Você está na página 1de 18

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

MEZCLA CONCRETO 1:2:3 DESCRIPCION

3100 PSI 210 MPa UND CANT. 190 0.56 0.84 0.1 350 0.006 DESP.% PRECIO UNIT

Unidad: M3 ITEM: BASICO VALOR TOTAL 9,500.00 25,452.00 63,630.00 680.00 117,600.00 75.00 216,937.00 9,737.20 9,737.20 2,700.00 5,399.26 8,099.26 234,773.46

MATERIALES LTS AGUA M3 ARENA GRUESA M3 GRAVA TRITURADA 3/4" COLOR AZUL GLN GASOLINA CORRIENTE CEMENTO GRIS PORTLAND SACO DE 50 KILOS KLS GLN ACEITE MOTOR 4 TIEMPOS PREMOLDA MANO DE OBRA M. O. ALBANILERIA 2 AYUDANTE HC DIA GLB

50.00 45,000.00 75,000.00 6,800.00 5 320.00 12,500.00 SUBTOTAL MATERIALES 1 1

1.1 8,852.00 SUBTOTAL MANO DE OBRA 0.06 2.6996 45,000.00 2,000.00 SUBTOTAL EQUIPO

EQUIPO MEZCLADORA DE CONCRETO HERRAMIENTA MENOR

COSTO DIRECTO

DESCAPOTE MANUAL MAS RETIRO H= O.20 MTS DESCRIPCION MANO DE OBRA M.O. ALBANILERIA 1 AYUDANTE EQUIPO VOLQUETA 5 M3 HERRAMIENTA MENOR UND. CANT. HC VJE GLB 0.35 0.03 0.675 DESP.% PRECIO UNIT.

Unidad: M2 ITEM: VALOR TOTAL 1,637.65 1,637.65 1,200.00 1,350.00 2,550.00 4,187.65

4679 SUBTOTAL MANO DE OBRA 40000 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

LOCALIZACION-REPLANTEO OBRA ARQUITECTON. DESCRIPCION MATERIALES PUNTILLA 2 CC BASTIDOR 2"x2"x3M OTOBO PIOLA GRUESA 50 METROS MINERAL ROJO MANO DE OBRA M.O. ALBANILERIA 2 AYUDANTE-1 OFI M.O. TOPOGRAFIA 1 CADENERO-1 TOP EQUIPO HERRAMIENTA MENOR UND. CANT. LBS ML ROL KLS HC HC GLB 0.02 0.33 0.06 0.005 0.06 0.04 0.039 DESP.% PRECIO UNIT.

Unidad: M2 ITEM: VALOR TOTAL 37.00 495.00 150.00 19.57 701.57 1,100.28 546.40 1,646.68 78.00 78.00 2,426.25

1850 1500 2500 3915 SUBTOTAL MATERIALES 18338 13660 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

EXCAVACION TIERRA A MANO DESCRIPCION MANO DE OBRA M.O. ALBANILERIA 1 AYUDANTE EQUIPO HERRAMIENTA MENOR UND. CANT. HC GLB 1.5 0.168 DESP.% PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 7,018.50 7,018.50 336.00 336.00 7,354.50

4679 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

SOLADO ESPESOR E=0.07M 3000 PSI 210 MPA DESCRIPCION MATERIALES MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 1 AYUDANTE-1 OFI UND. CANT. M3 HC 0.08 0.4 0.105 0.03 DESP.% PRECIO UNIT.

Unidad: M2 ITEM: VALOR TOTAL 18,781.87 18,781.87 4,713.60 4,713.60 472.50 60.00 532.50 24,027.97

234,773.46 SUBTOTAL MATERIALES 11784 SUBTOTAL MANO DE OBRA 4,500.00 2000 SUBTOTAL EQUIPO

EQUIPO VOLQUETA TRANSPORTE MAT.PETREOS 1-10KMSM3 HERRAMIENTA MENOR GLB

COSTO DIRECTO

MEZCLA CONCRETO 1:2:3 DESCRIPCION

3100 PSI 210 MPa UND CANT. 190 0.56 0.84 0.1 350 0.006 DESP.% PRECIO UNIT

Unidad: M3 ITEM: VALOR TOTAL 9,500.00 25,452.00 63,630.00 680.00 117,600.00 75.00 216,937.00 9,737.20 9,737.20 2,700.00 5,399.26 8,099.26 234,773.46

MATERIALES LTS AGUA M3 ARENA GRUESA M3 GRAVA TRITURADA 3/4" COLOR AZUL GLN GASOLINA CORRIENTE CEMENTO GRIS PORTLAND SACO DE 50 KILOS KLS GLN ACEITE MOTOR 4 TIEMPOS PREMOLDA MANO DE OBRA M. O. ALBANILERIA 2 AYUDANTE HC DIA GLB

