material",
DATE(2009,10,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0
"Cost_Types.Material",
DATE(2009,11,1)]|=if("Material"="Fixed_
Proc_Cost_per_U_Sc2["Process.Stage
"Cost_Types.Labo
DATE(2009,12,1)
if(Units!N33=0, 0
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,6,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,7,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage
if(Units!H33=0,
DATE(2009,8,1)]|=if("O
"Cost_Types.OH",
0, 'Costif(Un
Flow
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
0
"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,2,1)]|=if("Fixed_Exp"="Fixed_Exp",
0
"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage
DATE(2009,3,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,4,1
if(Units!C34=
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0
"Cost_Types.Material",
DATE(2009,10,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0
"Cost_Types.Material",
DATE(2009,11,1)]|=if("Material"="Fixed_
Proc_Cost_per_U_Sc3["Process.Stage
"Cost_Types.Labo
DATE(2009,12,1)
if(Units!N32=0, 0
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,6,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,7,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage
if(Units!H32=0,
DATE(2009,8,1)]|=if("O
"Cost_Types.OH",
0, 'Costif(Un
Flow
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
0
"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,2,1)]|=if("Fixed_Exp"="Fixed_Exp",
0
"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage
DATE(2009,3,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,4,1
if(Units!C33=
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0
"Cost_Types.Material",
DATE(2009,10,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0
"Cost_Types.Material",
DATE(2009,11,1)]|=if("Material"="Fixed_
Proc_Cost_per_U_Sc3["Process.Stage
"Cost_Types.Labo
DATE(2009,12,1)
if(Units!N34=0, 0
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,6,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,7,1)]|=if("OH"="Fixed_Exp",
0
"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage
if(Units!H34=0,
DATE(2009,8,1)]|=if("O
"Cost_Types.OH",
0, 'Costif(Un
Flow
Cost_per_U_Purchd_In["Process.Stage_3",
0 Cost_per_U_Purchd_In["Process.Stage_3",
0DATE(2009,2,1)]|=B161
Cost_per_U_Purchd_In["Process.Stage_3",
0DATE(2009,3,1)]|=C161
Cost_per_U_Purchd_In["Process.Stage_3",
0DATE(2009,4,1)]|=D161
Cost_per_U_Purchd_In["Process.Stage
DATE(2009,5,1)]|=
Scrap_Salvage_Value_per_U["Process.Stage_2",
0 Scrap_Salvage_Value_per_U["Process.Stage_2",
0 Scrap_Salvage_Value_per_U["Process.Stage_2",
DATE(2009,10,1)]|=L166
0 Scrap_Salvage_Value_per_U["Process.Stage_3",
DATE(2009,11,1)]|=N166
0 Scrap_Salvage_Value_per_U["Process
DATE(2009,12,1)]|=O166
DATE(2009
Fixed_Exp_per_Station["Process.Stage_2",
0 Fixed_Exp_per_Station["Process.Stage_2",
0DATE(2009,6,1)]|=G172
Fixed_Exp_per_Station["Process.Stage_2",
0DATE(2009,7,1)]|=H172
Fixed_Exp_per_Station["Process.Stage_2",
0DATE(2009,8,1)]|=J172
Fixed_Exp_per_Station["Process.Stage
DATE(2009,9,1)]|=
Units_Demand["Process.Stage_1",
0 Units_Demand["Process.Stage_1",
DATE(2009,2,1)]|=0/3
0 Units_Demand["Process.Stage_1",
DATE(2009,3,1)]|=0/3
0 Units_Demand["Process.Stage_1",
DATE(2009,4,1)]|=0/3
0 Units_Demand["Process.Stage_1",
DATE(2009,5,1)]|=0/3 DAT
Units_Demand["Process.Stage_3",
0 Units_Demand["Process.Stage_3",
DATE(2009,10,1)]|=0/3
0 Units_Demand["Process.Stage_3",
DATE(2009,11,1)]|=0/3
0 Selling_Price["Process.Stage_1",
DATE(2009,12,1)]|=0/3
0 Selling_Price["Process.Stage_1",
DATE(2009,1,1)]|=2*'Unit
DATE
Co
Selling_Price["Process.Stage_3",
0 Selling_Price["Process.Stage_3",
DATE(2009,6,1)]|=G191
0 Selling_Price["Process.Stage_3",
DATE(2009,7,1)]|=H191
0 Selling_Price["Process.Stage_3",
DATE(2009,8,1)]|=J191
0 Selling_Price["Process.Stage_3",
DATE(2009,9,1)]|=K191
DATE
:A:0:Units_Purchd_In_Day
Purch'd Units
:A:-1:Units_Purchd_In_Day
In / Day WIP Units purchased
:A:0:FG_Inven_Targ_Periods
externally
FG Inventory
as:A:-1:FG_Inven_Targ_Periods
input
Target
to each
Periods
Target
stage,
finished
by:A:0:Ident
time
goods
period
inventory for each stage, exp
:A:0:Units_In
Units In
:A:-1:Units_In
Good units :A:0:Units_Avail_In
input to each
Units
processing
Available
:A:-1:Units_Avail_In
stage,
In by Good
time period
units :A:0:Units_Buffer_Stock
available to enter each processing stag
:A:0:COGS_per_U
COGS/Unit:A:-1:COGS_per_U
Cost per unit
:A:0:Capacity_Util_pct
of units sold
Capacity
as finished
Utilization
:A:-1:Capacity_Util_pct
goods%asPercentage
output of each
:A:0:Fixed_Exp_per_Station
of processing
stage, segmented
capacity by
utilized
cost factor
for each
(m
:A:0:Scrap_Net_Cost_per_U
Scrap Net Cost/Unit
:A:-1:Scrap_Net_Cost_per_U
Cost of scrap
:A:0:Company_Name
less salvage
Company
value of
Name
:A:-1:Company_Name
scrap at each stage,0 segmented
:A:0:Project_Name
by cost factor (material, labo
:D:0:ProcessY.Stage_1
Stage 1
:D:2:ProcessY.Stage_1
Lvl 1
:D:0:ProcessY.Stage_2
Stage 2
:D:0:ProcessY.Stage_3
Stage 3
:D:-1:Cost_Types
:WS:
0 :WS:
0 :WS:
0 :WS:
0 :WS:

