Você está na página 1de 4

VALORIZACION N 04

SALDO DE OBRA: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE ANDAJES, DISTRITO DE ANDAJES - OYON - LIMA
Cdigo
02
02.01
02.01.01
02.01.02
02.01.05
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.01.03
02.04.01.09
02.04.03
02.04.03.01
03
03.01
03.01.01
03.01.02
03.01.05
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.04
03.01
03.04.01.01
03.04.02
03.04.02.01
03.04.02.02
05
05.01
05.01.01
05.01.02
05.01.03
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.03
05.03.01
05.03.02
05.03.03

Descripcin
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO FINAL
MOVIMIENTO DE TIERRAS
EXCAVAC. DE ZANJA MANUAL EN TERRENO SEMIROC. ANCHO 0.9 HASTA 1.5M
REFINE Y NIVELACION ZANJA TERR. SEMIROCA
RELLENO COMP. ZANJA TERR. SEMIRROCOSO "C"-TUB. 4"-6" HASTA 1.5M
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA 10 KM
TUBERIA Y ACCESORIOS
SUMINISTRO E INSTALACION DE TUBERIAS
CAMA MANUAL E=0.10 ZANJA P/TUBERIA
TUBERIA PARA AGUA PVC-UF ISO-4422 CLASE C-10, =63MM
TUBERIA PARA AGUA HDPE ISO-4427 CLASE C-10 D=75MM
UNION BRIDADA DE HDPE 75MM
PRUEBA Y DESINFECCION DE TUBERIAS
PRUEBA HIDRAULICA+DESINFECCION TUB. 3", 4" Y 6" A ZANJA ABIERTA
MEJORAMIENTO DE LINEA DE CONDUCCION EXISTENTE
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
TRAZO Y REPLANTEO FINAL
MOVIMIENTO DE TIERRAS
EXCAVAC. DE ZANJA MANUAL, TERRENO SEMIROC. ANCHO 0.9 HASTA 1.5M
REFINE Y NIVELACION ZANJA TERR. SEMIROCOSO
RELLENO Y COMP. ZANJA TERR. NORMAL "C"-TUB. 4"-6" HASTA 1.5M
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA 10KM
TUBERIA Y ACCESORIOS
TRABAJOS PRELIMINARES
TUBERIA PARA AGUAS PVC-UF ISO-4422 CLASE C-10, =63MM
PRUEBA Y DESINFECCION DE TUBERIAS
PRUEBA HIDRAULICA+DESINFECCION TUB. 3", 4" Y 6" A ZANJA ABIERTA
PRUEBA A ZANJA TAPADA Y DESINFECCION DE TUBERIA 42
CAMARA ROMPE PRESION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
TRANSPORTE DE MATERIALES A LA OBRA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS A MAS DE 2.00 Mts
EXCAVACION DE ZANJAS A MAS DE 1.50 Mts
ELIMINACION DE MATERIAL EXCEDENTE D=30MTS
REFINE, NIVELACION TERRENO NORMAL P/TUB PARA TODA PROF.
RELLENO COMPACTADO MANUAL PROPIO
CONCRETO SIMPLE
CONCRETO EN LOSA DE FONDO FC=210 KG/CM2 CAMARA DE VALVULA
CONCRETO EN MUROS FC=210 KG/CM2, CAMARA DE VALVULA
ENCOFRADO Y DESENCOF NORMAL EN MUROS

Unidad

Cantidad
Total

Precio
Unitario

Importe
Parcial
30,382.58
469.31
90.50
215.43
163.38
21,192.08
13,308.64
594.07
4,671.37
2,618.00
8,721.19

Anterior

METRADO
Actual
Acumulado

4,539.09
1,919.14
1,367.44
295.00

600.52
182,436.31
3,545.04
679.26
1,629.77
1,236.01
159,053.42
99,885.92
4,458.73
35,060.22
19,648.55
19,837.85

