Você está na página 1de 21

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE

IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH


(PHASE II)
Examination for supporting of top slab form works
5.1Design condition
5.1.1Load condition
Unit weight of Concrete

: c .

Working load

: Ww ..

Dead load of forms

: Wf

Load of Internal supporting

: Ws ..

3
25.0 kN/m
2
2.5 kN/m
2
0.5 kN/m
2
0.5 kN/m

5.1.2Allowable stress
Material Description Specification
Steel
Timber

SS 400
STK 500
Fir wood
Plywood

Allowable bending/tensile stress

t 16mm

t 12mm

a N/mm
163
236
13.2
16.1

Allowable shearing stress


a N/mm2
93
134
1.0
1.0

Allowable deflection a Normal case shall be 2-3mm, in case of external appearance to be conspicuous,
it shall be within 1-2mm
Here, a =
3.0 mm is chosen.
5.1.3Young's modulus E
TimberFir wood.
Plywood..
Steel material

2
8,800 (N/mm )
2
5,500 (N/mm )
2
200,000 (N/mm )

5.3Examination for bottom forms


Plywood
:
Round steel pipe 48.62.4
:
Square steel pipe-60 x 60 x 2.3, STK 400
:
Thickness of Concrete
:
Interval of steel pipe
:
Supporting span of square timber
:
Supporting span of steel pipe
:

48.6
60

x
x

12
2.4
60
450
300
800
800

mm
mm
mm
mm
mm
mm
mm

5.3.1Working load
Description
Concrete load W c
Working load
Ww
Total1= Wc + Ww
Dead load of Forms
Total2= W c + W w + W f

Calculation formula
25 x 0.45
11.25 + 2.5
Wf
13.75 + 0.5

Page 1 of 3

Load
kN/m2
11.25
2.50
13.75
0.50
14.25

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
5.3.2Examination for sheathing board
Sectional dimension for width per meter is as follows.
bh 2
Section modulus

3
24,000 (mm /m)

--------- =
6

:Z =

bh 3
Moment of Inertia of area

4
144,000 (mm /m)

--------- =
12

:I =

Working load for sheathing board (width per meter) is


w = 13.75 x 1000 / 1000 =
13.75 (N/mm)
Interval of batten is
300 mm
Sheathing board is calculated as uniform load with 3 span continuous beam
Bending moment

wl 2
:M --------- =
10

123,750 (N.mm)

M
Bending stress

Deflection

2
5.2 (N/mm )

--------- =
Z
wl 4
--------- =
137.6EI

1.0 (mm)

a = 16.1 OK

a = 3mm OK

5.3.3Examination for Batten


Round steel pipe48.62.4STK 500shall be used.
2
Sectional area
:A
348 (mm )
3
Section modulus
:Z
3,830 (mm )
4
Moment of inertia of area :I
93,200 (mm )
An interval of batten
300
mm
Working load to batten (per one piece)
w = 13.75 x 300 / 1000 =
4.1 (N/mm)
Maximum interval of sleeper as supporting point800 mm

Bending moment

wl 2
:M --------- =
8

330,000 (N.mm)

M
Bending stress

: ---------- =
Z

86

wl

Page 2 of 3

(N/mm2)

a = 236 OK

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
Shearing force

:S ---------- =
2

Shearing stress

Deflection

5wl 4
: ---------- =
384EI

1,650 (N)

1.5S
---------- =
A

a = 134 OK

7.1 (N)

1.2

a = 3mm OK

(mm)

5.3.4Examination for sleeper


Square steel pipe6060 x 2.3shall be used.
:A bh =
Sectional area

2
517 (mm )

bh 2
Section modulus

:Z =

3
9,440 (mm )

---------- =
6
bh 3

Moment of Inertia of area

4
283,000 (mm )

---------- =
12

:I =

Load distribution width of sleeper


d is= 800 (mm)
Working load to sleeper (per one piece)
w = 14.25 x 800 / 1000 =
11.40 (N/mm)
An interval of forms as supporting point 800 mm

Bending moment

wl 2
:M ---------- =
8

912,000 (N.mm)

M
Bending stress

: ---------- =
Z

96.6 (N/mm2)

Shearing force

wl
:S ---------- =
2

4,560 (N)

Shearing stress

1.5S
---------- =
A

13.2 (N)

Deflection

5wl 4
: ---------- =
384EI

1.1 (mm)

Page 3 of 3

a = 163 OK

a = 93OK

a = 3mm OK

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)

earance to be conspicuous,

Page 4 of 3

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)

The Structural calculation data


of the forms and supporting for UGR-5

KUBOTA CONSTRUCTION CO., LTD.

Page 1 of 23

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
Examination for supporting of top slab form works
5.1Design condition
5.1.1Load condition
Unit weight of Concrete

: c .

