ANALISA HARGA SATUAN BOW 2010

PEKERJAAN KAYU
KODE
ANALISA

HARGA
INDEK

SAT

URAIAN

HARGA SATUAN (Rp)

BAHAN

UPAH

( Rp )

( Rp )

JUMLAH HARGA (Rp)

A. PEKERJAAN PONDASI KAYU


A.1.BOW

SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 2,00 M


DICINCIN, DILANCIP DAN DITUMBUK

A.2

0.0200 M3

Balok ulin

5,000,000.00

0.5100 OH

tukang kayu

70,000.00

100,000.00
35,700.00

0.8750 OH

pekerja

55,000.00

48,125.00

0.0510 OH

kepala tukang

75,000.00

3,825.00

0.0440 OH

mandor

75,000.00

3,300.00

JUMLAH

100,000.00

400,000.00

90,950.00

190,950.00

SEBUAH TONGKAT ULIN UK.12/12 CM TINGGI 8,00 M

2 SAMBUNGAN DGN PIPA GALVANIS

A.3

0.0800 M3

Balok ulin

5,000,000.00

0.5100 OH

tukang kayu

70,000.00

35,700.00

0.8750 OH

pekerja

55,000.00

48,125.00

0.0510 OH

kepala tukang

75,000.00

3,825.00

0.0440 OH

mandor

75,000.00
400,000.00
200,000.00

0.0400 M3

Balok ulin

5,000,000.00

0.5100 OH

tukang kayu

70,000.00

35,700.00

0.8750 OH

pekerja

55,000.00

48,125.00

0.0510 OH

kepala tukang

75,000.00

3,825.00

0.0440 OH

mandor

75,000.00

490,950.00

3,300.00
200,000.00

90,950.00

290,950.00

1 M3 MENGERJAKAN PAPAN SIRING KAYU ULIN


1.1000 M3

papan siring kayu ulin

5,400,000.00

5,940,000.00

3.0000 kg

paku ulin

19,125.00

57,375.00

tukang kayu

70,000.00

1,050,000.00

4.0000 OH

pekerja

55,000.00

220,000.00

1.5000 OH

kepala tukang

75,000.00

112,500.00

0.2000 OH

mandor

75,000.00

15.0000 OH

A. 5

90,950.00

SEBUAH TONGKAT ULIN UK.10/10 CM TINGGI 4,00 M'

JUMLAH
A. 4

3,300.00

JUMLAH

15,000.00

JUMLAH

5,997,375.00
5,500,000.00

1,397,500.00

7,394,875.00

1 M3 RANGKA BAWAH KAYU ULIN ( tiang + kalang, sunduk )


1.1000 M3

balok ky ulin

5,000,000.00

15.0000 OH

tukang kayu

70,000.00

1,050,000.00

5.0000 OH

pekerja

55,000.00

275,000.00

1.5000 OH

kepala tukang

75,000.00

112,500.00

0.2500 OH

mandor

75,000.00

18,750.00

JUMLAH

5,500,000.00

1,456,250.00

6,956,250.00

B. PEKERJAAN LANTAI KAYU


B. 1

1 M3 MENGERJAKAN SLOOF DAN GELAGAR KY ULIN


balok ky ulin

5,000,000.00

5,500,000.00

10.0000 Kg

1.1000 M3

paku ulin

19,125.00

191,250.00

15.0000 OH

tukang kayu

70,000.00

1,050,000.00

5.0000 OH

pekerja

55,000.00

275,000.00

1.5000 OH

kepala tukang

75,000.00

112,500.00

0.2500 OH

mandor

75,000.00
JUMLAH

B. 2

1,456,250.00

7,147,500.00

1 M2 LANTAI PAPAN KAYU ULIN DIKETAM


0.0254 M3

papan kayu ulin

5,400,000.00

137,160.00

0.2500 Kg

paku ulin

19,125.00

4,781.25

0.8000 OH

tukang kayu

70,000.00

56,000.00

0.2800 OH

pekerja

55,000.00

15,400.00

0.0800 OH

kepala tukang

75,000.00

6,000.00

0.0140 OH

mandor

75,000.00
JUMLAH

B. 3

18,750.00
5,691,250.00

1,050.00
141,941.25

78,450.00

220,391.25

1 M2 LANTAI PAPAN KAYU MERANTI DIKETAM


0.0254 M3

papan kayu meranti klas 1

2,300,000.00

58,420.00

0.2500 Kg

paku biasa

15,583.33

3,895.83

0.8000 OH

tukang kayu

70,000.00

56,000.00

0.2800 OH

pekerja

55,000.00

15,400.00

0.0800 OH

kepala tukang

75,000.00

6,000.00

0.0140 OH

mandor

75,000.00
JUMLAH

1,050.00
62,315.83

78,450.00

140,765.83

B. PEKERJAAN DINDING KAYU


B. 4

B. 5

1 M3 MENGERJAKAN RANGKA RUMAH KAYU ULIN (termasuk kusen)


1.1000 M3

balok ky ulin

5,000,000.00

5,500,000.00

5.0000 Kg

paku ulin

19,125.00

95,625.00

20.0000 OH

tukang kayu

70,000.00

1,400,000.00

10.0000 OH

pekerja

55,000.00

550,000.00

2.0000 OH

kepala tukang

75,000.00

150,000.00

0.5000 OH

mandor

75,000.00
5,595,625.00

1.1000 M3

balok ky meranti

2,200,000.00

2,420,000.00

5.0000 Kg

paku biasa

15,583.33

77,916.67

20.0000 OH

tukang kayu

70,000.00

1,400,000.00

10.0000 OH

pekerja

55,000.00

550,000.00

2.0000 OH

kepala tukang

75,000.00

150,000.00

0.5000 OH

mandor

75,000.00

B. 8

B. 9

B. 10

7,733,125.00

37,500.00
2,497,916.67

2,137,500.00

4,635,416.67

1 M2 DINDING PAPAN ULIN DIKETAM


0.0240 M3

papan kayu ulin

5,400,000.00

129,600.00

0.2000 Kg

paku ulin

19,125.00

3,825.00

0.8000 OH

tukang kayu

70,000.00

56,000.00

0.2800 OH

pekerja

55,000.00

15,400.00

0.0800 OH

kepala tukang

75,000.00

6,000.00

0.0100 OH

mandor

75,000.00
JUMLAH

B. 7

2,137,500.00

1 M3 MENGERJAKAN RANGKA RUMAH KAYU MERANTI (termasuk kusen)

JUMLAH
B. 6

37,500.00

JUMLAH

750.00
133,425.00

78,150.00

211,575.00

1 M2 DINDING PAPAN MERANTI DIKETAM


0.0240 M3

papan kayu meranti

2,300,000.00

55,200.00

0.2000 Kg

paku biasa

15,583.33

3,116.67

0.8000 OH

tukang kayu

70,000.00

56,000.00

0.2800 OH

pekerja

55,000.00

15,400.00

0.0800 OH

kepala tukang

75,000.00

6,000.00

0.0100 OH

mandor

75,000.00

750.00

JUMLAH

58,316.67

78,150.00

136,466.67

1 M2 DINDING SUSUN SIRIH PAPAN MERANTI


0.0250 M3

papan kayu meranti

2,300,000.00

57,500.00

0.1500 Kg

paku biasa

15,583.33

2,337.50

0.4000 OH

tukang kayu

70,000.00

28,000.00

0.1400 OH

pekerja

55,000.00

7,700.00

0.0400 OH

kepala tukang

75,000.00

3,000.00

0.0070 OH

mandor

75,000.00

525.00

JUMLAH

59,837.50

39,225.00

99,062.50

1 M2 DINDING PAPAN MERANTI SUSUN SIRIH DIKETAM


0.0250 M3

papan kayu meranti

2,300,000.00

57,500.00

0.2000 Kg

paku biasa

15,583.33

3,116.67

0.8000 OH

tukang kayu

70,000.00

56,000.00

0.2800 OH

pekerja

55,000.00

15,400.00

0.0800 OH

kepala tukang

75,000.00

6,000.00

0.0100 OH

mandor

75,000.00

750.00

JUMLAH

60,616.67

78,150.00

138,766.67

1 M2 MENGERJAKAN DINDING PARTISI KAYU


MERANTI DAN LAPISAN MULTIPLEK 9 MM
0.0210 M3

papan kayu meranti

2,300,000.00

48,300.00

0.7000 LBR

Multiplek 9 mm

129,000.00

90,300.00

0.0400 KG

Paku biasa

15,583.33

623.33

0.0400 KG

Paku plywood

23,750.00

950.00

0.0150 OH

Tukang kayu

70,000.00

1,050.00

0.8000 OH

Pekerja

55,000.00

44,000.00

0.0150 OH

kepala tukang

75,000.00

1,125.00

0.0400 OH

Mandor

75,000.00
JUMLAH

3,000.00
140,173.33

49,175.00

189,348.33

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

REKAPITULASI ANALISA SNI 2011


NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

A. PEKERJAAN PERSIAPAN
A. 6.6.1

1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M

196,405.33

A. 6.6.2

1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M

244,372.00

A. 6.6.3

1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 M

A. 6.6.4

1 M' MENGUKUR DAN MEMASANG BOUWPLANK

A. 6.6.5

1 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERAN

A. 6.6.6

1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT

695,062.50

A. 6.6.7

1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU

756,095.83

A. 6.6.8

1 M' MEMBERSIHKAN LAPANGAN DAN PERATAAN

A. 6.6.9

1 M2 PEMBUATAN BEDENG BURUH

A. 6.6.10 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40 X 50 X 20) CM


A. 6.6.11 1 M2 PEMBUATAN STEGGER DARI BAMBU,UKURAN (40X50X20) CM

2,032,530.67
51,036.67
3,090,209.83

9,250.00
732,787.50
110,359.17
29,335.00

A. 6.6.12 1 M2 PEMBUATAN JALAN SEMENTARA

117,517.50

A. 6.6.13 1 M3 BONGKARAN BETON BERTULANG

391,660.00

A. 6.6.14 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

391,660.00

A. 6.6.15 1 M' PASANG PAGAR KAWAT JARING GALVANIS.TINGGI 1,00 M


A. 6.6.16 1 M' PASANG PAGAR BETON PRACETAK ( 5X50X213) CM

52,268.20
147,098.00

B. PEKERJAAN TANAH
B. 6.6.1

1 M3 GALIAN TANAH BIASA SEDALAM 1 M'

25,000.00

B. 6.6.2

1 M3 GALIAN TANAH BIASA SEDALAM 2 M'

32,830.00

B. 6.6.3

1 M3 GALIAN TANAH BIASA SEDALAM 3 M'

45,900.00

Bab XIII.Rekapitulasi Harga Hal 3

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

B. 6.6.4

1 M3 GALIAN TANAH KERAS SEDALAM 1 M'

39,025.00

B. 6.6.5

1 M3 GALIAN TANAH CADAS SEDALAM 1 M

78,125.00

B. 6.6.6

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M'

51,490.00

B. 6.6.7

1 M2 PEKERJAAN STRIPPING SETINGGI 1 M

3,125.00

B. 6.6.8

1 M3 PEMBUANGAN TANAH SEJAUH 150 M

32,130.00

B. 6.6.9

1 M3 URUGAN KEMBALI

11,985.00

B. 6.6.10

PEMADATAN TANAH

31,250.00

B. 6.6.11

1 M3 URUGAN TANAH

B. 6.6.11.a 1 M3 URUGAN PASIR

109,155.00
110,780.00

B. 6.6.12

1 M3 LAPISAN PUDEL CAMP 1 Kp : 3 Ps : 7 TL

133,602.12

B. 6.6.13

1 M3 LAPISAN PUDEL CAMP 1 Kp : 5 TL

B. 6.6.14

1 M3 PEMASANGAN LAPISAN IJUK

B. 6.6.15

1 M3 URUGAN SIRTU

345,385.00

B. 6.6.16

1 M2 PEMBUATAN JALAN SEMENTARA. TEBAL 25 CM

142,125.00

84,085.00
9,375.00

C. PEKERJAAN PONDASI
C.6.6.1

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1 Ps

959,665.00

C.6.6.2

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2 Ps

825,415.00

C.6.6.3

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2,5 Ps

959,665.00

C.6.6.4

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Ps

755,415.00

C.6.6.5

1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps

713,465.00

C.6.6.5.a

1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps (Pasir Putih)

617,005.00

C.6.6.5.b

1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps (Pasir Putih Sepaku)

711,025.00

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 5 Ps

684,365.00

C.6.6.6

Bab XIII.Rekapitulasi Harga Hal 4

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

C.6.6.7

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 6 Ps

663,915.00

C.6.6.8

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 8 Ps

630,115.00

C.6.6.9

1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 1 Ps

481,899.60

C.6.6.10

1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 2 Ps

457,058.00

C.6.6.11

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1/4 Kp ; 4 Ps

711,525.00

C.6.6.12

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Kp ; 10 Ps

574,600.00

C.6.6.13

1 M3 PASANG PONDASI BATU KALI, 1/4 Pc ; 1 Kp ; 4 Ps

556,270.00

C. 6.6.14

1 M3 PASANGAN BATU KOSONG (AANSTAMPING)

350,100.00

C. 6.6.15

1 M3 PASANG PONDASI SIKLOP 40 % BATU KALI

C. 6.6.16

1 M3 PASANG PONDASI SUMURAN DIA 100 CM

909,790.00

C. 6.6.17

PEMBUATAN TIANG PANCANG (40X40) CM, BETON BERTULANG

863,536.10

C. 6.6.18

PEMBUATAN TIANG PANCANG (35X35) CM, BETON BERTULANG

669,565.40

1,479,595.00

D. PEKERJAAN DINDING
D.6.6.1

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 1 Ps

247,489.00

D.6.6.2

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 2 Ps

226,050.00

D.6.6.3

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Ps

215,085.00

D.6.6.4

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps

207,265.00

D.6.6.5

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 5 Ps

203,860.00

D.6.6.6

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 6 Ps

203,860.00

D.6.6.7

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Kp ; 10 Ps

185,866.50

D.6.6.8

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc ; 1 Ps

117,615.00

D. 6.6.9

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 2 ps

108,610.00

D. 6.6.10

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 ps

103,156.00

Bab XIII.Rekapitulasi Harga Hal 5

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO
D. 6.6.11

URAIAN PEKERJAAN
1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps

JUMLAH HARGA (Rp)


100,175.00

D. 6.6.11.a 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps (Pasir Putih Lokal)

92,198.50

D. 6.6.11.b 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps (Pasir Putih Sepaku)

99,100.00

D. 6.6.12

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 5 ps

98,309.00

D. 6.6.13

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 6 ps

97,541.00

D. 6.6.14

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 8 ps

95,425.00

D. 6.6.15

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 Kp ; 10 ps

92,900.00

D. 6.6.16

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 1 Sm ; 1 ps

79,088.40

D. 6.6.17

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Kp ; 1 Sm ; 2 Ps

81,563.20

D. 6.6.18

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.20)

91,200.00

D. 6.6.19

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.15)

237,797.50

D. 6.6.20

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.10)

229,662.50

D. 6.6.21

1 M2 PASANGAN DINDING CON BLOCK (HB.20)

264,372.50

D. 6.6.22

1 M2 PASANGAN DINDING CON BLOCK (HB.15)

231,211.33

D. 6.6.23

1 M2 PASANGAN DINDING CON BLOCK (HB.10)

233,802.75

D. 6.6.24

1 M2 PASANGAN DINDING LATAI

D. 6.6.25

1 M2 PASANGAN DINDING ROSTER 20 X 20

207,140.00

D. 6.6.26

1 M2 PASANG BATA BERONGGA UKURAN ( 5x11x24 ) cm

267,595.00

D. 6.6.27

1 M2 PASANG DINDING ANYAMAN BAMBU RANGKA KAYU

43,212.00

D. 6.6.28

1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP

91,605.00

173,808.33

E. PEKERJAAN PLESTERAN
E. 6.6.1

1 M2 PLESTERAN 1 pc ; 1 ps, TEBAL 15 MM

43,421.00

E. 6.6.2

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 15 MM

38,701.00

Bab XIII.Rekapitulasi Harga Hal 6

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

E. 6.6.3

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 15 MM

36,549.00

E. 6.6.4

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM

35,135.00

E. 6.6.4.a

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM (Pasir Putih)

31,425.00

E. 6.6.4.b

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM (Pasir Putih Sepaku)

34,635.00

E. 6.6.5

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 15 MM

30,410.00

E. 6.6.6

1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 15 MM

29,642.50

E. 6.6.7

1 M2 PLESTERAN 1 pc ; 8 ps, TEBAL 15 MM

33,119.00

E. 6.6.8

1 M2 PLESTERAN 1 pc ; 0,5 Kp ; 3 Ps, TEBAL 15 MM

34,128.00

E. 6.6.9

1 M2 PLESTERAN 1 pc ; 3 Kp ; 10 Ps, TEBAL 15 MM

29,297.00

E. 6.6.10

1 M2 PLESTERAN 0,5 pc ; 1 Kp ; 4 Ps, TEBAL 15 MM

32,050.00

E. 6.6.11

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 1 Ps, TEBAL 15 MM

25,681.70

E. 6.6.12

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 15 MM

27,169.10

E. 6.6.13

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 20 MM

54,501.50

E. 6.6.14

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 20 MM

50,727.50

E. 6.6.15

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 20 MM

48,471.50

E. 6.6.16

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 20 MM

46,664.50

E. 6.6.17

1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 20 MM

45,799.50

E. 6.6.18

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 20 MM

34,744.20

E. 6.6.19

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 25 MM

56,375.00

E. 6.6.20

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 25 MM

57,000.00

E. 6.6.21

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 25 MM

54,799.00

E. 6.6.22

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 25 MM

53,047.00

E. 6.6.23

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 30 MM

71,095.00

Bab XIII.Rekapitulasi Harga Hal 7

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

E. 6.6.24

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 30 MM

66,245.00

E. 6.6.25

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 30 MM

63,394.00

E. 6.6.26

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 30 MM

59,997.00

E. 6.6.27

1 M2 BERAPEN 1 pc ; 3 ps, TEBAL 30 MM

28,716.00

E. 6.6.28

1 M2 BERAPEN 1 pc ; 5 ps, TEBAL 15 MM

27,396.00

E. 6.6.29

1 M2 PLESTERAN BETON 1 pc ; 2 ps, TEBAL 15 MM

34,495.00

E. 6.6.30

1 M2 PLESTERAN BETON 1 pc ; 3 ps, TEBAL 15 MM

32,346.00

E. 6.6.31

1 M2 PLESTERAN SKONING 1 pc ; 2ps

E. 6.6.32

1 M2 PLESTERAN GRANITO 1 pc WARNA ; 2 GRANITO, TEBAL 10 MM

231,091.00

E. 6.6.33

1 M2 PLESTERAN TERASO 1 pc WARNA ; 2 BATU TERASO, TEBAL 10 MM

218,951.67

E. 6.6.34

1 M2 PLESTERAN CIPRAT 1 pc ; 2ps

32,241.00

E. 6.6.35

1 M2 PLESTERAN SIAR ADUKAN 1 pc ; 2ps

16,466.00

E. 6.6.36

1 M2 PLESTERAN WATERPROOF BATACOTE 3 LAPIS

40,495.00

9,945.00

F. PEKERJAAN KAYU
F.6.6.1

1 M PASANG KUSEN PINTU DAN JENDELA KAYU JATI

7,402,500.00

F.6.6.2

1 M PASANG KUSEN PINTU DAN JENDELA KAYU BENGKIRAI

8,362,500.00

F.6.6.3

1 M PASANG KUSEN PINTU DAN JENDELA KAYU ULIN

7,762,500.00

F.6.6.4

1 M PASANG KUSEN PINTU DAN JENDELA KAYU MERANTI MERAH

4,402,500.00

F.6.6.5

1 M2 PASANG PINTU KLAMP KAYU BENGKIRAI

318,754.17

F.6.6.6

1 M2 PASANG PINTU KLAMP KAYU ULIN

297,331.25

F.6.6.7

1 M2 PASANG PINTU PANEL KAYU JATI

532,500.00

F.6.6.8

1 M2 PASANG PINTU PANEL KAYU BENGKIRAI

492,500.00

F.6.6.9

1 M2 PASANG PINTU DAN JENDELA KACA KAYU JATI

447,000.00

Bab XIII.Rekapitulasi Harga Hal 8

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

F.6.6.10

1 M2 PASANG PINTU DAN JENDELA KACA KAYU BENGKIRAI

412,000.00

F.6.6.11

1 M2 PASANG PINTU DAN JENDELA KACA KAYU ULIN

391,000.00

F.6.6.12

1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI

758,000.00

F.6.6.13

1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU BENGKIRAI

694,000.00

F.6.6.14

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI

387,167.50

F.6.6.15

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BENGKIRAI

367,567.50

F.6.6.16

1 M2 PASANG JALUSI MATI KUSEN KAYU JATI

606,712.50

F.6.6.17

1 M2 PASANG JALUSI MATI KUSEN KAYU BENGKIRAI

546,712.50

F.6.6.18

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU ULIN

355,913.75

F.6.6.19

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU JATI

392,437.50

F.6.6.20

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU BENGKIRAI

367,673.75

F.6.6.21

1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU JATI

447,250.83

F.6.6.22

1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU BENGKIRAI

427,650.83

F.6.6.23

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI

452,350.83

F.6.6.24

1 M2 PASANG PINTU TEAKWOOD & FORMIKA, RANGKA KAYU BENGKIRAI

450,250.83

F.6.6.25

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI

544,917.50

F.6.6.26

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU BENGKIRAI

525,317.50

F.6.6.27

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU JATI

7,154,466.67

F.6.6.28

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BENGKIRAI

7,704,466.67

F.6.6.29

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU ULIN

7,154,466.67

F.6.6.30

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU MERANTI

4,074,466.67

F.6.6.31

1M2 PASANG KASO + RENG GENTENG KODOK KAYU BENGKIRAI

81,962.50

F.6.6.32

1M2 PASANG KASO + RENG GENTENG KODOK KAYU ULIN

76,493.75

Bab XIII.Rekapitulasi Harga Hal 9

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

F.6.6.33

1M2 PASANG KASO + RENG GENTENG MONIER KAYU JATI

85,962.50

F.6.6.34

1M2 PASANG KASO + RENG GENTENG MONIER KAYU BENGKIRAI

92,962.50

F.6.6.35

1M2 PASANG KASO + RENG GENTENG BETON KAYU BENGKIRAI

92,962.50

F.6.6.36

1M2 PASANG KASO + RENG ATAP SIRAP KAYU BENGKIRAI

926,966.67

F.6.6.37

1M2 PASANG KASO + RENG ATAP SIRAP KAYU ULIN

927,675.00

F.6.6.38

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU JATI

F.6.6.39

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU BENGKIRAI

F.6.6.40

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU ULIN

F.6.6.41

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU JATI

F.6.6.42

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU BENGKIRAI

74,237.90

F.6.6.43

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU MERANTI

87,937.50

F.6.6.44

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU JATI

179,929.17

F.6.6.45

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU BENGKIRAI

193,429.17

F.6.6.46

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU MERANTI

104,329.17

F.6.6.47

1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU JATI

72,929.17

F.6.6.48

1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU BENGKIRAI

65,729.17

F.6.6.49

1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU JATI

F.6.6.50

1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU BENGKIRAI

F.6.6.51

1M' PASANG LISPLANG UKURAN 2x(3X20) CM, KAYU BENGKIRAI

121,185.00

F.6.6.52

1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU BENGKIRAI

69,535.00

F. 6.6.53.

1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU ULIN

64,375.00

F. 6.6.54

1M2 PASANG RANGKA DINDING PEMISAH KAYU BENGKIRAI

199,558.33

F. 6.6.55

1M2 PASANG RANGKA DINDING PEMISAH KAYU ULIN

189,808.33

94,808.33
100,808.33
95,162.50
144,673.75

101,254.17
47,767.46

Bab XIII.Rekapitulasi Harga Hal 10

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

F. 6.6.56

1M2 PASANG DINDING PEMISAH TEKWOOD RANGKAP, RANGKA KAYU BENGKIRAI

199,558.33

F. 6.6.57

1M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER

271,991.67

F. 6.6.58

1M2 PASANG DINDING LAMBRISIRING DARI PAPAN JATI

214,308.33

F. 6.6.59

1M2 PASANG PLYWOOD TEBAL 3 MM, UNTUK DINDING

30,064.17

F. 6.6.60

1M2 PASANG LIST PLAFOND, KAYU PROFIL

15,090.00

G. PEKERJAAN BETON
G.6.6.1

1 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr

834,025.00

G.6.6.2

1 M3 BETON TUMBUK 1 pc ; 3 ps ; 6 kr

818,725.00

G.6.6.3

1 M3 BETON TUMBUK 1 pc ; 4 ps ; 6 kr

788,025.00

G.6.6.4

1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK 1 pc ; 3 ps ; 5 kr

100,150.00

G.6.6.5.

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Krayan

820,725.00

G.6.6.5.a

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Palu

871,425.00

G.6.6.5.

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Sepaku

888,975.00

G.6.6.6

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)

907,625.00

G.6.6.7

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;2,5 kr)

958,725.00

G.6.6.8

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 3 kr)

874,225.00

G.6.6.9

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;2,5 kr)

1,008,425.00

G.6.6.10

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ; 2 kr)

1,090,325.00

G.6.6.11

1M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON

1,093,125.00

G.6.6.12

1M3 MEMBUAT BETON DENGAN PUZZDITH - 100 XR

G.6.6.13

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Krayan

1,067,425.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Palu

1,120,075.00

G.6.6.13.a

G.6.6.13.b 1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Sepaku

971,425.00

1,138,300.00

Bab XIII.Rekapitulasi Harga Hal 11

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

G.6.6.14

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)

1,033,425.00

G.6.6.15

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;3kr)

1,107,225.00

G.6.6.16

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 2,5 kr)

1,132,125.00

G.6.6.17

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ;1kr)

1,323,625.00

G.6.6.18

1M3 MEMBUAT BETON KEDAP AIR DENGAN STROROX - 100

1,132,125.00

G.6.6.19

1M' MEMASANG PVC WATERSTOP LEBAR 150 MM

5,225.00

G.6.6.20

1M' MEMASANG PVC WATERSTOP LEBAR 200 MM

5,612.50

G.6.6.21

1M' MEMASANG PVC WATERSTOP LEBAR 230 MM

32,925.00

G.6.6.22

1M' MEMASANG PVC WATERSTOP LEBAR 250 MM

32,925.00

G.6.6.23

1M' MEMASANG PVC WATERSTOP LEBAR 300 MM

32,925.00

G.6.6.24

1M' MEMASANG PVC WATERSTOP LEBAR 320 MM

5,350.00

G.6.6.25

1 KG PEMBESIAN DG BESI POLOS

11,750.00

G.6.6.25

1 KG PEMBESIAN DG BESI ULIR

13,587.50

G.6.6.26

1 KG KABEL PRESSTRESSED POLOS/STRANDS

11,385.00

G.6.6.27

1 KG JARING KAWAT BAJA

48,442.00

G.6.6.28

1M2 PASANG BEKISTING UNTUK PONDASI

130,900.00

G. 6.6.29

1 M2 PASANG BEKISTING UNTUK SLOOF ( 2 x pakai )

121,650.00

G. 6.6.30

1 M2 PASANG BEKISTING UNTUK KOLOM ( 2 x pakai )

216,762.50

G. 6.6.31

1 M2 PASANG BEKISTING UNTUK BALOK ( 2 x pakai )

224,462.50

G. 6.6.32

1 M2 PASANG BEKISTING UNTUK LANTAI ( 2 x pakai )

255,862.50

G. 6.6.33

1 M2 PASANG BEKISTING UNTUK DINDING ( 2 x pakai )

447,222.50

G. 6.6.34

1 M2 PASANG BEKISTING UNTUK TANGGA

213,262.50

G. 6.6.35

1M3 MEMBUAT BETON DENGAN MUTU K 225

1,431,650.00

Bab XIII.Rekapitulasi Harga Hal 12

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

G. 6.6.36

1M3 MEMBUAT BETON DENGAN MUTU K 275

G. 6.6.37

1 M2 PASANG JEMBATAN COR

G. 6.6.38

1M3 MEMBUAT PONDASI BETON BERTULANG (150KG BESI + BEKISTING)

3,337,925.00

G. 6.6.39

1M3 MEMBUAT SLOOF BETON BERTULANG (200KG BESI + BEKISTING)

4,137,091.67

G. 6.6.40

1M3 MEMBUAT KOLOM BETON BERTULANG (300KG BESI + BEKISTING)

6,786,575.00

G. 6.6.41

1M3 MEMBUAT BALOK BETON BERTULANG (200KG BESI + BEKISTING)

5,246,625.00

G. 6.6.42

1M3 MEMBUAT BALOK BETON BERTULANG (150KG BESI + BEKISTING)

4,801,975.00

G. 6.6.43

1M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)

4,614,875.00

G. 6.6.44

1M3 MEMBUAT TANGGA BETON BERTULANG (200KG BESI + BEKISTING)

4,892,333.33

G. 6.6.45

1M3 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11x11) CM

62,570.83

G. 6.6.46

1M' MEMBUAT RING BALOK BETON BERTULANG (10X15) CM

73,601.67

H. PEKERJAAN PENUTUP ATAP

1,403,000.00
84,830.00

H. 6.6.1

1M2 PASANG ATAP GENTENG PALENTONG KECIL

14,700.00

H. 6.6.2

1M2 PASANG ATAP GENTENG KODOK /GLAZZUR

77,200.00

H. 6.6.3

1M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR

13,500.00

H. 6.6.4

1M2 PASANG ATAP GENTENG BUBUNG PALENTONG

56,970.00

H. 6.6.5

1M' PASANG BUBUNG GENTENG KODOK

74,470.00

H. 6.6.6

1M2 PASANG BUBUNG GENTENG PALENTONG BESAR

45,186.14

H. 6.6.7

1M2 PASANG ROOFLIGHT FIBREGLASS (180X90) CM

11,416.25

H. 6.6.8

1m2 PASANG ATAP ASBES GELOMBANG (2,50X0,92)X5MM

29,686.67

H. 6.6.9

1m2 PASANG ATAP ASBES GELOMBANG (2,25X0,92)X5MM

29,820.00

H. 6.6.10

1m2 PASANG ATAP ASBES GELOMBANG (2,00X0,92)X5MM

29,670.00

H. 6.6.11

1m2 PASANG ATAP ASBES GELOMBANG (1,80X0,92)X5MM

33,120.00

Bab XIII.Rekapitulasi Harga Hal 13

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

H. 6.6.12

1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,05)X4 MM

23,920.00

H. 6.6.13

1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,05)X4 MM

25,530.00

H. 6.6.14

1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,05)X4 MM

25,430.00

H. 6.6.15

1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,05)X4 MM

27,040.00

H. 6.6.16

1m2 PASANG ATAP ASBES GELOMBANG (1,5X1,05)X4 MM

33,710.00

H. 6.6.17

1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,08)X6 MM

23,820.00

H. 6.6.18

1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,08)X6 MM

24,050.00

H. 6.6.19

1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,08)X6 MM

25,890.00

H. 6.6.20

1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,08)X6 MM

26,580.00

H. 6.6.21

1m2 PASANG ATAP ASBES GELOMBANG (1,80X1,08)X6 MM

28,420.00

H. 6.6.22

1M' PASANG BUBUNG STEL GELOMBANG 0,92 M

134,645.00

H. 6.6.23

1M' PASANG NOK STEL GELOMBANG 1,05 M

134,645.00

H. 6.6.24

1M' PASANG NOK STEL GELOMBANG 1,08 M

134,645.00

H. 6.6.25

1M' PASANG NOK paten 0,92 m

134,645.00

H. 6.6.26

1M' PASANG NOK PATEN 1,05 M

134,645.00

H. 6.6.27

1M' PASANG NOK PATEN 1,08 M

134,645.00

H. 6.6.28

1M' PASANG NOK STEL RATA 0,92 M

137,275.00

H. 6.6.29

1M' PASANG NOK STEL RATA 1,05 M

137,275.00

H. 6.6.30

1M2 PASANG ATAP GENTENG BETON

58,467.50

H. 6.6.31

1M2 PASANG ATAP GENTENG ASPAL

79,292.50

H. 6.6.32

1M2 PASANG ATAP GENTENG METAL

81,325.00

H. 6.6.33

1M' PASANG ATAP SIRAP

H. 6.6.34

1M' PASANG NOK GENTENG BETON

122,221.67
90,805.83

Bab XIII.Rekapitulasi Harga Hal 14

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

H. 6.6.35

1M' PASANG NOK GENTENG ASPAL

40,633.33

H. 6.6.36

1M' PASANG NOK GENTENG METAL

27,129.17

H. 6.6.37

1 M' MEMASANG BUBUNGAN ATAP SIRAP L 40 cm

56,946.67

H. 6.6.38

1 M2 MEMASANG ATAP SENG

39,580.83

H. 6.6.39

1 M2 MEMASANG BUBUNGAN ATAP SENG

79,500.00

H. 6.6.40

1 M2 PASANG ATAP ALUMUNIUM

62,293.33

H. 6.6.41

1 M2 PASANG NOK ALUMUNIUM

77,986.67

H. 6.6.42

1 M2 PASANG ALUMUNIUM FOIL /SISALATION

I. PEKERJAAN PLAFOND

485,225.00
-

I. 6.6.1

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 6 MM

39,765.00

I. 6.6.2

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 5 MM

39,765.00

I. 6.6.3

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 4 MM

89,925.00

I. 6.6.4

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 3,5 MM

89,925.00

I. 6.6.5

1 M2 PLAFOND AKUSTIK (30 X 30) CM

22,112.50

I. 6.6.6

1 M2 PLAFOND AKUSTIK (30 X 60) CM

12,462.50

I. 6.6.7

1 M2 PLAFOND AKUSTIK (60 X 120) CM

12,462.50

I. 6.6.8

1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 4 MM

32,375.00

I. 6.6.9

1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 6 MM

57,425.00

I. 6.6.10

1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 2 MM

29,215.63

I. 6.6.11

1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 6 MM

42,575.00

I. 6.6.12

1 M2 PLAFOND TEAKWOOD ( 30 x 60 ) cm, TEBAL 4 MM

48,323.00

I. 6.6.13

1 M2 PLAFOND TEAKWOOD ( 60 x 120 ) cm, TEBAL 4 MM

57,650.00

I. 6.6.14

1M2 PLAFOND LAT KAYU JATI

199,405.83

Bab XIII.Rekapitulasi Harga Hal 15

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

I. 6.6.15

1M2 PLAFOND LAT KAYU MERANTI

86,605.83

I. 6.6.16

1M2 PLAFOND LAT KAYU BENGKIRAI

I. 6.6.17

1M2 PLAFOND SOFTBOARD

41,442.50

I. 6.6.18

1M2 PLAFOND AKUSTIK 60 X 120 CM + RANGKA ALUMUNIUM

47,562.50

I. 6.6.19

1M2 PLAFOND KAYU PROFIL

18,335.83

I. 6.6.20

1M2 PLAFOND ASBES ( 1,00 X 1,00 ) M, TEBAL 3,2MM RANGKA MERANTI

145,210.00

I. 6.6.21

1M2 PLAFOND PLYWOOD 4 MM + RANGKA KAYU MERANTI

122,147.50

I. 6.6.22

1M2 PLAFOND AKUSTIK (30 X 60 ) CM + RANGKA KAYU MERANTI

100,110.00

I. 6.6.23

1M2 PLAFOND AKUSTIK (30 X 30 ) CM + RANGKA KAYU MERANTI

114,972.50

I. 6.6.24

1M2 PLAFOND GYPSUM BOARD, TEBAL 9 MM

175,405.83

35,610.00

J. PEKERJAAN SANITAIR
J. 6.6.1

MEMASANG 1 BH CLOSED DUDUK / MONOBLOK

J. 6.6.2

MEMASANG 1 BH CLOSED JONGKOK KERAMIK

427,170.83

J. 6.6.3

MEMASANG 1 BH CLOSED JONGKOK TERASO

305,270.83

J. 6.6.4

MEMASANG 1 BH URINOIR

2,575,737.50

J. 6.6.5

MEMASANG 1 BH WASTAFEL

2,621,987.50

J. 6.6.6

MEMASANG 1 BH BAK MANDI TERASO VOLUME 0.30 M3

377,087.50

J. 6.6.7

MEMASANG 1 BH BAK MANDI FIBREGLASS VOLUME 0,30 M3

525,550.00

J. 6.6.8

MEMASANG 1 BH BAK AIR BATU BATA VOLUME 0,3 M3 ( 60 x 60 )

J. 6.6.9

MEMASANG 1 BH BADKIP PORSELEN

J. 6.6.10

MEMASANG 1 BH BAK BETON VOLUME 1 M3 AIR

J. 6.6.11

MEMASANG 1 BH BAK FIBERGLASS VOLUME 1 M3 AIR

J. 6.6.12

MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.15 CM

1,940,075.00

1,796,945.00
80,250.00
17,881,412.50
1,119,000.00
10,891.15

Bab XIII.Rekapitulasi Harga Hal 16

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

J. 6.6.13

MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.20 CM

13,785.10

J. 6.6.14

MEMASANG 1M' PIPA BETON, DIAMETER 15 - 20 CM

35,623.20

J. 6.6.15

MEMASANG 1M' PIPA BETON, DIAMETER 30 - 100 CM

71,464.85

J. 6.6.16

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (30X30)CM TINGGI 35 CM

374,601.00

J. 6.6.17

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (45X45)CM TINGGI 50 CM

301,492.50

J. 6.6.18

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (60 x 60)CM TINGGI 65 CM

475,165.80

J. 6.6.19

MEMASANG 1M' PIPA GALVANIS DIAMETER 1/2"

92,725.00

J. 6.6.20

MEMASANG 1M' PIPA GALVANIS DIAMETER 3/4"

160,852.50

J. 6.6.21

MEMASANG 1M' PIPA GALVANIS DIAMETER 1 "

J. 6.6.22

MEMASANG 1M' PIPA GALVANIS DIAMETER 1 1/2 "

151,890.00

J. 6.6.23

MEMASANG 1M' PIPA GALVANIS DIAMETER 3"

298,496.50

J. 6.6.24

MEMASANG 1M' PIPA GALVANIS DIAMETER 4 "

427,287.50

J. 6.6.25

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1/2 "

36,860.83

J. 6.6.26

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3/4"

14,837.92

J. 6.6.27

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 "

16,872.29

J. 6.6.28

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 1/2 "

26,075.42

J. 6.6.29

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2"

46,716.25

J. 6.6.30

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2 1/2"

26,075.42

J. 6.6.31

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3"

74,900.00

J. 6.6.32

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 4"

73,672.92

J. 6.6.33

MEMASANG 1BH BAK CUCI PIRING STAINLES STEEL

255,012.50

J. 6.6.34

MEMASANG 1 BH BAK CUCI PIRING TERASO

409,625.00

J. 6.6.35

MEMASANG 1BH KRAN DIAMETER 3/4" ATAU 1/2"

92,725.00

33,775.00

Bab XIII.Rekapitulasi Harga Hal 17

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO
J. 6.6.36

URAIAN PEKERJAAN
MEMASANG 1BH FLOOR DRAIN

JUMLAH HARGA (Rp)


43,675.00

K. PEKERJAAN BESI DAN ALUMINIUM


K. 6.6.1

1 KG PASANG RANGKA ATAP BAJA

5,819.17

K. 6.6.2

1 M2 PASANG PINTU BESI BAJA

4,192.50

K. 6.6.3

1 M2 PASANG JENDELA BESI

139,518.75

K. 6.6.4

1 M2 PASANG JENDELA BESI TAHAN API

149,660.00

K. 6.6.5

1 M2 PASANG PINTU GULUNG BESI

159,450.00

K. 6.6.6

1 M2 PASANG PINTU LIPAT

K. 6.6.7

1 M2 PASANG PINTU SUNSCREEN ALLUMUNIUM

K. 6.6.8

1 M2 PASANG ROLLING DOOR

171,015.00

K. 6.6.9

1 M2 PASANG PINTU ALLUMUNIUM

139,515.00

K. 6.6.10

1 M2 PASANG VENETIONS BLINDS

46,506.25

K. 6.6.11

1 M2 PASANG VERTIKALS BLINDS

46,506.25

K. 6.6.12

1 M2 PASANG TERALI BESI

K. 6.6.13

1 M2 PASANG KAWAT HARMONIKA

54,254.13

K. 6.6.14

1 M2 PASANG KAWAT NYAMUK

45,239.17

K. 6.6.15

1 M2 PASANG KAWAT KASSA

26,264.17

K. 6.6.16

1 M2 PASANG KAWAT BURUNG

142,429.17

K. 6.6.17

1 M2 PASANG JENDELA NAKO & TRALIS

387,051.67

K. 6.6.18

1 M' PASANG TALANG DATAR, SENG BLJS 28

122,625.83

K. 6.6.19

1 M' PASANG TALANG MIRING, SENG BLJS 28

169,219.17

K. 6.6.20

1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 28

161,527.08

K. 6.6.21

1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 24

167,459.17

4,192.50
66,700.00

516,645.00

Bab XIII.Rekapitulasi Harga Hal 18

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

L. PEKERJAAN KUNCI DAN KACA


L. 6.6.1

1 BUAH PASANG KUNCI TANAM ANTIK

50,025.00

L. 6.6.2

1 BUAH PASANG KUNCI TANAM BIASA

5,175.00

L. 6.6.3

1 BUAH PASANG KUNCI KAMAR MANDI

35,837.50

L. 6.6.4

1 BUAH PASANG KUNCI SILINDER

28,040.00

L. 6.6.5

1 BUAH PASANG ENGSEL PINTU

40,034.03

L. 6.6.6

1 BUAH PASANG ENGSEL JENDELA KUPU - KUPU

23,754.17

L. 6.6.7

1 BUAH PASANG ENGSEL ANGIN

17,350.00

L. 6.6.8

1 BUAH PASANG SPRING KNIP

12,506.25

L. 6.6.9

1 BUAH PASANG KAIT ANGIN

24,506.25

L. 6.6.10

1 BUAH PASANG DOOR CLOSER

41,687.50

L. 6.6.11

1 BUAH PASANG KUNCI SELOT

16,675.00

L. 6.6.12

1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER

41,687.50

L. 6.6.13

1 BUAH PASANG DOOR STOP

L. 6.6.14

1 BUAH PASANG REL PINTU DORONG

50,025.00

L. 6.6.15

1 BUAH PASANG KUNCI LEMARI

45,843.75

L. 6.6.16

1 M2 PASANG KACA, TEBAL 3 MM

105,676.25

L. 6.6.17

1 M2 PASANG KACA, TEBAL 5 MM

125,036.25

L. 6.6.18

1 M2 PASANG KACA, TEBAL 8 MM

153,451.25

L. 6.6.19

1 M2 PASANG KACA GELAP, TEBAL 5 MM

162,293.75

L. 6.6.20

1 M2 PASANG KACA CERMIN, TEBAL 5 MM

137,906.25

L. 6.6.21

1 M2 PASANG KACA CERMIN, TEBAL 6 MM

137,906.25

L. 6.6.22

1 M2 PASANG KACA CERMIN, TEBAL 8 MM

165,755.00

8,337.50

Bab XIII.Rekapitulasi Harga Hal 19

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

L. 6.6.23

1 M2 PASANG KACA " WIREGLASS", TEBAL 5 MM

L. 6.6.24

1 M2 PASANG KACA PATRI, TEBAL 5 MM

JUMLAH HARGA (Rp)


12,506.25
452,506.25

M. PEKERJAAN PENUTUP LANTAI & DINDING


M.6.6.1

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 40 X 40 CM

92,220.63

M.6.6.2

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 30 X 30 CM

84,955.63

M.6.6.3

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20 X 20 CM

87,220.63

M.6.6.4

1 M2 PASANG LANTAI UBIN WARNA UKURAN 40 X 40 CM

92,259.88

M.6.6.5

1 M2 PASANG LANTAI UBIN WARNA UKURAN 30 x 30 CM

80,019.88

M.6.6.6

1 M2 PASANG LANTAI UBIN WARNA UKURAN 20 x 20 CM

89,489.88

M.6.6.7

1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 x 40 CM

105,673.75

M.6.6.8

1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 x 30 CM

118,175.42

M.6.6.9

1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40 X 40 CM

149,202.92

M.6.6.10

1 M2 PASANG LANTAI UBIN GRANITO UKURAN 30 X 30 CM

153,707.50

M.6.6.11

1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 40 X 40 CM

43,952.92

M.6.6.12

1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 30 X 30 CM

45,172.03

M.6.6.13

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM

49,126.17

M.6.6.14

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM

76,805.42

M.6.6.15

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM

90,365.63

M.6.6.16

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 15 X 20 CM

17,793.00

M.6.6.17

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 30 CM

12,778.56

M.6.6.18

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 40 CM

13,660.52

M.6.6.19

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 20 CM

15,414.58

M.6.6.20

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 30 CM

13,330.32

Bab XIII.Rekapitulasi Harga Hal 20

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

M.6.6.21

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 40 CM

16,125.85

M.6.6.22

1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 30 CM

19,592.58

M.6.6.23

1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 40 CM

26,654.58

M.6.6.24

1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 40 CM

28,017.08

M.6.6.25

1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 30 CM

70,822.83

M.6.6.26

1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM

60,832.83

M.6.6.27

1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM

60,832.83

M.6.6.28

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM

60,832.83

M.6.6.29

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM

59,190.11

M.6.6.30

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 30 CM

60,832.83

M.6.6.31

1 M2 PASANG TERASO COR DITEMPAT

56,812.50

M.6.6.32

1 M2 PASANG TERALUC COR DITEMPAT, TEBAL 3 CM

56,812.50

M.6.6.33

1 M2 PASANG UBIN TAHAN ASAM

38,637.50

M.6.6.34

1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 20 CM

164,726.50

M.6.6.35

1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 10 CM

184,643.17

M.6.6.36

1 M2 PASANG LANTAI KERAMIK ARTISTIK 5 X 20 CM

164,726.50

M.6.6.37

1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 20 CM

22,282.83

M.6.6.38

1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 10 CM

20,229.50

M.6.6.39

1 M2 PASANG PLINT KERAMIK ARTISTIK 5 X 20 CM

17,767.42

M.6.6.40

1 M' INTERNAL COVE ARTISTIK ( 5 X 5 X 20 ) CM

M.6.6.41

1 M' PASANG PLINT VINYL TANPA ADUKAN

M.6.6.42

1 M2 PASANG LANTAI KERAMIK 10 X 20 CM

139,622.50

M.6.6.43

1 M2 PASANG LANTAI KERAMIK 15 X 15 CM

142,126.50

103,448.25
10,900.00

Bab XIII.Rekapitulasi Harga Hal 21

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

M.6.6.44

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM

169,726.50

M.6.6.45

1 M2 PASANG LANTAI KERAMIK 25 X 25 CM

148,726.50

M.6.6.46

1 M2 PASANG LANTAI KERAMIK 15 X 20 CM

178,296.50

M.6.6.47

1 M2 PASANG LANTAI KERAMIK 30 x 30 CM

146,477.34

M.6.6.48

1 M2 PASANG LANTAI KERAMIK 30 x 30 CM ANTI SLIP

154,979.03

M.6.6.49

1 M2 PASANG LANTAI KERAMIK 10 x 33 CM

104,726.50

M.6.6.50

1 M2 PASANG LANTAI MOSAIK 30 X 30 CM, EX. LOKAL

112,407.92

M.6.6.51

1 M2 PASANG LANTAI MARMER

633,147.92

M.6.6.52

1 M2 PASANG LANTAI KARPET 100 % WOOL

23,162.50

M.6.6.53

1 M2 PASANG LANTAI KARPET 80 % WOOL, 20% NYLON

23,162.50

M.6.6.54

1 M2 PASANG UNDRLYER, TEBAL 6 MM

16,350.00

M.6.6.55

1 M2 PASANG LANTAI KARPET

23,162.50

M.6.6.56

1 M2 PASANG LANTAI PARQUET JATI

18,530.00

M.6.6.57

1 M2 PASANG GYMFLOOR

65,312.50

M.6.6.58

1 M2 PASANG DINDING PORSELIN 11 X 11 CM, PUTIH

106,957.50

M.6.6.59

1 M2 PASANG DINDING PORSELIN 11 X 11 CM, WARNA

106,957.50

M.6.6.60

1 M2 PASANG DINDING PORSELIN 15 X 15 CM, PUTIH

174,640.21

M.6.6.61

1 M2 PASANG DINDING PORSELIN 15 X 15 CM, WARNA

227,982.50

M.6.6.62

1 M2 PASANG DINDING PORSELIN 10 X 20 CM, WARNA

226,982.50

M.6.6.63

1 M2 PASANG DINDING PORSELIN 20 X 20 CM, WARNA

222,140.00

M.6.6.64

1 M2 PASANG DINDING KERAMIK ARTISTIK 10 X 20 CM

201,982.50

M.6.6.65

1 M2 PASANG DINDING KERAMIK ARTISTIK 5 X 20 CM

151,982.50

M.6.6.66

1 M2 PASANG DINDING KERAMIK 10 X 20 CM

153,371.39

Bab XIII.Rekapitulasi Harga Hal 22

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

M.6.6.67

1 M2 PASANG DINDING KERAMIK 15 x 15 CM

140,232.50

M.6.6.68

1 M2 PASANG DINDING KERAMIK 20 x 20 CM

129,806.57

M.6.6.69

1 M2 PASANG DINDING KERAMIK 10 x 20 CM

128,183.89

M.6.6.70

1 M2 PASANG DINDING MARMER

180,490.75

M.6.6.71

1 M2 PASANG DINDING BATA PELAPIS 7 X 3 X 24 CM

109,232.42

M.6.6.72

1 M2 PASANG DINDING BATA KLINKER 5 X 5 X 24 CM

148,590.75

M.6.6.73

1 M2 PASANG DINDING BATU PAROS

90,856.25

M.6.6.74

1 M2 PASANG DINDING BATU TEMPEL HITAM

88,506.25

M.6.6.75

1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL I

20,437.50

M.6.6.76

1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL II

20,437.50

M.6.6.77

1 M2 PASANG LANTAI VINYL ASBES 30 X 30 CM

20,437.50

M.6.6.78

1 M2 PASANG LANTAI VINYL MOTIF KEMBANG 30 X 30 CM

20,437.50

M.6.6.79

1 M2 PASANG WALL COVERING LEBAR 50 CM

55,062.50

M.6.6.80

1 M2 FLOOR HARDENER FERROVAX

16,350.00

M.6.6.81

1 M2 FLOOR HARDENER MASTERCRON

16,350.00

M.6.6.82

1 M2 PLINT KAYU 2 X 10 CM

34,150.00

N. PEKERJAAN CAT - CATAN


N. 6.6.1

1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA

14,250.00

N. 6.6.2

1 M2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT

14,775.00

N. 6.6.3

1 M2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL

14,775.00

N. 6.6.4

1 M2 MENYABUN PERMUKAAN TEMBOK LAMA

14,775.00

N. 6.6.5

1 M2 MENGEROK KARAT ATAU CAT LAMA PERMUKAAN BAJA DENGAN PANCAR

N. 6.6.6

1 M2 MENDEMPUL DAN MENGGOSOK KAYU

792,197.11
7,622.08

Bab XIII.Rekapitulasi Harga Hal 23

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

N. 6.6.7

1 M2 PENGECATAN BIDANG KAYU LAMA

22,329.17

N. 6.6.8

1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR,

24,539.17

N. 6.6.9

1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR )

35,016.67

N. 6.6.10

1 M2 PELABURAN BIDANG KAYU DENGAN TEAK OIL

24,950.50

N. 6.6.11

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

29,912.00

N. 6.6.12

1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER

N. 6.6.13

1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS

24,333.33

N. 6.6.14

1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir,

11,266.00

N. 6.6.15

1 M2 PENGECATAN TEMBOK LAMA

7,631.30

N. 6.6.16

1 M2 MELABUR TEMBOK DENGAN KALKARIUM

4,982.50

N. 6.6.17

1 M2 MELABUR TEMBOK DENGAN KAPUR SIRIH

15,027.50

N. 6.6.18

1 M2 MELABUR TEMBOK LAMA DENGAN KAPUR SIRIH ( UNTUK PEMELILHARAAN )

10,375.00

N. 6.6.19

1 M2 PEMASANGAN WALL PAPER

17,437.50

N. 6.6.20

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

19,480.00

N. 6.6.21

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH

38,480.00

N. 6.6.22

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

7,600.00

N. 6.6.23

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

5,880.00

N. 6.6.24

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

121,000.00

N. 6.6.25

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA SEMPROT

101,000.00

6,610.00

Bab XIII.Rekapitulasi Harga Hal 24

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

G. PEKERJAAN BETON
G.6.6.1

1 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr

834,025.00

G.6.6.2

1 M3 BETON TUMBUK 1 pc ; 3 ps ; 6 kr

818,725.00

G.6.6.3

1 M3 BETON TUMBUK 1 pc ; 4 ps ; 6 kr

788,025.00

G.6.6.4

1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK 1 pc ; 3 ps ; 5 kr

100,150.00

G.6.6.5.