8.27

14,403.78

2.10
1.02

3,657.55
1,776.52
18,901.62
1,165.25
6.89
12.46
1,145.90
5,288.00
829.84
337.56
3,966.76
23.28
130.56
635.39
55.56
213.31
366.52

m
KM
KM

232.06
0.23
0.23

0.39
936.65
710.35

m
m
m
m3

232.06
232.06
232.06
140.98

57.35
2.56
20.13
18.57

m
m
m
Und

232.06
232.06
53.90
5.00

19.56
8.27
25.37
59.00

285.96

2.10

m
KM
KM

1,741.69
1.74
1.74

0.39
936.65
710.35

m
m
m
m3

1,741.69
1,741.69
1,741.69
1,058.08

57.35
2.56
20.13
18.57

1,741.69

m
m

1,741.69
1,741.69

m2
m2
kg

12.30
10.93
3,819.68

0.56
1.14
0.30

m3
m3
m3
m
m3

14.75
6.00
247.15
6.00
6.00

56.26
56.26
16.05
3.88
21.76

m3
m3
m2

0.12
0.51
10.78

463.03
418.26
34.00

Anterior
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

Monto S/.
Actual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

SALDO POR VALORIZAR


METRADO
S/.
30,382.58
469.31
232.06
90.50
0.23
215.43
0.23
163.38
21,192.08
13,308.64
232.06
232.06
594.07
232.06
4,671.37
140.98
2,618.00
8,721.19

Acumulado
0.00
0.00
0.00

%
0%
0%
0%
0%
0%
0%

0.00

0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

0%
0%
0%
0%

232.06
232.06
53.90
5.00

4,539.09
1,919.14
1,367.44
295.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

285.96

600.52
182,436.31
3,545.04
679.26
1,629.77
1,236.01
159,053.42
99,885.92
4,458.73
35,060.22
19,648.55
19,837.85

1,741.69
1.74
1.74
1,741.69
1,741.69
1,741.69
1,058.08

0%

1,741.69

14,403.78

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

1,741.69
1,741.69

3,657.55
1,776.52
18,901.62
1,165.25
6.89
12.46
1,145.90
5,288.00
829.84
337.56
3,966.76
23.28
130.56
635.39
55.56
213.31
366.52

12.30
10.93
3,819.68
14.75
6.00
247.15
6.00
6.00
0.12
0.51
10.78

.
PAGINA 1 DE 4

VALORIZACION N 04
SALDO DE OBRA: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE ANDAJES, DISTRITO DE ANDAJES - OYON - LIMA
Cdigo
05.04
05.04.01
05.04.01.01
05.04.01.02
05.04.01.03
05.04.01.04
05.04.01.05
05.04.01.06
05.04.02
05.04.02.01
05.04.02.02
05.04.03
05.04.03.01
05.04.03.02
05.04.03.03
05.04.03.04
05.04.03.05
05.04.04
05.04.04.01
05.04.05
05.04.05.01
05.04.05.02
06
06.01
06.01.01
06.01.02
06.01.05
06.02
06.02.01
06.02.04
06.02.05
06.02.06
06.02.07
06.03
03.03.02
06.06
06.06.01
05.04.04.01
08
08.02
08.02.01
08.02.02
08.02.03
08.02.04
08.03
08.03.01
08.03.02
08.03.03