3
25.0 kN/m

Working load

: Ww ..

2
2.5 kN/m

Dead load of forms

: Wf

2
0.5 kN/m

Load of Internal supporting

: Ws ..

2
0.5 kN/m

5.1.2Allowable stress
Material Description Specification
Steel
Timber

SS 400
STK 500
Fir wood
Plywood

Allowable bending/tensile stress

t 16mm

a N/mm
163
236
13.2
16.1

Allowable shearing stress


a N/mm2
93
134
1.0
1.0

Allowable deflection a Normal case shall be 2-3mm, in case of external appearance to be conspicuous,
it shall be within 1-2mm
Here, a =
3.0 mm is chosen.
5.1.3Young's modulus E
2

TimberFir wood.

8,800 (N/mm )

Plywood..

5,500 (N/mm )

Steel material
5.3Examination for bottom forms
Plywood
Round steel pipe 48.62.4
Thick timber plate t=20mm x 2pcs
Thickness of Concrete
Interval of steel pipe
Supporting span of square timber
Supporting span of steel pipe

2
200,000 (N/mm )

t :
:
t :
:
l :
La :
Lb :

48.6
40

x
x

12
2.4
95
450
300
750
850

mm
mm
mm
mm
mm
mm
mm

5.3.1Working load

Description
Concrete load W c
Working load
Ww
Total1= Wc + Ww
Dead load of Forms

Calculation formula
25 x 0.45
11.25 + 2.5
Wf

Page 2 of 23

Load
kN/m2
11.25
2.50
13.75
0.50

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
Total2= W c + W w + W f

13.75 + 0.5

Page 3 of 23

14.25

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
5.3.2Examination for sheathing board
Sectional dimension for width per meter is as follows.
bh
Section modulus

:Z =

2
3
24,000 (mm /m)

--------- =
6
bh 3

Moment of Inertia of area

:I =

4
144,000 (mm /m)

--------- =
12

Working load for sheathing board (width per meter) is


w = 13.75 x 1000 / 1000 =
13.75 (N/mm)
Interval of batten is
300 mm.
Sheathing board is calculated as uniform load with 3 span continuous beam
Bending moment

wl 2
:M --------- =
10

123,750 (N.mm)

M
Bending stress

Deflection

2
5.2 (N/mm )

: --------- =
Z

wl 4
--------- =
137.6EI

1.0 (mm)

a = 16.1 OK

a = 3mm OK

5.3.3Examination for Batten


Round steel pipe48.62.4STK 500shall be used.
Sectional area

:A

2
348 (mm )

Section modulus

:Z

3
3,830 (mm )
4

Moment of inertia of area :I


93,200 (mm )
An interval of batten
300
mm
Working load to batten (per one piece)
w = 13.75 x 300 / 1000 =
4.1 (N/mm)
Maximum interval of sleeper as supporting point850 mm
2

Bending moment

wl
:M --------- =
8

372,539 (N.mm)

M
Bending stress

: ---------- =

97

Page 4 of 23

(N/mm2)

a = 236 OK

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
Z

Shearing force

wl
:S ---------- =
2

1,753 (N)

Shearing stress

1.5S
: ---------- =
A

7.6 (N)

Deflection

5wl 4
: ---------- =
384EI

1.5

a = 134 OK

(mm)

a = 3mm OK

5.3.4Examination for sleeper


Thick timber plate4095shall be used.
Sectional area

:A

bh
Section modulus

:Z =

bh =

3,800 (mm )

2
3
60,167 (mm )

---------- =
6
bh 3

Moment of Inertia of area

:I =

4
2,857,917 (mm )

---------- =
12

Load distribution width of sleeper d =is 850 (mm)


Working load to sleeper (per one piece)
w = 14.25 x 850 / 1000 =
12.11 (N/mm)
An interval of forms as supporting point 750 mm.

Bending moment

wl 2
:M ---------- =
8

851,660

(N.mm)

M
Bending stress

Shearing force

: ---------- =
Z
wl
:S ---------- =
2

14.2 (N/mm2)

4,542 (N)

1.5S

Page 5 of 23

a = 16.1 OK

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
Shearing stress

: ---------- =
A

1.8 (N)

a = 93OK

Deflection

5wl
: ---------- =
384EI

0.1 (mm)

Page 6 of 23

a = 3mm OK

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)

IExamination for Form Work


1.1Design condition
1.1.1Load condition
Unit weight of Concrete

: c .

3
25.0 kN/m

Working load

: Ww ..

2
2.5 kN/m

Dead load of forms

: Wf

2
0.5 kN/m

Load of Internal supporting

: Ws ..

