Você está na página 1de 3

Subsolo

1a
2a
3a

Total
SUBSOLO

40
4.61
27.06

71.67

Trreo - Construo Principal


1b
6.84
2b
24.85
3b
0.62
4b
7.10
5b
87.90
6b
17.78
7b
5.00
8b
4.61
9b
85.51
Subtotal
240.21
Trreo - Pergolado Coberto
1f
32.88
2f
17.57
Subtotal
50.45
Trreo - Const. Secundria
8b
5.60
9b
61.26
Subtotal
66.86
Total
PAV. TRREO

TOTAL CONSTRUDO COMPUTVEL


(Subsolo + Trreo + Superior)

357.52

668.13

MEMORIAL DE CLCULO - REAS (m)


Sup. - Construo Principal
1c
1.28
2c
1.28
3c
3.69
4c
41.15
5c
0.71
6c
122.36
Subtotal
170.47
Superior - Const. Secundria
7c
5.60
8c
61.27
9c
1.6
Subtotal
68.47
Total
PAV. SUPERIOR

238.94

rea Permevel
1j
2j
3j
4j
5j
6j
7j
8j
9j
10j
11j
12j
13j
14j
15j
16j
17j
18j
19j
20j
21j
22j
23j
24j
Total

166.84
38.81
36.51
25.35
26.65
28.87
50.02
70.18
8.36
93.03
11.89
14.51
13.47
10.88
17.51
3.45
1.61
1.6
3.31
12.14
14.29
1.96
5.07
4.6
660.91

Piscina (Trecho Descoberto)


1p
6.96
2p
4.46
3p
10.88
4p
2.26
5p
35.17
6p
1.21
Subtotal
60.94
C. Mqs.
7p
Total

6.41
67.35

Você também pode gostar