JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
50 kg
Zak
96,800.00
Kg
1,936.00
Kg
8,000.00
Aspal Buton
Kg
16,100.00
Semen (PC)
Semen warna
Aspal
Kawat Bentrad
Kg
31,400.00
Kawat Bronjong
Rool
847,000.00
Rool
1,374,700.00
M2
M2
3,900.00
M2
19,600.00
Besi Beton
ukuran dibawah 12 mm
Kg
13,900.00
ukuran diatas 12 mm
Kg
15,100.00
Kg
15,400.00
2 mm =120x240 mm
Lbr
1,278,000.00
3 mm =120x240 mm
Lbr
1,543,000.00
uk .0.4 mm
Lbr
133,200.00
Uk.0.5 mm
Lbr
157,400.00
Uk. 0.6 mm
Lbr
177,400.00
3/4x1/8x6 m
Btg
49,600.00
3/4x3/8x6 m
Btg
52,600.00
1x1/8x6 m
Btg
63,500.00
1x3/8x6 m
Btg
67,200.00
10
Besi Ulir
11
Besi Plat
12
Plat Aluminium
13
14
Besi Strip
Besi Siku
26,600.00
30x30x3 cm
135,000.00
40x40x4 cm
238,300.00
50x50x5 cm
363,100.00
60x60x6 cm
242,200.00
70x70x7 cm
708,500.00
100x100x10 cm
1,160,300.00
15
Paku Campur
Kg
26,000.00
16
Paku Tripleks
Kg
32,000.00
17
Paku Seng
Kg
34,500.00
18
Paku Beton
Dos
36,300.00
19
Paku Asbes
Kg
27,200.00
19
Kapur
Sirih
Kg
30,800.00
Batu
M3
211,900.00
Api
Drum
236,700.00
20
Hard Board
Uk. 122x244 cm
Lbr
109,600.00
21
Soat board
Uk. 122x244 cm
Lbr
98,700.00
22
Playwood
Uk. 122x244 cm
Lbr
98,700.00
23
Totalwod
Uk. 122x244 cm
Lbr
108,400.00
24
Jabarwod polos
Uk. 122x244 cm
Lbr
84,100.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
25
Jabarwod warna
Uk. 122x244 cm
Lbr
93,200.00
26
Formika polos
Uk. 122x244 cm
Lbr
105,900.00
27
Formika warna
Uk. 122x244 cm
Lbr
119,900.00
28
Teakwood 3 mm
3 mm Uk. 122x244 cm
Lbr
132,100.00
3 mm Uk. 80x244 cm
Lbr
99,700.00
2 mm Uk. 122x244 cm
Lbr
63,500.00
3 mm Uk. 122x244 cm
Lbr
67,100.00
4 mm Uk. 122x244 cm
Lbr
79,200.00
5 mm Uk. 122x244 cm
Lbr
97,400.00
8 mm Uk. 122x244 cm
Lbr
145,200.00
10 mm Uk. 122x244 cm
Lbr
163,900.00
20 mm Uk. 122x244 cm
Lbr
357,000.00
Lbr
121,000.00
Lbr
121,000.00
Sk 1
Staf
32,600.00
Sk 2
Staf
30,200.00
Sk 3
Staf
26,600.00
Sk 4a
Staf
21,700.00
Sk 5
Staf
21,700.00
Sk 16
Staf
22,900.00
Sk 17
Staf
30,200.00
Sk 18a
Staf
32,600.00
Sk 18b
Staf
33,800.00
Sk 18e
Staf
18,100.00
Sk 21
Staf
38,700.00
Sk 22e
Staf
38,700.00
Sk 23e
Staf
38,700.00
Sk 24
Staf
21,700.00
Sk 25
Staf
21,700.00
Sk 40e
Staf
47,100.00
Sk 41e
Staf
43,500.00
Sk 42e
Staf
21,700.00
Sk 43e
Staf
21,700.00
Sk 44e
Staf
35,000.00
Sk 45e
Staf
30,200.00
Sk 51a
Staf
38,700.00
Sk 51b
Staf
38,700.00
Sk 57b
Staf
99,200.00
1/2"
Staf
224,400.00
3/4"
Staf
285,000.00
1"
Staf
375,100.00
11/4"
Staf
496,100.00
11/2"
Staf
514,900.00
2"
Staf
663,200.00
21/2"
Staf
884,000.00
29
30
31
32
Tripleks
List Profil
3"
Staf
1,083,100.00
4"
Staf
1,089,200.00
6"
Staf
1,192,600.00
1/2"
Staf
284,400.00
3/4"
Staf
387,200.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
33
34
35
36
Pipa Gip
Pipa PVC
Knee PVC
1"
Staf
556,700.00
11/4"
Staf
738,200.00
11/2"
Staf
859,200.00
2"
Staf
1,179,900.00
21/2"
Staf
1,633,800.00
3"
Staf
1,875,800.00
4"
Staf
2,002,900.00
6"
Staf
2,117,900.00
1/2"
Staf
284,400.00
3/4"
Staf
387,200.00
1"
Staf
556,700.00
11/4"
Staf
738,200.00
11/2"
Staf
859,200.00
2"
Staf
1,179,900.00
21/2"
Staf
1,633,800.00
3"
Staf
1,875,800.00
4"
Staf
2,002,900.00
6"
Staf
2,117,900.00
M1
575,400.00
M1
466,500.00
M1
254,700.00
1/2"
Staf
260,200.00
3/4"
Staf
296,500.00
1"
Staf
332,800.00
11/4"
Staf
514,900.00
11/2"
Staf
562,700.00
2"
Staf
816,900.00
21/2"
Staf
907,600.00
3"
Staf
1,028,700.00
4"
Staf
1,119,400.00
6"
Staf
1,132,100.00
1/2"
Staf
6,600.00
3/4"
Staf
7,800.00
1"
Staf
11,400.00
11/4"
Staf
12,100.00
11/2"
Staf
15,100.00
2"
Staf
24,200.00
21/2"
Staf
30,800.00
3"
Staf
53,800.00
4"
Staf
68,300.00
6"
Staf
136,700.00
250 mm (RRJ)
M1
672,200.00
200 mm (RRJ)
M1
406,000.00
150 mm (RRJ)
M1
272,900.00
110 mm (RRJ)
M1
163,900.00
90 mm (RRJ)
149,400.00
63 mm (RRJ)
M1
139,700.00
25 mm (RRJ)
M1
99,800.00
1/2"
Staf
3,500.00
3/4"
Staf
4,800.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
37
38
39
40
41
Sok Over
Ulir Luar
Ulir Dalam
1"
Staf
11/4"
Staf
6,600.00
7,800.00
11/2"
Staf
18,700.00
2"
Staf
19,900.00
21/2"
Staf
21,100.00
3"
Staf
24,800.00
4"
Staf
30,800.00
6"
Staf
42,300.00
1/2"
Staf
3,500.00
3/4"
Staf
4,800.00
1"
Staf
6,600.00
11/4"
Staf
7,800.00
11/2"
Staf
18,700.00
2"
Staf
19,900.00
1/2
2 "
Staf
21,100.00
3"
Staf
24,800.00
4"
Staf
30,800.00
6"
Staf
42,900.00
1/2"
Staf
3,500.00
3/4"
Staf
4,800.00
1"
Staf
6,600.00
11/4"
Staf
7,800.00
11/2"
Staf
18,700.00
2"
Staf
19,900.00
21/2"
Staf
21,100.00
3"
Staf
24,800.00
4"
Staf
30,800.00
6"
Staf
42,900.00
6" ke 4"
Bh
10,200.00
4" ke 2 "
Bh
7,800.00
2" ke 1"
Bh
6,600.00
1" ke 3/4"
Bh
5,400.00
3/4" ke 1/2
Bh
4,200.00
1/2"
Staf
3,500.00
3/4"
Staf
4,800.00
1"
Staf
6,600.00
11/4"
Staf
7,800.00
11/2"
Staf
18,700.00
2"
Staf
19,900.00
21/2"
Staf
21,100.00
3"
Staf
24,800.00
4"
Staf
30,800.00
6"
Staf
42,900.00
1/2"
Staf
3,500.00
3/4"
Staf
4,800.00
1"
Staf
6,600.00
11/4"
Staf
7,800.00
11/2"
Staf
18,700.00
2"
Staf
19,900.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
1/2
2 "
Staf
21,100.00
3"
Staf
24,800.00
4"
Staf
30,800.00
6"
Staf
42,900.00
1/2"
Staf
54,500.00
3/4"
Staf
60,500.00
1"
Staf
78,600.00
11/4"
Staf
90,700.00
11/2"
Staf
102,800.00
42
Stop Krans
2"
Staf
163,500.00
21/2"
Staf
160,300.00
3"
Staf
269,700.00
4"
Staf
412,900.00
6"
Staf
579,500.00
110x110x110 mm (RR)
Bh
406,300.00
110 mm (FF)
Bh
806,000.00
43
44
Tee
45
Dreser join cl
46
Flag spigot
150 mm
Bh
806,000.00
47
Gate valve
150 mm
Bh
10,900,800.00
110 mm
Bh
7,872,800.00
48
Chake Valve
110 mm
Bh
7,872,800.00
49
Water meter
110 mm
Bh
10,900,800.00
150 mm
Bh
58,700.00
Bh
592,200.00
Bh
781,800.00
150 mm
Bh
769,700.00
110 mm
Bh
443,900.00
90'PVC 150 mm
Bh
359,100.00
90'PVC 110 mm
Bh
884,700.00
150 mm x 110 mm
Bh
630,400.00
110 mm x 90 mm
Bh
618,300.00
50
Pengadaan lubricant
51
Bend Gip
52
Repeir Socket
53
54
55
Lem Pipa
Kg
69,600.00
56
Henep
Bh
80,500.00
57
1100 ltr
Bh
3,028,000.00
58
1000 ltr
Bh
5,450,400.00
59
Pelampung Otomatis
Bh
102,900.00
60
Fiberglass
Bh
709,100.00
61
1 bak
Bh
545,000.00
2 bak
Bh
969,500.00
2.5 lt/dt H 80 m
Unit
79,334,200.00
5 lt/dt H 80 m
Unit
116,881,700.00
62
Pompa Submarsibel
7.5 lt/dt H 80 m
Unit
152,127,900.00
10 lt/dt H 100 m
Unit
193,793,600.00
15 lt/dt H 100 m
Unit
206,511,300.00
230,129,900.00
20 lt/dt H 100 m
Unit
Unit
76,911,800.00
Unit
114,459,300.00
Unit
152,006,800.00
Unit
156,851,600.00
Unit
109,614,500.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
63
64
Pompa Centrifugal
Batako
65
66
Batu Alam
67
Paving Stone
68
Batu Apung
69
Batu Angin
70
Glas block
71
Seng Gelombang
72
73
74
Seng plastik
75
Seng fiber
Unit
115,791,600.00
Unit
156,003,800.00
Unit
167,873,700.00
Unit
76,911,800.00
CR- 5 lt/dt 80 m
Unit
87,812,700.00
Unit
99,924,800.00
Unit
115,064,900.00
Unit
133,233,100.00
Unit
191,976,700.00
Unit
53,898,800.00
Unit
84,784,700.00
Unit
121,726,600.00
Unit
133,233,100.00
Unit
75,095,000.00
Unit
89,023,900.00
Unit
133,233,100.00
Unit
139,894,700.00
Kls 1 (K175)
Bh
7,200.00
Kls II
Bh
3,900.00
Bh
3,100.00
Pipih
Bh
5,500.00
Bulat
Bh
7,500.00
Bh
245,200.00
Bh
208,900.00
Bh
7,500.00
persegi enam
Bh
5,300.00
Bh
4,800.00
Corak bungga
Bh
84,700.00
Bh
9,500.00
persegi enam
Bh
9,500.00
Bh
38,100.00
BJLS 0.20 mm
Lbr
58,700.00
BJLS 0.25 mm
Lbr
71,400.00
BJLS 0.30 mm
Lbr
84,100.00
BJLS 0.20 mm
Lbr
69,600.00
BJLS 0.25 mm
Lbr
84,100.00
BJLS 0.30 mm
Lbr
109,000.00
SWG 32'X0.25 mm
Lbr
96,200.00
SWG 30X0.30 mm
Lbr
119,300.00
SWG28X0.40 mm
Lbr
155,600.00
Gelombang besar
Lbr
44,500.00
Kwalitas baik
Lbr
147,700.00
Kwalitas sedang
Lbr
89,000.00
76
Multi roof
0.30 mm
Lbr
100,500.00
77
Sakura roof
0.20 mm
Lbr
68,400.00
78
Sun Roof
0.20 mm
Lbr
66,600.00
79
Tora-tora
0.30 mm
Lbr
74,400.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
80
Nok bubungan
15,100.00
81
Lbr
60,500.00
82
Lbr
5,500.00
83
Lbr
145,300.00
M2
76,473.68
200 x 96 Cm
84
7 Cm
Bh
700.00
85
7 Cm
Bh
900.00
86
7 Cm
Bh
900.00
87
90 x 5 Cm
Lbr
78,700.00
88
Lbr
66,600.00
89
Lbr
79,300.00
M2
242,200.00
10 X 20
M2
120,000.00
Abu-abu 20x20 cm
M2
68,800.00
Warna 20x20 cm
M2
68,800.00
10 x 20 cm
Dos
68,800.00
10 x 10 cm
Dos
58,700.00
20 x 20 cm
Dos
69,600.00
20 x 25 cm
Dos
70,800.00
30 x 30 cm
Dos
73,200.00
40 x 40 cm
Dos
85,300.00
Dos
82,900.00
89
Batu Candi
90
Tegel PC
2,400.00
91
92
Tegel Porselin
Tegel Keramik
Buah
4,145.00
Dos
58,700.00
Buah
5,336.36
Dos
85,500.00
Buah
1,710.00
Dos
80,000.00
Buah
1,600.00
Dos
85,500.00
Buah
3,420.00
Dos
68,000.00
Buah
11,333.33
Dos
75,700.00
Buah
3,028.00
Dos
59,300.00
Buah
2,965.00
Dos
90,200.00
Buah
4,510.00
Dos
60,500.00
Buah
5,500.00
Dos
89,000.00
Buah
8,090.91
Dos
72,900.00
Buah
12,150.00
Dos
89,600.00
Buah
14,933.33
Dos
98,700.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
Buah
16,450.00
Dos
104,700.00
Buah
17,450.00
Dos
101,100.00
Buah
16,850.00
Dos
116,800.00
Buah
19,466.67
Dos
79,300.00
Buah
13,216.67
Dos
83,500.00
Buah
4,175.00
Kg
60,500.00
93
Cat Besi
94
Cat Kayu
Kg
60,500.00
95
Cat Tembok
Matex
1 Kg
21,100.00
Aviatek
1 Kg
26,600.00
Aries
11,500.00
Metrolite
22,400.00
Duluk
118,000.00
Catilac
25,400.00
96
97
Altex
1 Kg
32,000.00
98
Altex
1 Kg
35,700.00
99
Cat Atap
Altek / Yoko
1 Kg
25,100.00
Belmas
1 Kg
22,400.00
Thinner
1 Ltr
39,300.00
1/2 Ltr
23,600.00
1 Ltr
26,000.00
1/2 Ltr
15,100.00
100
Minyak Cat
no diop
Afduner
101
102
Kuas Cat
73,800.00
1 cm - 4 cm
Bh
9,900.00
5 cm - 10 cm
Bh
20,900.00
Kuas Rool
Bh
32,000.00
No. 0 - 3
Bh
9,900.00
No. 5 - 100
Bh
7,800.00
103
Dempul Kayu
Altex
Kg
27,200.00
104
Plamir Tembok
Boyo
Kg
13,500.00
105
Politur
Kg
53,800.00
106
Kg
68,400.00
107
Teao Oil
Ltr
46,600.00
108
Wood Stain
Infra
Ltr
83,500.00
109
Melamik
Infra
Ltr
56,800.00
110
Infra
Ltr
57,500.00
111
Sanding Sealer
Infra
Ltr
75,700.00
112
Lem seng
Roll
54,000.00
113
Spritus
Botol
7,900.00
114
Minyak tanah
Ltr
8,100.00
115
Pelumas / Oli
Ltr
31,000.00
116
Minyak Bekesting
Ltr
29,000.00
117
Bensin
Ltr
7,200.00
118
Solar
Ltr
7,200.00
119
Gemuk
Kg
37,500.00
120
Batu bara
Kg
2,800.00
121
Alcobound
Lbr
1,453,400.00
Uk. 122x244 cm
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
122
122
Aluminium silver
123
Pintu kaca
123
Tacon sheet
124
124
Karpet
125
Kaca rayband
126
Kaca bening
127
128
129
130
131
Kaca buram
Kaca cermin
5 mm
M2
4"
Staf
478,400.00
244,500.00
12 mm
Set
9,804,700.00
M2
127,700.00
Bungkus
61,100.00
M2
61,100.00
3 mm Uk. 122x152 cm
Lbr
116,800.00
5 mm Uk. 122x152 cm
Lbr
319,100.00
2 mm Uk. 127x76 cm
Lbr
72,600.00
3 mm Uk. 122x152 cm
Lbr
193,700.00
5 mm Uk. 122x152 cm
Lbr
282,800.00
3 mm Uk. 120x150 cm
Lbr
225,800.00
5 mm Uk. 120x150 cm
Lbr
371,700.00
2 mm Uk. 122x50 cm
Lbr
87,200.00
5 mm Uk. 152x120 cm
Lbr
414,200.00
M'
205,900.00
Bh
3,088,500.00
Bh
3,088,500.00
Bh
347,000.00
Bh
339,700.00
Bh
515,300.00
Bh
393,600.00
Bh
1,550,000.00
132
Urinoir
Bh
1,200,000.00
132
Mangkok
Bh
11,500.00
133
Mangkok
Bh
33,300.00
134
Bh
11,500.00
Bh
35,100.00
Bh
42,900.00
Bh
91,400.00
Bh
21,800.00
Polos uk 1/2"
Bh
7,200.00
Polos uk 5/8"
Bh
7,200.00
Polos uk 3/4"
Bh
10,900.00
Polos uk 1"
Bh
19,900.00
Polos uk 2"
Bh
42,900.00
Serat uk 1/2"
Bh
13,500.00
Serat uk 5/8"
Bh
15,100.00
Serat uk 3/4"
Bh
22,400.00
Serat uk 1"
Bh
27,200.00
Serat uk 2"
Bh
75,000.00
Ulir uk 1."