Descripcin
CONCRETO ARMADO
LOSAS DE FONDO DE CONCRETO ARMADO
CONCRETO EN LOSA DE FONDO FC=210 KG/CM2
CONCRETO EN MUROS FC=210 KG/CM2
CONCRETO EN LOSA DE TECHO FC=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN MUROS
ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS
ACERO CORRUGADO FY=4200 KG/CM2
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:2, e=1.5 cm
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
VALVULAS Y ACCESORIOS
SUMINISTRO E INST. BOYA DE PVC
SUMINISTRO E INST. VALVULA COMPUERTA BRONCE 3"
SUMINISTRO E INST. CANASTILLA PVC SP NTP 39.002 D=4"
SUMINISTRO E INST. CODO DE REBOSE DE 4 A 3"
SUMINISTRO E INST. CODO PVC SP 90 X 2" NTP 39.002
INSTALACION DE TUBERIAS
TUBERIA DE LIMPIA Y REBOSE PVC-SAP C-7.5 D=2" NTP 39.002
TAPAS SANITARIAS
TAPA SANITARIA METALICA 0.60 X 0.60 mts. PARA CAMARA HUMEDA
TAPA SANITARIA METALICA 0.40 X 0.40 mts PARA CAJA DE VALVULAS
REDES DE AGUA POTABLE
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO DE OBRA
TRAZO Y REPLANTEO FINAL
MOVIMIENTO DE TIERRAS
EXCAVACION CON EQUIPO T. NORMAL. P/TUBERIA AGUA HASTA =90MM
CAMA MANUAL E=0.10 ZANJA P/TUBERIA CON MATERIAL DE PRESTAMO HASTA 0.20m
REFINE Y NIVELACION ZANJA SEMI ROCOSO PARA TUB.
RELLENO COMP. ZANJA TERR. SEMIROCOSO"-TUB HASTA 1.50M
ELIMINACION DE MATERIAL EXCEDENTE
TUBERIA Y ACCESORIOS C/INSTALACION
TUBERIA PARA AGUA PVC-UF ISO-4422 CLASE C-7.5, =63MM
PRUEBA HIDRAULICA
PRUEBA HIDRAULICA+DESINFECCION TUB. 3", 4" Y 6" A ZANJA ABIERTA
TUBERIA DE LIMPIA Y REBOSE PVC-SAP C-7.5 D=2" NTP 39.002
CONEXIONES DOMICILIARIAS DE AGUA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO MEDIANO
EXCAVACION EN TERRENO SEMIROCOSO PARA TUBERIA A DOMICILIO
RELLENO CON MATERIAL PROPIO PARA ACOMETIDA DE AGUA
NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE MANUAL HASTA 10KM
INSTALACIONES HIDRAULICAS C/INSTALACION
CAJA CONCRETO CONEX. DOMICILIARIA AGUA CON TAPA Y MARCO C/SEGURIDAD
LOSA DE CONCRETOARMADO DE 0.95mx0.55mx0.05 EN CAJAS DE CONEXIONES
DOMICILIARIAS
LLAVES DE PASO PVC 1/2"

Unidad

Cantidad
Total

Precio
Unitario

Importe
Parcial
11,812.98

Anterior

METRADO
Actual
Acumulado

Anterior
0.00

Monto S/.
Actual
0.00

m3
m3
m3
m2
m2
kg

1.35
3.75
0.72
50.00
9.00
252.41

375.61
398.91
461.43
52.45
51.76
4.51

507.07
1,495.91
332.23
2,622.50
465.84
1,138.37

m2
m2

24.75
16.80

27.77
19.48

687.31
327.26

Und
und
Und
Und
Und

5.00
5.00
5.00
5.00
5.00

121.54
267.34
100.30
7.32
3.89

607.70
1,336.70
501.50
36.60
19.45

40.00
60.00
-

40.00
60.00
-

20.00
20.00
20.00
20.00
3.00

20.00
20.00
20.00
20.00
3.00

20.00

20.00

20.00
20.00

20.00
20.00

6.00
2.50
15.00
1.50

6.00
2.50
15.00
1.50

18.00

27.53

495.54

Und
Und

5.00
5.00

141.60
106.20

m2
m
KM

84.83
169.66
0.17

0.56
0.80
721.02

m
m
m
m
m3

169.66
169.66
169.66
169.66
169.29

4.87
15.56
2.39
6.09
30.74

169.66

10.36

m
m

169.66
169.66

2.95
2.95

m3
m3
m2
m3

161.28
192.00
134.40
25.73

45.87
13.21
6.70
16.05

Und

28.00

86.11

708.00
531.00
13,173.32
305.80
47.50
135.73
122.57
10,108.84
826.24
2,639.91
405.49
1,033.23
5,203.97
1,757.68
1,757.68
1,001.00
500.50
500.50
21,660.96
11,247.68
7,397.91
2,536.32
900.48
412.97
8,714.72
2,411.08

Und

28.00

56.39

1,578.92

Und

28.00

11.80

330.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

1,066.02
70.40
22.40
48.00
670.42
97.40
311.20
47.80
121.80
92.22
207.20
207.20
118.00
59.00
59.00
432.83
432.83
275.22
33.03
100.50
24.08
0.00
-

Acumulado
0.00
1,066.02
70.40
22.40
48.00
670.42
97.40
311.20
47.80
121.80
92.22
207.20
207.20
118.00
59.00
59.00
432.83
432.83
275.22
33.03
100.50
24.08
0.00
-