0
1
1
1
1
0
1
1000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Transition_pct_Sc1["ProcessX.Stage_1",
0 Transition_pct_Sc1["ProcessX.Stage_2",
"Process.Stage_3"]|=0
0 Transition_pct_Sc1["ProcessX.Stage_2",
"Process.Stage_1"]|=0
0 Transition_pct_Sc1["ProcessX.Stage_2",
"Process.Stage_2"]|=0
0
"Process.
Process_Yield_pct_Sc1["ProcessX.Stage_1",
1 Process_Yield_pct_Sc1["ProcessX.Stage_1",
1 Process_Yield_pct_Sc1["ProcessX.Stage_1",
DATE(2009,8,1)]|=J35
1 Process_Yield_pct_Sc1["ProcessX.Stage_1",
DATE(2009,9,1)]|=K35
1 DATE(2009,10,1)]|=L35DATE
Process_Yield_pct_Sc2["ProcessX.Stage_1",
1 Process_Yield_pct_Sc2["ProcessX.Stage_1",
1 Process_Yield_pct_Sc2["ProcessX.Stage_1",
DATE(2009,4,1)]|=D41
1 Process_Yield_pct_Sc2["ProcessX.Stage_1",
DATE(2009,5,1)]|=F41
1 DATE(2009,6,1)]|=G41DATE
Process_Yield_pct_Sc2["ProcessX.Stage_3",
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
DATE(2009,12,1)]|=O43
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
DATE(2009,1,1)]|=1 1 DATE(2009,2,1)]|=B47DATE
Process_Yield_pct_Sc3["ProcessX.Stage_3",
1 Process_Yield_pct_Sc3["ProcessX.Stage_3",
1 Process_Yield_pct_Sc3["ProcessX.Stage_3",
DATE(2009,8,1)]|=J49
1 Process_Yield_pct_Sc3["ProcessX.Stage_3",
DATE(2009,9,1)]|=K49
1 DATE(2009,10,1)]|=L49DATE
Units_Purchd_In_Day["Process.Stage_3",
0 Units_Purchd_In_Day["Process.Stage_3",
DATE(2009,3,1)]|=C61
0 Units_Purchd_In_Day["Process.Stage_3",
DATE(2009,4,1)]|=D61
0 Units_Purchd_In_Day["Process.Stage_3",
DATE(2009,5,1)]|=F61
0
DATE(2
Stations["Process.Stage_2",
1 Stations["Process.Stage_2",
DATE(2009,11,1)]|=N66
1 Stations["Process.Stage_3",
DATE(2009,12,1)]|=O66
1 Stations["Process.Stage_3",
DATE(2009,1,1)]|=1
1
DATE(2009,2,1)]|=B67
Station_Capacity_Day["Process.Stage_2",
1000 Station_Capacity_Day["Process.Stage_2",
1000
DATE(2009,7,1)]|=H72
Station_Capacity_Day["Process.Stage_2",
1000
DATE(2009,8,1)]|=J72
Station_Capacity_Day["Process.Stage_2",
1000
DATE(2009,9,1)]|=K72DATE(2
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,3,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,4,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!D32
DATE(20
"Cost_T
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,11,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,12,1)]|=if("OH"="Fixed
0"Cost_Types.Material",
if(Units!O32=0
"Cost_T
DATE(
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,7,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,8,1)]|=if("Fixed
"Cost_T
DAT
if(
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,3,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,4,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!D34
DATE(20
"Cost_T
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,11,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,12,1)]|=if("OH"="Fixed
0"Cost_Types.Material",
if(Units!O34=0
"Cost_T
DATE(
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,7,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,8,1)]|=if("Fixed
"Cost_T
DAT
if(
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,3,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,4,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!D33
DATE(20
"Cost_T
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,11,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,12,1)]|=if("OH"="Fixed
0"Cost_Types.Material",
if(Units!O33=0
"Cost_T
DATE(
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,7,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,8,1)]|=if("Fixed
"Cost_T
DAT
if(
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,3,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,4,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!D32
DATE(20
"Cost_T
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,11,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,12,1)]|=if("OH"="Fixed
0"Cost_Types.Material",
if(Units!O32=0
"Cost_T
DATE(
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,7,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,8,1)]|=if("Fixed
"Cost_T
DAT
if(
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,3,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,4,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!D34
DATE(20
"Cost_T
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.OH",
Cost_per_U_Purchd_In["Process.Stage_1",
DATE(2009,11,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Cost_per_U_Purchd_In["Process.Stage_1",
DATE(2009,12,1)]|=if("OH"="Fixed
0DATE(2009,1,1)]|=0
if(Units!O34=0
DATE(
Cost_per_U_Purchd_In["Process.Stage_3",
0 Cost_per_U_Purchd_In["Process.Stage_3",
0DATE(2009,7,1)]|=H161
Cost_per_U_Purchd_In["Process.Stage_3",
0DATE(2009,8,1)]|=J161
Cost_per_U_Purchd_In["Process.Stage_3",
0DATE(2009,9,1)]|=K161
DATE(
Scrap_Salvage_Value_per_U["Process.Stage_3",
0 Scrap_Salvage_Value_per_U["Process.Stage_3",
0 Scrap_Salvage_Value_per_U["Process.Stage_3",
DATE(2009,3,1)]|=C167
0 Scrap_Salvage_Value_per_U["Process.Stage_3",
DATE(2009,4,1)]|=D167
0
DATE(2009,5,1)]|=F167
D
Fixed_Exp_per_Station["Process.Stage_2",
0 Fixed_Exp_per_Station["Process.Stage_2",
0DATE(2009,11,1)]|=N172
Fixed_Exp_per_Station["Process.Stage_3",
0DATE(2009,12,1)]|=O172
Fixed_Exp_per_Station["Process.Stage_3",
0DATE(2009,1,1)]|=0 DATE(
Units_Demand["Process.Stage_1",
0 Units_Demand["Process.Stage_1",
DATE(2009,7,1)]|=0/3
0 Units_Demand["Process.Stage_1",
DATE(2009,8,1)]|=0/3
0 Units_Demand["Process.Stage_1",
DATE(2009,9,1)]|=0/3
0
DATE(2009,10,
Selling_Price["Process.Stage_1",
0 Selling_Price["Process.Stage_1",
DATE(2009,3,1)]|=C189
0 Selling_Price["Process.Stage_1",
DATE(2009,4,1)]|=D189
0 Selling_Price["Process.Stage_1",
DATE(2009,5,1)]|=F189
0
DATE(2009,6,1)]
Selling_Price["Process.Stage_3",
0 Selling_Price["Process.Stage_3",
DATE(2009,11,1)]|=N191
0
DATE(2009,12,1)]|=O191
Ident
:A:-1:Ident An "identify:A:0:Units_Demand
matrix" thatUnits
switches
Demand
index
:A:-1:Units_Demand
variables,
Market
enabling
demand
:A:0:Cost_Purchd_U_In
matrix
for units
multiplication
Cost
of finished
Purch'd
of 2-index
goods
Units In
output
variables
fromusing
eachfun
st
Units Buffer:A:-1:Units_Buffer_Stock
Stock
Good units :A:0:Units_Out
in buffer stock
Units
available
Out :A:-1:Units_Out
to ente each
Good
processign
units :A:0:Units_Sold
output
stage,
from
byUnits
each
timeSold
processing
period
stage, by time period.
Fixed Expense/Station
:A:-1:Fixed_Exp_per_Station
Fixed expense
:A:0:Fixed_Expense
per processing
Fixed Expense
station,
:A:-1:Fixed_Expense
for eachFixed
stage,
expense
per:A:0:Selling_Price
time
forperiod
eachSelling
stage, Price
per time period
Project Name
:A:-1:Project_Name 0 :A:0:Process_Yield_pct_Sc3
Yield % Scenario
:A:-1:Process_Yield_pct_Sc3
3
Pecentage :A:0:Proc_Cost_per_U_Sc3
of input units
Process
that exitCost/U
as good
Scenario
units for
3 each proces
A list of the :D:0:Cost_Types
types of costs
Cost
that
Types:D:2:Cost_Types
are tracked separately
Cost_Types
in the
:D:1:Cost_Types
analysis. Total
Cost of purchased
:D:0:Cost_Types.Material
input
Material
units are assigned to "Material".Fixed
0 :WS:
0 :WS:
0 :WS:
0 :WS:
0

