Goals, Criteria and Constraints Bigger, better addition to Global Close, affordable Maintains style Holds 600 students + faculty Green
Gantt Chart
Maps
General
Topographic
Soils
Flood
Zoning
Preliminary Work
Adjacency Matrix
Bubble Map
Room Planning
Codes Requirements
This project adheres to the International Building Code, 2009 for all codes and regulations. From the EllisCAD, the project site is located in a school zone. To meet the ADA requirements for accessibility, entrance ramps, wheelchair accessible sidewalks, and handicap-accessible restrooms have been included.
Type of Construction
Based on the type of building (Institution) and style of partner campus, we will be building it out of concrete, brick, wood and it will be 50 feet high, and 3 stories. This is from the IBC building types based on size and use of our facility section 302. Adhering to ADA codes and occupancy requirements, we will have a minimum 150 parking spaces, and 5 accessible parking spaces. Section 1106.
Heat Loss
Material Brick 90lb/ft^3 0.2 5.78 Fiberglass Insulation 4 Vapor Barrier 0 Inside air film 0.68 Door with Double glazed Window 1.67 Gypsum Wall Board 0.9 Q' = 73,929 x 1/5.78 x 68 Q' = 869,752 Btu/hr R-Value
Water Run-Off
PRE I = 2.17in Ai = 36,299.92 C = .18 Cs = 1.0 Q = (2.6)(.18)(2.17)(5.19458) = 5.28cfs POST (1)(5.19458) + (2.7)(5.19458) = 16.47cfs Cc (1)(.83) + (.18)(.69) = .95 Cc = .95 Q = CfCiA = (1)(.95)(2.17)(5.2) = 10.7cfs Difference = 10.7 5.28 = 5.42cfs
Building Model
First Floor
Second/Third Floor
Thank You