Escolar Documentos
Profissional Documentos
Cultura Documentos
Patok
Jarak Konstruksi
Jumlah
Volume
(m)
(m)
Beton
Bertulang
(m3)
A.101 (BLS-04
24.00
A.102
25.00
A.103
25.00
A.104
198.30
407.70
50.00
A.105
50.00
A.106
24.30
A.107 - A.110
(Linning Saluran
24.00
A.111
50.00
A.112
144.50
297.09
28.00
57.57
474.80
976.19
50.00
A.113
20.50
Gorong-Gorong
10.50
A.114
17.50
A.115/Jembatan
12.50
A.116
25.00
A.117
50.00
A.118
50.00
A.119
50.00
A.120
50.00
A.121
50.00
A.122
25.00
A.123
20.00
A.124
25.00
A.125
15.00
A.126
24.30
A.127
18.00
A.128
50.00
A.129
10.00
BLS-05
JUMLAH
845.60
845.60
1,738.55
KETERANGAN
URAIAN
Mandor
Kepala tukang
Tukang
Pekerja
Sopir (Dump Truck dan Alat Berat)
Sopir Pembantu
Operator
Pembantu Operator
Mekanik Terlatih
Mekanik Pmbantu
SATUAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
HARGA
(Rp)
50,000.00
60,000.00
50,000.00
35,000.00
55,000.00
45,000.00
65,000.00
45,000.00
60,000.00
45,000.00
URAIAN
Aspal Bitumen
2
3
4
Batu Bata
Batu Kali
Besi beton
Drain Hole
Gemuk (Grase)
Kawat beton
Kayu Bekisting
Kayu Sembarang
Kerikil Bersih
Lempengan Rumput
Minyak Aspal
Minyak Premium
Minyak Solar
Minyak Pelumas
Pasir Pasangan
Pasir Urug
Paku kayu
Paku seng
Semen Portland
Tanah Timbunan
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
SATUAN
kg
bh
m3
kg
buah
kg
kg
m3
m3
m3
m2
ltr
ltr
ltr
ltr
m3
m3
kg
kg
zak
m3
HARGA
(Rp)
5,500.00
620.00
160,000.00
7,700.00
3,500.00
13,800.00
14,400.00
1,824,000.00
720,000.00
160,000.00
22,200.00
5,250.00
5,625.00
5,250.00
33,000.00
110,000.00
70,000.00
9,360.00
16,200.00
38,400.00
51,650.00
(IR. M. NASIR)
Wakil Direktur
Direktur
Nama Alat
Merk
Type / Model
Kapasitas
Engine
Isi Karakter
Umur Ekonomis
Jam Kerja / Tahun
Harga Pokok
Harga Track
Nilai Sisa
Harga Penyusutan
: Backhoe / Excavator
: Komatzu
: PC. 200
: 0.80 m3
: ISUZU
:
51 Liter
:
5 Th
:
2,000.00
:
:
: Rp.
10.00% x
: Rp.
930,000,000.00 -
Rp.
Rp.
=
=
=
=
883,500,000.00
88,350,000.00
Rp.
Rp.
Rp.
Rp.
930,000,000.00
46,500,000.00
88,350,000.00
841,650,000.00
B. TAKSIRAN PRODUKSI
1.
2.
3.
4.
Swelling
Kapasitas
Dapat Melakukan Gerak
Produksi Maksimum Teoritis
C. FAKTOR KOREKSI
1.
Angle Of Swing
2.
Faktor Swing Dan Depth
3.
Eff Kerja Siang
4.
Kondisi Kerja
5.
Faktor Muat Diambil Rata-rata
6.
Faktor Koreksi
7.