Transition_pct_Sc1["ProcessX.Stage_3",
0 Transition_pct_Sc1["ProcessX.Stage_3",
"Process.Stage_1"]|=0
0 Transition_pct_Sc1["ProcessX.Stage_3",
"Process.Stage_2"]|=0
0 Transition_pct_Sc2["ProcessX.Stage_1",
"Process.Stage_3"]|=0
0 Transition_pct_Sc2["ProcessX.Stage_1
"Process.Stage_1"]|=
Process_Yield_pct_Sc1["ProcessX.Stage_1",
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
DATE(2009,12,1)]|=O35
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
DATE(2009,1,1)]|=1 1 Process_Yield_pct_Sc1["ProcessX.Stag
DATE(2009,2,1)]|=B36DATE(2009,3,1)
Process_Yield_pct_Sc2["ProcessX.Stage_1",
1 Process_Yield_pct_Sc2["ProcessX.Stage_1",
1 Process_Yield_pct_Sc2["ProcessX.Stage_1",
DATE(2009,8,1)]|=J41
1 Process_Yield_pct_Sc2["ProcessX.Stage_1",
DATE(2009,9,1)]|=K41
1 Process_Yield_pct_Sc2["ProcessX.Stag
DATE(2009,10,1)]|=L41DATE(2009,11,1
Process_Yield_pct_Sc3["ProcessX.Stage_1",
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
DATE(2009,4,1)]|=D47
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
DATE(2009,5,1)]|=F47
1 Process_Yield_pct_Sc3["ProcessX.Stag
DATE(2009,6,1)]|=G47DATE(2009,7,1)
Process_Yield_pct_Sc3["ProcessX.Stage_3",
1 FG_Inven_Targ_Periods[]|
2 Units_Purchd_In_Day["Process.Stage_1",
DATE(2009,12,1)]|=O49
0 Units_Purchd_In_Day["Process.Stage_1",
DATE(2009,1,1)]|=0/3
0 Units_Purchd_In_Day["Process.Stage_
DATE(2009,2,1)]|=B
Units_Purchd_In_Day["Process.Stage_3",
0 Units_Purchd_In_Day["Process.Stage_3",
DATE(2009,7,1)]|=H61
0 Units_Purchd_In_Day["Process.Stage_3",
DATE(2009,8,1)]|=J61
0 Units_Purchd_In_Day["Process.Stage_3",
DATE(2009,9,1)]|=K61
0 Units_Purchd_In_Day["Process.Stage_
DATE(2009,10,1)]|=
Stations["Process.Stage_3",
1 Stations["Process.Stage_3",
DATE(2009,3,1)]|=C67
1 Stations["Process.Stage_3",
DATE(2009,4,1)]|=D67
1 Stations["Process.Stage_3",
DATE(2009,5,1)]|=F67
1 Stations["Process.Stage_3",
DATE(2009,6,1)]|=G67DATE(200
Station_Capacity_Day["Process.Stage_2",
1000 Station_Capacity_Day["Process.Stage_2",
1000
DATE(2009,11,1)]|=N72
Station_Capacity_Day["Process.Stage_3",
1000
DATE(2009,12,1)]|=O72
Station_Capacity_Day["Process.Stage_3",
1000
DATE(2009,1,1)]|=1000
Station_Capacity_Day["Process.Stage_
DATE(2009,2,1)]|=B
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,7,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,8,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage
if(Units!J32=0,
DATE(2009,9,1)]|=if
"Cost_Types.Labo
0, 'Cost
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,3,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,4,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc1["Process.Stage
"Cost_Types.Mate
if(Units!D33=0,
DATE(2009,5,1)]|
0,
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,11,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage
DATE(2009,12,1)]|=if("Fixed_Exp"="Fi
DATE(2009,1,1)]|=B17
"Cost_Types.OH",
if(Units!O33
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,7,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,8,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage
if(Units!J34=0,
DATE(2009,9,1)]|=if
"Cost_Types.Labo
0, 'Cost
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,3,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,4,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc2["Process.Stage
"Cost_Types.Mate
if(Units!D32=0,
DATE(2009,5,1)]|
0,
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,11,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage
DATE(2009,12,1)]|=if("Fixed_Exp"="Fi
DATE(2009,1,1)]|=B17
"Cost_Types.OH",
if(Units!O32
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,7,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,8,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage
if(Units!J33=0,
DATE(2009,9,1)]|=if
"Cost_Types.Labo
0, 'Cost
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,3,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,4,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc2["Process.Stage
"Cost_Types.Mate
if(Units!D34=0,
DATE(2009,5,1)]|
0,
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,11,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage
DATE(2009,12,1)]|=if("Fixed_Exp"="Fi
DATE(2009,1,1)]|=B17
"Cost_Types.OH",
if(Units!O34
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,7,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,8,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage
if(Units!J32=0,
DATE(2009,9,1)]|=if
"Cost_Types.Labo
0, 'Cost
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,3,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,4,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc3["Process.Stage
"Cost_Types.Mate
if(Units!D33=0,
DATE(2009,5,1)]|
0,
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,11,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage
DATE(2009,12,1)]|=if("Fixed_Exp"="Fi
DATE(2009,1,1)]|=B17
"Cost_Types.OH",
if(Units!O33
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,7,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,8,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage
if(Units!J34=0,
DATE(2009,9,1)]|=if
"Cost_Types.Labo
0, 'Cost
Cost_per_U_Purchd_In["Process.Stage_1",
0 Cost_per_U_Purchd_In["Process.Stage_1",
0DATE(2009,3,1)]|=C159
Cost_per_U_Purchd_In["Process.Stage_1",
0DATE(2009,4,1)]|=D159
Cost_per_U_Purchd_In["Process.Stage_1",
0DATE(2009,5,1)]|=F159
Cost_per_U_Purchd_In["Process.Stage
DATE(2009,6,1)]|=
Cost_per_U_Purchd_In["Process.Stage_3",
0 Cost_per_U_Purchd_In["Process.Stage_3",
0DATE(2009,11,1)]|=N161
Scrap_Salvage_Value_per_U["Process.Stage_1",
0DATE(2009,12,1)]|=O161
Scrap_Salvage_Value_per_U["Process.Stage_1",
0 Scrap_Salvage_Value_per_U["Process
DATE(2009,1,1)]|=0 DATE(2009
Scrap_Salvage_Value_per_U["Process.Stage_3",
0 Scrap_Salvage_Value_per_U["Process.Stage_3",
0 Scrap_Salvage_Value_per_U["Process.Stage_3",
DATE(2009,7,1)]|=H167
0 Scrap_Salvage_Value_per_U["Process.Stage_3",
DATE(2009,8,1)]|=J167
0 Scrap_Salvage_Value_per_U["Process
DATE(2009,9,1)]|=K167
DATE(2009
Fixed_Exp_per_Station["Process.Stage_3",
0 Fixed_Exp_per_Station["Process.Stage_3",
0DATE(2009,3,1)]|=C173
Fixed_Exp_per_Station["Process.Stage_3",
0DATE(2009,4,1)]|=D173
Fixed_Exp_per_Station["Process.Stage_3",
0DATE(2009,5,1)]|=F173
Fixed_Exp_per_Station["Process.Stage
DATE(2009,6,1)]|=
Units_Demand["Process.Stage_1",
0 Units_Demand["Process.Stage_1",
DATE(2009,11,1)]|=0/3
0 Units_Demand["Process.Stage_2",
DATE(2009,12,1)]|=0/3
0 Units_Demand["Process.Stage_2",
DATE(2009,1,1)]|=0/3
0 Units_Demand["Process.Stage_2",
DATE(2009,2,1)]|=0/3 DAT
Selling_Price["Process.Stage_1",
0 Selling_Price["Process.Stage_1",
DATE(2009,7,1)]|=H189
0 Selling_Price["Process.Stage_1",
DATE(2009,8,1)]|=J189
0 Selling_Price["Process.Stage_1",
DATE(2009,9,1)]|=K189
0 Selling_Price["Process.Stage_1",
DATE(2009,10,1)]|=L189
DATE

