1 2 3 4 5
Site Study Report Revised Relay Settings chart Relay Secondary Injection Report CT Primary Injection Report Fuse Tripping Test Report
Project :
Mother Son Automotive Technologies & Engineering. Chittamanur Village, M.M Nagar Relay Co-Ordination Study
Witnessed By :
Approved By :
Project :
Mother Son Automotive Technologies & Engineering. Chittamanur Village, M.M Nagar Relay Co-Ordination Study
Protection
Relay Type CT Ratio Adop Over Current I> t> Charac.Curve I>> t>> Earth fault Ie> Te> Charac.Curve Ie>> Te>>
Incomer
C&S IRI-PRO-3I-EI 200/5A 1.00xIn (200A) 0.05(TMS) EI 2.00xIn(400A) 0.2(DEFT) 0.20xIn(40A) 0.2(DEFT) DEFT 0.50xIn(100A) 0.1(DEFT)
TR-1
C&S IRI-PRO-30-E0 120/5A C&S IRI-PRO-3I-EI 0.01(TMS) EI N.A N.A 0.15xIn(18A) 0.1(DEFT) DEFT N.A N.A
TR-2
C&S IRI-PRO-30-E0 120/5A 0.50xIn(60A) 0.01(TMS) EI N.A N.A 0.15xIn(18A) 0.1(DEFT) DEFT N.A N.A
FSPII (Outgoing)
C&S IRI-PRO-3I-EI 150/5A 0.50xIn(75A) 0.06(TMS) EI 1.00xIn(150A) 0.1(DEFT) 0.10xIn(15A) 0.15(DEFT) DEFT 0.50xIn(75A) 0.1(DEFT)
Plant 2
ER 2TJM10 200/5A 0.50xIn(100A) 0.2(TMS) NI N.A N.A 0.20xIn(40A) 0.2(TMS) NI N.A N.A
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study
1. NAME PLATE DATAS Manufacturer : C&S Electric Model : IRI PRO-V2-3I-EI-5-5 Sl.No : 2011124743 CT Ratio : 200/5A Vx : 24-270V DC / AC 2. RELAY SETTINGS ADOPTED: OVER CURRENT ELEMENT Over Load Setting I> : 1.0xIn (100%) Time Lever Setting (TMS): 0.05 (EI Curve) EARTH FAULT ELEMENT Over Load Setting Ie> : 0.2xIn (20%) Time Lever Setting (TMS): 0.2 (DMT)
Short Circuit Setting I>> Time Setting TI>> Short Circuit Setting Ie>> Time Setting TI>>
3. PHASE OVER CURRENT PROTECTION ELEMENT: (E.I) SET CURRENT IN AMP 1.00*In 1.00*In 1.00*In OPERATING TIME IN SEC 2*Is 5*Is As per As per OPER. OPER. CURVE CURVE TIME TIME TIME TIME 1.342 0.179 1.337 1.33 0.180 0.17 1.340 0.182
PHASE
TMS
I>
R Y B
4. PHASE OVER CURRENT PROTECTION ELEMENT: (DMT) SET CURRENT IN AMP 2.00*In 2.00*In 2.00*In TIME SETTING 0.2 0.2 0.2 OPERATING TIME IN SEC 0.217 0.215 0.216
PHASE R Y B
I>>
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study
5. Ie > EARTH FAULT PROTECTION: (DMT) SET CURRENT IN AMP 0.20*In 0.20*In 0.20*In TIME SETTING 0.20 0.20 0.20 OPERATING TIME IN SEC 0.202 0.210 0.212
PHASE R Y B
Ie>
6. Ie >> EARTH FAULT PROTECTION: (DMT) SET CURRENT IN AMP 0.50*In 0.50*In 0.50*In TIME SETTING 0.10 0.10 0.10 OPERATING TIME IN SEC 0.114 0.101 0.112
PHASE R Y B
Ie>>
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study