Taksiran Produksi
:
:
:
: 0.64 x
:
:
:
:
:
: 0.88 x
: 0.52 x
25.00
0.80
2.50
2.50
%
/
1.25
Circle Time
x
60
120.00 Derajat
0.88
0.83
0.75
0.95
0.83 x
0.75 x
96.00
=
0.95
49.96
0.64 m3
=
=
0.52
50.00 m3 / Jam
D. BIAYA PERALATAN
I. BIAYA - BIAYA
I. 1 BIAYA PEMILIKAN
Penyusutan
Bunga Bank
Pajak PPH
Gudang
Asuransi
I. 2
BIAYA OPERASI
Bahan Bakar (solar)
Minyak Pelumas
Minyak Hydroulic
Gemuk / Grease
Filter Oli
Filter Solar
Filter Udara
Operator
Co. Operator
Mekanik
Co. Mekanik
Bahan Pelengkap
: Rp.
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
841,650,000.00
24.00%
2.50%
0.50%
0.50%
1.100
1.050
1.050
1.100
0.004
0.002
0.001
/ 5 x 2.000
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
x
x
x
x
x
x
15.00
0.12
0.08
0.07
1.00
1.00
1.00
1.00
1.00
0.20
0.40
1.00
930,000,000.00
930,000,000.00
930,000,000.00
930,000,000.00
Ltr
Ltr
Ltr
Kg
Buah
Buah
Buah
Oh
Oh
Oh
Oh
Oh
@
@
@
@
@
@
@
@
@
@
@
@
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
84,165.00
111,600.00
11,625.00
2,325.00
2,325.00
209,715.00
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
86,625.00
4,158.00
2,772.00
1,062.60
300.00
240.00
1,200.00
8,125.00
5,625.00
1,500.00
2,250.00
1,328.13
115,185.73
2,000.00 = Rp.
JUMLAH
= Rp.
27,900.00
27,900.00
/
/
/
/
2,000.00
2,000.00
2,000.00
2,000.00
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,250.00
33,000.00
33,000.00
13,800.00
75,000.00
120,000.00
1,200,000.00
8,125.00
5,625.00
7,500.00
5,625.00
1,328.13
JUMLAH
I. 3
BIAYA PERBAIKAN
6.00% x
Rp.
930,000,000.00
REKAPITULASI BIAYA :
BIAYA PEMILIKAN
BIAYA OPERASI
BIAYA PERBAIKAN
BIAYA EXCAVATOR
: ..
= Rp.
209,715.00
: ..
= Rp.
115,185.73
: ..
= Rp.
27,900.00
: ..
= Rp.
352,800.73
:
: Rp.
50.00 m3 / Jam
352,800.73 /
50.00
= Rp.
Dibulatkan = Rp.
7,056.01 / m3
7,056.00 / m3
:
:
:
:
:
:
:
:
:
:
Dump Truck
FUSO
FM. 190
6 - 8 Ton 4 - 5 m3
5 Tahun
2,000
Rp.
1,969,500 x
Rp.
300,000,000
10.00% x
Rp.
300,000,000 -
:
:
:
6
Rp.
Rp.
300,000,000
30,000,000
5.00 m3
30.00 %
5.00 /
1.30
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
= Rp.
11,817,000
= Rp.
= Rp.
30,000,000
270,000,000
3.85 m3
1000.00 m'
60.00 Km / Jam
80.00 Km / Jam
0.80
0.35 Menit
0.85 Menit
5 / 84 x 60
1,000 / 1,000 + 1,000 / 1,333.33
0.35 + 0.85 + 3.57+ 1.75
(60 / 6.52) x 3.85
0.80 x 35.39
=
=
=
=
=
3.57
0.85
6.52
35.39
28.32
Menit
Menit
Menit
m3
m3 / Jam
C. BIAYA PERALATAN :
I. BIAYA - BIAYA
I.1. BIAYA PEMILIKAN
Penyusutan
Bunga Bank
Pajak PPH
Gudang
Asuransi
:
:
:
:
:
Rp.
270,000,000
24.00%
2.50%
0.50%
0.50%
/
x
x
x
x
:
:
:
:
:
:
:
:
:
:
:
:
:
1.100
1.050
1.050
1.100
0.004
0.002
0.001
1.000
6.00% x
REKAPUTULASI BIAYA :
BIAYA PEMILIKAN
BIAYA OPERASI
BIAYA PERBAIKAN
BIAYA DUMP TRUCK
HARGA SATUAN PEKERJAAN
KAPASITAS ANGKUT
HARGA ANGKUT TANAH DENGAN
JARAK 1 KM
:
:
:
:
Rp.