:A:-1:Cost_Purchd_U_In
Cost of purchased
:A:0:Proc_Cost_per_U
inputProcess
units entered
Cost/Unit
:A:-1:Proc_Cost_per_U
into each
Processing
state, segmented
:A:0:Scenario
cost per by
unit
Scenario
cost
for factor
units(1,
processed
(material,
:A:-1:Scenario
2 or 3) labor,
at each
fixed
stage,
expense,
segmented
overhea
by
:A:-1:Units_Sold
Good output:A:0:Units_Scrap
units sold Units
as finished
Scrap:A:-1:Units_Scrap
goods at each
Units
processing
scrapped
:A:0:Scrap_pct
stage,
during by
processing
Scrap
time%
period
at
:A:-1:Scrap_pct
each stage, by time period
:A:-1:Selling_Price
Price of finished
:A:0:Revenue
goodsRevenue
units sold from
:A:-1:Revenue
output Revenue
of each stage,
from
:A:0:Gross_Margin
selling
by timefinished
period
Gross Margin
good:A:-1:Gross_Margin
output of each stage, by time period
:A:-1:Proc_Cost_per_U_Sc3
Processing :A:0:Transition_pct_Sc3
cost per unit
Transition
for units %
processed
:A:-1:Transition_pct_Sc3
Scenarioat3
Percent
each stage,
of good
:D:-1:Process
segmented
units output
A list
by cost
of
from
thefactors
stage
:D:0:Process
process
A
(material,
that
stages
goesin
labor,
to
the
stage
process
fixedBexpense,
forflow
the nex
ov
:D:2:Cost_Types.Material
Cost_Types:D:0:Cost_Types.Labor
Labor
:D:0:Cost_Types.Fixed_Exp
Fixed Exp :D:0:Cost_Types.OH
OH
:WS:
Process Analysis
:WS:
0 :WS:
0 :WS:
Process Analysis
:WS:

0
1
1
1
0
0
1
1000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Transition_pct_Sc2["ProcessX.Stage_1",
0 Transition_pct_Sc2["ProcessX.Stage_2",
"Process.Stage_3"]|=0
0 Transition_pct_Sc2["ProcessX.Stage_2",
"Process.Stage_1"]|=0
0 Transition_pct_Sc2["ProcessX.Stage_2",
"Process.Stage_2"]|=0
0
"Process.
Process_Yield_pct_Sc1["ProcessX.Stage_2",
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
DATE(2009,5,1)]|=F36
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
DATE(2009,6,1)]|=G36
1 DATE(2009,7,1)]|=H36DATE
Process_Yield_pct_Sc2["ProcessX.Stage_2",
1 Process_Yield_pct_Sc2["ProcessX.Stage_2",
1 Process_Yield_pct_Sc2["ProcessX.Stage_2",
DATE(2009,1,1)]|=1 1 Process_Yield_pct_Sc2["ProcessX.Stage_2",
DATE(2009,2,1)]|=B42
1 DATE(2009,3,1)]|=C42DATE
Process_Yield_pct_Sc3["ProcessX.Stage_1",
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
DATE(2009,9,1)]|=K47
1 Process_Yield_pct_Sc3["ProcessX.Stage_1",
DATE(2009,10,1)]|=L47
1 DATE(2009,11,1)]|=N47
DATE
Units_Purchd_In_Day["Process.Stage_1",
0 Units_Purchd_In_Day["Process.Stage_1",
DATE(2009,4,1)]|=D59
0 Units_Purchd_In_Day["Process.Stage_1",
DATE(2009,5,1)]|=F59
0 Units_Purchd_In_Day["Process.Stage_1",
DATE(2009,6,1)]|=G59
0
DATE(2
Units_Purchd_In_Day["Process.Stage_3",
0 Stations["Process.Stage_1",
DATE(2009,12,1)]|=O61
1 Stations["Process.Stage_1",
DATE(2009,1,1)]|=1
1 Stations["Process.Stage_1",
DATE(2009,2,1)]|=B65
1
DATE(2009,3,1)]|=C6
Stations["Process.Stage_3",
1 Stations["Process.Stage_3",
DATE(2009,8,1)]|=J67
1 Stations["Process.Stage_3",
DATE(2009,9,1)]|=K67
1 Stations["Process.Stage_3",
DATE(2009,10,1)]|=L67
1
DATE(2009,11,1)]|=N
Station_Capacity_Day["Process.Stage_3",
1000 Station_Capacity_Day["Process.Stage_3",
1000
DATE(2009,4,1)]|=D73
Station_Capacity_Day["Process.Stage_3",
1000
DATE(2009,5,1)]|=F73
Station_Capacity_Day["Process.Stage_3",
1000
DATE(2009,6,1)]|=G73DATE(2
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,12,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
DATE(2009,1,1)]|=if("Fixed
if(Units!P3
"Cost_T
DAT
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,8,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,9,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,4,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,5,1)]|=if("OH"="Fixed_
0"Cost_Types.OH",
if(Units!F33=0,
DATE(2009
"Cost_T
0
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,12,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
DATE(2009,1,1)]|=if("Fixed
if(Units!P3
"Cost_T
DAT
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,8,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,9,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,4,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,5,1)]|=if("OH"="Fixed_
0"Cost_Types.OH",
if(Units!F32=0,
DATE(2009
"Cost_T
0
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,12,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
DATE(2009,1,1)]|=if("Fixed
if(Units!P3
"Cost_T
DAT
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,8,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,9,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,4,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,5,1)]|=if("OH"="Fixed_
0"Cost_Types.OH",
if(Units!F34=0,
DATE(2009
"Cost_T
0
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,12,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
DATE(2009,1,1)]|=if("Fixed
if(Units!P3
"Cost_T
DAT
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,8,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,9,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,4,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,5,1)]|=if("OH"="Fixed_
0"Cost_Types.OH",
if(Units!F33=0,
DATE(2009
"Cost_T
0
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,12,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
DATE(2009,1,1)]|=if("Fixed
if(Units!P3
"Cost_T
DAT
Cost_per_U_Purchd_In["Process.Stage_1",
0 Cost_per_U_Purchd_In["Process.Stage_1",
0DATE(2009,8,1)]|=J159
Cost_per_U_Purchd_In["Process.Stage_1",
0DATE(2009,9,1)]|=K159
Cost_per_U_Purchd_In["Process.Stage_1",
0DATE(2009,10,1)]|=L159
DATE(
Scrap_Salvage_Value_per_U["Process.Stage_1",
0 Scrap_Salvage_Value_per_U["Process.Stage_1",
0 Scrap_Salvage_Value_per_U["Process.Stage_1",
DATE(2009,4,1)]|=D165
0 Scrap_Salvage_Value_per_U["Process.Stage_1",
DATE(2009,5,1)]|=F165
0
DATE(2009,6,1)]|=G16D
Scrap_Salvage_Value_per_U["Process.Stage_3",
0 Fixed_Exp_per_Station["Process.Stage_1",
0 Fixed_Exp_per_Station["Process.Stage_1",
DATE(2009,12,1)]|=O167
0DATE(2009,1,1)]|=0
Fixed_Exp_per_Station["Process.Stage_1",
0DATE(2009,2,1)]|=B171
DATE(
Fixed_Exp_per_Station["Process.Stage_3",
0 Fixed_Exp_per_Station["Process.Stage_3",
0DATE(2009,8,1)]|=J173
Fixed_Exp_per_Station["Process.Stage_3",
0DATE(2009,9,1)]|=K173
Fixed_Exp_per_Station["Process.Stage_3",
0DATE(2009,10,1)]|=L173
DATE(
Units_Demand["Process.Stage_2",
0 Units_Demand["Process.Stage_2",
DATE(2009,4,1)]|=0/3
0 Units_Demand["Process.Stage_2",
DATE(2009,5,1)]|=0/3
0 Units_Demand["Process.Stage_2",
DATE(2009,6,1)]|=0/3
0
DATE(2009,7,1
Selling_Price["Process.Stage_1",
0 Selling_Price["Process.Stage_2",
DATE(2009,12,1)]|=O189
0 Selling_Price["Process.Stage_2",
DATE(2009,1,1)]|=2*'Unit
0 Selling_Price["Process.Stage_2",
DATE(2009,2,1)]|=B190
Cost'!P37
0
DATE(2009,3,1)]

