Escolar Documentos
Profissional Documentos
Cultura Documentos
NO. Patok
Jarak Konstruksi
(m)
Volume Linning
Saluran
(m3)
Jumlah
Volume
(m)
Beton
KETERANGAN
BAU-8
GAMBAR TIPIKAL SALURAN
Volume = 2.056
B.1
45.0
0.00
B.2
75.0
B.3
0.00
74.4
B.4
75.0
B.5
78.0
Volume (m3) =
B.6
30.4
B.7
0.00
44.0
B.8
72.4
B.9
50.0
20.55
42.4
17.43
50.0
20.55
64.0
26.30
50.0
20.55
50.0
20.55
49.6
20.39
20.4
8.38
48.0
19.73
50.0
20.55
67.4
27.70
73.4
30.17
50.0
20.55
50.0
20.55
50.0
20.55
50.0
20.55
18.6
7.64
1,328.00
342.69
B.10
0.00
B.11
B.12
B.13
B.14
B.15
0.00
B.16
B.17
B.18
B.19
B.20
B.21
B.22
B.23
B.24
0.00
B.25
BP.1
JUMLAH
0.00
0.00
KETERANGAN
0.41
KOORDINAT GALIAN
X
Y
XY
YX
KOORDINAT TIMBUNAN
X
Y
XY
YX
0.69
0.89
-
9.954
9.645
9.004
9.954
-
6.18
8.87
-
6.83
8.59
-
0.60
0.60
0.20
-
9.004
8.400
8.137
8.393
9.004
Jumlah 01
8.328
0.14
8.306
0.14
8.200
8.328
-
15.05
1.12
1.14
-
15.42
1.14
1.14
-
1.87
1.87
1.19
-
Jumlah 02
8.216
0.14
8.236
0.14
8.200
8.216
-
2.26
1.12
1.13
-
2.28
1.13
1.13
-
0.64
0.42
-
Jumlah 03
2.25
2.25
0.18
0.68
0.93
-
1.80
6.77
8.41
-
1.62
6.54
9.34
-
9.038
9.638
10.045
9.968
9.038
Jumlah 04
16.97
17.50
JUMLAH (01 + 02 + 03 + 04)
8.393
8.393
8.236
8.139
8.393
4.91
5.07
1.76
11.74
15.43
15.25
10.00
-
5.44
5.07
1.59
12.10
15.73
15.73
9.81
-
8.236
9.038
8.295
8.236
-
40.68
5.29
3.43
-
41.27
5.25
3.77
-
8.73
9.02
(lanjutan)
AREA (m2)
GALIAN
TIMBUNAN
0.19
0.18
0.01
0.29
0.00
0.15
0.27
0.46
0.62
Pot
Jarak
Profi
AREA (m2)
Langsung
B.0
Galian
Volume (M3)
Timbunan
Galian
Timbunan
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
45.0
0.00
0.00
0.00
0.00
120.0
0.00
0.00
0.00
0.00
194.4
0.00
0.00
0.00
0.00
269.4
0.00
0.00
0.00
0.00
347.4
0.00
0.00
0.00
0.00
377.8
0.00
0.00
0.00
0.00
421.8
0.00
0.00
0.00
0.00
494.2
0.00
0.00
0.00
0.00
544.2
0.91
0.21
22.64
5.20
586.6
0.93
0.02
38.94
4.78
636.6
1.28
0.31
55.27
8.16
700.6
0.88
0.06
69.07
11.71
BAU.8
B.1
45.0
B.2
75.0
B.3
74.4
B.4
75.0
B.5
78.0
B.6
30.4
B.7
44.0
B.8
72.4
B.9
50.0
B.10
42.4
B.11
50.0
B.12
64.0
B.13
50.0
B.14
750.6
1.42
0.12
57.40
4.33
800.6
1.81
0.04
80.80
4.01
850.2
2.41
0.08
104.86
3.12
870.6
0.34
28.06
0.83
918.6
1.41
41.92
0.00
968.6
0.74
53.82
4.13
50.0
B.15
49.6
B.16
20.4
B.17
48.0
B.18
50.0
B.19
0.17
67.4
B.20
1036.0
25.07
5.57
1109.4
0.00
0.00
73.4
B.21
50.0
B.22
1159.4
0.65
0.26
16.35
6.48
1209.4
0.04
0.54
17.38
19.87
1259.4
0.01
1.20
1.31
43.26
1309.4
0.46
0.62
11.88
45.36
624.72
166.83
50.0
B.23
50.0
B.24
50.0
B.25
18.6
BP.1
JUMLAH
1328.0