Bh
26,000.00
Ulir uk 2"
Bh
52,300.00
Kwalitas baik
Bh
419,600.00
Kwalitas sedang
Bh
176,200.00
Kwalitas biasa
Bh
97,100.00
Bh
2,846,300.00
Bh
4,839,300.00
Fiberglass
Bh
726,700.00
1 bak
Bh
551,100.00
2 bak
Bh
997,900.00
Ikat
115,600.00
135
Floor drain
136
Selang air
137
Hard shower
138
Profil Tank
139
140
141
IJUK
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
142
143
144
144
Kait angin
145
146
147
146
147
148
149
Kwalitas baik
Bh
175,000.00
Kwalitas sedang
Bh
211,900.00
Kwalitas baik
Bh
250,000.00
Kwalitas sedang
Bh
235,000.00
Kwalitas baik
Bh
275,000.00
Kuningan
Bh
36,500.00
Biasa
Bh
12,100.00
Kuningan
Bh
22,400.00
Biasa
Bh
14,500.00
Kuningan
Bh
23,600.00
Biasa
Bh
16,300.00
Stainles steel
Bh
75,000.00
Kuningan
Bh
55,000.00
Stainles steel
Bh
47,800.00
Kuningan
Bh
35,700.00
Biasa
Bh
8,100.00
Stainles steel
Bh
96,800.00
Kuningan
Bh
63,500.00
Biasa
Bh
22,400.00
Stainles steel
Bh
48,400.00
Kuningan
Bh
18,100.00
Biasa
Bh
16,300.00
Kecil
Bh
18,100.00
Sedang
Bh
29,600.00
Besar
Bh
95,000.00
150
Door Holder
35 cm
1 Psg
225,000.00
30 cm
1 Psg
139,800.00
150
Besi Hollow
4 x 4 Cm
Staf
125,000.00
Box Sekring
1 Lobang
M1
20,833.33
Bh
139,800.00
2 Lobang
151
212,500.00
Set
605,600.00
Tinggi 100 cm
Pohon
817,500.00
Tinggi 50 cm
Pohon
684,300.00
Tanaman Hias
Palem botol
152
153
Palem boditia
Tinggi 100 cm
Pohon
817,500.00
154
Cemara kipas
Tinggi 100 cm
Pohon
314,900.00
155
Tinggi 100 cm
Pohon
320,900.00
156
Cemara putri
Tinggi 100 cm
Pohon
333,000.00
157
Beringin putih
Tinggi 50 cm
Pohon
314,900.00
158
Beringin biasa
Tinggi 50 cm
Pohon
127,100.00
159
Cemara wangi
Tinggi 100 cm
Pohon
238,000.00
160
Glodok tiang
Tinggi 100 cm
Pohon
345,100.00
161
Rumput jepang
Pohon
90,800.00
162
Pohon
58,700.00
163
Bh
24,200.00
164
Bh
30,800.00
165
166
Bh
22,400.00
167
Bh
24,200.00
168
169
Bh
36,300.00
170
Bh
32,000.00
42,900.00
30,200.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
100 mtr
171
3,200.00
172
4,200.00
173
Kabel NYAF 1 X 3 mm
5,400.00
174
Kabel NYAF 1 X 4 mm
6,100.00
175
Kabel NYAF 1 X 6 mm
10,900.00
176
Kabel NYAF 1 X 10 mm
20,500.00
177
Kabel NYAF 1 X 16 mm
30,200.00
178
2,400.00
179
3,600.00
180
Kabel NYA 1 X 3 mm
4,200.00
181
Kabel NYA 1 X 4 mm
6,000.00
182
Kabel NYA 1 X 6 mm
9,000.00
183
Kabel NYA 1 X 10 mm
23,600.00
184
Kabel NYA 1 X 16 mm
30,200.00
185
Kabel SR 1 X 4 mm
9,600.00
186
Kabel SR 1 X 6 mm
14,500.00
187
Kabel SR 1 X 10 mm
18,100.00
188
Kabel SR 1 X 16 mm
30,200.00
189
9,600.00
190
14,500.00
191
Kabel NYM 2 X 3 mm
15,700.00
192
Kabel NYM 2 X 4 mm
17,500.00
193
Kabel NYM 2 X 6 mm
21,800.00
194
15,100.00
195
17,500.00
196
Kabel NYY 2 X 4 mm
22,400.00
197
Kabel NYY 2 X 6 mm
30,200.00
198
Kabel NYY 2 X 10 mm
39,900.00
199
Kabel NYY 2 X 16 mm
50,800.00
200
Kabel NYY 2 X 25 mm
72,600.00
201
Kabel NYY 2 X 35 mm
90,800.00
202
Kabel NYY 2 X 50 mm
117,400.00
203
Kabel NYY 2 X 70 mm
159,800.00
204
Kabel NYY 2 X 95 mm
218,000.00
205
272,500.00
206
16,900.00
207
20,500.00
208
Kabel NYY 3 X 4 mm
29,600.00
209
Kabel NYY 3 X 6 mm
36,300.00
210
Kabel NYY 3 X 10 mm
48,400.00
211
Kabel NYY 3 X 16 mm
60,500.00
212
Kabel NYY 3 X 25 mm
92,000.00
213
Kabel NYY 3 X 35 mm
121,100.00
214
Kabel NYY 3 X 50 mm
151,400.00
215
Kabel NYY 3 X 70 mm
211,900.00
216
Kabel NYY 3 X 95 mm
284,600.00
217
351,200.00
218
19,300.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
219
24,200.00
220
Kabel NYY 4 X 4 mm
35,100.00
221
Kabel NYY 4 X 6 mm
43,600.00
222
Kabel NYY 4 X 10 mm
59,300.00
223
Kabel NYY 4 X 16 mm
78,700.00
224
Kabel NYY 4 X 25 mm
115,000.00
225
Kabel NYY 4 X 35 mm
151,400.00
226
Kabel NYY 4 X 50 mm
199,800.00
227
Kabel NYY 4 X 70 mm
272,500.00
228
Kabel NYY 4 X 95 mm
369,400.00
229
460,200.00
230
Kabel NYFGBY
4X25 mm
71,000.00
231
Kabel NYFGBY
4X35 mm
79,400.00
232
Kabel NYFGBY
4X50 mm
98,500.00
233
Kabel NYFGBY
4X70 mm
125,000.00
234
Kabel NYFGBY
4X95 mm
140,900.00
235
Kabel NYFGBY
4X120 mm
168,500.00
236
Kabel NYFGBY
4X150 mm
254,300.00
237
Kabel NYFGBY
4X185 mm
296,700.00
238
Kabel NYFGBY
4X240 mm
593,400.00
239
Kabel NYFGBY
4X300 mm
890,200.00
240
12,100.00
241
16,300.00
242
Kabel N2XSFGbY 2 X 3 mm
17,500.00
243
Kabel N2XSFGbY 2 X 4 mm
19,300.00
244
Kabel N2XSFGbY 2 X 6 mm
21,800.00
245
Kabel N2XSFGbY 2 X 10 mm
23,000.00
246
Kabel N2XSFGbY 2 X 16 mm
24,200.00
247
Kabel NA2XSY
1x35 mm
55,100.00
248
Kabel NA2XSY
1x50 mm
60,400.00
249
Kabel NA2XSY
1x70 mm
68,800.00
250
Kabel NA2XSY
1x95 mm
78,400.00
251
Kabel NA2XSY
1x120 mm
95,300.00
252
Kabel NA2XSY
1x150 mm
102,800.00
253
Kabel NA2XSY
1x240 mm
127,100.00
254
Kabel NA2XSY
1x300 mm
145,100.00
255
Kabel N2XSY
1x35 mm
71,600.00
256
Kabel N2XSY
1x50 mm
80,200.00
257
Kabel N2XSY
1x70 mm
99,400.00
258
Kabel N2XSY
1x95 mm
126,100.00
259
Kabel N2XSY
1x120 mm
142,200.00
260
Kabel N2XSY
1x150 mm
170,000.00
261
Kabel N2XSY
1x240 mm
256,600.00
262
Kabel N2XSY
1x300 mm
299,400.00
263
Kabel NA2XSEBY
3x50 mm
212,700.00
264
Kabel NA2XSEBY
3x70 mm
244,800.00
265
Kabel NA2XSEBY
3x95 mm
279,000.00
266
Kabel NA2XSEBY
3x120 mm
311,100.00
267
Kabel NA2XSEBY
3x150 mm
343,200.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
268
Kabel NA2XSEBY
3x240 mm
482,200.00
269
Kabel NA2XSEBY
3x300 mm
556,000.00
270
Kabel N2XSEFGBY
3x120 mm
386,000.00
271
Kabel N2XSEFGBY
3x150 mm
460,800.00
272
Kabel N2XSEFGBY
3x240 mm
684,300.00
273
Kabel N2XSEFGBY
3x300 mm
876,800.00
274
Kabel LVTC
3x25 mm + 1x20 mm
275
Kabel LVTC
3x35 mm + 1x25 mm
79,400.00
276
Kabel LVTC
3x65 mm + 1x50 mm
104,400.00
277
Kabel LVTC
3x70 mm + 1x65 mm
117,900.00
278
Kabel LVTC
3x75 mm + 1x65 mm
128,300.00
279
Kawat AAAC
35 mm
280
Kawat AAAC
50 mm
7,400.00
281
Kawat AAAC
70 mm
10,600.00
282
Kawat AAAC
95 mm
13,900.00
283
Kawat AAAC
120 mm
18,100.00
284
Kawat AAAC
150 mm
20,300.00
285
Kawat AAAC
240 mm
32,000.00
25 mm
9,600.00
35 mm
11,700.00
288
45 mm
13,900.00
289
60 mm
16,000.00
290
70 mm
18,100.00
291
75 mm
20,300.00
292
150 mm
26,700.00
293
240 mm
43,800.00
294
Kabel Twisted Al
3x25+25 mm
18,100.00
295
Kabel Twisted Al
3x35+25 mm
26,700.00
296
Kabel Twisted Al
3x25+50 mm
28,800.00
297
Kabel Twisted Al
3x50+35 mm
34,200.00
298
Kabel Twisted Al
3x70+50 mm
48,100.00
299
Kabel Twisted Al
2x25+25 mm
13,900.00
300
Kabel Twisted Al
2x35+25 mm
18,100.00
301
Kabel Twisted Al
2x50+25 mm
24,500.00
302
Kabel Twisted Al
2x70+50 mm
33,100.00
303
Kabel Twisted Al
2x10 mm
5,300.00
304
Kabel Twisted Al
2x16 mm
7,400.00
305
Kabel Twisted Al
2x25 mm
11,600.00
306
Kabel Twisted Al
4x10 mm
9,500.00
307
Kabel Twisted Al
4x16 mm
12,700.00
308
Kabel Twisted Al
4x25 mm
18,000.00
309
Kabel Twisted Al
4x35 mm
26,400.00
310
Bolt U
2"
21,800.00
311
Bolt U
3"
23,000.00
312
Bolt U
6"
25,400.00
313
Bolt U
8"
27,200.00
314
Bolt U
10"
29,000.00
286
54,900.00
5,300.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
315
Bolt U
12"
30,800.00
316
Beugeles
2"
BH
30,200.00
317
Beugeles
4"
BH
42,300.00
318
Beugeles
6"
BH
54,500.00
319
Beugeles
8"
BH
60,500.00
320
Beugeles
10"
BH
66,600.00
321
Beugeles
12"
BH
72,600.00
321
=3/4"
BH
5,400.00
322
=2"
BH
6,100.00
323
=3"
BH
7,300.00
324
=6"
BH
8,500.00
325
=8"
BH
9,700.00
326
=10"
BH
10,900.00
327
=12"
BH
11,600.00
328
Klem Beugeles U
2"
BH
10,900.00
329
Klem Beugeles U
3"
BH
19,500.00
330
Klem Beugeles U
6"
BH
36,600.00
331
Klem Beugeles U
8"
BH
42,300.00
332
Klem Beugeles U
10"
BH
48,400.00
333
Klem Beugeles U
12"
BH
54,500.00
334
Klem Beugeles
2"
BH
14,500.00
335
Klem Beugeles
4"
BH
29,000.00
336
Klem Beugeles
6"
BH
43,600.00
337
Klem Beugeles
8"
BH
48,400.00
338
Klem Beugeles
10"
BH
60,500.00
339
Klem Beugeles
12"
BH
66,600.00
340
20/35
Set
102,900.00
341
20/36
Set
109,000.00
342
20/37
Set
121,100.00
343
20/38
Set
133,200.00
344
20/39
Set
145,300.00
345
20/40
Set
157,400.00
346
Mur Baut
u/ 5/6x4"
BH
5,400.00
347
Mur Baut
u/ 5/6x6"
BH
6,600.00
348
349
Mur Baut
Mur Baut
u/ 5/6x8"
u/ 1/2x11/2"
BH
BH
7,800.00
9,000.00
350
Mur Baut
12 mm
BH
9,600.00
351
Mur Baut
20 mm
BH
10,900.00
352
Mur Baut
25 mm
BH
12,100.00
353
Mur Baut
35 mm
BH
13,300.00
354
Mur Baut
50 mm
BH
14,500.00
355
Mur Baut
70 mm
BH
15,700.00
356
u/ 5/8x12"
BH
29,000.00
357
u/ 5/8x10"
BH
28,100.00
358
u/ 5/8x8"
BH
26,800.00
359
u/ 5/8x6"
BH
25,600.00
360
u/ 5/8x3"
BH
21,900.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
361
BH
302,800.00
362
80.45.4.1800 mm
BH
199,800.00
363
80.45.45.2000 mm
BH
187,700.00
364
5"
Set
78,700.00
365
Pole Band
Set
60,500.00
366
Rod 2m, 19 mm
Set
90,800.00
367
2x9 mm
BH
7,800.00
368
Guy Timble
9 mm
BH
6,600.00
369
Turn Bukcle
1/2x6 mm
BH
19,900.00
370
Stapping Buckle
BH
19,300.00
371
W. Ball Isolator
BH
29,000.00
372
Isolator TM
BH
102,900.00
373
Isolator Tarik
20 KVA
374
70 mm
BH
9,000.00
375
Ground Rod
BH
302,800.00
376
24,200.00
377
BH
102,600.00
378
BH
54,900.00
379
Suspension Assembly
BH
54,900.00
380
Large Assembly
BH