Rp.
Rp.
Rp.
x
x
x
x
x
x
x
/
Rp.
15.00
0.37
0.08
0.02
1.00
1.00
1.00
2,000.00
0.20
0.40
1.00
1.00
1.00
/
/
/
/
/
Ltr
Ltr
Ltr
Kg
Buah
Buah
Buah
Buah
Mh
Mh
Mh
Mh
Ls
300,000,000 /
2,000
2,000
2,000
2,000
2,000
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
JUMLAH
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
27,000.00
36,000.00
3,750.00
750.00
750.00
68,250.00
5,250
33,000
33,000
13,800
42,000
36,000
120,000
1,969,500
7,500
5,625
6,875
5,625
1,000
JUMLAH
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
86,625.00
12,820.50
2,772.00
303.60
168.00
72.00
120.00
984.75
1,500.00
2,250.00
6,875.00
5,625.00
1,000.00
121,115.85
JUMLAH
= Rp.
= Rp.
9,000.00
9,000.00
2,000
..
= Rp.
68,250.00
..
= Rp.
121,115.85
..
= Rp.
9,000.00
..
= Rp.
198,365.85
:
:
5.00
300,000,000
300,000,000
300,000,000
300,000,000
28.32 m3 / Jam
Rp.
198,365.85 /
28.32 m3 / Jam
= Rp.
Dibulatkan .. = Rp.
7,005.62 / m3
7,006.00 / m3
:
:
:
:
:
:
:
:
:
:
B. TAKSIRAN PRODUKSI :
1 . Produksi Maksimum Teoritis:
2 . Faktor Koreksi
a. Efisiensi Kerja
b. Kondisi Kerja
Faktor Koreksi
:
:
:
:
3 . Taksiran Produksi
VIBRATOR ROLLER
Dynopac
CA. 25
0.70 m3
5 Tahun
2,000 Jam
Rp.
300,000,000
Rp.
35,000,000
10.00% x
Rp.
300,000,000 -
(W x S x L) / P
Rp
Rp
265,000,000
35,000,000
= Rp.
= Rp.
0.70
0.70
0.70 x
0.70
(90 x 0.49)
90 m3/jam
0.49 m3/jam
44.10 m3/jam
26,500,000
238,500,000
C. BIAYA PERALATAN :
I. BIAYA LANGSUNG
I.1. BIAYA PEMILIKAN
a. Penyusutan
b. Bunga Bank, Gudang
Rp.
20% x (6.00/10.00) x
238,500,000 /
2,000
= Rp.
23,850.00 /jam
300,000,000
2,000
= Rp.
JUMLAH = Rp.
18,000.00 /jam
41,850.00 /jam
.15.00 Ltr
@ Rp.
5,250
. 0.40 Ltr
@ Rp.
33,000
. 0.20 Ltr
@ Rp.
33,000
. 0.15 Ltr
@ Rp.
71,250
. 1.00 Kg
@ Rp.
13,800
.
@ Rp.
8,125
.
@ Rp.
7,500
JUMLAH
10.00% x (Rp. 300,000,000 - Rp. 35,000,000)
15.00% x
Rp.
193,762.50
2,000
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
78,750.00
13,200.00
6,600.00
10,687.50
13,800.00
8,125.00
7,500.00
138,662.50
/jam
/jam
/jam
/jam
/jam
/jam
/jam
/jam
= Rp.
JUMLAH = Rp.
13,250.00 /jam
13,250.00 /jam
.
= Rp.
193,762.50 /jam
JUMLAH = Rp.
29,064.38 /jam
JUMLAH ( I + II ) = Rp.