Specifies which
:A:0:Proc_Cost_per_U_Sc1
scenario
Process
to use Cost/U
in :A:-1:Proc_Cost_per_U_Sc1
the model.
Scenario
Affects
Processing
1 assumptions
:A:0:Proc_Cost_per_U_Sc2
cost per unit
forProcess
processing
for units
Cost/U
processed
:A:-1:Proc_Cost_per_U_Sc2
costs
Scenario
peratunit,
Processing
each
2 transition
stage,cost
segmented
probabilities,
per unit for
byand
units
costyield
factors
proces
ra
Percentage:A:0:Process_Cost
of units input
Process
that become
Cost
:A:-1:Process_Cost
scrap atProcessing
each stage,
:A:0:COGSCost
cost
by at
time
each
period
stage,
of Goods
segmented
:A:-1:COGS
by Cost
process
of units
stage,
sold
byas
time
finished
periodgoods from
Gross margin
:A:0:Gross_Margin_pct
amount (revenue
Gross Margin
- cost
:A:-1:Gross_Margin_pct
%of goods)
Gross
for finished
margin
:A:0:WIP_Avail_In
goods
percentsold
=WIP
gross
asAvailable
output
margin
:A:-1:WIP_Avail_In
from
In
/ revenue
each Value
stage,ofbywork
timeinperiod
process inventory avail
Process :D:2:Process
Process :D:1:Process
Total
:D:0:Process.Stage_1
Stage 1
:D:2:Process.Stage_1
Lvl 1
0 :WS:

Company_Name[]|

Transition_pct_Sc2["ProcessX.Stage_3",
0 Transition_pct_Sc2["ProcessX.Stage_3",
"Process.Stage_1"]|=0
0 Transition_pct_Sc2["ProcessX.Stage_3",
"Process.Stage_2"]|=0
0 Transition_pct_Sc3["ProcessX.Stage_1",
"Process.Stage_3"]|=0
0 Transition_pct_Sc3["ProcessX.Stage_1
"Process.Stage_1"]|=
Process_Yield_pct_Sc1["ProcessX.Stage_2",
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
DATE(2009,9,1)]|=K36
1 Process_Yield_pct_Sc1["ProcessX.Stage_2",
DATE(2009,10,1)]|=L36
1 Process_Yield_pct_Sc1["ProcessX.Stag
DATE(2009,11,1)]|=N36
DATE(2009,12,1
Process_Yield_pct_Sc2["ProcessX.Stage_2",
1 Process_Yield_pct_Sc2["ProcessX.Stage_2",
1 Process_Yield_pct_Sc2["ProcessX.Stage_2",
DATE(2009,5,1)]|=F42
1 Process_Yield_pct_Sc2["ProcessX.Stage_2",
DATE(2009,6,1)]|=G42
1 Process_Yield_pct_Sc2["ProcessX.Stag
DATE(2009,7,1)]|=H42DATE(2009,8,1)
Process_Yield_pct_Sc3["ProcessX.Stage_2",
1 Process_Yield_pct_Sc3["ProcessX.Stage_2",
1 Process_Yield_pct_Sc3["ProcessX.Stage_2",
DATE(2009,1,1)]|=1 1 Process_Yield_pct_Sc3["ProcessX.Stage_2",
DATE(2009,2,1)]|=B48
1 Process_Yield_pct_Sc3["ProcessX.Stag
DATE(2009,3,1)]|=C48DATE(2009,4,1)
Units_Purchd_In_Day["Process.Stage_1",
0 Units_Purchd_In_Day["Process.Stage_1",
DATE(2009,8,1)]|=J59
0 Units_Purchd_In_Day["Process.Stage_1",
DATE(2009,9,1)]|=K59
0 Units_Purchd_In_Day["Process.Stage_1",
DATE(2009,10,1)]|=L59
0 Units_Purchd_In_Day["Process.Stage_
DATE(2009,11,1)]|=
Stations["Process.Stage_1",
1 Stations["Process.Stage_1",
DATE(2009,4,1)]|=D65
1 Stations["Process.Stage_1",
DATE(2009,5,1)]|=F65
1 Stations["Process.Stage_1",
DATE(2009,6,1)]|=G65
1 Stations["Process.Stage_1",
DATE(2009,7,1)]|=H65DATE(200
Stations["Process.Stage_3",
1 Station_Capacity_Day["Process.Stage_1",
DATE(2009,12,1)]|=O67
1000 Station_Capacity_Day["Process.Stage_1",
1000
DATE(2009,1,1)]|=1000
Station_Capacity_Day["Process.Stage_1",
1000
DATE(2009,2,1)]|=B71
Station_Capacity_Day["Process.Stage_
DATE(2009,3,1)]|=C
Station_Capacity_Day["Process.Stage_3",
1000 Station_Capacity_Day["Process.Stage_3",
1000
DATE(2009,8,1)]|=J73
Station_Capacity_Day["Process.Stage_3",
1000
DATE(2009,9,1)]|=K73
Station_Capacity_Day["Process.Stage_3",
1000
DATE(2009,10,1)]|=L73
Station_Capacity_Day["Process.Stage_
DATE(2009,11,1)]|=
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,4,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage
DATE(2009,5,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,6,1
if(Units!F32=
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Labor",
DATE(2009,12,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,1,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage
DATE(2009,2,1)]|=if
"Cost_Types.Labo
if(Units!P33=0, 0
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,8,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,9,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage
if(Units!K33=0,
DATE(2009,10,1)]|=if("
"Cost_Types.OH",
0, 'Costif(Un
Flow
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,4,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage
DATE(2009,5,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,6,1
if(Units!F34=
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Labor",
DATE(2009,12,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,1,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage
DATE(2009,2,1)]|=if
"Cost_Types.Labo
if(Units!P32=0, 0
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,8,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,9,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage
if(Units!K32=0,
DATE(2009,10,1)]|=if("
"Cost_Types.OH",
0, 'Costif(Un
Flow
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,4,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage
DATE(2009,5,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,6,1
if(Units!F33=
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Labor",
DATE(2009,12,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,1,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage
DATE(2009,2,1)]|=if
"Cost_Types.Labo
if(Units!P34=0, 0
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,8,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,9,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage
if(Units!K34=0,
DATE(2009,10,1)]|=if("
"Cost_Types.OH",
0, 'Costif(Un
Flow
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,4,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage
DATE(2009,5,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,6,1
if(Units!F32=
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Labor",
DATE(2009,12,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,1,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage
DATE(2009,2,1)]|=if
"Cost_Types.Labo
if(Units!P33=0, 0
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,8,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,9,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage
if(Units!K33=0,
DATE(2009,10,1)]|=if("
"Cost_Types.OH",
0, 'Costif(Un
Flow
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,4,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage
DATE(2009,5,1)]|=if("Fixed_Exp"="Fix
"Cost_Types.Fixed
DATE(2009,6,1
if(Units!F34=
Cost_per_U_Purchd_In["Process.Stage_1",
0 Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,12,1)]|=O159
Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,1,1)]|=0
Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,2,1)]|=B160
Cost_per_U_Purchd_In["Process.Stage
DATE(2009,3,1)]|=
Scrap_Salvage_Value_per_U["Process.Stage_1",
0 Scrap_Salvage_Value_per_U["Process.Stage_1",
0 Scrap_Salvage_Value_per_U["Process.Stage_1",
DATE(2009,8,1)]|=J165
0 Scrap_Salvage_Value_per_U["Process.Stage_1",
DATE(2009,9,1)]|=K165
0 Scrap_Salvage_Value_per_U["Process
DATE(2009,10,1)]|=L165
DATE(2009
Fixed_Exp_per_Station["Process.Stage_1",
0 Fixed_Exp_per_Station["Process.Stage_1",
0DATE(2009,4,1)]|=D171
Fixed_Exp_per_Station["Process.Stage_1",
0DATE(2009,5,1)]|=F171
Fixed_Exp_per_Station["Process.Stage_1",
0DATE(2009,6,1)]|=G171
Fixed_Exp_per_Station["Process.Stage
DATE(2009,7,1)]|=
Fixed_Exp_per_Station["Process.Stage_3",
0 Labor_Overhead_pct[DATE(2009,1,1)]|=0
0DATE(2009,12,1)]|=O173
Labor_Overhead_pct[DATE(2009,2,1)]|=B176
0 Labor_Overhead_pct[DATE(2009,3,1)]|=C176
0 Labor_Overhead_pct[DATE(2009,4,1)]|
Units_Demand["Process.Stage_2",
0 Units_Demand["Process.Stage_2",
DATE(2009,8,1)]|=0/3
0 Units_Demand["Process.Stage_2",
DATE(2009,9,1)]|=0/3
0 Units_Demand["Process.Stage_2",
DATE(2009,10,1)]|=0/3
0 Units_Demand["Process.Stage_2",
DATE(2009,11,1)]|=0/3DAT
Selling_Price["Process.Stage_2",
0 Selling_Price["Process.Stage_2",
DATE(2009,4,1)]|=D190
0 Selling_Price["Process.Stage_2",
DATE(2009,5,1)]|=F190
0 Selling_Price["Process.Stage_2",
DATE(2009,6,1)]|=G190
0 Selling_Price["Process.Stage_2",
DATE(2009,7,1)]|=H190
DATE

