OBRA: REND.

FECHA:

210 M/JOR.

UNIDAD:

LIMPIEZA DE TERRENO

CONCEPTO

UNIDAD

DESP.

CANTIDAD

P.UNITARIO

COSTO TOTAL

IMPORTE

CUADRILLA 01

JOR.

MANO DE OBRA 0.0047

$550.00

$2.59

SUB-TOTAL HERRAMIENTA 3%

$2.59

DEPRECIACIN

$2.59

$0.08

SUB-TOTAL CROQUIS REALIZ AUTORIZ

$0.08

COSTO DIRECTO COSTO INDIRECTO 24%

$2.66 $0.64 $3.30

TOTAL

OBRA: REND. FECHA:

210 M/JOR.

UNIDAD:

TRAZO Y NIVELACIN

CONCEPTO CALHIDRA ESTACAS HILO

UNIDAD KG. PZAS. ML.

DESP.

CANTIDAD 0.4000 0.5000 0.0020

P.UNITARIO $1.40 $5.00 $0.25

COSTO TOTAL $0.56 $2.50 $0.0005

IMPORTE

SUB-TOTAL MANO DE OBRA 0.165

3.06

CUADRILLA 01

JOR.

$550.00

$90.75

SUB-TOTAL HERRAMIENTA 3%

$90.75

DEPRECIACIN

$90.75

$2.72

SUB-TOTAL CROQUIS REALIZ AUTORIZ

$2.72

COSTO DIRECTO COSTO INDIRECTO 24%

$96.53 $23.17 $119.70

TOTAL

OBRA: REND. FECHA:

7 M/JOR.

UNIDAD:

EXCAVACIN DE CEPAS A MANO CON PICO Y PALA EN TERRENO TIPO II DE 1 A 1.5 METROS DE PROFUNDIDAD. CONCEPTO UNIDAD DESP. CANTIDAD P.UNITARIO COSTO TOTAL IMPORTE

SUB-TOTAL MANO DE OBRA 0.143

CUADRILLA 01

JOR.

$550.00

$78.54

SUB-TOTAL HERRAMIENTA 3%

$78.54

DEPRECIACIN

$78.54

$2.36

SUB-TOTAL CROQUIS REALIZ AUTORIZ

$2.36

COSTO DIRECTO COSTO INDIRECTO 24%

$80.90 $19.42 $100.31

TOTAL

OBRA: REND. FECHA:

3.8 M/JOR. UNIDAD:

PLANTILLA DE DESPLANTE EN CIMENTACIN TIPO I Y III DE CONCRETO SIMPLE POBRE FC=100 KG/CM DE 5 CM. DE ESPESOR. CONCEPTO CONCRETO FC=1OOKG/CM UNIDAD ML DESP. CANTIDAD 0.0400 P.UNITARIO $836.07 COSTO TOTAL $33.44 IMPORTE

SUB-TOTAL MANO DE OBRA 0.263

33.44

CUADRILLA 01

JOR.

$550.00

$144.71

SUB-TOTAL HERRAMIENTA 3%

$144.71

DEPRECIACIN

$144.71

$4.34

SUB-TOTAL CROQUIS
0.05

$4.34

REALIZ AUTORIZ

1.00 0.80

COSTO DIRECTO COSTO INDIRECTO 24%

$182.49 $43.80 $226.29

TOTAL

OBRA: REND. FECHA:

3.8 M/JOR. UNIDAD:

PLANTILLA DE DESPLANTE EN CIMENTACIN TIPO II Y IV DE CONCRETO SIMPLE POBRE FC=100 KG/CM DE 5 CM. DE ESPESOR. CONCEPTO CONCRETO FC=1OOKG/CM UNIDAD ML DESP. CANTIDAD 0.0300 P.UNITARIO $836.07 COSTO TOTAL $25.08 IMPORTE

SUB-TOTAL MANO DE OBRA 0.263

25.08

CUADRILLA 01

JOR.

$550.00

$144.71

SUB-TOTAL HERRAMIENTA 3%

$144.71

DEPRECIACIN

$144.71

$4.34

SUB-TOTAL CROQUIS
0.05

$4.34

REALIZ
1.00 0.60

AUTORIZ

COSTO DIRECTO COSTO INDIRECTO 24%

$174.13 $41.79 $215.92

TOTAL

OBRA: REND. FECHA:

3.8 M/JOR. UNIDAD:

PLANTILLA DE DESPLANTE EN CIMENTACIN TIPO V DE CONCRETO SIMPLE POBRE FC=100 KG/CM DE 5 CM. DE ESPESOR. CONCEPTO CONCRETO FC=1OOKG/CM UNIDAD ML DESP. CANTIDAD 0.0200 P.UNITARIO $836.07 COSTO TOTAL $16.72 IMPORTE

SUB-TOTAL MANO DE OBRA 0.263

16.72

CUADRILLA 01

JOR.

$550.00

$144.71

SUB-TOTAL HERRAMIENTA 3%

$144.71

DEPRECIACIN

$144.71

$4.34

SUB-TOTAL CROQUIS
0.05

$4.34

REALIZ AUTORIZ

1.00 0.60

COSTO DIRECTO COSTO INDIRECTO 24%

$165.77 $39.78 $205.55

TOTAL

OBRA: REND. FECHA:

2.6 M/JOR. UNIDAD:

CIMENTACIN DE MAMPOSTERIA DE PIEDRA BRASA ASENTADA CON MORTERO-ARENA 1:4. INC. ACARREO DE MATERIAL A PRIMERAA ESTACION Y HERRAMIENTA. CONCEPTO MORTERO CEMENTOARENA 1:4 PIEDRA BRASA UNIDAD M M DESP. CANTIDAD 0.3400 1.6600 P.UNITARIO $ 1,248.62 $190.00 COSTO TOTAL $424.53 $315.40 IMPORTE

SUB-TOTAL MANO DE OBRA 0.385

739.93

CUADRILLA 01

JOR.

$550.00

$211.53

SUB-TOTAL HERRAMIENTA 3%

$211.53

DEPRECIACIN

$211.53

$6.35

SUB-TOTAL CROQUIS REALIZ AUTORIZ

$6.35

COSTO DIRECTO COSTO INDIRECTO 24%

$957.81 $229.87 $1,187.68

TOTAL

OBRA: REND. FECHA:

UNIDAD:

ML.

ML DE DAL DE DESPLANTE DE CONCRETO ARMADO FC=200 KG/CM CON VARILLA DE 3/8" Y ESTRIVOS DEL No.2 @ 20 CM. INC. CIMBRA CONCEPTO
CONCRETO FC=200KG/CM (3/4")

UNIDAD M PZAS. KG. M KG. KG. LTS.

DESP.

CANTIDAD 0.0375 0.3330 1.3440 0.0190 0.5000 0.1200 0.2500

P.UNITARIO $1,165.15 $82.00 $20.00 $19.00 $40.00 $22.00 $11.63 SUB-TOTAL

COSTO TOTAL $43.69 $27.31 $26.88 $0.36 $20.00 $2.64 $2.91 123.79

IMPORTE

VARILLA No. 3 ALAMBRON ALAMBRE CIMBRA (RENTA) CLAVOS DIESEL

CUADRILLA 01

JOR.

MANO DE OBRA 0.165

$550.00

$90.75

SUB-TOTAL HERRAMIENTA 3%

$90.75

DEPRECIACIN

$90.75

$2.72

SUB-TOTAL CROQUIS REALIZ AUTORIZ

$2.72

COSTO DIRECTO COSTO INDIRECTO 24%

$217.26 $52.14 $269.40

TOTAL