Summary: In recent years world has witnessed a huge increase in demand of energy. Hence, mankind is now compelled to develop and use new technology to recover from non-conventional resources. This calls for new technological developments whose application can cater to the global energy needs. One such development is multi-stage well stimulation in horizontal wells. This review paper compares the two most common methods of multi-stage horizontal well stimulation i.e., widely used plug & perf method and relatively new ball & sleeve method, with their detailed analysis, operating principles and limitations. The paper closely examines their feasibility of economical as well as time aspects. It deals with confinement of fracturing process, involved potential risks and differences are showcased including maximising the production by tailoring treatments for unorthodox problems with a help of short case study.

Introduction Well Stimulation is a technique to improve the well productivity/ injectivity by applying various reservoir and/or wellbore treatments. This process aims at minimizing reservoir damage or eliminating production problems. It fulfils the following basic requirements: Bypasses near-wellbore damage and return a well to its natural productivity / injectivity Extends a conductive path deep into a formation and thus increase productivity / injectivity beyond the natural level Produces hydrocarbon from tight formation

This technique can be achieved by matrix acidization, fracture acidizing and hydraulic fracturing. Among these, hydraulic fracturing is the most accepted operation of the industry. Hydraulic fracture is a process of creating a fracture in a porous medium by injecting a fluid under pressure through a well bore in order to overcome native stresses and to cause material failure of the porous media. Although naturally occurring fractures in the rock such as cracks, fissures, joints, faults, etc. are caused due to thermal, chemical and other geo-stress imbalances in the past. The artificial fractures are achieved by pumping of hydraulic power fluids in the wellbore at a pressure exceeding the fracture pressure based on fracture gradient. The integrity of the produced cracks and fractures is preserved by adding the propping agents to the power fluid at the time of injection. Hydraulic fracturing is desirable under prevailing conditions: When the formation is very tight Having low permeability and poor conductivity Having relatively high pressure.

Since the inception of this technology, its scope has increased by many folds. Earlier its applications were limited to conventional reservoirs with vertical orientation. With latest advancements in technology like horizontal well completion we got better method for infill drilling and reservoir depletion. Unconventional reservoirs have been defined as formations that cannot be produced at economic flow rates or that do not produce economic volumes of oil and gas without stimulation treatments or special recovery processes and technologies. Unconventional resources like tight-gas reservoirs, shale gas, coal bed methane have come into existence recently. The problems faced during the exploitation of these unconventional resources using conventional techniques were: Increase in the effective surface area of the well to maximize reservoir contact. (Figure 1) Low vertical permeability resulting in less inflow. Less net pay thickness.

Other short comings were the ability to effectively stimulate or fracture the horizontal wellbore from the toe to the heel, particularly in reservoirs that were not naturally fractured. The use of limited entry and bull-heading techniques provided little benefit compared to vertical wells. Post production analysis on the deliverability of horizontal wells in reservoirs such as matrix, heterogeneous and non-conventional formations showed a direct correlation to the completion and stimulation methods employed and their shortcomings in horizontal applications. Thus, the added expense of a horizontal well was not justified by the equal to or slightly better production results versus vertical wells. Thus for efficient exploitation of the non-conventional plays and to fulfil the ever increasing global energy demand Multi Stage Horizontal Well Stimulation was introduced. The goal was of increasing access to the reservoir through the induction of fractures along the entire length of the horizontal wellbore. Since then extensive research has been done in this field which provided satisfactory results and remarkable increase in production from horizontal wells. This system comprise of the traditional methods of fracturing in multiple number of stages. The number of stages vary according to the extent of the horizontal well in the reservoir (usually 1000 -1500). This technique called off for introduction of new improved equipments whose details have been provided further in the paper.

