Você está na página 1de 8

NO.

Patok

Jarak Konstruksi

Jumlah

Volume

(m)

(m)

Beton
Bertulang
(m3)

A.101 (BLS-04
24.00

A.102
25.00

A.103
25.00

A.104

198.30

407.70

50.00

A.105
50.00

A.106
24.30

A.107 - A.110
(Linning Saluran
24.00

A.111
50.00

A.112

144.50

297.09

28.00

57.57

474.80

976.19

50.00

A.113
20.50

Gorong-Gorong
10.50

A.114
17.50

A.115/Jembatan
12.50

A.116
25.00

A.117
50.00

A.118
50.00

A.119
50.00

A.120
50.00

A.121
50.00

A.122
25.00

A.123
20.00

A.124
25.00

A.125
15.00

A.126
24.30

A.127
18.00

A.128
50.00

A.129
10.00

BLS-05
JUMLAH

845.60

845.60

1,738.55

KETERANGAN

A. DAFTAR HARGA SATUAN UPAH


No
1
2
3
4
5
6
7
8
9
10

URAIAN
Mandor
Kepala tukang
Tukang
Pekerja
Sopir (Dump Truck dan Alat Berat)
Sopir Pembantu
Operator
Pembantu Operator
Mekanik Terlatih
Mekanik Pmbantu

SATUAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

HARGA
(Rp)
50,000.00
60,000.00
50,000.00
35,000.00
55,000.00
45,000.00
65,000.00
45,000.00
60,000.00
45,000.00

B. DAFTAR HARGA SATUAN BAHAN


No

URAIAN

Aspal Bitumen

2
3
4

Batu Bata
Batu Kali
Besi beton
Drain Hole
Gemuk (Grase)
Kawat beton
Kayu Bekisting
Kayu Sembarang
Kerikil Bersih
Lempengan Rumput
Minyak Aspal
Minyak Premium
Minyak Solar
Minyak Pelumas
Pasir Pasangan
Pasir Urug
Paku kayu
Paku seng
Semen Portland
Tanah Timbunan

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

SATUAN
kg
bh
m3
kg
buah
kg
kg
m3
m3
m3
m2
ltr
ltr
ltr
ltr
m3
m3
kg
kg
zak
m3

HARGA
(Rp)
5,500.00
620.00
160,000.00
7,700.00
3,500.00
13,800.00
14,400.00
1,824,000.00
720,000.00
160,000.00
22,200.00
5,250.00
5,625.00
5,250.00
33,000.00
110,000.00
70,000.00
9,360.00
16,200.00
38,400.00
51,650.00

Lhokseumawe, Desember 2006


CV. TOTAL ENGINEERING CONSULTANT

(IR. M. NASIR)
Wakil Direktur
Direktur

ANALISA PERALATAN BACKHOE / EXCAVATOR


( Anl. P. 5. 1 )
A. DATA PERALATAN :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Nama Alat
Merk
Type / Model
Kapasitas
Engine
Isi Karakter
Umur Ekonomis
Jam Kerja / Tahun
Harga Pokok
Harga Track
Nilai Sisa
Harga Penyusutan

: Backhoe / Excavator
: Komatzu
: PC. 200
: 0.80 m3
: ISUZU
:
51 Liter
:
5 Th
:
2,000.00
:
:
: Rp.
10.00% x
: Rp.
930,000,000.00 -

Rp.
Rp.

=
=
=
=

883,500,000.00
88,350,000.00

Rp.
Rp.
Rp.
Rp.

930,000,000.00
46,500,000.00
88,350,000.00
841,650,000.00

B. TAKSIRAN PRODUKSI
1.
2.
3.
4.

Swelling
Kapasitas
Dapat Melakukan Gerak
Produksi Maksimum Teoritis

C. FAKTOR KOREKSI
1.
Angle Of Swing
2.
Faktor Swing Dan Depth
3.
Eff Kerja Siang
4.
Kondisi Kerja
5.
Faktor Muat Diambil Rata-rata
6.
Faktor Koreksi
7.
Taksiran Produksi