1. NAME PLATE DATAS Manufacturer : C&S Electric Model : IRI PRO-V2-3I-EI-5-5 Sl.No : 2012020204 CT Ratio : 150/5A Vx : 24-270V DC / AC 2. RELAY SETTINGS ADOPTED: OVER CURRENT ELEMENT Over Load Setting I> : 0.50xIn (50%) Time Lever Setting (TMS): 0.06 (EI Curve) EARTH FAULT ELEMENT Over Load Setting Ie> : 0.10xIn (10%) Time Lever Setting (TMS): 0.15 (DMT)
Short Circuit Setting I>> Time Setting TI>> Short Circuit Setting Ie>> Time Setting TI>>
3. PHASE OVER CURRENT PROTECTION ELEMENT: (E.I) SET CURRENT IN AMP 0.50*In 0.50*In 0.50*In OPERATING TIME IN SEC 2*Is 5*Is As per As per OPER. OPER. CURVE CURVE TIME TIME TIME TIME 1.605 0.213 1.611 1.60 0.211 0.20 1.601 0.217
PHASE
TMS
I>
R Y B
4. PHASE OVER CURRENT PROTECTION ELEMENT: (DMT) SET CURRENT IN AMP 1.0*In 1.0*In 1.0*In TIME SETTING 0.1 0.1 0.1 OPERATING TIME IN SEC 0.110 0.115 0.112
PHASE R Y B
I>>
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study
5. Ie > EARTH FAULT PROTECTION: (DMT) SET CURRENT IN AMP 0.10*In 0.10*In 0.10*In TIME SETTING 0.15 0.15 0.15 OPERATING TIME IN SEC 0.157 0.161 0.160
PHASE R Y B
Ie>
6. Ie >> EARTH FAULT PROTECTION: (DMT) SET CURRENT IN AMP 0.50 0.50 0.50 TIME SETTING 0.10 0.10 0.10 OPERATING TIME IN SEC 0.113 0.121 0.109
PHASE R Y B
Ie>>
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study
1. NAME PLATE DATAS Manufacturer : C&S Electric Model : IRI PRO-V2-30-E0-5-5 Sl.No : 2011124731 CT Ratio : 120/5A Vx : 24-270V DC / AC 2. RELAY SETTINGS ADOPTED: OVER CURRENT ELEMENT Over Load Setting I> : 0.50xIn (50%) Time Lever Setting (TMS): 0.01 (EI Curve) EARTH FAULT ELEMENT Over Load Setting Ie> : 0.15xIn (15%) Time Lever Setting (TMS): 0.10 (DMT)
Short Circuit Setting I>> Time Setting TI>> Short Circuit Setting Ie>> Time Setting TI>>
: N/A : -: N/A : --
3. PHASE OVER CURRENT PROTECTION ELEMENT: (E.I) SET CURRENT IN AMP 0.50*In 0.50*In 0.50*In OPERATING TIME IN SEC 2*Is 5*Is As per As per OPER. OPER. CURVE CURVE TIME TIME TIME TIME 0.289 0.041 0.280 0.27 0.039 0.03 0.276 0.036
PHASE
TMS
I>
R Y B
4. Ie > EARTH FAULT PROTECTION: (DMT) SET CURRENT IN AMP 0.15*In 0.15*In 0.15*In TIME SETTING 0.10 0.10 0.10 OPERATING TIME IN SEC 0.110 0.111 0.114
PHASE R Y B
Ie>
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study
1. NAME PLATE DATAS Manufacturer : C&S Electric Model : IRI PRO-V2-30-E0-5-5 Sl.No : 2012020230 CT Ratio : 120/5A Vx : 24-270V DC / AC 2. RELAY SETTINGS ADOPTED: OVER CURRENT ELEMENT Over Load Setting I> : 0.50xIn (50%) Time Lever Setting (TMS): 0.01 (EI Curve) EARTH FAULT ELEMENT Over Load Setting Ie> : 0.15xIn (15%) Time Lever Setting (TMS): 0.10 (DMT)
Short Circuit Setting I>> Time Setting TI>> Short Circuit Setting Ie>> Time Setting TI>>
: N/A : -: N/A : --