50.00 45,000.00 75,000.00 6,800.00 5 320.00 12,500.00 SUBTOTAL MATERIALES 1 1

1.1 8,852.00 SUBTOTAL MANO DE OBRA 0.06 2.6996 45,000.00 2,000.00 SUBTOTAL EQUIPO

EQUIPO MEZCLADORA DE CONCRETO HERRAMIENTA MENOR

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

ACERO DE REFUERZO 60000 PSI DESCRIPCION MATERIALES ALAMBRE NEGRO # 18 HIERR.DE 60000 PSI 420 MPA MANO DE OBRA M.O. ALBANILERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND CANT. KLS KLS HC GLB 0.04 1 0.056 0.1 DESP.% PRECIO UNIT

Unidad: KLS ITEM: VALOR TOTAL 108.00 2,621.63 2,729.63 659.90 659.90 200.00 200.00 3,589.53

2,700.00 10 2,383.30 SUBTOTAL MATERIALES 11,784.00 SUBTOTA MANO DE OBRA 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

COLUMNA EN CONCRETO 3000 PSI DESCRIPCION UND. CANT. 2 2 0.2 5.67 8 5 4.33 1.05 7.8 0.1 0.375 24 4 DESP.% PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 10,370.00 17,400.00 1,206.40 25,622.73 14,800.00 37,500.00 19,485.00 246,512.13 372,896.26 160,953.00 160,953.00 4,000.00 750.00 2,784.00 1,400.00 8,934.00 542,783.26

MATERIALES ANTISOL BLANCO KLS SEPAROL DESFORMALETEANTE TARRO 15 KLS KLS SIKAMENT NS SUPERPLASTIFIC TARRO DE 25 KLS KLS CUARTON 2"x4"x3M OTOBO UND PUNTILLA 2 CC LBS TABLA 1x10x3M OTOBO UND VARETA 2"x2"x3M OTOBO UND MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA M3 MANO DE OBRA M.O. ALBANILERIA 3 AYUDANTE-1 OIF HC

5185 8700 6032 4519 1850 7500 4500 234,773.46 SUBTOTAL MATERIALES 20635 SUBTOTAL MANO DE OBRA 40000 2000 116 350 SUBTOTAL EQUIPO

EQUIPO VIBRADOR ELECTRICO DIA HERRAMIENTA MENOR GLB TACO METALICO EXTENSION DE 2.OM A 3.30MT DIA ANDAMIO METALICO TUBULAR U/D

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

VIGA CONCRETO AEREA 3000 PSI, TIPO V-A DESCRIPCION MATERIALES CUARTON 2"x4"x3M OTOBO GUADUA [TACO] 2.50-3M PUNTILLA 2 CC TABLA 1x10x3M OTOBO VARETA 2"x2"x3M OTOBO MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 2 AYUDANTE-1 OFI EQUIPO VIBRADOR ELECTRICO HERRAMIENTA MENOR ANDAMIO METALICO TUBULAR UND. CANT. UND UND LBS UND UND M3 HC DIA GLB U/D 1.5 4 3.8 3.5 1.5 1.03 11 0.3 0.33 4 DESP.% PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 6,778.50 6,800.00 7,030.00 26,250.00 6,766.87 241,816.66 295,442.03 201,718.00 201,718.00 12,000.00 660.00 1,400.00 14,060.00 511,220.03

4519 1700 1850 7500 0.25 4500 234,773.46 SUBTOTAL MATERIALES 18338 SUBTOTAL MANO DE OBRA 40000 2000 350 SUBTOTAL EQUIPO

COSTO DIRECTO

VIGA CONCRETO AEREA 3000 PSI, TIPO V-B DESCRIPCION MATERIALES CUARTON 2"x4"x3M OTOBO GUADUA [TACO] 2.50-3M PUNTILLA 2 CC TABLA 1x10x3M OTOBO VARETA 2"x2"x3M OTOBO MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 2 AYUDANTE-1 OFI EQUIPO VIBRADOR ELECTRICO HERRAMIENTA MENOR ANDAMIO METALICO TUBULAR UND. CANT. UND UND LBS UND UND M3 HC DIA GLB U/D 1.5 4 3.8 3.5 1.5 1.03 11 0.3 0.33 4 DESP.% PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 6,778.50 6,800.00 7,030.00 26,250.00 6,766.87 241,816.66 295,442.03 201,718.00 201,718.00 12,000.00 660.00 1,400.00 14,060.00 511,220.03

4519 1700 1850 7500 0.25 4500 234,773.46 SUBTOTAL MATERIALES 18338 SUBTOTAL MANO DE OBRA 40000 2000 350 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

VIGA CONCRETO AEREA 3000 PSI, TIPO V-C DESCRIPCION MATERIALES CUARTON 2"x4"x3M OTOBO GUADUA [TACO] 2.50-3M PUNTILLA 2 CC TABLA 1x10x3M OTOBO VARETA 2"x2"x3M OTOBO MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 2 AYUDANTE-1 OFI EQUIPO VIBRADOR ELECTRICO HERRAMIENTA MENOR ANDAMIO METALICO TUBULAR UND. CANT. UND UND LBS UND UND M3 HC DIA GLB U/D 1.5 4 3.8 3.5 1.5 1.03 11 0.3 0.33 4 DESP.% PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 6,778.50 6,800.00 7,030.00 26,250.00 6,766.87 241,816.66 295,442.03 201,718.00 201,718.00 12,000.00 660.00 1,400.00 14,060.00 511,220.03