1,328.0
URAIAN
Mandor
Kepala tukang
Tukang
Pekerja
Sopir (Dump Truck dan Alat Berat)
Sopir Pembantu
Operator
Pembantu Operator
Mekanik Terlatih
Mekanik Pmbantu
SATUAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
HARGA
(Rp)
50,000.00
60,000.00
50,000.00
35,000.00
55,000.00
45,000.00
65,000.00
45,000.00
60,000.00
45,000.00
URAIAN
Aspal Bitumen
2
3
4
Batu Bata
Batu Kali
Besi beton
Drain Hole
Gemuk (Grase)
Kawat beton
Kayu Bekisting
Kayu Sembarang
Kerikil Bersih
Lempengan Rumput
Minyak Aspal
Minyak Premium
Minyak Solar
Minyak Pelumas
Pasir Pasangan
Pasir Urug
Paku kayu
Paku seng
Semen Portland
Tanah Timbunan
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
SATUAN
kg
bh
m3
kg
buah
kg
kg
m3
m3
m3
m2
ltr
ltr
ltr
ltr
m3
m3
kg
kg
zak
m3
HARGA
(Rp)
5,500.00
620.00
160,000.00
7,700.00
3,500.00
13,800.00
14,400.00
1,824,000.00
720,000.00
160,000.00
22,200.00
5,250.00
5,625.00
5,250.00
33,000.00
110,000.00
70,000.00
9,360.00
16,200.00
38,400.00
51,650.00
(IR. M. NASIR)
Wakil Direktur
a. Umur Ekonomis
b. Jam Kerja Dalam Satu Tahun
c. Harga Alat
a. Umur Ekonomis
b. Jam Kerja Dalam Satu Tahun
c. Harga Alat
=(H + I + K + L + M)
E
1
2
3
4
5
6
LAIN-LAIN
Tingkat suku bunga
Upah operator/sopir
Upah pembantu operator
Bahan bakar bensin
Bahan bakar solar
Minyak pelumas
SATUAN KET
: EXAVATOR 100
Pw
105.00
Cp
1.20
A
5.00
W
2,000.00
B
860,000,000.00
A'
5.00
W'
2,000.00
B'
860,000,000.00
HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah
C
D
86,000,000.00
0.334
Rupiah
-
129,404.95
Rupiah
860.00
Rupiah
130,264.95
Rupiah
H
I
K
96,468.75
69,300.00
75,250.00
Rupiah
Rupiah
Rupiah
L
M
8,125.00
5,625.00
Rupiah
Rupiah
254,768.75
Rupiah
385,033.70
Rp/jam
i
U1
U2
Mb
Ms
Mp
20.00 %/tahun
8,125.00 Rp/Jam
5,625.00 Rp/Jam
Rp/Liter
5,250.00 Rp/Liter
33,000.00 Rp/Liter
alat baru
alat baru
alat baru
Nama Alat
Merk
Type / Model
Kapasitas
Engine
Isi Karakter
Umur Ekonomis
Jam Kerja / Tahun
Harga Pokok
Harga Track
Nilai Sisa
Harga Penyusutan
: Backhoe / Excavator
: Komatzu
: PC. 200
: 0.80 m3
: ISUZU
:
51 Liter
:
5 Th
:
2,000.00
:
:
: Rp.
10.00% x
: Rp.
930,000,000.00 -
Rp.
Rp.
=
=
=
=
883,500,000.00
88,350,000.00
Rp.
Rp.
Rp.
Rp.
930,000,000.00
46,500,000.00
88,350,000.00
841,650,000.00
B. TAKSIRAN PRODUKSI
1.
2.
3.
4.
Swelling
Kapasitas
Dapat Melakukan Gerak
Produksi Maksimum Teoritis
C. FAKTOR KOREKSI
1.
Angle Of Swing
2.
Faktor Swing Dan Depth
3.
Eff Kerja Siang
4.
Kondisi Kerja
5.
Faktor Muat Diambil Rata-rata
6.
Faktor Koreksi
7.
