Você está na página 1de 12

Perhitungan Volume Beton Bertulang

NO. Patok

Jarak Konstruksi
(m)

Volume Linning
Saluran
(m3)

Jumlah

Volume

(m)

Beton

KETERANGAN

BAU-8
GAMBAR TIPIKAL SALURAN
Volume = 2.056

B.1
45.0

0.00

B.2
75.0
B.3

0.00

74.4
B.4
75.0
B.5
78.0

Volume (m3) =

B.6
30.4
B.7

0.00

44.0
B.8
72.4
B.9
50.0

20.55

42.4

17.43

50.0

20.55

64.0

26.30

50.0

20.55

50.0

20.55

49.6

20.39

20.4

8.38

48.0

19.73

50.0

20.55

67.4

27.70

73.4

30.17

50.0

20.55

50.0

20.55

50.0

20.55

50.0

20.55

18.6

7.64

1,328.00

342.69

B.10

0.00

B.11
B.12
B.13
B.14
B.15
0.00

B.16
B.17
B.18
B.19
B.20
B.21
B.22
B.23
B.24
0.00

B.25

BP.1
JUMLAH

0.00

0.00

KETERANGAN

GAMBAR TIPIKAL SALURAN

0.41

Perhitungan Volume Pekerjaan Tanah


Rehabilitasi Saluran Sekunder Ruas BAU.8 - BP.1 D.I. Alue Ubay Kab. Aceh Utara
CROSS
B.25

KOORDINAT GALIAN
X
Y
XY
YX

KOORDINAT TIMBUNAN
X
Y
XY
YX

0.69
0.89
-

9.954
9.645
9.004
9.954
-

6.18
8.87
-

6.83
8.59
-

0.60
0.60
0.20
-

9.004
8.400
8.137
8.393
9.004

Jumlah 01
8.328
0.14
8.306
0.14
8.200
8.328
-

15.05
1.12
1.14
-

15.42
1.14
1.14
-

1.87
1.87
1.19
-

Jumlah 02
8.216
0.14
8.236
0.14
8.200
8.216
-

2.26
1.12
1.13
-

2.28
1.13
1.13
-

0.64
0.42
-

Jumlah 03

2.25

2.25

0.18
0.68
0.93
-

1.80
6.77
8.41
-

1.62
6.54
9.34
-

9.038
9.638
10.045
9.968
9.038

Jumlah 04

16.97
17.50
JUMLAH (01 + 02 + 03 + 04)

8.393
8.393
8.236
8.139
8.393

4.91
5.07
1.76
11.74
15.43
15.25
10.00
-

5.44
5.07
1.59
12.10
15.73
15.73
9.81
-

8.236
9.038
8.295
8.236
-

40.68
5.29
3.43
-

41.27
5.25
3.77
-

8.73

9.02

(lanjutan)
AREA (m2)
GALIAN

TIMBUNAN

0.19

0.18

0.01

0.29

0.00

0.15

0.27

0.46

0.62

PERHITUNGAN VOLUME PEKERJAAN TANAH


PERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR
SALURAN SEKUNDER BAU.8 - BP.1 - D.I. ALUE UBAY
KECAMATAN LHOKSUKON - KABUPATEN ACEH UTARA
Bangunan Air /
Saluran

Pot

Jarak
Profi

AREA (m2)

Langsung

B.0

Galian

Volume (M3)

Timbunan

Galian

Timbunan

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

45.0

0.00

0.00

0.00

0.00

120.0

0.00

0.00

0.00

0.00

194.4

0.00

0.00

0.00

0.00

269.4

0.00

0.00

0.00

0.00

347.4

0.00

0.00

0.00

0.00

377.8

0.00

0.00

0.00

0.00

421.8

0.00

0.00

0.00

0.00

494.2

0.00

0.00

0.00

0.00

544.2

0.91

0.21

22.64

5.20

586.6

0.93

0.02

38.94

4.78

636.6

1.28

0.31

55.27

8.16

700.6

0.88

0.06

69.07

11.71

BAU.8
B.1
45.0
B.2
75.0
B.3
74.4
B.4
75.0
B.5
78.0
B.6
30.4
B.7
44.0
B.8
72.4
B.9
50.0
B.10
42.4
B.11
50.0
B.12
64.0
B.13
50.0
B.14