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr)

820,725.00

G.6.6.6

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)

907,625.00

G.6.6.7

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;2,5 kr)

958,725.00

G.6.6.8

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 3 kr)

G.6.6.9

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;2,5 kr)

1,008,425.00

G.6.6.10

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ; 2 kr)

1,090,325.00

G.6.6.11

1M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON

1,093,125.00

G.6.6.12

1M3 MEMBUAT BETON DENGAN PUZZDITH - 100 XR

G.6.6.13

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr)

1,067,425.00

G.6.6.14

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)

1,033,425.00

G.6.6.15

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;3kr)

1,107,225.00

G.6.6.16

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 2,5 kr)

1,132,125.00

G.6.6.17

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ;1kr)

1,323,625.00

G.6.6.18

1M3 MEMBUAT BETON KEDAP AIR DENGAN STROROX - 100

1,132,125.00

G.6.6.19

1M' MEMASANG PVC WATERSTOP LEBAR 150 MM

G.6.6.20

1M' MEMASANG PVC WATERSTOP LEBAR 200 MM

5,612.50

G.6.6.21

1M' MEMASANG PVC WATERSTOP LEBAR 230 MM

32,925.00

G.6.6.22

1M' MEMASANG PVC WATERSTOP LEBAR 250 MM

32,925.00

G.6.6.23

1M' MEMASANG PVC WATERSTOP LEBAR 300 MM

32,925.00

G.6.6.24

1M' MEMASANG PVC WATERSTOP LEBAR 320 MM

G.6.6.25

1 KG PEMBESIAN DG BESI POLOS

11,750.00

G.6.6.25

1 KG PEMBESIAN DG BESI ULIR

13,587.50

G.6.6.26

1 KG KABEL PRESSTRESSED POLOS/STRANDS

11,385.00

G.6.6.27

1 KG JARING KAWAT BAJA

G.6.6.28

1M2 PASANG BEKISTING UNTUK PONDASI

130,900.00

G. 6.6.29

1 M2 PASANG BEKISTING UNTUK SLOOF ( 2 x pakai )

121,650.00

G. 6.6.30

1 M2 PASANG BEKISTING UNTUK KOLOM ( 2 x pakai )

216,762.50

874,225.00

971,425.00

5,225.00

5,350.00

48,442.00

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

G. 6.6.31

1 M2 PASANG BEKISTING UNTUK BALOK ( 2 x pakai )

224,462.50

G. 6.6.32

1 M2 PASANG BEKISTING UNTUK LANTAI ( 2 x pakai )

255,862.50

G. 6.6.33

1 M2 PASANG BEKISTING UNTUK DINDING ( 2 x pakai )

447,222.50

G. 6.6.34

1 M2 PASANG BEKISTING UNTUK TANGGA

213,262.50

G. 6.6.35

1M3 MEMBUAT BETON DENGAN MUTU K 225

1,431,650.00

G. 6.6.36

1M3 MEMBUAT BETON DENGAN MUTU K 275

1,403,000.00

G. 6.6.37

1 M2 PASANG JEMBATAN COR

G. 6.6.38

1M3 MEMBUAT PONDASI BETON BERTULANG (150KG BESI + BEKISTING)

3,337,925.00

G. 6.6.39

1M3 MEMBUAT SLOOF BETON BERTULANG (200KG BESI + BEKISTING)

4,137,091.67

G. 6.6.40

1M3 MEMBUAT KOLOM BETON BERTULANG (300KG BESI + BEKISTING)

6,786,575.00

G. 6.6.41

1M3 MEMBUAT BALOK BETON BERTULANG (200KG BESI + BEKISTING)

5,246,625.00

G. 6.6.42

1M3 MEMBUAT BALOK BETON BERTULANG (150KG BESI + BEKISTING)

4,801,975.00

G. 6.6.43

1M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)

4,614,875.00

G. 6.6.44

1M3 MEMBUAT TANGGA BETON BERTULANG (200KG BESI + BEKISTING)

4,892,333.33

G. 6.6.45

1M3 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11x11) CM

62,570.83

G. 6.6.46

1M' MEMBUAT RING BALOK BETON BERTULANG (10X15) CM

73,601.67

84,830.00

H. PEKERJAAN PENUTUP ATAP


H. 6.6.1

1M2 PASANG ATAP GENTENG PALENTONG KECIL

14,700.00

H. 6.6.2

1M2 PASANG ATAP GENTENG KODOK /GLAZZUR

77,200.00

H. 6.6.3

1M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR

13,500.00

H. 6.6.4

1M2 PASANG ATAP GENTENG BUBUNG PALENTONG

56,970.00

H. 6.6.5

1M' PASANG BUBUNG GENTENG KODOK

74,470.00

H. 6.6.6

1M2 PASANG BUBUNG GENTENG PALENTONG BESAR

45,186.14

H. 6.6.7

1M2 PASANG ROOFLIGHT FIBREGLASS (180X90) CM

11,416.25

H. 6.6.8

1m2 PASANG ATAP ASBES GELOMBANG (2,50X0,92)X5MM

29,686.67

H. 6.6.9

1m2 PASANG ATAP ASBES GELOMBANG (2,25X0,92)X5MM

29,820.00

H. 6.6.10

1m2 PASANG ATAP ASBES GELOMBANG (2,00X0,92)X5MM

29,670.00

H. 6.6.11

1m2 PASANG ATAP ASBES GELOMBANG (1,80X0,92)X5MM

33,120.00

H. 6.6.12

1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,05)X4 MM

23,920.00

H. 6.6.13

1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,05)X4 MM

25,530.00

H. 6.6.14

1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,05)X4 MM

25,430.00

H. 6.6.15

1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,05)X4 MM

27,040.00

H. 6.6.16

1m2 PASANG ATAP ASBES GELOMBANG (1,5X1,05)X4 MM

33,710.00

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

H. 6.6.17

1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,08)X6 MM

23,820.00

H. 6.6.18

1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,08)X6 MM

24,050.00

H. 6.6.19

1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,08)X6 MM

25,890.00

H. 6.6.20

1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,08)X6 MM

26,580.00

H. 6.6.21

1m2 PASANG ATAP ASBES GELOMBANG (1,80X1,08)X6 MM

H. 6.6.22

1M' PASANG BUBUNG STEL GELOMBANG 0,92 M

134,645.00

H. 6.6.23

1M' PASANG NOK STEL GELOMBANG 1,05 M

134,645.00

H. 6.6.24

1M' PASANG NOK STEL GELOMBANG 1,08 M

134,645.00

H. 6.6.25

1M' PASANG NOK paten 0,92 m

134,645.00

H. 6.6.26

1M' PASANG NOK PATEN 1,05 M

134,645.00

H. 6.6.27

1M' PASANG NOK PATEN 1,08 M

134,645.00

H. 6.6.28

1M' PASANG NOK STEL RATA 0,92 M

137,275.00

H. 6.6.29

1M' PASANG NOK STEL RATA 1,05 M

137,275.00

H. 6.6.30

1M2 PASANG ATAP GENTENG BETON

58,467.50

H. 6.6.31

1M2 PASANG ATAP GENTENG ASPAL

79,292.50

H. 6.6.32

1M2 PASANG ATAP GENTENG METAL

H. 6.6.33

1M' PASANG ATAP SIRAP

H. 6.6.34

1M' PASANG NOK GENTENG BETON

90,805.83

H. 6.6.35

1M' PASANG NOK GENTENG ASPAL

40,633.33

H. 6.6.36

1M' PASANG NOK GENTENG METAL

27,129.17

H. 6.6.37

1 M' MEMASANG BUBUNGAN ATAP SIRAP L 40 cm

56,946.67

H. 6.6.38

1 M2 MEMASANG ATAP SENG

39,580.83

H. 6.6.39

1 M2 MEMASANG BUBUNGAN ATAP SENG

79,500.00

H. 6.6.40

1 M2 PASANG ATAP ALUMUNIUM

62,293.33

H. 6.6.41

1 M2 PASANG NOK ALUMUNIUM

H. 6.6.42

1 M2 PASANG ALUMUNIUM FOIL /SISALATION

28,420.00

81,325.00
122,221.67

77,986.67
485,225.00

I. PEKERJAAN PLAFOND
I. 6.6.1

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 6 MM

39,765.00

I. 6.6.2

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 5 MM

39,765.00

I. 6.6.3

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 4 MM

89,925.00

I. 6.6.4

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 3,5 MM

89,925.00

I. 6.6.5

1 M2 PLAFOND AKUSTIK (30 X 30) CM

22,112.50

I. 6.6.6

1 M2 PLAFOND AKUSTIK (30 X 60) CM

12,462.50

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

I. 6.6.7

1 M2 PLAFOND AKUSTIK (60 X 120) CM

12,462.50

I. 6.6.8

1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 4 MM

32,375.00

I. 6.6.9

1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 6 MM

57,425.00

I. 6.6.10

1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 2 MM

29,215.63

I. 6.6.11

1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 6 MM

42,575.00

I. 6.6.12

1 M2 PLAFOND TEAKWOOD ( 30 x 60 ) cm, TEBAL 4 MM

48,323.00

I. 6.6.13

1 M2 PLAFOND TEAKWOOD ( 60 x 120 ) cm, TEBAL 4 MM

I. 6.6.14

1M2 PLAFOND LAT KAYU JATI

I. 6.6.15

1M2 PLAFOND LAT KAYU MERANTI

I. 6.6.16

1M2 PLAFOND LAT KAYU BENGKIRAI

I. 6.6.17

1M2 PLAFOND SOFTBOARD

41,442.50

I. 6.6.18

1M2 PLAFOND AKUSTIK 60 X 120 CM + RANGKA ALUMUNIUM

47,562.50

I. 6.6.19

1M2 PLAFOND KAYU PROFIL

I. 6.6.20

1M2 PLAFOND ASBES ( 1,00 X 1,00 ) M, TEBAL 3,2MM RANGKA MERANTI

145,210.00

I. 6.6.21

1M2 PLAFOND PLYWOOD 4 MM + RANGKA KAYU MERANTI

122,147.50

I. 6.6.22

1M2 PLAFOND AKUSTIK (30 X 60 ) CM + RANGKA KAYU MERANTI

100,110.00

I. 6.6.23

1M2 PLAFOND AKUSTIK (30 X 30 ) CM + RANGKA KAYU MERANTI

114,972.50

I. 6.6.24

1M2 PLAFOND GYPSUM BOARD, TEBAL 9 MM

57,650.00
199,405.83
86,605.83
175,405.83

18,335.83

35,610.00

J. PEKERJAAN SANITAIR
J. 6.6.1

MEMASANG 1 BH CLOSED DUDUK / MONOBLOK

J. 6.6.2

MEMASANG 1 BH CLOSED JONGKOK KERAMIK

1,940,075.00

J. 6.6.3

MEMASANG 1 BH CLOSED JONGKOK TERASO

J. 6.6.4

MEMASANG 1 BH URINOIR

2,575,737.50

J. 6.6.5

MEMASANG 1 BH WASTAFEL

2,621,987.50

J. 6.6.6

MEMASANG 1 BH BAK MANDI TERASO VOLUME 0.30 M3

377,087.50

J. 6.6.7

MEMASANG 1 BH BAK MANDI FIBREGLASS VOLUME 0,30 M3

525,550.00

J. 6.6.8

MEMASANG 1 BH BAK AIR BATU BATA VOLUME 0,3 M3 ( 60 x 60 )

J. 6.6.9

MEMASANG 1 BH BADKIP PORSELEN

427,170.83
305,270.83

1,796,945.00
80,250.00

J. 6.6.10

MEMASANG 1 BH BAK BETON VOLUME 1 M3 AIR

17,881,412.50

J. 6.6.11

MEMASANG 1 BH BAK FIBERGLASS VOLUME 1 M3 AIR

J. 6.6.12

MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.15 CM

10,891.15

J. 6.6.13

MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.20 CM

13,785.10

J. 6.6.14

MEMASANG 1M' PIPA BETON, DIAMETER 15 - 20 CM

1,119,000.00

35,623.20
Hal : 520

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

J. 6.6.15

MEMASANG 1M' PIPA BETON, DIAMETER 30 - 100 CM

J. 6.6.16

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (30X30)CM TINGGI 35 CM

374,601.00

71,464.85

J. 6.6.17

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (45X45)CM TINGGI 50 CM

301,492.50

J. 6.6.18

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (60 x 60)CM TINGGI 65 CM

475,165.80

J. 6.6.19

MEMASANG 1M' PIPA GALVANIS DIAMETER 1/2"

92,725.00

J. 6.6.20

MEMASANG 1M' PIPA GALVANIS DIAMETER 3/4"

160,852.50

J. 6.6.21

MEMASANG 1M' PIPA GALVANIS DIAMETER 1 "

J. 6.6.22

MEMASANG 1M' PIPA GALVANIS DIAMETER 1 1/2 "

151,890.00

J. 6.6.23

MEMASANG 1M' PIPA GALVANIS DIAMETER 3"

298,496.50

J. 6.6.24

MEMASANG 1M' PIPA GALVANIS DIAMETER 4 "

427,287.50

J. 6.6.25

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1/2 "

36,860.83

J. 6.6.26

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3/4"

14,837.92

J. 6.6.27

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 "

16,872.29

J. 6.6.28

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 1/2 "

26,075.42

J. 6.6.29

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2"

46,716.25

J. 6.6.30

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2 1/2"

26,075.42

J. 6.6.31

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3"

74,900.00

J. 6.6.32

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 4"

J. 6.6.33

MEMASANG 1BH BAK CUCI PIRING STAINLES STEEL

255,012.50

J. 6.6.34

MEMASANG 1 BH BAK CUCI PIRING TERASO

409,625.00

J. 6.6.35

MEMASANG 1BH KRAN DIAMETER 3/4" ATAU 1/2"

33,775.00

J. 6.6.36

MEMASANG 1BH FLOOR DRAIN

43,675.00

92,725.00

73,672.92

K. PEKERJAAN BESI
K. 6.6.1

1 KG PASANG RANGKA ATAP BAJA

K. 6.6.2

1 M2 PASANG PINTU BESI BAJA

5,819.17

K. 6.6.3

1 M2 PASANG JENDELA BESI

139,518.75

K. 6.6.4

1 M2 PASANG JENDELA BESI TAHAN API

149,660.00

K. 6.6.5

1 M2 PASANG PINTU GULUNG BESI

159,450.00

K. 6.6.6

1 M2 PASANG PINTU LIPAT

K. 6.6.7

1 M2 PASANG PINTU SUNSCREEN ALLUMUNIUM

K. 6.6.8

1 M2 PASANG ROLLING DOOR

171,015.00

K. 6.6.9

1 M2 PASANG PINTU ALLUMUNIUM

139,515.00

K. 6.6.10

1 M2 PASANG VENETIONS BLINDS

4,192.50

4,192.50
66,700.00

46,506.25

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

K. 6.6.11

1 M2 PASANG VERTIKALS BLINDS

K. 6.6.12

1 M2 PASANG TERALI BESI

46,506.25

K. 6.6.13

1 M2 PASANG KAWAT HARMONIKA

54,254.13

K. 6.6.14

1 M2 PASANG KAWAT NYAMUK

45,239.17

K. 6.6.15

1 M2 PASANG KAWAT KASSA

K. 6.6.16

1 M2 PASANG KAWAT BURUNG

142,429.17

K. 6.6.17

1 M2 PASANG JENDELA NAKO & TRALIS

387,051.67

K. 6.6.18

1 M' PASANG TALANG DATAR, SENG BLJS 28

122,625.83

K. 6.6.19

1 M' PASANG TALANG MIRING, SENG BLJS 28

169,219.17

K. 6.6.20

1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 28

161,527.08

K. 6.6.21

1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 24

167,459.17

516,645.00

26,264.17

L. PEKERJAAN KUNCI DAN KACA


L. 6.6.1

1 BUAH PASANG KUNCI TANAM ANTIK

L. 6.6.2

1 BUAH PASANG KUNCI TANAM BIASA

50,025.00

L. 6.6.3

1 BUAH PASANG KUNCI KAMAR MANDI

35,837.50

L. 6.6.4

1 BUAH PASANG KUNCI SILINDER

28,040.00

L. 6.6.5

1 BUAH PASANG ENGSEL PINTU

40,034.03

L. 6.6.6

1 BUAH PASANG ENGSEL JENDELA KUPU - KUPU

23,754.17

L. 6.6.7

1 BUAH PASANG ENGSEL ANGIN

17,350.00

L. 6.6.8

1 BUAH PASANG SPRING KNIP

12,506.25

L. 6.6.9

5,175.00

1 BUAH PASANG KAIT ANGIN

24,506.25

L. 6.6.10

1 BUAH PASANG DOOR CLOSER

41,687.50

L. 6.6.11

1 BUAH PASANG KUNCI SELOT

16,675.00

L. 6.6.12

1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER

41,687.50

L. 6.6.13

1 BUAH PASANG DOOR STOP

L. 6.6.14

1 BUAH PASANG REL PINTU DORONG

L. 6.6.15

1 BUAH PASANG KUNCI LEMARI

L. 6.6.16

1 M2 PASANG KACA, TEBAL 3 MM

105,676.25

L. 6.6.17

1 M2 PASANG KACA, TEBAL 5 MM

125,036.25

L. 6.6.18

1 M2 PASANG KACA, TEBAL 8 MM

153,451.25

L. 6.6.19

1 M2 PASANG KACA GELAP, TEBAL 5 MM

162,293.75

L. 6.6.20

1 M2 PASANG KACA CERMIN, TEBAL 5 MM

137,906.25

L. 6.6.21

1 M2 PASANG KACA CERMIN, TEBAL 6 MM

137,906.25

8,337.50
50,025.00
45,843.75

NO

URAIAN PEKERJAAN

L. 6.6.22

1 M2 PASANG KACA CERMIN, TEBAL 8 MM

L. 6.6.23

1 M2 PASANG KACA " WIREGLASS", TEBAL 5 MM

L. 6.6.24

1 M2 PASANG KACA PATRI, TEBAL 5 MM

JUMLAH HARGA (Rp)


165,755.00
12,506.25
452,506.25

M. PEKERJAAN PENUTUP LANTAI & DINDING


M.6.6.1

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 40 X 40 CM

92,220.63

M.6.6.2

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 30 X 30 CM

84,955.63

M.6.6.3

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20 X 20 CM

87,220.63

M.6.6.4

1 M2 PASANG LANTAI UBIN WARNA UKURAN 40 X 40 CM

92,259.88

M.6.6.5

1 M2 PASANG LANTAI UBIN WARNA UKURAN 30 x 30 CM

80,019.88

M.6.6.6

1 M2 PASANG LANTAI UBIN WARNA UKURAN 20 x 20 CM

M.6.6.7

1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 x 40 CM

105,673.75

M.6.6.8

1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 x 30 CM

118,175.42

89,489.88

M.6.6.9

1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40 X 40 CM

149,202.92

M.6.6.10

1 M2 PASANG LANTAI UBIN GRANITO UKURAN 30 X 30 CM

153,707.50

M.6.6.11

1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 40 X 40 CM

43,952.92

M.6.6.12

1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 30 X 30 CM

45,172.03

M.6.6.13

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM

49,126.17

M.6.6.14

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM

76,805.42

M.6.6.15

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM

90,365.63

M.6.6.16

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 15 X 20 CM

17,793.00

M.6.6.17

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 30 CM

12,778.56

M.6.6.18

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 40 CM

13,660.52

M.6.6.19

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 20 CM

15,414.58

M.6.6.20

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 30 CM

13,330.32

M.6.6.21

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 40 CM

16,125.85

M.6.6.22

1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 30 CM

19,592.58

M.6.6.23

1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 40 CM

26,654.58

M.6.6.24

1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 40 CM

28,017.08

M.6.6.25

1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 30 CM

70,822.83

M.6.6.26

1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM

60,832.83

M.6.6.27

1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM

60,832.83

M.6.6.28

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM

60,832.83

M.6.6.29

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM

59,190.11

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

M.6.6.30

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 30 CM

60,832.83

M.6.6.31

1 M2 PASANG TERASO COR DITEMPAT

56,812.50

M.6.6.32

1 M2 PASANG TERALUC COR DITEMPAT, TEBAL 3 CM

56,812.50

M.6.6.33

1 M2 PASANG UBIN TAHAN ASAM

M.6.6.34

1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 20 CM

164,726.50

M.6.6.35

1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 10 CM

184,643.17

M.6.6.36

1 M2 PASANG LANTAI KERAMIK ARTISTIK 5 X 20 CM

164,726.50

M.6.6.37

1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 20 CM

22,282.83

M.6.6.38

1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 10 CM

20,229.50

M.6.6.39

1 M2 PASANG PLINT KERAMIK ARTISTIK 5 X 20 CM

17,767.42

M.6.6.40

1 M' INTERNAL COVE ARTISTIK ( 5 X 5 X 20 ) CM

M.6.6.41

1 M' PASANG PLINT VINYL TANPA ADUKAN

M.6.6.42

1 M2 PASANG LANTAI KERAMIK 10 X 20 CM

139,622.50

M.6.6.43

1 M2 PASANG LANTAI KERAMIK 15 X 15 CM

142,126.50

M.6.6.44

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM

169,726.50

M.6.6.45

1 M2 PASANG LANTAI KERAMIK 25 X 25 CM

148,726.50

M.6.6.46

1 M2 PASANG LANTAI KERAMIK 15 X 20 CM

178,296.50

M.6.6.47

1 M2 PASANG LANTAI KERAMIK 30 x 30 CM

146,477.34

M.6.6.48

1 M2 PASANG LANTAI KERAMIK 30 x 30 CM ANTI SLIP

154,979.03

M.6.6.49

1 M2 PASANG LANTAI KERAMIK 10 x 33 CM

104,726.50

M.6.6.50

1 M2 PASANG LANTAI MOSAIK 30 X 30 CM, EX. LOKAL

112,407.92

M.6.6.51

1 M2 PASANG LANTAI MARMER

633,147.92

M.6.6.52

1 M2 PASANG LANTAI KARPET 100 % WOOL

23,162.50

M.6.6.53

1 M2 PASANG LANTAI KARPET 80 % WOOL, 20% NYLON

23,162.50

M.6.6.54

1 M2 PASANG UNDRLYER, TEBAL 6 MM

16,350.00

M.6.6.55

1 M2 PASANG LANTAI KARPET

23,162.50

M.6.6.56

1 M2 PASANG LANTAI PARQUET JATI

18,530.00

M.6.6.57

1 M2 PASANG GYMFLOOR

M.6.6.58

1 M2 PASANG DINDING PORSELIN 11 X 11 CM, PUTIH

106,957.50

M.6.6.59

1 M2 PASANG DINDING PORSELIN 11 X 11 CM, WARNA

106,957.50

M.6.6.60

1 M2 PASANG DINDING PORSELIN 15 X 15 CM, PUTIH

174,640.21

M.6.6.61

1 M2 PASANG DINDING PORSELIN 15 X 15 CM, WARNA

227,982.50

M.6.6.62

1 M2 PASANG DINDING PORSELIN 10 X 20 CM, WARNA

226,982.50

38,637.50

103,448.25
10,900.00

65,312.50

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

M.6.6.63

1 M2 PASANG DINDING PORSELIN 20 X 20 CM, WARNA

222,140.00

M.6.6.64

1 M2 PASANG DINDING KERAMIK ARTISTIK 10 X 20 CM

201,982.50

M.6.6.65

1 M2 PASANG DINDING KERAMIK ARTISTIK 5 X 20 CM

151,982.50

M.6.6.66

1 M2 PASANG DINDING KERAMIK 10 X 20 CM

153,371.39

M.6.6.67

1 M2 PASANG DINDING KERAMIK 15 x 15 CM

140,232.50

M.6.6.68

1 M2 PASANG DINDING KERAMIK 20 x 20 CM

129,806.57

M.6.6.69

1 M2 PASANG DINDING KERAMIK 10 x 20 CM

128,183.89

M.6.6.70

1 M2 PASANG DINDING MARMER

180,490.75

M.6.6.71

1 M2 PASANG DINDING BATA PELAPIS 7 X 3 X 24 CM

109,232.42

M.6.6.72

1 M2 PASANG DINDING BATA KLINKER 5 X 5 X 24 CM

148,590.75

M.6.6.73

1 M2 PASANG DINDING BATU PAROS

90,856.25

M.6.6.74

1 M2 PASANG DINDING BATU TEMPEL HITAM

88,506.25

M.6.6.75

1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL I

20,437.50

M.6.6.76

1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL II

20,437.50

M.6.6.77

1 M2 PASANG LANTAI VINYL ASBES 30 X 30 CM

20,437.50

M.6.6.78

1 M2 PASANG LANTAI VINYL MOTIF KEMBANG 30 X 30 CM

20,437.50

M.6.6.79

1 M2 PASANG WALL COVERING LEBAR 50 CM

55,062.50

M.6.6.80

1 M2 FLOOR HARDENER FERROVAX

16,350.00

M.6.6.81

1 M2 FLOOR HARDENER MASTERCRON

16,350.00

M.6.6.82

1 M2 PLINT KAYU 2 X 10 CM

34,150.00

N. PEKERJAAN CAT - CATAN


N. 6.6.1

1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA

14,250.00

N. 6.6.2

1 M2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT

14,775.00

N. 6.6.3

1 M2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL

14,775.00

N. 6.6.4

1 M2 MENYABUN PERMUKAAN TEMBOK LAMA

N. 6.6.5

1 M2 MENGEROK KARAT ATAU CAT LAMA PERMUKAAN BAJA DENGAN PANCAR

N. 6.6.6

1 M2 MENDEMPUL DAN MENGGOSOK KAYU

N. 6.6.7

1 M2 PENGECATAN BIDANG KAYU LAMA

22,329.17

N. 6.6.8

1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR,

24,539.17

N. 6.6.9

14,775.00
792,197.11
7,622.08

1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR )

35,016.67

N. 6.6.10

1 M2 PELABURAN BIDANG KAYU DENGAN TEAK OIL

24,950.50

N. 6.6.11

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

29,912.00

N. 6.6.12

1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER

6,610.00

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

N. 6.6.13

1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS

24,333.33

N. 6.6.14

1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir,

11,266.00

N. 6.6.15

1 M2 PENGECATAN TEMBOK LAMA

7,631.30

N. 6.6.16

1 M2 MELABUR TEMBOK DENGAN KALKARIUM

4,982.50

N. 6.6.17

1 M2 MELABUR TEMBOK DENGAN KAPUR SIRIH

15,027.50

N. 6.6.18

1 M2 MELABUR TEMBOK LAMA DENGAN KAPUR SIRIH ( UNTUK PEMELILHARAAN )

10,375.00

N. 6.6.19

1 M2 PEMASANGAN WALL PAPER

17,437.50

N. 6.6.20

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

19,480.00

N. 6.6.21

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH

38,480.00

N. 6.6.22

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

N. 6.6.23

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

5,880.00

N. 6.6.24

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL

121,000.00

N. 6.6.25

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA SEMPROT

101,000.00

7,600.00

834,025.00

TRUE

818,725.00

TRUE

788,025.00

TRUE

100,150.00

TRUE

820,725.00

TRUE

907,625.00

TRUE

958,725.00

TRUE

874,225.00

TRUE

1,008,425.00

TRUE

1,090,325.00

TRUE

1,093,125.00

TRUE

971,425.00

TRUE

1,067,425.00

TRUE

1,033,425.00

TRUE

1,107,225.00

TRUE

1,132,125.00

TRUE

1,323,625.00

TRUE

1,132,125.00

TRUE

5,225.00

TRUE

5,612.50

TRUE

32,925.00

TRUE

32,925.00

TRUE

32,925.00

TRUE

5,350.00

TRUE

11,750.00

TRUE

13,587.50

TRUE

11,385.00

TRUE

48,442.00

TRUE

130,900.00

TRUE

121,650.00

TRUE

216,762.50

TRUE
TRUE

TRUE
FALSE
224,462.50

TRUE

255,862.50

TRUE

447,222.50

TRUE

213,262.50

TRUE

1,431,650.00

TRUE

1,403,000.00

TRUE

84,830.00

TRUE

3,337,925.00

TRUE

4,137,091.67

TRUE

6,786,575.00

TRUE

5,246,625.00

TRUE

4,801,975.00

TRUE

4,614,875.00

TRUE

4,892,333.33

TRUE

62,570.83

TRUE

73,601.67

TRUE
TRUE

14,700.00

TRUE

77,200.00

TRUE

13,500.00

TRUE

56,970.00

TRUE

74,470.00

TRUE

45,186.14

TRUE

11,416.25

TRUE

29,686.67

TRUE

29,820.00

TRUE

29,670.00

TRUE

33,120.00

TRUE

23,920.00

TRUE

25,530.00

TRUE

25,430.00

TRUE

27,040.00

TRUE

33,710.00

TRUE
TRUE

TRUE
FALSE
23,820.00

TRUE

24,050.00

TRUE

25,890.00

TRUE

26,580.00

TRUE

28,420.00

TRUE

134,645.00

TRUE

134,645.00

TRUE

134,645.00

TRUE

134,645.00

TRUE

134,645.00

TRUE

134,645.00

TRUE

137,275.00

TRUE

137,275.00

TRUE

58,467.50

TRUE

79,292.50

TRUE

81,325.00

TRUE

122,221.67

TRUE

90,805.83

TRUE

40,633.33

TRUE

27,129.17

TRUE

56,946.67

TRUE

39,580.83

TRUE

79,500.00

TRUE

62,293.33

TRUE

77,986.67

TRUE

485,225.00

TRUE
TRUE

39,765.00

TRUE

39,765.00

TRUE

89,925.00

TRUE

89,925.00

TRUE

22,112.50

TRUE

12,462.50

TRUE
TRUE

TRUE
FALSE
12,462.50

TRUE

32,375.00

TRUE

57,425.00

TRUE

29,215.63

TRUE

42,575.00

TRUE

48,323.00

TRUE

57,650.00

TRUE

199,405.83

TRUE

86,605.83

TRUE

175,405.83

TRUE

41,442.50

TRUE

47,562.50

TRUE

18,335.83

TRUE

145,210.00

TRUE

122,147.50

TRUE

100,110.00

TRUE

114,972.50

TRUE

35,610.00

TRUE
TRUE

1,940,075.00

TRUE

427,170.83

TRUE

305,270.83

TRUE

2,575,737.50

TRUE

2,621,987.50

TRUE

377,087.50

TRUE

525,550.00

TRUE

1,796,945.00

TRUE

80,250.00

TRUE

17,881,412.50

TRUE

1,119,000.00

TRUE

10,891.15

TRUE

13,785.10

TRUE

35,623.20

TRUE
FALSE

TRUE
FALSE
71,464.85

TRUE

374,601.00

TRUE

301,492.50

TRUE

475,165.80

TRUE

92,725.00

TRUE

160,852.50

TRUE

92,725.00

TRUE

151,890.00

TRUE

298,496.50

TRUE

427,287.50

TRUE

36,860.83

TRUE

14,837.92

TRUE

16,872.29

TRUE

26,075.42

TRUE

46,716.25

TRUE

26,075.42

TRUE

74,900.00

TRUE

73,672.92

TRUE

255,012.50

TRUE

409,625.00

TRUE

33,775.00

TRUE

43,675.00

TRUE
TRUE

5,819.17

TRUE

4,192.50

TRUE

139,518.75

TRUE

149,660.00

TRUE

159,450.00

TRUE

4,192.50

TRUE

66,700.00

TRUE

171,015.00

TRUE

139,515.00

TRUE

46,506.25

TRUE
TRUE

TRUE
FALSE
46,506.25

TRUE

516,645.00

TRUE

54,254.13

TRUE

45,239.17

TRUE

26,264.17

TRUE

142,429.17

TRUE

387,051.67

TRUE

122,625.83

TRUE

169,219.17

TRUE

161,527.08

TRUE

167,459.17

TRUE
TRUE

50,025.00

TRUE

5,175.00

TRUE

35,837.50

TRUE

28,040.00

TRUE

40,034.03

TRUE

23,754.17

TRUE

17,350.00

TRUE

12,506.25

TRUE

24,506.25

TRUE

41,687.50

TRUE

16,675.00

TRUE

41,687.50

TRUE

8,337.50

TRUE

50,025.00

TRUE

45,843.75

TRUE

105,676.25

TRUE

125,036.25

TRUE

153,451.25

TRUE

162,293.75

TRUE

137,906.25

TRUE

137,906.25

TRUE
TRUE

TRUE
FALSE
165,755.00

TRUE

12,506.25

TRUE

452,506.25

TRUE
TRUE

92,220.63

TRUE

84,955.63

TRUE

87,220.63

TRUE

92,259.88

TRUE

80,019.88

TRUE

89,489.88

TRUE

105,673.75

TRUE

118,175.42

TRUE

149,202.92

TRUE

153,707.50

TRUE

43,952.92

TRUE

45,172.03

TRUE

49,126.17

TRUE

76,805.42

TRUE

90,365.63

TRUE

17,793.00

TRUE

12,778.56

TRUE

13,660.52

TRUE

15,414.58

TRUE

13,330.32

TRUE

16,125.85

TRUE

19,592.58

TRUE

26,654.58

TRUE

28,017.08

TRUE

70,822.83

TRUE

60,832.83

TRUE

60,832.83

TRUE

60,832.83

TRUE

59,190.11

TRUE
TRUE

TRUE
FALSE
60,832.83

TRUE

56,812.50

TRUE

56,812.50

TRUE

38,637.50

TRUE

164,726.50

TRUE

184,643.17

TRUE

164,726.50

TRUE

22,282.83

TRUE

20,229.50

TRUE

17,767.42

TRUE

103,448.25

TRUE

10,900.00

TRUE

139,622.50

TRUE

142,126.50

TRUE

169,726.50

TRUE

148,726.50

TRUE

178,296.50

TRUE

146,477.34

TRUE

154,979.03

TRUE

104,726.50

TRUE

112,407.92

TRUE

633,147.92

TRUE

23,162.50

TRUE

23,162.50

TRUE

16,350.00

TRUE

23,162.50

TRUE

18,530.00

TRUE

65,312.50

TRUE

106,957.50

TRUE

106,957.50

TRUE

174,640.21

TRUE

227,982.50

TRUE

226,982.50

TRUE
TRUE

TRUE
FALSE
222,140.00

TRUE

201,982.50

TRUE

151,982.50

TRUE

153,371.39

TRUE

140,232.50

TRUE

129,806.57

TRUE

128,183.89

TRUE

180,490.75

TRUE

109,232.42

TRUE

148,590.75

TRUE

90,856.25

TRUE

88,506.25

TRUE

20,437.50

TRUE

20,437.50

TRUE

20,437.50

TRUE

20,437.50

TRUE

55,062.50

TRUE

16,350.00

TRUE

16,350.00

TRUE

34,150.00

TRUE
TRUE

14,250.00

TRUE

14,775.00

TRUE

14,775.00

TRUE

14,775.00

TRUE

792,197.11

TRUE

7,622.08

TRUE

22,329.17

TRUE

24,539.17

TRUE

35,016.67

TRUE

24,950.50

TRUE

29,912.00

TRUE

6,610.00

TRUE
TRUE

TRUE
FALSE
24,333.33

TRUE

11,266.00

TRUE

7,631.30

TRUE

4,982.50

TRUE

15,027.50

TRUE

10,375.00

TRUE

17,437.50

TRUE

19,480.00

TRUE

38,480.00

TRUE

7,600.00

TRUE

5,880.00

TRUE

121,000.00

TRUE

101,000.00

TRUE
TRUE

G. PEKERJAAN BETON
G.6.6.1

1 M3 BETON TUMBUK 1 pc ; 3 ps ; 5 kr
218.0000 kg

semen portland

1,300.00

283,400.00

0.5200 m3

pasir beton

250,000.00

130,000.00

0.8700 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

304,500.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00

6,000.00
717,900.00

G.6.6.2

semen portland

1,300.00

256,100.00

0.4700 m3

pasir beton

250,000.00

117,500.00

0.9400 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

329,000.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00

6,000.00
702,600.00

116,125.00

818,725.00

1 M3 BETON TUMBUK 1 pc ; 4 ps ; 6 kr
173.0000 kg

semen portland

1,300.00

224,900.00

0.5700 m3

pasir beton

250,000.00

142,500.00

0.8700 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

304,500.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00

6,000.00
671,900.00

G.6.6.4

834,025.00

1 M3 BETON TUMBUK 1 pc ; 3 ps ; 6 kr
197.0000 kg

G.6.6.3

116,125.00

116,125.00

788,025.00

1 M3 MEMBUAT LANTAI KERJA BETON TUMBUK 1 pc ; 3 ps ; 5 kr


10.0000 kg

semen portland

1,300.00

0.0260 m3

pasir beton

250,000.00

13,000.00
6,500.00

0.0440 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

15,400.00

1.1500 oh

pekerja

55,000.00

63,250.00

0.0200 oh

tukang batu

70,000.00

1,400.00

0.0020 oh

kepala tukang

75,000.00

150.00

0.0060 oh

mandor

75,000.00

450.00
34,900.00

65,250.00

100,150.00

G.6.6.5.

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Krayan


232.00 kg

semen portland

1,300.00

301,600.00

0.52 m3

pasir beton

250,000.00

130,000.00

0.78 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

1.65 oh

pekerja

55,000.00

90,750.00

0.25 oh

tukang batu

70,000.00

17,500.00

0.03 oh

kepala tukang

75,000.00

1,875.00

0.08 oh

mandor

75,000.00
JUMLAH

G.6.6.5..a

semen portland

1,300.00

301,600.00

0.52 m3

pasir beton

250,000.00

130,000.00

0.78 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex.palu

415,000.00

323,700.00

1.65 oh

pekerja

55,000.00

90,750.00

0.25 oh

tukang batu

70,000.00

17,500.00

0.03 oh

kepala tukang

75,000.00

1,875.00

0.08 oh

mandor

75,000.00
JUMLAH

116,125.00

semen portland

1,300.00

301,600.00

pasir beton

250,000.00

130,000.00

0.78 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Sepaku

437,500.00

341,250.00

1.65 oh

pekerja

55,000.00

90,750.00

0.25 oh

tukang batu

70,000.00

17,500.00

0.03 oh

kepala tukang

75,000.00

1,875.00

0.08 oh

mandor

75,000.00

871,425.00

6,000.00
772,850.00

116,125.00

888,975.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)


280.0000 kg

semen portland

1,300.00

364,000.00

0.4500 m3

pasir beton

250,000.00

112,500.00

0.9000 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

315,000.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00
JUMLAH

6,000.00
791,500.00

116,125.00

907,625.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;2,5 kr)


352.0000 kg

semen portland

1,300.00

457,600.00

0.5600 m3

pasir beton

250,000.00

140,000.00

0.7000 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

245,000.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00
JUMLAH

G.6.6.8

6,000.00
755,300.00

0.52 m3

JUMLAH

G.6.6.7

820,725.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Sepaku


232.00 kg

G.6.6.6

116,125.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 3 kr) Ex. Palu


232.00 kg

G.6.6.5.b

6,000.00
704,600.00

6,000.00
842,600.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 3 kr)


357.0000 kg

semen portland

1,300.00

464,100.00

0.4200 m3

pasir beton

250,000.00

105,000.00

0.5400 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

189,000.00

116,125.00

958,725.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00
JUMLAH

G.6.6.9

6,000.00
758,100.00

116,125.00

874,225.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;2,5 kr)


386.0000 kg

semen portland

1,300.00

501,800.00

0.4700 m3

pasir beton

250,000.00

117,500.00

0.7800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00
JUMLAH

6,000.00
892,300.00

116,125.00

1,008,425.00

G.6.6.10

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ; 2 kr)


479.0000 kg

semen portland

1,300.00

0.3700 m3

pasir beton

250,000.00

92,500.00

0.7400 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

259,000.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00
JUMLAH

G.6.6.11

semen portland

1,300.00

572,000.00

pasir beton

250,000.00

125,000.00

0.8000 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

280,000.00

2.4600 galon

Rapidrant

26,000.00

1.6500 oh

pekerja

55,000.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00

6,000.00
977,000.00

116,125.00

semen portland

1,300.00

436,800.00

0.5400 m3

pasir beton

250,000.00

135,000.00

0.8100 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

283,500.00

1.0000 ltr

puzzdith - 100 XR

1.6500 oh

pekerja

55,000.00

1,093,125.00

90,750.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0800 oh

mandor

75,000.00

JUMLAH

6,000.00
855,300.00

116,125.00

971,425.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Krayan


336.0000 kg

semen portland

1,300.00

436,800.00

0.5400 m3

pasir beton

250,000.00

135,000.00

0.8100 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

283,500.00

2.0000 oh

pekerja

55,000.00

110,000.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

1.0000 oh

mandor

75,000.00

75,000.00

JUMLAH

855,300.00

212,125.00

1,067,425.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Palu


336.0000 kg

semen portland

1,300.00

436,800.00

0.5400 m3

pasir beton

250,000.00

135,000.00

0.8100 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex.palu

415,000.00

336,150.00

2.0000 oh

pekerja

55,000.00

110,000.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

1.0000 oh

mandor

75,000.00

75,000.00

JUMLAH
G.6.6.13.b

1,090,325.00

1M3 MEMBUAT BETON DENGAN PUZZDITH - 100 XR


336.0000 kg

G.6.6.13.a

116,125.00

0.5000 m3

JUMLAH

G.6.6.13

6,000.00
974,200.00

1M3 MEMBUAT TIANG PANCANG PRESTRESSED BETON


440.0000 kg

G.6.6.12

622,700.00

907,950.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ;3 kr) Ex. Sepaku


336.0000 kg

semen portland

1,300.00

436,800.00

212,125.00

1,120,075.00

0.5400 m3

pasir beton

250,000.00

135,000.00

0.8100 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Sepaku

437,500.00

354,375.00

2.0000 oh

pekerja

55,000.00

110,000.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

1.0000 oh

mandor

75,000.00

75,000.00

JUMLAH
G.6.6.14

926,175.00

212,125.00

1,138,300.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 2 ps ; 4 kr)


291.0000 kg

semen portland

1,300.00

378,300.00

0.4700 m3

pasir beton

250,000.00

117,500.00

0.9300 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

325,500.00

2.0000 oh

pekerja

55,000.00

110,000.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

1.0000 oh

mandor

75,000.00

75,000.00

JUMLAH

821,300.00

212,125.00

1,033,425.00

G.6.6.15

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ;3kr)


367.0000 kg

semen portland

1,300.00

477,100.00

0.4400 m3

pasir beton

250,000.00

110,000.00

0.8800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

308,000.00

2.0000 oh

pekerja

55,000.00

110,000.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

1.0000 oh

mandor

75,000.00

75,000.00

JUMLAH
G.6.6.16

400.0000 kg

semen portland

1,300.00

520,000.00

pasir beton

250,000.00

120,000.00

0.8000 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

280,000.00

2.0000 oh

pekerja

55,000.00

110,000.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

1.0000 oh

mandor

75,000.00

75,000.00
920,000.00

212,125.00

semen portland

1,300.00

799,500.00

0.5200 m3

pasir beton

250,000.00

130,000.00

0.5200 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

182,000.00

2.0000 oh

pekerja

55,000.00

110,000.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

1.0000 oh

mandor

75,000.00

75,000.00

JUMLAH

1,132,125.00

1,111,500.00

212,125.00

1,323,625.00

1M3 MEMBUAT BETON KEDAP AIR DENGAN STROROX - 100


400.0000 kg

semen portland

1,300.00

520,000.00

0.4800 m3

pasir beton

250,000.00

120,000.00

0.8000 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

280,000.00

1.2000 Kg

Strorox - 100

2.0000 oh

pekerja

55,000.00

110,000.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

1.0000 oh

mandor

75,000.00

75,000.00

JUMLAH
G.6.6.19

1,107,225.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1 ps ;1kr)