Solution: Plug & Perf Technique Introduction Cemented liner,multi-stage fracturing method. This type of completion involves cementing production casing in the horizontal wellbore and plug and perf stimulation (Blanton and Mackenzie, 2006). Mechanical isolation in the liner is accomplished by setting of bridge plugs using pump down wireline or coiled tubing (CT), followed by perforating and then fracturing the well to provide access to the reservoir. The cement provides the mechanical diversion in the annulus while the bridge plug provides the mechanical diversion inside the liner. This process is then repeated for the number of stimulations desired for the horizontal wellbore. After all the stages have been completed, Coiled Tubing is used to drill out the composite plugs, thus re-establishing access to the toe of the horizontal wellbore. Although an effective method of

creating diversion along the horizontal for discrete stage stimulation, the inherent cost of multiple interventions with CT, perforating guns and deployment of fracturing equipment needed for each stage are extremely high, not to mention, very inefficient and time consuming (Houston et al., 2010; Samuelson et al., 2008). Production using this method can also be limiting, as cementing the wellbore closes many of the natural fractures and fissures that would otherwise contribute to overall production (Themig, 2010).

Working The technique requires multiple trips in and out of the well to accomplish individual components of an overall fracture stimulation completion. The first step in the process is to get communication from the tubing to the annulus at the toe of the well. Perf and plug uses a perforating assembly to initiate a fracture by using shaped explosives (perforating gun) (Figure 2). Once the perforation has been created, the assembly is run out of the hole and the wellhead is rigged up to pump trucks so that proppant can be injected into the fractured zone. Once completed, the pumping equipment is detached and a new perforating assembly coupled with a mechanical plug is run into the hole and set to isolate the treated zone from the next highest zone targeted for stimulation. There the perforation assembly is triggered to initiate the fracture in the new target zone, which is run back out of the hole to allow for the pumping of proppant into the fracture. This process continues until all zones within the well have been treated. The description of the fracturing fluid and proppant are as follows: Fracturing Fluid: The fluid used during hydraulic fracture treatment of reservoir consists primarily of water with some additives (in required concentrations) depending upon the conditions of the specific well being fractured. It has two functions. Firstly it opens and extends the fracture and secondly transport the proppant along the fracture length. Proppant: These are the suspended particles in fracturing fluids that are used to hold fractures open after hydraulic fracturing treatment, thus producing a conductive pathway that fluids can easily flow along. Naturally occurring sand grains or artificial ceramic materials are common proppants used. Advantages Used to stimulate cased wells. After the plugs have been milled out, the hydrocarbon get full wellbore radius for production. It is the simplest system to run in the hole and providing the full availability of wellbore diameter for stimulation purpose. Modelling of induced fractures can be done (simulation possible) Controlled fracturing Because of the above mentioned advantages it has gained strongest foothold in the market.

Problems faced The necessity for repeated CT interventions and the repeated rigging up and down of the fracturing or stimulation equipment. The situation gets complicated when the wellbore crosses sensitive zones, such as water zones, that need to be isolated from wellbore treatments

Depending on the well design and fracture-treatment design requirements, this process could take several hours per zone and require the frac crew to be idle while the plug and TCP/wireline trips are made to get ready for another frac.

Problems are often encountered when cementing horizontal liners in place with the added benefit of having a liner in the horizontal, which is beneficial for CT access and remedial operations later in the life of the well. Continued innovation such as pump-down plugs etc. have made this process more efficient, but at its best, operators are still only able to perform two or possibly three frac jobs per day on a single well. This process works well if over- flushing a previous fracture treatment is not an issue. It is a well-established process, but not feasible when multiple fractures are desired for a short duration.