2
0.5 kN/m

1.1.2Allowable stress
Material Description Specification
Steel
Timber

SS 400
STK 500
Fir wood
Plywood

Allowable bending/tensile stress

t 16mm

t 12mm

a N/mm
163
236
13.2
16.1

Allowable shearing stress


a N/mm2
93
134
1.0
1.0

Allowable deflection a Normal case shall be 2-3mm, in case of external appearance to be conspicuous,
it shall be within 1-2mm
Here, a =
3.0 mm is chosen.
1.1.3Young's modulus E
TimberFir wood.

2
8,800 (N/mm )

Plywood..

2
5,500 (N/mm )

Steel material
1.2Examination for bottom forms
Plywood
Round steel pipe 48.62.4
Square timber-100 x 100
Thickness of Concrete
Interval of steel pipe
Supporting span of square timber
Supporting span of steel pipe

2
200,000 (N/mm )

t :
:
t :
:
l :
La :
Lb :

48.6
100

x
x

12
2.4
100
450
300
800
800

mm
mm
mm
mm
mm
mm
mm

1.2.1Working load

Description
Concrete load W c
Working load
Ww
Total1= Wc + Ww
Dead load of Forms
Total2= W c + W w + W f

Calculation formula
25 x 0.45
11.25 + 2.5
Wf
13.75 + 0.5

Page 7 of 3

Load
kN/m2
11.25
2.50
13.75
0.50
14.25

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
1.2.2Examination for sheathing board
Sectional dimension for width per meter is as follows.
bh 2
Section modulus

:Z =

3
24,000 (mm /m)

--------- =
6
bh 3

Moment of Inertia of area

:I =

4
144,000 (mm /m)

--------- =
12

Working load for sheathing board (width per meter) is


w = 13.75 x 1000 / 1000 =
13.75 (N/mm)
Interval of batten is
300 mm
Sheathing board is calculated as uniform load with 3 span continuous beam
Bending moment

wl 2
:M --------- =
10

123,750 (N.mm)

M
Bending stress

Deflection

2
5.2 (N/mm )

: --------- =
Z
wl 4
: --------- =
137.6EI

1.0 (mm)

a = 16.1 OK

a = 3mm OK

1.2.3Examination for Batten


Round steel pipe48.62.4STK 500shall be used.
2
348 (mm )

Sectional area

3
3,830 (mm )

Section modulus

4
Moment of inertia of area
93,200 (mm )
An interval of batten
300
mm
Working load to batten (per one piece)
w = 13.75 x 300 / 1000 =
4.1 (N/mm)
Maximum interval of sleeper as supporting point800 mm

Bending moment

wl 2
:M --------- =
8

330,000 (N.mm)

M
Bending stress

: ---------- =
Z

86

wl

Page 8 of 3

(N/mm2)

a = 236 OK

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
Shearing force

:S ---------- =
2

Shearing stress

1.5S
: ---------- =
A

Deflection

5wl 4
: ---------- =
384EI

1,650 (N)

7.1 (N)

1.2

(mm)

a = 134 OK

a = 3mm OK

1.2.4Examination for sleeper


Square steel pipe100100 x 2.3shall be used.
2
10,000 (mm )

:A bh =

Sectional area

bh 2
Section modulus

3
166,667 (mm )

:Z = ---------- =
6
bh 3

Moment of Inertia of area

:I =

4
8,333,333 (mm )

---------- =
12

Load distribution width of sleeper


d is= 800 (mm)
Working load to sleeper (per one piece)
w = 14.25 x 800 / 1000 =
11.40 (N/mm)
An interval of forms as supporting point 800 mm

Bending moment

wl 2
:M ---------- =
8

912,000 (N.mm)

M
Bending stress

: ---------- =
Z

5.5 (N/mm2)

Shearing force

wl
:S ---------- =
2

4,560 (N)

Shearing stress

1.5S
: ---------- =
A

0.7 (N)

Deflection

5wl 4
: ---------- =
384EI

0.8 (mm)

IIExamination for Supporting

Page 9 of 3

a = 13.2 OK

a = 1OK

a = 3mm OK

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)

earance to be conspicuous,

Page 10 of 3

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)

5.1
5.1.1
-
-
-
-

25.0
2.5
0.5
0.5

kN/m
2
kN/m
2
kN/m
kN/m2

5.1.2

SS 400
STK 500

t 16mm

t 12mm

N/mm2 kgf/cm2 N/mm2 kgf/cm2


163
1663
93
949
236
2407
134
1367
13.2
135
1.0
10.2
16.1
164
1.0
10.2

23mm12mm

5.1.3

t =12mm

8,800 (N/mm2)
5,500 (N/mm2)
2
200,000 (N/mm )

5.3

48.62.4

-100x100

100

12
2.4
100
270
800

mm
mm
mm
mm
mm

5.3.1
-

25.00.27

kN/m2 kgf/m2
6.75
689
2.50
255
9.25
944

kN/m2 kgf/m2
34.72
3,542
2.50
255
0.50
51
0.50
51
38.22
3,899

5.3.2

Z =

bh
-------------- =
6

1000 x 12
-------------- =
6

Page 11 of 3

24,000 (mm /m)

