Você está na página 1de 6

POZO: CDB-54

TBG. 4-1/2" EUE

No. Long. Acumulado No. Long. Acumulado No.


151 31.45
4726.23 201 31.12
6281.69 101
152 30.94
4757.17 202 31.18
6312.87 102
153 31.45
4788.62 203 31.20
6344.07 103
154 31.48
4820.10 204 31.18
6375.25 104
155 31.49
4851.59 205 31.10
6406.35 105
156 31.35
4882.94 206 31.55
6437.90 106
157 31.08
4914.02 207 30.73
6468.63 107
158 31.47
4945.49 208 30.33
6498.96 108
159 31.50
4976.99 209 31.33
6530.29 109
160 31.45
5008.44 210 30.42
6560.71 110
161 30.78
5039.22 211 30.67
6591.38 111
162 31.25
5070.47 212 31.60
6622.98 112
163 31.10
5101.57 213 30.77
6653.75 113
164 30.78
5132.35 214 31.45
6685.20 114
165 30.44
5162.79 215 31.05
6716.25 115
166 30.10
5192.89 216 30.48
6746.73 116
167 30.13
5223.02 217
6746.73 117
168 30.17
5253.19 218
6746.73 118
169 31.48
5284.67 219
6746.73 119
170 30.98
5315.65 220
6746.73 120
171 30.94
5346.59 221
6746.73 121
172 30.28
5376.87 222
6746.73 122
173 31.35
5408.22 223
6746.73 123
174 30.34
5438.56 224
6746.73 124
175 30.48
5469.04 225
6746.73 125
176 30.97
5500.01 226
6746.73 126
177 31.50
5531.51 227
6746.73 127
178 31.68
5563.19 228
6746.73 128
179 31.50
5594.69 229
6746.73 129
180 31.58
5626.27 230
6746.73 130
181 31.35
5657.62 231
6746.73 131
182 31.42
5689.04 232
6746.73 132
183 31.13
5720.17 233
6746.73 133
184 31.25
5751.42 234
6746.73 134
185 31.04
5782.46 235
6746.73 135
186 31.33
5813.79 236
6746.73 136
187 30.68
5844.47 237
6746.73 137
188 31.00
5875.47 238
6746.73 138
189 30.60
5906.07 239
6746.73 139
190 31.45
5937.52 240
6746.73 140
191 31.50
5969.02 241
6746.73 141
192 31.45
6000.47 242
6746.73 142
193 31.28
6031.75 243
6746.73 143
194 31.48
6063.23 244
6746.73 144
195 31.48
6094.71 245
6746.73 145
196 31.10
6125.81 246
6746.73 146
197 31.15
6156.96 247
6746.73 147
198 31.13
6188.09 248
6746.73 148
199 31.63
6219.72 249
6746.73 149
200 30.85
6250.57 250
6746.73 150

Long. Acumulado No. Long.


31.55
6778.28 151
30.92
6809.20 152
31.10
6840.30 153
31.40
6871.70 154
31.42
6903.12 155
31.35
6934.47 156
31.23
6965.70 157
31.48
6997.18 158
31.48
7028.66 159
31.45
7060.11 160
31.63
7091.74 161
30.84
7122.58 162
31.38
7153.96 163
31.10
7185.06 164
31.40
7216.46 165
30.70
7247.16 166
31.40
7278.56 167
31.40
7309.96 168
31.10
7341.06 169
31.20
7372.26 170
31.63
7403.89 171
30.58
7434.47 172
31.20
7465.67 173
30.90
7496.57 174
31.50
7528.07 175
30.65
7558.72 176
30.58
7589.30 177
30.77
7620.07 178
31.18
7651.25 179
31.05
7682.30 180
31.70
7714.00 181
31.20
7745.20 182
31.13
7776.33 183
31.21
7807.54 184
31.35
7838.89 185
30.54
7869.43 186
31.30
7900.73 187
31.60
7932.33 188
31.55
7963.88 189
31.62
7995.50 190
30.90
8026.40 191
31.53
8057.93 192
31.33
8089.26 193
31.45
8120.71 194
31.37
8152.08 195
31.58
8183.66 196
30.88
8214.54 197
31.33
8245.87 198
31.43
8277.30 199
31.45
8308.75 200

Acumulado

SUPV.: O.APARCEDO

POZO: CDB-54
TBG. 4-1/2" EUE

SUPV.: O.APARCEDO

POZO: CDB-54
TBG. 4-1/2" EUE

SUPV.: O.APARCEDO

POZO: CDB-54
TBG. 4-1/2" EUE

SUPV.: O.APARCEDO

COMPLETACION DEL POZO CDB-54

Cant.

Descripcin : POZO CDB-54

BMR
105 TUBERIA 4-1/2" EUE NUEVA
1 BOTELLA 4-1/2" X 3-1/2" EUE
1 DESCARGA BOMBA
1 BOMBA 89 ETAPAS GC-6100
1 SEPARADOR DE GAS
2 UNIDADES DE SELLOS
1 MOTOR 304 HP, 2290 AMP.
1 SENSOR CENTINEL 2-3/8"
1 BOTELLA 2-3/8" X 4-1/2" EUE
1 NIPLE DE TUBERIA LISO

112
20
5
1

TUBOS LISOS 1.9"


TUBOS LISOS 1.9"
TUBOS PERFORADOS 1.9"
TUBO PERF. TAPONADO 1.9"

4
2
37
2

GRAMPAS 4-1/2" X 1.9"


GRAMPAS 4-1/2" X 1.9"
GRAMPAS 4-1/2" X 1.9"
GRAMPAS 4-1/2" X 1.9"

Long.

Tope

0
3,294.00
1.00
0.70
23.60
3.20
12.22
25.30
4.2
1
4

0
10
3,304.00
3,305.00
3,305.70
3,329.30
3,332.50
3,344.72
3,370.02
3,374.22
3,375.22

Base
10
3,304.00
3,305.00
3,305.70
3,329.30
3,332.50
3,344.72
3,370.02
3,374.22
3,375.22
3,379.22

10
3361
10.00 3,371.00
600 3,371.00 3,971.00
150 3,971.00 4,121.00
30 4,121.00 4,151.00

ELABORADO POR :O.APARCEDO


1/11/2014 11:08 AM

COMPLETACION DEL POZO CDB-54

ELABORADO POR :O.APARCEDO


1/11/2014 11:08 AM

Você também pode gostar