750.6

1.42

0.12

57.40

4.33

800.6

1.81

0.04

80.80

4.01

850.2

2.41

0.08

104.86

3.12

870.6

0.34

28.06

0.83

918.6

1.41

41.92

0.00

968.6

0.74

53.82

4.13

50.0
B.15
49.6
B.16
20.4
B.17
48.0
B.18
50.0
B.19

0.17

67.4
B.20

1036.0

25.07

5.57

1109.4

0.00

0.00

73.4
B.21
50.0
B.22

1159.4

0.65

0.26

16.35

6.48

1209.4

0.04

0.54

17.38

19.87

1259.4

0.01

1.20

1.31

43.26

1309.4

0.46

0.62

11.88

45.36

624.72

166.83

50.0
B.23
50.0
B.24
50.0
B.25
18.6
BP.1

JUMLAH

1328.0

1,328.0

A. DAFTAR HARGA SATUAN UPAH


No
1
2
3
4
5
6
7
8
9
10

URAIAN
Mandor
Kepala tukang
Tukang
Pekerja
Sopir (Dump Truck dan Alat Berat)
Sopir Pembantu
Operator
Pembantu Operator
Mekanik Terlatih
Mekanik Pmbantu

SATUAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

HARGA
(Rp)
50,000.00
60,000.00
50,000.00
35,000.00
55,000.00
45,000.00
65,000.00
45,000.00
60,000.00
45,000.00

B. DAFTAR HARGA SATUAN BAHAN


No

URAIAN

Aspal Bitumen

2
3
4

Batu Bata
Batu Kali
Besi beton
Drain Hole
Gemuk (Grase)
Kawat beton
Kayu Bekisting
Kayu Sembarang
Kerikil Bersih
Lempengan Rumput
Minyak Aspal
Minyak Premium
Minyak Solar
Minyak Pelumas
Pasir Pasangan
Pasir Urug
Paku kayu
Paku seng
Semen Portland
Tanah Timbunan

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

SATUAN
kg
bh
m3
kg
buah
kg
kg
m3
m3
m3
m2
ltr
ltr
ltr
ltr
m3
m3
kg
kg
zak
m3

HARGA
(Rp)
5,500.00
620.00
160,000.00
7,700.00
3,500.00
13,800.00
14,400.00
1,824,000.00
720,000.00
160,000.00
22,200.00
5,250.00
5,625.00
5,250.00
33,000.00
110,000.00
70,000.00
9,360.00
16,200.00
38,400.00
51,650.00

Lhokseumawe, Desember 2006


CV. TOTAL ENGINEERING CONSULTANT

(IR. M. NASIR)
Wakil Direktur

URAIAN ANALISIS HARGA SATUAN ALAT


JENIS PEKERJAAN
ITEM PEMBAYARAN
JENIS ALAT
SATUAN
PROPINSI
LOKASI
TAHUN ANGGRARAN
NO
A
URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat yang dipakai

: Analisa Galian Saluran (Lebar Atas Saluran B = 4 - 16 m)


: C.2
: EXAVATOR 100
: m3
: NANGGROE ACEH DARUSSALAM
: KABUPATEN ACEH UTARA
: 2006
URAIAN
KODE KOEF

a. Umur Ekonomis
b. Jam Kerja Dalam Satu Tahun
c. Harga Alat
a. Umur Ekonomis
b. Jam Kerja Dalam Satu Tahun
c. Harga Alat

BIAYA PASTI PERJAM KERJA


1 Nilai Sisa Alat
=10% x B
= i x (1 + i )^A'
2 Faktor angsuran modal
(1 + i )^A' - 1
3 Biaya Pasti Perjam
a. Biaya pengambilan modal = (B' - C) x D
W'
= 0.002 x B'
b. Ansuransi dll
W'
Biaya Pasti Perjam
=(E + F)
BIAYA OPERASI PERJAM KERJA
1 Bahan bakar
=(0.125-0.175 ltr/Hp/Jam) x Pw x Ms
2 Pelumas
=(0.01-0.02 ltr/Hp/Jam) x Pw x Mp
=(0.125-0.175 ) x B'
3 Perawatan dan Perbaikan
W'
4 Operator
=(1 orang Perjam) U1
5 Pembantu Operator
=(1 orang Perjam) U2
Biaya Pasti Perjam