615.0000 kg

G.6.6.18

212,125.00

0.4800 m3

JUMLAH
G.6.6.17

895,100.00

1 M3 MEMBUAT BETON BERTULANG (1 pc ; 1,5 ps ; 2,5 kr)

920,000.00

212,125.00

1,132,125.00

1M' MEMASANG PVC WATERSTOP LEBAR 150 MM


1.0500 m'

waterstop lebar 150 mm

0.0500 oh

pekerja

55,000.00

2,750.00

0.0300 oh

tukang batu

70,000.00

2,100.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0020 oh

mandor

75,000.00
JUMLAH

150.00
-

5,225.00

5,225.00

G.6.6.20

1M' MEMASANG PVC WATERSTOP LEBAR 200 MM


1.0500 m'

waterstop lebar 200 mm

0.0500 oh

pekerja

55,000.00

2,750.00

0.0350 oh

tukang batu

70,000.00

2,450.00

0.0035 oh

kepala tukang

75,000.00

262.50

0.0020 oh

mandor

75,000.00
JUMLAH

G.6.6.21

1.0500 m'

waterstop lebar 230 mm

0.5500 oh

pekerja

55,000.00

30,250.00

0.0350 oh

tukang batu

70,000.00

2,450.00

0.0030 oh

mandor

75,000.00

1.0500 m'

waterstop lebar 250 mm

0.5500 oh

pekerja

55,000.00

30,250.00

0.0350 oh

tukang batu

70,000.00

2,450.00

0.0030 oh

mandor

75,000.00

225.00
-

32,925.00

1.0500 m'

waterstop lebar 300 mm

0.5500 oh

pekerja

55,000.00

30,250.00

0.0350 oh

tukang batu

70,000.00

2,450.00

0.0030 oh

mandor

75,000.00

32,925.00

225.00
-

32,925.00

32,925.00

1M' MEMASANG PVC WATERSTOP LEBAR 320 MM


1.0500 m'

waterstop lebar 320 mm

0.0500 oh

pekerja

55,000.00

2,750.00

0.0350 oh

tukang batu

70,000.00

2,450.00

0.0020 oh

mandor

75,000.00

150.00
-

5,350.00

5,350.00

1 KG PEMBESIAN DG BESI POLOS


1.0500 Kg

Besi beton

10,000.00

10,500.00

0.0150 Kg

Kawat beton

20,000.00

300.00

0.0070 OH

pekerja

55,000.00

385.00

0.0070 OH

tukang besi

70,000.00

490.00

0.0007 OH

kepala tukang

75,000.00

52.50

0.0003 OH

mandor

75,000.00

@
G.6.6.25

32,925.00

1M' MEMASANG PVC WATERSTOP LEBAR 300 MM

JUMLAH
G.6.6.25

225.00
32,925.00

1M' MEMASANG PVC WATERSTOP LEBAR 250 MM

JUMLAH
G.6.6.24

5,612.50

JUMLAH
G.6.6.23

5,612.50

1M' MEMASANG PVC WATERSTOP LEBAR 230 MM

JUMLAH
G.6.6.22

150.00
-

JUMLAH

22.50
10,800.00

950.00

11,750.00

1 KG PEMBESIAN DG BESI ULIR


1.0500 Kg

Besi beton

11,750.00

12,337.50

0.0150 Kg

Kawat beton

20,000.00

300.00

0.0070 OH

pekerja

55,000.00

385.00

0.0070 OH

tukang besi

70,000.00

490.00

0.0007 OH

kepala tukang

75,000.00

52.50

0.0003 OH

mandor

75,000.00

JUMLAH

22.50
12,637.50

950.00

13,587.50

G.6.6.26

1 KG KABEL PRESSTRESSED POLOS/STRANDS


1.0500 Kg

besi presstressed polos

10,000.00

10,500.00

0.0100 Kg

Kawat beton

20,000.00

200.00

0.0050 OH

pekerja

55,000.00

275.00

0.0050 OH

tukang besi

70,000.00

350.00

0.0005 OH

kepala tukang

75,000.00

37.50

0.0003 OH

mandor

75,000.00
JUMLAH

G.6.6.27

G. 6.6.29

1.0200 Kg

Besi jaring kawat baja

28,350.00

28,917.00

0.8050 Kg

Kawat beton

20,000.00

16,100.00

0.0250 OH

pekerja

55,000.00

1,375.00

0.0250 OH

tukang besi

70,000.00

1,750.00

0.0025 OH

kepala tukang

75,000.00

187.50

0.0015 OH

mandor

75,000.00

11,385.00

112.50
45,017.00

3,425.00

48,442.00

1M2 PASANG BEKISTING UNTUK PONDASI


0.0400 M3

kayu terentang

2,200,000.00

88,000.00

0.3000 Kg

paku biasa 2' - 5'

15,583.33

4,675.00

0.1000 lt

minyak bekisting

12,000.00

1,200.00

0.3000 OH

pekerja

55,000.00

16,500.00

0.2600 OH

tukang besi

70,000.00

18,200.00

0.0260 OH

kepala tukang

75,000.00

1,950.00

0.0050 OH

mandor

75,000.00

375.00

JUMLAH

93,875.00

37,025.00

130,900.00

1 M2 PASANG BEKISTING UNTUK SLOOF ( 2 x pakai )


0.0450 m3

papan kayu kelas 2

1,750,000.00

78,750.00

0.3000 kg

paku biasa 2' - 5'

15,583.33

4,675.00

0.1000 lt

minyak bekisting

12,000.00

1,200.00

0.3000 OH

pekerja

55,000.00

16,500.00

0.2600 OH

tukang kayu

70,000.00

18,200.00

0.0260 OH

kepala tukang

75,000.00

1,950.00

0.0050 OH

mandor

75,000.00
JUMLAH

G. 6.6.30

685.00

1 KG JARING KAWAT BAJA

JUMLAH
G.6.6.28

22.50
10,700.00

375.00
84,625.00

37,025.00

121,650.00

1 M2 PASANG BEKISTING UNTUK KOLOM ( 2 x pakai )


0.0400 m3

papan kayu kelas 2

1,750,000.00

70,000.00

0.4000 kg

paku biasa 2' - 5'

15,583.33

6,233.33

0.2000 lt

minyak bekisting

12,000.00

2,400.00

0.0150 m3

balok kayu meranti

2,200,000.00

33,000.00

0.3500 lbr

plywood tebal 9 mm

124,583.33

43,604.17

2.0000 btg

dolken kayu galam dia 8 - 10/4

9,500.00

19,000.00

0.3000 oh

pekerja

55,000.00

16,500.00

0.3300 oh

tukang kayu

70,000.00

23,100.00

0.0330 oh

kepala tukang

75,000.00

2,475.00

0.0060 oh

mandor

75,000.00
JUMLAH

450.00
174,237.50

42,525.00

216,762.50

G. 6.6.31

1 M2 PASANG BEKISTING UNTUK BALOK ( 2 x pakai )


0.0400 m3

papan kayu kelas 2

1,750,000.00

70,000.00

0.4000 kg

paku biasa 2' - 5'

15,583.33

6,233.33

0.2000 lt

minyak bekisting

12,000.00

2,400.00

0.0180 m3

balok kayu meranti

2,200,000.00

39,600.00

0.3500 lbr

plywood tebal 9 mm

124,583.33

43,604.17

2.0000 btg

dolken kayu galam dia 8 - 10/4

9,500.00

19,000.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.3300 oh

tukang kayu

70,000.00

23,100.00

0.0330 oh

kepala tukang

75,000.00

2,475.00

0.0060 oh

mandor

75,000.00

450.00
118,233.33

G. 6.6.32

224,462.50

1 M2 PASANG BEKISTING UNTUK LANTAI ( 2 x pakai )


0.0400 m3

papan kayu kelas 2

1,750,000.00

70,000.00

0.4000 kg

paku biasa 2' - 5'

15,583.33

6,233.33

0.2000 lt

minyak bekisting

12,000.00

2,400.00

0.0150 m3

balok kayu meranti

2,200,000.00

33,000.00

0.3500 lbr

plywood tebal 9 mm

124,583.33

43,604.17

6.0000 btg

dolken kayu galam dia 8 - 10/4

9,500.00

57,000.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.3300 oh

tukang kayu

70,000.00

23,100.00

0.0330 oh

kepala tukang

75,000.00

2,475.00

0.0060 oh

mandor

75,000.00
JUMLAH

G. 6.6.33

106,229.17

450.00
111,633.33

144,229.17

255,862.50

1 M2 PASANG BEKISTING UNTUK DINDING ( 2 x pakai )


0.0300 m3

papan kayu kelas 2

1,750,000.00

52,500.00

0.4000 kg

paku biasa 2' - 5'

15,583.33

6,233.33

0.2000 lt

minyak bekisting

12,000.00

2,400.00

0.0200 m3

balok kayu meranti

2,200,000.00

44,000.00

0.3500 lbr

plywood tebal 9 mm

124,583.33

43,604.17

3.0000 btg

dolken kayu galam dia 8 - 10/4

9,500.00

28,500.00

4.0000 bh

formtie/penjaga jarak/spacer

55,000.00

220,000.00

0.3200 oh

pekerja

70,000.00

22,400.00

0.3300 oh

tukang kayu

75,000.00

24,750.00

0.0330 oh

kepala tukang

75,000.00

2,475.00

0.0060 oh

mandor

60,000.00
JUMLAH

360.00
397,237.50

49,985.00

447,222.50

G. 6.6.34

1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3

kayu terentang

2,200,000.00

66,000.00

0.4000 kg

paku biasa 2' - 5'

15,583.33

6,233.33

0.1500 lt

minyak bekisting

12,000.00

1,800.00

0.0150 m3

balok kayu meranti

2,200,000.00

33,000.00

0.3500 lbr

plywood tebal 9 mm

124,583.33

43,604.17

2.0000 btg

dolken kayu galam dia 8 - 10/4

9,500.00

19,000.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.3300 oh

tukang kayu

70,000.00

23,100.00

0.0330 oh

kepala tukang

75,000.00

2,475.00

0.0060 oh

mandor

75,000.00
JUMLAH

G. 6.6.35

Semen portland

1,300.00

504,400.00

0.6500 m3

Pasir beton

415,000.00

269,750.00

0.6500 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

227,500.00

6.0000 oh

pekerja

55,000.00

330,000.00

1.0000 oh

tukang kayu

70,000.00

70,000.00

0.1000 oh

kepala tukang

75,000.00

7,500.00

0.3000 oh

mandor

75,000.00

22,500.00

JUMLAH

213,262.50

1,001,650.00

430,000.00

1,431,650.00

1M3 MEMBUAT BETON DENGAN MUTU K 275


400.0000 kg

Semen portland

1,300.00

520,000.00

0.4000 m3

Pasir beton

415,000.00

166,000.00

0.8200 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

287,000.00

6.0000 oh

pekerja

55,000.00

330,000.00

1.0000 oh

tukang kayu

70,000.00

70,000.00

0.1000 oh

kepala tukang

75,000.00

7,500.00

0.3000 oh

mandor

75,000.00

22,500.00

JUMLAH
G. 6.6.37

43,625.00

1M3 MEMBUAT BETON DENGAN MUTU K 225


388.0000 kg

G. 6.6.36

450.00
169,637.50

973,000.00

430,000.00

1,403,000.00

1 M2 PASANG JEMBATAN COR


0.0264 m3

kayu terentang

2,200,000.00

58,080.00

0.6000 kg

paku biasa 2' - 5'

15,583.33

9,350.00

0.5000 btg

dolken kayu galam dia 8 - 10/4

9,500.00

4,750.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0500 oh

tukang kayu

70,000.00

3,500.00

0.0050 oh

kepala tukang

75,000.00

375.00

0.0070 oh

mandor

75,000.00
JUMLAH

525.00
72,180.00

12,650.00

84,830.00

G. 6.6.38

1M3 MEMBUAT PONDASI BETON BERTULANG (150KG BESI + BEKISTING)


0.2000 m3

kayu terentang

2,200,000.00

440,000.00

1.5000 kg

paku biasa 2' - 5'

15,583.33

23,375.00

0.4000 lt

minyak bekisting

12,000.00

4,800.00

150.0000 kg

besi beton polos

10,000.00

1,500,000.00

2.2500 kg

kawat beton

20,000.00

45,000.00

Semen portland

1,300.00

419,900.00

0.5200 m3

Pasir beton

415,000.00

215,800.00

0.7800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

3.9000 oh

pekerja

55,000.00

214,500.00

0.3500 oh

Tukang batu

70,000.00

24,500.00

1.0400 oh

tukang kayu

70,000.00

72,800.00

1.0500 oh

Tukang Besi

70,000.00

73,500.00

0.2450 oh

kepala tukang

75,000.00

18,375.00

0.1650 oh

mandor

75,000.00

323.0000 kg

JUMLAH
G. 6.6.39

12,375.00
2,921,875.00

416,050.00

3,337,925.00

1M3 MEMBUAT SLOOF BETON BERTULANG (200KG BESI + BEKISTING)


0.2700 m3

kayu terentang

2,200,000.00

594,000.00

2.0000 kg

paku biasa 2' - 5'

15,583.33

31,166.67

0.6000 lt

minyak bekisting

12,000.00

7,200.00

200.0000 kg

besi beton polos

10,000.00

2,000,000.00

3.0000 kg

kawat beton

20,000.00

60,000.00

Semen portland

1,300.00

419,900.00

0.5200 m3

Pasir beton

415,000.00

215,800.00

0.7800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

4.8500 oh

pekerja

55,000.00

0.3500 oh

Tukang batu

70,000.00

24,500.00

1.5600 oh

tukang kayu

70,000.00

109,200.00

1.4000 oh

Tukang Besi

70,000.00

98,000.00

0.3310 oh

kepala tukang

75,000.00

24,825.00

0.1700 oh

mandor

75,000.00

323.0000 kg

JUMLAH

266,750.00

12,750.00
3,601,066.67

536,025.00

4,137,091.67

G. 6.6.40

1M3 MEMBUAT KOLOM BETON BERTULANG (300KG BESI + BEKISTING)


0.4000 m3

kayu terentang

2,200,000.00

880,000.00

4.0000 kg

paku biasa 2' - 5'

15,583.33

62,333.33

2.0000 lt

minyak bekisting

12,000.00

24,000.00

300.0000 kg

besi beton polos

10,000.00

3,000,000.00

4.5000 kg

kawat beton

20,000.00

90,000.00

Semen portland

1,300.00

419,900.00

0.5200 m3

Pasir beton

415,000.00

215,800.00

0.7800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

0.1500 m3

Kayu meranti balok

2,200,000.00

330,000.00

3.5000 lbr

Plywood 9 mm

124,583.33

436,041.67

dolken kayu galam dia 8 - 10/4

9,500.00

190,000.00

7.3000 oh

pekerja

55,000.00

0.3500 oh

Tukang batu

70,000.00

24,500.00

3.3000 oh

tukang kayu

70,000.00

231,000.00

2.1000 oh

Tukang Besi

70,000.00

147,000.00

0.5700 oh

kepala tukang

75,000.00

42,750.00

0.2500 oh

mandor

75,000.00

323.0000 kg

20.0000 Btg

JUMLAH
G. 6.6.41

401,500.00

18,750.00
5,921,075.00

865,500.00

6,786,575.00

1M3 MEMBUAT BALOK BETON BERTULANG (200KG BESI + BEKISTING)


0.3200 m3

kayu terentang

2,200,000.00

704,000.00

3.2000 kg

paku biasa 2' - 5'

15,583.33

49,866.67

1.6000 lt

minyak bekisting

12,000.00

19,200.00

200.0000 kg

besi beton polos

10,000.00

2,000,000.00

3.0000 kg

kawat beton

20,000.00

60,000.00

Semen portland

1,300.00

419,900.00

0.5200 m3

Pasir beton

415,000.00

215,800.00

0.7800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

0.1400 m3

Kayu meranti balok

2,200,000.00

308,000.00

2.8000 lbr

Plywood 9 mm

124,583.33

348,833.33

dolken kayu galam dia 8 - 10/4

9,500.00

152,000.00

5.9600 oh

pekerja

55,000.00

0.3500 oh

Tukang batu

70,000.00

24,500.00

2.8000 oh

tukang kayu

70,000.00

196,000.00

1.4000 oh

Tukang Besi

70,000.00

98,000.00

0.4550 oh

kepala tukang

75,000.00

34,125.00

0.2080 oh

mandor

75,000.00

323.0000 kg

16.0000 Btg

JUMLAH

327,800.00

15,600.00
4,550,600.00

696,025.00

5,246,625.00

G. 6.6.42

1M3 MEMBUAT BALOK BETON BERTULANG (150KG BESI + BEKISTING)


0.3200 m3

kayu terentang

2,200,000.00

704,000.00

3.2000 kg

paku biasa 2' - 5'

15,583.33

49,866.67

1.6000 lt

minyak bekisting

12,000.00

19,200.00

150.0000 kg

besi beton polos

10,000.00

1,500,000.00

2.2500 kg

kawat beton

20,000.00

45,000.00

Semen portland

1,300.00

419,900.00

0.5200 m3

Pasir beton

415,000.00

215,800.00

0.7800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

0.1200 m3

Kayu meranti balok

2,200,000.00

264,000.00

2.8000 lbr

Plywood 9 mm

124,583.33

348,833.33

dolken kayu galam dia 8 - 10/4

9,500.00

304,000.00

5.8000 oh

pekerja

55,000.00

0.3500 oh

Tukang batu

70,000.00

24,500.00

2.8000 oh

tukang kayu

70,000.00

196,000.00

1.0500 oh

Tukang Besi

70,000.00

73,500.00

0.4200 oh

kepala tukang

75,000.00

31,500.00

0.1850 oh

mandor

75,000.00

323.0000 kg

32.0000 Btg

JUMLAH
G. 6.6.43

319,000.00

13,875.00
4,143,600.00

658,375.00

4,801,975.00

1M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)


0.2400 m3

kayu terentang

2,200,000.00

528,000.00

3.2000 kg

paku biasa 2' - 5'

15,583.33

49,866.67

1.6000 lt

minyak bekisting

12,000.00

19,200.00

150.0000 kg

besi beton polos

10,000.00

1,500,000.00

2.2500 kg

kawat beton

20,000.00

45,000.00

Semen portland

1,300.00

419,900.00

0.5200 m3

Pasir beton

415,000.00

215,800.00

0.7800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

0.1600 m3

Kayu meranti balok

2,200,000.00

352,000.00

2.8000 lbr

Plywood 9 mm

124,583.33

348,833.33

dolken kayu galam dia 8 - 10/4

9,500.00

228,000.00

5.6000 oh

pekerja

55,000.00

0.3500 oh

Tukang batu

70,000.00

24,500.00

2.6400 oh

tukang kayu

70,000.00

184,800.00

1.0500 oh

Tukang Besi

70,000.00

73,500.00

0.4000 oh

kepala tukang

75,000.00

30,000.00

0.1930 oh

mandor

75,000.00

323.0000 kg

24.0000 Btg

JUMLAH

308,000.00

14,475.00
3,979,600.00

635,275.00

4,614,875.00

G. 6.6.44

1M3 MEMBUAT TANGGA BETON BERTULANG (200KG BESI + BEKISTING)


0.2500 m3

kayu terentang

2,200,000.00

550,000.00

3.0000 kg

paku biasa 2' - 5'

15,583.33

46,750.00

1.2000 lt

minyak bekisting

12,000.00

14,400.00

200.0000 kg

besi beton polos

10,000.00

2,000,000.00

3.0000 kg

kawat beton

20,000.00

60,000.00

Semen portland

1,300.00

419,900.00

0.5200 m3

Pasir beton

415,000.00

215,800.00

0.7800 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

273,000.00

0.1050 m3

Kayu meranti balok

2,200,000.00

231,000.00

2.5000 lbr

Plywood 9 mm

124,583.33

311,458.33

dolken kayu galam dia 8 - 10/4

9,500.00

133,000.00

5.6000 oh

pekerja

55,000.00

0.3500 oh

Tukang batu

70,000.00

24,500.00

2.3000 oh

tukang kayu

70,000.00

161,000.00

1.4000 oh

Tukang Besi

70,000.00

98,000.00

0.4050 oh

kepala tukang

75,000.00

30,375.00

0.2020 oh

mandor

75,000.00

323.0000 kg

14.0000 Btg

JUMLAH
G. 6.6.45

308,000.00

15,150.00
4,255,308.33

637,025.00

4,892,333.33

1M3 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11x11) CM


0.0020 m3

kayu terentang

2,200,000.00

0.0100 kg

paku biasa 2' - 5'

15,583.33

155.83

3.0000 kg

besi beton polos

10,000.00

30,000.00

0.4500 kg

kawat beton

20,000.00

9,000.00

4.0000 kg

Semen portland

1,300.00

5,200.00

0.0060 m3

Pasir beton

415,000.00

2,490.00

0.0090 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

3,150.00

0.0600 oh

pekerja

55,000.00

3,300.00

0.0200 oh

Tukang batu

70,000.00

1,400.00

0.0200 oh

tukang kayu

70,000.00

1,400.00

0.0200 oh

Tukang Besi

70,000.00

1,400.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0030 oh

mandor

75,000.00
JUMLAH

4,400.00

225.00
54,395.83

8,175.00

62,570.83

G. 6.6.46

1M' MEMBUAT RING BALOK BETON BERTULANG (10X15) CM


0.0030 m3

Kayu meranti, balok

2,200,000.00

0.0200 kg

paku biasa 2' - 5'

15,583.33

311.67

3.6000 kg

besi beton polos

10,000.00

36,000.00

0.0500 kg

kawat beton

20,000.00

1,000.00

5.5000 kg

Semen portland

1,300.00

7,150.00

0.0090 m3

Pasir beton

415,000.00

3,735.00

0.0150 m3

Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

350,000.00

5,250.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.0330 oh

Tukang batu

70,000.00

2,310.00

0.0330 oh

tukang kayu

70,000.00

2,310.00

0.0330 oh

Tukang Besi

70,000.00

2,310.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00
JUMLAH

6,600.00

375.00
60,046.67

13,555.00

73,601.67

H. PEKERJAAN PENUTUP ATAP


H. 6.6.1

1M2 PASANG ATAP GENTENG PALENTONG KECIL


25.0000 bh

genteng palentong

0.1500 oh

pekerja

55,000.00

8,250.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0080 oh

kepala tukang

75,000.00

600.00

0.0080 oh

mandor

75,000.00
JUMLAH

H. 6.6.2

genteng kodok

2,500.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0080 oh

kepala tukang

75,000.00

600.00

0.0080 oh

mandor

75,000.00
JUMLAH

14,700.00

62,500.00

600.00
62,500.00

14,700.00

77,200.00

1M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR


12.0000 bh

genteng palentong super

0.1500 oh

pekerja

55,000.00

8,250.00

0.0600 oh

tukang kayu

70,000.00

4,200.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0080 oh

mandor

75,000.00
JUMLAH

H. 6.6.4

14,700.00

1M2 PASANG ATAP GENTENG KODOK /GLAZZUR


25.0000 bh

H. 6.6.3

600.00
-

600.00
-

13,500.00

13,500.00

1M2 PASANG ATAP GENTENG BUBUNG PALENTONG


5.0000 bh

genteng bubung palentong

8.0000 kg

Semen Portland

1,300.00

10,400.00

0.0320 m3

Pasir pasang

278,750.00

8,920.00

0.4000 oh

pekerja

55,000.00

22,000.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0020 oh

mandor

75,000.00
JUMLAH

150.00
19,320.00

37,650.00

56,970.00

H. 6.6.5

1M' PASANG BUBUNG GENTENG KODOK


5.0000 bh

genteng bubung kodok

3,500.00

17,500.00

8.0000 kg

Semen Portland

1,300.00

10,400.00

0.0320 m3

Pasir pasang

278,750.00

8,920.00

0.4000 oh

pekerja

55,000.00

22,000.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0020 oh

mandor

75,000.00
JUMLAH

H. 6.6.6

4.0000 bh

genteng bubung palentong

8.0000 kg

Semen Portland

1,300.00

10,400.00

0.0320 m3

Pasir pasang

278,750.00

8,920.00

0.4000 oh

pekerja

55,000.00

22,000.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0020 oh

mandor

75,000.00

30,320.00

45,186.14

1M2 PASANG ROOFLIGHT FIBREGLASS (180X90) CM


0.6000 bh

Roof light fibreglass

0.0500 kg

paku biasa 1/2" - 1"

15,583.33

779.17

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00

525.00
591.25

10,825.00

11,416.25

1m2 PASANG ATAP ASBES GELOMBANG (2,50X0,92)X5MM


0.5000 lbr

asbes gelombang

27,333.33

13,666.67

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0080 oh

kepala tukang

75,000.00

600.00

0.0080 oh

mandor

75,000.00
JUMLAH

H. 6.6.9

74,470.00

150.00
14,866.14

JUMLAH
H. 6.6.8

37,650.00

1M2 PASANG BUBUNG GENTENG PALENTONG BESAR

JUMLAH
H. 6.6.7

150.00
36,820.00

600.00
15,536.67

14,150.00

29,686.67

1m2 PASANG ATAP ASBES GELOMBANG (2,25X0,92)X5MM


0.6000 lbr

asbes gelombang

23,000.00

13,800.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0080 oh

kepala tukang

75,000.00

600.00

0.0080 oh

mandor

75,000.00
JUMLAH

600.00
15,670.00

14,150.00

29,820.00

H. 6.6.10

1m2 PASANG ATAP ASBES GELOMBANG (2,00X0,92)X5MM


0.6000 lbr

asbes gelombang

23,000.00

13,800.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00
JUMLAH

H. 6.6.11

0.7500 lbr

asbes gelombang

23,000.00

17,250.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00

525.00
19,120.00

14,000.00

0.3500 lbr

asbes gelombang

23,000.00

8,050.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00

33,120.00

525.00
9,920.00

14,000.00

23,920.00

1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,05)X4 MM


0.4200 lbr

asbes gelombang

23,000.00

9,660.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00
JUMLAH

H. 6.6.14

29,670.00

1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,05)X4 MM

JUMLAH
H. 6.6.13

14,000.00

1m2 PASANG ATAP ASBES GELOMBANG (1,80X0,92)X5MM

JUMLAH
H. 6.6.12

525.00
15,670.00

525.00
11,530.00

14,000.00

25,530.00

1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,05)X4 MM


0.4400 lbr

asbes gelombang

23,000.00

10,120.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00
JUMLAH

525.00
11,990.00

13,440.00

25,430.00

H. 6.6.15

1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,05)X4 MM


0.5100 lbr

asbes gelombang

23,000.00

11,730.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00
JUMLAH

H. 6.6.16

0.8000 lbr

asbes gelombang

23,000.00

18,400.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00

525.00
20,270.00

13,440.00

0.3700 lbr

asbes gelombang

23,000.00

8,510.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00

33,710.00

525.00
10,380.00

13,440.00

23,820.00

1m2 PASANG ATAP ASBES GELOMBANG (2,70X1,08)X6 MM


0.3800 lbr

asbes gelombang

23,000.00

8,740.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00
JUMLAH

H. 6.6.19

27,040.00

1m2 PASANG ATAP ASBES GELOMBANG (3,00X1,08)X6 MM

JUMLAH
H. 6.6.18

13,440.00

1m2 PASANG ATAP ASBES GELOMBANG (1,5X1,05)X4 MM

JUMLAH
H. 6.6.17

525.00
13,600.00

525.00
10,610.00

13,440.00

24,050.00

1m2 PASANG ATAP ASBES GELOMBANG (2,40X1,08)X6 MM


0.4600 lbr

asbes gelombang

23,000.00

10,580.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00
JUMLAH

525.00
12,450.00

13,440.00

25,890.00

H. 6.6.20

1m2 PASANG ATAP ASBES GELOMBANG (2,10X1,08)X6 MM


0.4900 lbr

asbes gelombang

23,000.00

11,270.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00
JUMLAH

H. 6.6.21

0.5700 lbr

asbes gelombang

23,000.00

13,110.00

0.1200 kg

paku pancing 60 x 230

15,583.33

1,870.00

0.1400 oh

pekerja

55,000.00

7,700.00

0.0670 oh

tukang kayu

70,000.00

4,690.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00

13,440.00

28,420.00

1M' PASANG BUBUNG STEL GELOMBANG 0,92 M


2.4000 lbr

bubung stel gelombang

6.0000 bh

paku skrup 3,5"

20,000.00

120,000.00

0.0840 oh

pekerja

55,000.00

4,620.00

0.1250 oh

tukang kayu

70,000.00

8,750.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0040 oh

mandor

75,000.00

300.00
120,000.00

14,645.00

134,645.00

1M' PASANG NOK STEL GELOMBANG 1,05 M


2.1000 lbr

nok stel gelombang

6.0000 bh

paku skrup 3,5"

20,000.00

120,000.00

0.0840 oh

pekerja

55,000.00

4,620.00

0.1250 oh

tukang kayu

70,000.00

8,750.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0040 oh

mandor

75,000.00
JUMLAH

H. 6.6.24

26,580.00

525.00
14,980.00

JUMLAH
H. 6.6.23

13,440.00

1m2 PASANG ATAP ASBES GELOMBANG (1,80X1,08)X6 MM

JUMLAH
H. 6.6.22

525.00
13,140.00

300.00
120,000.00

14,645.00

134,645.00

1M' PASANG NOK STEL GELOMBANG 1,08 M


2.0500 lbr

nok stel gelombang

6.0000 bh

paku skrup 3,5"

20,000.00

120,000.00

0.0840 oh

pekerja

55,000.00

4,620.00

0.1250 oh

tukang kayu

70,000.00

8,750.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0040 oh

mandor

75,000.00
JUMLAH

300.00
120,000.00

14,645.00

134,645.00

###

H. 6.6.25

1M' PASANG NOK paten 0,92 m


1.2000 lbr

nok paten

6.0000 bh

paku skrup 3,5"

20,000.00

120,000.00

0.0840 oh

pekerja

55,000.00

4,620.00

0.1250 oh

tukang kayu

70,000.00

8,750.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0040 oh

mandor

75,000.00
JUMLAH

H. 6.6.26

1.2000 lbr

nok paten

6.0000 bh

paku skrup 3,5"

20,000.00

120,000.00

0.0840 oh

pekerja

55,000.00

4,620.00

0.1250 oh

tukang kayu

70,000.00

8,750.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0040 oh

mandor

75,000.00

14,645.00

134,645.00

1M' PASANG NOK PATEN 1,08 M


1.2000 lbr

nok paten

6.0000 bh

paku skrup 3,5"

20,000.00

120,000.00

0.0840 oh

pekerja

55,000.00

4,620.00

0.1250 oh

tukang kayu

70,000.00

8,750.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0040 oh

mandor

75,000.00

300.00
120,000.00

14,645.00

134,645.00

1M' PASANG NOK STEL RATA 0,92 M


1.1000 lbr

nok stel rata

6.0000 bh

paku skrup 3,5"

20,000.00

120,000.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.1500 oh

tukang kayu

70,000.00

10,500.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0040 oh

mandor

75,000.00
JUMLAH

H. 6.6.29

134,645.00

300.00
120,000.00

JUMLAH
H. 6.6.28

14,645.00

1M' PASANG NOK PATEN 1,05 M

JUMLAH
H. 6.6.27

300.00
120,000.00

300.00
120,000.00

17,275.00

137,275.00

1M' PASANG NOK STEL RATA 1,05 M


1.1000 lbr

nok stel rata

6.0000 bh

paku skrup 3,5"

20,000.00

120,000.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.1500 oh

tukang kayu

70,000.00

10,500.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0040 oh

mandor

75,000.00
JUMLAH

300.00
120,000.00

17,275.00

137,275.00

H. 6.6.30

1M2 PASANG ATAP GENTENG BETON


11.0000 bh

genteng beton

3,500.00

38,500.00

0.0300 kg

Paku biasa 2" - 5"

15,583.33

467.50

0.2000 oh

pekerja

55,000.00

11,000.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0100 oh

mandor

75,000.00
JUMLAH

H. 6.6.31

6.9000 lbr

genteng aspal

2,500.00

17,250.00

0.3500 lbr

Plywood 4" x 8" x 6 mm

80,000.00

28,000.00

0.0300 kg

paku biasa 1/2" - 1"

15,583.33

467.50

0.5000 bh

Plastic aerator

1,200.00

600.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.3000 oh

tukang kayu

70,000.00

21,000.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0100 oh

mandor

75,000.00

750.00
46,317.50

32,975.00

1.4200 lbr

genteng metal

40,000.00

56,800.00

0.2000 kg

Paku paku atap metal

28,500.00

5,700.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0010 oh

mandor

75,000.00

79,292.50

75.00
62,500.00

18,825.00

81,325.00

1M' PASANG ATAP SIRAP


60.0000 bh

genteng sirap

1,500.00

90,000.00

0.2000 kg

paku biasa 1/2" - 1"

15,583.33

3,116.67

0.1660 oh

pekerja

55,000.00

9,130.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0080 oh

mandor

75,000.00
JUMLAH

H. 6.6.34

58,467.50

1M2 PASANG ATAP GENTENG METAL

JUMLAH
H. 6.6.33

19,500.00

1M2 PASANG ATAP GENTENG ASPAL

JUMLAH
H. 6.6.32

750.00
38,967.50

600.00
93,116.67

29,105.00

122,221.67

1M' PASANG NOK GENTENG BETON


3.5000 bh

nok genteng beton

5,000.00

0.0500 kg

Paku pancing

30,250.00

1,512.50

Semen abu - abu

1,300.00

14,040.00

0.0320 m3

Pasir pasang

278,750.00

8,920.00

1.0000 kg

Semen warna

9,833.33

9,833.33

0.4000 oh

pekerja

55,000.00

22,000.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0200 oh

mandor

75,000.00

10.8000 kg

JUMLAH

17,500.00

1,500.00
51,805.83

39,000.00

90,805.83

H. 6.6.35

1M' PASANG NOK GENTENG ASPAL


2.0000 bh

genteng aspal

2,500.00

5,000.00

0.0500 kg

paku seng

24,666.67

1,233.33

0.0035 m3

kayu meranti, balok

2,200,000.00

7,700.00

0.1250 oh

pekerja

55,000.00

6,875.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0060 oh

mandor

75,000.00
JUMLAH

H. 6.6.36

1.1000 bh

genteng decra bond

0.0500 kg

paku biasa 1/2" - 1"

15,583.33

779.17

0.2500 oh

pekerja

55,000.00

13,750.00

0.1500 oh

tukang kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0130 oh

mandor

75,000.00

975.00
779.17

26,350.00

0.4000 lbr

seng plat

45,833.33

18,333.33

0.1100 kg

paku seng

24,666.67

2,713.33

0.0040 oh

kayu meranti papan 3 cm

2,300,000.00

9,200.00

0.1250 oh

pekerja

55,000.00

6,875.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0060 oh

mandor

75,000.00

27,129.17

450.00
30,246.67

26,700.00

56,946.67

1 M2 MEMASANG ATAP SENG


0.7000 lbr

seng gelombang bjls

39,125.00

27,387.50

0.0200 kg

paku seng

24,666.67

493.33

0.1200 oh

pekerja

55,000.00

6,600.00

0.0600 oh

tukang kayu

70,000.00

4,200.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0060 oh

mandor

75,000.00
JUMLAH

H. 6.6.39

40,633.33

1 M' MEMASANG BUBUNGAN ATAP SIRAP L 40 cm

JUMLAH
H. 6.6.38

26,700.00

1M' PASANG NOK GENTENG METAL

JUMLAH
H. 6.6.37

450.00
13,933.33

450.00
27,880.83

11,700.00

39,580.83

1 M2 MEMASANG BUBUNGAN ATAP SENG


1.1000 lbr

seng plat

45,833.33

50,416.67

0.0500 kg

paku seng

24,666.67

1,233.33

0.1500 oh

pekerja

55,000.00

8,250.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0130 oh

mandor

75,000.00
JUMLAH

975.00
51,650.00

27,850.00

79,500.00

H. 6.6.40

1 M2 PASANG ATAP ALUMUNIUM


1.0500 m2

atap alumunium gelombang tebal 0,55

0.0200 kg

paku hak panjang 15 cm

24,666.67

493.33

0.1500 oh

pekerja

55,000.00

8,250.00

0.7500 oh

tukang kayu

70,000.00

52,500.00

0.0080 oh

kepala tukang

75,000.00

600.00

0.0060 oh

mandor

75,000.00
JUMLAH

H. 6.6.41

61,800.00

62,293.33

1 M2 PASANG NOK ALUMUNIUM


1.2000 m2

Nok standar 40 cm 18, swg 22

0.0400 kg

paku hak panjang 15 cm

24,666.67

986.67

0.1000 oh

pekerja

55,000.00

5,500.00

1.0000 oh

tukang kayu

70,000.00

70,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0100 oh

mandor

75,000.00
JUMLAH

H. 6.6.42

450.00
493.33

750.00
986.67

77,000.00

77,986.67

1 M2 PASANG ALUMUNIUM FOIL /SISALATION


1.0500 lbr

Sisalation / alumunium foil

450,000.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0500 oh

tukang kayu

70,000.00

3,500.00

0.0050 oh

kepala tukang

75,000.00

375.00

0.0080 oh

mandor

75,000.00
JUMLAH

472,500.00

600.00
472,500.00

12,725.00

485,225.00

I. PEKERJAAN PLAFOND
I. 6.6.1

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 6 MM


1.1000 lbr

pelat asbes tebal 6 mm

29,400.00

32,340.00

0.0100 kg

paku plywood

23,750.00

237.50

0.0300 oh

pekerja

55,000.00

1,650.00

0.0700 oh

tukang kayu

70,000.00

4,900.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0015 oh

mandor

75,000.00
JUMLAH

I. 6.6.2

112.50
32,577.50

7,187.50

39,765.00

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 5 MM


1.1000 lbr

pelat asbes tebal 5 mm

29,400.00

32,340.00

0.0100 kg

paku plywood

23,750.00

237.50

0.0300 oh

pekerja

55,000.00

1,650.00

0.0700 oh

tukang kayu

70,000.00

4,900.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0015 oh

mandor

75,000.00
JUMLAH

112.50
32,577.50

7,187.50

39,765.00

I. 6.6.3

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 4 MM


1.1000 lbr

pelat asbes tebal 4 mm

75,000.00

82,500.00

0.0100 kg

paku plywood

23,750.00

237.50

0.0300 oh

pekerja

55,000.00

1,650.00

0.0700 oh

tukang kayu

70,000.00

4,900.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0015 oh

mandor

75,000.00
JUMLAH

I. 6.6.4

1.1000 lbr

pelat asbes tebal 5 mm

75,000.00

82,500.00

0.0100 kg

paku plywood

23,750.00

237.50

0.0300 oh

pekerja

55,000.00

1,650.00

0.0700 oh

tukang kayu

70,000.00

4,900.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0015 oh

mandor

75,000.00

112.50
82,737.50

7,187.50

akustik ukuran 30 x 30 cm

0.0500 kg

paku plywood

23,750.00

89,925.00

0.0600 oh

pekerja

55,000.00

3,300.00

0.1200 oh

tukang kayu

70,000.00

8,400.00

0.1200 oh

kepala tukang

75,000.00

9,000.00

0.0030 oh

mandor

75,000.00
JUMLAH

1,187.50

225.00
1,187.50

20,925.00

22,112.50

1 M2 PLAFOND AKUSTIK (30 X 60) CM


5.8000 lbr

akustik ukuran 30 x 60 cm

0.0500 kg

paku plywood

23,750.00

0.0600 oh

pekerja

55,000.00

3,300.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0030 oh

mandor

75,000.00
JUMLAH

I. 6.6.7

89,925.00

1 M2 PLAFOND AKUSTIK (30 X 30) CM


11.5000 lbr

I. 6.6.6

7,187.50

1 M2 PLAFOND ASBES (1,00 X 1,00) M, TEBAL 3,5 MM

JUMLAH
I. 6.6.5

112.50
82,737.50

1,187.50

225.00
1,187.50

11,275.00

12,462.50

1 M2 PLAFOND AKUSTIK (60 X 120) CM


1.5000 lbr

akustik arm strong 60 x 120 cm

0.0500 kg

paku plywood

23,750.00

0.0600 oh

pekerja

55,000.00

3,300.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0030 oh

mandor

75,000.00
JUMLAH

1,187.50

225.00
1,187.50

11,275.00

12,462.50

I. 6.6.8

1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 4 MM


0.3600 lbr

Plywood 4mm

55,000.00

19,800.00

0.0300 kg

paku plywood

23,750.00

712.50

0.0700 oh

pekerja

55,000.00

3,850.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0035 oh

mandor

75,000.00
JUMLAH

I. 6.6.9

0.3600 lbr

Plywood 6mm

124,583.33

44,850.00

0.0300 kg

paku plywood

23,750.00

712.50

0.0700 oh

pekerja

55,000.00

3,850.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0035 oh

mandor

75,000.00

262.50
45,562.50

11,862.50

0.3750 lbr

Plywood 2mm

44,375.00

16,640.63

0.0300 kg

paku plywood

23,750.00

712.50

0.0700 oh

pekerja

55,000.00

3,850.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0035 oh

mandor

75,000.00

57,425.00

262.50
17,353.13

11,862.50

29,215.63

1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 6 MM


0.3750 lbr

Plywood 6mm

80,000.00

30,000.00

0.0300 kg

paku plywood

23,750.00

712.50

0.0700 oh

pekerja

55,000.00

3,850.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0035 oh

mandor

75,000.00
JUMLAH

I. 6.6.12

32,375.00

1 M2 PLAFOND PLYWOOD ( 60 X 120 ) cm, TEBAL 2 MM

JUMLAH
I. 6.6.11

11,862.50

1 M2 PLAFOND PLYWOOD ( 30 X 60 ) cm, TEBAL 6 MM

JUMLAH
I. 6.6.10

262.50
20,512.50

262.50
30,712.50

11,862.50

42,575.00

1 M2 PLAFOND TEAKWOOD ( 30 x 60 ) cm, TEBAL 4 MM


0.3600 lbr

Teakwood 4 mm

99,300.00

35,748.00

0.0300 kg

paku plywood

23,750.00

712.50

0.0700 oh

pekerja

55,000.00

3,850.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0035 oh

mandor

75,000.00
JUMLAH

262.50
36,460.50

11,862.50

48,323.00

I. 6.6.13

1 M2 PLAFOND TEAKWOOD ( 60 x 120 ) cm, TEBAL 4 MM


0.3750 lbr

Teakwood 4 mm

120,200.00

45,075.00

0.0300 kg

paku plywood

23,750.00

712.50

0.0700 oh

pekerja

55,000.00

3,850.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0035 oh

mandor

75,000.00
JUMLAH

I. 6.6.14

0.0240 lbr

Kayu jati, papan

7,000,000.00

0.0100 Kg

paku biasa

15,583.33

155.83

0.0500 kg

paku sekrup

20,000.00

1,000.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0100 oh

mandor

75,000.00

168,000.00

750.00
169,155.83

30,250.00

0.0240 lbr

Kayu meranti, papan

2,300,000.00

0.0100 Kg

paku biasa

15,583.33

155.83

0.0500 kg

paku sekrup

20,000.00

1,000.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0100 oh

mandor

75,000.00

199,405.83

55,200.00

750.00
56,355.83

30,250.00

86,605.83

1M2 PLAFOND LAT KAYU BENGKIRAI


0.0240 lbr

Kayu bengkirai, papan

6,000,000.00

0.0100 Kg

paku biasa

15,583.33

155.83

0.0500 kg

paku sekrup

20,000.00

1,000.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0100 oh

mandor

75,000.00
JUMLAH

I. 6.6.17

57,650.00

1M2 PLAFOND LAT KAYU MERANTI

JUMLAH
I. 6.6.16

11,862.50

1M2 PLAFOND LAT KAYU JATI, PAPAN

JUMLAH
I. 6.6.15

262.50
45,787.50

144,000.00

750.00
145,155.83

30,250.00

175,405.83

1M2 PLAFOND SOFTBOARD


0.3500 lbr

Softboard 4' x 8' x 4 mm

0.0300 Kg

paku biasa

15,583.33

0.6000 oh

pekerja

55,000.00

33,000.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0030 oh

mandor

75,000.00
JUMLAH

467.50

225.00
467.50

40,975.00

41,442.50

I. 6.6.18

1M2 PLAFOND AKUSTIK 60 X 120 CM + RANGKA ALUMUNIUM


3.6000 M'

Profil alumunium T

0.1500 kg

Kawat seng polos

1.0000 bh

Ramset / dina bold

1.5000 lbr

akustik arm strong 60 x 120 cm

0.1500 oh

pekerja

55,000.00

8,250.00

0.5000 oh

tukang kayu

70,000.00

35,000.00

0.0500 oh

kepala tukang

75,000.00

3,750.00

0.0075 oh

mandor

75,000.00

JUMLAH
I. 6.6.19

I. 6.6.20

I. 6.6.22

562.50
-

47,562.50

47,562.50

1M2 PLAFOND KAYU PROFIL


1.1000 lbr

List kayu profil bengkirai

10,300.00

11,330.00

0.0100 Kg

paku biasa

15,583.33

155.83

0.0500 oh

pekerja

55,000.00

2,750.00

0.0500 oh

tukang kayu

70,000.00

3,500.00

0.0050 oh

kepala tukang

75,000.00

375.00

0.0030 oh

mandor

75,000.00

225.00

JUMLAH

11,485.83
26,400.00

6,850.00

18,335.83

1M2 PLAFOND ASBES ( 1,00 X 1,00 ) M, TEBAL 3,2MM RANGKA MERANTI


0.0120 m3

kayu meranti

2,200,000.00

0.0600 Kg

paku biasa

15,583.33

935.00

1.1000 lbr

asbes 1,00 x 1,00 m

75,000.00

82,500.00

0.1800 oh

pekerja

55,000.00

9,900.00

0.3200 oh

tukang kayu

70,000.00

22,400.00

0.0320 oh

kepala tukang

75,000.00

2,400.00

0.0090 oh

mandor

75,000.00
JUMLAH

I. 6.6.21

675.00
109,835.00

35,375.00

145,210.00

1M2 PLAFOND PLYWOOD 4 MM + RANGKA KAYU MERANTI


0.0230 m3

kayu meranti

2,300,000.00

0.0600 kg

paku biasa

15,583.33

52,900.00
935.00

0.3900 lbr

Plywood 4' x 8' x 4mm

55,000.00

21,450.00

0.2700 oh

pekerja

55,000.00

14,850.00

0.4000 oh

tukang kayu

70,000.00

28,000.00

0.0400 oh

kepala tukang

75,000.00

3,000.00

0.0135 oh

mandor

75,000.00

1,012.50

JUMLAH

75,285.00

46,862.50

122,147.50

1M2 PLAFOND AKUSTIK (30 X 60 ) CM + RANGKA KAYU MERANTI


0.0230 m3

kayu meranti

2,300,000.00

52,900.00

0.0600 kg

paku biasa

15,583.33

935.00

5.8000 bh

akustik 30 x 60 cm

0.2600 oh

pekerja

55,000.00

14,300.00

0.4000 oh

tukang kayu

70,000.00

28,000.00

0.0400 oh

kepala tukang

75,000.00

3,000.00

0.0130 oh

mandor

75,000.00
JUMLAH

975.00
53,835.00

46,275.00

100,110.00

I. 6.6.23

1M2 PLAFOND AKUSTIK (30 X 30 ) CM + RANGKA KAYU MERANTI


0.0270 m3

kayu meranti, balok

2,200,000.00

59,400.00

0.0600 kg

paku

15,583.33

935.00

akustik 30 x30 cm

0.3100 oh

pekerja

55,000.00

17,050.00

0.4700 oh

tukang kayu

70,000.00

32,900.00

0.0470 oh

kepala tukang

75,000.00

3,525.00

0.0155 oh

mandor

75,000.00

11.5000 bh

JUMLAH
I. 6.6.24

1,162.50
60,335.00

54,637.50

114,972.50

1M2 PLAFOND GYPSUM BOARD, TEBAL 9 MM


0.3640 lbr

Gypsum board ( 120 x 240 x 9 ) mm

65,000.00

23,660.00

0.1100 kg

paku sekrup

20,000.00

2,200.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.0500 oh

tukang kayu

70,000.00

3,500.00

0.0050 oh

kepala tukang

75,000.00

375.00

0.0050 oh

mandor

75,000.00
JUMLAH

375.00
25,860.00

9,750.00

35,610.00

J. PEKERJAAN SANITAIR
J. 6.6.1

MEMASANG 1 BH CLOSED DUDUK / MONOBLOK


1.0000 bh

closed duduk monoblok

1,575,000.00

1,575,000.00

6.0000 %

perlengkapan (6 % harga klosed)