:A:0:Units_Capacity
Units Capacity
:A:-1:Units_Capacity
Units processing
:A:0:Station_Capacity_Day
capacity
Capacity/Station/Day
for each:A:-1:Station_Capacity_Day
stage, per time
Unitsperiod
processing
:A:0:Stations
capacity for each stage per station
:A:0:WIP_InWIP In
:A:-1:WIP_In
Value of units
:A:0:WIP_Out
of work in
WIP
process
Out inventory
:A:-1:WIP_Out
thatValue
enterofeach
units
:A:0:WIP_per_U_Out
processing
of work in stage,
process
segmented
inventory that
by cost
exit
:A:0:Scrap_Salvage_Value_per_U
Scrap Salvage
:A:-1:Scrap_Salvage_Value_per_U
$/Unit Salvage value
:A:0:Labor_Overhead_pct
per unit Labor
of unitsOverhead
scrapped
:A:-1:Labor_Overhead_pct
%at each
Overhead
stage, by
rate
:A:0:Scrap_Cost
time
on period
labor expense, by process stage
:D:0:Process.Stage_2
Stage 2
:D:0:Process.Stage_3
Stage 3
:D:-1:ProcessX
A duplicate :D:0:ProcessX
list of process
ProcessX
stages in:D:2:ProcessX
the process flow. This list is needed so

0
1
1
1
0
1
1000
1000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Transition_pct_Sc3["ProcessX.Stage_1",
0 Transition_pct_Sc3["ProcessX.Stage_2",
"Process.Stage_3"]|=0
0 Transition_pct_Sc3["ProcessX.Stage_2",
"Process.Stage_1"]|=0
0 Transition_pct_Sc3["ProcessX.Stage_2",
"Process.Stage_2"]|=0
0
"Process.
Process_Yield_pct_Sc1["ProcessX.Stage_3",
1 Process_Yield_pct_Sc1["ProcessX.Stage_3",
1 Process_Yield_pct_Sc1["ProcessX.Stage_3",
DATE(2009,2,1)]|=B37
1 Process_Yield_pct_Sc1["ProcessX.Stage_3",
DATE(2009,3,1)]|=C37
1 DATE(2009,4,1)]|=D37DATE
Process_Yield_pct_Sc2["ProcessX.Stage_2",
1 Process_Yield_pct_Sc2["ProcessX.Stage_2",
1 Process_Yield_pct_Sc2["ProcessX.Stage_2",
DATE(2009,10,1)]|=L42
1 Process_Yield_pct_Sc2["ProcessX.Stage_3",
DATE(2009,11,1)]|=N42
1 DATE(2009,12,1)]|=O42
DATE
Process_Yield_pct_Sc3["ProcessX.Stage_2",
1 Process_Yield_pct_Sc3["ProcessX.Stage_2",
1 Process_Yield_pct_Sc3["ProcessX.Stage_2",
DATE(2009,6,1)]|=G48
1 Process_Yield_pct_Sc3["ProcessX.Stage_2",
DATE(2009,7,1)]|=H48
1 DATE(2009,8,1)]|=J48 DATE
Units_Purchd_In_Day["Process.Stage_2",
0 Units_Purchd_In_Day["Process.Stage_2",
DATE(2009,1,1)]|=0/3
0 Units_Purchd_In_Day["Process.Stage_2",
DATE(2009,2,1)]|=B60
0 Units_Purchd_In_Day["Process.Stage_2",
DATE(2009,3,1)]|=C60
0
DATE(2
Stations["Process.Stage_1",
1 Stations["Process.Stage_1",
DATE(2009,9,1)]|=K65
1 Stations["Process.Stage_1",
DATE(2009,10,1)]|=L65
1 Stations["Process.Stage_1",
DATE(2009,11,1)]|=N65
1
DATE(2009,12,1)]|=O
Station_Capacity_Day["Process.Stage_1",
1000 Station_Capacity_Day["Process.Stage_1",
1000
DATE(2009,5,1)]|=F71
Station_Capacity_Day["Process.Stage_1",
1000
DATE(2009,6,1)]|=G71
Station_Capacity_Day["Process.Stage_1",
1000
DATE(2009,7,1)]|=H71DATE(2
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,1,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,2,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,9,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,10,1)]|=if("Fixe
"Cost_T
DAT
if(
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,5,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,6,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!G33
DATE(20
"Cost_T
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,1,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,2,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,9,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,10,1)]|=if("Fixe
"Cost_T
DAT
if(
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,5,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,6,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!G32
DATE(20
"Cost_T
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,1,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,2,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,9,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,10,1)]|=if("Fixe
"Cost_T
DAT
if(
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,5,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,6,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!G34
DATE(20
"Cost_T
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,1,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,2,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,9,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,10,1)]|=if("Fixe
"Cost_T
DAT
if(
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,5,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,6,1)]|=if("Labor"="F
0"Cost_Types.Labor",
if(Units!G33
DATE(20
"Cost_T
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,1,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,2,1)]|=if("Materia
"Cost_T
if(Units
DATE(
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,9,1)]|=if("Fixed_Exp"="Fixed_Exp",
0"Cost_Types.Fixed_Exp",
DATE(2009,10,1)]|=if("Fixe
"Cost_T
DAT
if(
Cost_per_U_Purchd_In["Process.Stage_2",
0 Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,5,1)]|=F160
Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,6,1)]|=G160
Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,7,1)]|=H160
DATE(
Scrap_Salvage_Value_per_U["Process.Stage_2",
0 Scrap_Salvage_Value_per_U["Process.Stage_2",
0 Scrap_Salvage_Value_per_U["Process.Stage_2",
DATE(2009,1,1)]|=0
0 Scrap_Salvage_Value_per_U["Process.Stage_2",
DATE(2009,2,1)]|=B166
0
DATE(2009,3,1)]|=C16D
Fixed_Exp_per_Station["Process.Stage_1",
0 Fixed_Exp_per_Station["Process.Stage_1",
0DATE(2009,9,1)]|=K171
Fixed_Exp_per_Station["Process.Stage_1",
0DATE(2009,10,1)]|=L171
Fixed_Exp_per_Station["Process.Stage_1",
0DATE(2009,11,1)]|=N171
DATE(
Labor_Overhead_pct[DATE(2009,5,1)]|=F176
0 Labor_Overhead_pct[DATE(2009,6,1)]|=G176
0 Labor_Overhead_pct[DATE(2009,7,1)]|=H176
0 Labor_Overhead_pct[DATE(2009,8,1)]|=J176
0
Units_Demand["Process.Stage_3",
0 Units_Demand["Process.Stage_3",
DATE(2009,1,1)]|=0/3
0 Units_Demand["Process.Stage_3",
DATE(2009,2,1)]|=0/3
0 Units_Demand["Process.Stage_3",
DATE(2009,3,1)]|=0/3
0
DATE(2009,4,1
Selling_Price["Process.Stage_2",
0 Selling_Price["Process.Stage_2",
DATE(2009,9,1)]|=K190
0 Selling_Price["Process.Stage_2",
DATE(2009,10,1)]|=L190
0 Selling_Price["Process.Stage_2",
DATE(2009,11,1)]|=N190
0
DATE(2009,12,1