68,400.00
381
Bundle Protection
BH
67,800.00
382
20 KVA
BH
274,900.00
383
16 mm
BH
17,100.00
384
25 mm
BH
18,300.00
385
35 mm
BH
19,300.00
386
50 mm
BH
21,800.00
387
70 mm
BH
24,200.00
384
100.50.4.2500
302,800.00
385
100.50.4.750
266,400.00
386
100.50.4.800
242,200.00
387
100.50.4.750
181,600.00
388
100.50.4.1000
181,600.00
389
80.50.4.750
102,900.00
390
100.50.4.700
423,900.00
391
50.50.4.700
302,800.00
392
181,600.00
393
Besi UNP
6/25 cm
Cm
145,300.00
394
Besi UNP
8/25 cm
Cm
151,400.00
395
Besi UNP
6/35 cm
Cm
157,400.00
396
Besi UNP
8/35 cm
Cm
163,500.00
397
Mour+Baut
5/6x2"
Pcs
4,200.00
398
Mour+Baut
5/6x4"
Pcs
5,400.00
399
Mour+Baut
5/6x6"
Pcs
6,000.00
400
Mour+Baut
5/8x2"
Pcs
6,600.00
401
Mour+Baut
5/8x2"
Pcs
4,200.00
402
Mour+Baut
5/8x4"
Pcs
5,400.00
403
Mour+Baut
5/8x6"
Pcs
6,000.00
404
Mour+Baut
5/8x8"
Pcs
6,600.00
80,500.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
405
Kawat BC 95 mm
102,900.00
406
Kawat BC 50 mm
90,800.00
407
Kawat BC 40 mm
78,700.00
408
Kawat BC 35 mm
66,600.00
409
Kawat BC 30 mm
54,500.00
410
Kawat BC 25 mm
42,300.00
411
Kawat BC 20 mm
30,200.00
412
Kawat BC 16 mm
18,100.00
413
Kawat BC 6 mm
14,500.00
414
Kawat BC 4 mm
12,700.00
415
MCB 2 A
Bh
42,300.00
416
MCB 4 A
Bh
42,300.00
417
MCB 6 A
Bh
54,400.00
418
MCB 10 A
Bh
54,400.00
419
MCB 12 A
Bh
60,500.00
420
MCB 16 A
Bh
66,600.00
421
MCB 20 A
Bh
72,600.00
422
MCCB 25 A
Bh
393,600.00
423
MCCB 50 A
Bh
423,800.00
424
MCCB 65 A
Bh
460,200.00
425
MCCB 75 A
Bh
544,900.00
426
MCCB 100 A
Bh
605,500.00
427
MCCB 150 A
Bh
1,059,700.00
428
MCCB 200 A
Bh
1,211,000.00
429
MCCB 250 A
Bh
1,453,300.00
430
NFB 25 A
Bh
393,600.00
431
NFB 50 A
Bh
423,800.00
432
NFB 65 A
Bh
460,200.00
433
NFB 75 A
Bh
545,000.00
434
NFB 100 A
Bh
605,600.00
435
NFB 150 A
Bh
1,059,800.00
436
NFB 200 A
Bh
1,211,200.00
437
NFB 250 A
Bh
1,453,400.00
438
Fuse Link 25 A
Bh
139,200.00
439
Fuse Link 50 A
Bh
145,300.00
440
Fuse Link 65 A
Bh
169,500.00
441
Fuse Link 75 A
Bh
181,500.00
442
Fuse Link 80 A
Bh
199,700.00
443
Fuse Link 90 A
Bh
213,000.00
444
Fuse Link 95 A
Bh
220,300.00
445
Bh
121,000.00
446
Bh
133,100.00
447
Bh
145,200.00
448
Bh
163,400.00
449
Bh
181,500.00
450
Bh
199,700.00
451
Bh
296,500.00
452
Bh
397,100.00
453
Bh
427,700.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
454
Bh
519,300.00
455
Bh
549,900.00
456
Bh
684,300.00
457
Bh
702,700.00
458
Highbom 50 A
Bh
794,300.00
459
Highbom 65 A
Bh
947,100.00
460
Highbom 75 A
Bh
959,300.00
461
Highbom 80 A
Bh
971,500.00
462
Highbom 90 A
Bh
971,500.00
463
Highbom 95 A
Bh
1,038,700.00
464
Highbom 100 A
Bh
1,160,900.00
465
Highbom 120 A
Bh
1,222,100.00
466
Highbom 125 A
Bh
1,283,200.00
467
Highbom 135 A
Bh
1,344,300.00
468
Highbom 140 A
Bh
1,405,400.00
469
Highbom 150 A
Bh
1,466,500.00
470
Highbom 200 A
Bh
1,527,600.00
471
Highbom 250 A
Bh
1,588,700.00
472
Highbom 300 A
Bh
1,649,800.00
473
Highbom 350 A
Bh
1,695,600.00
474
Highbom 400 A
Bh
1,756,200.00
475
Highbom 450 A
Bh
1,816,800.00
476
Highbom 500 A
Bh
2,846,300.00
477
Highbom 1000 A
Bh
5,450,400.00
478
Stop Kontak AC
Bh
91,600.00
479
Bh
54,900.00
480
Bh
24,400.00
481
Bh
24,400.00
482
Bh
30,500.00
483
Bh
6,100.00
484
Bh
6,000.00
485
Bh
33,200.00
486
Bh
51,400.00
487
Bh
6,000.00
488
Bh
27,200.00
489
Box Saklar
Bh
3,000.00
490
T Dos 3 Lobang
Bh
4,200.00
491
T Dos 4 Lobang
Bh
6,100.00
492
Veteng
Bh
54,900.00
493
Veteng Dowlight
Bh
42,700.00
494
Pipa Listrik
Staf
8,500.00
495
Bh
1,800.00
496
Staf
8,500.00
497
Klem 12
Dos
18,300.00
498
Klem 19
Dos
36,600.00
499
Isolasi Ban
Bh
9,700.00
Volmeter
dan pemasangan
pemasangan Peralatan
Instalasi
501 Pengadaan
Ampere meter dan
Bh
116,000.00
Bh
116,000.00
502
Cos
Bh
238,300.00
503
Curent Transformer
Bh
360,500.00
504
Frekwensi Meter
Bh
360,500.00
505
Selector Volt
Bh
116,000.00
500
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
506
Busbar cu
42,700.00
507
Sepatu Busbar
Bh
4,200.00
508
Isolator Busbar
Bh
6,100.00
509
Conektor Kabel SR
Bh
19,500.00
510
Tap Conextor
Bh
31,700.00
511
Panel 180X120X40
Bh
4,032,900.00
512
Panel 80X100X40
Bh
1,588,700.00
513
Panel 60x40x30
Bh
611,000.00
514
Panel 50x40x20
Bh
549,900.00
515
Panel 40x40x20
Bh
391,000.00
516
Join Sleeve al
75 mm
Bh
67,200.00
517
Join Sleeve al
70 mm
Bh
61,100.00
518
Join Sleeve al
35 mm
Bh
54,900.00
519
Join Sleeve al
25 mm
Bh
42,700.00
520
25 mm
Bh
42,700.00
521
35 mm
Bh
54,900.00
522
70 mm
Bh
61,100.00
523
75 mm
Bh
67,200.00
524
Paralel Grove Al
36-70 mm
Bh
61,400.00
525
Paralel Grove Al
25/50 mm
Bh
55,300.00
526
14/35-35 70 mm
Bh
24,500.00
527
16/35 - 35 70 mm
Bh
30,700.00
528
20/35 - 35 70 mm
Bh
43,000.00
529
Schoen Primodure
50-90 mm
Bh
14,500.00
530
50-90 mm
Bh
12,100.00
531
Schoen Press Cu
75 mm
Bh
11,400.00
532
Schoen Press Cu
70 mm
Bh
10,800.00
533
Schoen Press Cu
50 mm
Bh
9,600.00
534
Schoen Press Cu
35 mm
Bh
7,200.00
535
Schoen Press Cu
25 mm
Bh
6,000.00
536
75 mm
Bh
11,400.00
537
70 mm
Bh
10,800.00
538
50 mm
Bh
9,600.00
539
35 mm
Bh
7,200.00
540
25 mm
Bh
6,000.00
541
Schun 185 mm
Bh
22,000.00
542
Schun 100 mm
Bh
18,300.00
543
Schun 85 mm
Bh
14,600.00
544
Schun 80 mm
Bh
11,000.00
545
Schun 75 mm
Bh
8,500.00
546
Schun 50 mm
Bh
8,500.00
547
Schun 35 mm
Bh
6,100.00
548
Schun 25 mm
Bh
4,800.00
549
Schun 12 mm
Bh
4,200.00
550
Schun 10 mm
Bh
3,600.00
551
Schun 8 mm
Bh
3,100.00
16/36 "
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
552
Schun 6 mm
Bh
3,000.00
553
Schun 4 mm
Bh
1,800.00
554
Schun 2 mm
Bh
1,200.00
555
Generator
5 KVA
6,361,200.00
556
Generator
10 KVA
43,642,200.00
557
Generator
20 KVA
96,291,100.00
558
Generator
30 KVA
139,894,700.00
559
Generator
60 KVA
164,118,900.00
560
Generator
80 KVA
214,384,100.00
561
Generator
100 KVA
254,959,700.00
562
Generator
150 KVA
273,127,800.00
563
Generator
170 KVA
313,703,300.00
564
Generator
250 KVA
376,444,000.00
565
Generator
350 KVA
451,732,800.00
566
Generator
450 KVA
542,079,400.00
567
Rel Mcb
30,200.00
568
Wire Ducting
9,600.00
569
Pcs
7,800.00
570
Visher 10
Bh
1,200.00
571
Visher 12
Bh
1,200.00
572
Pilot Lamp
Bh
18,100.00
573
Lampu Pijar 5 W
Bh
6,000.00
574
Lampu Pijar 7 W
Bh
7,800.00
575
Lampu Pijar 9 W
Bh
8,400.00
576
Lampu Pijar 11 W
Bh
10,900.00
577
Lampu Pijar 14 W
Bh
14,500.00
578
Lampu Pijar 18 W
Bh
19,300.00
579
Lampu Pijar 24 W
Bh
21,800.00
580
Lampu Pijar 32 W
Bh
22,400.00
581
Lampu Pijar 40 W
Bh
24,200.00
582
Lampu Pijar 60 W
Bh
26,600.00
583
Bh
42,300.00
584
Lampu TL + Armaturnya 5 W
Bh
151,400.00
585
Lampu TL + Armaturnya 10 W
Bh
157,300.00
586
Lampu TL + Armaturnya 18 W
Bh
166,300.00
587
Lampu TL + Armaturnya 20 W
Bh
175,400.00
588
Lampu TL + Armaturnya 32 W
Bh
187,500.00
589
Lampu TL + Armaturnya 40 W
Bh
199,600.00
590
Bh
151,200.00
591
Bh
157,300.00
592
Bh
166,300.00
593
Bh
175,400.00
594
Bh
187,500.00
595
Bh
199,600.00
596
Bh
151,200.00
597
Bh
157,300.00
598
Bh
166,300.00
599
Bh
175,400.00
600
Bh
187,500.00
601
Bh
199,600.00
602
Bh
254,100.00
603
Bh
151,200.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
604
Bh
157,300.00
605
Bh
166,300.00
606
Bh
178,200.00
607
Bh
190,500.00
608
Bh
202,800.00
609
Bh
270,400.00
610
Set
215,100.00
611
Set
239,700.00
612
Tiang Besi
7 m, 100 dAN
Bh
720,000.00
613
Tiang Besi
9 m, 90 dAN
Bh
1,027,000.00
614
Tiang Besi
9 m, 100 dAN
Bh
1,588,200.00
615
Tiang Besi
9 m, 156 dAN
Bh
1,376,500.00
616
Tiang Besi
9 m, 200 dAN
Bh
1,905,900.00
617
Tiang Besi
9 m, 350 dAN
Bh
2,011,800.00
618
Tiang Besi
11 m, 156 dAN
Bh
1,525,800.00
619
Tiang Besi
11 m, 200 dAN
Bh
2,858,900.00
620
Tiang Besi
11 m, 350 dAN
Bh
3,705,900.00
621
Tiang Besi
12 m, 200 dAN
Bh
2,011,800.00
622
Tiang Besi
12 m, 350 dAN
Bh
4,447,100.00
623
Tiang Besi
13 m, 350 dAN
Bh
4,976,600.00
624
Tiang Beton
7 m, 100 dAN
Bh
741,100.00
625
Tiang Beton
9 m,100 dAN
Bh
952,900.00
626
Tiang Beton
9 m, 200 dAN
Bh
1,101,200.00
627
Tiang Beton
11 m, 200 dAN
Bh
1,588,200.00
628
Tiang Beton
11 m, 350 dAN
Bh
2,011,800.00
629
Tiang Beton
13 m, 350 dAN
Bh
2,647,100.00
630
Tiang Beton
14 m, 350 dAN
Bh
3,070,600.00
630
Bh
984,700.00
631
Ligthing Arrester
24 kv, 10 ka
Bh
952,900.00
632
Ligthing Arrester
25 kv, 5 ka
Bh
984,700.00
633
20 kv 600 a
Bh
23,315,700.00
634
24 kv 630 a
Bh
29,674,600.00
635
Bh
180,100.00
636
Bh
209,800.00
637
Suspention Insulator 20 KV
Bh
209,800.00
638
Trafo Distribusi
Bh
18,016,700.00
639
Trafo Distribusi
Bh
20,136,300.00
640
Trafo Distribusi
Bh
28,614,800.00
641
Trafo Distribusi
Bh
28,614,800.00
642
Trafo Distribusi
Bh
20,772,200.00
643
Trafo Distribusi
Bh
27,449,000.00
644
Trafo Distribusi
Bh
34,973,600.00
645
Trafo Distribusi
Bh
46,631,500.00
646
Trafo Distribusi
Bh
59,349,200.00
647
Trafo Distribusi
Bh
61,468,900.00
648
Trafo Distribusi
Bh
67,827,700.00
649
Trafo Distribusi
Bh
76,306,200.00
650
LBS Kubikel
Bh
51,930,600.00
NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp.)
KET.