4519 1700 1850 7500 0.25 4500 234,773.46 SUBTOTAL MATERIALES 18338 SUBTOTAL MANO DE OBRA 40000 2000 350 SUBTOTAL EQUIPO

COSTO DIRECTO

VIGA CONCRETO AEREA 3000 PSI, TIPO V-D PARA APOYO DE ESCALERA DESCRIPCION UND. CANT. DESP.% MATERIALES CUARTON 2"x4"x3M OTOBO GUADUA [TACO] 2.50-3M PUNTILLA 2 CC TABLA 1x10x3M OTOBO VARETA 2"x2"x3M OTOBO MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 2 AYUDANTE-1 OFI EQUIPO VIBRADOR ELECTRICO HERRAMIENTA MENOR ANDAMIO METALICO TUBULAR UND UND LBS UND UND M3 HC DIA GLB U/D 1.5 4 3.8 3.5 1.5 1.03 11 0.3 0.33 4

PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 6,778.50 6,800.00 7,030.00 26,250.00 6,766.87 241,816.66 295,442.03 201,718.00 201,718.00 12,000.00 660.00 1,400.00 14,060.00 511,220.03

4519 1700 1850 7500 0.25 4500 234,773.46 SUBTOTAL MATERIALES 18338 SUBTOTAL MANO DE OBRA 40000 2000 350 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

VIGA CIRCULAR EN CONCRETO AEREA 3000 PSI IMPERMEABILZADA DESCRIPCION UND. CANT. MATERIALES CUARTON 2"x4"x3M OTOBO GUADUA [TACO] 2.50-3M PUNTILLA 2 CC TABLA 1x10x3M OTOBO VARETA 2"x2"x3M OTOBO MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 2 AYUDANTE-1 OFI EQUIPO VIBRADOR ELECTRICO HERRAMIENTA MENOR ANDAMIO METALICO TUBULAR UND UND LBS UND UND M3 HC DIA GLB U/D 1.5 4 3.8 3.5 1.5 1.03 11 0.3 0.33 4

DESP.%

PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 6,778.50 6,800.00 7,030.00 26,250.00 6,766.87 241,816.66 295,442.03 201,718.00 201,718.00 12,000.00 660.00 1,400.00 14,060.00 511,220.03

4519 1700 1850 7500 0.25 4500 234,773.46 SUBTOTAL MATERIALES 18338 SUBTOTAL MANO DE OBRA 40000 2000 350 SUBTOTAL EQUIPO

COSTO DIRECTO

ACERO DE REFUERZO 60000 PSI DESCRIPCION MATERIALES ALAMBRE NEGRO # 18 HIERR.DE 60000 PSI 420 MPA MANO DE OBRA M.O. ALBANILERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND CANT. KLS KLS HC GLB 0.04 1 0.056 0.1 DESP.% PRECIO UNIT

Unidad: KLS ITEM: VALOR TOTAL 108.00 2,621.63 2,729.63 659.90 659.90 200.00 200.00 3,589.53

2,700.00 10 2,383.30 SUBTOTAL MATERIALES 11,784.00 SUBTOTA MANO DE OBRA 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

CONCRETO PARA CUPULA IN FERIOR, PARED CONICA Y ANILLO INFERIOR TANQUE ELEVADO 3000 PSI DESCRIPCION UND. CANT. DESP.% MATERIALES CUARTON 2"x4"x3M OTOBO GUADUA [TACO] 2.50-3M GUADUA 6 MT. PUNTILLA 2 CC TABLA 1x10x3M OTOBO CINTA PVC JUNT. DILATACION PLASTOCRETE D.M. (20 KGS) MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 3 AYUDANTE-1 OIF EQUIPO VIBRADOR ELECTRICO HERRAMIENTA MENOR ANDAMIO METALICO TUBULAR UND UND UND LBS UND UND KLS M3 HC DIA GLB U/D 3.7 2.85 3 1.6 5.1 1.42 1.8 1.05 9.9 0.22 0.61 2

PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 16,720.30 4,845.00 7,500.00 2,960.00 38,250.00 37,177.02 8,429.40 246,512.13 362,393.85 204,286.50 204,286.50 8,800.00 1,220.00 700.00 10,720.00 577,400.35

4519 1700 2500 1850 7500 26181 4683 234,773.46 SUBTOTAL MATERIALES 20635 SUBTOTAL MANO DE OBRA 40000 2000 350 SUBTOTAL EQUIPO