94,500.00

94,500.00

3.3000 oh

pekerja

55,000.00

181,500.00

1.1000 oh

tukang kayu

70,000.00

77,000.00

0.0010 oh

kepala tukang

75,000.00

75.00

0.1600 oh

mandor

75,000.00

12,000.00

JUMLAH
J. 6.6.2

270,575.00

1,940,075.00

MEMASANG 1 BH CLOSED JONGKOK KERAMIK


1.0000 bh

closed jongkok keramik

132,083.33

132,083.33

6.0000 kg

semen portland

1,300.00

7,800.00

0.0100 m3

pasir pasang

278,750.00

2,787.50

1.0000 oh

pekerja

55,000.00

55,000.00

1.5000 oh

tukang kayu

70,000.00

105,000.00

1.5000 oh

kepala tukang

75,000.00

112,500.00

0.1600 oh

mandor

75,000.00
JUMLAH

J. 6.6.3

1,669,500.00

12,000.00
142,670.83

284,500.00

427,170.83

MEMASANG 1 BH CLOSED JONGKOK TERASO


1.0000 bh

closed jongkok teraso

98,333.33

98,333.33

7.0000 bh

Bata Merah

800.00

5,600.00

6.0000 Kg

semen portland

1,300.00

7,800.00

0.0100 m3

pasir pasang

278,750.00

2,787.50

1.0000 oh

Pekerja

55,000.00

55,000.00

1.5000 oh

Tukang Batu

70,000.00

105,000.00

0.3000 oh

kepala tukang

75,000.00

22,500.00

0.1100 oh

mandor

75,000.00
JUMLAH

8,250.00
114,520.83

190,750.00

305,270.83
Hal : 467

J. 6.6.4

MEMASANG 1 BH URINOIR
1.0000 bh

urinoir

1,865,500.00

1,865,500.00

Perlengkapan

559,650.00

559,650.00

6.0000 Kg

Semen Portland

1,300.00

7,800.00

0.0100 m3

Pasir Pasang

278,750.00

2,787.50

1.0000 oh

pekerja

55,000.00

55,000.00

1.0000 oh

Tukang Batu

70,000.00

70,000.00

0.1000 oh

kepala tukang

75,000.00

7,500.00

0.1000 oh

mandor

75,000.00

30.0000 %

J. 6.6.5

MEMASANG 1 BH WASTAFEL
1.0000 bh

1,865,500.00

1,865,500.00

Perlengkapan

559,650.00

559,650.00

6.0000 Kg

Semen Portland

1,300.00

7,800.00

0.0100 m3

pasir pasang

278,750.00

2,787.50

1.2000 oh

pekerja

55,000.00

66,000.00

1.4500 oh

Tukang Batu

70,000.00

101,500.00

0.1500 oh

kepala tukang

75,000.00

11,250.00

0.1000 oh

mandor

75,000.00

Bak Teraso

185,000.00

185,000.00

6.0000 Kg

semen portland

1,300.00

7,800.00

0.0100 m3

pasir pasang

278,750.00

2,787.50

2.1000 oh

pekerja

55,000.00

115,500.00

0.7500 oh

Tukang Batu

70,000.00

52,500.00

0.0700 oh

kepala tukang

75,000.00

5,250.00

0.1100 oh

mandor

75,000.00

2,621,987.50

8,250.00
195,587.50

181,500.00

377,087.50

MEMASANG 1 BH BAK MANDI FIBREGLASS VOLUME 0,30 M3


1.0000 bh

Bak Fiberglass

160,000.00

160,000.00

Perlengkapan

28,800.00

28,800.00

1.8000 oh

pekerja

55,000.00

99,000.00

2.7000 oh

Tukang Batu

70,000.00

189,000.00

0.5400 oh

kepala tukang

75,000.00

40,500.00

0.1100 oh

mandor

75,000.00
JUMLAH

0.012

186,250.00

1.0000 bh

18.0000 %

2.4000

7,500.00
2,435,737.50

MEMASANG 1 BH BAK MANDI TERASO VOLUME 0.30 M3

JUMLAH

J. 6.6.8

2,575,737.50

JUMLAH

J. 6.6.7

140,000.00

Wastafel

12.0000 %

J. 6.6.6

7,500.00
2,435,737.50

8,250.00
188,800.00

336,750.00

525,550.00

MEMASANG 1 BH BAK AIR BATU BATA VOLUME 0,3 M3 ( 60 x 60 )


0.4000 bh

batu bata

800.00

320.00

semen portland

1,300.00

156,000.00

pasir pasang

278,750.00

83,625.00

Porselen ( 11x11)cm

2,500.00

900,000.00

6.0000 kg

Semen nat

12,000.00

72,000.00

6.0000 oh

pekerja

55,000.00

330,000.00

3.0000 oh

tukang batu

70,000.00

210,000.00

0.3000 oh

kepala tukang

75,000.00

22,500.00

0.3000 oh

mandor

75,000.00

120.0000 kg
0.3000 m3
360.0000 Bh

JUMLAH

22,500.00
1,211,945.00

585,000.00

1,796,945.00

J. 6.6.9

MEMASANG 1 BH BADKIP PORSELEN


1.0000 bh

Badkip

6.0000 %

Perlengkapan

pekerja

55,000.00

0.0750 oh

Tukang Batu

70,000.00

5,250.00

0.7500 oh

kepala tukang

75,000.00

56,250.00

0.2500 oh

mandor

75,000.00

oh

JUMLAH
J. 6.6.9

Badkip

6.0000 %

Perlengkapan

pekerja

55,000.00

0.0750 oh

Tukang Batu

70,000.00

5,250.00

0.7500 oh

kepala tukang

75,000.00

56,250.00

0.2500 oh

mandor

75,000.00

80,250.00

oh

18,750.00
-

80,250.00

80,250.00

MEMASANG 1 BH BADKIP PORSELEN


1.0000 bh

Badkip

6.0000 %

Perlengkapan

pekerja

55,000.00

0.0750 oh

Tukang Batu

70,000.00

5,250.00

0.7500 oh

kepala tukang

75,000.00

56,250.00

0.2500 oh

mandor

75,000.00

oh

JUMLAH

18,750.00
-

80,250.00

80,250.00

MEMASANG 1 BH BAK BETON VOLUME 1 M3 AIR


0.9000 m3

Beton 1 : 1,5 : 2,5

1,132,125.00

Besi Beton

10,000.00

1,800,000.00

8.0000 m3

kayu cetakan

1,750,000.00

14,000,000.00

5.0000 m2

Ubin Porselen

70,000.00

350,000.00

Perlengkapan

7,000.00

70,000.00

3.5000 oh

pekerja

55,000.00

192,500.00

4.5000 oh

Tukang Batu

70,000.00

315,000.00

0.9000 oh

kepala tukang

75,000.00

67,500.00

0.9000 oh

mandor

75,000.00

180.0000 kg

10.0000 %

JUMLAH
J. 6.6.11

80,250.00

1.0000 bh

JUMLAH

J. 6.6.10

18,750.00
-

MEMASANG 1 BH BADKIP PORSELEN

J. 6.6.9

1,018,912.50

67,500.00
17,238,912.50

642,500.00

17,881,412.50

MEMASANG 1 BH BAK FIBERGLASS VOLUME 1 M3 AIR


1.0000 bh

Bak Fiberglass

450,000.00

450,000.00

Perlengkapan

54,000.00

54,000.00

3.0000 oh

pekerja

55,000.00

165,000.00

4.5000 oh

Tukang Batu

70,000.00

315,000.00

0.9000 oh

kepala tukang

75,000.00

67,500.00

0.9000 oh

mandor

75,000.00

12.0000 %

JUMLAH

67,500.00
504,000.00

615,000.00

1,119,000.00

J. 6.6.12

MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.15 CM
1.6000 bh

Pipa tanah

0.6800 kg

Semen Portland

1,300.00

884.00

0.0130 m3

pasir pasang

278,750.00

3,623.75

0.0110 m3

pasir urug

51,900.00

570.90

0.0600 oh

pekerja

55,000.00

3,300.00

0.0300 oh

Tukang Batu

70,000.00

2,100.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0025 oh

mandor

75,000.00
JUMLAH

J. 6.6.13

1.6000 bh

Pipa tanah

0.8700 kg

Semen Portland

1,300.00

1,131.00

10,891.15

0.0140 m3

pasir pasang

278,750.00

3,902.50

0.0140 m3

pasir urug

51,900.00

726.60

0.0800 oh

pekerja

55,000.00

4,400.00

0.0400 oh

Tukang Batu

70,000.00

2,800.00

0.0040 oh

kepala tukang

75,000.00

300.00

0.0070 oh

mandor

75,000.00

525.00
5,760.10

8,025.00

13,785.10

MEMASANG 1M' PIPA BETON, DIAMETER 15 - 20 CM


1.1000 bh

pipa beton

0.0270 m3

Batu bata

3.9200 kg

Semen Portland

1,300.00

5,096.00

0.0560 m3

pasir pasang

278,750.00

15,610.00

0.0240 m3

pasir urug

51,900.00

1,245.60

0.1400 oh

pekerja

55,000.00

7,700.00

0.0700 oh

Tukang Batu

70,000.00

4,900.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0070 oh

mandor

75,000.00

800.00

JUMLAH
J. 6.6.15

5,812.50

MEMASANG 1M' PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA.20 CM

JUMLAH
J. 6.6.14

187.50
5,078.65

21.60

525.00
21,973.20

13,650.00

35,623.20

MEMASANG 1M' PIPA BETON, DIAMETER 30 - 100 CM


1.1000 bh

pipa beton

0.5500 m3

Batu bata

10.3000 kg

800.00

440.00

Semen Portland

1,300.00

13,390.00

0.0610 m3

pasir pasang

278,750.00

17,003.75

0.0690 m3

pasir urug

51,900.00

3,581.10

0.3800 oh

pekerja

55,000.00

20,900.00

0.1900 oh

Tukang Batu

70,000.00

13,300.00

0.0190 oh

kepala tukang

75,000.00

1,425.00

0.0190 oh

mandor

75,000.00
JUMLAH

1,425.00
34,414.85

37,050.00

71,464.85

J. 6.6.16

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (30X30)CM TINGGI 35 CM
0.1450 bh

Batu bata

800.00

116.00

Semen Portland

1,300.00

57,200.00

0.0700 kg

pasir pasang

278,750.00

19,512.50

0.0700 m3

Batu kerikil

263,000.00

18,410.00

1.6000 kg

Besi Beton

10,000.00

16,000.00

0.0600 m3

Pasir Beton

250,000.00

15,000.00

3.2000 oh

pekerja

55,000.00

176,000.00

1.0150 oh

Tukang Batu

70,000.00

71,050.00

0.0015 oh

kepala tukang

75,000.00

112.50

0.0160 oh

mandor

75,000.00

1,200.00

44.0000 m3

JUMLAH
J. 6.6.17

0.2500 bh

800.00

200.00

Semen Portland

1,300.00

100,100.00

0.1300 kg

pasir pasang

278,750.00

36,237.50

0.0200 m3

Batu kerikil

263,000.00

5,260.00

2.6000 kg

Besi Beton

10,000.00

26,000.00

0.0900 m3

Pasir Beton

250,000.00

22,500.00

1.4200 oh

pekerja

55,000.00

78,100.00

0.4730 oh

Tukang Batu

70,000.00

26,015.00

0.0470 oh

kepala tukang

75,000.00

2,820.00

0.0710 oh

mandor

75,000.00
JUMLAH

374,601.00

4,260.00
190,297.50

111,195.00

301,492.50

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (60 x 60)CM TINGGI 65 CM
0.3710 bh

Batu bata

800.00

296.80

Semen Portland

1,300.00

148,200.00

0.1840 kg

pasir pasang

278,750.00

51,290.00

0.0330 m3

Batu koral

263,000.00

8,679.00

4.8500 kg

Besi Beton

10,000.00

48,500.00

0.1200 m3

Pasir Beton

250,000.00

30,000.00

2.1600 oh

pekerja

55,000.00

118,800.00

0.7200 oh

Tukang Batu

70,000.00

50,400.00

0.0720 oh

kepala tukang

75,000.00

5,400.00

0.1080 oh

mandor

75,000.00

8,100.00

0.1000 oh

Tukang gali

55,000.00

114.0000 m3

JUMLAH
J. 6.6.19

263,362.50

Batu bata

77.0000 m3

J. 6.6.18

111,238.50

MEMASANG 1BH BAK KONTROL PAS. BATU BATA UKURAN (45X45)CM TINGGI 50 CM

5,500.00
286,965.80

188,200.00

475,165.80

MEMASANG 1M' PIPA GALVANIS DIAMETER 1/2"


1.2000 m'

Pipa galvanis

52,100.00

62,520.00

Perlengkapan

18,235.00

18,235.00

0.0540 oh

pekerja

55,000.00

2,970.00

0.0900 oh

Tukang Batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0270 oh

mandor

75,000.00

2,025.00

35.0000 %

JUMLAH

80,755.00

11,970.00

92,725.00

J. 6.6.20

MEMASANG 1M' PIPA GALVANIS DIAMETER 3/4"


1.2000 m'

Pipa galvanis

52,100.00

62,520.00

Perlengkapan

3,937.50

3,937.50

0.0540 oh

pekerja

55,000.00

2,970.00

0.0900 oh

Tukang Batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0270 oh

mandor

75,000.00

2,025.00

35.0000 %

JUMLAH
J. 6.6.21

1.2000 m'

52,100.00

62,520.00

Perlengkapan

18,235.00

18,235.00

0.0540 oh

pekerja

55,000.00

2,970.00

0.0900 oh

Tukang Batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0270 oh

mandor

75,000.00

2,025.00

JUMLAH
1.2000 m'

80,755.00

11,970.00

Pipa galvanis

103,100.00

123,720.00

Perlengkapan

7,875.00

7,875.00

0.1080 oh

pekerja

55,000.00

5,940.00

0.1800 oh

Tukang Batu

70,000.00

12,600.00

0.0180 oh

kepala tukang

75,000.00

1,350.00

0.0054 oh

mandor

75,000.00
JUMLAH

92,725.00

405.00
131,595.00

20,295.00

151,890.00

MEMASANG 1M' PIPA GALVANIS DIAMETER 3"


1.2000 m'

Pipa galvanis

182,150.00

218,580.00

Perlengkapan

63,752.50

63,752.50

0.1080 oh

pekerja

55,000.00

5,940.00

0.1800 oh

Tukang Batu

70,000.00

12,600.00

0.0180 oh

kepala tukang

75,000.00

1,350.00

0.0054 oh

mandor

75,000.00

35.0000 %

JUMLAH
J. 6.6.24

160,852.50

MEMASANG 1M' PIPA GALVANIS DIAMETER 1 1/2 "


35.0000 %

J. 6.6.23

9,540.00

Pipa galvanis

35.0000 %

J. 6.6.22

151,312.50

MEMASANG 1M' PIPA GALVANIS DIAMETER 1 "

405.00
282,332.50

16,164.00

298,496.50

MEMASANG 1M' PIPA GALVANIS DIAMETER 4 "


1.2000 m'

Pipa galvanis

259,300.00

311,160.00

Perlengkapan

90,755.00

90,755.00

0.1350 oh

pekerja

55,000.00

7,425.00

0.2250 oh

Tukang Batu

70,000.00

15,750.00

0.0225 oh

kepala tukang

75,000.00

1,687.50

0.0068 oh

mandor

75,000.00

35.0000 %

JUMLAH

510.00
401,915.00

25,372.50

427,287.50

J. 6.6.25

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1/2 "


1.2000 m'

Pipa PVC

19,416.67

23,300.00

Perlengkapan

6,795.83

6,795.83

0.0360 oh

pekerja

55,000.00

1,980.00

0.0600 oh

Tukang Batu

70,000.00

4,200.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0018 oh

mandor

75,000.00

35.0000 %

JUMLAH
J. 6.6.26

1.2000 m'

Pipa PVC

5,208.33

6,250.00

Perlengkapan

1,822.92

1,822.92

0.0360 oh

pekerja

55,000.00

1,980.00

0.0600 oh

Tukang Batu

70,000.00

4,200.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0018 oh

mandor

75,000.00
JUMLAH

1.2000 m'

135.00
8,072.92

6,765.00

Pipa PVC

6,520.83

7,825.00

Perlengkapan

2,282.29

2,282.29

0.0360 oh

pekerja

55,000.00

1,980.00

0.0600 oh

Tukang Batu

70,000.00

4,200.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0018 oh

mandor

75,000.00
JUMLAH

14,837.92

135.00
10,107.29

6,765.00

16,872.29

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 1/2 "


1.2000 m'

Pipa PVC

12,458.33

14,950.00

Perlengkapan

4,360.42

4,360.42

0.0360 oh

pekerja

55,000.00

1,980.00

0.0600 oh

Tukang Batu

70,000.00

4,200.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0018 oh

mandor

75,000.00

35.0000 %

JUMLAH
J. 6.6.29

36,860.83

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 1 "


35.0000 %

J. 6.6.28

6,765.00

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3/4"


35.0000 %

J. 6.6.27

135.00
30,095.83

135.00
19,310.42

6,765.00

26,075.42

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2"


1.2000 m'

Pipa PVC

25,775.00

30,930.00

Perlengkapan

9,021.25

9,021.25

0.0360 oh

pekerja

55,000.00

1,980.00

0.0600 oh

Tukang Batu

70,000.00

4,200.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0018 oh

mandor

75,000.00

35.0000 %

JUMLAH

135.00
39,951.25

6,765.00

46,716.25

J. 6.6.30

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 2 1/2"


1.2000 m'

Pipa PVC

12,458.33

14,950.00

Perlengkapan

4,360.42

4,360.42

0.0360 oh

pekerja

55,000.00

1,980.00

0.0600 oh

Tukang Batu

70,000.00

4,200.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0018 oh

mandor

75,000.00

35.0000 %

JUMLAH
J. 6.6.31

1.2000 m'

Pipa PVC

38,500.00

46,200.00

Perlengkapan

13,475.00

13,475.00

0.0810 oh

pekerja

55,000.00

4,455.00

0.1350 oh

Tukang Batu

70,000.00

9,450.00

0.0135 oh

kepala tukang

75,000.00

1,012.50

0.0041 oh

mandor

75,000.00
JUMLAH

1.2000 m'

307.50
59,675.00

15,225.00

Pipa PVC

37,708.33

45,250.00

Perlengkapan

13,197.92

13,197.92

0.0810 oh

pekerja

55,000.00

4,455.00

0.1350 oh

Tukang Batu

70,000.00

9,450.00

0.0135 oh

kepala tukang

75,000.00

1,012.50

0.0041 oh

mandor

75,000.00
JUMLAH

74,900.00

307.50
58,447.92

15,225.00

73,672.92

MEMASANG 1BH BAK CUCI PIRING STAINLES STEEL


1.0000 bh

Bak cuci stainless steel

442,916.67

442,916.67

1.0000 set

Water drain + Asseories

35,000.00

35,000.00

0.0300 oh

pekerja

55,000.00

1,650.00

0.3000 oh

Tukang Batu

70,000.00

21,000.00

0.0300 oh

kepala tukang

75,000.00

2,250.00

0.0015 oh

mandor

75,000.00
JUMLAH

J. 6.6.34

26,075.42

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 4"


35.0000 %

J. 6.6.33

6,765.00

MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 3"


35.0000 %

J. 6.6.32

135.00
19,310.42

112.50
230,000.00

25,012.50

255,012.50

MEMASANG 1 BH BAK CUCI PIRING TERASO


1.0000 bh

bak cuci teraso

293,000.00

293,000.00

1.0000 set

Water drain + Asseories

35,000.00

35,000.00

Semen Portland

1,300.00

26,000.00

0.0500 m3

Pasir

278,750.00

13,937.50

0.0500 oh

Pekerja

55,000.00

2,750.00

0.5000 oh

Tukang Batu

70,000.00

35,000.00

0.0500 oh

kepala tukang

75,000.00

3,750.00

0.0025 oh

mandor

75,000.00

20.0000 Kg

JUMLAH

187.50
367,937.50

41,687.50

409,625.00

J. 6.6.35

MEMASANG 1BH KRAN DIAMETER 3/4" ATAU 1/2"


1.0000 Bh

Kran Air

25,000.00

25,000.00

0.0250 Bh

Seal Tape

4,000.00

100.00

0.0100 oh

pekerja

55,000.00

550.00

0.1000 oh

Tukang Batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00
JUMLAH

J. 6.6.36

375.00
25,100.00

8,675.00

33,775.00

MEMASANG 1BH FLOOR DRAIN


1.0000 Bh

Floor drain

35,000.00

0.0100 oh

pekerja

55,000.00

550.00

0.1000 oh

Tukang Batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00
JUMLAH

35,000.00

375.00
35,000.00

8,675.00

43,675.00

K. PEKERJAAN BESI DAN ALUMINIUM


K. 6.6.1

1 KG PASANG RANGKA ATAP BAJA


1.1000 Kg

Besi Profil WF

0.0800 Kg

Meni Besi

20,333.33

0.0060 oh

Tukang Besi

70,000.00

420.00

0.0600 oh

Pekerja

55,000.00

3,300.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0003 oh

mandor

75,000.00
JUMLAH

K. 6.6.2

22.50
1,626.67

4,192.50

5,819.17

1 M2 PASANG PINTU BESI BAJA


1.1000 m2

Pintu Besi Baja

0.0060 oh

Tukang Besi Konstruksi

70,000.00

420.00

0.0600 oh

Pekerja

55,000.00

3,300.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0003 oh

mandor

75,000.00
JUMLAH

K. 6.6.3

1,626.67

22.50
-

4,192.50

4,192.50

1 M2 PASANG JENDELA BESI


1.0000 m2

Jendela Besi

1.0500 oh

Tukang Besi Konstruksi

70,000.00

73,500.00

1.0500 oh

Pekerja

55,000.00

57,750.00

0.1050 oh

kepala tukang

75,000.00

7,875.00

0.0053 oh

mandor

75,000.00
JUMLAH

393.75
-

139,518.75

139,518.75

K. 6.6.4

1 M2 PASANG JENDELA BESI TAHAN API


1.0000 m2

Jendela Besi tahan api

1.2000 oh

Tukang Besi Konstruksi

70,000.00

84,000.00

1.0220 oh

Pekerja

55,000.00

56,210.00

0.1200 oh

kepala tukang

75,000.00

9,000.00

0.0060 oh

mandor

75,000.00
JUMLAH

K. 6.6.5

1.0000 m2

Pintu Gulung besi

1.2000 oh

Tukang Besi Konstruksi

70,000.00

84,000.00

1.2000 oh

Pekerja

55,000.00

66,000.00

0.1200 oh

kepala tukang

75,000.00

9,000.00

0.0060 oh

mandor

75,000.00

159,450.00

1.1000 m2

Pintu Lipat

0.0060 oh

Tukang Besi Konstruksi

70,000.00

159,450.00

420.00

0.0600 oh

Pekerja

55,000.00

3,300.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0003 oh

mandor

75,000.00

22.50
-

4,192.50

4,192.50

1 M2 PASANG PINTU SUNSCREEN ALLUMUNIUM


1.0000 m2

Sunscreen Allumunium

0.8000 oh

Tukang Besi Konstruksi

70,000.00

56,000.00

0.0800 oh

Pekerja

55,000.00

4,400.00

0.0800 oh

kepala tukang

75,000.00

6,000.00

0.0040 oh

mandor

75,000.00

300.00
-

66,700.00

66,700.00

1 M2 PASANG ROLLING DOOR


1.0000 m2

Roll Door

1.5000 oh

Tukang Besi Konstruksi

70,000.00

105,000.00

1.0500 oh

Pekerja

55,000.00

57,750.00

0.1050 oh

kepala tukang

75,000.00

7,875.00

0.0052 oh

mandor

75,000.00
JUMLAH

K. 6.6.9

450.00
-

1 M2 PASANG PINTU LIPAT

JUMLAH
K. 6.6.8

149,660.00

JUMLAH
K. 6.6.7

149,660.00

1 M2 PASANG PINTU GULUNG BESI

JUMLAH
K. 6.6.6

450.00
-

390.00
-

171,015.00

171,015.00

1 M2 PASANG PINTU ALLUMUNIUM


1.0000 m2

Pintu Allumunium

1.0500 oh

Tukang Besi Konstruksi

70,000.00

73,500.00

1.0500 oh

Pekerja

55,000.00

57,750.00

0.1050 oh

kepala tukang

75,000.00

7,875.00

0.0052 oh

mandor

75,000.00
JUMLAH

390.00
-

139,515.00

139,515.00

K. 6.6.10

1 M2 PASANG VENETIONS BLINDS


1.0000 m2

Venetions Blinds

0.3500 oh

Tukang kayu

70,000.00

24,500.00

0.3500 oh

Pekerja

55,000.00

19,250.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0018 oh

mandor

75,000.00
JUMLAH

K. 6.6.11

1.0000 m2

Vertikals blinds

0.3500 oh

Tukang Kayu

70,000.00

24,500.00

0.3500 oh

Pekerja

55,000.00

19,250.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0018 oh

mandor

75,000.00

46,506.25

Besi Strip 2 x 3

31,800.00

Tukang Besi Konstruksi

70,000.00

84,000.00

1.2000 oh

Pekerja

55,000.00

66,000.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0006 oh

mandor

75,000.00

46,506.25

365,700.00

45.00
365,700.00

150,945.00

516,645.00

1 M2 PASANG KAWAT HARMONIKA


1.1000 m2

kawat harmonika

28,350.00

0.0200 kg

paku biasa 1/2" - 1"

15,583.33

311.67

0.0018 m3

papan ky meranti

2,300,000.00

4,140.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0005 oh

mandor

75,000.00
JUMLAH

31,185.00

37.50
43,624.13

10,630.00

54,254.13

1 M2 PASANG KAWAT NYAMUK


1.1000 m2

kawat nyamuk

25,000.00

0.0200 kg

paku biasa 1/2" - 1"

15,583.33

311.67

0.0018 m3

papan ky meranti

2,300,000.00

4,140.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0005 oh

mandor

75,000.00
JUMLAH

K. 6.6.15

131.25
-

1.2000 oh

JUMLAH

K. 6.6.14

46,506.25

1 M2 PASANG TERALI BESI


11.5000 m2

K. 6.6.13

46,506.25

1 M2 PASANG VERTIKALS BLINDS

JUMLAH
K. 6.6.12

131.25
-

27,500.00

37.50
31,951.67

13,287.50

45,239.17

1 M2 PASANG KAWAT KASSA


1.1000 m2

kawat kassa

7,750.00

0.0200 kg

paku biasa 1/2" - 1"

15,583.33

311.67

0.0018 m3

kayu bengkirai papan

2,300,000.00

4,140.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0005 oh

mandor

75,000.00
JUMLAH

8,525.00

37.50
12,976.67

13,287.50

26,264.17

K. 6.6.16

1 M2 PASANG KAWAT BURUNG


1.1000 m2

kawat Burung

107,300.00

0.0200 kg

paku biasa 1/2" - 1"

15,583.33

311.67

0.0018 m3

kayu bengkirai papan

6,000,000.00

10,800.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0005 oh

mandor

75,000.00
JUMLAH

K. 6.6.17

Jendela Nako

326,700.00

359,370.00

0.0200 kg

paku biasa 1/2" - 1"

15,583.33

311.67

0.0250 m3

Besi Strip

31,800.00

795.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0010 oh

mandor

75,000.00

142,429.17

75.00
360,476.67

26,575.00

387,051.67

1 M' PASANG TALANG DATAR, SENG BLJS 28


0.5000 Lbr

Seng plat 3' x 6' bljs 28

45,833.33

0.0150 kg

paku biasa 1/2" - 1"

15,583.33

233.75

0.0096 m3

Kayu ulin, papan

5,400,000.00

51,840.00

0.2500 kg

Flincote / Meni Besi

37,666.67

9,416.67

0.1500 oh

pekerja

55,000.00

8,250.00

0.4000 oh

tukang kayu

70,000.00

28,000.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0013 oh

mandor

75,000.00

22,916.67

93.75
84,407.08

38,218.75

122,625.83

1 M' PASANG TALANG MIRING, SENG BLJS 28


0.5000 Lbr

Seng plat 3' x 6' bljs 28

45,833.33

0.0150 kg

paku biasa 1/2" - 1"

15,583.33

233.75

0.0190 m3

Kayu ulin, papan

5,400,000.00

102,600.00

0.3000 kg

Flincote / Meni Besi

37,666.67

11,300.00

0.0400 oh

pekerja

55,000.00

2,200.00

0.4000 oh

tukang kayu

70,000.00

28,000.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0013 oh

mandor

75,000.00
JUMLAH

K. 6.6.20

13,287.50

1.1000 m2

JUMLAH
K. 6.6.19

37.50
129,141.67

1 M2 PASANG JENDELA NAKO & TRALIS

JUMLAH
K. 6.6.18

118,030.00

22,916.67

93.75
137,050.42

32,168.75

169,219.17

1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 28


0.3000 lbr

Seng plat 3' x 6' bljs 28

45,833.33

0.1000 kg

paku biasa 1/2" - 1"

15,583.33

1,558.33

0.0190 m3

Kayu ulin, papan

5,400,000.00

102,600.00

0.5000 kg

besi Strip

31,800.00

15,900.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0013 oh

mandor

75,000.00
JUMLAH

13,750.00

93.75
133,808.33

27,718.75

161,527.08

K. 6.6.21

1 M' PASANG TALANG 1/2 LINGKARAN D-10 CM. SENG BJLS 24


0.5000 m2

Seng plat 3' x 6' bljs 28

45,833.33

0.0150 kg

paku biasa 1/2" - 1"