Solution to the above mentioned problems Ball & Sleeve Method Introduction In 2000, the development of open hole mechanical diversion was placed at the forefront of research and development. Over the next two years various product components and systems were tested and deployed in the field. These tests led to what is now the standard system for open hole completions, with more than 300 successful runs to date. Uncemented , open hole, multi-stage (OHMS) fracturing method or in short Ball and Sliding Sleeve System : Between 2004 and 2006, a new, open hole, multi- stage system (OHMS) completion technology was run in Denton County, Texas (Lohoefer et al., 2006). OHMS were pioneered in 2001 with the goal of making multi-stage fracturing more efficient, both in terms of time and cost, as well as repeatable and reliable (Seale et al., 2006; Seale, 2007). OHMS use hydraulically set mechanical external packers instead of bridge plugs and cement to isolate sections of the wellbore. These packers typically have elastomer elements that expand to seal against the wellbore and do not need to be removed, or milled out, to produce the well. Instead of perforating the casing to allow fracturing, these systems have sliding sleeve tools to create ports in between the packers. These tools can be opened hydraulically (at a specific pressure) or by dropping size-specific actuation balls into the system to shift the sleeve and expose the port(Figure 3). The balls create internal isolation from stage to stage, eliminating the need for bridge plugs .OHMS permits that all the fracture treatments can be performed in a single, continuous pumping operation without the need for a drilling rig. Once stimulation treatment is complete, the well can be immediately flowed back and production brought on line. By developing a system to set in open hole, provide mechanical diversion and allow multiple fractures to be performed along the entire horizontal wellbore, all the problems associated with horizontal completions to date have been addressed. The packer would be required to sustain differential pressures of 10,000 psi at temperatures up to 425OF and set in holes enlarged up to 50%.

Working The stimulation sleeves also have the capability to be shifted open by landing a ball on a ball seat. The operator can use several different sized dropping balls and corresponding ball-landing seats to treat different intervals(Figure 4). It is important to note that this type of completion must be done from the toe up with the smallest ball and seat working the bottom/lowest zone. The Ball Activated Sliding Sleeve has a shear-pinned inner sleeve that covers the fracture ports until

a ball larger than the cast iron baffle in the bottom of the inner sleeve seats on the baffle and a pressure differential sufficient to shear the pins holding the inner sleeve closed is achieved to expose the fracture ports. When a ball lands on its specific seat, it isolates any zones treated below it and hydraulic pressure applied above the ball shifts the sleeve to the open position and aligns the ports to treat the next zone. The opening balls are phenolic and can be either drilled up or flowed back to surface once all the treatments are completed. The landing seats are made of a drillable material and can be drilled to give a full wellbore ID. When a ball injector was used, it was not necessary to shut down the pumps between stages. The shifting-tool profile remains in the inner mandrel so the operator can still engage and close a selected sleeve once the balls and ball seats are drilled out. Using the stimulation sleeves with ball-activation capability removes the need for any intervention to stimulate multiple zones in a single wellbore. The description of Stimulation sleeves, swelling packers and ball seats are as follows:

Stimulation Sleeve: The stimulation sleeve was designed to be run as part of the casing string. It is a tool that has communication ports between the ID and the OD of casing. The stimulation sleeve was designed to give the operator the option to selectively open and close any sleeve in the casing string (up to 10,000 psi differentials at 350F).

Swelling Packer: The swelling packer requires no mechanical movement or manipulation to set. The patented technology is the rubber compound that swells when it comes into contact with any liquid hydrocarbon. The compound will conform to the ID that it is swelling in and will continue to swell, up to 115% by volume of its original size.

Ball seats: These are designed to withstand the high erosional effects of fracturing and the corrosive effects of acids.

Advantages The introduction of the sleeve and swelling packer system (SSPS) technology now gives operators another completion method of effectively and economically completing new multi-zone wellbores with minimal to no intervention. Stimulation through the sleeves required less HHP, as a result of lowered treating pressures and providing the option to close the fracture ports in later date. A great efficiency is realized by performing multiple fractures or stimulation in a single pumping operation, which equates to significant savings of time and money, while reducing the health, safety and environment (HSE) hazards associated with those activities. Because fractures are able to initiate anywhere within the open-hole section of each isolated stage, the fracture will take the path of least resistance i.e. where the breakdown pressure is the lowest. This, in turn, reduces the potential for fracture tortuosity. The necessity for repeated Coiled Tubing interventions and the repeated rigging up and down of the fracturing or stimulation equipment is also eliminated with this system. The erosion resistance technology of the ball seats provides a design that could easily be milled/drilled. This allows all obstructions in the liner to be removed so full access to the toe of the horizontal wellbore could be attained.

Sometimes added backup may be provided in handling the high treating pressures that would be encountered. This system provides a redundant seal over a specified length, which was determined through modelling would prevent the stimulation or fracture to propagate past the seal.