=(H + I + K + L + M)

TOTAL BIAYA SEWA ALAT PERJAM = (G + P)

E
1
2
3
4
5
6

LAIN-LAIN
Tingkat suku bunga
Upah operator/sopir
Upah pembantu operator
Bahan bakar bensin
Bahan bakar solar
Minyak pelumas

SATUAN KET

: EXAVATOR 100
Pw
105.00
Cp
1.20
A
5.00
W
2,000.00
B
860,000,000.00
A'
5.00
W'
2,000.00
B'
860,000,000.00

HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

C
D

86,000,000.00
0.334

Rupiah
-

129,404.95

Rupiah

860.00

Rupiah

130,264.95

Rupiah

H
I
K

96,468.75
69,300.00
75,250.00

Rupiah
Rupiah
Rupiah

L
M

8,125.00
5,625.00

Rupiah
Rupiah

254,768.75

Rupiah

385,033.70

Rp/jam

i
U1
U2
Mb
Ms
Mp

20.00 %/tahun
8,125.00 Rp/Jam
5,625.00 Rp/Jam
Rp/Liter
5,250.00 Rp/Liter
33,000.00 Rp/Liter

alat baru
alat baru
alat baru

ANALISA PERALATAN BACKHOE / EXCAVATOR


( Anl. P. 5. 1 )
A. DATA PERALATAN :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Nama Alat
Merk
Type / Model
Kapasitas
Engine
Isi Karakter
Umur Ekonomis
Jam Kerja / Tahun
Harga Pokok
Harga Track
Nilai Sisa
Harga Penyusutan

: Backhoe / Excavator
: Komatzu
: PC. 200
: 0.80 m3
: ISUZU
:
51 Liter
:
5 Th
:
2,000.00
:
:
: Rp.
10.00% x
: Rp.
930,000,000.00 -

Rp.
Rp.

=
=
=
=

883,500,000.00
88,350,000.00

Rp.
Rp.
Rp.
Rp.

930,000,000.00
46,500,000.00
88,350,000.00
841,650,000.00

B. TAKSIRAN PRODUKSI
1.
2.
3.
4.

Swelling
Kapasitas
Dapat Melakukan Gerak
Produksi Maksimum Teoritis

C. FAKTOR KOREKSI
1.
Angle Of Swing
2.
Faktor Swing Dan Depth
3.
Eff Kerja Siang
4.
Kondisi Kerja
5.
Faktor Muat Diambil Rata-rata
6.
Faktor Koreksi
7.
Taksiran Produksi

:
:
:
: 0.64 x

:
:
:
:
:
: 0.88 x
: 0.52 x

25.00
0.80
2.50
2.50

%
/
1.25
Circle Time
x
60

120.00 Derajat
0.88
0.83
0.75
0.95
0.83 x
0.75 x
96.00
=

0.95
49.96

0.64 m3

96.00 m3 / Jam (BCM)

=
=

0.52
50.00 m3 / Jam

D. BIAYA PERALATAN
I. BIAYA - BIAYA
I. 1 BIAYA PEMILIKAN
Penyusutan
Bunga Bank
Pajak PPH
Gudang
Asuransi

I. 2

BIAYA OPERASI
Bahan Bakar (solar)
Minyak Pelumas
Minyak Hydroulic
Gemuk / Grease
Filter Oli
Filter Solar
Filter Udara
Operator
Co. Operator
Mekanik
Co. Mekanik
Bahan Pelengkap

: Rp.
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

841,650,000.00
24.00%
2.50%
0.50%
0.50%

1.100
1.050
1.050
1.100
0.004
0.002
0.001

/ 5 x 2.000
x
Rp.
x
Rp.
x
Rp.
x
Rp.

x
x
x
x
x
x
x

15.00
0.12
0.08
0.07
1.00
1.00
1.00
1.00
1.00
0.20
0.40
1.00

930,000,000.00
930,000,000.00
930,000,000.00
930,000,000.00

Ltr
Ltr
Ltr
Kg
Buah
Buah
Buah
Oh
Oh
Oh
Oh
Oh

@
@
@
@
@
@
@
@
@
@
@
@

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

84,165.00
111,600.00
11,625.00
2,325.00
2,325.00
209,715.00

=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
4,158.00
2,772.00
1,062.60
300.00
240.00
1,200.00
8,125.00
5,625.00
1,500.00
2,250.00
1,328.13
115,185.73

2,000.00 = Rp.
JUMLAH
= Rp.