15,583.33

233.75

0.0190 m3

Kayu ulin, papan

5,400,000.00

102,600.00

0.3000 kg

besi Strip

31,800.00

9,540.00

0.0400 oh

pekerja

55,000.00

2,200.00

0.4000 oh

tukang kayu

70,000.00

28,000.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0013 oh

mandor

75,000.00
JUMLAH

22,916.67

93.75
135,290.42

32,168.75

167,459.17

L. PEKERJAAN KUNCI DAN KACA


L. 6.6.1

1 BUAH PASANG KUNCI TANAM ANTIK


1.0000 Bh

Kunci tanam antik

0.0600 oh

Pekerja

55,000.00

3,300.00

0.6000 oh

Tukang Kayu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0030 oh

mandor

75,000.00
JUMLAH

L. 6.6.2

1.0000 Bh

Kunci tanam biasa

0.0100 oh

Pekerja

55,000.00

550.00

0.0500 oh

Tukang Kayu

70,000.00

3,500.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00

50,025.00

375.00
-

5,175.00

5,175.00

1 BUAH PASANG KUNCI KAMAR MANDI


1.0000 Bh

Kunci tanam kamar mandi

0.0050 oh

Pekerja

55,000.00

275.00

0.5000 oh

Tukang Kayu

70,000.00

35,000.00

0.0050 oh

kepala tukang

75,000.00

375.00

0.0025 oh

mandor

75,000.00

187.50
-

35,837.50

35,837.50

1 BUAH PASANG KUNCI SILINDER


1.0000 Bh

Kunci Silinder

0.0050 oh

Pekerja

55,000.00

275.00

0.5000 oh

Tukang Kayu

70,000.00

35,000.00

0.0050 oh

kepala tukang

75,000.00

375.00

0.0003 oh

mandor

75,000.00
JUMLAH

L. 6.6.5

50,025.00

1 BUAH PASANG KUNCI TANAM BIASA

JUMLAH
L. 6.6.4

225.00
-

JUMLAH
L. 6.6.3

18.75
-

35,668.75

28,040.00

1 BUAH PASANG ENGSEL PINTU


1.0000 Bh

Engsel Pintu

27,527.78

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00
JUMLAH

27,527.78

56.25
27,527.78

12,506.25

40,034.03

L. 6.6.6

1 BUAH PASANG ENGSEL JENDELA KUPU - KUPU


1.0000 Bh

Engsel Jendela

15,416.67

0.0100 oh

Pekerja

55,000.00

550.00

0.1000 oh

Tukang Kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0005 oh

mandor

75,000.00
JUMLAH

L. 6.6.7

Engsel angin

0.0200 oh

Pekerja

55,000.00

1,100.00

0.2000 oh

Tukang Kayu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0100 oh

mandor

75,000.00

750.00
-

17,350.00

17,350.00

1 BUAH PASANG SPRING KNIP


1.0000 Bh

Spring Knip

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00

56.25
-

12,506.25

12,506.25

1 BUAH PASANG KAIT ANGIN


1.0000 Bh

Kait angin

12,000.00

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00

12,000.00

56.25
12,000.00

12,506.25

24,506.25

1 BUAH PASANG DOOR CLOSER


1.0000 Bh

Door Closer

0.0500 oh

Pekerja

55,000.00

2,750.00

0.5000 oh

Tukang Kayu

70,000.00

35,000.00

0.0500 oh

kepala tukang

75,000.00

3,750.00

0.0025 oh

mandor

75,000.00
JUMLAH

L. 6.6.11

23,754.17

JUMLAH
L. 6.6.10

8,337.50

1.0000 Bh

JUMLAH
L. 6.6.9

37.50
15,416.67

1 BUAH PASANG ENGSEL ANGIN

JUMLAH
L. 6.6.8

15,416.67

187.50
-

41,687.50

41,687.50

1 BUAH PASANG KUNCI SELOT


1.0000 Bh

Kunci selot

0.0200 oh

Pekerja

55,000.00

1,100.00

0.2000 oh

Tukang Kayu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0010 oh

mandor

75,000.00
JUMLAH

75.00
-

16,675.00

16,675.00

L. 6.6.12

1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER


1.0000 Bh

Door Holder

0.0500 oh

Pekerja

55,000.00

2,750.00

0.5000 oh

Tukang Kayu

70,000.00

35,000.00

0.0500 oh

kepala tukang

75,000.00

3,750.00

0.0025 oh

mandor

75,000.00
JUMLAH

L. 6.6.13

1.0000 Bh

Door Stop

0.0100 oh

Pekerja

55,000.00

550.00

0.1000 oh

Tukang Kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0005 oh

mandor

75,000.00

8,337.50

1.0000 Bh

Rel pintu dorong

0.0600 oh

Pekerja

55,000.00

8,337.50

3,300.00

0.6000 oh

Tukang Kayu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0030 oh

mandor

75,000.00

225.00
-

50,025.00

50,025.00

1 BUAH PASANG KUNCI LEMARI


1.0000 Bh

Kunci Lemari

25,000.00

0.0250 oh

Pekerja

55,000.00

1,375.00

0.2500 oh

Tukang Kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0013 oh

mandor

75,000.00

25,000.00

93.75
25,000.00

20,843.75

45,843.75

1 M2 PASANG KACA, TEBAL 3 MM


1.1000 m2

kaca

84,700.00

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00
JUMLAH

L. 6.6.17

37.50
-

1 BUAH PASANG REL PINTU DORONG

JUMLAH
L. 6.6.16

41,687.50

JUMLAH
L. 6.6.15

41,687.50

1 BUAH PASANG DOOR STOP

JUMLAH
L. 6.6.14

187.50
-

93,170.00

56.25
93,170.00

12,506.25

105,676.25

1 M2 PASANG KACA, TEBAL 5 MM


1.1000 m2

Kaca

102,300.00

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00
JUMLAH

112,530.00

56.25
112,530.00

12,506.25

125,036.25

L. 6.6.18

1 M2 PASANG KACA, TEBAL 8 MM

16,000.00

1.1000 m2

Kaca

127,000.00

0.0165 oh

Pekerja

55,000.00

907.50

0.1650 oh

Tukang Kayu

70,000.00

11,550.00

0.0165 oh

kepala tukang

75,000.00

1,237.50

0.0008 oh

mandor

75,000.00
JUMLAH

L. 6.6.19

kaca gelap

127,000.00

139,700.00

0.0500 kg

Sealent

35,000.00

1,750.00

0.0250 oh

Pekerja

55,000.00

1,375.00

0.2500 oh

Tukang Kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0013 oh

mandor

75,000.00

93.75
141,450.00

20,843.75

1.1000 m2

Kaca cermin

114,000.00

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00

162,293.75

125,400.00

56.25
125,400.00

12,506.25

137,906.25

1 M2 PASANG KACA CERMIN, TEBAL 6 MM


1.1000 m2

Kaca cermin

114,000.00

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00

125,400.00

56.25
125,400.00

12,506.25

137,906.25

1 M2 PASANG KACA CERMIN, TEBAL 8 MM


1.0000 m2

Kaca cermin

152,000.00

0.0165 oh

Pekerja

55,000.00

907.50

0.1650 oh

Tukang Kayu

70,000.00

11,550.00

0.0165 oh

kepala tukang

75,000.00

1,237.50

0.0008 oh

mandor

75,000.00
JUMLAH

L. 6.6.23

153,451.25

1 M2 PASANG KACA CERMIN, TEBAL 5 MM

JUMLAH
L. 6.6.22

13,751.25

1.1000 m2

JUMLAH
L. 6.6.21

56.25
139,700.00

1 M2 PASANG KACA GELAP, TEBAL 5 MM

JUMLAH
L. 6.6.20

139,700.00

152,000.00

60.00
152,000.00

13,755.00

165,755.00

1 M2 PASANG KACA " WIREGLASS", TEBAL 5 MM


1.1000 m2

Kaca Wireglass

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00
JUMLAH

56.25
-

12,506.25

12,506.25

L. 6.6.24

1 M2 PASANG KACA PATRI, TEBAL 5 MM


1.1000 m2

Kaca Patri

400,000.00

0.0150 oh

Pekerja

55,000.00

825.00

0.1500 oh

Tukang Kayu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0008 oh

mandor

75,000.00
JUMLAH

440,000.00

56.25
440,000.00

12,506.25

452,506.25

M. PEKERJAAN PENUTUP LANTAI & DINDING


M.6.6.1
0.04

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 40 X 40 CM


6.6300 Bh

Ubin abu-abu 40 x 40 cm

7,466.06

49,500.00

9.8000 kg

Semen portland

1,300.00

12,740.00

0.0215 m3

Pasir pasang

278,750.00

5,993.13

0.2500 oh

pekerja

55,000.00

13,750.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0125 oh

mandor

75,000.00
JUMLAH

M.6.6.2
0.09

0.09

23,987.50

92,220.63

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 30 X 30 CM


11.8700 Bh

Ubin abu-abu 30 x 30 cm

3,454.09

41,000.00

10.0000 kg

semen portland

1,300.00

13,000.00

0.0215 m3

pasir pasang

278,750.00

5,993.13

0.2600 oh

pekerja

55,000.00

14,300.00

0.1250 oh

tukang batu

70,000.00

8,750.00

0.0125 oh

kepala tukang

75,000.00

937.50

0.0130 oh

mandor

75,000.00
JUMLAH

M.6.6.3

937.50
68,233.13

975.00
59,993.13

24,962.50

84,955.63

1 M2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20 X 20 CM


26.5000 Bh

Ubin abu-abu 20 x 20 cm

1,660.38

44,000.00

10.4000 kg

semen portland

1,300.00

13,520.00

0.0135 m3

pasir pasang

278,750.00

3,763.13

0.2700 oh

pekerja

55,000.00

14,850.00

0.1300 oh

tukang batu

70,000.00

9,100.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0135 oh

mandor

75,000.00

1,012.50

JUMLAH

61,283.13

25,937.50

87,220.63

M.6.6.4
0.09

1 M2 PASANG LANTAI UBIN WARNA UKURAN 40 X 40 CM


6.6300 Bh

Ubin Warna 40 x 40 cm

7,466.06

49,500.00

8.1600 kg

semen portland

1,300.00

10,608.00

0.0230 m3

pasir pasang

278,750.00

6,411.25

0.9000 kg

Semen warna

1,947.92

1,753.13

0.2500 oh

pekerja

55,000.00

13,750.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0125 oh

mandor

75,000.00
JUMLAH

M.6.6.5
0.09

0.09

11.8700 Bh

Ubin Warna 30 x 30 cm

3,117.10

37,000.00

8.3600 kg

semen portland

1,300.00

10,868.00

0.0230 m3

pasir pasang

278,750.00

6,411.25

0.9000 kg

Semen warna

1,947.92

1,753.13

0.2500 oh

pekerja

55,000.00

13,750.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0125 oh

mandor

75,000.00

0.09

92,259.88

937.50
56,032.38

23,987.50

80,019.88

1 M2 PASANG LANTAI UBIN WARNA UKURAN 20 x 20 CM


26.5000 Bh

Ubin Warna 20 x 20 cm

1,660.38

44,000.00

8.7600 kg

semen portland

1,300.00

11,388.00

0.0230 m3

pasir pasang

278,750.00

6,411.25

0.9000 kg

Semen warna

1,947.92

1,753.13

0.2700 oh

pekerja

55,000.00

14,850.00

0.1300 oh

tukang batu

70,000.00

9,100.00

0.0130 oh

kepala tukang

75,000.00

975.00

0.0135 oh

mandor

75,000.00

1,012.50

JUMLAH
M.6.6.7

23,987.50

1 M2 PASANG LANTAI UBIN WARNA UKURAN 30 x 30 CM

JUMLAH
M.6.6.6

937.50
68,272.38

63,552.38

25,937.50

89,489.88

1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 x 40 CM


6.2500 Bh

Ubin teraso 40 x 40 cm

10,000.00

62,500.00

8.8000 kg

semen portland

1,300.00

11,440.00

0.0215 m3

pasir pasang

278,750.00

5,993.13

0.9000 kg

Semen warna

1,947.92

1,753.13

0.2500 oh

pekerja

55,000.00

13,750.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0125 oh

mandor

75,000.00
JUMLAH

937.50
81,686.25

23,987.50

105,673.75

M.6.6.8
0.09

1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 x 30 CM


11.8700 Bh

Ubin teraso 30 x 30 cm

6,000.00

71,220.00

10.0000 kg

semen portland

1,300.00

13,000.00

0.0215 m3

pasir pasang

278,750.00

5,993.13

1.5400 kg

Semen warna

1,947.92

2,999.79

0.2600 oh

pekerja

55,000.00

14,300.00

0.1250 oh

tukang batu

70,000.00

8,750.00

0.0125 oh

kepala tukang

75,000.00

937.50

0.0130 oh

mandor

75,000.00
JUMLAH

M.6.6.9
0.09

0.09

6.9300 Bh

Ubin granito 40 x 40 cm

15,000.00

103,950.00

9.8000 kg

semen portland

1,300.00

12,740.00

0.0215 m3

pasir pasang

278,750.00

5,993.13

1.3000 kg

Semen warna

1,947.92

2,532.29

0.2500 oh

pekerja

55,000.00

13,750.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0125 oh

mandor

75,000.00

0.09

118,175.42

937.50
125,215.42

23,987.50

149,202.92

1 M2 PASANG LANTAI UBIN GRANITO UKURAN 30 X 30 CM


11.8700 Bh

Ubin granito 30 x 30 cm

9,000.00

106,830.00

10.0000 kg

semen portland

1,300.00

13,000.00

0.0215 m3

pasir pasang

278,750.00

5,993.13

1.5000 kg

Semen warna

1,947.92

2,921.88

0.2600 oh

pekerja

55,000.00

14,300.00

0.1250 oh

tukang batu

70,000.00

8,750.00

0.0125 oh

kepala tukang

75,000.00

937.50

0.0130 oh

mandor

75,000.00
JUMLAH

M.6.6.11

24,962.50

1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40 X 40 CM

JUMLAH
M.6.6.10

975.00
93,212.92

975.00
128,745.00

24,962.50

153,707.50

1 M2 PASANG LANTAI UBIN TERALUX KERANG UKURAN 40 X 40 CM


6.2500 Bh

Ubin teralux terang 40 x 40 cm

8.8000 kg

semen portland

1,300.00

11,440.00

0.0215 m3

pasir pasang

278,750.00

5,993.13

1.3000 kg

Semen warna

1,947.92

2,532.29

0.2500 oh

pekerja

55,000.00

13,750.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0125 oh

mandor

75,000.00
JUMLAH

937.50
19,965.42

23,987.50

43,952.92

M.6.6.12
0.09

1 M2 PASANG LANTAI UBIN TERALUX TERANG UKURAN 30 X 30 CM


11.8070 Bh

Ubin teralux terang 30 x 30 cm

10.0000 kg

semen portland

1,300.00

13,000.00

0.0215 m3

pasir pasang

278,750.00

5,993.13

1.1250 kg

Semen warna

1,947.92

2,191.41

0.2500 oh

pekerja

55,000.00

13,750.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0125 oh

mandor

75,000.00
JUMLAH

M.6.6.13
0.09

0.09

5.6000 Bh

Ubin teralux marmer 60 x 60 cm

8.1900 kg

semen portland

1,300.00

10,647.00

0.09

45,172.03

0.0450 m3

pasir pasang

278,750.00

12,543.75

1.0000 kg

Semen warna

1,947.92

1,947.92

0.2500 oh

pekerja

55,000.00

13,750.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0125 oh

mandor

75,000.00

937.50
25,138.67

23,987.50

49,126.17

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM


6.2500 Bh

Ubin teralux marmer 40 x 40 cm

8.8000 kg

semen portland

1,300.00

11,440.00

0.0215 m3

pasir pasang

278,750.00

5,993.13

1.3000 kg

Semen warna

1,947.92

2,532.29

0.6720 oh

pekerja

55,000.00

36,960.00

0.2240 oh

tukang batu

70,000.00

15,680.00

0.0220 oh

kepala tukang

75,000.00

1,650.00

0.0340 oh

mandor

75,000.00
JUMLAH

M.6.6.15

23,987.50

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM

JUMLAH
M.6.6.14

937.50
21,184.53

2,550.00
19,965.42

56,840.00

76,805.42

1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM


11.8700 Bh

Ubin teralux marmer 30 x 30 cm

10.0000 kg

semen portland

1,300.00

13,000.00

0.0250 m3

pasir pasang

278,750.00

6,968.75

1.5000 kg

Semen warna

1,947.92

2,921.88

0.7000 oh

pekerja

55,000.00

38,500.00

0.3400 oh

tukang batu

70,000.00

23,800.00

0.0340 oh

kepala tukang

75,000.00

2,550.00

0.0350 oh

mandor

75,000.00
JUMLAH

2,625.00
22,890.63

67,475.00

90,365.63

M.6.6.16
0.09

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 15 X 20 CM


5.3000 Bh

Plint Ubin 15 x 20 cm

1,660.38

8,800.00

1.5600 kg

semen portland

1,300.00

2,028.00

0.0040 m3

pasir pasang

278,750.00

1,115.00

0.0600 oh

pekerja

55,000.00

3,300.00

0.0300 oh

tukang batu

70,000.00

2,100.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0030 oh

mandor

75,000.00
JUMLAH

M.6.6.17
0.09

0.09

3.5300 Bh

Plint Ubin 10 x 30 cm

1,151.36

4,064.31

1.5600 kg

semen portland

1,300.00

2,028.00

0.0030 m3

pasir pasang

278,750.00

836.25

0.0600 oh

pekerja

55,000.00

3,300.00

0.0300 oh

tukang batu

70,000.00

2,100.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0030 oh

mandor

75,000.00

0.09

0.09

225.00
6,928.56

5,850.00

2.6500 Bh

Plint Ubin 10 x 40 cm

1,866.52

4,946.27

1.5600 kg

semen portland

1,300.00

2,028.00

0.0030 m3

pasir pasang

278,750.00

836.25

0.0600 oh

pekerja

55,000.00

3,300.00

0.0300 oh

tukang batu

70,000.00

2,100.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0030 oh

mandor

75,000.00

12,778.56

225.00
7,810.52

5,850.00

13,660.52

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 20 CM


5.3000 Bh

Plint Ubin Pc Warna 10 x 20 cm

830.19

4,400.00

1.2000 kg

semen portland

1,300.00

1,560.00

0.0030 m3

pasir pasang

278,750.00

836.25

0.1900 kg

Semen warna

9,833.33

1,868.33

0.0600 oh

pekerja

70,000.00

4,200.00

0.0300 oh

tukang batu

70,000.00

2,100.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0030 oh

mandor

75,000.00
JUMLAH

M.6.6.20

17,793.00

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 40 CM

JUMLAH
M.6.6.19

5,850.00

1 M' PASANG PLINT UBIN PC ABU-ABU UKURAN 10 X 30 CM

JUMLAH
M.6.6.18

225.00
11,943.00

225.00
8,664.58

6,750.00

15,414.58

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 30 CM


3.3300 Bh

Plint Ubin Pc Warna 10 x 30 cm

1,039.03

3,459.98

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m3

pasir pasang

278,750.00

892.00

0.1000 kg

Semen warna

9,833.33

983.33

0.0600 oh

pekerja

55,000.00

3,300.00

0.0300 oh

tukang batu

70,000.00

2,100.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0030 oh

mandor

75,000.00
JUMLAH

225.00
7,480.32

5,850.00

13,330.32

M.6.6.21
0.09

1 M' PASANG PLINT UBIN PC WARNA UKURAN 10 X 40 CM


2.6500 Bh

Plint Ubin Pc Warna 10 x 40 cm

1,866.52

4,946.27

1.2000 kg

semen portland

1,300.00

1,560.00

0.0030 m3

pasir pasang

278,750.00

836.25

0.1000 kg

Semen warna

9,833.33

983.33

0.0800 oh

pekerja

55,000.00

4,400.00

0.0400 oh

tukang batu

70,000.00

2,800.00

0.0040 oh

kepala tukang

75,000.00

300.00

0.0040 oh

mandor

75,000.00
JUMLAH

M.6.6.22
0.09

0.09

3.5300 Bh

Plint Ubin Teraso 10 x 30 cm

2,000.00

7,060.00

1.5600 kg

semen portland

1,300.00

2,028.00

0.0030 m3

pasir pasang

278,750.00

836.25

0.1900 kg

Semen warna

9,833.33

1,868.33

0.0800 oh

pekerja

55,000.00

4,400.00

0.0400 oh

tukang batu

70,000.00

2,800.00

0.0040 oh

kepala tukang

75,000.00

300.00

0.0040 oh

mandor

75,000.00

0.09

16,125.85

300.00
11,792.58

7,800.00

19,592.58

1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 40 CM


2.6500 Bh

Plint Ubin Teraso 10 x 40 cm

2,500.00

6,625.00

1.2000 kg

semen portland

1,300.00

1,560.00

0.0030 m3

pasir pasang

278,750.00

836.25

1.0000 kg

Semen warna

9,833.33

9,833.33

0.0800 oh

pekerja

55,000.00

4,400.00

0.0400 oh

tukang batu

70,000.00

2,800.00

0.0040 oh

kepala tukang

75,000.00

300.00

0.0040 oh

mandor

75,000.00
JUMLAH

M.6.6.24

7,800.00

1 M' PASANG PLINT UBIN TERASO UKURAN 10 X 30 CM

JUMLAH
M.6.6.23

300.00
8,325.85

300.00
18,854.58

7,800.00

26,654.58

1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 40 CM


2.6500 Bh

Plint Ubin Granito 10 x 40 cm

3,750.00

9,937.50

1.2000 kg

semen portland

1,300.00

1,560.00

0.0030 m3

pasir pasang

278,750.00

836.25

1.0000 kg

Semen warna

9,833.33

9,833.33

0.0600 oh

pekerja

55,000.00

3,300.00

0.0300 oh

tukang batu

70,000.00

2,100.00

0.0030 oh

kepala tukang

75,000.00

225.00

0.0030 oh

mandor

75,000.00
JUMLAH

225.00
22,167.08

5,850.00

28,017.08

M.6.6.25
0.09

1 M' PASANG PLINT UBIN GRANITO UKURAN 10 X 30 CM


3.3300 Bh

Plint Ubin Granito 10 x 30 cm

3,000.00

9,990.00

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m3

pasir pasang

278,750.00

892.00

0.1000 kg

Semen warna

9,833.33

983.33

0.9000 oh

pekerja

55,000.00

49,500.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00
JUMLAH

M.6.6.26
0.09

0.09

2.5000 Bh

plint Ubin teralux kerang 10 x 40 cm

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m3

pasir pasang

278,750.00

892.00

0.1000 kg

Semen warna

9,833.33

983.33

0.9000 oh

pekerja

55,000.00

49,500.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00

0.09

70,822.83

337.50
4,020.33

56,812.50

60,832.83

1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 30 CM


3.3300 Bh

plint Ubin teralux kerang 10 x 30 cm

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m3

pasir pasang

278,750.00

892.00

0.1000 kg

Semen warna

9,833.33

983.33

0.9000 oh

pekerja

55,000.00

49,500.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00
JUMLAH

M.6.6.28

56,812.50

1M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 X 40 CM

JUMLAH
M.6.6.27

337.50
14,010.33

337.50
4,020.33

56,812.50

60,832.83

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 60 CM


1.7000 Bh

Plint Ubin teralux marmer 10 x 60 cm

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m3

pasir pasang

278,750.00

892.00

0.1000 kg

Semen warna

9,833.33

983.33

0.9000 oh

pekerja

55,000.00

49,500.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00
JUMLAH

337.50
4,020.33

56,812.50

60,832.83

M.6.6.29
0.09

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 40 CM


2.5000 Bh

Plint Ubin teralux marmer 10 x 40 cm

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m3

pasir pasang

278,750.00

892.00

0.1000 kg

Semen warna

9,833.33

983.33

0.9000 oh

pekerja

55,000.00

49,500.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00
JUMLAH

M.6.6.30
0.09

0.09

3.3000 Bh

Plint Ubin teralux marmer 10 x 30 cm

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m3

pasir pasang

278,750.00

892.00

0.1000 kg

Semen warna

9,833.33

983.33

0.9000 oh

pekerja

55,000.00

49,500.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00

0.09

0.09

337.50
4,020.33

56,812.50

0.0036 m3

Bahan Teraso Cor

0.9000 oh

pekerja

55,000.00

60,832.83

49,500.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00

337.50
-

56,812.50

56,812.50

1 M2 PASANG TERALUC COR DITEMPAT, TEBAL 3 CM


0.0036 m3

Bahan Teraluc cor

0.9000 oh

pekerja

55,000.00

49,500.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00
JUMLAH

M.6.6.33

59,190.11

1 M2 PASANG TERASO COR DITEMPAT

JUMLAH
M.6.6.32

56,812.50

1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 X 30 CM

JUMLAH
M.6.6.31

337.50
2,377.61

337.50
-

56,812.50

56,812.50

1 M2 PASANG UBIN TAHAN ASAM


1.0500 m2

Ubin tahan asam

semen tahan asam

0.0400 m2

pasir pasang

278,750.00

0.2700 oh

pekerja

55,000.00

14,850.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0135 oh

mandor

75,000.00

14.1400 kg

JUMLAH

11,150.00

1,012.50
11,150.00

27,487.50

38,637.50

M.6.6.34
0.09

1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 20 CM


50.0000 bh

ubin keramik artistik 10 x 20 cm

1,200.00

60,000.00

11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.35
0.09

JUMLAH
100.0000 bh

ubin keramik artistik 10 x 10 cm

750.00

75,000.00

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

2.0000 kg

Semen warna

9,833.33

19,666.67

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

0.09
0.09

JUMLAH
100.0000 m2

0.09

2,250.00
121,168.17

63,475.00

ubin keramik artistik 5 x 20 cm

600.00

60,000.00

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

0.09
0.09

164,726.50

184,643.17

1 M2 PASANG LANTAI KERAMIK ARTISTIK 5 X 20 CM


11.3800 kg

M.6.6.37

63,475.00

1 M2 PASANG LANTAI KERAMIK ARTISTIK 10 X 10 CM


11.3800 kg

M.6.6.36

2,250.00
101,251.50

JUMLAH

2,250.00
101,251.50

63,475.00

164,726.50

1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 20 CM


5.0000 m2

Plint keramik artistik 10 x 20 cm

1,200.00

6,000.00

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m2

pasir pasang

278,750.00

892.00

0.1000 kg

Semen warna

9,833.33

983.33

0.0900 oh

pekerja

55,000.00

4,950.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00
JUMLAH

337.50
10,020.33

12,262.50

22,282.83

M.6.6.38
0.09

1 M2 PASANG PLINT KERAMIK ARTISTIK 10 X 10 CM


5.0000 m2

Plint keramik artistik 10 x 10 cm

750.00

3,750.00

1.6500 kg

semen portland

1,300.00

2,145.00

0.0032 m2

pasir pasang

278,750.00

892.00

0.1200 kg

Semen warna

9,833.33

1,180.00

0.0900 oh

pekerja

55,000.00

4,950.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00

0.09
M.6.6.39
0.09

JUMLAH

0.09

5.0000 m2

Plint keramik artistik 5 x 20 cm

600.00

3,000.00

0.8500 kg

semen portland

1,300.00

1,105.00

0.0022 m2

pasir pasang

278,750.00

613.25

0.0800 kg

Semen warna

9,833.33

786.67

0.0900 oh

pekerja

55,000.00

4,950.00

0.0900 oh

tukang batu

70,000.00

6,300.00

0.0090 oh

kepala tukang

75,000.00

675.00

0.0045 oh

mandor

75,000.00
JUMLAH

0.09

10.0000 m2

0.09

337.50
5,504.92

12,262.50

Interval cove ( 5 x 5 x 20 ) cm

1.4150 kg

semen portland

1,300.00

1,839.50

0.0390 m2

pasir pasang

278,750.00

10,871.25

1.2000 kg

Semen warna

9,833.33

11,800.00

0.7500 oh

pekerja

55,000.00

41,250.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0375 oh

mandor

75,000.00

17,767.42

JUMLAH

2,812.50
24,510.75

78,937.50

103,448.25

1 M' PASANG PLINT VINYL TANPA ADUKAN


3.5000 Bh

Lt vinyl karet 30 x 30 kwl

0.0800 kg

Lem vinyl

0.0800 oh

pekerja

55,000.00

4,400.00

0.0800 oh

tukang batu

70,000.00

5,600.00

0.0080 oh

kepala tukang

75,000.00

600.00

0.0040 oh

mandor

75,000.00

0.09
M.6.6.42

20,229.50

1 M' INTERNAL COVE ARTISTIK ( 5 X 5 X 20 ) CM

0.09
M.6.6.41

12,262.50

1 M2 PASANG PLINT KERAMIK ARTISTIK 5 X 20 CM

0.09
M.6.6.40

337.50
7,967.00

JUMLAH

300.00
-

10,900.00

10,900.00

1 M2 PASANG LANTAI KERAMIK 10 X 20 CM


50.0000 Bh

Ubin keramik artistik 10 x 20 cm

700.00

35,000.00

11.3000 kg

semen portland

1,300.00

14,690.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00
JUMLAH

2,250.00
76,147.50

63,475.00

139,622.50

M.6.6.43
0.09

1 M2 PASANG LANTAI KERAMIK 15 X 15 CM


44.0000 Bh

Ubin keramik 15 x 15 cm

850.00

37,400.00

11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.44
0.09

JUMLAH

0.09

25.0000 Bh

Ubin keramik 20 x 20 cm

2,600.00

65,000.00

11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00
JUMLAH

0.09

0.09

142,126.50

2,250.00
106,251.50

63,475.00

169,726.50

1 M2 PASANG LANTAI KERAMIK 25 X 25 CM


16.0000 Bh

Ubin keramik 25 x 25 cm

2,750.00

44,000.00

11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.46

63,475.00

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM

0.09
M.6.6.45

2,250.00
78,651.50

JUMLAH

2,250.00
85,251.50

63,475.00

148,726.50

1 M2 PASANG LANTAI KERAMIK 15 X 20 CM


35.0000 Bh

Ubin keramik 15 x 20 cm

2,102.00

73,570.00

11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00
JUMLAH

2,250.00
114,821.50

63,475.00

178,296.50

M.6.6.47
0.09

1 M2 PASANG LANTAI KERAMIK 30 x 30 CM


11.1111 Bh

Ubin keramik 30 x 30 cm

3,757.58

41,750.84

11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.48
0.09

JUMLAH

0.09

11.1111 Bh

Ubin keramik 30 X 30 cm Anti slip

4,522.73

50,252.53

11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00
JUMLAH

0.09

0.09

146,477.34

2,250.00
91,504.03

63,475.00

154,979.03

1 M2 PASANG LANTAI KERAMIK 10 x 33 CM


33.0000 Bh

Ubin keramik 10 x 33 cm

11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m2

pasir pasang

278,750.00

11,707.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.50

63,475.00

1 M2 PASANG LANTAI KERAMIK 30 x 30 CM ANTI SLIP

0.09
M.6.6.49

2,250.00
83,002.34

JUMLAH

2,250.00
41,251.50

63,475.00

104,726.50

1 M2 PASANG LANTAI MOSAIK 30 X 30 CM, EX. LOKAL


12.0000 Bh

Mosaik 30 x 30 cm

14.1500 kg

semen portland

1,300.00

18,395.00

0.0390 m2

pasir pasang

278,750.00

10,871.25

2.0000 kg

Semen warna

9,833.33

19,666.67

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00
JUMLAH

2,250.00
48,932.92

63,475.00

112,407.92

M.6.6.51
0.09

1 M2 PASANG LANTAI MARMER


1.0520 Bh

Marmer

495,000.00

520,740.00

semen portland

1,300.00

18,395.00

0.0390 m2

pasir pasang

278,750.00

10,871.25

2.0000 kg

Semen warna

9,833.33

19,666.67

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

14.1500 kg

0.09
M.6.6.52
0.09

JUMLAH

0.09

1.0500 Bh

Feltex carpet 100% wool T-21

0.3500 kg

Lem Vinyl

0.1700 oh

pekerja

55,000.00

9,350.00

0.1700 oh

tukang batu

70,000.00

11,900.00

0.0170 oh

kepala tukang

75,000.00

1,275.00

0.0085 oh

mandor

75,000.00

0.09

0.09

0.09

637.50
-

23,162.50

23,162.50

1 M2 PASANG LANTAI KARPET 80 % WOOL, 20% NYLON


1.0500 Bh

Carpet 80%, 20% nylon

0.3500 kg

Lem Vinyl

0.1700 oh

pekerja

55,000.00

9,350.00

0.1700 oh

tukang batu

70,000.00

11,900.00

0.0170 oh

kepala tukang

75,000.00

1,275.00

0.0085 oh

mandor

75,000.00

JUMLAH

637.50
-

23,162.50

23,162.50

1 M2 PASANG UNDRLYER, TEBAL 6 MM


1.0500 Bh

Underlyer tebal 6 mm / rubber corrugated

0.1200 oh

pekerja

55,000.00

6,600.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0060 oh

mandor

75,000.00

0.09
M.6.6.55

633,147.92

JUMLAH

0.09
M.6.6.54

63,475.00

1 M2 PASANG LANTAI KARPET 100 % WOOL

0.09
M.6.6.53

2,250.00
569,672.92

JUMLAH

450.00
-

16,350.00

16,350.00

1 M2 PASANG LANTAI KARPET


1.0500 Bh

Carpet

0.3500 kg

Lem Vinyl

0.1700 oh

pekerja

55,000.00

9,350.00

0.1700 oh

tukang batu

70,000.00

11,900.00

0.0170 oh

kepala tukang

75,000.00

1,275.00

0.0085 oh

mandor

75,000.00
JUMLAH

637.50
-

23,162.50

23,162.50

M.6.6.56
0.09

1 M2 PASANG LANTAI PARQUET JATI


1.0500 Bh

Parquet jati

0.3500 kg

Lem Vinyl

0.1700 oh

pekerja

55,000.00

9,350.00

0.1700 oh

tukang batu

70,000.00

11,900.00

0.0170 oh

kepala tukang

75,000.00

1,275.00

0.0085 oh

mandor

75,000.00

0.09
M.6.6.57
0.09

JUMLAH

0.09

0.09

0.09

0.09

23,162.50

Gymfloor

0.6000 kg

Lem Vinyl

0.6500 oh

pekerja

55,000.00

35,750.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0325 oh

mandor

75,000.00

18,530.00

JUMLAH

2,437.50
-

65,312.50

65,312.50

1 M2 PASANG DINDING PORSELIN 11 X 11 CM, PUTIH


83.0000 Bh

porselin 11 x 11 cm

9.3000 kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 Kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.5000 oh

tukang batu

70,000.00

35,000.00

0.0500 oh

kepala tukang

75,000.00

3,750.00

0.0300 oh

mandor

75,000.00
JUMLAH

2,250.00
31,857.50

75,100.00

106,957.50

1 M2 PASANG DINDING PORSELIN 11 X 11 CM, WARNA


83.0000 Bh

porselin 11 x 11 cm warna

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6200 oh

pekerja

55,000.00

34,100.00

0.5000 oh

tukang batu

70,000.00

35,000.00

0.0500 oh

kepala tukang

75,000.00

3,750.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.60

637.50
-

1.0500 Bh

0.09
M.6.6.59

1 M2 PASANG GYMFLOOR

0.09
M.6.6.58

JUMLAH

2,250.00
31,857.50

75,100.00

106,957.50

1 M2 PASANG DINDING PORSELIN 15 X 15 CM, PUTIH


45.0000 Bh

porselin 15 x 15 cm putih

2,300.00

103,500.00

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00
JUMLAH

2,250.00
118,390.21

56,250.00

174,640.21

M.6.6.61
0.09

1 M2 PASANG DINDING PORSELIN 15 X 15 CM, WARNA


45.0000 Bh

porselin 15 x 15 cm putih

2,800.00

126,000.00

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.62
0.09

JUMLAH

0.09

50.0000 Bh

porselin 10 x 20 cm, warna

2,500.00

125,000.00

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00
JUMLAH

0.09

0.09

227,982.50

2,250.00
156,857.50

70,125.00

226,982.50

1 M2 PASANG DINDING PORSELIN 20 X 20 CM, WARNA


25.0000 Bh

porselin 20 x 20 cm, warna

3,000.00

75,000.00

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.1800 m3

pasir pasang

278,750.00

50,175.00

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.64

70,125.00

1 M2 PASANG DINDING PORSELIN 10 X 20 CM, WARNA

0.09
M.6.6.63

2,250.00
157,857.50

JUMLAH

2,250.00
152,015.00

70,125.00

222,140.00

1 M2 PASANG DINDING KERAMIK ARTISTIK 10 X 20 CM


100.0000 Bh

Keramik artistik 10 x 20 cm

1,000.00

100,000.00

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00
JUMLAH

2,250.00
131,857.50

70,125.00

201,982.50

M.6.6.65
0.09

1 M2 PASANG DINDING KERAMIK ARTISTIK 5 X 20 CM


100.0000 Bh

Keramik artistik 5 x 20 cm

500.00

50,000.00

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.66
0.09

JUMLAH

0.09

50.0000 Bh

Keramik 10 x 20 cm

1,027.78

51,388.89

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00
JUMLAH

0.09

0.09

151,982.50

2,250.00
83,246.39

70,125.00

153,371.39

1 M2 PASANG DINDING KERAMIK 15 x 15 CM


45.0000 Bh

Keramik 15 x 15 cm

850.00

38,250.00

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00

0.09
M.6.6.68

70,125.00

1 M2 PASANG DINDING KERAMIK 10 X 20 CM

0.09
M.6.6.67

2,250.00
81,857.50

JUMLAH

2,250.00
70,107.50

70,125.00

140,232.50

1 M2 PASANG DINDING KERAMIK 20 x 20 CM


25.0000 Bh

Keramik 20 x 20 cm

1,112.96

27,824.07

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.4500 oh

tukang batu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0300 oh

mandor

75,000.00
JUMLAH

2,250.00
59,681.57

70,125.00

129,806.57

M.6.6.69
0.09

1 M2 PASANG DINDING KERAMIK 10 x 20 CM


50.0000 Bh

Keramik 10 x 20 cm

1,027.78

51,388.89

9.3000 Kg

Semen abu-abu

1,300.00

12,090.00

0.0180 m3

pasir pasang

278,750.00

5,017.50

1.5000 kg

Semen warna

9,833.33

14,750.00

0.6000 oh

pekerja

55,000.00

33,000.00

0.1250 oh

tukang batu

70,000.00

8,750.00

0.0125 oh

kepala tukang

75,000.00

937.50

0.0300 oh

mandor

75,000.00

2,250.00

0.09
M.6.6.70
0.09

JUMLAH
1.0200 m2

marmer

2.0000 Kg

Pacu Pancing 60 x 230

25,000.00

50,000.00
16,172.00

12.4400 Kg

0.09

Semen abu-abu

1,300.00

pasir pasang

278,750.00

6,968.75

1.5000 kg

Semen warna

9,833.33

14,750.00

0.7200 oh

pekerja

55,000.00

39,600.00

0.6500 oh

tukang batu

70,000.00

45,500.00

0.0650 oh

kepala tukang

75,000.00

4,875.00

0.0350 oh

mandor

75,000.00
JUMLAH

0.09

0.09

92,600.00

Bata Pelapis dinding

770.00

46,200.00

12.4400 Kg

Semen abu-abu

1,300.00

16,172.00

0.0250 m3

pasir pasang

278,750.00

6,968.75

0.6500 oh

pekerja

9,833.33

6,391.67

0.5000 oh

tukang batu

55,000.00

27,500.00

0.0500 oh

kepala tukang

75,000.00

3,750.00

0.0300 oh

mandor

75,000.00
JUMLAH

180,490.75

2,250.00
69,340.75

39,891.67

109,232.42

1 M2 PASANG DINDING BATA KLINKER 5 X 5 X 24 CM


80.0000 Bh

Bata Pelapis klinker

770.00

61,600.00

12.4400 Kg

Semen abu-abu

1,300.00

16,172.00

0.0250 m3

pasir pasang

278,750.00

6,968.75

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0350 oh

mandor

75,000.00
JUMLAH

2,625.00
84,740.75

63,850.00

148,590.75

1 M2 PASANG DINDING BATU PAROS


1.0500 m2

Batu paros

Semen abu-abu

1,500.00

17,625.00

0.0350 m3

pasir pasang

278,750.00

9,756.25

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

11.7500 Kg

0.09

2,625.00
87,890.75

60.0000 Bh

0.09
M.6.6.73

128,183.89

1 M2 PASANG DINDING BATA PELAPIS 7 X 3 X 24 CM

0.09
M.6.6.72

44,937.50

0.0250 m3

0.09
M.6.6.71

83,246.39

1 M2 PASANG DINDING MARMER

JUMLAH

2,250.00
27,381.25

63,475.00

90,856.25

M.6.6.74
0.09

1 M2 PASANG DINDING BATU TEMPEL HITAM


1.0500 m2

Batu tempel hitam

Semen abu-abu

1,300.00

15,275.00

0.0350 m3

pasir pasang

278,750.00

9,756.25

0.6200 oh

pekerja

55,000.00

34,100.00

0.3500 oh

tukang batu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0300 oh

mandor

75,000.00

11.7500 Kg

0.09
M.6.6.75
0.09

JUMLAH

0.09

11.0500 m2

0.09

Vinyl karet 30 x 30 cm KL I

Lem Vinyl

0.1500 oh

pekerja

55,000.00

8,250.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0075 oh

mandor

75,000.00

0.09

0.09

88,506.25

JUMLAH

562.50
-

20,437.50

20,437.50

1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL II


11.0500 m2

Vinyl karet 30 x 30 cm KL II

0.3500 Kg

Lem Vinyl

0.1500 oh

pekerja

55,000.00

8,250.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0075 oh

mandor

75,000.00

JUMLAH

562.50
-

20,437.50

20,437.50

1 M2 PASANG LANTAI VINYL ASBES 30 X 30 CM


11.0500 m2

Vinyl asbes 30 x 30 cm

0.3500 Kg

Lem Vinyl

0.1500 oh

pekerja

55,000.00

8,250.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0075 oh

mandor

75,000.00

0.09
M.6.6.78

63,475.00

0.3500 Kg

0.09
M.6.6.77

2,250.00
25,031.25

1 M2 PASANG LANTAI VINYL KARET 30 X 30 CM KL I

0.09
M.6.6.76

JUMLAH

562.50
-

20,437.50

20,437.50

1 M2 PASANG LANTAI VINYL MOTIF KEMBANG 30 X 30 CM


11.0500 m2

Vinyl motif kembang 30 x 30 cm

0.3500 Kg

Lem Vinyl

0.1500 oh

pekerja

55,000.00

8,250.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0075 oh

mandor

75,000.00
JUMLAH

562.50
-

20,437.50

20,437.50

M.6.6.79
0.09

1 M2 PASANG WALL COVERING LEBAR 50 CM


1.1000 m2

Vinyl Wall covering, lebar 50 cm

0.2500 Kg

Lem

0.7500 oh

pekerja

55,000.00

41,250.00

0.1700 oh

tukang batu

70,000.00

11,900.00

0.0170 oh

kepala tukang

75,000.00

1,275.00

0.0085 oh

mandor

75,000.00

0.09
M.6.6.80
0.09

JUMLAH

0.09

0.09

637.50
-

55,062.50

3.0000 Kg

Floor hardener ferrovax

0.1200 oh

pekerja

55,000.00

6,600.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0060 oh

mandor

75,000.00

55,062.50

JUMLAH

450.00
-

16,350.00

16,350.00

1 M2 FLOOR HARDENER MASTERCRON


5.0000 Kg

Mastercron "S"

0.1200 oh

pekerja

55,000.00

6,600.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0060 oh

mandor

75,000.00

0.09
M.6.6.82

1 M2 FLOOR HARDENER FERROVAX

0.09
M.6.6.81

JUMLAH

450.00
-

16,350.00

16,350.00

1 M2 PLINT KAYU 2 X 10 CM
0.0024 m3

kayu Jati papan

7,000,000.00

0.0500 Kg

Paku skrup 3,5 "

20,000.00

1,000.00

0.1200 oh

pekerja

55,000.00

6,600.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0060 oh

mandor

75,000.00

0.09

JUMLAH

16,800.00

450.00
16,800.00

17,350.00

34,150.00

N. PEKERJAAN CAT - CATAN


N. 6.6.1

1 M2 MENGIKIS/MENGEROK PERMUKAAN CAT TEMBOK LAMA


0.0500 kg

Soda Api

0.1500 oh

pekerja

55,000.00

8,250.00

0.0750 oh

tukang cat

70,000.00

5,250.00

0.0075 oh

kepala tukang

75,000.00

562.50

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.2

187.50
-

14,250.00

14,250.00

1 M2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DICAT


0.0500 kg

Sabun

10,500.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0750 oh

tukang cat

70,000.00

5,250.00

0.0075 oh

kepala tukang

75,000.00

562.50

0.0025 oh

mandor

75,000.00
JUMLAH

525.00

187.50
525.00

14,250.00

14,775.00

N. 6.6.3

1 M2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL


0.0500 kg

Sabun

10,500.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0750 oh

tukang cat

70,000.00

5,250.00

0.0075 oh

kepala tukang

75,000.00

562.50

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.4

187.50
525.00

14,250.00

14,775.00

1 M2 MENYABUN PERMUKAAN TEMBOK LAMA


0.0500 kg

Sabun

10,500.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0750 oh

tukang cat

70,000.00

5,250.00

0.0075 oh

kepala tukang

75,000.00

562.50

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.5

525.00

525.00

187.50
525.00

14,250.00

14,775.00

1 M2 MENGEROK KARAT ATAU CAT LAMA PERMUKAAN BAJA DENGAN PANCAR


PASIR ( SANBLASTING ) DENGAN TINGKAT KEBERSIHAN Sa 2 1/2
40.0000 kg

Pasir silika

10.0000 Ltr

BBM, solar

6,950.00

69,500.00

Kompressor, blasting pot

425,197.11

425,197.11

1.0000 Hr

Selang dan Nozzle

1.6000 oh

pekerja

55,000.00

88,000.00

1.6000 oh

tukang cat

70,000.00

112,000.00

0.8000 oh

kepala tukang

75,000.00

60,000.00

0.5000 oh

mandor

75,000.00
JUMLAH

N. 6.6.6

792,197.11

792,197.11

1 M2 MENDEMPUL DAN MENGGOSOK KAYU


0.0800 kg

Dempul jadi

21,666.67

1,733.33

0.0200 kg

Minyak cat

12,500.00

250.00

0.0100 kg

Batu apung

15,125.00

151.25

0.0400 oh

pekerja

55,000.00

2,200.00

0.0400 oh

tukang cat

70,000.00

2,800.00

0.0040 oh

kepala tukang

75,000.00

300.00

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.7

37,500.00
-

187.50
2,134.58

5,487.50

7,622.08

1 M2 PENGECATAN BIDANG KAYU LAMA


0.1500 kg

plamir

18,500.00

2,775.00

0.1700 kg

cat dasar

20,333.33

3,456.67

0.1700 kg

cat penutup/kilap

36,750.00

6,247.50

0.0700 oh

pekerja

55,000.00

3,850.00

0.0750 oh

tukang cat

70,000.00

5,250.00

0.0075 oh

kepala tukang

75,000.00

562.50

0.0025 oh

mandor

75,000.00
JUMLAH

187.50
12,479.17

9,850.00

22,329.17

N. 6.6.8

1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), 1 LAPIS CAT DASAR,


2 LAPIS CAT PENUTUP
0.2000 kg

cat meni

20,333.33

4,066.67

0.1200 kg

Plamir

20,000.00

2,400.00

0.1700 kg

cat dasar

20,000.00

3,400.00

0.2600 kg

cat penutup 2 kali

36,750.00

9,555.00

0.0700 oh

pekerja

55,000.00

3,850.00

0.0090 oh

tukang cat

70,000.00

630.00

0.0060 oh

kepala tukang

75,000.00

450.00

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.9

187.50
19,421.67

5,117.50

24,539.17

1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR )


1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP
0.2000 kg

cat meni

20,333.33

4,066.67

0.1500 kg

plamir

20,000.00

3,000.00

0.1700 kg

cat dasar

20,000.00

3,400.00

0.3500 oh

cat penutup 3 kali

36,750.00

12,862.50

0.0700 oh

pekerja

55,000.00

3,850.00

0.1050 oh

tukang cat

70,000.00

7,350.00

0.0040 oh

kepala tukang

75,000.00

300.00

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.10

0.3600 ltr

oli bekas

37,300.00

0.0400 oh

pekerja

55,000.00

2,200.00

0.0630 oh

tukang cat

70,000.00

4,410.00

0.0630 oh

kepala tukang

75,000.00

4,725.00

0.0025 oh

mandor

75,000.00

35,016.67

13,428.00

187.50
13,428.00

11,522.50

24,950.50

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.1500 ltr

plitur

35,583.33

5,337.50

0.3720 ltr

plitur jadi

35,583.33

13,237.00

2.0000 lbr

ampelas

2,875.00

5,750.00

pekerja

0.0600 oh

tukang cat

70,000.00

4,200.00

0.0160 oh

kepala tukang

75,000.00

1,200.00

0.0025 oh

mandor

75,000.00

oh

JUMLAH
N. 6.6.12

11,687.50

1 M2 PELABURAN BIDANG KAYU DENGAN OLI BEKAS

JUMLAH
N. 6.6.11

187.50
23,329.17

187.50
24,324.50

5,587.50

29,912.00

1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER


0.3500 ltr

Residu atau ter

5,000.00

1,750.00

0.1000 oh

pekerja

45,000.00

4,500.00

oh

tukang cat

oh

kepala tukang

mandor

0.0060 oh

60,000.00
JUMLAH

360.00
6,250.00

360.00

6,610.00

N. 6.6.13

1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS


0.1500 ltr

Vernis

10,000.00

1,500.00

0.0500 Kg

Dempul

21,666.67

1,083.33

0.1000 Ltr

ampelas

2,875.00

287.50

0.0100 bh

Kuas

7,500.00

75.00

0.1600 oh

pekerja

55,000.00

8,800.00

0.1600 oh

tukang cat

70,000.00

11,200.00

0.0160 oh

kepala tukang

75,000.00

1,200.00

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.14

187.50
2,945.83

21,387.50

24,333.33

1 M2 PENGECATAN TEMBOK BARU ( 1 lapis plamir,


1 lapis cat dasar, 2 lapis cat penutup )
0.1000 kg

plamir

20,000.00

0.1000 kg

cat dasar

8,600.00

860.00

0.2600 kg

cat penutup

8,600.00

2,236.00

0.0200 oh

pekerja

55,000.00

1,100.00

0.0630 oh

tukang cat

70,000.00

4,410.00

0.0063 oh

kepala tukang

75,000.00

472.50

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.15

2,000.00

187.50
5,096.00

6,170.00

11,266.00

1 M2 PENGECATAN TEMBOK LAMA


( 1 lapis cat dasar, 2 lapis cat penutup )
0.1200 kg

cat dasar

20,000.00

2,400.00

0.1800 kg

cat penutup 2 x

8,600.00

1,548.00

0.0280 oh

pekerja

8,600.00

240.80

0.0420 oh

tukang cat

70,000.00

2,940.00

0.0042 oh

kepala tukang

75,000.00

315.00

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.16

3,683.30

7,631.30

1 M2 MELABUR TEMBOK DENGAN KALKARIUM


0.1000 ltr

Kalkarium

0.0280 oh

pekerja

55,000.00

1,540.00

0.0420 oh

tukang cat

70,000.00

2,940.00

0.0042 oh

kepala tukang

75,000.00

315.00

0.0025 oh

mandor

75,000.00
JUMLAH

N. 6.6.17

187.50
3,948.00

187.50
-

4,982.50

4,982.50

1 M2 MELABUR TEMBOK DENGAN KAPUR SIRIH


0.1000 lbr

Ampelas

2,875.00

0.2500 Ikat

Alang-alang

500.00

125.00

0.0020 m3

Perancah kayu

2,300,000.00

4,600.00

0.1500 kg

kapur sirih

10,000.00

1,500.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0010 oh

tukang cat

70,000.00

70.00

0.0001 oh

kepala tukang

75,000.00

7.50

0.0025 oh

mandor

75,000.00

187.50

JUMLAH

287.50

6,512.50

8,515.00

15,027.50

N. 6.6.18

1 M2 MELABUR TEMBOK LAMA DENGAN KAPUR SIRIH ( UNTUK PEMELILHARAAN )


0.0020 lbr

Perancah kayu

2,300,000.00

4,600.00

0.3000 kg

kapur sirih

10,000.00

3,000.00

0.0400 oh

pekerja

55,000.00

2,200.00

0.0050 oh

tukang cat

70,000.00

350.00

0.0005 oh

kepala tukang

75,000.00

37.50

0.0025 oh

Mandor

75,000.00

187.50

JUMLAH
N. 6.6.19

7,600.00

1.2000 lbr

Wall paper

0.2000 kg

Perekat

10,000.00

2,000.00

0.0200 oh

pekerja

55,000.00

1,100.00

0.2000 oh

tukang cat

70,000.00

14,000.00

0.0020 oh

kepala tukang

75,000.00

150.00

0.0025 oh

Mandor

75,000.00
JUMLAH

N. 6.6.20

187.50
2,000.00

15,437.50

0.1000 kg

meni besi

20,333.33

2,033.33

0.0100 Ikat

Kuas

9,666.67

96.67

0.0200 oh

pekerja

55,000.00

1,100.00

0.2000 oh

tukang cat

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0100 oh

Mandor

75,000.00

17,437.50

750.00
2,130.00

17,350.00

19,480.00

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH


0.1000 kg

meni besi

20,333.33

0.0100 Ikat

Kuas

9,666.67

96.67

0.0020 m3

Perancah kayu

2,300,000.00

4,600.00

0.2500 oh

pekerja

55,000.00

13,750.00

0.2250 oh

tukang cat

70,000.00

15,750.00

0.0225 oh

kepala tukang

75,000.00

1,687.50

0.0075 oh

Mandor

75,000.00
JUMLAH

N. 6.6.22

10,375.00

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

JUMLAH
N. 6.6.21

2,775.00

1 M2 PEMASANGAN WALL PAPER

2,033.33

562.50
6,730.00

31,750.00

38,480.00

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL


SISTEM 4 LAPIS CAT KONVENSIONAL DENGAN TEBAL 200 UM
0.1000 kg

meni ( read lead ) A

0.1000 kg

meni ( read lead ) B

0.0400 kg

Alumunium C

0.0400 kg

Alumunium C

0.0100 Ltr

Pengencer

0.0020 m3

Perancah kayu

2,300,000.00

0.0060 oh

pekerja

55,000.00

0.0060 oh

tukang cat

70,000.00

420.00

0.0225 oh

kepala tukang

75,000.00

1,687.50

0.0075 oh

Mandor

4,600.00
330.00

75,000.00
JUMLAH

562.50
4,600.00

3,000.00

7,600.00

N. 6.6.23

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL


SISTEM 1 LAPIS CAT MUTAKHIR DENGAN TEBAL 200 UM
0.3000 kg

cat

0.0060 oh

pekerja

55,000.00

330.00

0.0600 oh

tukang cat

70,000.00

4,200.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0060 oh

Mandor

75,000.00
JUMLAH

N. 6.6.24

450.00
-

5,880.00

5,880.00

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA MANUAL


SISTEM 3 LAPIS CAT KONVENSIONAL DENGAN TEBAL 200 UM
0.1100 Kg

Cat dasar

0.1700 kg

cat antara

0.0800 kg

cat penutup

0.5000 oh

pekerja

55,000.00

27,500.00

0.8000 oh

tukang cat

70,000.00

56,000.00

0.3000 oh

kepala tukang

75,000.00

22,500.00

0.2000 oh

Mandor

75,000.00

JUMLAH
N. 6.6.25

15,000.00
-

121,000.00

121,000.00

1 M2 PENGECATAN PERMUKAAN BAJA LAPIS SENG ( GALBANI ) SECARA SEMPROT


( AIRLESS SPRAY ) SISTEM 1 LAPIS CAT MUTAKHIR DENGAN TEBAL 200 UM
0.3000 kg

cat dasar

0.4000 oh

pekerja

55,000.00

22,000.00

0.7000 oh

tukang cat

70,000.00

49,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.2000 oh

Mandor

75,000.00
JUMLAH

15,000.00
-

101,000.00

101,000.00

65,000.00 Semen
1,300.00

2600

ANALISA HARGA SATUAN SNI 2010


KODE
ANALISA

HARGA
INDEK

SATUAN

URAIAN

HARGA SATUAN ( Rp )

BAHAN

UPAH

( Rp )

( Rp )

JUMLAH HARGA ( Rp )

A. PEKERJAAN PERSIAPAN
A. 6.6.1

1 M' PAGAR SEMENTARA DARI KAYU TINGGI 2 M


1.2500 btg

Dolken kayu dia 8-10/4 m'

9,500.00

11,875.00

2.5000 kg

Semen portland

1,298.00

3,245.00

0.0050 m3

Pasir beton

250,000.00

1,250.00

0.0090 m3

Koral beton

263,000.00

2,367.00

0.0720 m3

Kayu 5/7

1,800,000.00

129,600.00

0.0600 kg

Paku biasa 2'-5'

15,583.33

935.00

0.4000 lt

Residu

20,333.33

8,133.33

0.2000 oh

Tukang kayu

70,000.00

14,000.00

0.4000 oh

Pekerja

55,000.00

22,000.00

0.0200 oh

Kepala tukang

75,000.00

1,500.00

0.0200 oh

Mandor

75,000.00
JUMLAH

A. 6.6.2

39,000.00

196,405.33

1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M


1.2500 btg

Dolken kayu dia 8-10/4 m'

9,500.00

2.5000 kg

Semen portland

1,298.00

3,245.00

1.2000 Lbr

Seng gelombang 3" - 5 "

39,125.00

46,950.00

0.0050 m3

Pasir Beton

250,000.00

1,250.00

0.0090 m3

Koral beton

263,000.00

2,367.00

0.0720 kg

Kayu 5/7

1,800,000.00

129,600.00

0.0600 kg

Paku biasa 2'-5'

15,583.33

935.00

0.4500 Kg

Meni besi

20,333.33

9,150.00

0.2000 oh

Tukang kayu

70,000.00

14,000.00

0.4000 oh

Pekerja

55,000.00

22,000.00

0.0200 oh

Kepala tukang

75,000.00

1,500.00

0.0200 oh

Mandor

75,000.00
JUMLAH

A. 6.6.3

1,500.00
157,405.33
11,875.00

1,500.00
205,372.00

39,000.00

244,372.00

1 M' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 M


1.2500 btg

Dolken kayu dia 8-10/4 m'

9,500.00

2.5000 kg

Semen portland

1,300.00

3,250.00

Kawat Duri

79,166.67

1,979,166.67

0.0050 m3

Pasir Beton

250,000.00

1,250.00

0.0090 m3

Koral beton

263,000.00

2,367.00

0.0720 kg

Paku biasa 2'-5'

15,583.33

1,122.00

0.2000 oh

Tukang kayu

70,000.00

14,000.00

0.3000 oh

Pekerja

55,000.00

16,500.00

0.0200 oh

Kepala tukang

75,000.00

1,500.00

0.0200 oh

Mandor

75,000.00

25.0000 kg

JUMLAH

11,875.00

1,500.00
1,999,030.67

33,500.00

2,032,530.67
Hal : 404

A. 6.6.4

1 M' MENGUKUR DAN MEMASANG BOUWPLANK


0.0120 m3

kayu meranti, balok

1,750,000.00

0.0200 kg

Paku Biasa 2' - 5'

15,583.33

311.67

0.0070 m3

kayu papan 3/20

2,300,000.00

16,100.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00
JUMLAH

A. 6.6.5

375.00
37,411.67

13,625.00

51,036.67

1 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERAN


1.2500 btg

Dolken kayu dia 8-10/4 m'

9,500.00

11,875.00

0.1800 kg

Kayu

1,750,000.00

315,000.00

0.8500 m3

Kayu Biasa

1,800,000.00

1,530,000.00

1.1000 m3

Besi Strip

31,800.00

34,980.00

Semen portland

1,300.00

45,500.00

0.1500 kg

Pasir Pasang

278,750.00

41,812.50

0.1000 m3

Pasir Beton

250,000.00

25,000.00

0.1500 m3

Koral beton

263,000.00

39,450.00

Bata merah

800.00

24,000.00

0.2500 Lbr

Seng Plat

45,833.33

11,458.33

2.0000 Bh

Jendela Nako

326,700.00

653,400.00

0.0800 m2

Kaca Polos

102,300.00

8,184.00

0.0150 Bh

Kunci Tanam

0.0600 Lbr

Plywood 4 mm

55,000.00

70,000.00

70,000.00

70,000.00

55,000.00

110,000.00
22,500.00

35.0000 kg

30.0000 Bh

2.0000 oh
1.0000 oh
2.0000 oh

tukang kayu
Tukang Batu
pekerja

0.3000 oh

Kepala tukang

75,000.00

0.0500 oh

Mandor

75,000.00
JUMLAH

A. 6.6.6

21,000.00

3,300.00
140,000.00

3,750.00
2,743,959.83

346,250.00

3,090,209.83

1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT - ALAT


1.7000 btg

Dolken kayu dia 8-10/4 m'

9,500.00

16,150.00

0.2100 kg

Kayu

1,750,000.00

367,500.00

0.3000 kg

Paku biasa 2'-5'

15,583.33

4,675.00

10.5000 kg

Semen portland

1,300.00

13,650.00

0.0300 m3

Pasir Beton

250,000.00

7,500.00

0.0500 m3

Koral beton

263,000.00

13,150.00

1.5000 Lbr

Seng gelombang

39,125.00

58,687.50

2.0000 oh

Tukang kayu

70,000.00

140,000.00

1.0000 oh

Pekerja

55,000.00

55,000.00

0.2000 oh

Kepala tukang

75,000.00

15,000.00

0.0500 oh

Mandor

75,000.00
JUMLAH

3,750.00
481,312.50

213,750.00

695,062.50

A. 6.6.7

1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg

Dolken kayu dia 8-10/4 m'

9,500.00

28,500.00

0.2760 kg

Kayu

1,750,000.00

483,000.00

0.7000 kg

Paku biasa 2'-5'

15,583.33

10,908.33

1.5000 Lbr

Seng gelombang bljs 32

39,125.00

58,687.50

1.5000 oh

Tukang kayu

70,000.00

105,000.00

1.0000 oh

Pekerja

55,000.00

55,000.00

0.1500 oh

Kepala tukang

75,000.00

11,250.00

0.0500 oh

Mandor

75,000.00
JUMLAH

A. 6.6.8

0.1000 oh

pekerja

55,000.00

0.0500 oh

mandor

75,000.00

5,500.00
3,750.00
-

9,250.00

1.2500 btg

Dolken kayu dia 8-10/4 m'

9,500.00

11,875.00

0.1860 kg

Kayu

1,750,000.00

325,500.00

0.3000 Kg

Paku biasa 2'-5'

15,583.33

4,675.00

Semen portland

1,300.00

23,400.00

0.0300 m3

Pasir Beton

250,000.00

7,500.00

0.0500 m3

Koral beton

263,000.00

13,150.00

1.5000 Lbr

Seng gelombang bljs 32

39,125.00

58,687.50

1.3500 Lbr

Plywood 4 mm

55,000.00

74,250.00

2.0000 oh

Tukang kayu

70,000.00

140,000.00

1.0000 oh

Pekerja

55,000.00

55,000.00

0.2000 oh

Kepala tukang

75,000.00

15,000.00

0.0500 oh

Mandor

75,000.00
JUMLAH

9,250.00

3,750.00
519,037.50

213,750.00

732,787.50

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40 X 50 X 20) CM


0.0360 m3

Kayu Terentang

1,750,000.00

0.0800 kg

Paku biasa 2'-5'

15,583.33

1,246.67

1.0000 btg

kaso 5/7

25,000.00

25,000.00

0.3000 oh

Tukang kayu

70,000.00

0.0015 oh

Mandor

75,000.00
JUMLAH

A. 6.6.11

756,095.83

1 M2 PEMBUATAN BEDENG BURUH

18.0000 kg

A. 6.6.10

175,000.00

1 M' MEMBERSIHKAN LAPANGAN DAN PERATAAN

JUMLAH
A. 6.6.9

3,750.00
581,095.83

63,000.00

21,000.00
112.50
89,246.67

21,112.50

110,359.17

1 M2 PEMBUATAN STEGGER DARI BAMBU,UKURAN (40X50X20) CM


1.0000 btg

Bambu dia. 6 - 8 / 600 cm

10,000.00

10,000.00

0.2500 kg

Tali Ijuk

25,000.00

6,250.00

0.0170 oh

Tukang kayu

70,000.00

1,190.00

0.2500 oh

Pekerja

55,000.00

13,750.00

0.0020 oh

Kepala tukang

75,000.00

150.00

0.0130 oh

Mandor

75,000.00
JUMLAH

975.00
16,250.00

16,065.00

29,335.00

A. 6.6.12

1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3

Batu Belah 15/20

215,400.00

32,310.00

0.0900 m3

Batu Pecah 5/7

263,000.00

23,670.00

0.0100 m3

Pasir pasang

278,750.00

2,787.50

1.0000 oh

pekerja

55,000.00

0.0500 oh

mandor

75,000.00
JUMLAH

A. 6.6.13

0.3330 oh

pekerja
Mandor

55,000.00

75,000.00
JUMLAH

0.3330 oh

117,517.50

366,685.00
24,975.00
-

pekerja
Mandor

55,000.00

75,000.00
JUMLAH

391,660.00

391,660.00

366,685.00
24,975.00
-

391,660.00

391,660.00

1 M' PASANG PAGAR KAWAT JARING GALVANIS.TINGGI 1,00 M


0.4340 m2

Pagar Kawat jaring

107,300.00

0.0420 oh

Pekerja

55,000.00

0.0040 oh

Kepala tukang

75,000.00

300.00

0.0420 oh

Tukang

70,000.00

2,940.00

0.0020 oh

Mandor

46,568.20
2,310.00

75,000.00
JUMLAH

A. 6.6.16

58,750.00

1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh

A. 6.6.15

3,750.00
58,767.50

1 M3 BONGKARAN BETON BERTULANG


6.6670 oh

A. 6.6.14

55,000.00

150.00
46,568.20

5,700.00

52,268.20

1 M' PASANG PAGAR BETON PRACETAK ( 5X50X213) CM


0.9860 lbr

Panel Beton Pracetak

0.5250 btg

Kolom Beton Pracetak

0.0740 m3

Pasir Beton

250,000.00

18,500.00

0.1460 m3

Koral

263,000.00

38,398.00

Semen Abu- abu

1,300.00

58,500.00

0.1250 oh

Tukang batu

70,000.00

0.0120 oh

Kepala tukang

75,000.00

900.00

0.3750 oh

pekerja

55,000.00

20,625.00

0.0190 oh

mandor

45.0000 kg

8,750.00

75,000.00
JUMLAH

1,425.00
115,398.00

31,700.00

147,098.00

B. PEKERJAAN TANAH
B. 6.6.1

1 M3 GALIAN TANAH BIASA SEDALAM 1 M'


0.4000 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0400 oh

JUMLAH

22,000.00
3,000.00
25,000.00

25,000.00

B. 6.6.2

1 M3 GALIAN TANAH BIASA SEDALAM 2 M'


0.5260 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0520 oh

JUMLAH
B. 6.6.3

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0730 oh

JUMLAH
pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0620 oh

JUMLAH
pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.1250 oh

JUMLAH
pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0830 oh

JUMLAH

40,425.00
5,475.00
45,900.00

45,900.00

34,375.00
4,650.00
39,025.00

39,025.00

68,750.00
9,375.00
78,125.00

78,125.00

45,265.00
6,225.00
51,490.00

51,490.00

1 M2 PEKERJAAN STRIPPING SETINGGI 1 M


0.0500 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

375.00

0.0050 oh

JUMLAH
B. 6.6.8

32,830.00

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M'


