GLT ENGINEERS PRIVATE, SINGAPORE

FOUNDATION DESIGN
PROJECT TITLE BOREHOLE : 891 B TAMPINES AVE 8 : BH 20

Type of pile : Pile size : Concrete grade : Surface perimeter , As : Bearing area, Ab :

BoredPile 200 Dia. for 5 Tier Carpark 200 35 N/mm^2 0.63 m^2/m 0.03 m^2 12.5 m

EST. PILE PENETRATION LENGH FROM PILE CUT OFF LEVEL :

STRUCTURAL CAPACITIES OF PILES IN ACCORDANCE WITH BS8004 AND GEOTECHNICAL CAPACITIES OF PILES BASED ON N-VALUES (MEYERHOF, 1976) Qu = C1*Ns*As + C2*Nb*Ab Qs = C1*Ns*As Where C1 = 2 for Bored pile with SPT < 100 Where C1 = 2.5 for Bored pile with SPT >= 100 Ns Ns ( ave.) Cu Cu ( ave.) fs kN/m^2 Shaft Friction (kN)

SHAFT FRICTION

Datum (m) 0.00

Layer Soil Layer depth(m)

3.00 3.00 1.00 4.00

Excavation

0.0

0.00

0.0

Yellow,Brown & Red Fine to coarse clayey

0.0

20

10

-8.80

-6.2

Qnsf, total
2.00 6.00 3.00 9 00 9.00 3.00 12.00 3.00 15.00 0.50 15.50 Dense to very dense Yellowish pinky & white, fine to Coarse silty sand with quartz 100.0 92.0 " Ditto " 84.0 74.5 Very dense Greyish white fine to coarse silty 65.0 37.5 Stif light grey & yellownClaye with organic 10.0 9.5 "Ditto" 9.0 4.5

=
9

-6.2
11.3

19

35.8

75

141.4

149

280.9

230

72.3

Qs total Qs,

541 6 541.6

Shaft length =

12.5 m

Qs

541.6

kN
Qb = C2*Nb*Ab

Qnsf

-6.2

kN

END BEARING Db = Where C2*Nb = 1.5 m C2 = 12(Db/B) = 9000 kN/m^2 =>

= 90.00 < 400 Where

0.2 m Nb = (C2*Nb) <= 7500 kN/m^2 100

Qb

235.6 kN

GEOTECHINICAL CAPACTY Short term Long term

D:\yEnnIe\GLT\HDB file\BATCH 7\Block 891B TAMPINES AVE 8\EXCEL\Borepile-891B

Qu = Qs + Qb Qa = (Qs+Qb)/2.5 = STRUCTURAL CAPACITY

Qa = Qs/1.5+Qb/3 - Qnsf =

433.5 kN

310.89 kN

fy = Asc =

460 N/mm2 3T32 = 2413 mm2 493.0 kN 486.8 kN

Qa = (0.4*Ab*fcu + 0.75*fy*As Qan = Qa - Qnsf =

=> (Minimum) : Geotechinical Capacity Controls = Say =

433 kN 430 kN