Processing :A:-1:Stations
Stations Number of processing
:A:0:Process_Yield_pct
stations
Yield % at each
:A:-1:Process_Yield_pct
processing
Pecentage
stage, :A:0:Transition_pct
of
byinput
time units
period
Transition
that exit as
% good units for each proces
WIP/Unit Out
:A:-1:WIP_per_U_Out
Value per unit
:A:0:WIP_per_U_In
of work in
WIP/Unit
processIn:A:-1:WIP_per_U_In
inventory that
Value
exitsper
each
unit
:A:0:WIP_Buffer_Stock
processing
of work in
WIP_Buffer
stage
process
as good
inventory
Stock
units,
that
segmented
enters each
by co
pro
Scrap Cost :A:-1:Scrap_Cost
Cost imputed
:A:0:Scrap_Cost_per_U
to scrap at
Scrap
eachCost/Unit
stage,
:A:-1:Scrap_Cost_per_U
segmented
Cost
byper
cost
unit
factor
:A:0:Cost_per_U_Purchd_In
imputed
(material,
toCost/Unit
scrapped
labor,Purch'd
fixed
unitsexpense,
atIneach stage,
overhead)
segmen
by
ProcessX :D:1:ProcessX
Total
:D:0:ProcessX.Stage_1
Stage 1
:D:2:ProcessX.Stage_1
Lvl 1
:D:0:ProcessX.Stage_2
Stage 2