The packer optimizes the mechanical diversion within the designed section length in the open hole horizontal wellbore and yet, flexible enough to navigate higher dog legs encountered in some drilling environments. With full access through the liner, standard operations associated with CT, logging, flow testing, etc. can be performed. It is common to have issues with noise and the surface owners while completing these wells, so the less time a stimulation crew can spend on locations, the better it will be for community relations. Removing the explosives from locations also removes one of the safety hazards.

That issue is the ability to re-fracture the well without having to utilize a work string or a rig. With the ReClosable FracPort design, all stages can be closed, leaving only the last one open and the well can be refractured just as it was initially, by dropping balls and pumping specifically designed fracturing treatments for each specific section of the horizontal well.

Problems faced The limiting factor in the number of ball-drop activated tools run in a single wellbore is the undesired low fracture flow rates due the reducing size of available balls and ball seats. The larger balls would flow back to surface, but the smaller ones could not. Another issue inherent in the OHMS system is the presence of the hoop stress around the wellbore and the fact that there is no medium in place to combat longitudinal growth along the wellbore (Barree et al, 2009)

Contrasting features between Plug & Perf Method and Ball & sleeve method:

1.

Cost Analysis The most significant cost savings use of OHMS come from the saved time on location and horsepower requirements associated with the fracture treatment. Tubing Conveyed perforating, Wireline perforating and plugs are just a few of the added costs needed to perform the plug and perf procedure that are not necessary in the OHMS system. The OHMS completion method eliminated approximately two weeks of completion operations at a cost savings of $300,000 to $400,000 per well at 2005 pricing.

Additional costs for plug-and-perf operations include renting and running a tieback string to provide a mono-bore for plug and gun deployment, wireline charges, and additional pumping charges. The cumulative effect of this delay over the course of a sustained drilling program can have a significant impact on the net present value (NPV) of the project.

For example, in the Bakken Shale an extra 200 bbl is used per stage to pump down plugs. For a 14-stage completion, the average cost for water using OHMS is US$40,000 saving 15% or $6,000 per job (Zander et al., 2010). The cumulative effect of these savings taken over the course of a sustained drilling program can have a

significant impact on the net present value of the project.

2.

Time Aspects With no logistical issues or mechanical failures, the fracture treatment of a 20-stage OHMS (the technical limit at the time of the study) could be pumped in a single, 24-hour period. A comparable plug and perf completion can take up to five days.

An additional benefit is to greatly increase the availability and flexibility of the service companys hydraulic fracturing treatment equipment schedule. The shorter stimulation treatment time of OHMS completions allows for less stand-by time of frac and wireline services and also allows the well to be put on production faster than a cemented liner, plug and perf well, which maximizes usage of increasingly limited frac crews (Edwards et al., 2010; Loehoefer et al., 2010).This disparity is strictly due to the time required to pump each stage for the plug and perf method.

The plug and perf method require bridge plugs to be pumped down the tubing, which requires the wellbore to be flushed clean of all proppant to avoid getting the plug stuck before it reaches the desired setting depth which is a time consuming process.

3.

Production Performance The study was undertaken to compare cemented verses uncemented multi-stage fractured wells in the Barnett shale. This study analyzed the data of the two types in the same time period and the long-term production recoveries .

Previous studies in the Barnett Shale have indicated that uncemented wells perform better than cemented wells (Fisher et al., 2004). However, despite having opened other unconventional plays, the perception persists that open hole completions do not work within certain areas where cemented casing dominates (Britt and Smith, 2009).

Example: Once the well list was narrowed down to the Central study area, each well was categorized as OHMS or perf and plug. Cumulative production was used to evaluate the production performance of wells in each category. A chart containing the average 6 month and 12 month cumulative production is found below. Results are in MMCFE using a 6:1 bbl:MCF ratio.

6 months OHMS Plug and Perf 300 224

12 months 478 358

The OHMS completion method outperformed the plug and perf method by 33% through 12 months of production. Not as many wells have enough production to extend the comparison beyond 12 months, but most wells appear to be

staying on trend.

4.