:
:
:
: 0.64 x

:
:
:
:
:
: 0.88 x
: 0.52 x

25.00
0.80
2.50
2.50

%
/
1.25
Circle Time
x
60

120.00 Derajat
0.88
0.83
0.75
0.95
0.83 x
0.75 x
96.00
=

0.95
49.96

0.64 m3

96.00 m3 / Jam (BCM)

=
=

0.52
50.00 m3 / Jam

D. BIAYA PERALATAN
I. BIAYA - BIAYA
I. 1 BIAYA PEMILIKAN
Penyusutan
Bunga Bank
Pajak PPH
Gudang
Asuransi

I. 2

BIAYA OPERASI
Bahan Bakar (solar)
Minyak Pelumas
Minyak Hydroulic
Gemuk / Grease
Filter Oli
Filter Solar
Filter Udara
Operator
Co. Operator
Mekanik
Co. Mekanik
Bahan Pelengkap

: Rp.
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

841,650,000.00
24.00%
2.50%
0.50%
0.50%

1.100
1.050
1.050
1.100
0.004
0.002
0.001

/ 5 x 2.000
x
Rp.
x
Rp.
x
Rp.
x
Rp.

x
x
x
x
x
x
x

15.00
0.12
0.08
0.07
1.00
1.00
1.00
1.00
1.00
0.20
0.40
1.00

930,000,000.00
930,000,000.00
930,000,000.00
930,000,000.00

Ltr
Ltr
Ltr
Kg
Buah
Buah
Buah
Oh
Oh
Oh
Oh
Oh

@
@
@
@
@
@
@
@
@
@
@
@

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

84,165.00
111,600.00
11,625.00
2,325.00
2,325.00
209,715.00

=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,625.00
4,158.00
2,772.00
1,062.60
300.00
240.00
1,200.00
8,125.00
5,625.00
1,500.00
2,250.00
1,328.13
115,185.73

2,000.00 = Rp.
JUMLAH
= Rp.

27,900.00
27,900.00

/
/
/
/

2,000.00
2,000.00
2,000.00
2,000.00
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,250.00
33,000.00
33,000.00
13,800.00
75,000.00
120,000.00
1,200,000.00
8,125.00
5,625.00
7,500.00
5,625.00
1,328.13

JUMLAH
I. 3

BIAYA PERBAIKAN

6.00% x

Rp.

930,000,000.00

REKAPITULASI BIAYA :
BIAYA PEMILIKAN
BIAYA OPERASI
BIAYA PERBAIKAN
BIAYA EXCAVATOR

: ..
= Rp.
209,715.00
: ..
= Rp.
115,185.73
: ..
= Rp.
27,900.00
: ..
= Rp.
352,800.73

HARGA SATUAN PEKERJAAN


KAPASITAS GALIAN
HARGA GALIAN

:
: Rp.

50.00 m3 / Jam
352,800.73 /
50.00

= Rp.
Dibulatkan = Rp.

7,056.01 / m3
7,056.00 / m3

ANALISA PERALATAN DUMP TRUCK


( Anl. P. 5. 3 )
A. DATA PERALATAN :
1 . Nama Alat
2 . Merk
3 . Type / Model
4 . Kapasitas
5 . Umur Ekonomis
6 . Jam Kerja / Tahun
7 . Harga Ban Timmer Ring
8 . Harga Pokok
9 . Nilai Sisa
10 . Harga Penyusutan
B. TAKSIRAN PRODUKSI :
1 . Kapasitas
2 . Swelling
3 . Kapasitas Nyata
4 . Jarak Angkut
a. Jalan Raya / Aspal
b. Jalan Tanah / Kerja
1. Kecepatan Dalam Keadaan Isi
a. Jalan Raya / Aspal
b. Jalan Tanah / Kerja
2. Kecepatan Dlm Keadaan Kosong
a. Jalan Raya / Aspal
b. Jalan Tanah / Kerja
3. Speed Factor
4. Dump Truck
5. Manuver
6. Waktu Muat
7. Travel Time
8. Total Circle Time
9. Produksi Maksimum Teoritis
10. Produksi Nyata

:
:
:
:
:
:
:
:
:
:

Dump Truck
FUSO
FM. 190
6 - 8 Ton 4 - 5 m3
5 Tahun
2,000
Rp.
1,969,500 x
Rp.
300,000,000
10.00% x
Rp.
300,000,000 -

:
:
:

6
Rp.
Rp.

300,000,000
30,000,000

5.00 m3
30.00 %
5.00 /
1.30

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

= Rp.

