METRADO ACEROS_________________________________________________________________________ _MUROS DE CONTENCION

MURO DE CONCRETO ARMADO Altura


Longitu del tramo :
Tipo

Descripcion

m.

Long.

Tramo

N d Veses

Metro Lineal

Pantalla interna

0.1

3/8"
0.56

1/2"
0.994

5/8"

3/4"

1"

1.552

2.235

3.973

3.4
1/2"

3.75

0.2

15

56.25

56.3

0.25
55.91

Pantalla externa

0.1

2.9

3/8"

3.2505

0.3

10

32.5

32.505

0.25

Pantalla recorte a 1.8m

18.203

1.8

1/2"

0.2

15

30.0

30

29.82
arriba 3/8"

0.8333

0.30

interme. 3/8"

0.8333

0.25

11

abajo 3/8"

0.8333

0.25

11

arriba 3/8"

0.8333

0.15

5.5556

18

interme. 3/8"

0.8333

0.15

5.5556

18

abajo 3/8"

0.8333

0.15

5.5556

18

1/2"

2.5

0.15

20.0

50

50.0
49.7

1/2"

2.34

0.15

20.0

47

46.8
46.5

1/2"

1.84

0.15

12.3

38

37.8
37.6

3/8"

1.84

0.25

7.4

23

Pantalla
interior
transver

h/3
0.8333
3

Pantalla
exterior
transver

Acero
SUPERIOR
e INFERIOR
transver.
zapata

0.25
h/3
0.8333

Acero
SUPERIOR
e INFERIOR
zapata

1.9

9.3
5.2
11.0
6.2
11.0
6.2
17.7
9.9
17.7
9.9
17.7
9.9

0.3

0.3
0.25

0.25
1.84

Total:
Total de VARILLAS :
Total Kg.
3E+02

297.9
costo :

S/.

kg.

23.1
12.9
78.4
10

219.5
26

0.0
0

0.0
0

0.0
0

3/8"

1/2"

5/8"

3/4"

1"

1,340.5