Você está na página 1de 23

Boiler Circulating Water Pump Failures

BCW Failure
Project Dadri Unit 5C Failure date 14-12-09 Status of unit while Reason for failure failure After Synchronization Boiler water entry in pump

Simhadri
Durgapur Andal Vallur Jajjar North chennai North chennai

3C
1B 1A 1B

29-05-11
27-07-11 30-08-11

After Synchronization
During Commissioning During trial run of pump After commissioning

Large amount of iron powder in pump


Boiler water entry in Pump Forced assy leading to impeller breakage Purge water Flange leakage

1A

During Erection During Storage Preservative gas expired

BCW PUMP
Boiler circulating water pumps are provided for forced circulation of water in water walls of 500 MW size and above. BHEL boilers are operating since 1985 with BCW pump. BCW pump imported from Hayward Tyler UK, KSB Germany and Torishima Japan. V-FLO China trial order has been placed. The pump and motor have glandless connection.

BCW PUMP problems


The pump motor cavity is filled with cold water which is kept cool by circulating through a cooler. Boiler water which is at 340-360 C at full load should not enter the pump. If it enters the pump motor cavity the motor will be damaged Boiler water can enter pump motor cavity only if the water in pump cavity is drained/leaking out. Motor chamber contains stator windings and rotor. The trip temperature is 66 C.

Pump internals

Pump with cooler arrangement

BCW pump P & ID

Dadri unit 5

Dadri BCW PUMP Stator winding

Dadri Failure Analysis


Damage due to hot boiler water entry into pump motor cavity

Simhadri unit 3

Simhadri

Pump casing drain

Simhadri failure analysis


Simhadri Pump trial was conducted in Nov 2010. After that the unit has not been running on regular basis Boiler and pre boiler Corrosion material has entered the pump. The failure could have been avoided If the quality of water in pump was checked before taking it in to service. Drain line in pump casing was choked with similar material

Vallur- PUMP-A

VALLUR - PUMP A

VALLUR PUMP-B IMPELLER DAMAGE

VALLUR FAILURE ANALYSIS

PUMPS A&B
From the Photographs it is clear that pump was forced in to the pump casing resulting in breakage of impeller. Foreign material was also in pump. Failure could have been avoided by proper care during installation

Durgapur failure

Durgapur failure
The pump cavity temperature has increased about 150 C. Megger value of motor has come down. Hot water has entered the motor.

ACTION TO BE TAKEN TO AVOID BCW PUMP FAILURE IN FUTURE


BCW pump erection and commissioning should be done under the guidance of supplier representative. Drain valve handle to be removed to prevent accidental opening of drain. BCW pump to be flushed as per procedure before taking into service after long shut down. Water quality to be checked before starting the pump after long S/D. Training to be given to all operators at site.

PUMP NORTH CHENNAI


PUMP- A DURING ERECTION IT FAILED ANOTHER PUMP DURING STORING PRESERVATIVE GAS EXPIRED.

THANKS

Você também pode gostar