Transition_pct_Sc3["ProcessX.Stage_3",
0 Transition_pct_Sc3["ProcessX.Stage_3",
"Process.Stage_1"]|=0
0 Transition_pct_Sc3["ProcessX.Stage_3",
"Process.Stage_2"]|=0
0 Process_Yield_pct_Sc1["ProcessX.Stage_1",
"Process.Stage_3"]|=0
1 Process_Yield_pct_Sc1["ProcessX.Stag
DATE(2009,1,1)
Process_Yield_pct_Sc1["ProcessX.Stage_3",
1 Process_Yield_pct_Sc1["ProcessX.Stage_3",
1 Process_Yield_pct_Sc1["ProcessX.Stage_3",
DATE(2009,6,1)]|=G37
1 Process_Yield_pct_Sc1["ProcessX.Stage_3",
DATE(2009,7,1)]|=H37
1 Process_Yield_pct_Sc1["ProcessX.Stag
DATE(2009,8,1)]|=J37 DATE(2009,9,1)
Process_Yield_pct_Sc2["ProcessX.Stage_3",
1 Process_Yield_pct_Sc2["ProcessX.Stage_3",
1 Process_Yield_pct_Sc2["ProcessX.Stage_3",
DATE(2009,2,1)]|=B43
1 Process_Yield_pct_Sc2["ProcessX.Stage_3",
DATE(2009,3,1)]|=C43
1 Process_Yield_pct_Sc2["ProcessX.Stag
DATE(2009,4,1)]|=D43DATE(2009,5,1)
Process_Yield_pct_Sc3["ProcessX.Stage_2",
1 Process_Yield_pct_Sc3["ProcessX.Stage_2",
1 Process_Yield_pct_Sc3["ProcessX.Stage_2",
DATE(2009,10,1)]|=L48
1 Process_Yield_pct_Sc3["ProcessX.Stage_3",
DATE(2009,11,1)]|=N48
1 Process_Yield_pct_Sc3["ProcessX.Stag
DATE(2009,12,1)]|=O48
DATE(2009,1,1)
Units_Purchd_In_Day["Process.Stage_2",
0 Units_Purchd_In_Day["Process.Stage_2",
DATE(2009,5,1)]|=F60
0 Units_Purchd_In_Day["Process.Stage_2",
DATE(2009,6,1)]|=G60
0 Units_Purchd_In_Day["Process.Stage_2",
DATE(2009,7,1)]|=H60
0 Units_Purchd_In_Day["Process.Stage_
DATE(2009,8,1)]|=J
Stations["Process.Stage_2",
1 Stations["Process.Stage_2",
DATE(2009,1,1)]|=1
1 Stations["Process.Stage_2",
DATE(2009,2,1)]|=B66
1 Stations["Process.Stage_2",
DATE(2009,3,1)]|=C66
1 Stations["Process.Stage_2",
DATE(2009,4,1)]|=D66DATE(200
Station_Capacity_Day["Process.Stage_1",
1000 Station_Capacity_Day["Process.Stage_1",
1000
DATE(2009,9,1)]|=K71
Station_Capacity_Day["Process.Stage_1",
1000
DATE(2009,10,1)]|=L71
Station_Capacity_Day["Process.Stage_1",
1000
DATE(2009,11,1)]|=N71
Station_Capacity_Day["Process.Stage_
DATE(2009,12,1)]|=
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,5,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,6,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc1["Process.Stage
"Cost_Types.Mate
if(Units!G32=0,
DATE(2009,7,1)]|
0,
Proc_Cost_per_U_Sc1["Process.Stage_1",
0 Proc_Cost_per_U_Sc1["Process.Stage_1",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,1,1)]|=B176*B83
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_1",
DATE(2009,2,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage
DATE(2009,3,1)]|=if("O
"Cost_Types.OH",
if(Un
Proc_Cost_per_U_Sc1["Process.Stage_2",
0 Proc_Cost_per_U_Sc1["Process.Stage_2",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,9,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage_2",
DATE(2009,10,1)]|=if("Labor"="Fixed_Exp"
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc1["Process.Stage
if(Units!L33=0,
DATE(2009,11,1)]|=
"Cost_Types.Labo
0, 'Cost
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,5,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,6,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc1["Process.Stage
"Cost_Types.Mate
if(Units!G34=0,
DATE(2009,7,1)]|
0,
Proc_Cost_per_U_Sc1["Process.Stage_3",
0 Proc_Cost_per_U_Sc1["Process.Stage_3",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,1,1)]|=B176*B95
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage_3",
DATE(2009,2,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc1["Process.Stage
DATE(2009,3,1)]|=if("O
"Cost_Types.OH",
if(Un
Proc_Cost_per_U_Sc2["Process.Stage_1",
0 Proc_Cost_per_U_Sc2["Process.Stage_1",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,9,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_1",
DATE(2009,10,1)]|=if("Labor"="Fixed_Exp"
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage
if(Units!L32=0,
DATE(2009,11,1)]|=
"Cost_Types.Labo
0, 'Cost
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,5,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.Material",
DATE(2009,6,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc2["Process.Stage
"Cost_Types.Mate
if(Units!G33=0,
DATE(2009,7,1)]|
0,
Proc_Cost_per_U_Sc2["Process.Stage_2",
0 Proc_Cost_per_U_Sc2["Process.Stage_2",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,1,1)]|=B176*B115
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage_2",
DATE(2009,2,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc2["Process.Stage
DATE(2009,3,1)]|=if("O
"Cost_Types.OH",
if(Un
Proc_Cost_per_U_Sc2["Process.Stage_3",
0 Proc_Cost_per_U_Sc2["Process.Stage_3",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,9,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage_3",
DATE(2009,10,1)]|=if("Labor"="Fixed_Exp"
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc2["Process.Stage
if(Units!L34=0,
DATE(2009,11,1)]|=
"Cost_Types.Labo
0, 'Cost
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,5,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.Material",
DATE(2009,6,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc3["Process.Stage
"Cost_Types.Mate
if(Units!G32=0,
DATE(2009,7,1)]|
0,
Proc_Cost_per_U_Sc3["Process.Stage_1",
0 Proc_Cost_per_U_Sc3["Process.Stage_1",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,1,1)]|=B176*B135
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_1",
DATE(2009,2,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage
DATE(2009,3,1)]|=if("O
"Cost_Types.OH",
if(Un
Proc_Cost_per_U_Sc3["Process.Stage_2",
0 Proc_Cost_per_U_Sc3["Process.Stage_2",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,9,1)]|=if("Labor"="Fixed_Exp",
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage_2",
DATE(2009,10,1)]|=if("Labor"="Fixed_Exp"
0"Cost_Types.Labor",
Proc_Cost_per_U_Sc3["Process.Stage
if(Units!L33=0,
DATE(2009,11,1)]|=
"Cost_Types.Labo
0, 'Cost
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Material",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,5,1)]|=if("Material"="Fixed_Exp",
Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.Material",
DATE(2009,6,1)]|=if("Material"="Fixed_E
Proc_Cost_per_U_Sc3["Process.Stage
"Cost_Types.Mate
if(Units!G34=0,
DATE(2009,7,1)]|
0,
Proc_Cost_per_U_Sc3["Process.Stage_3",
0 Proc_Cost_per_U_Sc3["Process.Stage_3",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,1,1)]|=B176*B147
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage_3",
DATE(2009,2,1)]|=if("OH"="Fixed_Exp",
0"Cost_Types.OH",
Proc_Cost_per_U_Sc3["Process.Stage
DATE(2009,3,1)]|=if("O
"Cost_Types.OH",
if(Un
Cost_per_U_Purchd_In["Process.Stage_2",
0 Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,9,1)]|=K160
Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,10,1)]|=L160
Cost_per_U_Purchd_In["Process.Stage_2",
0DATE(2009,11,1)]|=N160
Cost_per_U_Purchd_In["Process.Stage
DATE(2009,12,1)]
Scrap_Salvage_Value_per_U["Process.Stage_2",
0 Scrap_Salvage_Value_per_U["Process.Stage_2",
0 Scrap_Salvage_Value_per_U["Process.Stage_2",
DATE(2009,5,1)]|=F166
0 Scrap_Salvage_Value_per_U["Process.Stage_2",
DATE(2009,6,1)]|=G166
0 Scrap_Salvage_Value_per_U["Process
DATE(2009,7,1)]|=H166
DATE(2009
Fixed_Exp_per_Station["Process.Stage_2",
0 Fixed_Exp_per_Station["Process.Stage_2",
0DATE(2009,1,1)]|=0
Fixed_Exp_per_Station["Process.Stage_2",
0DATE(2009,2,1)]|=B172
Fixed_Exp_per_Station["Process.Stage_2",
0DATE(2009,3,1)]|=C172
Fixed_Exp_per_Station["Process.Stage
DATE(2009,4,1)]|=
Labor_Overhead_pct[DATE(2009,9,1)]|=K176
0 Labor_Overhead_pct[DATE(2009,10,1)]|=L176
0 Labor_Overhead_pct[DATE(2009,11,1)]|=N176
0 Labor_Overhead_pct[DATE(2009,12,1)]|=O176
0 Units_Demand["Process.Stage_1", DAT
Units_Demand["Process.Stage_3",
0 Units_Demand["Process.Stage_3",
DATE(2009,5,1)]|=0/3
0 Units_Demand["Process.Stage_3",
DATE(2009,6,1)]|=0/3
0 Units_Demand["Process.Stage_3",
DATE(2009,7,1)]|=0/3
0 Units_Demand["Process.Stage_3",
DATE(2009,8,1)]|=0/3 DAT
Selling_Price["Process.Stage_3",
0 Selling_Price["Process.Stage_3",
DATE(2009,1,1)]|=2*'Unit
0 Selling_Price["Process.Stage_3",
DATE(2009,2,1)]|=B191
Cost'!P38
0 Selling_Price["Process.Stage_3",
DATE(2009,3,1)]|=C191
0 Selling_Price["Process.Stage_3",
DATE(2009,4,1)]|=D191
DATE

:A:-1:Transition_pct
Percent of good
:A:0:Transition_pct_Sc1
units output
Transition
from%
stage
:A:-1:Transition_pct_Sc1
Scenario
A that1
Percent
goes toof
stage
good
:A:0:Transition_pct_Sc2
Bunits
for the
output
Transition
next from
time%
stage
period,
:A:-1:Transition_pct_Sc2
Scenario
Afor
that
all
2goes
pairstoofstage
processes
B for the
A and
nexB
:A:-1:WIP_Buffer_Stock
Value of units
:A:0:Process_Yield_pct_Sc1
in buffer Yield
stock%
available
Scenario
:A:-1:Process_Yield_pct_Sc1
to 1enterPecentage
each processing
:A:0:Process_Yield_pct_Sc2
of inputstage,
units
Yield
that
segmented
%
exit
Scenario
as
:A:-1:Process_Yield_pct_Sc2
good
by cost
2 units
factor
for each
(material,
processing
labor, fixed
stage,
e
:A:-1:Cost_per_U_Purchd_In
Cost per unit
:A:0:Scrap_Net_Cost
of purchased
Scrap
input
Netunits
Cost
:A:-1:Scrap_Net_Cost
enteredCost
into each
of scrap
state,
:A:0:Scrap_Salvage_Value
less
bysalvage
timeScrap
period
value
Salvage
of:A:-1:Scrap_Salvage_Value
scrap
Value
at each stage, segmented by co
:D:0:ProcessX.Stage_3
Stage 3
:D:-1:ProcessY
A duplicate :D:0:ProcessY
list of process
ProcessY
stages in:D:2:ProcessY
the process
ProcessY
flow. This:D:1:ProcessY
list is needed so that some variables c

1
1
1
1
0
1
1000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Percent of good units output from stage A that goes to stage B for the next time period, for all pairs of processes A and B, by time p
Pecentage of input units that exit as good units for each processing stage, by time period, for scenario 2
Salvage value of units scrapped at each stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period
Total

eriod, for all pairs of processes A and B, by time period, for scenario 2
e period, for scenario 2
al, labor, fixed expense, overhead) by time period

Você também pode gostar