APPENDIX C
TEMPORARY WORKS
SAFETY / ENV
APPROVALS / CHECKING SCHEME DESIGN CONTRACTOR PLANS, PROGRAMME, STAFF, SCHEDULE OF SUBMISSIONS, DESIGN PROGRAMME, CLAIMS/VO's
QUALITY RQMNTS
II
SITE ESTABLISHMENT, PROGRAMME DEVELOPMENT, CONTRACTOR'S SITE LAYOUT, SITE GRID, ORGANISATION, HSQE PLANS, PAYMENTS & SETTING OUT & APPLICATIONS, DRAWING & DOCUMENT COMPATIBILITY CHECK. CONTROL, STAKEHOLDERS, RISK, INTERFACES, REPORTING.
CONTRACT ADMINISTRATION, DOCUMENT CONTROL, I&TP, QUALITY MANUAL, PAYMENT PROCEDURE, COMPLIANCE MATRIX PROGRAMME PLAN, INSPECTION AGAINST CONTRACT PLAN & CHECKLISTS. REPORT FORMATS, CONTROLS CHECKLISTS FOR PILING, MATERIALS, INSPECTION COMPACTION, DRAINAGE, RECORDS, PROGRESS RECORDING, COMPACTION, MEASUREMENT.
III
HEAVY EQPT, PLANT, INSTRUMENTATION, OPEN EXCAVATIONS, SLOPES, RETAINING LIFTING, NIGHT WORK, STRUCTURE, CRANES & PUBLIC ROADS, DUST, DRAINS, HAUL ROADS. NOISE FALSEWORK, CRANES, DRAINS, CONCRETING PUMPS LIFTING, HEAVY EQUIPMENT, ELECTRICITY,WATER, NOISE, PUBLIC ROADS
METHOD STATEMENTS. SETTING VOUT, LOAD TESTS, SUBGRADE, MATERIALS, RC WORKS METHOD STATEMENTS, REBAR FIXING, CONCRETING, SETTING OUT,
IV
BASEMENT CONSTRUCTION, RAMPS, WATERPROOFING, SUMPS/PLINTHS, BACKFILLING. INTERFACE WITH APRONS, + Elevated Road & MLCP PTB SUPERSTRUCTURE, RC WORKS, STEELWORKS, LIFT SHAFTS, ESACLATOR PITS, PENETRATIONS (including Road & MLCP) ROOF & CLADDING, FAADE & WALLS (ENVELOPE)
GFC DWGS, EQUIPMENT NEEDS re PLINTHS etc. SEWERAGE/ DRAINAGE CONNECTION. COLUMNS, SLABS, PENETRATIONS, SEMs, STEELWORK, DRAINAGE STEELWORK, CLADDING, SKYLIGHTS, DRAINAGE, GLAZING, FRAMES CSD's, SEMS, CONTROL PANELS, LAYOUTS. INTERFACE WITH IT / AIRPORT SYSTEMS etc.
MATERIALS, INSPECTION CHECKLISTS, SURVEY, RECORDS, FIELD & LAB MESAUREMENT, PROGRESS TESTING RECORDS/REPORTING CONCRETING & REBAR CHECKLISTS, STEELWORK CHECKING, PROGRESS REPORTING CHECKLISTS, MEASUREMENT, PROGRESS RECORDS/REPORTING
HEIGHT, LIFTING, FIRE, METHOD STATEMENTS, RC ELECTRICITY, WORKS, FORMWORK/ SCAFFOLDS STEEL/ CONCRETING HEIGHT, LIFTING, POWER, POWER TOOLS, HOTWORKS METHOD STATEMENTS, SEQUENCING, WELDING, MOCK-UP, PROTOTYPES, BENCHMARKS.
VI
E&M INSTALLATION & FIT OUT: E&M EQUIPMENT, PBB, DG SETS, ELEVATORS ESCALATORS, TRAVELLATORS, HVAC etc (Plus MLCP). INDIVIDUAL T&C.
METHOD STATEMENTS & MATERIALS, MANUALS, INSTALLATION RQMNTS, CIP, T&C PROCEDURES, SUPPLIERS, STORAGE, INSPECTION RECORDS STATUTORY INSPECTIONS, METHOD STATEMENTS, MATERIALS, PROTOTYPES, MOCK UPS, BENCHMARKS METHOD STATEMENTS, APPROVALS BY AIRPORT USERS, FIRE APPROVAL, STATUTORY INSPECTIONS.
THIRD PARTY CHECKS REQUIRED, CIP DEVELOPMENT, CSD's ACCEPATANCE OF ARCHITECTURAL WORKS. PROGRESS MEASUREMENT & PAYMENT CHECKLISTS, CHECKS BY STATUTORY BODIES / OTHERS & ACCEPATNCE PROCEDURE
VII
SCHEDULES FOR DOORS, HEIGHT, FALLS, ROOMS, FINISHES, STAGING, FALSEWORK, POWER TOOLS, REFLECTED CEILING PLAN, LIFTING EQUIPMENT ELECTRICITY, FIRE. TILE LAYOUTS. STATUTORY & ADVISORY, LOCATIONS & FIXINGS, LETTERING MANUALS, PLAN FOR SEQUENCING & INTEGRATION WITH OTHER SYSTEMS AAI PLAN MANUALS
SNAGGING / PUNCHLISTS
ACCEPTANCE BY OTHERS.
VIII
FIRE, ELECTROCUTION
T&C PROCEDURE +
IX X
AIRPORT OPERATIONAL REQUIREMENTS DEFECTS LIABILITY PERIOD (after Builder's Clean) CONTRACT CLOSE
PASSENGERS/STAFF As Req'd
METHOD STATEMENT FROM RECORD OF TRIAL ?? FOR AIRPORT TRIAL PTB OPERATOR INPUT COMPLETION CERTIFICATE RECORDS ALL RECORDS
I II
PHASE REVIEW OF PROJECT SITE ESTABLISHMENT, PROGRAMME DEVELOPMENT, CONTRACTOR'S ORGANISATION, HSQE PLANS, PAYMENTS & APPLICATIONS, DRAWING & DOCUMENT CONTROL, SITE PREPARTION, EARTHWORKS, FOUNDATIONS. (Including Elevated Road & MLCP) BASEMENT CONSTRUCTION, RAMPS, WATERPROOFING, SUMPS/PLINTHS, BACKFILLING. INTERFACE WITH APRONS, + Elevated Road & MLCP PTB SUPERSTRUCTURE, RC WORKS, STEELWORKS, LIFT SHAFTS, ESACLATOR PITS, PENETRATIONS (including Road & MLCP) ROOF & CLADDING, FAADE & WALLS (ENVELOPE) E&M INSTALLATION & FIT OUT: E&M EQUIPMENT, PBB, DG SETS, ELEVATORS ESCALATORS, TRAVELLATORS, HVAC etc (Plus MLCP). INDIVIDUAL T&C. FINISHES - FLOORING, WALLS, CEILINGS, DOORS, SOCKETS, A/C, TOILETS, LIGHTING SIGNAGE (including Roads, MLCP), & FURNITURE + LANDSCAPING INTEGRATED TESTING & COMMISSIONING AIRPORT OPERATIONAL REQUIREMENTS DEFECTS LIABILITY PERIOD (after Builder's Clean) CONTRACT CLOSE
Period 1
Period 2
Period 3
Period 4
Period 5
Period 6
Period 7
Period 8
Period 9
III
IV