Taksiran Produksi
:
:
:
: 0.64 x
:
:
:
:
:
: 0.88 x
: 0.52 x
25.00
0.80
2.50
2.50
%
/
1.25
Circle Time
x
60
120.00 Derajat
0.88
0.83
0.75
0.95
0.83 x
0.75 x
96.00
=
0.95
49.96
0.64 m3
=
=
0.52
50.00 m3 / Jam
D. BIAYA PERALATAN
I. BIAYA - BIAYA
I. 1 BIAYA PEMILIKAN
Penyusutan
Bunga Bank
Pajak PPH
Gudang
Asuransi
I. 2
BIAYA OPERASI
Bahan Bakar (solar)
Minyak Pelumas
Minyak Hydroulic
Gemuk / Grease
Filter Oli
Filter Solar
Filter Udara
Operator
Co. Operator
Mekanik
Co. Mekanik
Bahan Pelengkap
: Rp.
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
841,650,000.00
24.00%
2.50%
0.50%
0.50%
1.100
1.050
1.050
1.100
0.004
0.002
0.001
/ 5 x 2.000
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
x
x
x
x
x
x
15.00
0.12
0.08
0.07
1.00
1.00
1.00
1.00
1.00
0.20
0.40
1.00
930,000,000.00
930,000,000.00
930,000,000.00
930,000,000.00
Ltr
Ltr
Ltr
Kg
Buah
Buah
Buah
Oh
Oh
Oh
Oh
Oh
@
@
@
@
@
@
@
@
@
@
@
@
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
84,165.00
111,600.00
11,625.00
2,325.00
2,325.00
209,715.00
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
86,625.00
4,158.00
2,772.00
1,062.60
300.00
240.00
1,200.00
8,125.00
5,625.00
1,500.00
2,250.00
1,328.13
115,185.73
2,000.00 = Rp.
JUMLAH
= Rp.
27,900.00
27,900.00
/
/
/
/
2,000.00
2,000.00
2,000.00
2,000.00
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,250.00
33,000.00
33,000.00
13,800.00
75,000.00
120,000.00
1,200,000.00
8,125.00
5,625.00
7,500.00
5,625.00
1,328.13
JUMLAH
I. 3
BIAYA PERBAIKAN
6.00% x
Rp.
930,000,000.00
REKAPITULASI BIAYA :
BIAYA PEMILIKAN
BIAYA OPERASI
BIAYA PERBAIKAN
BIAYA EXCAVATOR
: ..
= Rp.
209,715.00
: ..
= Rp.
115,185.73
: ..
= Rp.
27,900.00
: ..
= Rp.
352,800.73
:
: Rp.
50.00 m3 / Jam
352,800.73 /
50.00
= Rp.
Dibulatkan = Rp.
7,056.01 / m3
7,056.00 / m3
:
:
:
:
:
:
:
:
:
:
Dump Truck
FUSO
FM. 190
6 - 8 Ton 4 - 5 m3
5 Tahun
2,000
Rp.
1,969,500 x
Rp.
320,000,000
10.00% x
Rp.
320,000,000 -
:
:
:
6
Rp.
Rp.
320,000,000
32,000,000
5.00 m3
30.00 %
5.00 /
1.30
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
= Rp.
11,817,000
= Rp.
= Rp.
32,000,000
288,000,000
3.85 m3
1000.00 m'
60.00 Km / Jam
80.00 Km / Jam
0.80
0.35 Menit
0.85 Menit
5 / 84 x 60
1,000 / 1,000 + 1,000 / 1,333.33
0.35 + 0.85 + 3.57+ 1.75
(60 / 6.52) x 3.85
0.80 x 35.39
=
=
=
=
=
3.57
0.85
6.52
35.39
28.32
Menit
Menit
Menit
m3
m3 / Jam
C. BIAYA PERALATAN :
I. BIAYA - BIAYA
I.1. BIAYA PEMILIKAN
Penyusutan
Bunga Bank
Pajak PPH
Gudang
Asuransi
:
:
:
:
:
Rp.
288,000,000
24.00%
2.50%
0.50%
0.50%
/
x
x
x
x
:
:
:
:
:
:
:
:
:
:
:
:
:
1.100
1.050
1.050
1.100
0.004
0.002
0.001
1.000
6.00% x
REKAPUTULASI BIAYA :
BIAYA PEMILIKAN
BIAYA OPERASI
BIAYA PERBAIKAN
BIAYA DUMP TRUCK
HARGA SATUAN PEKERJAAN
KAPASITAS ANGKUT
HARGA ANGKUT TANAH DENGAN
JARAK 1 KM
:
:
:
:
Rp.