11,817,000

= Rp.
= Rp.

30,000,000
270,000,000

3.85 m3

1000.00 m'

60.00 Km / Jam

80.00 Km / Jam
0.80
0.35 Menit
0.85 Menit
5 / 84 x 60
1,000 / 1,000 + 1,000 / 1,333.33
0.35 + 0.85 + 3.57+ 1.75
(60 / 6.52) x 3.85
0.80 x 35.39

1,000.00 m' / Menit

1,333.33 m' / Menit

=
=
=
=
=

3.57
0.85
6.52
35.39
28.32

Menit
Menit
Menit
m3
m3 / Jam

C. BIAYA PERALATAN :
I. BIAYA - BIAYA
I.1. BIAYA PEMILIKAN
Penyusutan
Bunga Bank
Pajak PPH
Gudang
Asuransi

:
:
:
:
:

Rp.

270,000,000
24.00%
2.50%
0.50%
0.50%

/
x
x
x
x

I.2. BIAYA OPERASI


Bahan Bakar (solar)
Minyak Pelumas
Minyak Hydroulic
Gemuk / Grease
Filter Oli
Filter Solar
Filter Udara
Ban
Mekanik
Co. Mekanik
Driver
Co. Driver
Bahan Pelengkap

:
:
:
:
:
:
:
:
:
:
:
:
:

1.100
1.050
1.050
1.100
0.004
0.002
0.001
1.000

I.3. BIAYA PERBAIKAN

6.00% x

REKAPUTULASI BIAYA :
BIAYA PEMILIKAN
BIAYA OPERASI
BIAYA PERBAIKAN
BIAYA DUMP TRUCK
HARGA SATUAN PEKERJAAN
KAPASITAS ANGKUT
HARGA ANGKUT TANAH DENGAN
JARAK 1 KM

:
:
:
:

Rp.
Rp.
Rp.
Rp.

x
x
x
x
x
x
x
/

Rp.

15.00
0.37
0.08
0.02
1.00
1.00
1.00
2,000.00
0.20
0.40
1.00
1.00
1.00

/
/
/
/
/

Ltr
Ltr
Ltr
Kg
Buah
Buah
Buah
Buah
Mh
Mh
Mh
Mh
Ls

300,000,000 /

2,000
2,000
2,000
2,000
2,000

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

JUMLAH

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

27,000.00
36,000.00
3,750.00
750.00
750.00
68,250.00

5,250
33,000
33,000
13,800
42,000
36,000
120,000
1,969,500
7,500
5,625
6,875
5,625
1,000
JUMLAH

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

86,625.00
12,820.50
2,772.00
303.60
168.00
72.00
120.00
984.75
1,500.00
2,250.00
6,875.00
5,625.00
1,000.00
121,115.85

JUMLAH

= Rp.
= Rp.

9,000.00
9,000.00

2,000

..
= Rp.
68,250.00
..
= Rp.
121,115.85
..
= Rp.
9,000.00
..
= Rp.
198,365.85

:
:

5.00
300,000,000
300,000,000
300,000,000
300,000,000

28.32 m3 / Jam
Rp.

198,365.85 /
28.32 m3 / Jam
= Rp.
Dibulatkan .. = Rp.

7,005.62 / m3
7,006.00 / m3

ANALISA PERALATAN VIBRATOR ROLLER


( Anl. P. 5. 4 )
A. DATA PERALATAN :
1 . Nama Alat
2 . Merk
3 . Type / Model
4 . Kapasitas
5 . Umur Ekonomis
6 . Jam Kerja / Tahun
7 . Harga Pokok
8 . Harga Roller
9 . Nilai Sisa
10 . Harga Penyusutan

:
:
:
:
:
:
:
:
:
:

B. TAKSIRAN PRODUKSI :
1 . Produksi Maksimum Teoritis:
2 . Faktor Koreksi
a. Efisiensi Kerja
b. Kondisi Kerja
Faktor Koreksi

:
:
:
:

3 . Taksiran Produksi

VIBRATOR ROLLER
Dynopac
CA. 25
0.70 m3
5 Tahun
2,000 Jam
Rp.
300,000,000
Rp.
35,000,000
10.00% x
Rp.
300,000,000 -

(W x S x L) / P

Rp
Rp

265,000,000
35,000,000

= Rp.
= Rp.