COSTO DIRECTO

CONCRETO PARA PARED CILINDRICA DEL TANQUE ELEVADO 3000 PSI DESCRIPCION UND. CANT. DESP.% MATERIALES CUARTON 2"x4"x3M OTOBO GUADUA [TACO] 2.50-3M GUADUA 6 MT. PUNTILLA 2 CC TABLA 1x10x3M OTOBO CINTA PVC JUNT. DILATACION PLASTOCRETE D.M. (20 KGS) MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 3 AYUDANTE-1 OIF EQUIPO VIBRADOR ELECTRICO HERRAMIENTA MENOR ANDAMIO METALICO TUBULAR UND UND UND LBS UND UND KLS M3 HC DIA GLB U/D 3.7 2.85 3 1.6 5.1 1.42 1.8 1.05 9.9 0.22 0.61 2

PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 16,720.30 4,845.00 7,500.00 2,960.00 38,250.00 37,177.02 8,429.40 246,512.13 362,393.85 204,286.50 204,286.50 8,800.00 1,220.00 700.00 10,720.00 577,400.35

4519 1700 2500 1850 7500 26181 4683 234,773.46 SUBTOTAL MATERIALES 20635 SUBTOTAL MANO DE OBRA 40000 2000 350 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

CONCRETO PARA CUPULA SUPERIOR, ANILLO SUPERIOR Y MENSULA DEL TANQUE ELEVADO 3000 PSI DESCRIPCION UND. CANT. DESP.% MATERIALES CUARTON 2"x4"x3M OTOBO GUADUA [TACO] 2.50-3M GUADUA 6 MT. PUNTILLA 2 CC TABLA 1x10x3M OTOBO CINTA PVC JUNT. DILATACION PLASTOCRETE D.M. (20 KGS) MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA MANO DE OBRA M.O. ALBANILERIA 3 AYUDANTE-1 OIF EQUIPO VIBRADOR ELECTRICO HERRAMIENTA MENOR ANDAMIO METALICO TUBULAR UND UND UND LBS UND UND KLS M3 HC DIA GLB U/D 3.7 2.85 3 1.6 5.1 1.42 1.8 1.05 9.9 0.22 0.61 2

PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 16,720.30 4,845.00 7,500.00 2,960.00 38,250.00 37,177.02 8,429.40 246,512.13 362,393.85 204,286.50 204,286.50 8,800.00 1,220.00 700.00 10,720.00 577,400.35

4519 1700 2500 1850 7500 26181 4683 234,773.46 SUBTOTAL MATERIALES 20635 SUBTOTAL MANO DE OBRA 40000 2000 350 SUBTOTAL EQUIPO

COSTO DIRECTO

ACERO DE REFUERZO 60000 PSI DESCRIPCION MATERIALES ALAMBRE NEGRO # 18 HIERR.DE 60000 PSI 420 MPA MANO DE OBRA M.O. ALBANILERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND CANT. KLS KLS HC GLB 0.04 1 0.056 0.1 DESP.% PRECIO UNIT

Unidad: KLS ITEM: VALOR TOTAL 108.00 3,850.00 3,958.00 659.90 659.90 200.00 200.00 4,817.90

2,700.00 10 3,500.00 SUBTOTAL MATERIALES 11,784.00 SUBTOTA MANO DE OBRA 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

NIPLE A.C 6" BXEL PARA PVC L=0.50MTS DESCRIPCION UND CANT. 0.15 8 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 580.50 16,000.00 236,466.00 253,046.50 11,254.10 11,254.10 400.00 400.00 264,700.60

MATERIALES KLS WAIPE UND TORNILLO 3/4" L=8.3CM, CON TUERCA Y ARANDELA UND NIPLE A.C 6" BXEL L=0.50MTS MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR HC GLB

3,870.00 2,000.00 236,466.00 SUBTOTAL MATERIALES

0.65 17,314.00 SUBTOTAL- MANO DE OBRA 0.2 2,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

CODO 6"X90 BXB (A.C) DESCRIPCION UND CANT. 1 16 0.085 0.025 0.35 0.258 DESP.% PRECIO UNIT

Unidad: UND ITEM: VALOR TOTAL 460,000.00 32,000.00 328.95 62.50 492,391.45 4,382.00 4,382.00 516.00 516.00 497,289.45

MATERIALES UND CODO A.C 6"X90 BXB UND TORNILLO 3/4" L=8.3CM, CON TUERCA Y ARANDELA KLS WAIPE ROL PIOLA GRUESA 50 METROS MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR HC GLB

460,000.00 2,000.00 3,870.00 2,500.00 SUBTOTAL MATERIALES 12,520.00 SUBTOTA MANO DE OBRA 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

TUBERIA ACERO AL CARBON D=6" PARA SOLDAR DESCRIPCION UND. CANT. 0.15 0.115 1 0.65 0.165 DESP.% PRECIO UNIT.