651
Bh
75,246,400.00
652
Bh
81,605,200.00
653
Bh
73,126,800.00
654
Bh
56,169,800.00
655
CB Main Protection
Bh
307,344,500.00
656
Bh
299,293,800.00
657
VT CB Out Kubikel
Bh
352,548,900.00
658
Bh
37,278,500.00
659
Double Incoming
Bh
233,390,800.00
660
Bh
182,132,500.00
661
Bh
1,217,200.00
662
Bh
1,825,800.00
663
Bh
1,947,600.00
663
AC casette 3 PK
Bh
8,094,700.00
664
AC casette 2 PK
Bh
6,086,300.00
665
AC spit 1.5 PK
Bh
5,416,800.00
666
AC spit 1 PK
Bh
4,077,800.00
667
AC spit 0.75PK
Bh
2,744,900.00
668
Bh
791,200.00
669
Bh
669,400.00
670
Bh
426,000.00
671
rotary fan
Bh
1,040,700.00
SELVIA ONG
KUASA KSO
HARGA SATUAN BAHAN PABRIKASI KABUPATEN HALMAHERA BARAT PROPINSI MALUKU UTARA
NO
JENIS BAHAN
1
1
Semen (PC)
Semen warna
Aspal
4
5
6
6
7
8
Kawat Bentrad
Kawat Bronjong
Kawat Duri ( 100 ) m
Kawat Nyamuk ( Kawat Ram-Ram)
Kawat Saringan Pasir / Ayakan
Kawat Nyamuk plastik (kawat Kasa)
Besi Beton
10
11
Besi Ulir
Besi Plat
12
Plat Aluminium
13
Besi Strip
14
Besi Siku
SPESIFIKASI
MERK / MODEL
UKURAN
3
50 kg
1
1
Aspal Buton
SATUAN
4
Zak
Kg
Kg
Kg
Kg
Rool
Rool
M2
M2
2
M
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
8,808.80
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
484.48
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
96,896.80
88,000.00
5
88,000.00
KE LOKASI
PROYEK
6
88.00
7,300.00
7,300.00
7.30
730.73
40.19
8,038.03
13,350.00
14,685.00
2.94
1,468.79
80.78
16,156.73
26,000.00
699,900.00
1,135,000.00
22,000.00
3,250.00
16,200.00
28,600.00
769,890.00
1,248,500.00
24,200.00
3,575.00
17,820.00
5.72
153.98
1,248.50
4.84
0.72
17.82
2,860.57
77,004.40
124,974.85
2,420.48
357.57
1,783.78
157.33
4,235.24
6,873.62
133.13
19.67
98.11
31,466.29
847,048.38
1,374,723.35
26,625.32
3,933.29
19,621.60
HPS
ukuran dibawah 12 mm
ukuran diatas 12 mm
Kg
Kg
12,500.00
11,500.00
13,750.00
12,650.00
13.75
12.65
1,376.38
1,266.27
75.70
69.64
15,140.13
13,928.92
2 mm =120x240 mm
3 mm =120x240 mm
uk .0.4 mm
Uk.0.5 mm
Uk. 0.6 mm
3/4x1/8x6 m
3/4x3/8x6 m
1x1/8x6 m
1x3/8x6 m
Kg
Lbr
Lbr
Lbr
Lbr
Lbr
Btg
Btg
Btg
Btg
12,800.00
1,056,000.00
1,275,000.00
110,000.00
130,000.00
146,500.00
41,000.00
43,500.00
52,500.00
55,500.00
14,080.00
1,161,600.00
1,402,500.00
121,000.00
143,000.00
161,150.00
45,100.00
47,850.00
57,750.00
61,050.00
2.82
232.32
280.50
121.00
143.00
161.15
45.10
47.85
57.75
61.05
1,408.28
116,183.23
140,278.05
12,112.10
14,314.30
16,131.12
4,514.51
4,789.79
5,780.78
6,111.11
77.46
6,390.08
7,715.29
666.17
787.29
887.21
248.30
263.44
317.94
336.11
15,491.10
1,278,015.55
1,543,058.55
133,233.10
157,457.30
177,442.27
49,659.61
52,687.64
63,588.53
67,222.16
111,500.00
196,800.00
299,800.00
200,000.00
585,000.00
958,000.00
122,650.00
216,480.00
329,780.00
220,000.00
643,500.00
1,053,800.00
122.65
216.48
329.78
220.00
643.50
1,053.80
12,277.27
21,669.65
33,010.98
22,022.00
64,414.35
105,485.38
675.25
1,191.83
1,815.60
1,211.21
3,542.79
5,801.70
135,049.92
238,366.13
363,120.76
242,242.00
708,557.85
1,160,339.18
30x30x3 cm
40x40x4 cm
50x50x5 cm
60x60x6 cm
70x70x7 cm
100x100x10 cm
NO
JENIS BAHAN
15
16
17
18
19
Paku Campur
Paku Tripleks
Paku Seng
Paku Beton
Paku Asbes
19
Kapur
20
21
22
23
24
25
26
27
SPESIFIKASI
MERK / MODEL
UKURAN
3
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
HPS
5
KE LOKASI
PROYEK
6
PROFIT
10%
(Rp)
7=10% *(5+6)
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
Kg
Kg
Kg
Dos
Kg
21,500.00
26,500.00
28,500.00
30,000.00
22,500.00
23,650.00
29,150.00
31,350.00
33,000.00
24,750.00
23.65
5.83
31.35
33.00
24.75
2,367.37
2,915.58
3,138.14
3,303.30
2,477.48
130.21
160.36
172.60
181.68
136.26
26,041.02
32,071.41
34,519.49
36,336.30
27,252.23
Sirih
Batu
Api
Kg
M3
Drum
25,500.00
175,000.00
195,500.00
28,050.00
192,500.00
215,050.00
28.05
192.50
215.05
2,807.81
19,269.25
21,526.51
154.43
1,059.81
1,183.96
30,885.86
211,961.75
236,791.56
Hard Board
Soat board
Playwood
Totalwod
Jabarwod polos
Jabarwod warna
Formika polos
Formika warna
Uk. 122x244 cm
Uk. 4x8 (3mm)
Uk. 4x8
Uk. 4x7
Uk. 4x8
Uk. 4x8
Uk. 3x6
Uk. 3x6
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
90,500.00
81,500.00
81,500.00
89,500.00
69,500.00
77,000.00
87,500.00
99,000.00
99,550.00
89,650.00
89,650.00
98,450.00
76,450.00
84,700.00
96,250.00
108,900.00
99.55
89.65
89.65
98.45
76.45
84.70
96.25
108.90
9,964.96
8,973.97
8,973.97
9,854.85
7,652.65
8,478.47
9,634.63
10,900.89
548.07
493.57
493.57
542.02
420.90
466.32
529.90
599.55
109,614.51
98,713.62
98,713.62
108,403.30
84,179.10
93,263.17
105,980.88
119,909.79
28
Teakwood 3 mm
29
Tripleks
3 mm Uk. 122x244 cm
3 mm Uk. 80x244 cm
2 mm Uk. 122x244 cm
3 mm Uk. 122x244 cm
4 mm Uk. 122x244 cm
5 mm Uk. 122x244 cm
8 mm Uk. 122x244 cm
10 mm Uk. 122x244 cm
20 mm Uk. 122x244 cm
Km/ Wc Lapis Aluminium 3 mm
Melamin 3mm Uk. 122x244 cm
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
120,000.00
90,600.00
52,500.00
55,500.00
65,500.00
80,500.00
120,000.00
135,500.00
295,000.00
100,000.00
100,000.00
120,000.00
90,600.00
57,750.00
61,050.00
72,050.00
88,550.00
132,000.00
149,050.00
324,500.00
110,000.00
110,000.00
120.00
90.60
57.75
12.21
14.41
17.71
26.40
29.81
64.90
22.00
22.00
12,012.00
9,069.06
5,780.78
6,106.22
7,206.44
8,856.77
13,202.64
14,907.98
32,456.49
11,002.20
11,002.20
660.66
498.80
317.94
335.84
396.35
487.12
726.15
819.94
1,785.11
605.12
605.12
132,132.00
99,759.66
63,588.53
67,168.43
79,270.85
97,424.48
145,229.04
163,987.79
357,021.39
121,024.20
121,024.20
30
List Profil
Sk 1
Sk 2
Sk 3
Sk 4a
Sk 5
Sk 16
Staf
Staf
Staf
Staf
Staf
Staf
27,000.00
25,000.00
22,000.00
18,000.00
18,000.00
19,000.00
29,700.00
27,500.00
24,200.00
19,800.00
19,800.00
20,900.00
5.94
5.50
4.84
3.96
3.96
4.18
2,970.59
2,750.55
2,420.48
1,980.40
1,980.40
2,090.42
163.38
151.28
133.13
108.92
108.92
114.97
32,676.53
30,256.05
26,625.32
21,784.36
21,784.36
22,994.60
NO
JENIS BAHAN
31
SPESIFIKASI
MERK / MODEL
UKURAN
3
Sk 17
Sk 18a
Sk 18b
Sk 18e
Sk 21
Sk 22e
Sk 23e
Sk 24
Sk 25
Sk 40e
Sk 41e
Sk 42e
Sk 43e
Sk 44e
Sk 45e
Sk 51a
Sk 51b
Sk 57b
1/2"
3/4"
1"
1/4
1 "
1/2
1 "
2"
21/2"
3"
4"
6"
32
1/2"
3/4"
1"
1/4
1 "
11/2"
2"
21/2"
3"
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
2,750.55
2,970.59
3,080.62
1,650.33
3,520.70
3,520.70
3,520.70
1,980.40
1,980.40
4,290.86
3,960.79
1,980.40
1,980.40
3,190.64
2,750.55
3,520.70
3,520.70
9,021.80
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
151.28
163.38
169.43
90.77
193.64
193.64
193.64
108.92
108.92
236.00
217.84
108.92
108.92
175.49
151.28
193.64
193.64
496.20
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
30,256.05
32,676.53
33,886.78
18,153.63
38,727.74
38,727.74
38,727.74
21,784.36
21,784.36
47,199.44
43,568.71
21,784.36
21,784.36
35,097.02
30,256.05
38,727.74
38,727.74
99,239.84
4
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
25,000.00
27,000.00
28,000.00
15,000.00
32,000.00
32,000.00
32,000.00
18,000.00
18,000.00
39,000.00
36,000.00
18,000.00
18,000.00
29,000.00
25,000.00
32,000.00
32,000.00
82,000.00
5
27,500.00
29,700.00
30,800.00
16,500.00
35,200.00
35,200.00
35,200.00
19,800.00
19,800.00
42,900.00
39,600.00
19,800.00
19,800.00
31,900.00
27,500.00
35,200.00
35,200.00
90,200.00
KE LOKASI
PROYEK
6
5.50
5.94
6.16
3.30
7.04
7.04
7.04
3.96
3.96
8.58
7.92
3.96
3.96
6.38
5.50
7.04
7.04
18.04
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
185,500.00
235,500.00
310,000.00
410,000.00
425,500.00
548,000.00
730,500.00
895,000.00
900,000.00
985,500.00
204,050.00
259,050.00
341,000.00
451,000.00
468,050.00
602,800.00
803,550.00
984,500.00
990,000.00
1,084,050.00
40.81
51.81
68.20
90.20
93.61
120.56
160.71
196.90
198.00
216.81
20,409.08
25,910.18
34,106.82
45,109.02
46,814.36
60,292.06
80,371.07
98,469.69
99,019.80
108,426.68
1,122.50
1,425.06
1,875.88
2,481.00
2,574.79
3,316.06
4,420.41
5,415.83
5,446.09
5,963.47
224,499.89
285,011.99
375,175.02
496,199.22
514,957.97
663,212.62
884,081.78
1,083,166.59
1,089,217.80
1,192,693.49
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
235,000.00
320,000.00
460,000.00
610,000.00
710,000.00
975,000.00
1,350,000.00
1,550,000.00
258,500.00
352,000.00
506,000.00
671,000.00
781,000.00
1,072,500.00
1,485,000.00
1,705,000.00
51.70
70.40
101.20
134.20
156.20
214.50
297.00
341.00
25,855.17
35,207.04
50,610.12
67,113.42
78,115.62
107,271.45
148,529.70
170,534.10
1,422.03
1,936.39
2,783.56
3,691.24
4,296.36
5,899.93
8,169.13
9,379.38
284,406.87
387,277.44
556,711.32
738,247.62
859,271.82
1,179,985.95
1,633,826.70
1,875,875.10
HPS
NO
JENIS BAHAN
33
Pipa Gip
SPESIFIKASI
MERK / MODEL
UKURAN
3
4"
6"
1/2"
3/4"
1"
1/4
1 "
1/2
1 "
2"
1/2
2 "
3"
4"
6"
200 mm (FF) lengkap dg baut+mur
160 mm (FF) lengkap dg baut+mur
110 mm (FF) lengkap dg baut+mur
34
1/2"
3/4"
1"
1/4
1 "
11/2"
2"
1/2
2 "
3"
4"
6"
35
Pipa PVC
1/2"
3/4"
1"
11/4"
1/2
1 "
2"
21/2"
3"
4"
6"
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
182,086.41
192,538.50
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
10,014.75
10,589.62
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
2,002,950.51
2,117,923.50
4
Staf
Staf
1,655,000.00
1,750,000.00
5
1,820,500.00
1,925,000.00
KE LOKASI
PROYEK
6
364.10
385.00
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
M1
1
M
M1
235,000.00
320,000.00
460,000.00
610,000.00
710,000.00
975,000.00
1,350,000.00
1,550,000.00
1,655,000.00
1,750,000.00
475,500.00
385,500.00
210,500.00
258,500.00
352,000.00
506,000.00
671,000.00
781,000.00
1,072,500.00
1,485,000.00
1,705,000.00
1,820,500.00
1,925,000.00
523,050.00
424,050.00
231,550.00
51.70
70.40
101.20
134.20
156.20
214.50
297.00
341.00
364.10
385.00
104.61
84.81
46.31
25,855.17
35,207.04
50,610.12
67,113.42
78,115.62
107,271.45
148,529.70
170,534.10
182,086.41
192,538.50
52,315.46
42,413.48
23,159.63
1,422.03
1,936.39
2,783.56
3,691.24
4,296.36
5,899.93
8,169.13
9,379.38
10,014.75
10,589.62
2,877.35
2,332.74
1,273.78
284,406.87
387,277.44
556,711.32
738,247.62
859,271.82
1,179,985.95
1,633,826.70
1,875,875.10
2,002,950.51
2,117,923.50
575,470.07
466,548.29
254,755.94
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
215,000.00
245,000.00
275,000.00
425,500.00
465,000.00
675,000.00
750,000.00
850,000.00
925,000.00
935,500.00
236,500.00
269,500.00
302,500.00
468,050.00
511,500.00
742,500.00
825,000.00
935,000.00
1,017,500.00
1,029,050.00
47.30
53.90
60.50
93.61
102.30
148.50
165.00
187.00
203.50
205.81
23,654.73
26,955.39
30,256.05
46,814.36
51,160.23
74,264.85
82,516.50
93,518.70
101,770.35
102,925.58
1,301.01
1,482.55
1,664.08
2,574.79
2,813.81
4,084.57
4,538.41
5,143.53
5,597.37
5,660.91
260,202.03
296,509.29
332,816.55
514,957.97
562,762.53
816,913.35
907,681.50
1,028,705.70
1,119,473.85
1,132,181.39
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
5,500.00
6,500.00
9,500.00
10,000.00
12,500.00
20,000.00
25,500.00
44,500.00
56,500.00
113,000.00
6,050.00
7,150.00
10,450.00
11,000.00
13,750.00
22,000.00
28,050.00
48,950.00
62,150.00
124,300.00
1.21
1.43
2.09
2.20
2.75
4.40
5.61
9.79
12.43
24.86
605.12
715.14
1,045.21
1,100.22
1,375.28
2,200.44
2,805.56
4,895.98
6,216.24
12,432.49
33.28
39.33
57.49
60.51
75.64
121.02
154.31
269.28
341.89
683.79
6,656.33
7,866.57
11,497.30
12,102.42
15,128.03
24,204.84
30,861.17
53,855.77
68,378.67
136,757.35
HPS
NO
JENIS BAHAN
36
Knee PVC
SPESIFIKASI
MERK / MODEL
UKURAN
3
250 mm (RRJ)
200 mm (RRJ)
150 mm (RRJ)
110 mm (RRJ)
90 mm (RRJ)
63 mm (RRJ)
25 mm (RRJ)
1/2"
3/4"
1"
11/4"
1/2
1 "
2"
1/2
2 "
3"
4"
6"
37
1/2"
3/4"
1"
1/4
1 "
1/2
1 "
2"
21/2"
3"
4"
6"
38
1/2"
3/4"
1"
1/4
1 "
11/2"
2"
21/2"
3"
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
61,117.22
36,912.38
24,809.96
14,907.98
13,587.72
12,707.54
9,076.82
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
3,361.45
2,030.18
1,364.55
819.94
747.32
698.91
499.22
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
672,289.43
406,036.19
272,909.57
163,987.79
149,464.89
139,782.95
99,844.97
4
1
M
1
M
M1
1
M
M1
M1
1
M
555,500.00
335,500.00
225,500.00
135,500.00
123,500.00
115,500.00
82,500.00
5
611,050.00
369,050.00
248,050.00
149,050.00
135,850.00
127,050.00
90,750.00
KE LOKASI
PROYEK
6
122.21
73.81
49.61
29.81
27.17
25.41
18.15
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