%
0%

SALDO POR VALORIZAR


METRADO
S/.
11,812.98

0%
0%
0%
0%
0%
0%

1.35
3.75
0.72
50.00
9.00
252.41

507.07
1,495.91
332.23
2,622.50
465.84
1,138.37

0%
0%

24.75
16.80

687.31
327.26

0%
0%
0%
0%
0%

5.00
5.00
5.00
5.00
5.00

607.70
1,336.70
501.50
36.60
19.45

0%

18.00

495.54

0%
0%
8%
23%
47%
35%
0%
7%
12%
12%
12%
12%
2%
12%
12%
12%
12%
12%
2%
4%
4%
1%
11%
6%
0%
0%

5.00
5.00

708.00
531.00
12,107.30
235.40
25.10
87.73
122.57
9,438.42
728.84
2,328.71
357.69
911.43
5,111.75
1,550.48
1,550.48
883.00
441.50
441.50
21,228.14
10,814.86
7,122.69
2,503.30
799.98
388.89
8,714.72
2,411.08

0%
0%

44.83
109.66
0.17
149.66
149.66
149.66
149.66
166.29
149.66
149.66
149.66

155.28
189.50
119.40
24.23
28.00
28.00
28.00

1,578.92
330.40

.
PAGINA 2 DE 4

VALORIZACION N 04
SALDO DE OBRA: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE ANDAJES, DISTRITO DE ANDAJES - OYON - LIMA
Cdigo
08.03.04
08.03.05
08.03.06
08.03.07
08.03.08
08.03.09
09.03.10
08.04
08.04.02
09
09.01
09.01.01
09.01.02
09.01.03
09.01.05
09.02
09.02.01
09.02.02
09.02.03
09.02.04
09.03
05.04.04
09.03.01.01
09.03.01.02
09.03.01.03
09.03.01.04
09.03.01.05
09.03.01.06
09.03.01.07
09.03.01.08
09.04
09.04.01
09.04.01.01
09.04.01.02
09.04.02
09.04.02.01
09.04.03
08.04.02
10
10.01
01.01.02
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.03
10.03.01
10.03.02
10.03.03

Descripcin
LLAVE CORPORATIONCON NIPLE Y TUERCA 1/2"
UNION PVC 1/2"
TUBERIA PVC-SAP C-10 DN=15mm
TUBERIA DE PVC SAL 4"
ABRAZADERA PVC 90mm. X 1/2" ISO
CODO PVC-SAP 1/2" *90
CODO PVC-SAP 1/2" *45
ROTURA Y REPOSICION
ROTURA, E.D. Y REPOSICION: VEREDA FC= 140 KG/CM2 X 10CM (PARCHE)
REDES DE ALCANTARILLADO
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO DE OBRA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO MEDIANO
TRAZO Y REPLANTEO FINAL
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA A MAQUINA EN TERRENO SEMIROCOSO
ELIMINACION DE MATERIAL EXCEDENTE
REFINE DE ZANJA INCL.CAMA EN TERRENO NORMAL-SEMIROCOSO 200 MMA 300 MM
RELLENO COMP.ZANJA TERR. SEMIROCOSO
CONCRETO ARMADO
INSTALACION DE TUBERIAS
CONCRETO PARA BUZONES DE FONDO FC=140 KG/CM2P
CONCRETO PARA PAREDES DE BUZONES FC=175KG/CM2
CONCRETO FC=210 KG/CM2 PARA LOSAS MACIZAS P
CONCRETO DE ANCLAJE FC=175 KG/CM2 P
ENCOFRADO Y DESENCOFRADO PARA BUZON
ACERO CORRUGADO FY=4200 KG/CM2
CONCRETO FC=210 KG/CM2. P/CANALETAS DE BUZON
MARCO Y TAPA DE FF PARA BUZON D=0.6M
ROTURA Y REPOSICION
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435 S25, =160MM
TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435 S25, =200MM
ROTURA Y REPOSICION DE PISTA DE CONCRETO
ROTURA, E.D. Y REPOSICION: PAVIM. CONCR.6"(PARCHE)
PRUEBA HIDRAULICA
ROTURA, E.D. Y REPOSICION: VEREDA FC= 140 KG/CM2 X 10CM (PARCHE)
CONEXIONES DOMICILIARIAS DE DESAGUE
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO MEDIANO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA CAJAS DE REGISTRO
RELLENO CON MATERIAL PROPIO PARA ACOMETIDA DE AGUA
ELIMINACION DE MATERIAL EXCEDENTE
NIVELACION INTERIOR APISONADO MANUAL
INSTALACIONES HIDRAULICAS C/INSTALACION
TUBERIA PARA ALCANTARILLADO PVC-UF ISO-4435 S25, =160MM
PRUEBA HIDRAULICA Y ESCORRENTIA P/TUBERIA A ZANJA TAPADA =160MM
CONEXIN DOMICILIARIA C/EMPALME A LA RED INCLUYE CAJA Y ACCESORIOS