Unidad: ML ITEM: VALOR TOTAL 580.50 287.50 204,000.00 204,868.00 11,254.10 11,254.10 330.00 330.00 216,452.10

MATERIALES WAIPE KLS PIOLA GRUESA 50 METROS ROL TUB.ACE CARBON D=6" SCHEDULE 40 USO AGUA ML MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR HC GLB

3870 2500 204000 SUBTOTAL MATERIALES 17314 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

TEE 6 x 6 (A.C) BXB DESCRIPCION MATERIALES TEE AC 6 x 6 ACERO CARBON WAIPE PIOLA GRUESA 50 METROS MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND. CANT. UND KLS ROL HC GLB 1 0.15 0.15 1.2 0.515 DESP.% PRECIO UNIT.

Unidad: UND ITEM: VALOR TOTAL 330,000.00 580.50 375.00 330,955.50 15,024.00 15,024.00 1,030.00 1,030.00 347,009.50

330000 3870 2500 SUBTOTAL MATERIALES 12520 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

BRIDAS PARA SOLDAR 6" DESCRIPCION MATERIALES SOLDADURA 6011 1/8" VARILLA BRIDAS DE 6" PARA SOLDAR MANO DE OBRA M.O. METALISTERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR SOLDADOR ELECTRICO UND KLS UND HC GLB DIA CANT. 0.5 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 2,985.00 94,000.00 96,985.00 15,555.10 15,555.10 2,000.00 1,750.00 3,750.00 116,290.10

5,970.00 94,000.00 SUBTOTAL MATERIALES

1.1 14,141.00 SUBTOTAL- MANO DE OBRA 1 0.125 2,000.00 14,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

PASAMURO 6" BXB L= 0.50MTS Z=0.15MTS DESCRIPCION UND CANT. 0.15 0.15 16 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 580.50 375.00 32,000.00 384,000.00 416,955.50 11,254.10 11,254.10 400.00 400.00 428,609.60

MATERIALES KLS WAIPE ROL PIOLA GRUESA 50 METROS UND TORNILLO 3/4" L=8.3CM, CON TUERCA Y ARANDELA UND PASA MURO 6" BXB L=0.5MTS, Z=0.25MTS MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR HC GLB

3,870.00 2,500.00 2,000.00 384,000.00 SUBTOTAL MATERIALES

0.65 17,314.00 SUBTOTAL- MANO DE OBRA 0.2 2,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

PASAMURO 8" BXE.L L=0.50MTS, Z=0.15MTS DESCRIPCION UND CANT. 0.15 0.15 16 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 580.50 375.00 32,000.00 454,200.00 487,155.50 11,254.10 11,254.10 400.00 400.00 498,809.60

MATERIALES KLS WAIPE ROL PIOLA GRUESA 50 METROS UND TORNILLO 3/4" L=8.9CM, CON TUERCA Y ARANDELA UND PASAMURO 8" BXE.L L=0.5MTS, Z=0.15MTS MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR HC GLB

3,870.00 2,500.00 2,000.00 454,200.00 SUBTOTAL MATERIALES

0.65 17,314.00 SUBTOTAL- MANO DE OBRA 0.2 2,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

CODO A.C 8"X45 BXB DESCRIPCION UND CANT. 1 16 0.085 0.025 0.35 0.25 DESP.% PRECIO UNIT

Unidad: UND ITEM: VALOR TOTAL 548,100.00 32,000.00 328.95 62.50 580,491.45 4,382.00 4,382.00 500.00 500.00 585,373.45

MATERIALES UND CODO A.C 8"X45 BXB UND TORNILLO 3/4" L=8.9CM, CON TUERCA Y ARANDELA KLS WAIPE ROL PIOLA GRUESA 50 METROS MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR HC GLB

548,100.00 2,000.00 3,870.00 2,500.00 SUBTOTAL MATERIALES 12,520.00 SUBTOTA MANO DE OBRA 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

TUBERIA ACERO AL CARBON 8" PARA SOLDAR DESCRIPCION MATERIALES PIOLA GRUESA 50 METROS WAIPE TUBERIA A.C 8" PARA SOLDAR MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR UND ROL KLS ML HC GLB CANT. 0.15 0.15 1 DESP.% PRECIO UNIT

Unidad: ML ITEM: VALOR TOTAL 375.00 580.50 298,000.00 298,955.50 11,254.10 11,254.10 400.00 400.00 310,609.60

2,500.00 3,870.00 298,000.00 SUBTOTAL MATERIALES

0.65 17,314.00 SUBTOTAL- MANO DE OBRA 0.2 2,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

BRIDA PARA SOLDAR 8" DESCRIPCION MATERIALES SOLDADURA 6011 1/8" VARILLA BRIDAS PARA SOLDAR 8" MANO DE OBRA M.O. METALISTERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR SOLDADOR ELECTRICO UND KLS UND HC GLB DIA CANT. 0.5 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 2,985.00 140,940.00 143,925.00 15,555.10 15,555.10 2,000.00 1,750.00 3,750.00 163,230.10

5,970.00 140,940.00 SUBTOTAL MATERIALES

1.1 14,141.00 SUBTOTAL- MANO DE OBRA 1 0.125 2,000.00 14,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

TEE 8"X6"X8" BXBXB (A.C) DESCRIPCION MATERIALES TEE AC 8"X6"X8" BXBXB WAIPE PIOLA GRUESA 50 METROS MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND. CANT. UND KLS ROL HC GLB 1 0.15 0.15 1.2 0.515 DESP.% PRECIO UNIT.