(1.20 x 1.500 x 0.20) / 4

0.70
0.70
0.70 x

0.70

(90 x 0.49)

90 m3/jam

0.49 m3/jam

44.10 m3/jam

26,500,000
238,500,000

C. BIAYA PERALATAN :
I. BIAYA LANGSUNG
I.1. BIAYA PEMILIKAN
a. Penyusutan
b. Bunga Bank, Gudang

Rp.

20% x (6.00/10.00) x

I.2. BIAYA OPERASI DAN PERAWATAN


a. Bahan Bakar (Solar)
:
b. Minyak Pelumas
:
c. Minyak Hydroulic
:
d. Oli Transmisi
:
e. Gemuk / Grease
:
f. Operator
:
g. Co. Operator dan Mekanik
:

I.3. BIAYA PERBAIKAN

238,500,000 /

2,000

= Rp.

23,850.00 /jam

300,000,000

2,000

= Rp.
JUMLAH = Rp.

18,000.00 /jam
41,850.00 /jam

.15.00 Ltr
@ Rp.
5,250
. 0.40 Ltr
@ Rp.
33,000
. 0.20 Ltr
@ Rp.
33,000
. 0.15 Ltr
@ Rp.
71,250
. 1.00 Kg
@ Rp.
13,800
.
@ Rp.
8,125
.
@ Rp.
7,500
JUMLAH
10.00% x (Rp. 300,000,000 - Rp. 35,000,000)

Jumlah Biaya Langsung (1.1 + 1.2 + 1.3)

II. BIAYA TIDAK LANGSUNG

15.00% x

Rp.

193,762.50

2,000

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

78,750.00
13,200.00
6,600.00
10,687.50
13,800.00
8,125.00
7,500.00
138,662.50

/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam

= Rp.
JUMLAH = Rp.

13,250.00 /jam
13,250.00 /jam

.
= Rp.

193,762.50 /jam

JUMLAH = Rp.

29,064.38 /jam

JUMLAH ( I + II ) = Rp.

222,826.88 /jam

/ 44.10 m3/jam = Rp.


Dibulatkan
= Rp.

5,052.76 / m3
5,053.00 / m3

HARGA SATUAN PEKERJAAN


Rp.

222,826.88

RENCANA ANGGARAN BIAYA


Kegitan
Lokasi
No
I.

: PERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR


SALURAN SEKUNDER BAU.8 - BP.1
: Kecamatan Lhoksukon - Kabupaten Aceh Utara
Uraian

Analisa

Stn

Kuantitas

Taksir
Taksir
Taksir
Taksir

Ls
Ls
Ls
Ls

Harga Satuan
(Rp)

Harga Pekerjaan
(Rp)

PEKERJAAN PERSIAPAN
1
2
3
4

Pematokan/cek pengukuran
Sewa Direksi Keet
Pengeringan (Dewatering)
Mobilisasi dan Demobilisasi alat

550,000.00
1,500,000.00
3,000,000.00
4,000,000.00
Jumlah

II.

1
2
3
4
5

9,050,000.00

PEKERJAAN SALURAN
Rehabilitasi Saluran Ruas BAU.8 - BP.1

691.80

1. Galian Tanah (Alat Berat)


2. Timbunan Tanah Hasil Galian
3. Timbunan Tanah Didatangkan
4. Beton Bertulang K-175 (linning saluran)

Anl. AB.1
Anl.A.16
Anl. AB.1b
Supl. V

m3
m3
m3
m3

7,056.00
9,250.00
76,621.50
1,961,700.40
Jumlah

III.