0.8230 oh

B. 6.6.7

32,830.00

1 M3 GALIAN TANAH CADAS SEDALAM 1 M


1.2500 oh

B. 6.6.6

3,900.00

1 M3 GALIAN TANAH KERAS SEDALAM 1 M'


0.6250 oh

B. 6.6.5

1 M3 GALIAN TANAH BIASA SEDALAM 3 M'


0.7350 oh

B. 6.6.4

28,930.00

2,750.00
-

3,125.00

3,125.00

1 M3 PEMBUANGAN TANAH SEJAUH 150 M


0.5160 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0500 oh

JUMLAH

28,380.00
3,750.00
32,130.00

32,130.00

B. 6.6.9

1 M3 URUGAN KEMBALI
0.1920 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0190 oh

10,560.00
1,425.00

JUMLAH
B. 6.6.10

11,985.00

0.5000 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0500 oh

27,500.00
3,750.00

JUMLAH
B. 6.6.11

31,250.00

1.2000 M3

Tanah urug

51,900.00

0.2500 oh

pekerja

55,000.00

0.0250 oh

mandor

75,000.00

1,875.00

1.0000 oh

Ls biaya pemadatan

31,250.00

31,250.00

13,750.00

62,280.00

46,875.00

1.2000 M3

pasir urug

51,900.00

0.3000 oh

pekerja

55,000.00

0.0100 oh

mandor

75,000.00

750.00

1.0000 oh

Ls biaya pemadatan

31,250.00

31,250.00

109,155.00

62,280.00
16,500.00

62,280.00

48,500.00

110,780.00

1 M3 LAPISAN PUDEL CAMP 1 Kp : 3 Ps : 7 TL


0.3300 M3

pasir urug

0.1090 M3

kapur padam

51,900.00

0.7630 M3

tanah liat

0.8330 oh

pekerja

55,000.00

45,815.00

0.4160 oh

tukang batu

70,000.00

29,120.00

0.0400 oh

kepala tukang

75,000.00

3,000.00

0.0830 oh

mandor

75,000.00
JUMLAH

B. 6.6.13

62,280.00

1 M3 URUGAN PASIR

JUMLAH
B. 6.6.12

31,250.00

1 M3 URUGAN TANAH

JUMLAH
B. 6.6.11.a

11,985.00

PEMADATAN TANAH

17,127.00

6,225.00
17,127.00

84,160.00

133,602.12

1 M3 LAPISAN PUDEL CAMP 1 Kp : 5 TL


0.2000 M3

kapur padam

1.0000 M3

tanah liat

0.8330 oh

pekerja

55,000.00

45,815.00

0.4160 oh

tukang batu

70,000.00

29,120.00

0.0410 oh

kepala tukang

75,000.00

3,075.00

0.0810 oh

mandor

75,000.00

JUMLAH

6,075.00
-

84,085.00

84,085.00

B. 6.6.14

1 M3 PEMASANGAN LAPISAN IJUK


1.2000 m3

ijuk

0.1500 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0150 oh

JUMLAH
B. 6.6.15

1,125.00
-

9,375.00

9,375.00

1 M3 URUGAN SIRTU
1.2000 M3

Sirtu

274,800.00

0.2500 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.0250 oh

JUMLAH
B. 6.6.16

8,250.00

329,760.00
13,750.00
1,875.00
329,760.00

15,625.00

345,385.00

1 M2 PEMBUATAN JALAN SEMENTARA. TEBAL 25 CM


0.2750 m3

batu belah

215,400.00

0.0300 m3

kerikil /Koral

263,000.00

7,890.00

0.0500 m3

pasir

250,000.00

12,500.00

1.0000 oh

pekerja

55,000.00

oh

tukang gali

70,000.00

oh

kepala tukang

75,000.00

mandor

75,000.00

0.1000 oh

JUMLAH

59,235.00

55,000.00
7,500.00
79,625.00

62,500.00

142,125.00

C. PEKERJAAN PONDASI
C.6.6.1

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1 Ps


1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

509,600.00

0.3140 m3

pasir pasang

250,000.00

78,500.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

392.0000 kg

JUMLAH
C.6.6.2

5,625.00
825,040.00

134,625.00

959,665.00

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2 Ps


1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

347,100.00

0.4270 m3

pasir pasang

250,000.00

106,750.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

267.0000 kg

JUMLAH

5,625.00
690,790.00

134,625.00

825,415.00

C.6.6.3

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 2,5 Ps


1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

509,600.00

0.3140 m3

pasir pasang

250,000.00

78,500.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

392.0000 kg

JUMLAH
C.6.6.4

134,625.00

1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

262,600.00

0.4850 m3

pasir pasang

250,000.00

121,250.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00
JUMLAH

5,625.00
620,790.00

134,625.00

1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

211,900.00

0.5200 m3

pasir pasang Ex. Semuntai

250,000.00

130,000.00

1.5000 oh

pekerja

55,000.00

82,500.00

3.6

0.6000 oh

tukang batu

70,000.00

42,000.00

0.36

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.45

0.0750 oh

mandor

75,000.00
JUMLAH

1.1000 m3

134,625.00

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

211,900.00

0.5200 m3

pasir pasang Putih

64,500.00

33,540.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00
JUMLAH

713,465.00

5,625.00
482,380.00

134,625.00

617,005.00

1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps (Pasir Putih Sepaku)


1.1000 m3

batu belah 15/20 cm (SEPAKU)

225,000.00

247,500.00

semen porland

1,300.00

211,900.00

0.5200 m3

Pasir pasang putih Sepaku

225,000.00

117,000.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

163.0000 kg

JUMLAH
C.6.6.6

5,625.00
578,840.00

1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps (Pasir Putih)


163.0000 kg

C.6.6.5.b

755,415.00

1 M3 PASANG PONDASI BATU KALI / GUNUNG / BELAH 1 Pc ; 4 Ps


163.0000 kg

C.6.6.5.a

959,665.00

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Ps


202.0000 kg

C.6.6.5

5,625.00
825,040.00

5,625.00
576,400.00

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 5 Ps


1.1000 m3
136.0000 kg
0.5440 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

176,800.00

pasir pasang

250,000.00

136,000.00

134,625.00

711,025.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00
JUMLAH

C.6.6.7

5,625.00
549,740.00

134,625.00

684,365.00

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 6 Ps


1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

152,100.00

0.5610 m3

pasir pasang

250,000.00

140,250.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

117.0000 kg

JUMLAH

5,625.00
529,290.00

134,625.00

663,915.00

C.6.6.8

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 8 Ps


1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen porland

1,300.00

118,300.00

0.5610 m3

pasir pasang

250,000.00

140,250.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

91.0000 kg

JUMLAH
C.6.6.9

1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

0.2290 kg

kapur pasang

1,300.00

297.70

0.2290 m3

semen merah

1,600.00

366.40

0.5440 oh

pasir pasang

250,000.00

136,000.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

630,115.00

5,625.00
373,299.60

108,600.00

481,899.60

1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 2 Ps


1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

0.1700 kg

kapur pasang

1,300.00

221.00

0.1700 m3

semen merah

1,600.00

272.00

0.3400 oh

pasir pasang

250,000.00

85,000.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00
JUMLAH

C.6.6.11

134,625.00

1 M3 PASANG PONDASI BATU KALI, 1 Kp ; 1 Sm ; 1 Ps

JUMLAH
C.6.6.10

5,625.00
495,490.00

5,625.00
322,433.00

134,625.00

457,058.00

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 1/4 Kp ; 4 Ps


1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen portland

1,300.00

202,800.00

0.0320 m3

kapur pasang

5,000.00

160.00

0.5480 oh

pasir pasang

250,000.00

137,000.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

156.0000 kg

JUMLAH

5,625.00
576,900.00

134,625.00

711,525.00

C.6.6.12

1 M3 PASANG PONDASI BATU KALI, 1 Pc ; 3 Kp ; 10 Ps


1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen portland

1,300.00

79,300.00

0.1470 m3

kapur pasang

5,000.00

735.00

0.4920 oh

pasir pasang

250,000.00

123,000.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00

61.0000 kg

JUMLAH
C.6.6.13

1.1000 m3

batu belah 15/20 cm

215,400.00

236,940.00

semen portland

1,300.00

53,300.00

0.1310 m3

kapur pasang

5,000.00

655.00

0.5230 oh

pasir pasang

250,000.00

130,750.00

1.5000 oh

pekerja

55,000.00

82,500.00

0.6000 oh

tukang batu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0750 oh

mandor

75,000.00
JUMLAH

574,600.00

5,625.00
421,645.00

134,625.00

556,270.00

1 M3 PASANGAN BATU KOSONG (AANSTAMPING)


1.2000 m3

batu gunung

215,400.00

258,480.00

0.3000 m3

pasir urug

51,900.00

15,570.00

0.7800 oh

pekerja

55,000.00

42,900.00

0.3900 oh

tukang batu

70,000.00

27,300.00

0.0390 oh

kepala tukang

75,000.00

2,925.00

0.0390 oh

mandor

75,000.00
JUMLAH

C. 6.6.15

134,625.00

1 M3 PASANG PONDASI BATU KALI, 1/4 Pc ; 1 Kp ; 4 Ps


41.0000 kg

C. 6.6.14

5,625.00
439,975.00

2,925.00
274,050.00

76,050.00

350,100.00

1 M3 PASANG PONDASI SIKLOP 40 % BATU KALI


75.0000 kg

besi beton

10,000.00

750,000.00

semen portland

1,300.00

262,600.00

0.3200 m3

pasir beton

250,000.00

80,000.00

0.4900 m3

koral beton

263,000.00

128,870.00

0.8000 kg

kawat beton

20,000.00

16,000.00

3.0000 oh

pekerja

55,000.00

165,000.00

0.8500 oh

tukang batu

70,000.00

59,500.00

0.0850 oh

kepala tukang

75,000.00

6,375.00

0.1500 oh

mandor

75,000.00

11,250.00

202.0000 kg

JUMLAH

1,237,470.00

242,125.00

1,479,595.00

C. 6.6.16

1 M3 PASANG PONDASI SUMURAN DIA 100 CM


0.4500 kg

batu belah 15/20

215,400.00

96,930.00

semen portland

1,300.00

364,000.00

0.4500 m3

pasir beton

250,000.00

112,500.00

0.6700 m3

koral beton

263,000.00

176,210.00

2.3800 oh

pekerja

55,000.00

130,900.00

0.3000 oh

tukang batu

70,000.00

21,000.00

0.0300 oh

kepala tukang

75,000.00

2,250.00

0.0800 oh

mandor

75,000.00

280.0000 kg

JUMLAH
C. 6.6.17

160,150.00

909,790.00

PEMBUATAN TIANG PANCANG (40X40) CM, BETON BERTULANG


0.0190 m3

pasir urug darat

51,900.00

986.10

0.0940 m3

pasir beton

250,000.00

23,500.00

0.1500 m3

39,450.00

koral beton

263,000.00

60.5000 kg

semen portland

1,300.00

78,650.00

45.0000 kg

besi beton

11,750.00

528,750.00

0.9000 kg

kawat beton

20,000.00

18,000.00

0.0320 m3

kayu kaso 5/7

1,750,000.00

56,000.00

0.1200 kg

paku

15,583.33

1,870.00

0.0900 lt

minyak bekisting

13,500.00

1,215.00

0.2400 kg

plamur tembok

18,500.00

4,440.00

1.0000 oh

pekerja

55,000.00

55,000.00

0.6700 oh

tukang batu

70,000.00

46,900.00

0.0670 oh

kepala tukang

75,000.00

5,025.00

0.0500 oh

mandor

75,000.00
JUMLAH

C. 6.6.18

6,000.00
749,640.00

3,750.00
752,861.10

110,675.00

863,536.10

PEMBUATAN TIANG PANCANG (35X35) CM, BETON BERTULANG


0.0160 m3

pasir urug darat

51,900.00

830.40

0.0800 m3

pasir beton

250,000.00

20,000.00

0.1250 m3

32,875.00

koral beton

263,000.00

49.0000 kg

semen portland

1,300.00

63,700.00

34.5000 kg

besi beton

11,750.00

405,375.00

0.7000 kg

kawat beton

10,000.00

7,000.00

0.0270 m3

kayu kaso 5/7

1,750,000.00

47,250.00

0.1200 kg

paku

15,583.33

1,870.00

0.0900 lt

minyak bekisting

13,500.00

1,215.00

0.2000 kg

plamur tembok

18,500.00

3,700.00

0.8000 oh

pekerja

55,000.00

44,000.00

0.5000 oh

tukang batu

70,000.00

35,000.00

0.0500 oh

kepala tukang

75,000.00

3,750.00

0.0400 oh

mandor

75,000.00
JUMLAH

3,000.00
583,815.40

85,750.00

669,565.40

D. PEKERJAAN DINDING
D.6.6.1
62.5

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 1 Ps


120.0000 bh

bata merah

800.00

96,000.00

semen portland

1,300.00

83,239.00

0.0590 m3

pasir pasang

250,000.00

14,750.00

0.6500 oh

pekerja

55,000.00

35,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0300 oh

mandor

75,000.00

64.0300 kg

JUMLAH
D.6.6.2

bata merah

800.00

96,000.00

semen portland

1,300.00

56,550.00

0.0800 m3

pasir pasang

250,000.00

20,000.00

0.6500 oh

pekerja

55,000.00

35,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0300 oh

mandor

75,000.00

43.5000 kg

JUMLAH

2,250.00
172,550.00

53,500.00

bata merah

800.00

96,000.00

semen portland

1,300.00

42,835.00

0.0910 m3

pasir pasang

250,000.00

22,750.00

0.6500 oh

pekerja

55,000.00

35,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0300 oh

mandor

75,000.00

32.9500 kg

JUMLAH

226,050.00

2,250.00
161,585.00

53,500.00

215,085.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 4 Ps


120.0000 bh

bata merah

800.00

96,000.00

semen portland

1,300.00

34,515.00

0.0930 m3

pasir pasang

250,000.00

23,250.00

0.6500 oh

pekerja

55,000.00

35,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0300 oh

mandor

75,000.00

26.5500 kg

JUMLAH
D.6.6.5

247,489.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Ps


120.0000 bh

D.6.6.4

53,500.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 2 Ps


120.0000 bh

D.6.6.3

2,250.00
193,989.00

2,250.00
153,765.00

53,500.00

207,265.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 5 Ps


120.0000 bh

bata merah

800.00

96,000.00

semen portland

1,300.00

28,860.00

0.1020 m3

pasir pasang

250,000.00

25,500.00

0.6500 oh

pekerja

55,000.00

35,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0300 oh

mandor

75,000.00

22.2000 kg

JUMLAH

2,250.00
150,360.00

53,500.00

203,860.00

D.6.6.6

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 6 Ps


120.0000 bh

bata merah

800.00

96,000.00

semen portland

1,300.00

28,860.00

0.1020 m3

pasir pasang

250,000.00

25,500.00

0.6500 oh

pekerja

55,000.00

35,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0300 oh

mandor

75,000.00

22.2000 kg

JUMLAH
D.6.6.7

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc ; 3 Kp ; 10 Ps


120.0000 bh

800.00

96,000.00

semen portland

1,300.00

13,104.00

0.0925 m3

pasir pasang

250,000.00

23,125.00

0.0275 m3

kapur pasang

5,000.00

137.50

0.6500 oh

pekerja

55,000.00

35,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0300 oh

mandor

75,000.00

2,250.00
132,366.50

53,500.00

185,866.50

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc ; 1 Ps


60.0000 bh

bata merah

800.00

48,000.00

27.8000 kg

semen portland

1,300.00

36,140.00

0.0280 m3

pasir pasang

250,000.00

7,000.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH

91,140.00

26,475.00

117,615.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 2 ps


60.0000 bh

bata merah 8 x 8 x 15 cm

800.00

48,000.00

18.9500 kg

semen porland

1,300.00

24,635.00

0.0380 m3

pasir pasang

250,000.00

9,500.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH
D. 6.6.10

203,860.00

JUMLAH

D. 6.6.9

53,500.00

bata merah

10.0800 kg

D.6.6.8

2,250.00
150,360.00

82,135.00

26,475.00

108,610.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 ps


60.0000 bh

bata merah 8 x 8 x 15 cm

800.00

48,000.00

14.3700 kg

semen porland

1,300.00

18,681.00

0.0400 m3

pasir pasang

250,000.00

10,000.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH

76,681.00

26,475.00

103,156.00

D. 6.6.11

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps


60.0000 bh

bata merah 8 x 8 x 15 cm

800.00

48,000.00

11.5000 kg

semen porland

1,300.00

14,950.00

0.0430 m3

pasir pasang

250,000.00

10,750.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH

73,700.00

26,475.00

100,175.00

D. 6.6.11.a 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps (pasir Putih Lokal)
60.0000 bh

bata merah 8 x 8 x 15 cm

800.00

48,000.00

11.5000 kg

semen porland

1,300.00

14,950.00

0.0430 m3

pasir pasang putih lokal

64,500.00

2,773.50

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH

65,723.50

26,475.00

92,198.50

D. 6.6.11.b 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 4 ps (pasir Putih Sepaku)
60.0000 bh

bata merah 8 x 8 x 15 cm

800.00

48,000.00

11.5000 kg

semen porland

1,300.00

14,950.00

0.0430 m3

pasir pasang putih lokal sepaku

225,000.00

9,675.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH
D. 6.6.12

bata merah 8 x 8 x 15 cm

800.00

48,000.00

9.6800 kg

semen porland

1,300.00

12,584.00

0.0450 m3

pasir pasang

250,000.00

11,250.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH

99,100.00

71,834.00

26,475.00

98,309.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 6 ps


60.0000 bh

bata merah 8 x 8 x 15 cm

800.00

48,000.00

8.3200 kg

semen porland

1,300.00

10,816.00

0.0490 m3

pasir pasang

250,000.00

12,250.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH
D. 6.6.14

26,475.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 5 ps


60.0000 bh

D. 6.6.13

72,625.00

71,066.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 8 ps


60.0000 bh

bata merah 8 x 8 x 15 cm

800.00

48,000.00

26,475.00

97,541.00

6.5000 kg

semen porland

1,300.00

8,450.00

0.0500 m3

pasir pasang

250,000.00

12,500.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH

68,950.00

26,475.00

95,425.00

D. 6.6.15

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 3 Kp ; 10 ps


60.0000 bh

bata merah 8 x 8 x 15 cm

800.00

4.5000 kg

semen porland

1,300.00

5,850.00

0.0500 m3

pasir pasang

250,000.00

12,500.00

0.0150 m3

kapur padam

5,000.00

75.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH
D. 6.6.16

26,550.00

bata merah

800.00

0.0180 kg

semen merah/bata merah tumbuk

1,300.00

23.40

0.0180 m3

pasir pasang

250,000.00

4,500.00

0.0180 m3

kapur padam

5,000.00

90.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH

92,900.00

48,000.00

52,613.40

26,475.00

79,088.40

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Kp ; 1 Sm ; 2 Ps


60.0000 bh

bata merah

800.00

0.0140 kg

semen merah/bata merah tumbuk

1,300.00

18.20

0.0280 m3

pasir pasang

250,000.00

7,000.00

0.0140 m3

kapur padam

5,000.00

70.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH
D. 6.6.18

66,350.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 pc ; 1 Sm ; 1 ps


60.0000 bh

D. 6.6.17

48,000.00

48,000.00

55,088.20

26,475.00

81,563.20

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.20)


12.5000 bh

Hollow block

800.00

10,000.00

13.5000 kg

semen portland

1,300.00

17,550.00

0.0480 m3

pasir pasang

250,000.00

12,000.00

1.9500 m3

besi beton polos

10,000.00

19,500.00

0.3500 oh

pekerja

55,000.00

19,250.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0170 oh

mandor

75,000.00
JUMLAH

1,275.00
59,050.00

32,150.00

91,200.00

D. 6.6.19

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.15)


12.5000 bh

Hollow block

13,375.00

167,187.50

10.4500 kg

semen portland

1,300.00

13,585.00

0.0380 m3

pasir pasang

250,000.00

9,500.00

1.9500 m3

besi beton polos

10,000.00

19,500.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1200 oh

tukang batu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH
D. 6.6.20

28,025.00

237,797.50

1 M2 PASANGAN DINDING HOLLOW BLOCK (HB.10)


12.5000 bh

Hollow block

13,375.00

167,187.50

7.5000 kg

semen portland

1,300.00

9,750.00

0.0270 m3

pasir pasang

250,000.00

6,750.00

1.9500 m3

besi beton polos

10,000.00

19,500.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH
D. 6.6.21

209,772.50

203,187.50

26,475.00

229,662.50

1 M2 PASANGAN DINDING CON BLOCK (HB.20)


12.5000 bh

concrete block

13,375.00

167,187.50

14.0500 kg

semen portland

1,300.00

18,265.00

0.0040 m3

pasir beton

250,000.00

1,000.00

0.0420 m3

pasir pasang

64,500.00

2,709.00

3.8700 kg

besi beton polos

10,000.00

38,700.00

0.0060 kg

paku biasa 2" - 5"

15,583.33

93.50

0.0010 kg

kayu terentang

55,000.00

55.00

0.0300 kg

kawat beton

20,000.00

600.00

0.0050 kg

koral beton

263,000.00

1,315.00

0.3700 oh

pekerja

55,000.00

20,350.00

0.1570 oh

tukang batu

70,000.00

10,990.00

0.0070 oh

tukang besi

70,000.00

490.00

0.0164 oh

kepala tukang

75,000.00

1,230.00

0.0185 oh

mandor

75,000.00
JUMLAH

1,387.50
229,925.00

34,447.50

264,372.50

D. 6.6.22

1 M2 PASANGAN DINDING CON BLOCK (HB.15)


12.5000 bh

concrete block

13,375.00

167,187.50

10.4600 kg

semen portland

1,300.00

13,598.00

0.0300 m3

pasir beton

250,000.00

7,500.00

0.0320 m3

pasir pasang

64,500.00

2,064.00

0.8700 kg

besi beton polos

10,000.00

8,700.00

0.0040 kg

paku biasa 2" - 5"

15,583.33

62.33

0.0010 kg

kayu terentang

55,000.00

55.00

0.0200 kg

kawat beton

20,000.00

400.00

0.0040 kg

koral beton

263,000.00

1,052.00

0.3400 oh

pekerja

55,000.00

18,700.00

0.1300 oh

tukang batu

70,000.00

9,100.00

0.0070 oh

tukang besi

70,000.00

490.00

0.0137 oh

kepala tukang

75,000.00

1,027.50

0.0170 oh

mandor

75,000.00
JUMLAH

D. 6.6.23

30,592.50

231,211.33

1 M2 PASANGAN DINDING CON BLOCK (HB.10)


12.5000 bh

concrete block

13,375.00

167,187.50

7.2000 kg

semen portland

1,300.00

9,360.00

0.0020 m3

pasir beton

250,000.00

500.00

0.0210 m3

pasir pasang

64,500.00

1,354.50

2.5400 kg

besi beton polos

10,000.00

25,400.00

0.0030 kg

paku biasa 2" - 5"

15,583.33

46.75

0.0010 kg

kayu terentang

55,000.00

55.00

0.0150 kg

kawat beton

20,000.00

300.00

0.0030 kg

koral beton

263,000.00

789.00

0.3400 oh

pekerja

55,000.00

18,700.00

0.1070 oh

tukang batu

70,000.00

7,490.00

0.0070 oh

tukang besi

70,000.00

490.00

0.0114 oh

kepala tukang

75,000.00

855.00

0.0170 oh

mandor

75,000.00

1,275.00

JUMLAH
D. 6.6.24

1,275.00
200,618.83

204,992.75

28,810.00

233,802.75

1 M2 PASANGAN DINDING LATAI


2.5000 bh

bondbeam 40x20x20 cm

5.1000 kg

semen portland

1,300.00

6,630.00

0.0800 m3

pasir beton

250,000.00

20,000.00

1.5000 kg

besi beton polos

10,000.00

15,000.00

0.1500 m3

koral beton

263,000.00

39,450.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.0300 oh

tukang batu

70,000.00

2,100.00

0.0300 oh

tukang besi

70,000.00

2,100.00

0.0060 oh

kepala tukang

75,000.00

450.00

mandor

75,000.00

0.005 oh

JUMLAH

375.00
81,080.00

10,525.00

91,605.00

D. 6.6.25

1 M2 PASANGAN DINDING ROSTER 20 X 20

0.04

26.0000 bh

roster / terawang

6,000.00

156,000.00

25

12.8000 kg

semen porland

1,300.00

16,640.00

0.0350 m3

pasir pasang

250,000.00

8,750.00

0.3000 oh

pekerja

55,000.00

16,500.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0150 oh

mandor

75,000.00
JUMLAH

D. 6.6.26

1,125.00
181,390.00

25,750.00

0.04

80.0000 bh

bata berongga

800.00

25

23.6500 kg

semen porland

1,300.00

30,745.00

0.5700 m3

pasir pasang

250,000.00

142,500.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0150 oh

mandor

75,000.00
JUMLAH

D. 6.6.27

64,000.00

1,125.00
237,245.00

30,350.00

267,595.00

1 M2 PASANG DINDING ANYAMAN BAMBU RANGKA KAYU

0.04

1.5000 m2

bilik bambu

2,500.00

3,750.00

25

0.0140 m3

kayu

1,750,000.00

24,500.00

0.0120 kg

paku

15,583.33

187.00

0.0030 m3

list kayu 2/4

1,750,000.00

5,250.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.0500 oh

tukang batu

70,000.00

3,500.00

0.0050 oh

kepala tukang

75,000.00

375.00

0.0020 oh

mandor

75,000.00

150.00
33,687.00

D. 6.6.28

207,140.00

1 M2 PASANG BATA BERONGGA UKURAN ( 5x11x24 ) cm

9,525.00

43,212.00

1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP


RANGKA KAYU MERANTI
0.0195 m3

balok kayu meranti

2,200,000.00

42,900.00

0.0070 m3

papan kayu meranti

2,300,000.00

16,100.00

0.1000 kg

paku biasa 2' - 5'

15,583.33

1,558.33

1.0000 lbr

plywood 4 mm

55,000.00

55,000.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.6000 oh

tukang kayu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0100 oh

mandor

75,000.00
JUMLAH

750.00
115,558.33

58,250.00

173,808.33

E. PEKERJAAN PLESTERAN
E. 6.6.1

1 M2 PLESTERAN 1 pc ; 1 ps, TEBAL 15 MM


12.9200 kg

semen portland

1,300.00

16,796.00

0.0130 m3

pasir pasang

250,000.00

3,250.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00

750.00
20,046.00

E. 6.6.2

8.5200 kg

semen portland

1,300.00

11,076.00

0.0170 m3

pasir pasang

250,000.00

4,250.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00

semen portland

1,300.00

8,424.00

0.0190 m3

pasir pasang

250,000.00

4,750.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00

750.00
13,174.00

23,375.00

5.2000 kg

semen portland

1,300.00

6,760.00

0.0200 m3

pasir pasang

250,000.00

5,000.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00

36,549.00

750.00
11,760.00

23,375.00

35,135.00

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM (Pasir Putih)


5.2000 kg

semen portland

1,300.00

6,760.00

0.0200 m3

Pasir pasang putih

64,500.00

1,290.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00

750.00
8,050.00

23,375.00

31,425.00

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM (Pasir Putih Sepaku)


5.2000 kg

semen portland

1,300.00

6,760.00

0.0200 m3

Pasir pasang putih Sepaku

225,000.00

4,500.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00
JUMLAH

E. 6.6.5

38,701.00

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 15 MM

JUMLAH
E. 6.6.4.b

23,375.00

6.4800 kg

JUMLAH
E. 6.6.4.a

750.00
15,326.00

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 15 MM

JUMLAH
E. 6.6.4

43,421.00

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 15 MM

JUMLAH
E. 6.6.3

23,375.00

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 15 MM

750.00
11,260.00

23,375.00

34,635.00

4.3200 kg

semen portland

1,300.00

5,616.00

0.0220 m3

pasir pasang putih

64,500.00

1,419.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00
JUMLAH

750.00
7,035.00

23,375.00

30,410.00

E. 6.6.6

1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 15 MM


3.6800 kg

semen portland

1,300.00

4,784.00

0.0230 m3

pasir pasang putih

64,500.00

1,483.50

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00
JUMLAH

E. 6.6.7

2.8800 kg

semen portland

1,300.00

3,744.00

0.0240 m3

pasir pasang

250,000.00

6,000.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00

23,375.00

33,119.00

1 M2 PLESTERAN 1 pc ; 0,5 Kp ; 3 Ps, TEBAL 15 MM


5.7600 kg

semen portland

1,300.00

0.0030 m3

Kapur padam

5,000.00

15.00

0.0130 m3

pasir pasang

250,000.00

3,250.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00

7,488.00

750.00
10,753.00

23,375.00

34,128.00

1 M2 PLESTERAN 1 pc ; 3 Kp ; 10 Ps, TEBAL 15 MM


1.8400 kg

semen portland

1,300.00

0.0060 m3

Kapur padam

5,000.00

30.00

0.0140 m3

pasir pasang

250,000.00

3,500.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00
JUMLAH

E. 6.6.10

29,642.50

750.00
9,744.00

JUMLAH
E. 6.6.9

23,375.00

1 M2 PLESTERAN 1 pc ; 8 ps, TEBAL 15 MM

JUMLAH
E. 6.6.8

750.00
6,267.50

2,392.00

750.00
5,922.00

23,375.00

29,297.00

1 M2 PLESTERAN 0,5 pc ; 1 Kp ; 4 Ps, TEBAL 15 MM


3.0000 kg

semen portland

1,300.00

0.0050 m3

Kapur padam

5,000.00

25.00

0.0190 m3

pasir pasang

250,000.00

4,750.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00
JUMLAH

3,900.00

750.00
8,675.00

23,375.00

32,050.00

E. 6.6.11

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 1 Ps, TEBAL 15 MM


0.0090 kg

semen merah

1,300.00

0.0090 m3

Kapur padam

5,000.00

45.00

0.0090 m3

pasir pasang

250,000.00

2,250.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00
JUMLAH

E. 6.6.12

semen merah

1,300.00

9.10

0.0070 m3

Kapur padam

5,000.00

35.00

0.0150 m3

pasir pasang

250,000.00

3,750.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.1500 oh

tukang batu

70,000.00

10,500.00

0.0150 oh

kepala tukang

75,000.00

1,125.00

0.0100 oh

mandor

75,000.00

25,681.70

750.00
3,794.10

23,375.00

27,169.10

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 20 MM


semen portland

1,300.00

18,564.00

0.0230 m3

pasir pasang

250,000.00

5,750.00

0.2500 oh

pekerja

55,000.00

13,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0125 oh

mandor

75,000.00
JUMLAH

937.50
24,314.00

30,187.50

54,501.50

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 20 MM


10.8000 kg

semen portland

1,300.00

14,040.00

0.0260 m3

pasir pasang

250,000.00

6,500.00

0.2500 oh

pekerja

55,000.00

13,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0125 oh

mandor

75,000.00
JUMLAH

E. 6.6.15

23,375.00

0.0070 kg

14.2800 kg

E. 6.6.14

750.00
2,306.70

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 15 MM

JUMLAH
E. 6.6.13

11.70

937.50
20,540.00

30,187.50

50,727.50

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 20 MM


8.6800 kg

semen portland

1,300.00

11,284.00

0.0280 m3

pasir pasang

250,000.00

7,000.00

0.2500 oh

pekerja

55,000.00

13,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0125 oh

mandor

75,000.00
JUMLAH

937.50
18,284.00

30,187.50

48,471.50

E. 6.6.16

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 20 MM


7.2900 kg

semen portland

1,300.00

9,477.00

0.0280 m3

pasir pasang

250,000.00

7,000.00

0.2500 oh

pekerja

55,000.00

13,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0125 oh

mandor

75,000.00
JUMLAH

E. 6.6.17

6.2400 kg

semen portland

1,300.00

8,112.00

0.0300 m3

pasir pasang putih

250,000.00

7,500.00

0.2500 oh

pekerja

55,000.00

13,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0125 oh

mandor

75,000.00

937.50
15,612.00

30,187.50

0.0090 kg

semen merah

1,300.00

0.0090 m3

Kapur padam

5,000.00

45.00

0.0180 m3

pasir pasang

250,000.00

4,500.00

0.2500 oh

pekerja

55,000.00

13,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0125 oh

mandor

75,000.00

45,799.50

11.70

937.50
4,556.70

30,187.50

34,744.20

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 25 MM


15.5000 kg

semen portland

1,300.00

20,150.00

0.0130 m3

pasir pasang

250,000.00

3,250.00

0.3000 oh

pekerja

55,000.00

16,500.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0130 oh

mandor

75,000.00
JUMLAH

E. 6.6.20

46,664.50

1 M2 PLESTERAN 1 Kp ; 1 Sm ; 2 Ps, TEBAL 20 MM

JUMLAH
E. 6.6.19

30,187.50

1 M2 PLESTERAN 1 pc ; 6 ps, TEBAL 20 MM

JUMLAH
E. 6.6.18

937.50
16,477.00

975.00
23,400.00

32,975.00

56,375.00

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 25 MM


11.7500 kg

semen portland

1,300.00

15,275.00

0.0350 m3

pasir pasang

250,000.00

8,750.00

0.3000 oh

pekerja

55,000.00

16,500.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0130 oh

mandor

75,000.00
JUMLAH

975.00
24,025.00

32,975.00

57,000.00

E. 6.6.21

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 25 MM


9.4800 kg

semen portland

1,300.00

12,324.00

0.0380 m3

pasir pasang

250,000.00

9,500.00

0.3000 oh

pekerja

55,000.00

16,500.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0130 oh

mandor

75,000.00
JUMLAH

E. 6.6.22

7.9400 kg

semen portland

1,300.00

10,322.00

0.0390 m3

pasir pasang

250,000.00

9,750.00

0.3000 oh

pekerja

55,000.00

16,500.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0130 oh

mandor

75,000.00

975.00
20,072.00

32,975.00

semen portland

1,300.00

24,245.00

0.0350 m3

pasir pasang

250,000.00

8,750.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0150 oh

mandor

75,000.00
JUMLAH

53,047.00

1,125.00
32,995.00

38,100.00

71,095.00

1 M2 PLESTERAN 1 pc ; 3 ps, TEBAL 30 MM


14.1500 kg

semen portland

1,300.00

18,395.00

0.0390 m3

pasir pasang

250,000.00

9,750.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0150 oh

mandor

75,000.00

1,125.00
28,145.00

E. 6.6.25

54,799.00

1 M2 PLESTERAN 1 pc ; 2 ps, TEBAL 30 MM


18.6500 kg

E. 6.6.24

32,975.00

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 25 MM

JUMLAH
E. 6.6.23

975.00
21,824.00

38,100.00

66,245.00

1 M2 PLESTERAN 1 pc ; 4 ps, TEBAL 30 MM


11.3800 kg

semen portland

1,300.00

14,794.00

0.0420 m3

pasir pasang

250,000.00

10,500.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0150 oh

mandor

75,000.00
JUMLAH

1,125.00
25,294.00

38,100.00

63,394.00

E. 6.6.26

1 M2 PLESTERAN 1 pc ; 5 ps, TEBAL 30 MM


8.1900 kg

semen portland

1,300.00

10,647.00

0.0450 m3

pasir pasang

250,000.00

11,250.00

0.3200 oh

pekerja

55,000.00

17,600.00

0.2500 oh

tukang batu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0150 oh

mandor

75,000.00
JUMLAH

E. 6.6.27

7.0700 kg

semen portland

1,300.00

9,191.00

0.0210 m3

pasir pasang

250,000.00

5,250.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0700 oh

tukang batu

70,000.00

4,900.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0080 oh

mandor

75,000.00

14,275.00

28,716.00

1 M2 BERAPEN 1 pc ; 5 ps, TEBAL 15 MM


5.6700 kg

semen portland

1,300.00

7,371.00

0.0230 m3

pasir pasang

250,000.00

5,750.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.0700 oh

tukang batu

70,000.00

4,900.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0080 oh

mandor

75,000.00

600.00
13,121.00

14,275.00

27,396.00

1 M2 PLESTERAN BETON 1 pc ; 2 ps, TEBAL 15 MM


9.3000 kg

semen portland

1,300.00

12,090.00

0.0180 m3

pasir pasang

250,000.00

4,500.00

0.0260 oh

pekerja

55,000.00

1,430.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0130 oh

mandor

75,000.00
JUMLAH

E. 6.6.30

59,997.00

600.00
14,441.00

JUMLAH
E. 6.6.29

38,100.00

1 M2 BERAPEN 1 pc ; 3 ps, TEBAL 30 MM

JUMLAH
E. 6.6.28

1,125.00
21,897.00

975.00
16,590.00

17,905.00

34,495.00

1 M2 PLESTERAN BETON 1 pc ; 3 ps, TEBAL 15 MM


7.0700 kg

semen portland

1,300.00

9,191.00

0.0210 m3

pasir pasang

250,000.00

5,250.00

0.0260 oh

pekerja

55,000.00

1,430.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0130 oh

mandor

75,000.00
JUMLAH

975.00
14,441.00

17,905.00

32,346.00

E. 6.6.31

1 M2 PLESTERAN SKONING 1 pc ; 2ps


0.5000 kg

semen portland

1,300.00

650.00

0.0020 m3

pasir pasang

250,000.00

500.00

0.0570 oh

pekerja

55,000.00

3,135.00

0.0380 oh

tukang batu

70,000.00

2,660.00

0.0380 oh

kepala tukang

75,000.00

2,850.00

0.0020 oh

mandor

75,000.00
JUMLAH

E. 6.6.32

0.1440 kg

Pc Warna

9,833.33

1,416.00

Batu Granito

15,000.00

225,000.00

0.0500 oh

pekerja

55,000.00

2,750.00

0.0200 oh

tukang batu

70,000.00

1,400.00

0.0020 oh

kepala tukang

75,000.00

150.00

0.0050 oh

mandor

75,000.00
JUMLAH

0.4400 kg

Pc Warna

375.00
226,416.00

4,675.00

9,833.33

4,326.67

Batu teraso

15,000.00

172,500.00

0.4500 oh

pekerja

55,000.00

24,750.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0250 oh

mandor

75,000.00
JUMLAH

231,091.00

1,875.00
176,826.67

42,125.00

218,951.67

1 M2 PLESTERAN CIPRAT 1 pc ; 2ps


4.3200 kg

semen portland

0.0160 m3

pasir pasang

1,300.00

5,616.00

250,000.00

0.2500 oh

pekerja

55,000.00

4,000.00
13,750.00

0.1000 oh

tukang batu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0150 oh

mandor

75,000.00

1,125.00

JUMLAH
E. 6.6.35

9,945.00

1 M2 PLESTERAN TERASO 1 pc WARNA ; 2 BATU TERASO, TEBAL 10 MM


11.5000 kg

E. 6.6.34

8,795.00

1 M2 PLESTERAN GRANITO 1 pc WARNA ; 2 GRANITO, TEBAL 10 MM


15.0000 kg

E. 6.6.33

150.00
1,150.00

9,616.00

22,625.00

32,241.00

1 M2 PLESTERAN SIAR ADUKAN 1 pc ; 2ps


4.3200 kg

semen portland

0.0160 m3

pasir pasang

1,300.00

5,616.00

250,000.00

0.0150 oh

pekerja

55,000.00

4,000.00
825.00

0.0700 oh

tukang batu

70,000.00

4,900.00

0.0070 oh

kepala tukang

75,000.00

525.00

0.0080 oh

mandor

75,000.00
JUMLAH

600.00
9,616.00

6,850.00

16,466.00

E. 6.6.36

1 M2 PLESTERAN WATERPROOF BATACOTE 3 LAPIS


0.5000 kg

semen portland

1,300.00

650.00

2.9000 kg

Batacote

1,800.00

5,220.00

0.0060 m3

pasir pasang

250,000.00

1,500.00

0.3000 oh

pekerja

55,000.00

16,500.00

0.2000 oh

tukang batu

70,000.00

14,000.00

0.0200 oh

kepala tukang

75,000.00

1,500.00

0.0150 oh

mandor

75,000.00
JUMLAH

1,125.00
7,370.00

33,125.00

40,495.00

F. PEKERJAAN KAYU
F.6.6.1

1 M PASANG KUSEN PINTU DAN JENDELA KAYU JATI


1.1000 m3

kayu jati, balok

5,000,000.00

6.0000 oh

pekerja

55,000.00

330,000.00

tukang kayu

70,000.00

1,400,000.00

2.0000 oh

kepala tukang

75,000.00

150,000.00

0.3000 oh

mandor

75,000.00

20.0000 oh

JUMLAH
F.6.6.2

kayu bengkirai, balok

5,500,000.00

6.0000 oh

pekerja

55,000.00

330,000.00

tukang kayu

70,000.00

1,260,000.00

2.0000 oh

kepala tukang

75,000.00

150,000.00

0.3000 oh

mandor

75,000.00

7,402,500.00

6,600,000.00

22,500.00
6,600,000.00

1,762,500.00

8,362,500.00

1 M PASANG KUSEN PINTU DAN JENDELA KAYU ULIN


1.2000 m3

kayu ulin, balok

5,000,000.00

6.0000 oh

pekerja

55,000.00

330,000.00

tukang kayu

70,000.00

1,260,000.00

2.0000 oh

kepala tukang

75,000.00

150,000.00

0.3000 oh

mandor

75,000.00

18.0000 oh

JUMLAH

6,000,000.00

22,500.00
6,000,000.00

1,762,500.00

7,762,500.00

1 M PASANG KUSEN PINTU DAN JENDELA KAYU MERANTI MERAH


1.2000 m3

kayu meranti, balok

2,200,000.00

6.0000 oh

pekerja

55,000.00

330,000.00

tukang kayu

70,000.00

1,260,000.00

2.0000 oh

kepala tukang

75,000.00

150,000.00

0.3000 oh

mandor

75,000.00

18.0000 oh

JUMLAH
F.6.6.5

1,902,500.00

1.2000 m3

JUMLAH

F.6.6.4

22,500.00
5,500,000.00

1 M PASANG KUSEN PINTU DAN JENDELA KAYU BENGKIRAI

18.0000 oh

F.6.6.3

5,500,000.00

2,640,000.00

22,500.00
2,640,000.00

1,762,500.00

4,402,500.00

1 M2 PASANG PINTU KLAMP KAYU BENGKIRAI


0.0360 m3

Kayu bengkirai, papan

6,000,000.00

216,000.00

0.0500 kg

Paku Biasa 2" - 5"

15,583.33

779.17

0.3500 oh

pekerja

55,000.00

19,250.00

1.0500 oh

tukang kayu

70,000.00

73,500.00

0.1050 oh

kepala tukang

75,000.00

7,875.00

0.0180 oh

mandor

75,000.00
JUMLAH

1,350.00
216,779.17

101,975.00

318,754.17

F.6.6.6

1 M2 PASANG PINTU KLAMP KAYU ULIN


0.0360 m3

Kayu ulin, papan

5,400,000.00

194,400.00

0.0500 kg

Paku ulin

19,125.00

956.25

0.3500 oh

pekerja

55,000.00

19,250.00

1.0500 oh

tukang kayu

70,000.00

73,500.00

0.1050 oh

kepala tukang

75,000.00

7,875.00

0.0180 oh

mandor

75,000.00
JUMLAH

F.6.6.7

0.0400 m3

Kayu Jati, papan

7,000,000.00

1.0000 oh

pekerja

55,000.00

55,000.00

2.5000 oh

tukang kayu

70,000.00

175,000.00

0.2500 oh

kepala tukang

75,000.00

18,750.00

0.0500 oh

mandor

75,000.00

3,750.00
280,000.00

252,500.00

Kayu bengkirai, papan

6,000,000.00

1.0000 oh

pekerja

55,000.00

55,000.00

2.5000 oh

tukang kayu

70,000.00

175,000.00

0.2500 oh

kepala tukang

75,000.00

18,750.00

0.0500 oh

mandor

75,000.00

532,500.00

240,000.00

3,750.00
240,000.00

252,500.00

492,500.00

1 M2 PASANG PINTU DAN JENDELA KACA KAYU JATI


0.0350 m3

Kayu Jati, papan

7,000,000.00

0.8000 oh

pekerja

55,000.00

44,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0400 oh

mandor

75,000.00

245,000.00

3,000.00
245,000.00

202,000.00

447,000.00

1 M2 PASANG PINTU DAN JENDELA KACA KAYU BENGKIRAI


0.0350 m3

Kayu Bengkirai, papan

6,000,000.00

0.8000 oh

pekerja

55,000.00

44,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0400 oh

mandor

75,000.00
JUMLAH

F.6.6.11

280,000.00

0.0400 m3

JUMLAH
F.6.6.10

297,331.25

1 M2 PASANG PINTU PANEL KAYU BENGKIRAI

JUMLAH
F.6.6.9

101,975.00

1 M2 PASANG PINTU PANEL KAYU JATI

JUMLAH
F.6.6.8

1,350.00
195,356.25

210,000.00

3,000.00
210,000.00

202,000.00

412,000.00

1 M2 PASANG PINTU DAN JENDELA KACA KAYU ULIN


0.0350 m3

Kayu Ulin, papan

5,400,000.00

0.8000 oh

pekerja

55,000.00

44,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0400 oh

mandor

75,000.00
JUMLAH

189,000.00

3,000.00
189,000.00

202,000.00

391,000.00

F.6.6.12

1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI


0.0640 m3

Kayu Jati, papan

7,000,000.00

1.0000 oh

pekerja

55,000.00

55,000.00

3.0000 oh

tukang kayu

70,000.00

210,000.00

0.3000 oh

kepala tukang

75,000.00

22,500.00

0.3000 oh

mandor

75,000.00
JUMLAH

F.6.6.13

Kayu bengkirai, papan

6,000,000.00

1.0000 oh

pekerja

55,000.00

55,000.00

3.0000 oh

tukang kayu

70,000.00

210,000.00

0.3000 oh

kepala tukang

75,000.00

22,500.00

0.3000 oh

mandor

75,000.00

758,000.00

384,000.00

22,500.00
384,000.00

310,000.00

694,000.00

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI


0.0196 m3

Kayu jati, papan

7,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

15,583.33

467.50

0.3000 ltr

lem kayu

14,166.67

4,250.00

1.0000 lbr

plywood 4' x 3' x 4 mm

55,000.00

55,000.00

0.6000 oh

pekerja

55,000.00

33,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0300 oh

mandor

75,000.00

137,200.00

2,250.00
196,917.50

190,250.00

387,167.50

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU BENGKIRAI


0.0196 m3

Kayu bangkirai, papan

6,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

15,583.33

467.50

0.3000 ltr

lem kayu

14,166.67

4,250.00

1.0000 lbr

plywood 4' x 3' x 4 mm

55,000.00

55,000.00

0.6000 oh

pekerja

55,000.00

33,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0300 oh

mandor

75,000.00
JUMLAH

F.6.6.16

310,000.00

0.0640 m3

JUMLAH
F.6.6.15

22,500.00
448,000.00

1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU BENGKIRAI

JUMLAH
F.6.6.14

448,000.00

117,600.00

2,250.00
177,317.50

190,250.00

367,567.50

1 M2 PASANG JALUSI MATI KUSEN KAYU JATI


0.0600 m3

Kayu jati, papan

7,000,000.00

420,000.00

0.1500 Kg

paku biasa 1/2" - 1"

15,583.33

2,337.50

0.5000 oh

pekerja

55,000.00

27,500.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0250 oh

mandor

75,000.00
JUMLAH

1,875.00
422,337.50

184,375.00

606,712.50

F.6.6.17

1 M2 PASANG JALUSI MATI KUSEN KAYU BENGKIRAI


0.0600 m3

Kayu bengkirai, papan

6,000,000.00

360,000.00

0.1500 Kg

paku biasa 1/2" - 1"

15,583.33

2,337.50

0.5000 oh

pekerja

55,000.00

27,500.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0250 oh

mandor

75,000.00
JUMLAH

F.6.6.18

0.0196 m3

Kayu ulin, papan

5,400,000.00

0.0300 Kg

paku ulin

19,125.00

573.75

0.3000 ltr

lem kayu

14,166.67

4,250.00

1.0000 lbr

plywood 4' x 3' x 4 mm

55,000.00

55,000.00

0.6000 oh

pekerja

55,000.00

33,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0300 oh

mandor

75,000.00

546,712.50

105,840.00

2,250.00
165,663.75

190,250.00

355,913.75

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU JATI


0.0196 m3

Kayu jati, papan

7,000,000.00

137,200.00

0.3000 Kg

paku biasa 1/2" - 1"