Unidad: UND ITEM: VALOR TOTAL 752,000.00 580.50 375.00 752,955.50 15,024.00 15,024.00 1,030.00 1,030.00 769,009.50

752000 3870 2500 SUBTOTAL MATERIALES 12520 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

NIPLE A.C 8" BXE.L PARA PVC L=0.50MTS DESCRIPCION UND CANT. 0.15 0.15 16 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 375.00 580.50 32,000.00 407,160.00 440,115.50 11,254.10 11,254.10 400.00 400.00 451,769.60

MATERIALES ROL PIOLA GRUESA 50 METROS KLS WAIPE UND TORNILLO 3/4" L=8.9CM, CON TUERCA Y ARANDELA UND NIPLE A.C 8" BXE.L PARA PVC L=0.50MTS MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR HC GLB

2,500.00 3,870.00 2,000.00 407,160.00 SUBTOTAL MATERIALES

0.65 17,314.00 SUBTOTAL- MANO DE OBRA 0.2 2,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

NIPLE A.C 4" BXB L=0.30MTS DESCRIPCION UND CANT. 0.15 0.15 16 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 375.00 580.50 32,000.00 172,300.00 205,255.50 11,254.10 11,254.10 400.00 400.00 216,909.60

MATERIALES ROL PIOLA GRUESA 50 METROS KLS WAIPE UND TORNILLO 5/8" L=7.6CM, CON TUERCA Y ARANDELA UND NIPLE A.C 4" BXB L=0.30MTS MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR HC GLB

2,500.00 3,870.00 2,000.00 172,300.00 SUBTOTAL MATERIALES

0.65 17,314.00 SUBTOTAL- MANO DE OBRA 0.2 2,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

CODO A.C 4"X90 BXB DESCRIPCION UND. CANT. 1 16 0.1 0.15 0.5 0.308 DESP.% PRECIO UNIT.

Unidad: UND ITEM: VALOR TOTAL 187,920.00 32,000.00 387.00 375.00 220,682.00 6,260.00 6,260.00 616.00 616.00 227,558.00

MATERIALES CODO AC 90 X 4" BXB UND TORNILLO 5/8" L=7.6CM, CON TUERCA Y ARANDELA UND WAIPE KLS PIOLA GRUESA 50 METROS ROL MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR HC GLB

187920 2000 3870 2500 SUBTOTAL MATERIALES 12520 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

TUBERIA A.C 4" PARA SOLDAR DESCRIPCION MATERIALES PIOLA GRUESA 50 METROS WAIPE TUBERIA A.C 4" PARA SOLDAR MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR UND ROL KLS ML HC GLB CANT. 0.15 0.15 1 DESP.% PRECIO UNIT

UNIDAD: ML ITEM: VALOR TOTAL 375.00 580.50 141,000.00 141,955.50 11,254.10 11,254.10 400.00 400.00 153,609.60

2,500.00 3,870.00 141,000.00 SUBTOTAL MATERIALES

0.65 17,314.00 SUBTOTAL- MANO DE OBRA 0.2 2,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

NIPLE 4" BXE.L PARA PVC L=0.50MTS DESCRIPCION UND CANT. 0.15 0.15 16 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 580.50 375.00 32,000.00 141,000.00 173,955.50 11,254.10 11,254.10 400.00 400.00 185,609.60

MATERIALES KLS WAIPE ROL PIOLA GRUESA 50 METROS UND TORNILLO 5/8" L=7.6CM, CON TUERCA Y ARANDELA UND NIPLE 4" BXE.L PARA PVC L=0.50MTS MANO DE OBRA M.O. HIDROSANIT. 2 AYUDANTE - 1 OFIC. EQUIPO HERRAMIENTA MENOR HC GLB

3,870.00 2,500.00 2,000.00 141,000.00 SUBTOTAL MATERIALES

0.65 17,314.00 SUBTOTAL- MANO DE OBRA 0.2 2,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

BRIDA PARA SOLDAR 4" DESCRIPCION MATERIALES SOLDADURA 6011 1/8" VARILLA BRIDA PARA SOLDAR 4" MANO DE OBRA M.O. METALISTERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR SOLDADOR ELECTRICO UND KLS UND HC GLB DIA CANT. 0.5 1 DESP.% PRECIO UNIT

UNIDAD: UND ITEM: VALOR TOTAL 2,985.00 54,497.00 57,482.00 15,555.10 15,555.10 2,000.00 1,750.00 3,750.00 76,787.10

5,970.00 54,497.00 SUBTOTAL MATERIALES

1.1 14,141.00 SUBTOTAL- MANO DE OBRA 1 0.125 2,000.00 14,000.00 SUBTOTAL- EQUIPO

COSTO DIRECTO

TEE A.C 8"X4"X8" BXBXB DESCRIPCION MATERIALES TEE A.C 8"X4"X8" BXBXB WAIPE PIOLA GRUESA 50 METROS MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND. CANT. UND KLS ROL HC GLB 1 0.15 0.15 1.2 0.515 DESP.% PRECIO UNIT.