27,900.00
27,900.00

/
/
/
/

2,000.00
2,000.00
2,000.00
2,000.00
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
33,000.00
33,000.00
13,800.00
75,000.00
120,000.00
1,200,000.00
8,125.00
5,625.00
7,500.00
5,625.00
1,328.13

JUMLAH
I. 3

BIAYA PERBAIKAN

6.00% x

Rp.

930,000,000.00

REKAPITULASI BIAYA :
BIAYA PEMILIKAN
BIAYA OPERASI
BIAYA PERBAIKAN
BIAYA EXCAVATOR

: ..
= Rp.
209,715.00
: ..
= Rp.
115,185.73
: ..
= Rp.
27,900.00
: ..
= Rp.
352,800.73

HARGA SATUAN PEKERJAAN


KAPASITAS GALIAN
HARGA GALIAN

:
: Rp.

50.00 m3 / Jam
352,800.73 /
50.00

= Rp.
Dibulatkan = Rp.

7,056.01 / m3
7,056.00 / m3

ANALISA PERALATAN DUMP TRUCK


( Anl. P. 5. 3 )
A. DATA PERALATAN :
1 . Nama Alat
2 . Merk
3 . Type / Model
4 . Kapasitas
5 . Umur Ekonomis
6 . Jam Kerja / Tahun
7 . Harga Ban Timmer Ring
8 . Harga Pokok
9 . Nilai Sisa
10 . Harga Penyusutan
B. TAKSIRAN PRODUKSI :
1 . Kapasitas
2 . Swelling
3 . Kapasitas Nyata
4 . Jarak Angkut
a. Jalan Raya / Aspal
b. Jalan Tanah / Kerja
1. Kecepatan Dalam Keadaan Isi
a. Jalan Raya / Aspal
b. Jalan Tanah / Kerja
2. Kecepatan Dlm Keadaan Kosong
a. Jalan Raya / Aspal
b. Jalan Tanah / Kerja
3. Speed Factor
4. Dump Truck
5. Manuver
6. Waktu Muat
7. Travel Time
8. Total Circle Time
9. Produksi Maksimum Teoritis
10. Produksi Nyata

:
:
:
:
:
:
:
:
:
:

Dump Truck
FUSO
FM. 190
6 - 8 Ton 4 - 5 m3
5 Tahun
2,000
Rp.
1,969,500 x
Rp.
320,000,000
10.00% x
Rp.
320,000,000 -

:
:
:

6
Rp.
Rp.

320,000,000
32,000,000

5.00 m3
30.00 %
5.00 /
1.30

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

= Rp.

11,817,000

= Rp.
= Rp.

32,000,000
288,000,000

3.85 m3

1000.00 m'

60.00 Km / Jam

80.00 Km / Jam
0.80
0.35 Menit
0.85 Menit
5 / 84 x 60
1,000 / 1,000 + 1,000 / 1,333.33
0.35 + 0.85 + 3.57+ 1.75
(60 / 6.52) x 3.85
0.80 x 35.39

1,000.00 m' / Menit

1,333.33 m' / Menit

=
=
=
=
=

3.57
0.85
6.52
35.39
28.32

Menit
Menit
Menit
m3
m3 / Jam

C. BIAYA PERALATAN :
I. BIAYA - BIAYA
I.1. BIAYA PEMILIKAN
Penyusutan
Bunga Bank
Pajak PPH
Gudang
Asuransi

:
:
:
:
:

Rp.