Rp.
Rp.
Rp.
x
x
x
x
x
x
x
/
Rp.
15.00
0.37
0.08
0.02
1.00
1.00
1.00
2,000.00
0.20
0.40
1.00
1.00
1.00
/
/
/
/
/
Ltr
Ltr
Ltr
Kg
Buah
Buah
Buah
Buah
Mh
Mh
Mh
Mh
Ls
320,000,000 /
2,000
2,000
2,000
2,000
2,000
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
JUMLAH
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
28,800.00
38,400.00
4,000.00
800.00
800.00
72,800.00
5,250
33,000
33,000
13,800
42,000
36,000
120,000
1,969,500
7,500
5,625
6,875
5,625
1,000
JUMLAH
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
86,625.00
12,820.50
2,772.00
303.60
168.00
72.00
120.00
984.75
1,500.00
2,250.00
6,875.00
5,625.00
1,000.00
121,115.85
JUMLAH
= Rp.
= Rp.
9,600.00
9,600.00
2,000
..
= Rp.
72,800.00
..
= Rp.
121,115.85
..
= Rp.
9,600.00
..
= Rp.
203,515.85
:
:
5.00
320,000,000
320,000,000
320,000,000
320,000,000
28.32 m3 / Jam
Rp.
203,515.85 /
28.32 m3 / Jam
= Rp.
Dibulatkan
.. = Rp.
7,187.50 / m3
7,188.00 / m3
:
:
:
:
:
:
:
:
:
:
B. TAKSIRAN PRODUKSI :
1 . Produksi Maksimum Teoritis:
2 . Faktor Koreksi
a. Efisiensi Kerja
b. Kondisi Kerja
Faktor Koreksi
:
:
:
:
3 . Taksiran Produksi
VIBRATOR ROLLER
Dynopac
CA. 25
0.70 m3
5 Tahun
2,000 Jam
Rp.
300,000,000
Rp.
35,000,000
10.00% x
Rp.
300,000,000 -
(W x S x L) / P
Rp
Rp
265,000,000
35,000,000
= Rp.
= Rp.
0.70
0.70
0.70 x
0.70
(90 x 0.49)
90 m3/jam
0.49 m3/jam
44.10 m3/jam
26,500,000
238,500,000
C. BIAYA PERALATAN :
I. BIAYA LANGSUNG
I.1. BIAYA PEMILIKAN
a. Penyusutan
b. Bunga Bank, Gudang
Rp.
20% x (6.00/10.00) x
238,500,000 /
2,000
= Rp.
23,850.00 /jam
300,000,000
2,000
= Rp.
JUMLAH = Rp.
18,000.00 /jam
41,850.00 /jam
.15.00 Ltr
@ Rp.
5,250
. 0.40 Ltr
@ Rp.
33,000
. 0.20 Ltr
@ Rp.
33,000
. 0.15 Ltr
@ Rp.
71,250
. 1.00 Kg
@ Rp.
13,800
.
@ Rp.
8,125
.
@ Rp.
7,500
JUMLAH
10.00% x (Rp. 300,000,000 - Rp. 35,000,000)
15.00% x
Rp.
193,762.50
2,000
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
78,750.00
13,200.00
6,600.00
10,687.50
13,800.00
8,125.00
7,500.00
138,662.50
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
= Rp.
JUMLAH = Rp.
13,250.00 /jam
13,250.00 /jam
.
= Rp.
193,762.50 /jam
JUMLAH = Rp.
29,064.38 /jam
JUMLAH ( I + II ) = Rp.
222,826.88 /jam
5,052.76 / m3
5,053.00 / m3
222,826.88
No
I.
Uraian
Analisa
Stn
Kuantitas
Harga Satuan
(Rp)
Harga Pekerjaan
(Rp)
PEKERJAAN PERSIAPAN
1
Pematokan/cek pengukuran
Taksir
Ls
1,000,000.00
1,000,000.00
Taksir
Ls
2,000,000.00
2,000,000.00
Pengeringan (Dewatering)
Taksir
Ls
3,000,000.00
3,000,000.00
Taksir
Ls
5,000,000.00
5,000,000.00
Jumlah
II.