3. PHASE OVER CURRENT PROTECTION ELEMENT: (E.I) SET CURRENT IN AMP 0.50*In 0.50*In 0.50*In OPERATING TIME IN SEC 2*Is 5*Is As per As per OPER. OPER. CURVE CURVE TIME TIME TIME TIME 0.270 0.037 0.271 0.27 0.039 0.03 0.279 0.041
PHASE
TMS
I>
R Y B
4. Ie > EARTH FAULT PROTECTION: (DMT) SET CURRENT IN AMP 0.15*In 0.15*In 0.15*In TIME SETTING 0.10 0.10 0.10 OPERATING TIME IN SEC 0.113 0.117 0.120
PHASE R Y B
Ie>
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study TEST REPORT FOR CURRENT TRANSFORMER
LOCATION : 11KV SWITCH BOARD (OUTDOOR VCB) PANEL NAME : 4 PANEL VCB 11 KV HT PANEL FEEDER NAME : INCOMER 1. CT PRIMARY INJECTION TEST: CT RATIO: 400-200/5-5A CORE-2 :( PROTECTION, CT RATIO SELECTED: 200/5A) APPLIED PRI CURRENT (%) CORE-2 25% 50% 75% 100% MEASURED SEC. CURRENT(A) Y-PHASE 2S1-2S2 2S1-2S3 1.25 1.24 2.50 2.49 3.75 3.74 5.00 4.99
R-PHASE 2S1-2S2 2S1-2S3 1.25 1.25 2.50 2.49 3.75 3.74 5.00 5.00
B-PHASE 2S1-2S2 2S1-2S3 1.25 1.24 2.49 2.50 3.75 3.74 5.00 4.99
CORE-1 :( METERING, CT RATIO SELECTED: 400/5A) APPLIED PRI CURRENT (%) CORE-1 25% 50% 75% 100% MEASURED SEC. CURRENT(A) Y-PHASE 1S1-1S2 1S1-1S3 1.25 1.24 2.50 2.49 3.75 3.74 4.99 4.99
R-PHASE 1S1-1S2 1S1-1S3 1.25 1.25 2.50 2.50 3.75 3.74 5.00 5.00
B-PHASE 1S1-1S2 1S1-1S3 1.25 1.24 2.49 2.49 3.74 3.74 4.99 4.99
3. Group Test: (CT RATIO SELECTED: 200/5A) Loop Between RY YB BR Y Alone E\F Primary Current 50.00A 50.00A 50.00A 50.00A Secondary Current in Amps R-Phase 1.25A --1.25A --Y-Phase 1.25A 1.25A --1.25A B-Phase --1.25A 1.25A --Breaker Tripping OK OK OK OK
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study TEST REPORT FOR CURRENT TRANSFORMER
LOCATION : 11KV SWITCH BOARD (OUTDOOR VCB) PANEL NAME : 4 PANEL VCB 11 KV HT PANEL FEEDER NAME : OUTGOING-1(FISP-2) 1. CT PRIMARY INJECTION TEST: CT RATIO: 300-150/5-5A CORE-2 :( PROTECTION, CT RATIO SELECTED: 150/5A) APPLIED PRI CURRENT (%) CORE-2 25% 50% 75% 100% MEASURED SEC. CURRENT(A) Y-PHASE 2S1-2S2 2S1-2S3 1.25 1.25 2.50 2.49 3.75 3.75 5.00 5.00
R-PHASE 2S1-2S2 2S1-2S3 1.25 1.25 2.50 2.50 3.75 3.75 5.00 5.00
B-PHASE 2S1-2S2 2S1-2S3 1.25 1.25 2.49 2.50 3.75 3.75 5.00 5.00
CORE-1 :( METERING, CT RATIO SELECTED: 300/5A) APPLIED PRI CURRENT (%) CORE-1 25% 50% 75% 100% MEASURED SEC. CURRENT(A) Y-PHASE 1S1-1S2 1S1-1S3 1.25 1.25 2.50 2.50 3.75 3.75 5.00 5.00
R-PHASE 1S1-1S2 1S1-1S3 1.25 1.25 2.50 2.50 3.75 3.74 5.00 5.00
B-PHASE 1S1-1S2 1S1-1S3 1.25 1.24 2.49 2.49 3.74 3.74 4.99 4.99
3. Group Test: (CT RATIO SELECTED: 150/5A) Loop Between RY YB BR Y Alone E\F Primary Current 37.50A 37.50A 37.50A 37.50A Secondary Current in Amps R-Phase 1.24A --1.25A --Y-Phase 1.24A 1.24A --1.24A B-Phase --1.24A 1.25A --Breaker Tripping OK OK OK OK