19,125.00

5,737.50

0.3000 ltr

lem kayu

14,166.67

4,250.00

1.0000 lbr

teakwood 4 mm

55,000.00

55,000.00

0.6000 oh

pekerja

55,000.00

33,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0300 oh

mandor

75,000.00
JUMLAH

F.6.6.20

184,375.00

1 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU ULIN

JUMLAH
F.6.6.19

1,875.00
362,337.50

2,250.00
202,187.50

190,250.00

392,437.50

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKAP KAYU BENGKIRAI


0.0196 m3

kayu Bengkirai, papan

6,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

19,125.00

573.75

0.3000 ltr

lem kayu

14,166.67

4,250.00

1.0000 lbr

teakwood 4 mm

55,000.00

55,000.00

0.6000 oh

pekerja

55,000.00

33,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2000 oh

kepala tukang

75,000.00

15,000.00

0.0300 oh

mandor

75,000.00
JUMLAH

117,600.00

2,250.00
177,423.75

190,250.00

367,673.75

F.6.6.21

1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU JATI


0.0196 m3

kayu jati, papan

7,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

15,583.33

467.50

0.8000 ltr

lem kayu

14,166.67

11,333.33

1.0000 lbr

plywood 4' x 3' x 4 mm

55,000.00

55,000.00

0.5000 lbr

Formika

75,000.00

37,500.00

0.8000 oh

pekerja

55,000.00

44,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2500 oh

kepala tukang

75,000.00

18,750.00

0.0400 oh

mandor

75,000.00
JUMLAH

F.6.6.22

205,750.00

0.0196 m3

kayu bengkirai, papan

6,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

15,583.33

467.50

0.8000 ltr

lem kayu

14,166.67

11,333.33

1.0000 lbr

plywood 4' x 3' x 4 mm

55,000.00

55,000.00

0.5000 lbr

Formika

75,000.00

37,500.00

0.8000 oh

pekerja

55,000.00

44,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2500 oh

kepala tukang

75,000.00

18,750.00

0.0400 oh

mandor

447,250.83

117,600.00

75,000.00

3,000.00
221,900.83

205,750.00

427,650.83

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI


0.0196 m3

kayu jati, papan

7,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

15,583.33

467.50

0.8000 ltr

lem kayu

14,166.67

11,333.33

0.5000 lbr

teakwood 4' x 8' x 4 mm

120,200.00

60,100.00

0.5000 lbr

Formika 4' x 3'

75,000.00

37,500.00

0.8000 oh

pekerja

55,000.00

44,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2500 oh

kepala tukang

75,000.00

18,750.00

0.0400 oh

mandor

75,000.00
JUMLAH

F.6.6.24

3,000.00
241,500.83

1 M2 PASANG PINTU PLYWOOD & FORMIKA, RANGKA KAYU BENGKIRAI

JUMLAH
F.6.6.23

137,200.00

137,200.00

3,000.00
246,600.83

205,750.00

452,350.83

1 M2 PASANG PINTU TEAKWOOD & FORMIKA, RANGKA KAYU BENGKIRAI


0.0196 m3

kayu bengkirai, papan

6,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

15,583.33

467.50

0.8000 ltr

lem kayu

14,166.67

11,333.33

0.5000 lbr

teakwood 4' x 8' x 4 mm

120,200.00

60,100.00

0.5000 ltr

vernis

35,000.00

17,500.00

0.5000 lbr

Formika 4' x 8'

75,000.00

37,500.00

0.8000 oh

pekerja

55,000.00

44,000.00

2.0000 oh

tukang kayu

70,000.00

140,000.00

0.2500 oh

kepala tukang

75,000.00

18,750.00

0.0400 oh

mandor

75,000.00
JUMLAH

117,600.00

3,000.00
244,500.83

205,750.00

450,250.83

F.6.6.25

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI


0.0196 m3

kayu jati, papan

7,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

15,583.33

467.50

1.2000 ltr

lem kayu

14,166.67

17,000.00

1.0000 lbr

plywood 4' x 8' x 4 mm

55,000.00

55,000.00

1.0000 lbr

Formika 4' x 8'

75,000.00

75,000.00

1.0000 oh

pekerja

55,000.00

55,000.00

2.6000 oh

tukang kayu

70,000.00

182,000.00

0.2600 oh

kepala tukang

75,000.00

19,500.00

0.0500 oh

mandor

75,000.00
JUMLAH

F.6.6.26

260,250.00

0.0196 m3

kayu bengkirai, papan

6,000,000.00

0.0300 Kg

paku biasa 1/2" - 1"

15,583.33

467.50

1.2000 ltr

lem kayu

14,166.67

17,000.00

1.0000 lbr

plywood 4' x 8' x 4 mm

55,000.00

55,000.00

1.0000 lbr

Formika 4' x 8'

75,000.00

75,000.00

1.0000 oh

pekerja

55,000.00

55,000.00

2.6000 oh

tukang kayu

70,000.00

182,000.00

0.2600 oh

kepala tukang

75,000.00

19,500.00

0.0500 oh

mandor

544,917.50

117,600.00

75,000.00

3,750.00
265,067.50

260,250.00

525,317.50

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU JATI


1.1000 m3

kayu jati, balok

5,000,000.00

5,500,000.00

besi strip

31,800.00

477,000.00

0.8000 Kg

Paku Biasa 2" - 5"

15,583.33

12,466.67

4.0000 oh

pekerja

55,000.00

220,000.00

tukang kayu

70,000.00

840,000.00

1.2000 oh

kepala tukang

75,000.00

90,000.00

0.2000 oh

mandor

75,000.00

15.0000 Kg

12.0000 oh

JUMLAH
F.6.6.28

3,750.00
284,667.50

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU BENGKIRAI

JUMLAH
F.6.6.27

137,200.00

15,000.00
5,989,466.67

1,165,000.00

7,154,466.67

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BENGKIRAI


1.1000 m3

kayu bengkirai, balok

5,500,000.00

6,050,000.00

besi strip

31,800.00

477,000.00

0.8000 Kg

Paku Biasa 2" - 5"

15,583.33

12,466.67

4.0000 oh

pekerja

55,000.00

220,000.00

tukang kayu

70,000.00

840,000.00

1.2000 oh

kepala tukang

75,000.00

90,000.00

0.2000 oh

mandor

75,000.00

15.0000 Kg

12.0000 oh

JUMLAH

15,000.00
6,539,466.67

1,165,000.00

7,704,466.67

F.6.6.29

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU ULIN


kayu ulin, balok

5,000,000.00

5,500,000.00

15.0000 Kg

1.1000 m3

besi strip

31,800.00

477,000.00

0.8000 Kg

Paku ulin

15,583.33

12,466.67

4.0000 oh

pekerja

55,000.00

220,000.00

tukang kayu

70,000.00

840,000.00

1.2000 oh

kepala tukang

75,000.00

90,000.00

0.2000 oh

mandor

75,000.00

12.0000 oh

JUMLAH
F.6.6.30

1.1000 m3

kayu meranti, balok

2,200,000.00

2,420,000.00

besi strip

31,800.00

477,000.00

0.8000 Kg

Paku Biasa 2" - 5"

15,583.33

12,466.67

4.0000 oh

pekerja

55,000.00

220,000.00

tukang kayu

70,000.00

840,000.00

1.2000 oh

kepala tukang

75,000.00

90,000.00

0.2000 oh

mandor

75,000.00

12.0000 oh

JUMLAH

15,000.00
2,909,466.67

1,165,000.00

0.0120 m3

kayu bengkirai, balok

5,500,000.00

66,000.00

0.1500 Kg

Paku Biasa 2" - 5"

15,583.33

2,337.50

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00

4,074,466.67

375.00
68,337.50

13,625.00

81,962.50

1M2 PASANG KASO + RENG GENTENG KODOK KAYU ULIN


0.0120 m3

kayu ulin, balok

5,000,000.00

60,000.00

0.1500 Kg

Paku ulin

19,125.00

2,868.75

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00
JUMLAH

F.6.6.33

7,154,466.67

1M2 PASANG KASO + RENG GENTENG KODOK KAYU BENGKIRAI

JUMLAH
F.6.6.32

1,165,000.00

1M3 PASANG KONSTRUKSI KUDA-KUDA KAYU MERANTI


15.0000 Kg

F.6.6.31

15,000.00
5,989,466.67

375.00
62,868.75

13,625.00

76,493.75

1M2 PASANG KASO + RENG GENTENG MONIER KAYU JATI


0.0140 m3

kayu jati, balok

5,000,000.00

70,000.00

0.1500 Kg

Paku Biasa 2" - 5"

15,583.33

2,337.50

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00
JUMLAH

375.00
72,337.50

13,625.00

85,962.50

F.6.6.34

1M2 PASANG KASO + RENG GENTENG MONIER KAYU BENGKIRAI


0.0140 m3

kayu bengkirai, balok

5,500,000.00

77,000.00

0.1500 Kg

Paku Biasa 2" - 5"

15,583.33

2,337.50

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00
JUMLAH

F.6.6.35

0.0140 m3

kayu bengkirai, balok

5,500,000.00

77,000.00

0.1500 Kg

Paku Biasa 2" - 5"

15,583.33

2,337.50

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0050 oh

mandor

75,000.00

375.00
79,337.50

13,625.00

0.1650 m3

kayu bengkirai, balok

5,500,000.00

907,500.00

0.2000 Kg

Paku Biasa 2" - 5"

15,583.33

3,116.67

0.1200 oh

pekerja

55,000.00

6,600.00

0.1200 oh

tukang kayu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0060 oh

mandor

75,000.00

92,962.50

450.00
910,616.67

16,350.00

926,966.67

1M2 PASANG KASO + RENG ATAP SIRAP KAYU ULIN


0.1650 m3

kayu ulin, balok

5,500,000.00

907,500.00

0.2000 Kg

Paku ulin

19,125.00

3,825.00

0.1200 oh

pekerja

55,000.00

6,600.00

0.1200 oh

tukang kayu

70,000.00

8,400.00

0.0120 oh

kepala tukang

75,000.00

900.00

0.0060 oh

mandor

75,000.00
JUMLAH

F.6.6.38

92,962.50

1M2 PASANG KASO + RENG ATAP SIRAP KAYU BENGKIRAI

JUMLAH
F.6.6.37

13,625.00

1M2 PASANG KASO + RENG GENTENG BETON KAYU BENGKIRAI

JUMLAH
F.6.6.36

375.00
79,337.50

450.00
911,325.00

16,350.00

927,675.00

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU JATI


0.0120 m3

kayu jati, balok

5,000,000.00

60,000.00

0.1000 Kg

Paku Biasa 2" - 5"

15,583.33

1,558.33

0.1500 oh

pekerja

55,000.00

8,250.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0750 oh

mandor

75,000.00
JUMLAH

5,625.00
61,558.33

33,250.00

94,808.33

F.6.6.39

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU BENGKIRAI


0.0120 m3

kayu bengkirai, balok

5,500,000.00

66,000.00

0.1000 Kg

Paku Biasa 2" - 5"

15,583.33

1,558.33

0.1500 oh

pekerja

55,000.00

8,250.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0750 oh

mandor

75,000.00
JUMLAH

F.6.6.40

0.0120 m3

kayu ulin, balok

5,000,000.00

60,000.00

0.1000 Kg

Paku ulin

19,125.00

1,912.50

0.1500 oh

pekerja

55,000.00

8,250.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0750 oh

mandor

75,000.00

5,625.00
61,912.50

33,250.00

0.0230 m3

Kayu jati, balok

5,000,000.00

115,000.00

0.1500 Kg

Paku Biasa 2" - 5"

15,583.33

2,337.50

0.2000 oh

pekerja

55,000.00

11,000.00

0.3000 oh

tukang kayu

70,000.00

21,000.00

0.0300 oh

kepala tukang

75,000.00

2,250.00

0.0100 oh

mandor

75,000.00

95,162.50

750.00
116,773.75

27,900.00

144,673.75

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU BENGKIRAI


0.0230 m3

kayu bengkirai, balok

5,500,000.00

126,500.00

0.1500 Kg

Paku Biasa 2" - 5"

15,583.33

2,337.50

0.2000 oh

pekerja

55,000.00

11,000.00

0.3000 oh

tukang kayu

70,000.00

21,000.00

0.0300 oh

kepala tukang

75,000.00

2,250.00

0.0100 oh

mandor

75,000.00
JUMLAH

F.6.6.43

100,808.33

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU JATI

JUMLAH
F.6.6.42

33,250.00

1 M2 PASANG RANGKA LANGIT-LANGIT (1.00X1.00) M, KAYU ULIN

JUMLAH
F.6.6.41

5,625.00
67,558.33

750.00
128,837.50

35,000.00

74,237.90

1 M2 PASANG RANGKA LANGIT-LANGIT (30x60) CM, KAYU MERANTI


0.0230 m3

kayu meranti, balok

2,200,000.00

50,600.00

0.1500 Kg

Paku Biasa 2" - 5"

15,583.33

2,337.50

0.2000 oh

pekerja

55,000.00

11,000.00

0.3000 oh

tukang kayu

70,000.00

21,000.00

0.0300 oh

kepala tukang

75,000.00

2,250.00

0.0100 oh

mandor

75,000.00
JUMLAH

750.00
52,937.50

35,000.00

87,937.50

F.6.6.44

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU JATI


0.0270 m3

kayu jati, balok

5,000,000.00

135,000.00

0.2000 Kg

Paku Biasa 2" - 5"

15,583.33

3,116.67

0.2500 oh

pekerja

55,000.00

13,750.00

0.3500 oh

tukang kayu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0125 oh

mandor

75,000.00
JUMLAH

F.6.6.45

0.0270 m3

kayu bengkirai, balok

5,500,000.00

148,500.00

0.2000 Kg

Paku Biasa 2" - 5"

15,583.33

3,116.67

0.2500 oh

pekerja

55,000.00

13,750.00

0.3500 oh

tukang kayu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0125 oh

mandor

75,000.00

937.50
151,616.67

41,812.50

0.0270 m3

kayu meranti, balok

2,200,000.00

59,400.00

0.2000 Kg

Paku Biasa 2" - 5"

15,583.33

3,116.67

0.2500 oh

pekerja

55,000.00

13,750.00

0.3500 oh

tukang kayu

70,000.00

24,500.00

0.0350 oh

kepala tukang

75,000.00

2,625.00

0.0125 oh

mandor

75,000.00

193,429.17

937.50
62,516.67

41,812.50

104,329.17

1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU JATI


0.0072 m3

kayu jati, papan

7,000,000.00

50,400.00

0.0500 Kg

Paku Biasa 2" - 5"

15,583.33

779.17

0.1000 oh

pekerja

55,000.00

5,500.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0050 oh

mandor

75,000.00
JUMLAH

F.6.6.48

179,929.17

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU MERANTI

JUMLAH
F.6.6.47

41,812.50

1 M2 PASANG RANGKA LANGIT-LANGIT (30x30) CM, KAYU BENGKIRAI

JUMLAH
F.6.6.46

937.50
138,116.67

375.00
51,179.17

21,750.00

72,929.17

1M' PASANG LISPLANG UKURAN (3X20) CM, KAYU BENGKIRAI


0.0072 m3

kayu bengkirai, papan

6,000,000.00

43,200.00

0.0500 Kg

Paku Biasa 2" - 5"

15,583.33

779.17

0.1000 oh

pekerja

55,000.00

5,500.00

0.2000 oh

tukang kayu

70,000.00

14,000.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0050 oh

mandor

75,000.00
JUMLAH

375.00
43,979.17

21,750.00

65,729.17

F.6.6.49

1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU JATI


0.0110 m3

kayu jati, papan

7,000,000.00

77,000.00

0.0500 Kg

Paku Biasa 2" - 5"

15,583.33

779.17

0.1100 oh

pekerja

55,000.00

6,050.00

0.2200 oh

tukang kayu

70,000.00

15,400.00

0.0220 oh

kepala tukang

75,000.00

1,650.00

0.0050 oh

mandor

75,000.00
JUMLAH

F.6.6.50

0.0110 m3

kayu bengkirai, papan

2,137,571.94

23,513.29

0.0500 Kg

Paku Biasa 2" - 5"

15,583.33

779.17

0.1100 oh

pekerja

55,000.00

6,050.00

0.2200 oh

tukang kayu

70,000.00

15,400.00

0.0220 oh

kepala tukang

75,000.00

1,650.00

0.0050 oh

mandor

75,000.00

375.00
24,292.46

23,475.00

0.0145 m3

kayu bengkirai, papan

6,000,000.00

87,000.00

0.0600 Kg

Paku Biasa 2" - 5"

15,583.33

935.00

0.1500 oh

pekerja

55,000.00

8,250.00

0.2500 oh

tukang kayu

70,000.00

17,500.00

0.0250 oh

kepala tukang

75,000.00

1,875.00

0.0750 oh

mandor

75,000.00

47,767.46

5,625.00
87,935.00

33,250.00

121,185.00

1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU BENGKIRAI


0.0086 m3

kayu bengkirai, papan

6,000,000.00

51,600.00

0.0600 Kg

Paku Biasa 2" - 5"

15,583.33

935.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0500 oh

mandor

75,000.00

3,750.00

@
F. 6.6.53.

101,254.17

1M' PASANG LISPLANG UKURAN 2x(3X20) CM, KAYU BENGKIRAI

JUMLAH
F.6.6.52

23,475.00

1M' PASANG LISPLANG UKURAN (3X30) CM, KAYU BENGKIRAI

JUMLAH
F.6.6.51

375.00
77,779.17

JUMLAH

52,535.00

17,000.00

69,535.00

1M' PASANG LISPLANG UKURAN 2x(2X20) CM, KAYU ULIN


0.0086 m3

kayu ulin, papan

5,400,000.00

46,440.00

0.0600 kg

paku biasa 2' - 5'

15,583.33

935.00

0.1000 oh

pekerja

55,000.00

5,500.00

0.1000 oh

tukang kayu

70,000.00

7,000.00

0.0100 oh

kepala tukang

75,000.00

750.00

0.0500 oh

mandor

75,000.00

3,750.00

JUMLAH

47,375.00

17,000.00

64,375.00

F. 6.6.54

1M2 PASANG RANGKA DINDING PEMISAH KAYU BENGKIRAI


0.0195 m3

kayu bengkirai, balok

5,500,000.00

107,250.00

0.0070 m3

kayu bengkirai, papan

6,000,000.00

42,000.00

0.1000 kg

paku biasa 2' - 5'

15,583.33

1,558.33

0.1500 oh

pekerja

55,000.00

8,250.00

0.4500 oh

tukang kayu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0750 oh

mandor

75,000.00
JUMLAH

F. 6.6.55

0.0195 m3

kayu ulin, balok

5,000,000.00

97,500.00

0.0070 m3

kayu ulin, papan

6,000,000.00

42,000.00

0.1000 kg

paku biasa 2' - 5'

15,583.33

1,558.33

0.1500 oh

pekerja

55,000.00

8,250.00

0.4500 oh

tukang kayu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0750 oh

mandor

75,000.00

199,558.33

5,625.00
141,058.33

48,750.00

189,808.33

1M2 PASANG DINDING PEMISAH TEKWOOD RANGKAP, RANGKA KAYU BENGKIRAI


0.0195 m3

kayu bengkirai, balok

5,500,000.00

107,250.00

0.0070 m3

kayu bengkirai, papan

6,000,000.00

42,000.00

0.1000 kg

paku biasa 2' - 5'

15,583.33

1,558.33

0.1500 oh

pekerja

55,000.00

8,250.00

0.4500 oh

tukang kayu

70,000.00

31,500.00

0.0450 oh

kepala tukang

75,000.00

3,375.00

0.0750 oh

mandor

75,000.00
JUMLAH

F. 6.6.57

48,750.00

1M2 PASANG RANGKA DINDING PEMISAH KAYU ULIN

JUMLAH
F. 6.6.56

5,625.00
150,808.33

5,625.00
150,808.33

48,750.00

199,558.33

1M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER


0.0195 m3

kayu bengkirai, balok

5,500,000.00

107,250.00

0.0070 m3

kayu bengkirai, papan

6,000,000.00

42,000.00

0.1000 lt

paku biasa 2' - 5'

15,583.33

1,558.33

0.5600 lbr

lem kayu

14,166.67

7,933.33

1.0000 kg

plywood 4' x 8' x 4 mm

55,000.00

55,000.00

0.2000 oh

pekerja

55,000.00

11,000.00

0.6000 oh

tukang kayu

70,000.00

42,000.00

0.0600 oh

kepala tukang

75,000.00

4,500.00

0.0100 oh

mandor

75,000.00
JUMLAH

750.00
213,741.67

58,250.00

271,991.67

F. 6.6.58

1M2 PASANG DINDING LAMBRISIRING DARI PAPAN JATI


0.0070 m3

kayu jati, balok

5,000,000.00

35,000.00

0.1000 kg

paku biasa 2' - 5'

15,583.33

1,558.33

0.1500 kg

paku skrup 3,5"

20,000.00

3,000.00

0.6000 oh

pekerja

55,000.00

33,000.00

1.8000 oh

tukang kayu

70,000.00

126,000.00

0.1800 oh

kepala tukang

75,000.00

13,500.00

0.0300 oh

mandor

75,000.00
JUMLAH

F. 6.6.59

174,750.00

214,308.33

1M2 PASANG PLYWOOD TEBAL 4 MM, UNTUK DINDING


0.4000 lbr

plywood 4 mm

55,000.00

22,000.00

0.0500 kg

paku biasa 1/2" - 1"

15,583.33

779.17

0.0250 oh

pekerja

55,000.00

1,375.00

0.0750 oh

tukang kayu

70,000.00

5,250.00

0.0075 oh

kepala tukang

75,000.00

562.50

0.0013 oh

mandor

75,000.00
JUMLAH

F. 6.6.60

2,250.00
39,558.33

97.50
22,779.17

7,285.00

30,064.17

1M2 PASANG LIST PLAFOND, KAYU PROFIL


1.0500 m'

kayu profil

10,300.00

0.0210 oh

pekerja

55,000.00

1,155.00

0.0210 oh

tukang kayu

70,000.00

1,470.00

0.0210 oh

kepala tukang

75,000.00

1,575.00

0.0010 oh

mandor

75,000.00
JUMLAH

10,815.00

75.00
10,815.00

4,275.00

15,090.00

65,000.00
1298

BEKISTING SLOOP 15/20

JUMLAH (Kg) BESI SLOOP 15/20 PER M3

0.4 vol.bekisting/m'
0.03 vol.beton/m'
33.33333333 panjang beton/m3
13.33333333

13.333

Dia ( mm )

Berat kg/m'

12.00

0.89

Panjang
1.05

Batang
4.00

Jumlah (kg)
3.74

10.00

0.62

0.60

7.67

2.85 jarak begel / 15 cm'

6.00

0.22

TOTAL KG

6.59

VOLUME BETON / M'


PANJANG BETON / M3

0.03
33.333333

219.67

207,600.00

436,620.00

PANJANG PONDASI

78.41 M

LA

0.3

LB

0.7

H
LUAS
VOLUME
BATU GUNUNG
SEMEN
PASIR PUTIH

0.7
0.35
27.4435 M3
27.44 M3

5.49 RET

3,567,655.00

4,473.29 KG

89.47 SAK

4,473,290.50

14.27 M3

2.85 RET
TUKANG

713,531.00
4,704,600.00
13,459,076.50
2,100,000.00

DAFTAR HARGA SATUAN UP


BIDANG

: Cipta Karya

TAHUN ANGGARAN

: 2011

NO

URAIAN

SAT

HARGA DASAR
RATA-RATA

4 = 6+5

HARGA
BANGUNAN
JAYA

HARGA
SOTEK

KECAMATAN PENAJAM

UPAH KERJA
1 Pekerja ( Buruh semi terlatih )

Hari

55,000.00

55,000

55,000

2 Tukang Batu

Hari

70,000.00

70,000

70,000

3 Tukang Kayu

Hari

70,000.00

70,000

70,000

4 Tukang Besi

Hari

70,000.00

70,000

70,000

5 Tukang Cat

Hari

70,000.00

70,000

70,000

6 Kepala Tukang

Hari

75,000.00

75,000

75,000

7 Mandor

Hari

75,000.00

75,000

75,000

8 Sopir

Hari

60,000.00

60,000

60,000

9 Pembantu Sopir

Hari

45,000.00

45,000

45,000

10 Aluminium foil single sided

Roll

605,000.00

605,000

605,000

11 Ampelas

Lbr

2,875.00

3,000

3,000

12 Atap Asbes Gelombang Besar

Lbr

27,333.33

27,000

28,000

13 Atap Genteng Kodok

Bh

6,750.00

6,750

6,750

14 Atap Metal Berkualitas ( 2 ssn, 8 daun )

Lbr

85,000.00

85,000

85,000

15 Atap Metal Surya Roof ( 2 ssn, 8 daun )

Lbr

32,000.00

32,000

32,000

16 Atap Metal Mega Color ( 1 ssn, 5 daun )

Lbr

17 Atap Metal Verza roof ( 1 ssn, 5 daun )

Lbr

18 Atap Metal Multi roof ( 2 susun )

Lbr

75,000

75,000

19 Atap Metal Multi color ( 1 susun )

Lbr

20 Atap Plastik gelombang 60 x 170

Lbr

35,208.33

37,500

35,000

21 Atap Sirap

Ikat

69,500.00

69,500

69,500

22 Atap Tilux

Bh

29,200.00

29,200

29,200

23 Bahan Plafond Asbes Semen 5 mm

M2

75,000.00

75,000

75,000

24 Bahan Plafond eternit 4 mm

M2

58,100.00

58,100

58,100

25 Bahan Plafond Hardplex 5 mm 120 x 130

Lbr

56,400.00

56,400

56,400

26 Bahan Politur ( sirlak ) India

Kg

47,140.12

42,500

45,000

27 Bak Air Fiber (60 x 60 cm)

Bh

207,727.27

200,000

170,000

28 Bak Air Fiber (60 x 80 cm)

Bh

255,000.00

250,000

250,000

29 Bak Cuci Piring Stainles Lobang 1

Bh

235,833.33

225,000

230,000

30 Bak Cuci Piring Stainles Lobang 2

Bh

442,916.67

425,000

450,000

31 Bak Kontrol 50 x 50 x 40 cm

Bh

121,000.00

121,000

121,000

Harga Bahan

71,666.67
-

32 Bak air Traso Besar

Bh

293,000.00

293,000

293,000

33 Balok Klas I Bangkirai

M3

5,500,000.00

6,000,000

6,000,000

34 Balok Klas I Ulin

M3

5,000,000.00

5,500,000

5,000,000

35 Balok Kayu Meranti

M3

2,200,000.00

2,200,000

2,300,000

36 Batako

Bh

1,800.00

1,800

1,800

37 Batu alam

M2

188,300.00

188,300

188,300

38 Batu Bata

Bh

800.00

700

850

39 Batu apung

Kg

850.00

850

850

40 Batu Gunung

M3

215,400.00

215,400

215,400

41 Batu Gunung (SEPAKU)

M3

225,000.00

42 Baut

Kg

22,000.00

22,000

22,000

43 Bensin

Lt

5,300.00

5,300

5,300

44 Besi Beton Polos

Kg

10,000.00

10,000

10,000

45 Besi Beton Ulir

Kg

11,750.00

11,750

11,750

46 Besi penggantung plafond

Kg

16,300.00

16,300

16,300

47 Besi strip

Kg

31,800.00

31,800

31,800

48 Box MCB 2 group

Unit

97,000.00

97,000

97,000

49 Box MCB 4 group

Unit

156,800.00

156,800

156,800

50 Breaker

Bh

25,000.00

25,000

25,000

51 Buis Beton Dia 80 cm tanpa tulangan

Bh

506,500.00

506,500

506,500

54 Buis Beton Dia 100 cm tanpa tulangan

Bh

626,000.00

626,000

626,000

56 Cat Air / tembok

Kg

8,600.00

8,000

8,000

57 Cat Air / tembok ex.setara ICI,dulux,mowilex

Kg

85,000.00

85,000

85,000

58 Cat besi

Kg

37,666.67

35,000

40,000

59 Cat Dasar / plamir

Kg

20,000.00

20,000

20,000

60 Cat Kilap / Kayu

Kg

36,750.00

35,000

35,000

61 Cat Menie kayu

Kg

20,333.33

20,000

15,000

62 Closed Jongkok Keramik berkualitas

Bh

132,083.33

15,000

160,000

63 Closed Jongkok Keramik Toto

Bh

750,000.00

750,000

750,000

64 Closed Jongkok Teraso

Bh

98,333.33

100,000

100,000

65 Closet Duduk Type Keramik Berkualitas

Unit

1,575,000.00

1,500,000

1,500,000

66 Daun Jendela Uk. Besar (Fabrikasi) Kc 5 mm

Bh

374,800.00

374,800

374,800

67 Daun Jendela Uk. Kecil (Fabrikasi) Kc 5 mm

Bh

314,600.00

314,600

314,600

68 Daun Pintu Plywood Bag. Dlm Lapis Aluminium Foil

Bh

454,000.00

454,000

454,000

69 Daun Ventilasi

Bh

78,650.00

78,650

78,650

70 Dempul Halus ( INFRA )

Kg

35,200.00

35,200

35,200

71 Dempul kayu

Kg

21,666.67

20,000

20,000

72 Dempul Politur

Kg

49,583.33

50,000

50,000

73 Engsel Jendela Lokal 3 "

Bh

15,416.67

13,500

12,500

74 Engsel Pintu Lokal 5 "

Bh

27,527.78

27,500

30,000

75 Espagnolet

Bh

26,700.00

26,700

26,700

76 Floor Drain

Bh

35,000.00

35,000

35,000

77 Formika Ukuran Pintu

Lbr

104,300.00

104,300

104,300

78 Genteng keramik

Bh

7,500.00

7,500

7,500

79 Glass block

Bh

23,125.00

22,500

23,000

80 Grendel Jendela

Bh

10,000.00

8,000

7,000

81 Grendel Pintu

Bh

16,375.00

12,500

10,000

82 Grendel tanam Pintu

Bh

125,000.00

125,000

125,000

83 Gypsum board, t = 9 mm

Lbr

65,000.00

65,000

65,000

84 Hak Angin

Bh

10,041.67

10,000

10,000

85 Handle Jendela putih

Bh

10,375.00

10,000

10,000

86 Handle Pintu

Bh

147,500.00

150,000

150,000

87 Jalusi Atap

Bh

565,700.00

565,700

565,700

88 Jalusi Kayu Bangkirai

M'

40,000.00

40,000

40,000

89 Kabel NGA 2,5

Rol

250,833.33

260,000

250,000

91 Kaca Naco ( kerangka/daun ) 5 mm

Set

326,700.00

326,700

326,700

92 Kaca polos 2 mm

M2

72,600.00

72,600

72,600

93 Kaca polos 3 mm

M2

84,700.00

84,700

84,700

94 Kaca polos 5 mm

M2

102,300.00

102,300

102,300

95 Kaca Rayben 5 mm

M2

127,000.00

127,000

127,000

96 Kanopi Atap

Bh

546,000.00

546,000

546,000

97 Kawat Bendrat / Beton

Kg

20,000.00

20,000

20,000

98 Kawat Bronjong

Kg

107,300.00

107,300

107,300

Rol

79,166.67

75,000

80,000

100 Kawat Harmonika

99 Kawat Duri

m2

28,350.00

28,350

28,350

101 Kawat nyamuk besi/aluminium

m2

25,000.00

25,000

25,000

102 Kawat nyamuk plastik

m2

7,750.00

8,000

8,000

103 Kayu Klas 2

M3

1,800,000.00

1,800,000

1,800,000

104 Kayu galam dia 10 - 12 cm

Btg

11,200.00

11,200

11,200

105 Keramik 10 x 20 cm

M2

46,250.00

47,000

47,000

106 Keramik 20 x 25 cm

M2

52,550.00

50,000

55,600

107 Keramik 20 x 20 cm

M2

50,083.33

50,000

50,000

108 Keramik 30 x 30 cm Halus

M2

41,333.33

45,000

43,000

109 Keramik 30 x 30 cm Kasar

M2

49,750.00

49,000

48,000

110 Keramik 40 x 40 Ex. Roman Setara,granito

M2

220,000.00

220,000

220,000

111 Karet Talang

M'

7,833.33

7,000

8,000

112 Batu Split ( ukuran 2-3 cm/1-2 )Ex.palu

M3

415,000.00

415,000

415,000

113 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

M3

350,000.00

350,000

350,000

114 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Sepaku

M3

437,500.00

437,500

437,500

115 Koral (ex.Lokal)

M3

263,000.00

263,000

263,000

116 Kran Air Dia 1"

Bh

26,000.00

26,000

26,000

117 Kran Air Dia 3/4

Bh

26,500.00

26,500

26,500

118 Kuas 3 "

Bh

9,666.67

9,000

10,000

119 Kunci Pintu 2 Slag berkualitas

Bh

196,666.67

200,000

165,000

120 Kunci Pintu Double Ex Cisa

Bh

137,500.00

216,000

216,000

121 Kunci Pintu Double Lengkap Dgn Accecories

Bh

210,000.00

300,000

30,000

122 Kunci Pintu Tanam antik

Bh

123 Kusen aluminium 1

124 Kusen aluminium 2

125 Kusen aluminium 3

127 Lampu 2 - TL 40 Watt Double + Instalasi

Bh

150,000.00

150,000

150,000

129 Lampu Merkury 250 wt

Bh

154,000.00

154,000

154,000

130 Lampu Pijar 10 Watt

Bh

6,000.00

6,000

6,000

131 Lampu Pijar 100 Watt

Bh

7,416.67

7,500

7,500

132 Lampu Pijar 15 Watt

Bh

5,958.33

6,000

6,000

133 Lampu Pijar 25 Watt

Bh

6,500.00

6,000

6,000

134 Lampu Pijar 40 Watt

Bh

6,583.33

6,000

6,000

135 Lampu Pijar 5 Watt

Bh

5,750.00

5,000

5,000

136 Lampu Pijar 60 Watt

Bh

9,416.67

7,000

10,000

137 Lampu Philip SL 20 Watt + Fitting

Bh

42,666.67

42,000

42,000

139 Lampu TL Philip + Fitting 20 Watt

Bh

83,250.00

83,250

83,250

140 Lampu TL 20 Watt Double (Trafo)

Bh

75,000.00

75,000

75,000

141 Lampu TL 40 Watt (Trafo)

Bh

91,000.00

91,000

91,000

142 Lampu TL 40 Watt Double (Trafo)

Bh

101,800.00

101,800

101,800

143 Lem Kayu ( Fox )

Ltr

14,166.67

15,000

15,000

144 Lem Paralon

Bh

4,833.33

5,000

5,000

145 List Cornice Gypsum

M'

27,500.00

27,500

27,500

146 List Plafond Gypsum

M'

27,500.00

27,500

27,500

147 List Plafond Plywood

M'

27,500.00

27,500

27,500

148 List Profil Sudut 3/5 Ky Bangkirai

M'

10,300.00

10,300

10,300

149 List Profil Sudut 3/5 Ky Meranti

M'

6,050.00

6,050

6,050

150 Listplank kayu ukir

M'

66,550.00

66,550

66,550

151 List plafond gypsum

M'

36,000.00

36,000

36,000

152 Macam2 Sambungan PVC AW Dia 1 "

Bh

3,166.67

3,000

3,000

153 Macam2 Sambungan PVC AW Dia 1/2 "

Bh

2,333.33

2,000

2,500

154 Macam2 Sambungan PVC AW Dia 2 "

Bh

4,916.67

4,000

5,000

155 Macam2 Sambungan PVC AW Dia 3/4 "

Bh

2,458.33

2,000

2,500

156 Macam2 Sambungan PVC AW Dia 4 "

Bh

11,500.00

10,000

12,000

157 Marmer lokal

m2

495,000.00

495,000

495,000

158 Minyak cat

Ltr

20,000.00

20,000

20,000

159 Minyak bekisting

Ltr

12,000.00

12,000

12,000

160 Multiplek 4 mm

Lbr

62,000.00

62,000

62,000

161 Multiplek 6 mm

Lbr

129,000.00

129,000

129,000

162 Multiplek 9 mm

Lbr

205,000.00

205,000

205,000

163 Multiplek 15 mm

Lbr

219,000.00

219,000

219,000

164 Multiplek 18 mm

Lbr

223,300.00

223,300

223,300

165 Multiplex 12 mm

Lbr

155,700.00

155,700

155,700

166 Nok Genteng Kodok

Bh

20,300.00

20,300

20,300

167 Nok Genteng keramik

Bh

17,500.00

17,500

17,500

168 Nok Model U ukuran 110 x 5 x 6 cm

M'

36,700.00

36,700

36,700

169 Nok Model U Verza Roof 40 x 12 cm

Bh

32,700.00

32,700

32,700

170 Oker

Kg

22,500.00

22,500

22,500

171 Oli / pelumas

Ltr

37,300.00

37,300

37,300

172 Pagar besi motif BRC 1,2 x 2,4 m'

M'

173 Pagar besi motif BRC 1,75 x 2,4 m'

M'

174 Paku Asbes + Karet

Kg

27,125.00

27,500

27,000

175 Paku Beton

Bh

19,800.00

19,800

19,800

176 Paku bor

Kg

27,500.00

27,500

27,500

177 Paku Genteng metal

Kg

28,500.00

25,000

30,000

178 Paku Kayu / biasa

Kg

15,583.33

15,000

15,000

179 Paku Keling

Kg

30,250.00

30,250

30,250

180 Paku Seng

Kg

24,666.67

22,000

25,000

181 Paku Ulin

Kg

19,125.00

17,500

20,000

182 Paku Plywood

Kg

23,750.00

22,000

25,000

183 Paku Sekrup

Kg

20,000.00

20,000

20,000

184 Papan Kayu Bangkirai

M3

6,000,000.00

6,500,000

6,500,000

185 Papan Kayu Ulin

M3

5,400,000.00

6,250,000

5,000,000

186 Papan Kayu kelas 2

M3

1,750,000.00

1,750,000

1,800,000

187 Papan Kayu Meranti

M3

2,300,000.00

2,200,000

2,300,000

188 Papan Nama Proyek

Bh

550,000.00

550,000

550,000

189 Papan Reuter Bengkirai

M'

24,200.00

24,200

24,200

190 Pas. Lampu Baret + Instalasi

Unit

513,000.00

513,000

513,000

191 Pas. Lampu Gantung

Unit

607,400.00

607,400

607,400

192 Pasir Beton Ex. Lokal samuntai

M3

250,000.00

250,000

250,000

193 Pasir Beton (sepaku)

M3

330,000.00

330,000

330,000

194 Pasir Pasang sungai ex. Kandilo

M3

278,750.00

280,000

280,000

195 Pasir pasang putih

M3

64,500.00

64,500

64,500

196 Pasir pasang putih Sepaku

M3

225,000.00

197 Pasir Urug

M3

51,900.00

51,900

51,900

198 Paving blok biasa

bh

2,000.00

2,000

2,000

199 Paving block K - 127

m2

104,350.00

104,350

104,350

200 Penangkal Petir + Instalasi

unit

3,920,000.00

3,920,000

3,920,000

201 Pintu Panel Double ky Bangkirai

Bh

1,089,000.00

1,089,000

1,089,000

202 Pintu Double Plywood

Bh

332,750.00

332,750

332,750

203 Pintu Panel ky Bangkirai Uk. Besar L 80 cm

Bh

544,500.00

544,500

544,500

204 Pintu Panel ky Bangkirai Uk. Kecil L 70 cm

Bh

484,000.00

484,000

484,000

205 Pintu Panel kayu Ulin Ukuran Besar L 80 cm

Bh

513,700.00

513,700

513,700

206 Pintu Panel kayu Ulin Ukuran Kecil L 70 cm

Bh

484,000.00

484,000

484,000

207 Pintu Panel Lapis Formika (Fabrikasi)

Bh

363,000.00

363,000

363,000

208 Pintu Skat

Bh

385,000.00

385,000

385,000

209 Pipa Galvanis AW Dia 1 "

M'

52,100.00

52,100

52,100

210 Pipa Galvanis AW Dia 2 "

M'

103,100.00

103,100

103,100

211 Pipa Galvanis AW Dia 3 "

M'

182,150.00

182,150

182,150

212 Pipa Galvanis AW Dia 4 "

M'

259,300.00

259,300

259,300

213 Pipa PVC AW Dia 1 "

Btg

26,083.33

25,000

25,000

214 Pipa PVC AW Dia 1/2 "

Btg

19,416.67

20,000

20,000

215 Pipa PVC AW Dia 2 "

Btg

49,833.33

50,000

50,000

216 Pipa PVC AW Dia 3/4 "

Btg

20,833.33

20,000

20,000

217 Pipa PVC AW Dia 4 "

Btg

150,833.33

150,000

150,000

218 Pipa stainless steel 2 "

M'

37,400.00

37,400

37,400

219 Pipa stainless steel 3 "

M'

67,000.00

67,000

67,000

220 Pitting

Bh

9,916.67

10,000

10,000

221 Plamir

Kg

18,500.00

18,500

18,500

222 Plitur

Kg

35,583.33

42,500

42,500

223 Plint / list lantai keramik

Bh

5,000.00

5,000

5,000

224 Plint marmer 10 x 40 cm

Bh

21,800.00

21,800

21,800

225 Plywood 3 mm

Lbr

44,375.00

42,000

45,000

226 Plywood 4 mm

Lbr

55,000.00

56,000

55,000

227 Plywood 6 mm

Lbr

80,000.00

80,000

80,000

228 Plywood 9 mm

Lbr

124,583.33

125,000

125,000

229 Plywood 12 mm

Lbr

220,000.00

220,000

220,000

230 Plywood 18 mm

Lbr

250,000.00

250,000

250,000

231 Porselen 20 x 20 cm

Bh

52,000.00

52,000

52,000

232 Polycarbonat

M2

825,000.00

825,000

825,000

233 Rangka besi hollow

M'

53,500.00

53,500

53,500

234 Rol Cat Tembok

Bh

15,875.00

15,000

16,500

235 Rolling door Standart

236 Roster beton 20 x 20 cm

1 Unit
Bh

33,000.00

33,000

33,000

237 Roster beton 20 x 30 cm

Bh

46,000.00

46,000

46,000

238 Roster kayu bangkirai 20 x 20 cm

Bh

36,000.00

36,000

36,000

239 Rumput Hias

M2

27,500.00

27,500

27,500

240 Saklar Ganda

Bh

19,000.00

15,000

20,000

241 Saklar Tunggal

Bh

14,541.67

12,500

15,000

242 Sekering Kas 3 Group + Instalasi

Unit

146,800.00

146,800

146,800

243 Semen Abu - Abu / PC ( 50 kg/Zak )

Zak

65,000.00

65,000

65,000

244 Semen Warna

Kg

9,833.33

10,000

10,000

245 Semen putih

Kg

1,947.92

2,000

2,000

246 Seng gelombang Besar / kecil

Lbr

39,125.00

37,000

40,000

248 Seng Plat

Lbr

45,833.33

45,000

45,000

249 Septictank ( 3 x 1,5 )+Resapan (1,5 x 1,5 )

Unit

250 Septictank Kayu

Unit

251 Sirlak

Kg

29,700.00

29,700

29,700

252 Sirtu

m3

274,800.00

274,800

274,800

253 Solar

Ltr

6,950.00

6,950

6,950

254 Spritus

Ltr

14,800.00

14,800

14,800

255 Stop Kontak

Bh

14,916.67

15,000

15,000

256 Talang Air PVC Maspion

M'

16,041.67

12,500

16,250

257 Tambah daya Listrik

Wt

258 Tanah Urug

M3

259 Tandon Air 2 x 1200 ltr + Menara + Atap


260 Tandon Air 1 x 1200 ltr + Menara + Atap

51,900.00

51,900

51,900

Unit

5,406,900.00

5,406,900

5,406,900

Unit

3,177,300.00

3,177,300

3,177,300

261 Tangga Naik Tinggi 1 m

Bh

231,000.00

231,000

231,000

262 Tanki Air Viberglass 1200 Ltr

Bh

1,235,400.00

1,235,400

1,235,400

263 Tanki Air Viberglass 2500 Ltr

Bh

2,613,000.00

2,613,000

2,613,000

264 Tanki Air Viberglass 550 Ltr

Bh

930,800.00

930,800

930,800

265 Teakwood 3 mm

Lbr

99,300.00

99,300

99,300

266 Teakwood 4 mm

Lbr

120,200.00

120,200

120,200

267 Teakwood 6 mm

Lbr

195,850.00

195,850

195,850

268 Ter / Residu

Kg

45,300.00

45,300

45,300

269 Terpentin

Ltr

4,750.00

4,750

4,750

270 Tiang Lampu Tunggal 11 m'

Bt

2,984,700.00

2,984,700

2,984,700

271 Tiang Lampu Tunggal 9 m'

Bt

1,960,000.00

1,960,000

1,960,000

272 Tiang Lampu Ganda 11 m'


273 Tiang Lampu ganda 9 m'

Bt
Bt

3,520,000.00
2,311,000.00

3,520,000
2,311,000

3,520,000
2,311,000

274 Tinner A

Ltr

22,916.67

23,500

20,000

275 Titik Mata Lampu

Ttk

169,400.00

169,400

169,400

276 Trap Depan Papan Tulis Bak Lapis Keramik

Bh

275,000.00

275,000

275,000

277 Ukiran jamang pada puncak

Bh

440,000.00

440,000

440,000

278 Ukiran jamang pada listplank

Bh

495,000.00

495,000

495,000

279 Urinoir

Bh

1,865,500.00

1,865,500

1,865,500

280 Kloset duduk Ex. Toto

Bh

2,400,000.00

2,400,000

2,400,000

281 Pasir beton Exs. Palu

m3

415,000.00

415,000

415,000

282 Washtafel + Cermin

Bh

495,833.33

500,000

550,000

T. A 2010

1.
2.
3.
4

Catatan :
Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal
Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran
Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut
Harga belum termasuk PPn

