Você está na página 1de 2

PROJECT :

PROJ. NO.:
CLIENT:
UNIT :

DATE :
BY :
REV :
DOC NO.:

02-Jan-03
S. Rahimi
A

Salt Balance (Two Stage Desalter)

Salinity Calculation
Chloride Conc. In feed
Chloride in washing water
Mixing Efficiency
Outlet Oil Salt Content
Minimum Desalter Feed water
Feed Salinity
Washing Water Salinity
Feed Salinity
Washing Water Salinity

mg/lit
mg/lit
%
PTB
%
mg/lit
mg/lit
lb/BBL
lb/BBL

136170
244
100
18
4
224393
402
78.49
0.14

Oil Flow Rate


Water Percent
Total water Flow Rate
Mixed Water Flow Rate
Salt Content
Salt Content
Salt Content

BOPD
Vol%
BWPD
BWPD
lb/day
lb/BBL
PTB

1
FEED
Stream
218336
2
4456
4456
349751
78.49
1601 89
1601.89

Calculation Summary
Oil Flow Rate
Fresh Water Consumption
1st stage Internal Recirculation
2nd stage Internal Recirculation
Package Recirculation
Package Reject
Reject salt Concentration

m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
mg/lit

1446.5
4.9
23.4
51.5
4.9
33.0
198941

Salt Balance Calculation


Parameter

www.chemwork.org

Unit

2
Stream to
Stage 1
218336
4.00
8733
8733
607756
69.59
2783 58
2783.58

8
Reject
Stage 1
218336
3.90
8515
8515
592547
69.59
2713 92
2713.92

10
1st stage
Int. Recirc.
218336
1.62
3538
3538
246180
69.59
1127 53
1127.53

12
Package
Reject
218336
2.28
4977
4977
346367
69.59
1586 39
1586.39
0.00

3
Out of
Stage 1
218336
0.1
219
219
15209
69.59
69 66
69.66

7
Fresh
Water
218336
0.34
740
740
104
0.14
0 48
0.48

4
Stream to
Stage 2
218336
4.00
8733
8733
139550
15.98
639 15
639.15

6
Reject
Stage 2
218336
3.90
8515
8515
136058
15.98
623 16
623.16

9
11
2nd stage Recycle to
Int. Recirc. 1st stage
218336
218336
3.56
0.34
7775
740
7775
740
124237
11825
15.98
15.98
569 02
569.02
54 16
54.16
0.00

5
Out of
Stage 2
218336
0.1
219
219
3492
15.98
15 99
15.99

PROJECT :
PROJ. NO.:
CLIENT:
UNIT :

DATE :
BY :
REV :
DOC NO.:

02-Jan-03
S. Rahimi
A

Salt Balance (Two Stage Desalter)

1st STAGE
DESALTER
2

2nd STAGE
DESALTER
4

6
11

10

12

Notes

www.chemwork.org

Você também pode gostar