PEKERJAAN SALURAN
Rehabilitasi Saluran Ruas BAU.8 - BP.1
691.80
Anl. AB.1
m3
166.83
7,190.16
1,199,524.09
Anl. AB.1a
m3
457.89
14,378.16
6,583,658.44
Anl.A.16
m3
166.83
9,250.00
1,543,163.67
Supl. Vc
284.33
1,451,876.40
412,812,016.81
Supl. Vb
m3
166.02
1,834,244.40
304,521,255.29
Supl. Va
m3
65.15
2,690,020.40
175,254,829.06
Jumlah
III.
11,000,000.00
901,914,447.36
PEKERJAAN LAIN-LAIN
Administrasi Kontrak
Taksir
Ls
1,500,000.00
1,500,000.00
Taksir
Ls
700,000.00
700,000.00
Taksir
Ls
500,000.00
500,000.00
P3K
Taksir
Ls
500,000.00
500,000.00
Taksir
unit
1.00
400,000.00
400,000.00
Jumlah
3,600,000.00
REKAPITULASI
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN SALURAN
III.
PEKERJAAN LAIN-LAIN
(L =
Rp.
11,000,000.00
Rp.
901,914,447.36
Rp.
3,600,000.00
Jumlah
Rp.
916,514,447.36
Dibulatkan
Rp.
691.80 meter)
916,514,000.00
TERBILANG:
Sembilan Ratus Enam Belas Juta Lima Ratus Empat Belas Ribu Rupiah
Menyetujui,
Ka.Bid. Program dan Hidrologi
Dinas Sumber Daya Air
(Ir. HASANUDDIN)
Nip. 390 012 616
(Ir. M. NASIR)
Wakil Direktur
Mengetahui,
Penanggungjawab Kegiatan
Kepala Dinas Sumber Daya Air
Kabupaten Aceh Utara
(Ir. MAWARDI)
Pembina/Nip. 390 012 231
DAFTAR ANALISA
CV. TOTAL ENGINEERING CONSULTANT
Jl. Kenari No 9B Tlp. (0645)-41538 - LHOKSEUMAWE
Anl. A.1
Org
Org
Pekerja
Mandor
@ Rp
@ Rp
35,000.00 Rp
50,000.00 Rp
Jumlah
Anl. A.16
Rp
27,500.00
35,000.00 Rp
50,000.00 Rp
8,750.00
500.00
Org
Org
Pekerja
Mandor
@ Rp
@ Rp
Jumlah
Anl. AB.1
Rp
9,250.00
7,190.16 Rp
7,190.16
Rp
7,190.16
7,190.16 Rp
7,188.00 Rp
7,190.16
7,188.00
Rp
14,378.16
7,190.16 Rp
5,053.00 Rp
51,650.00 Rp
7,190.16
5,053.00
64,562.50
unit
@ Rp
Jumlah
Anl. AB.1a
unit
unit
@ Rp
@ Rp
Jumlah
Anl. AB.1b
Anl. G.41
26,250.00
1,250.00
unit
unit
m3
@ Rp
@ Rp
@ Rp
Jumlah
Rp
76,805.66
: 1 m3 BETON COR 1 : 2 : 3
6.0000
0.3000
1.0000
0.1000
0.8200
8.5000
0.5400
org
org
org
org
m3
zak
m3
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Kerikil Bersih
Semen PC
Pasir Pasangan
ANL. SUPL.V
: 1 M3 BETON BETON BERTULANG
A. Beton Cor (1:2:3)
Tenaga Kerja ;
6.0000
Org Pekerja
0.3000
Org Mandor
1.0000
Org Tukang
0.1000
Org Kepala Tukang
Bahan ;
0.8200
M3
Kerikil Bersih
8.5000
Zak Semen (PC)
0.5400
M3
Pasir Beton
@
@
@
@
@
@
@
Rp
Rp
Rp
Rp
Rp
Rp
Rp
35,000.00
50,000.00
50,000.00
60,000.00
160,000.00
38,400.00
110,000.00
Jumlah
Dibulatkan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
210,000.00
15,000.00
50,000.00
6,000.00
131,200.00
326,400.00
59,400.00
798,000.00
798,000.00
@
@
@
@
Rp
Rp
Rp
Rp
35,000.00
50,000.00
50,000.00
60,000.00
Rp
Rp
Rp
Rp
210,000.00
15,000.00
50,000.00
6,000.00
160,000.00 Rp
38,400.00 Rp
110,000.00 Rp
Jumlah
131,200.00
326,400.00
59,400.00
798,000.00
@ Rp
@ Rp
@ Rp