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study TEST REPORT FOR CURRENT TRANSFORMER
LOCATION : 11KV SWITCH BOARD (OUTDOOR VCB) PANEL NAME : 4 PANEL VCB 11 KV HT PANEL FEEDER NAME : OUTGOING-2(TRANSFORMER-2) 1. CT PRIMARY INJECTION TEST: CT RATIO: 120/5-5A CORE-2 :( PROTECTION) APPLIED PRI CURRENT (%) CORE-2 25% 50% 75% 100% MEASURED SEC. CURRENT(A) R-PHASE Y-PHASE B-PHASE 2S1-2S2 2S1-2S2 2S1-2S2 1.25 1.25 1.25 2.50 2.50 2.49 3.75 3.75 3.75 5.00 5.00 5.00
CORE-1 :( METERING) APPLIED PRI CURRENT (%) CORE-1 25% 50% 75% 100% MEASURED SEC. CURRENT(A) R-PHASE Y-PHASE B-PHASE 1S1-1S2 1S1-1S2 1S1-1S2 1.25 1.25 1.25 2.50 2.50 2.49 3.75 3.75 3.75 5.00 5.00 5.00
2. Group Test: (CT RATIO SELECTED: 120/5A) Loop Between RY YB BR Y Alone E\F Primary Current 30.00A 30.00A 30.00A 30.00A Secondary Current in Amps R-Phase 1.25A --1.25A --Y-Phase 1.25A 1.25A --1.25A B-Phase --1.25A 1.25A --Breaker Tripping OK OK OK OK
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study TEST REPORT FOR CURRENT TRANSFORMER
LOCATION : 11KV SWITCH BOARD (OUTDOOR VCB) PANEL NAME : 4 PANEL VCB 11 KV HT PANEL FEEDER NAME : OUTGOING-3(TRANSFORMER-1) 1. CT PRIMARY INJECTION TEST: CT RATIO: 120/5-5A CORE-2 :( PROTECTION) APPLIED PRI CURRENT (%) CORE-2 25% 50% 75% 100% MEASURED SEC. CURRENT(A) R-PHASE Y-PHASE B-PHASE 2S1-2S2 2S1-2S2 2S1-2S2 1.24 1.24 1.25 2.50 2.49 2.49 3.74 3.74 3.75 5.00 5.00 4.99
CORE-1 :( METERING) APPLIED PRI CURRENT (%) CORE-1 25% 50% 75% 100% MEASURED SEC. CURRENT(A) R-PHASE Y-PHASE B-PHASE 1S1-1S2 1S1-1S2 1S1-1S2 1.25 1.25 1.25 2.50 2.49 2.49 3.74 3.75 3.75 5.00 5.00 4.99
2. Group Test: (CT RATIO SELECTED: 120/5A) Loop Between RY YB BR Y Alone E\F Primary Current 30.00A 30.00A 30.00A 30.00A Secondary Current in Amps R-Phase 1.25A --1.25A --Y-Phase 1.25A 1.25A --1.25A B-Phase --1.25A 1.25A --Breaker Tripping OK OK OK OK
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com
Project :
Mother Son Automotive Technologies & Engineering Chittamanur Village, M.M Nagar Relay Co-Ordination Study TEST REPORT FOR HT FUSE
LOCATION
1. FUSE TRIPPING CHECKS Fuse Size : Not known Fuse rating : Not known APPLIED CURRENT 160A 170A 180A 190A 200A OPERATING TIME No Tripping up to 10Mins No Tripping up to 10Mins No Tripping up to 10Mins No Tripping up to 10Mins Trips instantaneously
Witnessed By :
Approved By :
PRE-COMMISSIONING RELAY TESTING - H.V.ELECTRICALS SYSTEM STUDIES, HIPOT TEST, FAULT LEVEL CALCULATIONS, METER S TROUBLE SHOOTING ON TRANSFORMERS / MOTORS / SWITCHGEARS / TRANSMISSION LINES ETC. Contact Details : 28, S.S.Nagar, Karambakkam, Porur, Chennai 116. Tele fax : (091)-(044)-24762522, 98411 31621 E-mail-testcom.engineers@yahoo.com