Unidad
Und
Und
m
m
Und
Und
Und

Cantidad
Total
28.00
28.00
224.00
84.00
28.00
28.00
56.00

Precio
Unitario
19.71
3.04
7.35
7.03
30.69
7.87
7.87

m2

16.00

106.16

m2
m
VJE
KM

450.38
450.38
1.00
0.45

0.56
0.80
590.00
506.59

m3
m3
m
m

648.55
243.21
450.38
450.38

17.26
31.13
19.25
14.96

m3
m3
m3
m3
m2
kg
m3
Und

6.84
20.34
5.87
1.50
234.88
852.07
2.88
17.00

292.00
395.35
365.69
307.06
31.14
4.61
429.44
317.22

m
m

158.86
291.52

20.53
31.26

m2

5.60

135.92

m2

450.38

7.08

VJE

1.00

472.00

m3
m3
m3
m2

141.12
82.32
79.38
117.60

32.77
13.21
30.74
9.75

m
m
Und

196.00
196.00
28.00

20.78
2.68
368.72

Importe
Parcial
551.88
85.12
1,646.40
590.52
859.32
220.36
440.72
1,698.56
1,698.56
82,444.86
1,430.48
252.21
360.30
590.00
227.97
34,172.60
11,193.97
7,571.13
8,669.82
6,737.68
30,517.62

Anterior
-

METRADO
Actual
Acumulado
-

Anterior
0.00
78,495.02
1,430.48
252.21
360.30
590.00
227.97
34,172.60
11,193.97
7,571.13
8,669.82
6,737.68
30,517.62

450.38
450.38
1.00
0.45

450.38
450.38
1.00
0.45

648.55
243.21
450.38
450.38

648.55
243.21
450.38
450.38

1,997.28
8,041.42
2,146.60
460.59
7,314.16
3,928.04
1,236.79
5,392.74
16,324.16

6.84
20.34
5.87
1.50
234.88
852.07
2.88
17.00

6.84
20.34
5.87
1.50
234.88
852.07
2.88
17.00

1,997.28
8,041.42
2,146.60
460.59
7,314.16
3,928.04
1,236.79
5,392.74
12,374.32

3,261.40
9,112.92

158.86
291.52

158.86
291.52

3,261.40
9,112.92

761.15

3,188.69
27,982.17
472.00
472.00
9,298.69
4,624.50
1,087.45
2,440.14
1,146.60
14,922.32
4,072.88
525.28
10,324.16

1.00

1.00

141.12
42.00
79.38
117.60

141.12
42.00
79.38
117.60

106.00
106.00
12.00

106.00
106.00
12.00

16,149.46
472.00
472.00
8,766.06
4,624.50
554.82
2,440.14
1,146.60
6,911.40
2,202.68
284.08
4,424.64

Monto S/.
Actual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

SALDO POR VALORIZAR


METRADO
S/.
28.00
551.88
28.00
85.12
224.00
1,646.40
84.00
590.52
28.00
859.32
28.00
220.36
56.00
440.72
1,698.56
16.00
1,698.56
3,949.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Acumulado
0.00
78,495.02
1,430.48
252.21
360.30
590.00
227.97
34,172.60
11,193.97
7,571.13
8,669.82
6,737.68
30,517.62

%
0%
0%
0%
0%
0%
0%
0%
0%
0%
95%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

1,997.28
8,041.42
2,146.60
460.59
7,314.16
3,928.04
1,236.79
5,392.74
12,374.32
3,261.40
9,112.92
-

100%
100%
100%
100%
100%
100%
100%
100%
76%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,949.84

100%
100%

0.00
0.00

16,149.46
472.00
472.00
8,766.06
4,624.50
554.82
2,440.14
1,146.60
6,911.40
2,202.68
284.08
4,424.64