2,950.00
4,000.00
5,500.00
6,500.00
15,500.00
16,500.00
17,500.00
20,500.00
25,500.00
35,000.00
3,245.00
4,400.00
6,050.00
7,150.00
17,050.00
18,150.00
19,250.00
22,550.00
28,050.00
38,500.00
3.25
4.40
6.05
7.15
17.05
18.15
19.25
22.55
28.05
38.50
324.82
440.44
605.61
715.72
1,706.71
1,816.82
1,926.93
2,257.26
2,807.81
3,853.85
17.87
24.22
33.31
39.36
93.87
99.92
105.98
124.15
154.43
211.96
3,573.07
4,844.84
6,661.66
7,872.87
18,773.76
19,984.97
21,196.18
24,829.81
30,885.86
42,392.35
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
2,950.00
4,000.00
5,500.00
6,500.00
15,500.00
16,500.00
17,500.00
20,500.00
25,500.00
35,500.00
3,245.00
4,400.00
6,050.00
7,150.00
17,050.00
18,150.00
19,250.00
22,550.00
28,050.00
39,050.00
3.25
4.40
6.05
7.15
17.05
18.15
19.25
22.55
28.05
39.05
324.82
440.44
605.61
715.72
1,706.71
1,816.82
1,926.93
2,257.26
2,807.81
3,908.91
17.87
24.22
33.31
39.36
93.87
99.92
105.98
124.15
154.43
214.99
3,573.07
4,844.84
6,661.66
7,872.87
18,773.76
19,984.97
21,196.18
24,829.81
30,885.86
42,997.96
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
2,950.00
4,000.00
5,500.00
6,500.00
15,500.00
16,500.00
17,500.00
20,500.00
3,245.00
4,400.00
6,050.00
7,150.00
17,050.00
18,150.00
19,250.00
22,550.00
3.25
4.40
6.05
7.15
17.05
18.15
19.25
22.55
324.82
440.44
605.61
715.72
1,706.71
1,816.82
1,926.93
2,257.26
17.87
24.22
33.31
39.36
93.87
99.92
105.98
124.15
3,573.07
4,844.84
6,661.66
7,872.87
18,773.76
19,984.97
21,196.18
24,829.81
HPS
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
4"
6"
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
4
Staf
Staf
25,500.00
35,500.00
5
28,050.00
39,050.00
KE LOKASI
PROYEK
6
28.05
39.05
HPS
PROFIT
10%
(Rp)
7=10% *(5+6)
2,807.81
3,908.91
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
154.43
214.99
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
30,885.86
42,997.96
39
Sok Over
6" ke 4"
4" ke 2 "
2" ke 1"
1" ke 3/4"
3/4" ke 1/2
Bh
Bh
Bh
Bh
Bh
8,500.00
6,500.00
5,500.00
4,500.00
3,500.00
9,350.00
7,150.00
6,050.00
4,950.00
3,850.00
9.35
7.15
6.05
4.95
3.85
935.94
715.72
605.61
495.50
385.39
51.48
39.36
33.31
27.25
21.20
10,295.29
7,872.87
6,661.66
5,450.45
4,239.24
40
Ulir Luar
1/2"
3/4"
1"
1/4
1 "
11/2"
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
Staf
2,950.00
4,000.00
5,500.00
6,500.00
15,500.00
16,500.00
17,500.00
20,500.00
25,500.00
35,500.00
3,245.00
4,400.00
6,050.00
7,150.00
17,050.00
18,150.00
19,250.00
22,550.00
28,050.00
39,050.00
3.25
4.40
6.05
7.15
17.05
18.15
19.25
22.55
28.05
39.05
324.82
440.44
605.61
715.72
1,706.71
1,816.82
1,926.93
2,257.26
2,807.81
3,908.91
17.87
24.22
33.31
39.36
93.87
99.92
105.98
124.15
154.43
214.99
3,573.07
4,844.84
6,661.66
7,872.87
18,773.76
19,984.97
21,196.18
24,829.81
30,885.86
42,997.96
1/2"
3/4"
1"
1/4
1 "
Staf
Staf
Staf
2,950.00
4,000.00
5,500.00
3,245.00
4,400.00
6,050.00
0.65
0.88
1.21
324.56
440.09
605.12
17.85
24.20
33.28
3,570.21
4,840.97
6,656.33
Staf
6,500.00
7,150.00
1.43
715.14
39.33
7,866.57
11/2"
Staf
Staf
15,500.00
16,500.00
17,050.00
18,150.00
3.41
18.15
1,705.34
1,816.82
93.79
99.92
18,758.75
19,984.97
Staf
Staf
Staf
Staf
17,500.00
20,500.00
25,500.00
35,500.00
19,250.00
22,550.00
28,050.00
39,050.00
19.25
22.55
5.61
7.81
1,926.93
2,257.26
2,805.56
3,905.78
105.98
124.15
154.31
214.82
21,196.18
24,829.81
30,861.17
42,963.59
1/2"
3/4"
1"
1/4
1 "
Staf
Staf
Staf
45,000.00
50,000.00
65,000.00
49,500.00
55,000.00
71,500.00
49.50
55.00
14.30
4,954.95
5,505.50
7,151.43
272.52
302.80
393.33
54,504.45
60,560.50
78,665.73
Staf
75,000.00
82,500.00
16.50
8,251.65
453.84
90,768.15
11/2"
Staf
Staf
85,000.00
135,000.00
93,500.00
148,500.00
18.70
148.50
9,351.87
14,864.85
514.35
817.57
102,870.57
163,513.35
2"
21/2"
3"
4"
6"
41
Ulir Dalam
2"
1/2
2 "
3"
4"
6"
42
Stop Krans
2"
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
1/2
2 "
48
49
Chake Valve
Water meter
50
51
52
Pengadaan lubricant
Bend Gip
Repeir Socket
53
54
55
56
Lem Pipa
Henep
57
58
59
60
61
62
Pompa Submarsibel
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
HPS
5
KE LOKASI
PROYEK
6
PROFIT
10%
(Rp)
7=10% *(5+6)
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
Staf
Staf
Staf
Staf
145,600.00
245,000.00
375,000.00
478,500.00
145,600.00
245,000.00
375,000.00
526,350.00
145.60
245.00
375.00
526.35
14,574.56
24,524.50
37,537.50
52,687.64
801.60
1,348.85
2,064.56
2,897.82
160,320.16
269,769.50
412,912.50
579,563.99
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
335,500.00
665,500.00
665,500.00
9,000,000.00
6,500,000.00
6,500,000.00
9,000,000.00
48,500.00
489,000.00
645,500.00
635,500.00
366,500.00
296,500.00
730,500.00
520,500.00
510,500.00
369,050.00
732,050.00
732,050.00
9,900,000.00
7,150,000.00
7,150,000.00
9,900,000.00
53,350.00
537,900.00
710,050.00
699,050.00
403,150.00
326,150.00
803,550.00
572,550.00
561,550.00
369.05
732.05
732.05
9,900.00
7,150.00
7,150.00
9,900.00
53.35
537.90
710.05
699.05
403.15
326.15
803.55
572.55
561.55
36,941.91
73,278.21
73,278.21
990,990.00
715,715.00
715,715.00
990,990.00
5,340.34
53,843.79
71,076.01
69,974.91
40,355.32
32,647.62
80,435.36
57,312.26
56,211.16
2,031.80
4,030.30
4,030.30
54,504.45
39,364.33
39,364.33
54,504.45
293.72
2,961.41
3,909.18
3,848.62
2,219.54
1,795.62
4,423.94
3,152.17
3,091.61
406,360.96
806,060.26
806,060.26
10,900,890.00
7,872,865.00
7,872,865.00
10,900,890.00
58,743.69
592,281.69
781,836.06
769,723.96
443,908.47
359,123.77
884,788.91
630,434.81
618,322.71
Kg
Bh
57,500.00
66,500.00
63,250.00
73,150.00
63.25
73.15
6,331.33
7,322.32
348.22
402.73
69,644.58
80,545.47
Fiberglass
1 bak
2 bak
Bh
Bh
Bh
Bh
Bh
Bh
2,500,000.00
4,500,000.00
85,000.00
585,500.00
450,000.00
800,500.00
2,750,000.00
4,950,000.00
93,500.00
644,050.00
495,000.00
880,550.00
2,750.00
4,950.00
93.50
644.05
495.00
880.55
275,275.00
495,495.00
9,359.35
64,469.41
49,549.50
88,143.06
15,140.13
27,252.23
514.76
3,545.82
2,725.22
4,847.87
3,028,025.00
5,450,445.00
102,952.85
709,163.46
545,044.50
969,573.61
2.5 lt/dt H 80 m
5 lt/dt H 80 m
7.5 lt/dt H 80 m
10 lt/dt H 100 m
15 lt/dt H 100 m
20 lt/dt H 100 m
Unit
Unit
Unit
Unit
Unit
Unit
65,500,000.00
96,500,000.00
125,600,000.00
160,000,000.00
170,500,000.00
190,000,000.00
72,050,000.00
106,150,000.00
138,160,000.00
176,000,000.00
187,550,000.00
209,000,000.00
72,050.00
106,150.00
138,160.00
176,000.00
187,550.00
209,000.00
7,212,205.00
10,625,615.00
13,829,816.00
17,617,600.00
18,773,755.00
20,920,900.00
396,671.28
584,408.83
760,639.88
968,968.00
1,032,556.53
1,150,649.50
79,334,255.00
116,881,765.00
152,127,976.00
193,793,600.00
206,511,305.00
230,129,900.00
3"
4"
6"
43
44
45
46
47
SATUAN
110x110x110 mm (RR)
110 mm (FF)
150 mm
150 mm
110 mm
110 mm
110 mm
150 mm
110 mm 90' (FF)
150 mm
110 mm
90'PVC 150 mm
90'PVC 110 mm
150 mm x 110 mm
110 mm x 90 mm
1100 ltr
1000 ltr
NO
JENIS BAHAN
63
Pompa Centrifugal
64
Batako
65
66
67
Paving Stone
68
69
Batu Apung
Batu Angin
70
Glas block
SPESIFIKASI
MERK / MODEL
UKURAN
3
8A-25. 2.5 lt/dt H 100 M. 5.5 Kw
17-13. 5 lt/dt H 100. 9.2 Kw
30-15. 7.5 lt/dt H 100. 13 Kw
46-12. 10 lt/dt H 100 m. 18.5 Kw
8A-30. 2.5 lt/dt H 120 m. 5.5 Kw
17-16. 5 lt/dt H 120 m. 9.2 Kw
30-16. 7.5 lt/dt H 120 m. 15 Kw
46-14. 10 lt/dt H 120 m. 22 Kw
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
6,991,985.00
10,405,395.00
13,818,805.00
14,259,245.00
9,964,955.00
10,526,516.00
14,182,168.00
15,261,246.00
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
384,559.18
572,296.73
760,034.28
784,258.48
548,072.53
578,958.38
780,019.24
839,368.53
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
76,911,835.00
114,459,345.00
152,006,855.00
156,851,695.00
109,614,505.00
115,791,676.00
156,003,848.00
167,873,706.00
4
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
63,500,000.00
94,500,000.00
125,500,000.00
129,500,000.00
90,500,000.00
95,600,000.00
128,800,000.00
138,600,000.00
5
69,850,000.00
103,950,000.00
138,050,000.00
142,450,000.00
99,550,000.00
105,160,000.00
141,680,000.00
152,460,000.00
KE LOKASI
PROYEK
6
69,850.00
103,950.00
138,050.00
142,450.00
99,550.00
105,160.00
141,680.00
152,460.00
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
63,500,000.00
72,500,000.00
82,500,000.00
95,000,000.00
110,000,000.00
158,500,000.00
44,500,000.00
70,000,000.00
100,500,000.00
110,000,000.00
62,000,000.00
73,500,000.00
110,000,000.00
115,500,000.00
69,850,000.00
79,750,000.00
90,750,000.00
104,500,000.00
121,000,000.00
174,350,000.00
48,950,000.00
77,000,000.00
110,550,000.00
121,000,000.00
68,200,000.00
80,850,000.00
121,000,000.00
127,050,000.00
69,850.00
79,750.00
90,750.00
104,500.00
121,000.00
174,350.00
48,950.00
77,000.00
110,550.00
121,000.00
68,200.00
80,850.00
121,000.00
127,050.00
6,991,985.00
7,982,975.00
9,084,075.00
10,460,450.00
12,112,100.00
17,452,435.00
4,899,895.00
7,707,700.00
11,066,055.00
12,112,100.00
6,826,820.00
8,093,085.00
12,112,100.00
12,717,705.00
384,559.18
439,063.63
499,624.13
575,324.75
666,165.50
959,883.93
269,494.23
423,923.50
608,633.03
666,165.50
375,475.10
445,119.68
666,165.50
699,473.78
76,911,835.00
87,812,725.00
99,924,825.00
115,064,950.00
133,233,100.00
191,976,785.00
53,898,845.00
84,784,700.00
121,726,605.00
133,233,100.00
75,095,020.00
89,023,935.00
133,233,100.00
139,894,755.00
Kls 1 (K175)
Kls II
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
6,000.00
3,250.00
2,600.00
300,000.00
300,000.00
202,500.00
172,500.00
7,750.00
7,750.00
4,000.00
70,000.00
7,850.00
7,850.00
31,500.00
6,600.00
3,575.00
2,860.00
330,000.00
330,000.00
222,750.00
189,750.00
8,525.00
8,525.00
4,400.00
77,000.00
8,635.00
8,635.00
34,650.00
6.60
3.58
2.86
330.00
330.00
222.75
189.75
8.53
8.53
4.40
77.00
8.64
8.64
34.65
660.66
357.86
286.29
33,033.00
33,033.00
22,297.28
18,993.98
853.35
853.35
440.44
7,707.70
864.36
864.36
3,468.47
36.34
19.68
15.75
1,816.82
1,816.82
1,226.35
1,044.67
46.93
46.93
24.22
423.92
47.54
47.54
190.77
7,267.26
3,936.43
3,149.15
363,363.00
363,363.00
245,270.03
208,933.73
9,386.88
9,386.88
4,844.84
84,784.70
9,508.00
9,508.00
38,153.12
Andesit Alur
Andesit Polos
HPS
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
HPS
5
KE LOKASI
PROYEK
6
PROFIT
10%
(Rp)
7=10% *(5+6)
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
71
Seng Gelombang
BJLS 0.20 mm
BJLS 0.25 mm
BJLS 0.30 mm
Lbr
Lbr
Lbr
48,500.00
59,000.00
69,500.00
53,350.00
64,900.00
76,450.00
53.35
64.90
76.45
5,340.34
6,496.49
7,652.65
293.72
357.31
420.90
58,743.69
71,461.39
84,179.10
72
BJLS 0.20 mm
BJLS 0.25 mm
BJLS 0.30 mm
Lbr
Lbr
Lbr
57,500.00
69,500.00
90,000.00
63,250.00
76,450.00
99,000.00
63.25
76.45
99.00
6,331.33
7,652.65
9,909.90
348.22
420.90
545.04
69,644.58
84,179.10
109,008.90
73
SWG 32'X0.25 mm
SWG 30X0.30 mm
SWG28X0.40 mm
Lbr
Lbr
Lbr
79,500.00
98,500.00
128,500.00
87,450.00
108,350.00
141,350.00
87.45
108.35
141.35
8,753.75
10,845.84
14,149.14
481.46
596.52
778.20
96,291.20
119,304.19
155,640.49
74
75
Seng plastik
Seng fiber
Gelombang besar
Kwalitas baik
Kwalitas sedang
Lbr
Lbr
Lbr
36,800.00
122,000.00
73,500.00
40,480.00
134,200.00
80,850.00
40.48
134.20
80.85
4,052.05
13,433.42
8,093.09
222.86
738.84
445.12
44,572.53
147,767.62
89,023.94
76
77
78
79
Multi roof
Sakura roof
Sun Roof
Tora-tora
0.30 mm
0.20 mm
0.20 mm
0.30 mm
83,000.00
56,500.00
55,000.00
61,500.00
91,300.00
62,150.00
60,500.00
67,650.00
91.30
62.15
60.50
67.65
9,139.13
6,221.22
6,056.05
6,771.77
502.65
342.17
333.08
372.45
100,530.43
68,433.37
66,616.55
74,489.42
80
81
82
83
84
85
86
87
88
89
Nok bubungan
Nok genteng metal
Atap nipa / Rumbia
Atap Onduline Sheet Clasic
Onduline P.E. Nails (paku)
Onduline Safe Top Nails ( Paku Ulir )
Onduline Stelfix Drill Screws ( Sekrup )
Onduline Ridge Piece ( Nook )
Onduline Varge Piece
Onduline Eaves Filters
Lbr
Lbr
Lbr
Lbr
M1
12,500.00
50,000.00
4,600.00
120,000.00
650.00
750.00
750.00
65,000.00
55,000.00
65,500.00
13,750.00
55,000.00
5,060.00
132,000.00
715.00
825.00
825.00
71,500.00
60,500.00
72,050.00
13.75
55.00
5.06
132.00
0.72
0.83
0.83
71.50
60.50
72.05
1,376.38
5,505.50
506.51
13,213.20
71.57
82.58
82.58
7,157.15
6,056.05
7,212.21
75.70
302.80
27.86
726.73
3.94
4.54
4.54
393.64
333.08