AR HARGA SATUAN UPAH DAN BAHAN KAB. PENAJAM

HARGA
BANGUNAN
R2T

HARGA
CAHAYA
ABADI

AMATAN PENAJAM

HARGA
SINAR BARU

HARGA
BINTANG
BARU

HARGA
BINTANG MAS

KECAMATAN WARU

HARGA
HARAPAN
BARU

HARGA
BANGUNAN

KECAMATAN BABULU

55,000

55,000

55,000

55,000

55,000

55,000

55,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

60,000

60,000

60,000

60,000

60,000

60,000

60,000

45,000

45,000

45,000

45,000

45,000

45,000

45,000

605,000

605,000

605,000

605,000

605,000

605,000

605,000

3,000

2,500

3,500

4,000

3,000

3,000

3,000

27,000

27,000

27,000

28,000

28,000

28,000

27,000

6,750

6,750

6,750

6,750

6,750

6,750

6,750

85,000

85,000

85,000

85,000

85,000

85,000

85,000

32,000

32,000

32,000

32,000

32,000

32,000

32,000

70,000

70,000

60,000

75,000

70,000

70,000

70,000

35,000

35,000

35,000

35,000

35,000

35,000

35,000

69,500

69,500

69,500

69,500

69,500

69,500

69,500

29,200

29,200

29,200

29,200

29,200

29,200

29,200

75,000

75,000

75,000

75,000

75,000

75,000

75,000

58,100

58,100

58,100

58,100

58,100

58,100

58,100

56,400

56,400

56,400

56,400

56,400

56,400

56,400

75,100

54,200

54,200

54,200

54,200

54,200

54,200

200,000

250,000

250,000

250,000

185,000

190,000

190,000

250,000

350,000

245,000

270,000

250,000

225,000

300,000

180,000

170,000

250,000

250,000

250,000

425,000

500,000

365,000

450,000

450,000

450,000

450,000

121,000

121,000

121,000

121,000

121,000

121,000

121,000

293,000

293,000

293,000

293,000

293,000

293,000

293,000

6,000,000

6,000,000

6,000,000

6,000,000

6,000,000

6,000,000

6,000,000

5,500,000

5,500,000

5,000,000

5,500,000

5,500,000

5,000,000

5,500,000

2,300,000

2,200,000

2,300,000

2,300,000

2,200,000

2,300,000

2,300,000

1,800

1,800

1,800

1,800

1,800

1,800

1,800

188,300

188,300

188,300

188,300

188,300

188,300

188,300

850

800

800

800

800

800

800

850

850

850

850

850

850

850

215,400

215,400

215,400

215,400

215,400

215,400

215,400

22,000

22,000

22,000

22,000

22,000

22,000

22,000

5,300

5,300

5,300

5,300

5,300

5,300

5,300

10,000

10,000

10,000

10,000

10,000

10,000

10,000

11,750

11,750

11,750

11,750

11,750

11,750

11,750

16,300

16,300

16,300

16,300

16,300

16,300

16,300

31,800

31,800

31,800

31,800

31,800

31,800

31,800

97,000

97,000

97,000

97,000

97,000

97,000

97,000

156,800

156,800

156,800

156,800

156,800

156,800

156,800

25,000

25,000

25,000

25,000

25,000

25,000

25,000

506,500

506,500

506,500

506,500

506,500

506,500

506,500

626,000

626,000

626,000

626,000

626,000

626,000

626,000

8,000

7,000

13,000

11,200

8,000

8,000

8,000

85,000

85,000

85,000

85,000

85,000

85,000

85,000

30,000

38,000

38,000

40,000

38,000

38,000

38,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

35,000

38,000

38,000

40,000

35,000

35,000

35,000

20,000

20,000

15,000

20,000

22,000

25,000

20,000

150,000

15,000

160,000

150,000

160,000

150,000

150,000

750,000

750,000

750,000

750,000

750,000

750,000

750,000

95,000

100,000

100,000

95,000

100,000

100,000

95,000

1,500,000

1,800,000

1,500,000

1,500,000

1,800,000

1,500,000

1,500,000

374,800

374,800

374,800

374,800

374,800

374,800

374,800

314,600

314,600

314,600

314,600

314,600

314,600

314,600

454,000

454,000

454,000

454,000

454,000

454,000

454,000

78,650

78,650

78,650

78,650

78,650

78,650

78,650

35,200

35,200

35,200

35,200

35,200

35,200

35,200

20,000

35,000

20,000

15,000

20,000

20,000

20,000

50,000

40,000

50,000

55,000

50,000

50,000

50,000

12,500

13,500

12,500

12,500

20,000

20,000

20,000

35,000

33,000

20,000

20,000

35,000

25,000

30,833

26,700

26,700

26,700

26,700

26,700

26,700

26,700

35,000

35,000

35,000

35,000

35,000

35,000

35,000

104,300

104,300

104,300

104,300

104,300

104,300

104,300

7,500

7,500

7,500

7,500

7,500

7,500

7,500

22,000

23,000

21,000

25,000

23,000

21,000

25,000

10,000

12,000

8,000

10,000

10,000

8,000

10,000

20,000

12,000

15,000

25,000

15,000

12,000

15,000

125,000

125,000

125,000

125,000

125,000

125,000

125,000

65,000

65,000

65,000

65,000

65,000

65,000

65,000

10,000

10,000

8,500

12,000

10,000

12,000

10,000

10,000

7,500

10,000

15,000

10,000

12,000

10,000

150,000

165,000

150,000

150,000

150,000

130,000

150,000

565,700

565,700

565,700

565,700

565,700

565,700

565,700

40,000

40,000

40,000

40,000

40,000

40,000

40,000

250,000

250,000

250,000

250,000

250,000

250,000

250,000

326,700

326,700

326,700

326,700

326,700

326,700

326,700

72,600

72,600

72,600

72,600

72,600

72,600

72,600

84,700

84,700

84,700

84,700

84,700

84,700

84,700

102,300

102,300

102,300

102,300

102,300

102,300

102,300

127,000

127,000

127,000

127,000

127,000

127,000

127,000

546,000

546,000

546,000

546,000

546,000

546,000

546,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

107,300

107,300

107,300

107,300

107,300

107,300

107,300

80,000

80,000

80,000

80,000

70,000

85,000

80,000

28,350

28,350

28,350

28,350

28,350

28,350

28,350

25,000

25,000

25,000

25,000

25,000

25,000

25,000

8,000

7,000

7,000

7,000

8,000

8,000

8,000

1,800,000

1,800,000

1,800,000

1,800,000

1,800,000

1,800,000

1,800,000

11,200

11,200

11,200

11,200

11,200

11,200

11,200

45,000

47,000

47,000

47,000

47,000

40,000

47,000

55,000

55,000

50,000

50,000

50,000

52,000

55,000

50,000

55,000

50,000

50,000

48,000

48,000

50,000

45,000

38,000

41,000

50,000

49,000

45,000

50,000

50,000

50,000

55,000

48,000

50,000

49,000

220,000

220,000

220,000

220,000

220,000

220,000

220,000

8,000

8,000

6,000

8,000

8,000

8,000

8,000

26,000

26,000

26,000

26,000

26,000

26,000

26,000

26,500

26,500

26,500

26,500

26,500

26,500

26,500

7,000

12,000

10,000

10,000

8,000

10,000

10,000

250,000

165,000

200,000

180,000

200,000

200,000

200,000

300,000

160,000

216,000

300,000

30,000

300,000

415,000
350,000
437,500
263,000

216,000
300,000

300,000

30,000

300,000

150,000

150,000

150,000

150,000

150,000

150,000

150,000

154,000

154,000

154,000

154,000

154,000

154,000

154,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

7,500

7,500

6,000

8,000

7,500

7,500

7,500

6,000

7,000

4,500

6,000

6,000

6,000

6,000

6,000

7,000

5,000

6,000

7,000

7,000

7,000

6,000

8,000

5,000

6,000

7,000

7,000

7,000

5,000

3,000

5,000

4,000

7,000

7,000

7,000

10,000

10,000

10,000

6,000

10,000

10,000

10,000

42,000

43,000

43,000

42,000

43,000

43,000

43,000

83,250

83,250

83,250

83,250

83,250

83,250

83,250

75,000

75,000

75,000

75,000

75,000

75,000

75,000

91,000

91,000

91,000

91,000

91,000

91,000

91,000

101,800

101,800

101,800

101,800

101,800

101,800

101,800

15,000

15,000

12,000

16,000

12,000

15,000

15,000

5,000

5,000

4,000

5,000

4,000

5,000

5,000

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

10,300

10,300

10,300

10,300

10,300

10,300

10,300

6,050

6,050

6,050

6,050

6,050

6,050

6,050

66,550

66,550

66,550

66,550

66,550

66,550

66,550

36,000

36,000

36,000

36,000

36,000

36,000

36,000

3,000

3,000

3,000

4,000

4,000

3,000

3,000

2,500

2,000

2,500

3,000

2,000

2,000

2,500

5,000

4,000

5,000

5,000

5,000

5,000

5,000

2,500

2,500

2,500

2,500

2,500

2,000

2,500

12,000

10,000

12,000

12,000

12,000

10,000

12,000

495,000

495,000

495,000

495,000

495,000

495,000

495,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

12,000

12,000

12,000

12,000

12,000

12,000

12,000

62,000

62,000

62,000

62,000

62,000

62,000

62,000

129,000

129,000

129,000

129,000

129,000

129,000

129,000

205,000

205,000

205,000

205,000

205,000

205,000

205,000

219,000

219,000

219,000

219,000

219,000

219,000

219,000

223,300

223,300

223,300

223,300

223,300

223,300

223,300

155,700

155,700

155,700

155,700

155,700

155,700

155,700

20,300

20,300

20,300

20,300

20,300

20,300

20,300

17,500

17,500

17,500

17,500

17,500

17,500

17,500

36,700

36,700

36,700

36,700

36,700

36,700

36,700

32,700

32,700

32,700

32,700

32,700

32,700

32,700

22,500

22,500

22,500

22,500

22,500

22,500

22,500

37,300

37,300

37,300

37,300

37,300

37,300

37,300

27,000

24,000

27,000

25,000

28,000

28,000

28,000

19,800

19,800

19,800

19,800

19,800

19,800

19,800

27,500

27,500

27,500

27,500

27,500

27,500

27,500

30,000

25,000

27,000

30,000

28,000

27,000

30,000

16,000

16,000

14,000

17,000

15,000

15,000

16,000

30,250

30,250

30,250

30,250

30,250

30,250

30,250

25,000

24,000

25,000

25,000

25,000

25,000

25,000

20,000

18,000

18,000

18,000

18,000

20,000

20,000

25,000

20,000

20,000

25,000

22,000

26,000

25,000

20,000

20,000

20,000

20,000

20,000

20,000

20,000

6,500,000

6,500,000

6,500,000

6,500,000

6,500,000

6,500,000

6,500,000

5,000,000

6,250,000

5,000,000

5,000,000

6,250,000

5,000,000

5,000,000

1,800,000

1,750,000

1,800,000

1,800,000

1,750,000

1,800,000

1,800,000

2,300,000

2,200,000

2,300,000

2,300,000

2,200,000

2,300,000

2,300,000

550,000

550,000

550,000

550,000

550,000

550,000

550,000

24,200

24,200

24,200

24,200

24,200

24,200

24,200

513,000

513,000

513,000

513,000

513,000

513,000

513,000

607,400

607,400

607,400

607,400

607,400

607,400

607,400

250,000

250,000

250,000

250,000

225,000

225,000

225,000

330,000

330,000

330,000

330,000

330,000

330,000

330,000

280,000

280,000

280,000

280,000

255,000

255,000

255,000

64,500

64,500

64,500

64,500

64,500

64,500

64,500

51,900

51,900

51,900

51,900

51,900

51,900

51,900

2,000

2,000

2,000

2,000

2,000

2,000

2,000

104,350

104,350

104,350

104,350

104,350

104,350

104,350

3,920,000

3,920,000

3,920,000

3,920,000

3,920,000

3,920,000

3,920,000

1,089,000

1,089,000

1,089,000

1,089,000

1,089,000

1,089,000

1,089,000

332,750

332,750

332,750

332,750

332,750

332,750

332,750

544,500

544,500

544,500

544,500

544,500

544,500

544,500

484,000

484,000

484,000

484,000

484,000

484,000

484,000

513,700

513,700

513,700

513,700

513,700

513,700

513,700

484,000

484,000

484,000

484,000

484,000

484,000

484,000

363,000

363,000

363,000

363,000

363,000

363,000

363,000

385,000

385,000

385,000

385,000

385,000

385,000

385,000

52,100

52,100

52,100

52,100

52,100

52,100

52,100

103,100

103,100

103,100

103,100

103,100

103,100

103,100

182,150

182,150

182,150

182,150

182,150

182,150

182,150

259,300

259,300

259,300

259,300

259,300

259,300

259,300

25,000

30,000

25,000

30,000

25,000

28,000

25,000

20,000

16,000

20,000

20,000

15,000

22,000

20,000

50,000

50,000

50,000

55,000

45,000

48,000

50,000

20,000

25,000

20,000

25,000

20,000

20,000

20,000

150,000

150,000

150,000

160,000

150,000

150,000

150,000

37,400

37,400

37,400

37,400

37,400

37,400

37,400

67,000

67,000

67,000

67,000

67,000

67,000

67,000

10,000

9,000

10,000

10,000

10,000

10,000

10,000

18,500

18,500

18,500

18,500

18,500

18,500

18,500

55,000

38,000

38,000

38,000

42,500
5,000

5,000

5,000

5,000

5,000

5,000

5,000

21,800

21,800

21,800

21,800

21,800

21,800

21,800

45,000

43,000

42,500

45,000

45,000

45,000

45,000

55,000

55,000

54,000

55,000

55,000

55,000

55,000

80,000

80,000

75,000

85,000

80,000

80,000

80,000

125,000

125,000

125,000

120,000

125,000

125,000

125,000

220,000

220,000

220,000

220,000

220,000

220,000

220,000

250,000

250,000

250,000

250,000

250,000

250,000

250,000

52,000

52,000

52,000

52,000

52,000

52,000

52,000

825,000

825,000

825,000

825,000

825,000

825,000

825,000

53,500

53,500

53,500

53,500

53,500

53,500

53,500

16,500

15,000

15,000

18,000

16,000

16,000

16,000

33,000

33,000

33,000

33,000

33,000

33,000

33,000

46,000

46,000

46,000

46,000

46,000

46,000

46,000

36,000

36,000

36,000

36,000

36,000

36,000

36,000

27,500

27,500

27,500

27,500

27,500

27,500

27,500

20,000

15,000

20,000

18,000

20,000

20,000

20,000

15,000

15,000

12,000

15,000

15,000

15,000

15,000

146,800

146,800

146,800

146,800

146,800

146,800

146,800

65,000

65,000

65,000

65,000

65,000

65,000

65,000

10,000

10,000

10,000

8,000

10,000

10,000

10,000

2,000

1,750

1,875

1,750

2,000

2,000

2,000

40,000

40,000

40,000

37,000

38,000

37,500

40,000

45,000

45,000

45,000

55,000

45,000

45,000

45,000

29,700

29,700

29,700

29,700

29,700

29,700

29,700

6,950

6,950

6,950

6,950

6,950

6,950

6,950

14,800

14,800

14,800

14,800

14,800

14,800

14,800

15,000

15,000

12,000

15,000

15,000

17,000

15,000

16,250

16,250

17,500

16,250

16,250

16,250

16,250

51,900

51,900

51,900

51,900

51,900

51,900

51,900

5,406,900

5,406,900

5,406,900

5,406,900

5,406,900

5,406,900

5,406,900

3,177,300

3,177,300

3,177,300

3,177,300

3,177,300

3,177,300

3,177,300

274,800

231,000

231,000

231,000

231,000

231,000

231,000

231,000

1,235,400

1,235,400

1,235,400

1,235,400

1,235,400

1,235,400

1,235,400

2,613,000

2,613,000

2,613,000

2,613,000

2,613,000

2,613,000

2,613,000

930,800

930,800

930,800

930,800

930,800

930,800

930,800

99,300

99,300

99,300

99,300

99,300

99,300

99,300

120,200

120,200

120,200

120,200

120,200

120,200

120,200

195,850

195,850

195,850

195,850

195,850

195,850

195,850

45,300

45,300

45,300

45,300

45,300

45,300

45,300

4,750

4,750

4,750

4,750

4,750

4,750

4,750

2,984,700

2,984,700

2,984,700

2,984,700

2,984,700

2,984,700

2,984,700

1,960,000

1,960,000

1,960,000

1,960,000

1,960,000

1,960,000

1,960,000

3,520,000
2,311,000

3,520,000
2,311,000

3,520,000
2,311,000

3,520,000
2,311,000

3,520,000
2,311,000

3,520,000
2,311,000

3,520,000
2,311,000

23,500

23,500

23,500

20,000

23,500

23,500

23,500

169,400

169,400

169,400

169,400

169,400

169,400

169,400

275,000

275,000

275,000

275,000

275,000

275,000

275,000

440,000

440,000

440,000

440,000

440,000

440,000

440,000

495,000

495,000

495,000

495,000

495,000

495,000

495,000

1,865,500

1,865,500

1,865,500

1,865,500

1,865,500

1,865,500

1,865,500

2,400,000

2,400,000

2,400,000

2,400,000

2,400,000

2,400,000

2,400,000

415,000

415,000

415,000

415,000

415,000

415,000

415,000

500,000

400,000

500,000

500,000

500,000

500,000

500,000

utk bahan lokal


ku dipasaran

HARGA
BANGUNAN
BARU

HARGA
MITRA
BANGUNAN

HARGA BUMI
HARAPAN
INDAH

TAHUN 2010

KECAMATAN SEPAKU

55,000

55,000

55,000

55,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

70,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

75,000

60,000

60,000

60,000

60,000

45,000

45,000

45,000

45,000

605,000

605,000

605,000

605,000

2,000

2,500

2,000

2,750

27,000

27,000

27,000

28,700

6,750

6,750

6,750

6,750

85,000

85,000

85,000

40,200

32,000

32,000

32,000

19,969

75,000

75,000

75,000

9,477

8,462

35,000

35,000

35,000

31,750

69,500

69,500

69,500

69,500

29,200

29,200

29,200

29,200

75,000

75,000

75,000

44,500

58,100

58,100

58,100

58,100

56,400

56,400

56,400

56,400

19,470

33,378

25,033

75,100

175,000

225,000

207,000

236,000

175,000

250,000

250,000

250,000

229,400

450,000

450,000

450,000

427,700

121,000

121,000

121,000

121,000

293,000

293,000

293,000

293,000

6,000,000

6,000,000

6,000,000

3,169,000

5,500,000

5,000,000

5,500,000

2,665,000

2,200,000

2,300,000

2,300,000

1,723,000

1,800

1,800

1,800

1,800

188,300

188,300

188,300

188,300

800

800

800

780

850

850

850

850

215,400

215,400

215,400

200,000

225,000

225,000

225,000

225,000

22,000

22,000

22,000

4,000

5,300

5,300

5,300

5,300

10,000

10,000

10,000

10,000

11,750

11,750

11,750

11,750

16,300

16,300

16,300

16,300

31,800

31,800

31,800

31,800

97,000

97,000

97,000

97,000

156,800

156,800

156,800

156,800

25,000

25,000

25,000

25,000

506,500

506,500

506,500

506,500

626,000

626,000

626,000

626,000

8,000

8,000

8,000

8,560

85,000

85,000

85,000

67,500

39,000

39,000

39,000

39,000

20,000

20,000

20,000

20,800

45,000

35,000

35,000

34,650

22,000

25,000

20,000

18,350

175,000

150,000

150,000

146,600

750,000

750,000

750,000

750,000

100,000

100,000

95,000

211,800

1,800,000

1,500,000

1,500,000

1,370,000

374,800

374,800

374,800

374,800

314,600

314,600

314,600

314,600

454,000

454,000

454,000

454,000

78,650

78,650

78,650

78,650

35,200

35,200

35,200

35,200

30,000

20,000

20,000

20,000

50,000

50,000

50,000

37,700

18,000

15,000

15,000

23,000

25,000

24,000

25,000

27,800

26,700

26,700

26,700

26,700

35,000

35,000

35,000

31,700

104,300

104,300

104,300

104,300

7,500

7,500

7,500

7,500

25,000

22,000

25,000

30,000

12,000

12,500

12,500

9,000

20,000

20,000

20,000

16,500

125,000

125,000

125,000

37,000

65,000

65,000

65,000

48,800

8,000

10,000

10,000

9,400

10,000

10,000

10,000

8,300

125,000

150,000

150,000

109,000

565,700

565,700

565,700

565,700

40,000

40,000

40,000

40,000

250,000

250,000

250,000

230,000

326,700

326,700

326,700

326,700

72,600

72,600

72,600

72,600

84,700

84,700

84,700

84,700

102,300

102,300

102,300

102,300

127,000

127,000

127,000

127,000

546,000

546,000

546,000

546,000

20,000

20,000

20,000

19,600

107,300

107,300

107,300

107,300

80,000

80,000

80,000

74,850

28,350

28,350

28,350

28,350

25,000

25,000

25,000

24,300

8,000

8,000

8,000

8,000

1,800,000

1,800,000

1,800,000

1,452,000

11,200

11,200

11,200

11,200

47,000

47,000

47,000

49,600

48,000

55,000

55,000

55,600

50,000

50,000

50,000

55,000

50,000

45,000

45,000

49,000

48,000

50,000

50,000

55,500

220,000

220,000

220,000

220,000

9,000

8,000

8,000

8,650
415,000
350,000
437,500
263,000

26,000

26,000

26,000

26,000

26,500

26,500

26,500

26,500

10,000

10,000

10,000

8,300

200,000

200,000

200,000

161,750

216,000

110,000

216,000

300,000

30,000

300,000

255,900

132,800

150,000

150,000

150,000

154,000

154,000

154,000

154,000

154,000

6,000

6,000

6,000

6,300

7,500

7,500

7,500

8,200

6,000

6,000

6,000

7,100

7,000

7,000

7,000

9,250

7,000

7,000

7,000

6,300

7,000

7,000

7,000

5,200

10,000

10,000

10,000

10,000

43,000

43,000

43,000

42,100

83,250

83,250

83,250

83,250

75,000

75,000

75,000

74,800

91,000

91,000

91,000

91,000

101,800

101,800

101,800

101,800

13,000

15,000

12,000

15,000

5,000

5,000

5,000

6,200

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

27,500

10,300

10,300

10,300

10,300

6,050

6,050

6,050

6,050

66,550

66,550

66,550

66,550

36,000

36,000

36,000

36,000

3,000

3,000

3,000

34,000

2,000

2,500

2,500

2,500

6,000

5,000

5,000

5,600

3,000

2,500

2,500

5,100

12,000

12,000

12,000

12,900

495,000

495,000

495,000

495,000

20,000

20,000

20,000

20,000

12,000

12,000

12,000

12,000

62,000

62,000

62,000

62,000

129,000

129,000

129,000

129,000

205,000

205,000

205,000

205,000

219,000

219,000

219,000

219,000

223,300

223,300

223,300

223,300

155,700

155,700

155,700

155,700

20,300

20,300

20,300

20,300

17,500

17,500

17,500

17,500

36,700

36,700

36,700

36,700

32,700

32,700

32,700

32,700

22,500

22,500

22,500

22,500

37,300

37,300

37,300

37,300

28,000

28,000

28,000

27,300

19,800

19,800

19,800

19,800

27,500

27,500

27,500

27,500

30,000

30,000

30,000

29,200

16,000

16,000

16,000

16,650

30,250

30,250

30,250

30,250

25,000

25,000

25,000

26,350

20,000

20,000

20,000

19,800

25,000

25,000

25,000

23,500

20,000

20,000

20,000

11,500

6,500,000

6,500,000

6,500,000

3,992,000

6,250,000

5,000,000

5,000,000

3,600,000

1,750,000

1,800,000

1,800,000

1,500,000

2,200,000

2,300,000

2,300,000

1,786,000

550,000

550,000

550,000

550,000

24,200

24,200

24,200

24,200

513,000

513,000

513,000

513,000

607,400

607,400

607,400

607,400

275,000

275,000

275,000

250,000

330,000

330,000

330,000

330,000

300,000

300,000

300,000

280,000
61,800

225,000

225,000

225,000

225,000

51,900

51,900

51,900

51,900

2,000

2,000

2,000

3,680

104,350

104,350

104,350

104,350

3,920,000

3,920,000

3,920,000

3,920,000

1,089,000

1,089,000

1,089,000

1,089,000

332,750

332,750

332,750

332,750

544,500

544,500

544,500

544,500

484,000

484,000

484,000

484,000

513,700

513,700

513,700

513,700

484,000

484,000

484,000

484,000

363,000

363,000

363,000

363,000

385,000

385,000

385,000

385,000

52,100

52,100

52,100

52,100

103,100

103,100

103,100

103,100

182,150

182,150

182,150

182,150

259,300

259,300

259,300

259,300

25,000

25,000

25,000

24,100

20,000

20,000

20,000

20,200

50,000

50,000

50,000

48,900

20,000

20,000

20,000

19,650

150,000

150,000

150,000

112,400

37,400

37,400

37,400

37,400

67,000

67,000

67,000

67,000

10,000

10,000

10,000

6,450

18,500

18,500

18,500

18,500

42,500

43,000

45,000

42,500

5,000

5,000

5,000

3,100

21,800

21,800

21,800

21,800

45,000

45,000

45,000

44,600

55,000

55,000

55,000

56,500

80,000

80,000

80,000

79,000

125,000

125,000

125,000

116,500

220,000

220,000

220,000

220,000

250,000

250,000

250,000

231,000

52,000

52,000

52,000

52,000

825,000

825,000

825,000

825,000

53,500

53,500

53,500

53,500

16,500

15,000

15,000

16,500

33,000

33,000

33,000

33,000

46,000

46,000

46,000

46,000

36,000

36,000

36,000

36,000

27,500

27,500

27,500

27,500

20,000

20,000

20,000

16,700

15,000

15,000

15,000

12,800

146,800

146,800

146,800

146,800

65,000

65,000

65,000

63,500

10,000

10,000

10,000

13,500

2,000

2,000

2,000

19,250

40,000

40,000

40,000

40,900

45,000

45,000

45,000

53,600
695,000
1,815,000

29,700

29,700

29,700

29,700

6,950

6,950

6,950

6,950

14,800

14,800

14,800

14,800

15,000

15,000

15,000

12,500

16,250

16,250

16,250

89,100

51,900

51,900

51,900

51,900

5,406,900

5,406,900

5,406,900

5,406,900

3,177,300

3,177,300

3,177,300

3,177,300

274,800

231,000

231,000

231,000

231,000

1,235,400

1,235,400

1,235,400

1,235,400

2,613,000

2,613,000

2,613,000

2,613,000

930,800

930,800

930,800

930,800

99,300

99,300

99,300

99,300

120,200

120,200

120,200

120,200

195,850

195,850

195,850

195,850

45,300

45,300

45,300

45,300

4,750

4,750

4,750

4,750

2,984,700

2,984,700

2,984,700

2,984,700

1,960,000

1,960,000

1,960,000

1,960,000

3,520,000
2,311,000

3,520,000
2,311,000

3,520,000
2,311,000

3,520,000
2,311,000

207,600.00

23,500

23,500

23,500

23,500

169,400

169,400

169,400

169,400

275,000

275,000

275,000

275,000

440,000

440,000

440,000

440,000

495,000

495,000

495,000

495,000

1,865,500

1,865,500

1,865,500

1,865,500

2,400,000

2,400,000

2,400,000

2,400,000

415,000

415,000

415,000

415,000

500,000

500,000

500,000

439,000

4
palu
ponton
mobil

1,100,000.00
420,000.00
1,520,000.00
1,520,000.00
380,000.00
418,000.00

38,000.00

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

DAFTAR HARGA SATUAN UPAH DAN BAHAN


BIDANG

: Cipta Karya

TAHUN ANGGARAN

: 2011

NO

URAIAN

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

HARGA DASAR
SATUAN

KETERANGAN

4 = 6+5

UPAH KERJA
1 Pekerja ( Buruh semi terlatih )

Hari

55,000.00

55,000.00

2 Tukang Batu

Hari

70,000.00

70,000.00

3 Tukang Kayu

Hari

70,000.00

70,000.00

4 Tukang Besi

Hari

70,000.00

70,000.00

5 Tukang Cat

Hari

70,000.00

70,000.00

6 Kepala Tukang

Hari

75,000.00

75,000.00

7 Mandor

Hari

75,000.00

75,000.00

8 Sopir

Hari

60,000.00

60,000.00

9 Pembantu Sopir

Hari

45,000.00

45,000.00

1 Aluminium foil single sided

Roll

605,000.00

605,000.00

2 Ampelas

Lbr

2,875.00

2,875.00

3 Atap Asbes Gelombang Besar

Lbr

27,333.33

27,333.33

Harga Bahan

4 Atap Genteng Kodok

Bh

6,750.00

6,750.00

5 Atap Metal Berkualitas ( 2 ssn, 8 daun )

Lbr

85,000.00

85,000.00

6 Atap Plastik gelombang 60 x 170

Lbr

35,208.33

35,208.33

7 Atap Sirap

Ikat

69,500.00

69,500.00

8 Atap Tilux

Bh

29,200.00

29,200.00

9 Bahan Plafond Asbes Semen 5 mm

M2

75,000.00

75,000.00

10 Bahan Plafond eternit 4 mm

M2

58,100.00

58,100.00

11 Bahan Plafond Hardplex 5 mm 120 x 130

Lbr

56,400.00

56,400.00

12 Bahan Politur ( sirlak ) India

Kg

47,140.12

47,140.12

13 Bak Air Fiber (60 x 60 cm)

Bh

207,727.27

207,727.27

14 Bak Air Fiber (60 x 80 cm)

Bh

255,000.00

255,000.00

15 Bak Cuci Piring Stainles Lobang 1

Bh

235,833.33

235,833.33

isi 100 bh

Bab XIII.Harga Satuan dan Upah Hal 23

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

4 = 6+5

HARGA DASAR
SATUAN

KETERANGAN

16 Bak Cuci Piring Stainles Lobang 2

Bh

442,916.67

442,916.67

17 Bak Kontrol 50 x 50 x 40 cm

Bh

121,000.00

121,000.00

18 Bak air Traso Besar

Bh

293,000.00

293,000.00

19 Balok Klas I Bangkirai

M3

5,500,000.00

5,500,000.00

20 Balok Klas I Ulin

M3

5,000,000.00

5,000,000.00

21 Balok Kayu Meranti

M3

2,200,000.00

2,200,000.00

22 Batako

Bh

1,800.00

1,800.00

23 Batu alam

M2

188,300.00

188,300.00

24 Batu Bata

Bh

800.00

800.00

25 Batu apung

Kg

850.00

850.00

26 Batu Gunung

M3

215,400.00

215,400

26.a Batu Gunung (SEPAKU)

M3

225,000.00

225,000

27 Baut

Bh

22,000.00

22,000.00

28 Bensin

Lt

5,300.00

5,300.00

29 Besi Beton Polos

Kg

10,000.00

10,000.00

10.68

30 Besi Beton Ulir

Kg

11,750.00

11,750.00

7022.47191

31 Besi penggantung plafond

Kg

16,300.00

16,300.00

14513.10861

32 Besi strip

Kg

31,800.00

31,800.00

33 Box MCB 2 group

Unit

97,000.00

97,000.00

34 Box MCB 4 group

Unit

156,800.00

156,800.00

35 Breaker

Bh

25,000.00

25,000.00

36 Buis Beton Dia 80 cm tanpa tulangan

Bh

506,500.00

506,500.00

39 Buis Beton Dia 100 cm tanpa tulangan

Bh

626,000.00

626,000.00

41 Cat Air / tembok

Kg

8,600.00

42 Cat Air / tembok ex.setara ICI,dulux,mowilex

Kg

85,000.00

43 Cat besi

Kg

37,666.67

37,666.67

44 Cat Dasar / plamir

Kg

20,000.00

20,000.00

45 Cat Kilap / Kayu

Kg

36,750.00

36,750.00

46 Cat Menie kayu

Kg

20,333.33

20,333.33

47 Closed Jongkok Keramik berkualitas

Bh

132,083.33

132,083.33

48 Closed Jongkok Keramik Toto

Bh

750,000.00

750,000.00

8,600.00
85,000.00

Bab XIII.Harga Satuan dan Upah Hal 24

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

49 Closed Jongkok Teraso

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

4 = 6+5

Bh

HARGA DASAR
SATUAN

KETERANGAN

98,333.33

98,333.33

50 Closet Duduk Type Keramik Berkualitas

Unit

1,575,000.00

1,575,000.00

51 Daun Jendela Uk. Besar (Fabrikasi) Kc 5 mm

Bh

374,800.00

374,800.00

52 Daun Jendela Uk. Kecil (Fabrikasi) Kc 5 mm

Bh

314,600.00

314,600.00

53 Daun Pintu Plywood Bag. Dlm Lapis Aluminium Foil

Bh

454,000.00

454,000.00

54 Daun Ventilasi

Bh

78,650.00

78,650.00

55 Dempul Halus ( INFRA )

Kg

35,200.00

35,200.00

56 Dempul kayu

Kg

21,666.67

21,666.67

57 Dempul Politur

Kg

49,583.33

49,583.33

58 Engsel Jendela Lokal 3 "

Bh

15,416.67

15,416.67

59 Engsel Pintu Lokal 5 "

Bh

27,527.78

27,527.78

60 Espagnolet

Bh

26,700.00

26,700.00

61 Floor Drain

Bh

35,000.00

35,000.00

62 Formika Ukuran Pintu

Lbr

104,300.00

104,300.00

63 Genteng keramik

Bh

7,500.00

7,500.00

64 Glass block

Bh

23,125.00

23,125.00

65 Grendel Jendela

Bh

10,000.00

10,000.00

66 Grendel Pintu

Bh

16,375.00

16,375.00

67 Grendel tanam Pintu

Bh

125,000.00

125,000.00

68 Gypsum board, t = 9 mm

Lbr

65,000.00

65,000.00

69 Hak Angin

Bh

10,041.67

10,041.67

70 Handle Jendela putih

Bh

10,375.00

10,375.00

71 Handle Pintu

Bh

147,500.00

147,500.00

72 Jalusi Atap

Bh

565,700.00

565,700.00

73 Jalusi Kayu Bangkirai

M'

40,000.00

40,000.00

74 Kabel NGA 2,5

Rol

250,833.33

250,833.33

76 Kaca Naco ( kerangka/daun ) 5 mm

Set

326,700.00

326,700.00

77 Kaca polos 2 mm

M2

72,600.00

72,600.00

78 Kaca polos 3 mm

M2

84,700.00

84,700.00

79 Kaca polos 5 mm

M2

102,300.00

102,300.00

80 Kaca Rayben 5 mm

M2

127,000.00

127,000.00

16,000.00

Bab XIII.Harga Satuan dan Upah Hal 25

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

4 = 6+5

81 Kanopi Atap

Bh

82 Kawat Bendrat / Beton


83 Kawat Bronjong

HARGA DASAR
SATUAN

KETERANGAN

546,000.00

Kg

20,000.00

20,000.00

Kg

107,300.00

107,300.00

84 Kawat Duri

Rol

79,166.67

79,166.67

85 Kawat Harmonika

m2

28,350.00

28,350.00

86 Kawat nyamuk besi/aluminium

m2

25,000.00

25,000.00

87 Kawat nyamuk plastik

m2

7,750.00

7,750.00

88 Kayu Klas 2

M3

1,800,000.00

1,800,000.00

89 Kayu galam dia 10 - 12 cm

Btg

11,200.00

11,200.00

90 Keramik 10 x 20 cm

M2

46,250.00

46,250.00

91 Keramik 20 x 25 cm

M2

52,550.00

52,550.00

92 Keramik 20 x 20 cm

M2

50,083.33

50,083.33

93 Keramik 30 x 30 cm Halus

M2

41,333.33

41,333.33

94 Keramik 30 x 30 cm Kasar

M2

49,750.00

49,750.00

95 Keramik 40 x 40 Ex. Roman Setara,granito

M2

220,000.00

220,000.00

96 Karet Talang

M'

7,833.33

7,833.33

97 Batu Split ( ukuran 2-3 cm/1-2 )Ex.palu

M3

415,000.00

415,000.00

98 Batu Split ( ukuran 2-3 cm/1-2 )Ex. Krayan

M3

350,000.00

350,000.00

98.a Batu Split ( ukuran 2-3 cm/1-2 )Ex. Sepaku

M3

437,500.00

437,500.00

M3

263,000.00

263,000.00

100 Kran Air Dia 1"

Bh

26,000.00

26,000.00

101 Kran Air Dia 3/4

Bh

26,500.00

26,500.00

102 Kuas 3 "

Bh

9,666.67

9,666.67

103 Kunci Pintu 2 Slag berkualitas

Bh

196,666.67

196,666.67

104 Kunci Pintu Double Ex Cisa

Bh

137,500.00

137,500.00

105 Kunci Pintu Double Lengkap Dgn Accecories

Bh

210,000.00

210,000.00

106 Kunci Pintu Tanam antik

Bh

99 Koral (ex.Lokal)

546,000.00

107 Kusen aluminium 1

108 Kusen aluminium 2

109 Kusen aluminium 3

111 Lampu 2 - TL 40 Watt Double + Instalasi

Bh

150,000.00

150,000.00

Bab XIII.Harga Satuan dan Upah Hal 26

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

4 = 6+5

HARGA DASAR
SATUAN

KETERANGAN

113 Lampu Merkury 250 wt

Bh

154,000.00

154,000.00

114 Lampu Pijar 10 Watt

Bh

6,000.00

6,000.00

115 Lampu Pijar 100 Watt

Bh

7,416.67

7,416.67

116 Lampu Pijar 15 Watt

Bh

5,958.33

5,958.33

117 Lampu Pijar 25 Watt

Bh

6,500.00

6,500.00

118 Lampu Pijar 40 Watt

Bh

6,583.33

6,583.33

119 Lampu Pijar 5 Watt

Bh

5,750.00

5,750.00

120 Lampu Pijar 60 Watt

Bh

9,416.67

9,416.67

121 Lampu Philip SL 20 Watt + Fitting

Bh

42,666.67

42,666.67

123 Lampu TL Philip + Fitting 20 Watt

Bh

83,250.00

83,250.00

124 Lampu TL 20 Watt Double (Trafo)

Bh

75,000.00

75,000.00

125 Lampu TL 40 Watt (Trafo)

Bh

91,000.00

91,000.00

126 Lampu TL 40 Watt Double (Trafo)

Bh

101,800.00

101,800.00

127 Lem Kayu ( Fox )

Ltr

14,166.67

14,166.67

128 Lem Paralon

Bh

4,833.33

4,833.33

129 List Cornice Gypsum

M'

27,500.00

27,500.00

130 List Plafond Gypsum

M'

27,500.00

27,500.00

131 List Plafond Plywood

M'

27,500.00

27,500.00

132 List Profil Sudut 3/5 Ky Bangkirai

M'

10,300.00

10,300.00

133 List Profil Sudut 3/5 Ky Meranti

M'

6,050.00

6,050.00

134 Listplank kayu ukir

M'

66,550.00

66,550.00

32,692.62

135 List plafond gypsum

M'

36,000.00

36,000.00

5,000.00

136 Macam2 Sambungan PVC AW Dia 1 "

Bh

3,166.67

3,166.67

137 Macam2 Sambungan PVC AW Dia 1/2 "

Bh

2,333.33

2,333.33

138 Macam2 Sambungan PVC AW Dia 2 "

Bh

4,916.67

4,916.67

139 Macam2 Sambungan PVC AW Dia 3/4 "

Bh

2,458.33

2,458.33

140 Macam2 Sambungan PVC AW Dia 4 "

Bh

11,500.00

11,500.00

141 Marmer lokal

m2

495,000.00

495,000.00

142 Minyak cat

Ltr

20,000.00

20,000.00

143 Minyak bekisting

Ltr

12,000.00

12,000.00

144 Multiplek 4 mm

Lbr

62,000.00

62,000.00

66,666.67

Bab XIII.Harga Satuan dan Upah Hal 27

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

4 = 6+5

HARGA DASAR
SATUAN

KETERANGAN

145 Multiplek 6 mm

Lbr

129,000.00

129,000.00

146 Multiplek 9 mm

Lbr

205,000.00

205,000.00

100,000.00
16,666.67

147 Multiplek 15 mm

Lbr

219,000.00

219,000.00

250,000.00

148 Multiplek 18 mm

Lbr

223,300.00

223,300.00

300,000.00

149 Multiplex 12 mm

Lbr

155,700.00

155,700.00

200,000.00

150 Nok Genteng Kodok

Bh

20,300.00

20,300.00

151 Nok Genteng keramik

Bh

17,500.00

17,500.00

152 Nok Model U ukuran 110 x 5 x 6 cm

M'

36,700.00

36,700.00

153 Nok Model U Verza Roof 40 x 12 cm

Bh

32,700.00

32,700.00

154 Oker

Kg

22,500.00

22,500.00

155 Oli / pelumas

Ltr

37,300.00

37,300.00

156 Pagar besi motif BRC 1,2 x 2,4 m'

M'

157 Pagar besi motif BRC 1,75 x 2,4 m'

M'

158 Paku Asbes + Karet

Kg

27,125.00

27,125.00

159 Paku Beton

Bh

19,800.00

19,800.00

160 Paku bor

Kg

27,500.00

27,500.00

161 Paku Genteng metal

Kg

28,500.00

28,500.00

162 Paku Kayu / biasa

Kg

15,583.33

15,583.33

162 Paku Keling

Kg

30,250.00

30,250.00

163 Paku Seng

Kg

24,666.67

24,666.67

164 Paku Ulin

Kg

19,125.00

19,125.00

165 Paku Plywood

Kg

23,750.00

23,750.00

166 Paku Sekrup

Kg

20,000.00

20,000.00

167 Papan Kayu Bangkirai

M3

6,000,000.00

6,000,000.00

168 Papan Kayu Ulin

M3

5,400,000.00

5,400,000.00

169 Papan Kayu kelas 2

M3

1,750,000.00

1,750,000.00

170 Papan Kayu Meranti

M3

2,300,000.00

2,300,000.00

171 Papan Nama Proyek

Bh

550,000.00

550,000.00

172 Papan Reuter Bengkirai

M'

24,200.00

24,200.00

173 Pas. Lampu Baret + Instalasi

Unit

513,000.00

513,000.00

174 Pas. Lampu Gantung

Unit

607,400.00

607,400.00

Bab XIII.Harga Satuan dan Upah Hal 28

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

175 Pasir Beton Ex. Lokal samuntai


175.a Pasir Beton (sepaku)

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

4 = 6+5

HARGA DASAR
SATUAN

KETERANGAN

M3

250,000.00

250,000.00

M3

330,000.00

330,000.00

176 Pasir Pasang sungai ex. Kandilo

M3

278,750.00

278,750.00

177 Pasir pasang putih

M3

64,500.00

64,500.00

M3

225,000.00

225,000.00

178 Pasir Urug

M3

51,900.00

51,900.00

179 Paving blok biasa

bh

2,000.00

2,000.00

180 Paving block K - 127

m2

104,350.00

104,350.00

181 Penangkal Petir + Instalasi

unit

3,920,000.00

3,920,000.00

182 Pintu Panel Double ky Bangkirai

Bh

1,089,000.00

1,089,000.00

183 Pintu Double Plywood

Bh

332,750.00

332,750.00

184 Pintu Panel ky Bangkirai Uk. Besar L 80 cm

Bh

544,500.00

544,500.00

185 Pintu Panel ky Bangkirai Uk. Kecil L 70 cm

Bh

484,000.00

484,000.00

186 Pintu Panel kayu Ulin Ukuran Besar L 80 cm

Bh

513,700.00

513,700.00

187 Pintu Panel kayu Ulin Ukuran Kecil L 70 cm

Bh

484,000.00

484,000.00

188 Pintu Panel Lapis Formika (Fabrikasi)

Bh

363,000.00

363,000.00

189 Pintu Skat

Bh

385,000.00

385,000.00

190 Pipa Galvanis AW Dia 1 "

M'

52,100.00

52,100.00

191 Pipa Galvanis AW Dia 2 "

M'

103,100.00

103,100.00

192 Pipa Galvanis AW Dia 3 "

M'

182,150.00

182,150.00

193 Pipa Galvanis AW Dia 4 "

M'

259,300.00

259,300.00

194 Pipa PVC AW Dia 1 "

Btg

26,083.33

26,083.33

4 m' / btg

195 Pipa PVC AW Dia 1/2 "

Btg

19,416.67

19,416.67

4 m' / btg

196 Pipa PVC AW Dia 2 "

Btg

49,833.33

49,833.33

4 m' / btg

196 Pipa PVC AW Dia 3/4 "

Btg

20,833.33

20,833.33

4 m' / btg

197 Pipa PVC AW Dia 4 "

Btg

150,833.33

150,833.33

4 m' / btg

198 Pipa stainless steel 2 "

M'

37,400.00

37,400.00

199 Pipa stainless steel 3 "

M'

67,000.00

67,000.00

200 Pitting

Bh

9,916.67

9,916.67

201 Plamir

Kg

18,500.00

18,500.00

202 Plitur

Kg

35,583.33

35,583.33

177.a Pasir pasang putih Sepaku

Bab XIII.Harga Satuan dan Upah Hal 29

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

203 Plint / list lantai keramik

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

HARGA DASAR
SATUAN

KETERANGAN

4 = 6+5

Bh

5,000.00

5,000.00

204 Plint marmer 10 x 40 cm

Bh

21,800.00

21,800.00

205 Plywood 3 mm

Lbr

44,375.00

44,375.00

15,333.33

206 Plywood 4 mm

Lbr

55,000.00

55,000.00

61,333.33

207 Plywood 6 mm

Lbr

80,000.00

80,000.00

92,000.00

208 Plywood 9 mm

Lbr

124,583.33

124,583.33

184,000.00

209 Plywood 12 mm

Lbr

220,000.00

220,000.00

230,000.00

210 Plywood 18 mm

Lbr

250,000.00

250,000.00

276,000.00

211 Porselen 20 x 20 cm

Bh

52,000.00

52,000.00

212 Polycarbonat

M2

825,000.00

825,000.00

213 Rangka besi hollow

M'

53,500.00

53,500.00

214 Rol Cat Tembok

Bh

15,875.00

15,875.00

215 Rolling door Standart

1 Unit

216 Roster beton 20 x 20 cm

Bh

33,000.00

33,000.00

217 Roster beton 20 x 30 cm

Bh

46,000.00

46,000.00

218 Roster kayu bangkirai 20 x 20 cm

Bh

36,000.00

36,000.00

219 Rumput Hias

M2

27,500.00

27,500.00

220 Saklar Ganda

Bh

19,000.00

19,000.00

221 Saklar Tunggal

Bh

14,541.67

14,541.67

222 Sekering Kas 3 Group + Instalasi

Unit

146,800.00

146,800.00

223 Semen Abu - Abu / PC ( 50 kg/Zak )

Zak

65,000.00

65,000.00

224 Semen Warna

Kg

9,833.33

9,833.33

225 Semen putih

Kg

1,947.92

1,947.92

226 Seng gelombang Besar / kecil

Lbr

39,125.00

39,125.00

228 Seng Plat

Lbr

45,833.33

45,833.33

229 Septictank ( 3 x 1,5 )+Resapan (1,5 x 1,5 )

Unit

230 Septictank Kayu

Unit

231 Sirlak

Kg

29,700.00

29,700.00

232 Sirtu

m3

274,800.00

274,800.00

233 Solar

Ltr

6,950.00

6,950.00

234 Spritus

Ltr

14,800.00

14,800.00

Bab XIII.Harga Satuan dan Upah Hal 30

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

235 Stop Kontak

SAT

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

4 = 6+5

HARGA DASAR
SATUAN

KETERANGAN

Bh

14,916.67

14,916.67

236 Talang Air PVC Maspion

M'

16,041.67

16,041.67

237 Tambah daya Listrik

Wt

Perbatang 4 m'

238 Tanah Urug

M3

51,900.00

51,900.00

239 Tandon Air 2 x 1200 ltr + Menara + Atap

Unit

5,406,900.00

5,406,900.00

240 Tandon Air 1 x 1200 ltr + Menara + Atap

Unit

3,177,300.00

3,177,300.00

241 Tangga Naik Tinggi 1 m

Bh

231,000.00

231,000.00

242 Tanki Air Viberglass 1200 Ltr

Bh

1,235,400.00

1,235,400.00

243 Tanki Air Viberglass 2500 Ltr

Bh

2,613,000.00

2,613,000.00

244 Tanki Air Viberglass 550 Ltr

Bh

930,800.00

930,800.00

245 Teakwood 3 mm

Lbr

99,300.00

99,300.00

28,333.33

246 Teakwood 4 mm

Lbr

120,200.00

120,200.00

113,333.33

247 Teakwood 6 mm

Lbr

195,850.00

195,850.00

170,000.00

248 Ter / Residu

Kg

45,300.00

45,300.00

249 Terpentin

Ltr

4,750.00

4,750.00

250 Tiang Lampu Tunggal 11 m'

Bt

2,984,700.00

2,984,700.00

251 Tiang Lampu Tunggal 9 m'

Bt

1,960,000.00

1,960,000.00

252 Tiang Lampu Ganda 11 m'


253 Tiang Lampu ganda 9 m'

Bt
Bt

3,520,000.00
2,311,000.00

3,520,000.00
2,311,000.00

254 Tinner A

Ltr

22,916.67

22,916.67

255 Titik Mata Lampu

Ttk

169,400.00

169,400.00

256 Trap Depan Papan Tulis Bak Lapis Keramik

Bh

275,000.00

275,000.00

257 Ukiran jamang pada puncak

Bh

440,000.00

440,000.00

258 Ukiran jamang pada listplank

Bh

495,000.00

495,000.00

Bab XIII.Harga Satuan dan Upah Hal 31

Harga Standar Kab. PPU T.A 2011 Bidang Cipta Karya

NO

URAIAN

259 Urinoir

SAT
3

HARGA DASAR
TANPA PAJAK

BIAYA
ANGKUT

4 = 6+5

HARGA DASAR
SATUAN

KETERANGAN

Bh

1,865,500.00

260 Kloset duduk Ex. Toto

Bh

2,400,000.00

2,400,000.00

261 Pasir beton Exs. Palu

m3

415,000.00

415,000.00

262 Washtafel + Cermin

Bh

495,833.33

1,865,500.00

495,833.33

T. A 2010

1.
2.
3.
4

Catatan :
Harga diatas adalah harga disumber material ( disungai, dilokasi penggalian) khusus utk bahan lokal
Untuk bahan-bahan non lokal harga tersebut adalah harga toko / harga yang berlaku dipasaran
Harga sudah terrmasuk keuntungan kontraktor dan ongkos angkut
Harga belum termasuk PPn

Bab XIII.Harga Satuan dan Upah Hal 32

TABEL BERAT BESI POLOS


mm
Kg/m
6.00
0.222
8.00
0.393
10.00
0.620
12.00
0.887
14.00
1.209
16.00
1.580
20.00
2.465
22.00
3.800
20.00
2.465

TABEL BERAT BESI ULIR


Kode No.
Kg/m
D 10
0.560
D 12
0.995
D 16
1.560
D 19
2.250
D 22
3.040
D 25
3.980
D 29
5.040
D 32
6.230

HARGA DI TOKO PANJANG

Rp

45,000.00

12

Rp

75,000.00

12

Rp

115,000.00

12

BERAT TOTAL HARGA PER KG

7.44

Rp

6,048.39

10.64

Rp

7,046.22

14.51

Rp

7,926.66

DAFTAR ONGKOS ANGKUT MATERIAL


BIDANG
TAHUN

: CIPTA KARYA
: September 2008

NO

MATERIAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Balok Klas I Bangkirai


Balok Klas I Ulin
Balok Kayu Meranti
Batu Gunung
Kayu Klas 2
Kayu galam dia 10 - 12 cm
Kerikil Beton / Split ( 2-3 cm )
Koral
Papan Kayu Bangkirai
Papan Kayu Ulin
Papan Kayu kelas 2
Papan Kayu Meranti
Pasir Beton
Pasir Pasang sungai
Pasir pasang putih
Pasir Urug
Sirtu
Tanah Urug

SAT
m3
m3
m3
m3
m3
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

JARAK ANGKUT
RATA-RATA 46 - 70
ONGKOS
ANGKUT

JUMLAH
-

5,500,000.00
5,000,000.00
2,200,000.00
215,400.00
1,230,000.00
9,500.00
415,000.00
263,000.00
6,000,000.00
5,400,000.00
1,750,000.00
2,300,000.00
250,000.00
278,750.00
64,500.00
51,900.00
274,800.00
51,900.00