Unidad: UND ITEM: VALOR TOTAL 712,530.00 580.50 375.00 713,485.50 15,024.00 15,024.00 1,030.00 1,030.00 729,539.50

712530 3870 2500 SUBTOTAL MATERIALES 12520 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

CODO 8"X90 BXB DESCRIPCION MATERIALES CODO A.C 8"X90 BXB WAIPE PIOLA GRUESA 50 METROS MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND CANT. UND KLS ROL HC GLB 1 0.085 0.025 0.35 0.258 DESP.% PRECIO UNIT

Unidad: UND ITEM: VALOR TOTAL 657,720.00 328.95 62.50 658,111.45 4,382.00 4,382.00 516.00 516.00 663,009.45

657,720.00 3,870.00 2,500.00 SUBTOTAL MATERIALES 12,520.00 SUBTOTA MANO DE OBRA 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

VALVULA DE COMPUERTA VNA 6" BXB DESCRIPCION UND CANT. 1 16 5 5 DESP.% PRECIO UNIT

Unidad: UND ITEM: VALOR TOTAL 1,508,000.00 32,000.00 1,540,000.00 62,600.00 62,600.00 10,000.00 10,000.00 1,612,600.00

MATERIALES UND VALVULA DE COMPUERTA VNA 6" BXB UND TORNILLO 3/4" L=8.3CM, CON TUERCA Y ARANDELA MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR HC GLB

1,508,000.00 2,000.00 SUBTOTAL MATERIALES 12,520.00 SUBTOTA MANO DE OBRA 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

VALVULA DE COMPUERTA VNA 8" BXB DESCRIPCION UND CANT. 16 1 5 5 DESP.% PRECIO UNIT

Unidad: UND ITEM: VALOR TOTAL 32,000.00 2,010,280.00 2,042,280.00 62,600.00 62,600.00 10,000.00 10,000.00 2,114,880.00

MATERIALES UND TORNILLO 3/4" L=8.9CM, CON TUERCA Y ARANDELA UND VALVULA DE COMPUERTA VNA 8" BXB MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR HC GLB

2,000.00 2,010,280.00 SUBTOTAL MATERIALES 12,520.00 SUBTOTA MANO DE OBRA 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

VALVULA DE COMPUERTA VNA 4" BXB DESCRIPCION UND. CANT. 16 1 0.4 0.308 DESP.% PRECIO UNIT.

Unidad: UND ITEM: VALOR TOTAL 32,000.00 719,200.00 751,200.00 5,008.00 5,008.00 616.00 616.00 756,824.00

MATERIALES TORNILLO 5/8" L=7.6CM, CON TUERCA Y ARANDELA UND VALVULA DE COMPUERTA VNA 4" BXB UND MANO DE OBRA M.O. HIDROSANIT. 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR HC GLB

2000 719200 SUBTOTAL MATERIALES 12520 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

PASAMANOS TUBO GALV. 11/2" S/BARR OTES DESCRIPCION MATERIALES LIJA 320 AGUA WASH PRIMER SOLDADURA 6011 1/8" VARILLA MASILLA PLASTICA INTERIORES TUBO GALV. 1.1/2"*6.0M MANO DE OBRA M.O. METALISTERIA 1 AYUDANTE-1 OFI EQUIPO SOLDADOR ELECTRICO HERRAMIENTA MENOR UND. CANT. PLI LTS KLS CU UND HC DIA GLB 2 0.2 0.5 0.06 0.67 DESP.% PRECIO UNIT.

Unidad: M2 ITEM: VALOR TOTAL 1,600.00 1,148.00 2,985.00 3,120.00 50,618.50 59,471.50 36,766.60 36,766.60 1,750.00 20,000.00 21,750.00 117,988.10

800.00 5,740.00 5,970.00 52,000.00 75,550.00 SUBTOTAL MATERIALES

14,141.00 2.6 SUBTOTAL MANO DE OBRA 0.125 10 14,000.00 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

ESCALERAS CON PASA MANOS DEL NIVEL 0.0 A NIVEL 25.0 EN TUBERIA DE H.G 1 1/2" UND CANT. DESP.% DESCRIPCION MATERIALES LIJA 320 AGUA WASH PRIMER SOLDADURA 6011 1/8" VARILLA MASILLA PLASTICA INTERIORES TUBO GALV. 1.1/2"*6.0M MANO DE OBRA M.O. METALISTERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR SOLDADOR ELECTRICO PLI LTS KLS CU UND HC GLB DIA 2 0.35 1 0.07 1.54 3.5 1 0.125

PRECIO UNIT

Unidad: ML ITEM: VALOR TOTAL 1,600.00 2,009.00 5,970.00 3,640.00 116,347.00 129,566.00 49,493.50 49,493.50 2,000.00 1,750.00 3,750.00 182,809.50