Optimisation Scope In terms of optimizing production of multi-stage stimulated wells, recent modelling simulations of depletion profiles from 6-stage open hole and cemented liner multi-stage completions have shown that open hole completions result in better drainage of the lateral (Themig, 2010). However, most models are unable to simulate the varying stresses in a horizontal wellbore the actual growth path and therefore size of the fracture cannot be determined. This creates a problem when attempting to optimize the fracture growth to allow for the most contact with the formation.

While the plug and perf method does seem to combat the majority of the concerns above including isolation with cement, perforations that extend into the formation to combat the hoop stress (Britt et al, 2009).But cementing off the lateral prevents the contribution of production from natural fractures and fissures often present in unconventional reservoirs that an open hole lateral would benefit from.

5.

Operational Characteristics The major operational advantage of OHMS completions is that they can be performed in a single, continuous pumping operation without the need for a drilling rig or wireline/CT services. This single feature provided the primary source of time and cost savings.(Edwards et al., 2010; Houston et al., 2010; Lohoefer et al., 2010; Samuelson et al., 2008).

However the plug and perf technology required following tasks, all down hole work after the drilling rig had reached total depth (TD): cementing of the lateral casing, coiled tubing or tubing conveyed toe stage perforating, the setting of 5 or 6 bridge plugs, and perforating runs for a 6 or 7 stage hydraulic fracture treatment design. Then, after fracturing treatment, the long drill out process of bridge plugs set between stages.

6.

Stimulation dynamics

There are differing opinions on how fractures initiate in the two systems: The OHMS system allows for the fracture treatment to seek out the area of least principal stress along the wellbore and propagate one or multiple fractures. This method seems like a natural fit in a hard rock low perm environment, however it can lead to some problems when attempting to model the fractures. However in Plug and Perf method concrete entry points into the formation to allow for easier fracture initiation (Britt et al, 2009) and then propagation throughout the reservoir.

7.

Well Downtime Discounting fracture treatment scheduling concerns often encountered, a well completed using OHMS can be put on production within two days of rig release. The plug and perf system can add an additional 4 days to the fracture treatment and introduce several logistical headaches including trucking and timing issues.

8.

HSE factors (Health, Safety and Environment) OHMS completions are safer due to the reduced number of trips in and out of well, reduced time on site, as well as no requirement for perforating explosives.

9.

Best fracturing practices

Development of best fracturing practices over the last few decades would include: not overdisplacing proppant, ensuring near-wellbore conductivity, promoting immediate flowback, optimizing load recovery, keeping breakdown pressures low, minimizing fracture tortuosity and minimizing fluid loading (Themig, 2010) Immediate flowback. The importance of managing the flowback period of a well is another parameter that has been recognized as an important factor for optimum well production performance (Crafton and Gunderson, 2007). OHMS completed wells can be immediately flowed back and put on production after stimulation as opposed to requiring time-consuming drill out of bridge plugs and potential shut-in periods which can exacerbate formation damage and cause irreparable reductions to the flow rate and regained permeability.

Overdisplacement In plug and perf ,to ensure that bridge plugs do not get stuck in the well due to the presence of proppant in the wellbore from the previous stage, an entire wellbore worth of fluid is displaced before a bridge plug is pumped down which although removes the extra proppant but also pushes that proppant out into the fracture away from the wellbore. On the other hand, by taking into account the type of system being run, the depths, lateral lengths and fluids being displaced, OHMS completions can more accurately place a ball on seat to isolate the previous stages fracture treatment resulting in the more ideal situation proppant placed right at the wellbore reducing overdisplacement of the fracture treatment.

Case Study (FracPoint System Increased Production in Bakken Formations) A well drilled in the Bakken shales in North Dakota was fractured with multistage fracture treatments have shown an increased production rate. An operator wanted to increase the number of stages in a packer and sleeve well and asked Baker Hughes to design a system that would combine the cost-effectiveness of a packer and sleeve system with the increased number of initiation points of a plug and perf system. Through extensive research into ball materials and redesigning the ball seats, the Baker Hughes team designed and developed a 24-stage packer and sleeve system that would combine the benets of both isolation methods and meet the operators needs. The system underwent a thorough testing program that validated its performance. The patented, new ball seats allowed ratings of 8,000 psi (551 bar), 1/8-in. incremental ball sizes and increased ow rates for the smaller sizes. The 24-stage FracPoint multistage fracturing system was deployed in a horizontal well where it performed awlessly. The