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
3

I =

bh
-------------- =
12

1000 x 12
-------------- =
12

144,000 (mm4/m)

w = 9.25x1000/1000 =
9.25 (N/mm)

300 mm

wl
-------------- =
10

M
-------------- =
Z

3.5 (N/mm )

wl 4
-------------- =
137.6EI

0.7 mm

83,250 (N.mm)

a=16.1 OK

a=3.0mm OK

5.3.3
48.62.4STK 500
A
348 (mm2)
Z
3,830 (mm3)
I
93,200 (mm4)

300

w = 38.2x300/1000 =
11.5 (N/mm)

650

wl 2
-------------- =
8

M
-------------- =
Z

wl
-------------- =
2

3,727 (N)

1.5S
-------------- =
A

16.1 (N)

5wl
-------------- =
384EI

605,569 (N.mm)

2
158 (N/mm )

a=236 OK

a=134 OK

Page 12 of 3

1.4 mm

a=3.0mm OK

THE PROJECT FOR FLOOD PROTECTION AND DRAINAGE


IMPROVEMENT IN THE MUNICIPALITY OF PHNOM PENH
(PHASE II)
5.3.4
100100
A
bh

10,000 (mm2)
2

Z =

I =

bh
-------------- =
6

100 x 100
-------------- =
6

166,667 (mm )

bh 3
-------------- =
12

100 x 1003
-------------- =
12

8,333,333 (mm4)

1/2(800)
325 (mm)

w = 38.2x400/1000 =
12.42 (N/mm)

610 mm

wl 2
-------------- =
8

M
-------------- =
Z

wl
-------------- =
2

3,789 (N)

1.5S
-------------- =
A

0.6 (N)

5wl 4
-------------- =
384EI

Page 13 of 3

577,775 (N.mm)

2
3.5 (N/mm )

0.3 mm

a=13.2 OK

a=1OK

a=3.0mm OK


5.1
5.1.1
-
-
-
-

25.0
2.5
0.5
0.5

kN/m
2
kN/m
2
kN/m
kN/m2

5.1.2

SS 400
STK 500

t 16mm

t 12mm

5.1.3

t =12mm

N/mm2 kgf/cm2 N/mm2 kgf/cm2


163
1663
93
949
236
2407
134
1367
13.2
135
1.0
10.2
16.1
164
1.0
10.2

8,800 (N/mm2)
5,500 (N/mm2)
200,000 (N/mm2)

5.3

-60x60x2.3

-100x120

60
100

60
120

12 mm
2.3 mm
mm
270 mm
914 mm

5.3.1
-

25.00.27

kN/m kgf/m2
6.75
689
2.50
255
9.25
944
2

kN/m kgf/m2
34.72
3,542
2.50
255
0.50
51
0.50
51
38.22
3,899

5.3.2

Z =

bh 2
-------------- =
6
3

I =

bh
-------------- =
12

1000 x 122
-------------- =
6

24,000 (mm /m)

1000 x 12
-------------- =
12

144,000 (mm4/m)


w = 9.25x1000/1000 =
9.25 (N/mm)

300 mm

wl
-------------- =
10

M
-------------- =
Z

wl
-------------- =
137.6EI

83,250 (N.mm)

2
3.5 (N/mm )

a=16.1 OK

0.7 mm

a=3.0mm OK

5.3.3
60602.3STK 400
2
A
517 (mm )
Z
9,440 (mm3)
I
283,000 (mm4)

300

w = 38.2x300/1000 =
11.5 (N/mm)

914

wl 2
-------------- =
8

M
-------------- =
Z

wl
-------------- =
2

5,240 (N)

1.5S
-------------- =
A

15.2 (N)

5wl 4
-------------- =
384EI

5.3.4
100120
A
bh

Z =

127 (N/mm )

bh
-------------- =
6

a=163 OK

a=93 OK

1.8 mm

12,000
2

1,197,372 (N.mm)

a=3.0mm OK

(mm )

100 x 120
-------------- =
6

240,000 (mm3)

I =

bh
-------------- =
12

100 x 120
-------------- =
12

14,400,000 (mm4)

1/2(914186)
550 (mm)

w = 38.2x550/1000 =
21.02 (N/mm)

610 mm
2

wl
-------------- =
8

M
-------------- =
Z

wl
-------------- =
2

6,412 (N)

1.5S
-------------- =
A

0.8 (N)

5wl 4
-------------- =
384EI

977,773 (N.mm)

4.1 (N/mm )

0.3 mm

a=13.2OK

a=1OK

a=3.0mm OK