WHEATSTONE PROJECT LNG PLANT CONNECTIONS PILE CAP TO PILE MCL CHECK BY : AGG/ UBA
of 0
10-Jul-2013 :
Section
Calculation Sheet 1.0 Introduction The purpose of this calculation is to check the capacity of reinforcement in tension only. The shear was not consider in the design because it was assume the conrete soffit will hold the lateral force in the pile 2.0 Soil Properties 30 fcu = 460 fy = 0.50 =
Remark
MPa MPa
characteristic cube strength of concrete at 28days characteristic yield strength of steel coefficient to determine design ultimate bond stress
(Tension : =0.28 (Plain Bars), =0.4(Deformed Type 1), =0.5(Deformed Type 2),=0.65(Fabric) (Compression : =0.35 (Plain Bars), =0.5(Deformed Type 1), =0.63(Deformed Type 2),=0.81(Fabric)
e A
= =
12
mm
the effective bar size which for a sngle bar is equal to the bar size and for a group of bars in contact is equal to diameter of a bar of equal total area area of rebars
113.097 mm 2
Ld n 3.0 Sketch
= =
700 5
mm pcs
T or Fs
PILE CAP Ld
SOFFIT
PILE
4.0 Design Calculation A. Anchorage And Bond Capacity Bond Stress Anchorage Bond Force B. Tension of Rebars
where P = Fs Fs = fb**e*Ld*n
fbu = Fs = T =
Sec D.1
B.
Summary:
The maximum resisting forces for uplift pressure will be 156.07 for one pile