288,000,000
24.00%
2.50%
0.50%
0.50%

/
x
x
x
x

I.2. BIAYA OPERASI


Bahan Bakar (solar)
Minyak Pelumas
Minyak Hydroulic
Gemuk / Grease
Filter Oli
Filter Solar
Filter Udara
Ban
Mekanik
Co. Mekanik
Driver
Co. Driver
Bahan Pelengkap

:
:
:
:
:
:
:
:
:
:
:
:
:

1.100
1.050
1.050
1.100
0.004
0.002
0.001
1.000

I.3. BIAYA PERBAIKAN

6.00% x

REKAPUTULASI BIAYA :
BIAYA PEMILIKAN
BIAYA OPERASI
BIAYA PERBAIKAN
BIAYA DUMP TRUCK
HARGA SATUAN PEKERJAAN
KAPASITAS ANGKUT
HARGA ANGKUT TANAH DENGAN
JARAK 1 KM

:
:
:
:

Rp.
Rp.
Rp.
Rp.

x
x
x
x
x
x
x
/

Rp.

15.00
0.37
0.08
0.02
1.00
1.00
1.00
2,000.00
0.20
0.40
1.00
1.00
1.00

/
/
/
/
/

Ltr
Ltr
Ltr
Kg
Buah
Buah
Buah
Buah
Mh
Mh
Mh
Mh
Ls

320,000,000 /

2,000
2,000
2,000
2,000
2,000

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

JUMLAH

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

28,800.00
38,400.00
4,000.00
800.00
800.00
72,800.00

5,250
33,000
33,000
13,800
42,000
36,000
120,000
1,969,500
7,500
5,625
6,875
5,625
1,000
JUMLAH

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

86,625.00
12,820.50
2,772.00
303.60
168.00
72.00
120.00
984.75
1,500.00
2,250.00
6,875.00
5,625.00
1,000.00
121,115.85

JUMLAH

= Rp.
= Rp.

9,600.00
9,600.00

2,000

..
= Rp.
72,800.00
..
= Rp.
121,115.85
..
= Rp.
9,600.00
..
= Rp.
203,515.85

:
:

5.00
320,000,000
320,000,000
320,000,000
320,000,000

28.32 m3 / Jam
Rp.

203,515.85 /
28.32 m3 / Jam
= Rp.
Dibulatkan
.. = Rp.

7,187.50 / m3
7,188.00 / m3

ANALISA PERALATAN VIBRATOR ROLLER


( Anl. P. 5. 4 )
A. DATA PERALATAN :
1 . Nama Alat
2 . Merk
3 . Type / Model
4 . Kapasitas
5 . Umur Ekonomis
6 . Jam Kerja / Tahun
7 . Harga Pokok
8 . Harga Roller
9 . Nilai Sisa
10 . Harga Penyusutan

:
:
:
:
:
:
:
:
:
:

B. TAKSIRAN PRODUKSI :
1 . Produksi Maksimum Teoritis:
2 . Faktor Koreksi
a. Efisiensi Kerja
b. Kondisi Kerja
Faktor Koreksi

:
:
:
:

3 . Taksiran Produksi

VIBRATOR ROLLER
Dynopac
CA. 25
0.70 m3
5 Tahun
2,000 Jam
Rp.
300,000,000
Rp.
35,000,000
10.00% x
Rp.
300,000,000 -

(W x S x L) / P

Rp
Rp

265,000,000
35,000,000

= Rp.
= Rp.

(1.20 x 1.500 x 0.20) / 4

0.70
0.70
0.70 x

0.70

(90 x 0.49)

90 m3/jam

0.49 m3/jam

44.10 m3/jam

26,500,000
238,500,000

C. BIAYA PERALATAN :
I. BIAYA LANGSUNG
I.1. BIAYA PEMILIKAN
a. Penyusutan
b. Bunga Bank, Gudang

Rp.

20% x (6.00/10.00) x

I.2. BIAYA OPERASI DAN PERAWATAN


a. Bahan Bakar (Solar)
:
b. Minyak Pelumas
:
c. Minyak Hydroulic
:
d. Oli Transmisi
:
e. Gemuk / Grease
:
f. Operator
:
g. Co. Operator dan Mekanik
:

I.3. BIAYA PERBAIKAN

238,500,000 /

2,000

= Rp.

23,850.00 /jam

300,000,000

2,000

= Rp.
JUMLAH = Rp.