396.67
15,140.13
60,560.50
5,571.57
145,345.20
787.29
908.41
908.41
78,728.65
66,616.55
79,334.26
90
200,000.00
220,000.00
220.00
22,022.00
1,211.21
242,242.00
91
Tegel PC
M2
M2
56,850.00
56,850.00
62,535.00
62,535.00
62.54
62.54
6,259.75
6,259.75
344.29
344.29
68,857.29
68,857.29
200 x 96 Cm
7 Cm
7 Cm
7 Cm
90 x 5 Cm
Lbr
Lbr
Lbr
Bh
Bh
Bh
Lbr
Lbr
Lbr
M
Abu-abu 20x20 cm
Warna 20x20 cm
NO
JENIS BAHAN
1
92
Tegel Porselin
93
Tegel Keramik
86
87
88
Cat Besi
Cat Kayu
Cat Tembok
89
90
91
92
93
Minyak Cat
SPESIFIKASI
MERK / MODEL
UKURAN
3
10 x 20 cm
10 x 10 cm
20 x 20 cm
20 x 25 cm
30 x 30 cm
40 x 40 cm
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
6,259.75
5,340.34
6,331.33
6,441.44
6,661.66
7,762.76
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
344.29
293.72
348.22
354.28
366.39
426.95
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
68,857.29
58,743.69
69,644.58
70,855.79
73,278.21
85,390.31
4
Dos
Dos
Dos
Dos
Dos
Dos
56,850.00
48,500.00
57,500.00
58,500.00
60,500.00
70,500.00
5
62,535.00
53,350.00
63,250.00
64,350.00
66,550.00
77,550.00
KE LOKASI
PROYEK
6
62.54
53.35
63.25
64.35
66.55
77.55
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
68,500.00
48,500.00
56,200.00
62,500.00
49,000.00
74,500.00
50,000.00
73,500.00
60,200.00
73,990.00
81,500.00
86,500.00
83,500.00
96,500.00
65,500.00
69,000.00
75,350.00
53,350.00
61,820.00
68,750.00
53,900.00
81,950.00
55,000.00
80,850.00
66,220.00
81,389.00
89,650.00
95,150.00
91,850.00
106,150.00
72,050.00
75,900.00
75.35
53.35
61.82
68.75
53.90
81.95
55.00
80.85
66.22
81.39
89.65
95.15
91.85
106.15
72.05
75.90
7,542.54
5,340.34
6,188.18
6,881.88
5,395.39
8,203.20
5,505.50
8,093.09
6,628.62
8,147.04
8,973.97
9,524.52
9,194.19
10,625.62
7,212.21
7,597.59
414.84
293.72
340.35
378.50
296.75
451.18
302.80
445.12
364.57
448.09
493.57
523.85
505.68
584.41
396.67
417.87
82,967.89
58,743.69
68,070.00
75,700.63
59,349.29
90,235.15
60,560.50
89,023.94
72,914.84
89,617.43
98,713.62
104,769.67
101,136.04
116,881.77
79,334.26
83,573.49
Kg
Kg
1 Kg
1 Kg
50,000.00
50,000.00
17,500.00
22,000.00
9,500.00
18,500.00
97,500.00
21,000.00
61,000.00
26,500.00
29,500.00
20,800.00
18,500.00
32,500.00
55,000.00
55,000.00
19,250.00
24,200.00
10,450.00
20,350.00
107,250.00
23,100.00
67,100.00
29,150.00
32,450.00
22,880.00
20,350.00
35,750.00
55.00
55.00
19.25
24.20
10.45
20.35
107.25
23.10
67.10
29.15
32.45
22.88
20.35
35.75
5,505.50
5,505.50
1,926.93
2,422.42
1,046.05
2,037.04
10,735.73
2,312.31
6,716.71
2,917.92
3,248.25
2,290.29
2,037.04
3,578.58
302.80
302.80
105.98
133.23
57.53
112.04
590.46
127.18
369.42
160.49
178.65
125.97
112.04
196.82
60,560.50
60,560.50
21,196.18
26,646.62
11,506.50
22,407.39
118,092.98
25,435.41
73,883.81
32,097.07
35,730.70
25,193.17
22,407.39
39,364.33
1 Kg
1 Kg
1 Kg
1 Kg
1 Ltr
HPS
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
Afduner
94
Kuas Cat
95
96
97
98
99
100
101
102
103
104
105
Dempul Kayu
Plamir Tembok
Politur
Stone Care / Pelapis Batu Alam
Teao Oil
Wood Stain
Melamik
Melamik + Obat Pengering
Sanding Sealer
Lem seng
106
107
108
109
110
111
112
Spritus
Minyak tanah
Pelumas / Oli
Bensin
Solar
Gemuk
Batu bara
113
114
115
116
117
118
119
120
Alcobound
Kaca one way
Aluminium silver
Pintu kaca
Tacon sheet
Lem tacon sheet
Karpet
Kaca rayband
121
Kaca bening
1 cm - 4 cm
5 cm - 10 cm
Kuas Rool
No. 0 - 3
No. 5 - 100
Altex
Boyo
Infra
Infra
Infra
Infra
Uk. 122x244 cm
5 mm
4"
12 mm
3 mm Uk. 122x152 cm
5 mm Uk. 122x152 cm
2 mm Uk. 127x76 cm
3 mm Uk. 122x152 cm
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
2,147.15
2,367.37
1,376.38
902.90
1,904.90
2,917.92
902.90
715.72
2,477.48
1,233.23
4,899.90
6,221.22
4,239.24
7,597.59
5,164.16
5,230.23
6,881.88
4,910.91
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
118.09
130.21
75.70
49.66
104.77
160.49
49.66
39.36
136.26
67.83
269.49
342.17
233.16
417.87
284.03
287.66
378.50
270.10
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
23,618.60
26,041.02
15,140.13
9,931.92
20,953.93
32,097.07
9,931.92
7,872.87
27,252.23
13,565.55
53,898.85
68,433.37
46,631.59
83,573.49
56,805.75
57,532.48
75,700.63
54,019.97
4
1/2 Ltr
1 Ltr
1/2 Ltr
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Ltr
Roll
19,500.00
21,500.00
12,500.00
8,200.00
17,300.00
26,500.00
8,200.00
6,500.00
22,500.00
11,200.00
44,500.00
56,500.00
38,500.00
69,000.00
46,900.00
47,500.00
62,500.00
44,600.00
5
21,450.00
23,650.00
13,750.00
9,020.00
19,030.00
29,150.00
9,020.00
7,150.00
24,750.00
12,320.00
48,950.00
62,150.00
42,350.00
75,900.00
51,590.00
52,250.00
68,750.00
49,060.00
KE LOKASI
PROYEK
6
21.45
23.65
13.75
9.02
19.03
29.15
9.02
7.15
24.75
12.32
48.95
62.15
42.35
75.90
51.59
52.25
68.75
49.06
Botol
Ltr
Ltr
Ltr
Ltr
Kg
Kg
6,550.00
6,750.00
25,600.00
6,000.00
6,000.00
31,000.00
2,350.00
7,205.00
7,425.00
28,160.00
6,600.00
6,600.00
34,100.00
2,585.00
7.21
7.43
28.16
6.60
6.60
34.10
2.59
721.22
743.24
2,818.82
660.66
660.66
3,413.41
258.76
39.67
40.88
155.03
36.34
36.34
187.74
14.23
7,933.43
8,175.67
31,006.98
7,267.26
7,267.26
37,547.51
2,846.34
1,200,000.00
395,000.00
201,900.00
8,095,000.00
105,500.00
50,500.00
50,500.00
96,500.00
263,500.00
60,000.00
160,000.00
1,320,000.00
434,500.00
222,090.00
8,904,500.00
116,050.00
55,550.00
55,550.00
106,150.00
289,850.00
66,000.00
176,000.00
1,320.00
434.50
222.09
8,904.50
116.05
55.55
55.55
106.15
289.85
66.00
176.00
132,132.00
43,493.45
22,231.21
891,340.45
11,616.61
5,560.56
5,560.56
10,625.62
29,013.99
6,606.60
17,617.60
7,267.26
2,392.14
1,222.72
49,023.72
638.91
305.83
305.83
584.41
1,595.77
363.36
968.97
1,453,452.00
478,427.95
244,543.30
9,804,744.95
127,782.66
61,166.11
61,166.11
116,881.77
319,153.84
72,672.60
193,793.60
Lbr
M2
Staf
Set
M2
Bungkus
M2
Lbr
Lbr
Lbr
Lbr
HPS
NO
JENIS BAHAN
122
Kaca buram
123
Kaca cermin
124
125
Kloset Jongkok
126
Wastafel
127
128
129
130
132
Floor drain
Selang air
133
Hard shower
134
Profil Tank
135
SPESIFIKASI
MERK / MODEL
UKURAN
3
5 mm Uk. 122x152 cm
3 mm Uk. 120x150 cm
5 mm Uk. 120x150 cm
2 mm Uk. 122x50 cm
5 mm Uk. 152x120 cm
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
4
Lbr
Lbr
Lbr
Lbr
Lbr
M'
233,500.00
186,500.00
306,900.00
72,000.00
342,000.00
170,000.00
5
256,850.00
205,150.00
337,590.00
79,200.00
376,200.00
187,000.00
KE LOKASI
PROYEK
6
256.85
205.15
337.59
79.20
376.20
187.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
2,550,000.00
2,550,000.00
286,500.00
280,500.00
425,500.00
325,000.00
9,500.00
27,500.00
9,500.00
29,000.00
35,500.00
75,500.00
18,000.00
6,000.00
6,000.00
9,000.00
16,500.00
35,500.00
11,200.00
12,500.00
18,500.00
22,500.00
62,000.00
21,500.00
43,200.00
346,500.00
145,500.00
80,200.00
2,350,000.00
3,995,500.00
600,000.00
2,805,000.00
2,805,000.00
315,150.00
308,550.00
468,050.00
357,500.00
10,450.00
30,250.00
10,450.00
31,900.00
39,050.00
83,050.00
19,800.00
6,600.00
6,600.00
9,900.00
18,150.00
39,050.00
12,320.00
13,750.00
20,350.00
24,750.00
68,200.00
23,650.00
47,520.00
381,150.00
160,050.00
88,220.00
2,585,000.00
4,395,050.00
660,000.00
2,805.00
2,805.00
315.15
308.55
468.05
357.50
10.45
30.25
10.45
31.90
39.05
83.05
19.80
6.60
6.60
9.90
18.15
39.05
12.32
13.75
20.35
24.75
68.20
23.65
47.52
381.15
160.05
88.22
2,585.00
4,395.05
660.00
HPS
PROFIT
10%
(Rp)
7=10% *(5+6)
25,710.69
20,535.52
33,792.76
7,927.92
37,657.62
18,718.70
280,780.50
280,780.50
31,546.52
30,885.86
46,851.81
35,785.75
1,046.05
3,028.03
1,046.05
3,193.19
3,908.91
8,313.31
1,981.98
660.66
660.66
990.99
1,816.82
3,908.91
1,233.23
1,376.38
2,037.04
2,477.48
6,826.82
2,367.37
4,756.75
38,153.12
16,021.01
8,830.82
258,758.50
439,944.51
66,066.00
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
1,414.09
1,129.45
1,858.60
436.04
2,071.17
1,029.53
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
282,817.54
225,890.67
371,720.35
87,207.12
414,233.82
205,905.70
15,442.93
15,442.93
1,735.06
1,698.72
2,576.85
1,968.22
57.53
166.54
57.53
175.63
214.99
457.23
109.01
36.34
36.34
54.50
99.92
214.99
67.83
75.70
112.04
136.26
375.48
130.21
261.62
2,098.42
881.16
485.70
14,231.72
24,196.95
3,633.63
3,088,585.50
3,088,585.50
347,011.67
339,744.41
515,369.86
393,643.25
11,506.50
33,308.28
11,506.50
35,125.09
42,997.96
91,446.36
21,801.78
7,267.26
7,267.26
10,900.89
19,984.97
42,997.96
13,565.55
15,140.13
22,407.39
27,252.23
75,095.02
26,041.02
52,324.27
419,684.27
176,231.06
97,139.04
2,846,343.50
4,839,389.56
726,726.00
NO
JENIS BAHAN
1
136
2
bak cuci piring stainless steel
137
IJUK
138
139
140
Kait angin
141
Grendel Kecil
142
Grendel besar
142
Engsel Jendela
143
145
146
147
Box Sekring
148
149
SPESIFIKASI
MERK / MODEL
UKURAN
3
1 bak
2 bak
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
50,100.05
90,719.63
10,515.51
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
2,755.50
4,989.58
578.35
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
551,100.55
997,915.92
115,670.56
4
Bh
Bh
Ikat
455,000.00
823,900.00
95,500.00
5
500,500.00
906,290.00
105,050.00
KE LOKASI
PROYEK
6
500.50
906.29
105.05
Kwalitas baik
Kwalitas sedang
Kwalitas baik
Kwalitas sedang
Kuningan
Biasa
Kuningan
Biasa
Kuningan
Biasa
Stainles steel
Kuningan
Biasa
Stainles steel
Kuningan
Biasa
Stainles steel
Kuningan
Biasa
Kecil
Sedang
Besar
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
195,000.00
175,000.00
356,000.00
180,000.00
30,200.00
10,000.00
18,500.00
12,000.00
19,500.00
13,500.00
39,500.00
29,500.00
6,700.00
80,000.00
52,500.00
18,500.00
40,000.00
15,000.00
13,500.00
15,000.00
24,500.00
78,500.00
214,500.00
192,500.00
391,600.00
198,000.00
33,220.00
11,000.00
20,350.00
13,200.00
21,450.00
14,850.00
43,450.00
32,450.00
7,370.00
88,000.00
57,750.00
20,350.00
44,000.00
16,500.00
14,850.00
16,500.00
26,950.00
86,350.00
214.50
192.50
391.60
198.00
33.22
11.00
20.35
13.20
21.45
14.85
43.45
32.45
7.37
88.00
57.75
20.35
44.00
16.50
14.85
16.50
26.95
86.35
21,471.45
19,269.25
39,199.16
19,819.80
3,325.32
1,101.10
2,037.04
1,321.32
2,147.15
1,486.49
4,349.35
3,248.25
737.74
8,808.80
5,780.78
2,037.04
4,404.40
1,651.65
1,486.49
1,651.65
2,697.70
8,643.64
1,180.93
1,059.81
2,155.95
1,090.09
182.89
60.56
112.04
72.67
118.09
81.76
239.21
178.65
40.58
484.48
317.94
112.04
242.24
90.84
81.76
90.84
148.37
475.40
236,185.95
211,961.75
431,190.76
218,017.80
36,578.54
12,112.10
22,407.39
14,534.52
23,618.60
16,351.34
47,842.80
35,730.70
8,115.11
96,896.80
63,588.53
22,407.39
48,448.40
18,168.15
16,351.34
18,168.15
29,674.65
95,079.99
1 Lobang
2 Lobang
Bh
Set
115,500.00
175,500.00
500,000.00
127,050.00
193,050.00
550,000.00
127.05
193.05
550.00
12,717.71
19,324.31
55,055.00
699.47
1,062.84
3,028.03
139,894.76
212,567.36
605,605.00
Pohon
Pohon
Pohon
Pohon
Pohon
Pohon
Pohon
675,000.00
565,000.00
675,000.00
260,000.00
265,000.00
275,000.00
260,000.00
742,500.00
621,500.00
742,500.00
286,000.00
291,500.00
302,500.00
286,000.00
742.50
621.50
742.50
286.00
291.50
302.50
286.00
74,324.25
62,212.15
74,324.25
28,628.60
29,179.15
30,280.25
28,628.60
4,087.83
3,421.67
4,087.83
1,574.57
1,604.85
1,665.41
1,574.57
817,566.75
684,333.65
817,566.75
314,914.60
320,970.65
333,082.75
314,914.60
Tinggi 100 cm
Tinggi 50 cm
Tinggi 100 cm
Tinggi 100 cm
Tinggi 100 cm
Tinggi 100 cm
Tinggi 50 cm
HPS
NO
1
JENIS BAHAN
2
Beringin biasa
Cemara wangi
Glodok tiang
Rumput jepang
Rumput berwarna menjalar
SPESIFIKASI
MERK / MODEL
UKURAN
3
Tinggi 50 cm
Tinggi 100 cm
Tinggi 100 cm
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
11,561.55
21,636.62
31,381.35
8,258.25
5,340.34
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
635.89
1,190.01
1,725.97
454.20
293.72
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
127,177.05
238,002.77
345,194.85
90,840.75
58,743.69
105,000.00
196,500.00
285,000.00
75,000.00
48,500.00
5
115,500.00
216,150.00
313,500.00
82,500.00
53,350.00
KE LOKASI
PROYEK
6
115.50
216.15
313.50
82.50
53.35
Bh
Bh
20,000.00
25,500.00
35,500.00
18,500.00
20,000.00
25,000.00
30,000.00
26,500.00
22,000.00
28,050.00
39,050.00
20,350.00
22,000.00
27,500.00
33,000.00
29,150.00
22.00
28.05
39.05
20.35
22.00
27.50
33.00
29.15
2,202.20
2,807.81
3,908.91
2,037.04
2,202.20
2,752.75
3,303.30
2,917.92