222,826.88 /jam
5,052.76 / m3
5,053.00 / m3
222,826.88
Analisa
Stn
Kuantitas
Taksir
Taksir
Taksir
Taksir
Ls
Ls
Ls
Ls
Harga Satuan
(Rp)
Harga Pekerjaan
(Rp)
PEKERJAAN PERSIAPAN
1
2
3
4
Pematokan/cek pengukuran
Sewa Direksi Keet
Pengeringan (Dewatering)
Mobilisasi dan Demobilisasi alat
550,000.00
1,500,000.00
3,000,000.00
4,000,000.00
Jumlah
II.
1
2
3
4
5
9,050,000.00
PEKERJAAN SALURAN
Rehabilitasi Saluran Ruas BAU.8 - BP.1
691.80
Anl. AB.1
Anl.A.16
Anl. AB.1b
Supl. V
m3
m3
m3
m3
7,056.00
9,250.00
76,621.50
1,961,700.40
Jumlah
III.
550,000.00
1,500,000.00
3,000,000.00
4,000,000.00
0.00
0.00
0.00
0.00
0.00
PEKERJAAN LAIN-LAIN
Administrasi Kontrak
Adm. Progress dan Pelaporan
Adm. Foto Dukumentsi
P3K
Pembuatan Papan Nama Proyek
Taksir
Taksir
Taksir
Taksir
Taksir
unit
Ls
Ls
Ls
Ls
1.00
1,000,000.00
700,000.00
500,000.00
500,000.00
200,000.00
Jumlah
1,000,000.00
700,000.00
500,000.00
500,000.00
200,000.00
2,900,000.00
REKAPITULASI
I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN SALURAN
III.
PEKERJAAN LAIN-LAIN
(L =
Rp.
9,050,000.00
Rp.
0.00
Rp.
2,900,000.00
Jumlah
Rp.
2,900,000.00
Dibulatkan
Rp.
6,724,345,000.00
#REF! meter)
TERBILANG:
Enam Milyar Tujuh Ratus Dua Puluh Empat Juta Tiga Ratus Empat Puluh Lima Ribu Rupiah
Menyetujui,
Ka.Bid. Program dan Hidrologi
Dinas Sumber Daya Air
(IR. HASANUDDIN)
Nip. 390 012 616
(IR. M. NASIR)
Wakil Direktur
Mengetahui,
Penanggungjawab Kegiatan
Kepala Dinas Sumber Daya Air
Kabupaten Aceh Utara
(IR. MAWARDI)
Pembina/Nip. 390 012 231
DAFTAR ANALISA
CV. TOTAL ENGINEERING CONSULTANT
Jl. Kenari No 9B Tlp. (0645)-41538 - LHOKSEUMAWE
Anl. A.1
Org
Org
Pekerja
Mandor
@ Rp
@ Rp
35,000.00 Rp
50,000.00 Rp
Jumlah
Anl. A.16
Rp
27,500.00
35,000.00 Rp
50,000.00 Rp
8,750.00
500.00
Org
Org
Pekerja
Mandor
@ Rp
@ Rp
Jumlah
Anl. AB.1
Rp
9,250.00
7,056.00 Rp
7,056.00
Rp
7,056.00
7,056.00 Rp
7,006.00 Rp
7,056.00
7,006.00
Rp
14,062.00
7,006.00 Rp
5,053.00 Rp
51,650.00 Rp
7,006.00
5,053.00
64,562.50
unit
@ Rp
Jumlah
Anl. AB.1a
unit
unit
@ Rp
@ Rp
Jumlah
Anl. AB.1b
Anl. A.B.1
unit
unit
m3
@ Rp
@ Rp
@ Rp
Jumlah
Rp
76,621.50
35,000.00
50,000.00
22,200.00
Jumlah
Rp
Rp
Rp
Rp
5,250.00
500.00
22,200.00
27,950.00
27,950.00 Rp
18,633.33
: 1 M2 PASANGAN RUMPUT
0.1500
0.0100
1.0000
Org
Org
m2
Pekerja
Mandor
Lempengan Rumput
Diambil 2/3 x
Anl. G.41
26,250.00
1,250.00
: 1 m3 BETON COR 1 : 2 : 3
@ Rp
@ Rp
@ Rp
Rp