18,000.00 /jam
41,850.00 /jam

.15.00 Ltr
@ Rp.
5,250
. 0.40 Ltr
@ Rp.
33,000
. 0.20 Ltr
@ Rp.
33,000
. 0.15 Ltr
@ Rp.
71,250
. 1.00 Kg
@ Rp.
13,800
.
@ Rp.
8,125
.
@ Rp.
7,500
JUMLAH
10.00% x (Rp. 300,000,000 - Rp. 35,000,000)

Jumlah Biaya Langsung (1.1 + 1.2 + 1.3)

II. BIAYA TIDAK LANGSUNG

15.00% x

Rp.

193,762.50

2,000

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

78,750.00
13,200.00
6,600.00
10,687.50
13,800.00
8,125.00
7,500.00
138,662.50

/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam

= Rp.
JUMLAH = Rp.

13,250.00 /jam
13,250.00 /jam

.
= Rp.

193,762.50 /jam

JUMLAH = Rp.

29,064.38 /jam

JUMLAH ( I + II ) = Rp.

222,826.88 /jam

/ 44.10 m3/jam = Rp.


Dibulatkan
= Rp.

5,052.76 / m3
5,053.00 / m3

HARGA SATUAN PEKERJAAN


Rp.

222,826.88

RENCANA ANGGARAN BIAYA


Kegitan
Lokasi

: PERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR


SALURAN SEKUNDER BAU.8 - BP.1
: Kecamatan Lhoksukon - Kabupaten Aceh Utara

No
I.

Uraian

Analisa

Stn

Kuantitas

Harga Satuan
(Rp)

Harga Pekerjaan
(Rp)

PEKERJAAN PERSIAPAN
1

Pematokan/cek pengukuran

Taksir

Ls

1,000,000.00

1,000,000.00

Sewa Direksi Keet

Taksir

Ls

2,000,000.00

2,000,000.00

Pengeringan (Dewatering)

Taksir

Ls

3,000,000.00

3,000,000.00

Mobilisasi dan Demobilisasi alat

Taksir

Ls

5,000,000.00

5,000,000.00

Jumlah
II.

PEKERJAAN SALURAN
Rehabilitasi Saluran Ruas BAU.8 - BP.1

691.80

1. Galian Tanah (Alat Berat)

Anl. AB.1

m3

166.83

7,190.16

1,199,524.09

2. Galian Tanah + Dibuang (Alat Berat)

Anl. AB.1a

m3

457.89

14,378.16

6,583,658.44

Anl.A.16

m3

166.83

9,250.00

1,543,163.67

4. Beton Bertulang K-175 (Linning Saluran)

Supl. Vc

284.33

1,451,876.40

412,812,016.81

5. Beton Bertulang K-175 (Lantai Saluran)

Supl. Vb

m3

166.02

1,834,244.40

304,521,255.29

6. Beton Bertulang K-175 Balok 14/28 (Diafragma dan


Memanjang)

Supl. Va

m3

65.15

2,690,020.40

175,254,829.06

3. Timbunan Tanah Hasil Galian

Jumlah
III.

11,000,000.00

901,914,447.36

PEKERJAAN LAIN-LAIN

Administrasi Kontrak

Taksir

Ls

1,500,000.00

1,500,000.00

Adm. Progress dan Pelaporan

Taksir

Ls

700,000.00

700,000.00

Adm. Foto Dukumentsi

Taksir

Ls

500,000.00

500,000.00

P3K

Taksir

Ls

500,000.00

500,000.00

Pembuatan Papan Nama Proyek

Taksir

unit

1.00

400,000.00

400,000.00

Jumlah

3,600,000.00

PERBAIKAN DAN PEMBANGUNAN


JARINGAN IRIGASI DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER RUAS BAU.8 - BP.1


KECAMATAN PAYA BAKONG - KABUPATEN ACEH UTARA

REKAPITULASI
I.

PEKERJAAN PERSIAPAN

II.

PEKERJAAN SALURAN

III.

PEKERJAAN LAIN-LAIN

(L =

Rp.

11,000,000.00

Rp.

901,914,447.36

Rp.

3,600,000.00

Jumlah

Rp.

916,514,447.36

Dibulatkan

Rp.