0%
58%
100%
100%
94%
100%
51%
100%
100%
46%
54%
54%
43%

0%

5.60

761.15

450.38

3,188.69
11,832.71
0.00
0.00
532.63
0.00
532.63
0.00
0.00
8,010.92
1,870.20
241.20
5,899.52

40.32
90.00
90.00
16.00

.
PAGINA 3 DE 4

VALORIZACION N 04
SALDO DE OBRA: MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE ANDAJES, DISTRITO DE ANDAJES - OYON - LIMA
Cdigo
10.05
10.05.02
10.04
10.06.01
14
14.01
14.01.02
14.01.03
14.01.04
14.01.05
14.01.06
14.01.07
14.01.08
14.01.09
15
15.01

Descripcin
ROTURA Y REPOSICION
ROTURA, E.D. Y REPOSICION: VEREDA FC=10 KG/CM2 X 10CM (PARCHE)
LOSAS ALIGERADAS
LOSA DE CONCRETO ARMADO DE 0.95mx0.55mx0.05m
SEGURIDAD EN OBRA
SEALIZACION Y SEGURIDAD EN LA OBRA
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M
CAMPAMENTO PROVISIONAL DE LA OBRA
SEALIZACIONES-DESVIOS EN VIA DE GRAN TRANSITO
CINTA PLASTICA SEALIZADORA PARA LIMITE DE SEGURIDAD DE OBRA
CERCO DE MALLA HDP DE 1M ALTURA PARA LIMITE DE SEGURIDAD
CONO FIBRA DE VIDRIO FOSFORECENTE PARA DESVIO DE TRANSITO C/BASE DE FIERRO
TRANQUERAS DE MADERA 1.20 X 1.10M P/DESVIO TRANSITO VEHICULAR
PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA SEGN DISEO
OBRAS PRELIMINARES
TRANSPORTE DE MATERIALES
TOTAL COSTO DIRECTO

Unidad

Cantidad
Total

Precio
Unitario

m2

16.00

106.89

Und

28.00

56.39

Und
GLB
Und
m
m

1.00
1.00
1.00
1,500.00
800.00

1,753.60
1,560.87
2,640.62
1.63
11.25

Importe
Parcial
1,710.24
1,710.24
1,578.92
1,578.92
22,179.89
22,179.89
1,753.60
1,560.87
2,640.62
2,445.00
9,000.00

Und

10.00

76.70

767.00

Und
Und

5.00
15.00

94.56
236.00

GLB

1.00

7,670.00

472.80
3,540.00
7,670.00
7,670.00
S/.

GASTO GENERALES (12%)


PRESUPUESTO TOTAL
PORCENTAJE TOTAL

406,831.71
48,819.81

S/.

455,651.52
100.00%

Anterior

METRADO
Actual
Acumulado

1.00
0.50
700.00
700.00

0.50
250.00
100.00

1.00
1.00
950.00
800.00

10.00
10.00

2.00
2.00

10.00
2.00
12.00

Anterior
0.00
0.00
15,216.91
15,216.91
1,753.60
1,320.31
1,141.00
7,875.00

Monto S/.
Actual
0.00
0.00
3,513.93
3,513.93
1,320.31
407.50
1,125.00

Acumulado
0.00
0.00
18,730.84
18,730.84
1,753.60
2,640.62
1,548.50
9,000.00

%
0%
0%
0%
0%
84%
84%
100%
0%
100%
63%
100%
100%
40%
80%
0%
0%

767.00
2,360.00
-

189.12
472.00
-

767.00
189.12
2,832.00
-

S/. 109,861.39

S/. 5,012.78

S/. 114,874.17

13,183.37

601.53

13,784.91

S/. 123,044.76

S/. 5,614.31

S/. 128,659.08

27.00%

1.23%

28.24%

SALDO POR VALORIZAR


METRADO
S/.
1,710.24
16.00
1,710.24
1,578.92
28.00
1,578.92
3,449.05
3,449.05
0.00
1.00
1,560.87
0.00
550.00
896.50
0.00
0.00

3.00
3.00

283.68
708.00
7,670.00
7,670.00

1.00
S/.

291,957.55

S/.

326,992.46

35,034.91

71.76%

.
PAGINA 4 DE 4