FracSur EX technology increased the initiation points along the wellbore as well as increasing initial production rates. Because of this success, the operator continues to use the FracPoint multistage fracturing system with new Baker Hughes technologies to enhance well completions. Conclusion Although contrasted above it can be concluded that the advent of these stimulation techniques has led to the tremendous growth in the unconventional reservoir. Plug & Perf and Ball & Sleeve method have risen up as the most common completion methodologies for tight reservoirs. The OHMS completion strategy accomplished all initial efficiency objectives with the added benefits of improved high density completion (more stages in the same lateral length),. In addition to better long-term recoveries, OHMS completions intrinsically use better fracturing practices, as well as being a safer and more efficient use of resources. On the other hand, plug and perf method has also proved its reliability. For example it is historically opted method of completing Granite Wash wells till today.The fracture direction can be better controlled using this method since the flow path to the reservoir is manually generated. In the presence of high stress rock, plug and perf should be the preferred method. The technique being most utilized, efficiently initiates fractures with lower treating pressures. However Ball & Sleeve Technique has been running worldwide in a variety of formations, both on and offshore proving it to be more versatile.

System

Cost Analysis -

Time Aspects -

Production Performance -

Optimisation Scope +

Operational Characteristics +

Stimulation Dynamics + +

Well Downtime +

HSE

Best fracturing practices +

Plug and perf system

Ball activated + + + sliding sleeve system + Advantage, - Disadvantage , ** Comparisons done above are relative to one another.

References ONGC Production Operations Manual SPE 104557; Multistage Fracturing System: Improving Operational Efficiency and Production R. Seale, SPE, Packers Plus Energy Services; J. Donaldson, SPE, D&J Oil Co.; and J. Athans, SPE, Packers Plus Energy Services SPE 142729;Optimisation of Completions in Unconventional Reservoirs for Higher Ultimate Recovery Daniel J. Snyder, SPE and Rocky Seale, SPE, Packers Plus Energy Services SPE 138445;Tight Gas Multi-stage Horizontal Completion Technology in the Granite Wash W. M. Jason Edwards P.E., SPE, Daniel K. Braxton, SPE, Vince Smith, Jones Energy, SPE SPE 135386;Comparative Study of Cemented Versus Uncemented Multi-Stage Fractured Wells in the Barnett Shale Darrell Lohoefer, SPE, Eagle Oil & Gas, and Daniel J. Snyder, SPE, Rocky Seale, SPE, and Daniel Themig, SPE, Packers Plus Energy Services SPE 124120;Cemented, Ball-Activated Sliding Sleeves Improve Well Economics and Efficiency Timothy Bozeman, SPE, Halliburton, and Dennis Degner, SPE, Encana

10

SPE 106705;Multizone Completion With Accurately Placed Stimulation Through Casing Wall Ron Hinkie and Matt Howell, Halliburton SPE 147546; Benefits And application of a surface controlled sliding sleeve for fracturing operation Joel Shaw, Halliburton www.bakerhughes.com SPE JPT Online Magazine www.packersplus.com www.halliburton.com www.glossary.oilfield.slb.com

Figures

Figure 1: Illustration of increased reservoir contact in horizontal well as compared to vertical wells.

11

Figure 2: Schematic of plug and perf method in horizontal well.

Figure 3: The 4 phases involved in the process of sleeve activation: sleeve closed before landing, ball landing, sleeve shifting open and the sleeve reaching the end of travel.

Figure 4: Schematic of ball activated sliding sleeve technique in horizontal well.

About the authors :

Prakhar Mathur, student 3rd year, Pandit Deendayal Petroleum University. e-mail: prakhar.mbtech09@spt.pdpu.ac.in, ph.no. : +91 9723493492

Nitesh Kumar, student 3rd year, Pandit Deendayal Petroleum University. e-mail: nitesh.kumarbtech09@spt.pdpu.ac.in, ph.no. : +91 9408334433

12