691.80 meter)

916,514,000.00

TERBILANG:
Sembilan Ratus Enam Belas Juta Lima Ratus Empat Belas Ribu Rupiah

Menyetujui,
Ka.Bid. Program dan Hidrologi
Dinas Sumber Daya Air

Lhokseumawe, Desember 2006


CV. TOTAL ENGINEERING
CONSULTANT

(Ir. HASANUDDIN)
Nip. 390 012 616

(Ir. M. NASIR)
Wakil Direktur

Mengetahui,
Penanggungjawab Kegiatan
Kepala Dinas Sumber Daya Air
Kabupaten Aceh Utara

(Ir. MAWARDI)
Pembina/Nip. 390 012 231

DAFTAR ANALISA
CV. TOTAL ENGINEERING CONSULTANT
Jl. Kenari No 9B Tlp. (0645)-41538 - LHOKSEUMAWE

Anl. A.1

: 1 M3 GALIAN TANAH BIASA


0.7500
0.0250

Org
Org

Pekerja
Mandor

@ Rp
@ Rp

35,000.00 Rp
50,000.00 Rp
Jumlah

Anl. A.16

Rp

27,500.00

35,000.00 Rp
50,000.00 Rp

8,750.00
500.00

: 1 M3 TIMBUNAN TANAH / DIRATAKAN / DITIMBRIS


0.2500
0.0100

Org
Org

Pekerja
Mandor

@ Rp
@ Rp

Jumlah
Anl. AB.1

Rp

9,250.00

7,190.16 Rp

7,190.16

Rp

7,190.16

7,190.16 Rp
7,188.00 Rp

7,190.16
7,188.00

Rp

14,378.16

7,190.16 Rp
5,053.00 Rp
51,650.00 Rp

7,190.16
5,053.00
64,562.50

: 1 M3 GALIAN TANAH MENGGUNAKAN ALAT BERAT


1.0000

unit

Excavator (Anl. P.5.2)

@ Rp
Jumlah

Anl. AB.1a

: 1 M3 GALIAN TANAH MENGGUNAKAN ALAT BERAT DAN MENGANGKUT


1.0000
1.0000

unit
unit

Excavator (Anl. P.5.2)


Dump Truck (Anl. P.5.3)

@ Rp
@ Rp
Jumlah

Anl. AB.1b

: 1 M3 TIMBUNAN TANAH DIDATANGKAN (MENGGUNAKAN ALAT BERAT)


1.0000
1.0000
1.2500

Anl. G.41

26,250.00
1,250.00

unit
unit
m3

Excavator (Anl. P.5.2)


Vibrator (Anl. P.5.4)
Tanah Timbun

@ Rp
@ Rp
@ Rp

Jumlah

Rp

76,805.66

: 1 m3 BETON COR 1 : 2 : 3
6.0000
0.3000
1.0000
0.1000
0.8200
8.5000
0.5400

org
org
org
org
m3
zak
m3

Pekerja
Mandor
Tukang Batu
Kepala Tukang
Kerikil Bersih
Semen PC
Pasir Pasangan

ANL. SUPL.V
: 1 M3 BETON BETON BERTULANG
A. Beton Cor (1:2:3)
Tenaga Kerja ;
6.0000
Org Pekerja
0.3000
Org Mandor
1.0000
Org Tukang
0.1000
Org Kepala Tukang
Bahan ;
0.8200
M3
Kerikil Bersih
8.5000
Zak Semen (PC)
0.5400
M3
Pasir Beton

@
@
@
@
@
@
@

Rp
Rp
Rp
Rp
Rp
Rp
Rp

35,000.00
50,000.00
50,000.00
60,000.00
160,000.00
38,400.00
110,000.00
Jumlah
Dibulatkan

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

210,000.00
15,000.00
50,000.00
6,000.00
131,200.00
326,400.00
59,400.00
798,000.00
798,000.00

@
@
@
@

Rp
Rp
Rp
Rp

35,000.00
50,000.00
50,000.00
60,000.00

Rp
Rp
Rp
Rp

210,000.00
15,000.00
50,000.00
6,000.00

160,000.00 Rp
38,400.00 Rp
110,000.00 Rp
Jumlah

131,200.00
326,400.00
59,400.00
798,000.00

@ Rp
@ Rp