550,000.00
1,500,000.00
3,000,000.00
4,000,000.00

0.00
0.00
0.00
0.00
0.00

PEKERJAAN LAIN-LAIN
Administrasi Kontrak
Adm. Progress dan Pelaporan
Adm. Foto Dukumentsi
P3K
Pembuatan Papan Nama Proyek

Taksir
Taksir
Taksir
Taksir
Taksir

unit

Ls
Ls
Ls
Ls
1.00

1,000,000.00
700,000.00
500,000.00
500,000.00
200,000.00
Jumlah

1,000,000.00
700,000.00
500,000.00
500,000.00
200,000.00
2,900,000.00

PEKERJAAN PERENCANAAN TEKNIS


JARINGAN IRIGASI, WADUK DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER BAU.8 - BP.1


KECAMATAN LHOKSUKON - KABUPATEN ACEH UTARA

REKAPITULASI
I.

PEKERJAAN PERSIAPAN

II.

PEKERJAAN SALURAN

III.

PEKERJAAN LAIN-LAIN

(L =

Rp.

9,050,000.00

Rp.

0.00

Rp.

2,900,000.00

Jumlah

Rp.

2,900,000.00

Dibulatkan

Rp.

6,724,345,000.00

#REF! meter)

TERBILANG:
Enam Milyar Tujuh Ratus Dua Puluh Empat Juta Tiga Ratus Empat Puluh Lima Ribu Rupiah

Menyetujui,
Ka.Bid. Program dan Hidrologi
Dinas Sumber Daya Air

Lhokseumawe, Desember 2006


CV. TOTAL ENGINEERING
CONSULTANT

(IR. HASANUDDIN)
Nip. 390 012 616

(IR. M. NASIR)
Wakil Direktur

Mengetahui,
Penanggungjawab Kegiatan
Kepala Dinas Sumber Daya Air
Kabupaten Aceh Utara

(IR. MAWARDI)
Pembina/Nip. 390 012 231

DAFTAR ANALISA
CV. TOTAL ENGINEERING CONSULTANT
Jl. Kenari No 9B Tlp. (0645)-41538 - LHOKSEUMAWE

Anl. A.1

: 1 M3 GALIAN TANAH BIASA


0.7500
0.0250

Org
Org

Pekerja
Mandor

@ Rp
@ Rp

35,000.00 Rp
50,000.00 Rp
Jumlah

Anl. A.16

Rp

27,500.00

35,000.00 Rp
50,000.00 Rp

8,750.00
500.00

: 1 M3 TIMBUNAN TANAH / DIRATAKAN / DITIMBRIS


0.2500
0.0100

Org
Org

Pekerja
Mandor

@ Rp
@ Rp

Jumlah

Anl. AB.1

Rp

9,250.00

7,056.00 Rp

7,056.00

Rp

7,056.00

7,056.00 Rp
7,006.00 Rp

7,056.00
7,006.00

Rp

14,062.00

7,006.00 Rp
5,053.00 Rp
51,650.00 Rp

7,006.00
5,053.00
64,562.50

: 1 M3 GALIAN TANAH MENGGUNAKAN ALAT BERAT


1.0000

unit

Excavator (Anl. P.5.2)

@ Rp
Jumlah

Anl. AB.1a

: 1 M3 GALIAN TANAH MENGGUNAKAN ALAT BERAT DAN MENGANGKUT


1.0000
1.0000

unit
unit

Excavator (Anl. P.5.2)


Dump Truck (Anl. P.5.3)

@ Rp
@ Rp
Jumlah

Anl. AB.1b

: 1 M3 TIMBUNAN TANAH DIDATANGKAN (MENGGUNAKAN ALAT BERAT)


1.0000
1.0000
1.2500

Anl. A.B.1

unit
unit
m3

Excavator (Anl. P.5.2)


Vibrator (Anl. P.5.4)
Tanah Timbun

@ Rp
@ Rp
@ Rp

Jumlah

Rp

76,621.50

35,000.00
50,000.00
22,200.00
Jumlah

Rp
Rp
Rp
Rp

5,250.00
500.00
22,200.00
27,950.00

27,950.00 Rp

18,633.33

: 1 M2 PASANGAN RUMPUT
0.1500
0.0100
1.0000

Org
Org
m2

Pekerja
Mandor
Lempengan Rumput

Diambil 2/3 x
Anl. G.41

26,250.00
1,250.00

: 1 m3 BETON COR 1 : 2 : 3

@ Rp
@ Rp
@ Rp

Rp