800.00 5,740.00 5,970.00 52,000.00 0 75,550.00 SUBTOTAL MATERIALES 14,141.00 SUBTOTA MANO DE OBRA 2,000.00 14,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

ESCALERA DEL NIVEL 25.0 A CUPULA SUPERIOR EN TUBERIA DE H.G 1 1/2" UND CANT. DESP.% DESCRIPCION MATERIALES LIJA 320 AGUA WASH PRIMER SOLDADURA 6011 1/8" VARILLA MASILLA PLASTICA INTERIORES TUBO GALV. 1.1/2"*6.0M MANO DE OBRA M.O. METALISTERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR SOLDADOR ELECTRICO PLI LTS KLS CU UND HC GLB DIA 2 0.35 1 0.07 0.54 3.5 1 0.125

PRECIO UNIT

Unidad: ML ITEM: VALOR TOTAL 1,600.00 2,009.00 5,970.00 3,640.00 40,797.00 54,016.00 49,493.50 49,493.50 2,000.00 1,750.00 3,750.00 107,259.50

800.00 5,740.00 5,970.00 52,000.00 75,550.00 SUBTOTAL MATERIALES 14,141.00 SUBTOTA MANO DE OBRA 2,000.00 14,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

ESCALERA INTERIOR DEL TANQUE EN TUBERIA DE H.G 1 1/2" DESCRIPCION MATERIALES LIJA 320 AGUA WASH PRIMER SOLDADURA 6011 1/8" VARILLA MASILLA PLASTICA INTERIORES TUBO GALV. 1.1/2"*6.0M MANO DE OBRA M.O. METALISTERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR SOLDADOR ELECTRICO UND CANT. PLI LTS KLS CU UND HC GLB DIA 2 0.35 1 0.07 0.54 3.5 1 0.125 DESP.% PRECIO UNIT

Unidad: ML ITEM: VALOR TOTAL 1,600.00 2,009.00 5,970.00 3,640.00 40,797.00 54,016.00 49,493.50 49,493.50 2,000.00 1,750.00 3,750.00 107,259.50

800.00 5,740.00 5,970.00 52,000.00 75,550.00 SUBTOTAL MATERIALES 14,141.00 SUBTOTA MANO DE OBRA 2,000.00 14,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

INSTAL. PASA MANOS Y ESCALERAS DESCRIPCION MANO DE OBRA M.O. METALISTERIA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND. CANT. HC GLB DESP.% PRECIO UNIT.

Unidad: ML ITEM: VALOR TOTAL 8,484.60 8,484.60 2,000.00 2,000.00 10,484.60

14,141.00 0.6 SUBTOTAL MANO DE OBRA 1 2,000.00 SUBTOTAL EQUIPO

COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS CONSTRUCCIN DE TANQUE DE ALMACENAMIENTO ELEVADO DE 500 M3 EN EL MUNICIPIO DE LOS CRDOBAS, DEPARTAMENTO DE CRDOBA

EXCAVACION TIERRA A MANO DESCRIPCION MANO DE OBRA M.O. ALBANILERIA 1 AYUDANTE EQUIPO HERRAMIENTA MENOR UND. CANT. HC GLB 1.5 0.168 DESP.% PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 7,018.50 7,018.50 336.00 336.00 7,354.50

4679 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

TUB.PVC UM 8 RDE 41 DESCRIPCION MATERIALES LUBRICANTE TUB PVC/500GR 500GRS TUBO PVC UM 8 RDE-41 PRESION MANO DE OBRA M.O. CARP.MADERA 1 AYUDANTE-1 OFI EQUIPO HERRAMIENTA MENOR UND. CANT. UND ML HC GLB 0.05 1 0.2 0.04 DESP.% PRECIO UNIT.

Unidad: ML ITEM: VALOR TOTAL 596.05 52,974.72 53,570.77 2,651.20 2,651.20 80.00 80.00 56,301.97

11921 2 51936 SUBTOTAL MATERIALES 13256 SUBTOTAL MANO DE OBRA 2000 SUBTOTAL EQUIPO

COSTO DIRECTO

RELLENO MATERIAL SITIO COMPACTADO DESCRIPCION MATERIALES GASOLINA CORRIENTE ACEITE MOTOR 4 TIEMPOS UND. CANT. GLN GLN HC DIA GLB 0.05 0.015 0.5 0.04 0.05 DESP.% PRECIO UNIT.

Unidad: M3 ITEM: VALOR TOTAL 340.00 187.50 527.50 4,426.00 4,426.00 1,800.00 100.00 1,900.00 6,853.50

PREMOLDA

6800 12500 SUBTOTAL MATERIALES 8852 SUBTOTAL MANO DE OBRA 45000 2000 SUBTOTAL EQUIPO

MANO DE OBRA M.O. ALBANILERIA 2 AYUDANTE EQUIPO VIBROCOMPACTADOR TIPO RANA HERRAMIENTA MENOR

COSTO DIRECTO

Você também pode gostar