121.12
154.43
214.99
112.04
121.12
151.40
181.68
160.49
24,224.20
30,885.86
42,997.96
22,407.39
24,224.20
30,280.25
36,336.30
32,097.07
M
M
M
M
M
M
M
2,700.00
3,500.00
4,500.00
5,100.00
9,000.00
17,000.00
25,000.00
2,970.00
3,850.00
4,950.00
5,610.00
9,900.00
18,700.00
27,500.00
2.97
3.85
4.95
5.61
9.90
18.70
27.50
297.30
385.39
495.50
561.56
990.99
1,871.87
2,752.75
16.35
21.20
27.25
30.89
54.50
102.95
151.40
3,270.27
4,239.24
5,450.45
6,177.17
10,900.89
20,590.57
30,280.25
4
Pohon
Pohon
Pohon
Pohon
Pohon
Bh
Bh
HPS
150
151
152
153
154
155
156
157
155
156
157
158
159
160
161
162
163
164
165
166
167
168
M
M
M
M
M
M
M
2,000.00
3,000.00
3,500.00
5,000.00
7,500.00
19,500.00
25,000.00
2,200.00
3,300.00
3,850.00
5,500.00
8,250.00
21,450.00
27,500.00
2.20
3.30
3.85
5.50
8.25
21.45
27.50
220.22
330.33
385.39
550.55
825.83
2,147.15
2,752.75
12.11
18.17
21.20
30.28
45.42
118.09
151.40
2,422.42
3,633.63
4,239.24
6,056.05
9,084.08
23,618.60
30,280.25
169
170
171
172
Kabel SR 1 X 4 mm
Kabel SR 1 X 6 mm
Kabel SR 1 X 10 mm
Kabel SR 1 X 16 mm
M
M
M
M
8,000.00
12,000.00
15,000.00
25,000.00
8,800.00
13,200.00
16,500.00
27,500.00
8.80
13.20
16.50
27.50
880.88
1,321.32
1,651.65
2,752.75
48.45
72.67
90.84
151.40
9,689.68
14,534.52
18,168.15
30,280.25
173
174
M
M
8,000.00
12,000.00
8,800.00
13,200.00
8.80
13.20
880.88
1,321.32
48.45
72.67
9,689.68
14,534.52
Bh
Bh
100 mtr
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
1,431.43
1,596.60
1,981.98
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
78.73
87.81
109.01
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
15,745.73
17,562.55
21,801.78
4
M
M
M
13,000.00
14,500.00
18,000.00
5
14,300.00
15,950.00
19,800.00
KE LOKASI
PROYEK
6
14.30
15.95
19.80
M
M
M
M
M
M
M
M
M
M
M
M
12,500.00
14,500.00
18,500.00
25,000.00
33,000.00
42,000.00
60,000.00
75,000.00
97,000.00
132,000.00
180,000.00
225,000.00
13,750.00
15,950.00
20,350.00
27,500.00
36,300.00
46,200.00
66,000.00
82,500.00
106,700.00
145,200.00
198,000.00
247,500.00
13.75
15.95
20.35
27.50
36.30
46.20
66.00
82.50
106.70
145.20
198.00
247.50
1,376.38
1,596.60
2,037.04
2,752.75
3,633.63
4,624.62
6,606.60
8,258.25
10,680.67
14,534.52
19,819.80
24,774.75
75.70
87.81
112.04
151.40
199.85
254.35
363.36
454.20
587.44
799.40
1,090.09
1,362.61
15,140.13
17,562.55
22,407.39
30,280.25
39,969.93
50,870.82
72,672.60
90,840.75
117,487.37
159,879.72
218,017.80
272,522.25
190
191
192
193
194
195
196
197
198
199
200
201
M
M
M
M
M
M
M
M
M
M
M
M
14,000.00
17,000.00
24,500.00
30,000.00
40,000.00
50,000.00
76,000.00
100,000.00
125,000.00
175,000.00
235,000.00
290,000.00
15,400.00
18,700.00
26,950.00
33,000.00
44,000.00
55,000.00
83,600.00
110,000.00
137,500.00
192,500.00
258,500.00
319,000.00
15.40
18.70
26.95
33.00
44.00
55.00
83.60
110.00
137.50
192.50
258.50
319.00
1,541.54
1,871.87
2,697.70
3,303.30
4,404.40
5,505.50
8,368.36
11,011.00
13,763.75
19,269.25
25,875.85
31,931.90
84.78
102.95
148.37
181.68
242.24
302.80
460.26
605.61
757.01
1,059.81
1,423.17
1,756.25
16,956.94
20,590.57
29,674.65
36,336.30
48,448.40
60,560.50
92,051.96
121,121.00
151,401.25
211,961.75
284,634.35
351,250.90
202
203
204
205
206
207
208
209
M
M
M
M
M
M
M
M
16,000.00
20,000.00
29,000.00
36,000.00
49,000.00
65,000.00
95,000.00
125,000.00
17,600.00
22,000.00
31,900.00
39,600.00
53,900.00
71,500.00
104,500.00
137,500.00
17.60
22.00
31.90
39.60
53.90
71.50
104.50
137.50
1,761.76
2,202.20
3,193.19
3,963.96
5,395.39
7,157.15
10,460.45
13,763.75
96.90
121.12
175.63
218.02
296.75
393.64
575.32
757.01
19,379.36
24,224.20
35,125.09
43,603.56
59,349.29
78,728.65
115,064.95
151,401.25
1
175
176
177
2
Kabel NYM 2 X 3 mm
Kabel NYM 2 X 4 mm
Kabel NYM 2 X 6 mm
178
179
180
181
182
183
184
185
186
187
188
189
HPS
NO
JENIS BAHAN
1
210
211
212
213
2
Kabel NYY 4 X 50 mm
Kabel NYY 4 X 70 mm
Kabel NYY 4 X 95 mm
Kabel NYY 4 X 120 mm
214
215
216
217
218
219
220
221
222
223
Kabel NYFGBY
Kabel NYFGBY
Kabel NYFGBY
Kabel NYFGBY
Kabel NYFGBY
Kabel NYFGBY
Kabel NYFGBY
Kabel NYFGBY
Kabel NYFGBY
Kabel NYFGBY
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
Kabel NA2XSY
Kabel NA2XSY
Kabel NA2XSY
Kabel NA2XSY
Kabel NA2XSY
Kabel NA2XSY
Kabel NA2XSY
Kabel NA2XSY
239
240
241
242
243
Kabel N2XSY
Kabel N2XSY
Kabel N2XSY
Kabel N2XSY
Kabel N2XSY
SPESIFIKASI
MERK / MODEL
UKURAN
3
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
18,168.15
24,774.75
33,583.55
41,841.80
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
999.25
1,362.61
1,847.10
2,301.30
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
199,849.65
272,522.25
369,419.05
460,259.80
4
M
M
M
M
165,000.00
225,000.00
305,000.00
380,000.00
5
181,500.00
247,500.00
335,500.00
418,000.00
KE LOKASI
PROYEK
6
181.50
247.50
335.50
418.00
M
M
M
M
M
M
M
M
M
M
58,625.00
65,625.00
81,375.00
103,250.00
116,375.00
139,125.00
210,000.00
245,000.00
490,000.00
735,000.00
64,487.50
72,187.50
89,512.50
113,575.00
128,012.50
153,037.50
231,000.00
269,500.00
539,000.00
808,500.00
64.49
72.19
89.51
113.58
128.01
153.04
231.00
269.50
539.00
808.50
6,455.20
7,225.97
8,960.20
11,368.86
12,814.05
15,319.05
23,123.10
26,976.95
53,953.90
80,930.85
355.04
397.43
492.81
625.29
704.77
842.55
1,271.77
1,483.73
2,967.46
4,451.20
71,007.19
79,485.66
98,562.21
125,057.43
140,954.56
168,509.59
254,354.10
296,746.45
593,492.90
890,239.35
M
M
M
M
M
M
M
10,000.00
13,500.00
14,500.00
16,000.00
18,000.00
19,000.00
20,000.00
11,000.00
14,850.00
15,950.00
17,600.00
19,800.00
20,900.00
22,000.00
11.00
14.85
15.95
17.60
19.80
20.90
22.00
1,101.10
1,486.49
1,596.60
1,761.76
1,981.98
2,092.09
2,202.20
60.56
81.76
87.81
96.90
109.01
115.06
121.12
12,112.10
16,351.34
17,562.55
19,379.36
21,801.78
23,012.99
24,224.20
1x35 mm
1x50 mm
1x70 mm
1x95 mm
1x120 mm
1x150 mm
1x240 mm
1x300 mm
M
M
M
M
M
M
M
M
45,500.00
49,875.00
56,875.00
64,750.00
78,750.00
84,875.00
105,000.00
119,875.00
50,050.00
54,862.50
62,562.50
71,225.00
86,625.00
93,362.50
115,500.00
131,862.50
50.05
54.86
62.56
71.23
86.63
93.36
115.50
131.86
5,010.01
5,491.74
6,262.51
7,129.62
8,671.16
9,345.59
11,561.55
13,199.44
275.55
302.05
344.44
392.13
476.91
514.01
635.89
725.97
55,110.06
60,409.10
68,887.57
78,425.85
95,382.79
102,801.45
127,177.05
145,193.80
1x35 mm
1x50 mm
1x70 mm
1x95 mm
1x120 mm
M
M
M
M
M
58,625.00
65,625.00
81,375.00
103,250.00
116,375.00
64,487.50
72,187.50
89,512.50
113,575.00
128,012.50
644.88
721.88
895.13
1,135.75
1,280.13
6,513.24
7,290.94
9,040.76
11,471.08
12,929.26
358.23
401.00
497.24
630.91
711.11
71,645.61
80,200.31
99,448.39
126,181.83
142,221.89
4X25 mm
4X35 mm
4X50 mm
4X70 mm
4X95 mm
4X120 mm
4X150 mm
4X185 mm
4X240 mm
4X300 mm
HPS
NO
JENIS BAHAN
2
SPESIFIKASI
MERK / MODEL
UKURAN
3
1x150 mm
1x240 mm
1x300 mm
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
15,456.79
23,331.00
27,219.50
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
850.12
1,283.21
1,497.07
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
170,024.66
256,641.00
299,414.50
4
M
M
M
139,125.00
210,000.00
245,000.00
5
153,037.50
231,000.00
269,500.00
KE LOKASI
PROYEK
6
1,530.38
2,310.00
2,695.00
3x50 mm
3x70 mm
3x95 mm
3x120 mm
3x150 mm
3x240 mm
3x300 mm
M
M
M
M
M
M
M
174,125.00
200,375.00
228,375.00
254,625.00
280,875.00
394,625.00
455,000.00
191,537.50
220,412.50
251,212.50
280,087.50
308,962.50
434,087.50
500,500.00
1,915.38
2,204.13
2,512.13
2,800.88
3,089.63
4,340.88
5,005.00
19,345.29
22,261.66
25,372.46
28,288.84
31,205.21
43,842.84
50,550.50
1,063.99
1,224.39
1,395.49
1,555.89
1,716.29
2,411.36
2,780.28
212,798.16
244,878.29
279,097.09
311,177.21
343,257.34
482,271.21
556,055.50
3x120 mm
3x150 mm
3x240 mm
3x300 mm
M
M
M
M
315,875.00
377,125.00
560,000.00
717,500.00
347,462.50
414,837.50
616,000.00
789,250.00
3,474.63
4,148.38
6,160.00
7,892.50
35,093.71
41,898.59
62,216.00
79,714.25
1,930.15
2,304.42
3,421.88
4,384.28
386,030.84
460,884.46
684,376.00
876,856.75
45,000.00
65,000.00
85,500.00
96,500.00
105,000.00
49,500.00
71,500.00
94,050.00
106,150.00
115,500.00
495.00
715.00
940.50
1,061.50
1,155.00
4,999.50
7,221.50
9,499.05
10,721.15
11,665.50
274.97
397.18
522.45
589.66
641.60
54,994.50
79,436.50
104,489.55
117,932.65
128,320.50
M
M
M
M
M
M
M
4,375.00
6,125.00
8,750.00
11,375.00
14,875.00
16,625.00
26,250.00
4,812.50
6,737.50
9,625.00
12,512.50
16,362.50
18,287.50
28,875.00
48.13
67.38
96.25
125.13
163.63
182.88
288.75
486.06
680.49
972.13
1,263.76
1,652.61
1,847.04
2,916.38
26.73
37.43
53.47
69.51
90.89
101.59
160.40
5,346.69
7,485.36
10,693.38
13,901.39
18,178.74
20,317.41
32,080.13
M
M
M
M
M
M
M
7,875.00
9,625.00
11,375.00
13,125.00
14,875.00
16,625.00
21,875.00
8,662.50
10,587.50
12,512.50
14,437.50
16,362.50
18,287.50
24,062.50
86.63
105.88
125.13
144.38
163.63
182.88
240.63
874.91
1,069.34
1,263.76
1,458.19
1,652.61
1,847.04
2,430.31
48.12
58.81
69.51
80.20
90.89
101.59
133.67
9,624.04
11,762.71
13,901.39
16,040.06
18,178.74
20,317.41
26,733.44
1
244
245
246
Kabel N2XSY
Kabel N2XSY
Kabel N2XSY
247
248
249
250
251
252
253
Kabel NA2XSEBY
Kabel NA2XSEBY
Kabel NA2XSEBY
Kabel NA2XSEBY
Kabel NA2XSEBY
Kabel NA2XSEBY
Kabel NA2XSEBY
254
255
256
257
Kabel N2XSEFGBY
Kabel N2XSEFGBY
Kabel N2XSEFGBY
Kabel N2XSEFGBY
258
259
260
261
262
Kabel LVTC
Kabel LVTC
Kabel LVTC
Kabel LVTC
Kabel LVTC
3x25 mm + 1x20 mm
3x35 mm + 1x25 mm
3x65 mm + 1x50 mm
3x70 mm + 1x65 mm
3x75 mm + 1x65 mm
263
264
265
266
267
268
269
Kawat AAAC
Kawat AAAC
Kawat AAAC
Kawat AAAC
Kawat AAAC
Kawat AAAC
Kawat AAAC
35 mm
50 mm
70 mm
95 mm
120 mm
150 mm
240 mm
270
271
272
273
274
275
276
25 mm
35 mm
45 mm
60 mm
70 mm
75 mm
150 mm
HPS
NO
JENIS BAHAN
1
278
2
Kawat AAACS u/Jamper TM
279
280
281
282
283
284
285
286
287
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
288
289
290
291
292
293
294
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
Kabel Twisted Al
295
296
297
298
299
300
SPESIFIKASI
MERK / MODEL
UKURAN
3
240 mm
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
3,985.71
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
219.21
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
43,842.84
4
M
35,875.00
5
39,462.50
KE LOKASI
PROYEK
6
394.63
3x25+25 mm
3x35+25 mm
3x25+50 mm
3x50+35 mm
3x70+50 mm
2x25+25 mm
2x35+25 mm
2x50+25 mm
2x70+50 mm
M
M
M
M
M
M
M
M
M
14,875.00
21,875.00
23,625.00
28,000.00
39,375.00
11,375.00
14,875.00
20,125.00
27,125.00
16,362.50
24,062.50
25,987.50
30,800.00
43,312.50
12,512.50
16,362.50
22,137.50
29,837.50
163.63
240.63
259.88
308.00
433.13
125.13
163.63
221.38
298.38
1,652.61
2,430.31
2,624.74
3,110.80
4,374.56
1,263.76
1,652.61
2,235.89
3,013.59
90.89
133.67
144.36
171.09
240.60
69.51
90.89
122.97
165.75
18,178.74
26,733.44
28,872.11
34,218.80
48,120.19
13,901.39
18,178.74
24,594.76
33,149.46
2x10 mm
2x16 mm
2x25 mm
4x10 mm
4x16 mm
4x25 mm
4x35 mm
M
M
M
M
M
M
M
4,375.00
6,125
9,625.00
7,875.00
10,500.00
14,875.00
21,875.00
4,812.50
6,737.50
10,587.50
8,662.50
11,550.00
16,362.50
24,062.50
48.13
67.38
10.59
8.66
11.55
16.36
24.06
486.06
680.49
1,059.81
867.12
1,156.16
1,637.89
2,408.66
26.73
37.43
58.29
47.69
63.59
90.08
132.48
5,346.69
7,485.36
11,657.90
9,538.28
12,717.71
18,016.75
26,495.22
Bolt U
Bolt U
Bolt U
Bolt U
Bolt U
Bolt U
2"
3"
6"
8"
10"
12"
M
M
M
M
M
M
18,000.00
19,000.00
21,000.00
22,500.00
24,000.00
25,500.00
19,800.00
20,900.00
23,100.00
24,750.00
26,400.00
28,050.00
19.80
20.90
23.10
24.75
26.40
28.05
1,981.98
2,092.09
2,312.31
2,477.48
2,642.64
2,807.81
109.01
115.06
127.18
136.26
145.35
154.43
21,801.78
23,012.99
25,435.41
27,252.23
29,069.04
30,885.86
301
302
303
304
305
306
Beugeles
Beugeles
Beugeles
Beugeles
Beugeles
Beugeles
2"
4"
6"
8"
10"
12"
BH
BH
BH
BH
BH
BH
25,000.00
35,000.00
45,000.00
50,000.00
55,000.00
60,000.00
27,500.00
38,500.00
49,500.00
55,000.00
60,500.00
66,000.00
27.50
38.50
49.50
55.00
60.50
66.00
2,752.75
3,853.85
4,954.95
5,505.50
6,056.05
6,606.60
151.40
211.96
272.52
302.80
333.08
363.36
30,280.25
42,392.35
54,504.45
60,560.50
66,616.55
72,672.60
307
308
309
310
=3/4"
=2"
=3"
=6"
BH
BH
BH
BH
4,500.00
5,000.00
6,000.00
7,000.00
4,950.00
5,500.00
6,600.00
7,700.00
4.95
55.00
66.00
77.00
495.50
555.50
666.60
777.70
27.25
30.55
36.66
42.77
5,450.45
6,110.50
7,332.60
8,554.70
HPS
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
=8"
=10"
=12"
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
888.80
999.90
1,055.45
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
48.88
54.99
58.05
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
9,776.80
10,998.90
11,609.95
4
BH
BH
BH
8,000.00
9,000.00
9,500.00
5
8,800.00
9,900.00
10,450.00
KE LOKASI
PROYEK
6
88.00
99.00
104.50
2"
3"
6"
8"
10"
12"
BH
BH
BH
BH
BH
BH
9,000.00
16,000.00
30,000.00
35,000.00
40,000.00
45,000.00
9,900.00
17,600.00
33,000.00
38,500.00
44,000.00
49,500.00
99.00
176.00
330.00
38.50
44.00
49.50
999.90
1,777.60
3,333.00
3,853.85
4,404.40
4,954.95
54.99
97.77
183.32
211.96
242.24
272.52
10,998.90
19,553.60
36,663.00
42,392.35
48,448.40
54,504.45
2"
4"
6"
8"
10"
12"
BH
BH
BH
BH
BH
BH
12,000.00
24,000.00
36,000.00
40,000.00
50,000.00
55,000.00
13,200.00
26,400.00
39,600.00
44,000.00
55,000.00
60,500.00
13.20
26.40
39.60
44.00
55.00
60.50
1,321.32
2,642.64
3,963.96
4,404.40
5,505.50
6,056.05
72.67
145.35
218.02
242.24
302.80
333.08
14,534.52
29,069.04
43,603.56
48,448.40
60,560.50
66,616.55
20/35
20/36
20/37
20/38
20/39
20/40
Set
Set
Set
Set
Set
Set
85,000.00
90,000.00
100,000.00
110,000.00
120,000.00
130,000.00
93,500.00
99,000.00
110,000.00
121,000.00
132,000.00
143,000.00
93.50
99.00
110.00
121.00
132.00
143.00
9,359.35
9,909.90
11,011.00
12,112.10
13,213.20
14,314.30
514.76
545.04
605.61
666.17
726.73
787.29
102,952.85
109,008.90
121,121.00
133,233.10
145,345.20
157,457.30
Mur Baut
Mur Baut
Mur Baut
u/ 5/6x4"
u/ 5/6x6"
u/ 5/6x8"
BH
BH
BH
4,500.00
5,500.00
6,500.00
4,950.00
6,050.00
7,150.00
4.95
6.05
7.15
495.50
605.61
715.72
27.25
33.31
39.36
5,450.45
6,661.66
7,872.87
335
Mur Baut
u/ 1/2x1 /2"
BH
7,500.00
8,250.00
8.25
825.83
45.42
9,084.08
336
337
338
339
340
341
Mur Baut
Mur Baut
Mur Baut
Mur Baut
Mur Baut
Mur Baut
12 mm
20 mm
25 mm
35 mm
50 mm
70 mm
BH
BH
BH
BH
BH
BH
8,000.00
9,000.00
10,000.00
11,000.00
12,000.00
13,000.00
8,800.00
9,900.00
11,000.00
12,100.00
13,200.00
14,300.00
8.80
9.90
11.00
12.10
13.20
14.30
880.88
990.99
1,101.10
1,211.21
1,321.32
1,431.43
48.45
54.50
60.56
66.62
72.67
78.73
9,689.68
10,900.89
12,112.10
13,323.31
14,534.52
15,745.73
342
343
u/ 5/8x12"
u/ 5/8x10"
BH
BH
24,000.00
23,000.00
26,400.00
25,300.00
26.40
253.00
2,642.64
2,555.30
145.35
140.54
29,069.04
28,108.30
1
311
312
313
2
Klem Beugeles Veleng Stuck
Klem Beugeles Veleng Stuck
Klem Beugeles Veleng Stuck
314
315
316
317
318
319
Klem Beugeles
Klem Beugeles
Klem Beugeles
Klem Beugeles
Klem Beugeles
Klem Beugeles
320
321
322
323
324
325
Klem Beugeles
Klem Beugeles
Klem Beugeles
Klem Beugeles
Klem Beugeles
Klem Beugeles
326
327
328
329
330
331
332
333
334
U
U
U
U
U
U
HPS
NO
JENIS BAHAN
1
344
345
346
2
Mur Baut (Full Ulir )+Ring
Mur Baut (Full Ulir )+Ring
Mur Baut (Full Ulir )+Ring
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
SPESIFIKASI
MERK / MODEL
UKURAN
3
u/ 5/8x8"
u/ 5/8x6"
u/ 5/8x3"
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
2,444.20
2,333.10
1,999.80
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
134.43
128.32
109.99
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
26,886.20
25,664.10
21,997.80
22,000.00
21,000.00
18,000.00
5
24,200.00
23,100.00
19,800.00
KE LOKASI
PROYEK
6
242.00
231.00
198.00
20 KVA
BH
BH
M
BH
BH
BH
BH
BH
BH
250,000.00
165,000.00
155,000.00
65,000.00
50,000.00
75,000.00
6,500.00
5,500.00
16,500.00
16,000.00
24,000.00
85,000.00
66,500.00
7,500.00
250,000.00
20,000.00
84,000.00
45,000.00
45,000.00
56,000.00
56,000.00
225,000.00
275,000.00
181,500.00
170,500.00
71,500.00
55,000.00
82,500.00
7,150.00
6,050.00
18,150.00
17,600.00
26,400.00
93,500.00
73,150.00
8,250.00
275,000.00
22,000.00
92,400.00
49,500.00
49,500.00
61,600.00
61,600.00
247,500.00
275.00
181.50
170.50
71.50
55.00
82.50
7.15
6.05
18.15
17.60
26.40
93.50
73.15
8.25
275.00
22.00
924.00
495.00
495.00
616.00
61.60
2,475.00
27,527.50
18,168.15
17,067.05
7,157.15
5,505.50
8,258.25
715.72
605.61
1,816.82
1,761.76
2,642.64
9,359.35
7,322.32
825.83
27,527.50
2,202.20
9,332.40
4,999.50
4,999.50
6,221.60
6,166.16
24,997.50
1,514.01
999.25
938.69
393.64
302.80
454.20
39.36
33.31
99.92
96.90
145.35
514.76
402.73
45.42
1,514.01
121.12
513.28
274.97
274.97
342.19
339.14
1,374.86
302,802.50
199,849.65
187,737.55
78,728.65
60,560.50
90,840.75
7,872.87
6,661.66
19,984.97
19,379.36
29,069.04
102,952.85
80,545.47
9,084.08
302,802.50
24,224.20
102,656.40
54,994.50
54,994.50
68,437.60
67,827.76
274,972.50
16 mm
25 mm
35 mm
50 mm
70 mm
BH
BH
BH
BH
BH
14,000.00
15,000.00
16,000.00
18,000.00
20,000.00
15,400.00
16,500.00
17,600.00
19,800.00
22,000.00
154.00
165.00
17.60
19.80
22.00
1,555.40
1,666.50
1,761.76
1,981.98
2,202.20
85.55
91.66
96.90
109.01
121.12
17,109.40
18,331.50
19,379.36
21,801.78
24,224.20
100.50.4.2500
100.50.4.750
100.50.4.800
100.50.4.750
100.50.4.1000
M
M
M
M
M
250,000.00
220,000.00
200,000.00
150,000.00
150,000.00
275,000.00
242,000.00
220,000.00
165,000.00
165,000.00
275.00
242.00
220.00
165.00
165.00
27,527.50
24,224.20
22,022.00
16,516.50
16,516.50
1,514.01
1,332.33
1,211.21
908.41
908.41
302,802.50
266,466.20
242,242.00
181,681.50
181,681.50
20 KVA
70 mm
Baja 20 mm, Lapis Cu 250 m
4
BH
BH
BH
BH
BH
BH
Set
Set
Set
BH
BH
BH
BH
BH
BH
HPS
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
80.50.4.750
100.50.4.700
50.50.4.700
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
9,359.35
38,538.50
27,527.50
16,516.50
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
514.76
2,119.62
1,514.01
908.41
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
102,952.85
423,923.50
302,802.50
181,681.50
4
M
M
M
M
85,000.00
350,000.00
250,000.00
150,000.00
5
93,500.00
385,000.00
275,000.00
165,000.00
KE LOKASI
PROYEK
6
93.50
385.00
275.00
165.00
6/25 cm
8/25 cm
6/35 cm
8/35 cm
Cm
Cm
Cm
Cm
120,000.00
125,000.00
130,000.00
135,000.00
132,000.00
137,500.00
143,000.00
148,500.00
132.00
137.50
143.00
148.50
13,213.20
13,763.75
14,314.30
14,864.85
726.73
757.01
787.29
817.57
145,345.20
151,401.25
157,457.30
163,513.35
Mour+Baut
Mour+Baut
Mour+Baut
Mour+Baut
5/6x2"
5/6x4"
5/6x6"
5/8x2"
Pcs
Pcs
Pcs
Pcs
3,500.00
4,500.00
5,000.00
5,500.00
3,850.00
4,950.00
5,500.00
6,050.00
3.85
4.95
5.50
6.05
385.39
495.50
550.55
605.61
21.20
27.25
30.28
33.31
4,239.24
5,450.45
6,056.05
6,661.66
391
392
393
394
Mour+Baut
Mour+Baut
Mour+Baut
Mour+Baut
5/8x2"
5/8x4"
5/8x6"
5/8x8"
Pcs
Pcs
Pcs
Pcs
3,500.00
4,500.00
5,000.00
5,500.00
3,850.00
4,950.00
5,500.00
6,050.00
3.85
4.95
4.95
5.45
385.39
495.50
550.50
605.54
21.20
27.25
30.28
33.30
4,239.24
5,450.45
6,055.45
6,660.99
395
396
397
398
399
400
401
402
403
404
Kawat BC 95 mm
Kawat BC 50 mm
Kawat BC 40 mm
Kawat BC 35 mm
Kawat BC 30 mm
Kawat BC 25 mm
Kawat BC 20 mm
Kawat BC 16 mm
Kawat BC 6 mm
Kawat BC 4 mm
M
M
M
M
M
M
M
M
M
M
85,000.00
75,000.00
65,000.00
55,000.00
45,000.00
35,000.00
25,000.00
15,000.00
12,000.00
10,500.00
93,500.00
82,500.00
71,500.00
60,500.00
49,500.00
38,500.00
27,500.00
16,500.00
13,200.00
11,550.00
93.50
82.50
71.50
60.50
49.50
38.50
24.75
14.85
13.20
10.40
9,359.35
8,258.25
7,157.15
6,056.05
4,954.95
3,853.85
2,752.48
1,651.49
1,321.32
1,156.04
514.76
454.20
393.64
333.08
272.52
211.96
151.39
90.83
72.67
63.58
102,952.85
90,840.75
78,728.65
66,616.55
54,504.45
42,392.35
30,277.23
18,166.34
14,534.52
12,716.43
405
406
407
408
409
410
411
MCB 2 A
MCB 4 A
MCB 6 A
MCB 10 A
MCB 12 A
MCB 16 A
MCB 20 A
Bh
Bh
Bh
Bh
Bh
Bh
Bh
35,000.00
35,000.00
45,000.00
45,000.00
50,000.00
55,000.00
60,000.00
38,500.00
38,500.00
49,500.00
49,500.00
55,000.00
60,500.00
66,000.00
34.65
34.65
44.55
44.55
49.50
54.45
59.40
3,853.47
3,853.47
4,954.46
4,954.46
5,504.95
6,055.45
6,605.94
211.94
211.94
272.50
272.50
302.77
333.05
363.33
42,388.12
42,388.12
54,499.01
54,499.01
60,554.45
66,609.90
72,665.34
1
379
380
381
382
2
Besi UNDP Dudukan Pipa
Besi UNDP Dudukan Panel LV
Besi Siku Penyangga Dudukan Trafo
Besi Penyangga TR/TM
383
384
385
386
Besi UNP
Besi UNP
Besi UNP
Besi UNP
387
388
389
390
HPS
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
HPS
5
KE LOKASI
PROYEK
6
PROFIT
10%
(Rp)
7=10% *(5+6)
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
412
413
414
415
416
417
418
419
MCCB 25 A
MCCB 50 A
MCCB 65 A
MCCB 75 A
MCCB 100 A
MCCB 150 A
MCCB 200 A
MCCB 250 A
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
325,000.00
350,000.00
380,000.00
450,000.00
500,000.00
875,000.00
1,000,000.00
1,200,000.00
357,500.00
385,000.00
418,000.00
495,000.00
550,000.00
962,500.00
1,100,000.00
1,320,000.00
321.75
346.50
376.20
445.50
495.00
866.25
990.00
1,188.00
35,782.18
38,534.65
41,837.62
49,544.55
55,049.50
96,336.63
110,099.00
132,118.80
1,968.02
2,119.41
2,301.07
2,724.95
3,027.72
5,298.51
6,055.45
7,266.53
393,603.93
423,881.15
460,213.82
544,990.05
605,544.50
1,059,702.88
1,211,089.00
1,453,306.80
420
421
422
423
424
425
426
427
NFB 25 A
NFB 50 A
NFB 65 A
NFB 75 A
NFB 100 A
NFB 150 A
NFB 200 A
NFB 250 A
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
325,000.00
350,000.00
380,000.00
450,000.00
500,000.00
875,000.00
1,000,000.00
1,200,000.00
357,500.00
385,000.00
418,000.00
495,000.00
550,000.00
962,500.00
1,100,000.00
1,320,000.00
321.75
346.50
418.00
495.00
550.00
962.50
1,100.00
1,320.00
35,782.18
38,534.65
41,841.80
49,549.50
55,055.00
96,346.25
110,110.00
132,132.00
1,968.02
2,119.41
2,301.30
2,725.22
3,028.03
5,299.04
6,056.05
7,267.26
393,603.93
423,881.15
460,259.80
545,044.50
605,605.00
1,059,808.75
1,211,210.00
1,453,452.00
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
Fuse Link 25 A
Fuse Link 50 A
Fuse Link 65 A
Fuse Link 75 A
Fuse Link 80 A
Fuse Link 90 A
Fuse Link 95 A
Fuse Link 100 A
Fuse Link 120 A
Fuse Link 125 A
Fuse Link 135 A
Fuse Link 140 A
Fuse Link 150 A
Fuse Link 200 A
Fuse Link 250 A
Fuse Link 300 A
Fuse Link 350 A
Fuse Link 400 A
Fuse Link 450 A
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
115,000.00
120,000.00
140,000.00
150,000.00
165,000.00
176,000.00
182,000.00
100,000.00
110,000.00
120,000.00
135,000.00
150,000.00
165,000.00
245,000.00
325,000.00
350,000.00
425,000.00
450,000.00
560,000.00
126,500.00
132,000.00
154,000.00
165,000.00
181,500.00
193,600.00
200,200.00
110,000.00
121,000.00
132,000.00
148,500.00
165,000.00
181,500.00
269,500.00
357,500.00
385,000.00
467,500.00
495,000.00
616,000.00
101.20
105.60
123.20
82.50
90.75
96.80
100.10
55.00
60.50
66.00
74.25
66.00
72.60
107.80
3,575.00
3,850.00
4,675.00
4,950.00
6,160.00
12,660.12
13,210.56
15,412.32
16,508.25
18,159.08
19,369.68
20,030.01
11,005.50
12,106.05
13,206.60
14,857.43
16,506.60
18,157.26
26,960.78
36,107.50
38,885.00
47,217.50
49,995.00
62,216.00
696.31
726.58
847.68
907.95
998.75
1,065.33
1,101.65
605.30
665.83
726.36
817.16
907.86
998.65
1,482.84
1,985.91
2,138.68
2,596.96
2,749.73
3,421.88
139,261.32
145,316.16
169,535.52
181,590.75
199,749.83
213,066.48
220,330.11
121,060.50
133,166.55
145,272.60
163,431.68
181,572.60
199,729.86
296,568.58
397,182.50
427,735.00
519,392.50
549,945.00
684,376.00
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
63,882.50
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
3,513.54
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
702,707.50
1
447
4
Bh
575,000.00
5
632,500.00
KE LOKASI
PROYEK
6
6,325.00
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
Highbom 50 A
Highbom 65 A
Highbom 75 A
Highbom 80 A
Highbom 90 A
Highbom 95 A
Highbom 100 A
Highbom 120 A
Highbom 125 A
Highbom 135 A
Highbom 140 A
Highbom 150 A
Highbom 200 A
Highbom 250 A
Highbom 300 A
Highbom 350 A
Highbom 400 A
Highbom 450 A
Highbom 500 A
Highbom 1000 A
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
650,000.00
775,000.00
785,000.00
795,000.00
795,000.00
850,000.00
950,000.00
1,000,000.00
1,050,000.00
1,100,000.00
1,150,000.00
1,200,000.00
1,250,000.00
1,300,000.00
1,350,000.00
1,400,000.00
1,450,000.00
1,500,000.00
2,350,000.00
4,500,000.00
715,000.00
852,500.00
863,500.00
874,500.00
874,500.00
935,000.00
1,045,000.00
1,100,000.00
1,155,000.00
1,210,000.00
1,265,000.00
1,320,000.00
1,375,000.00
1,430,000.00
1,485,000.00
1,540,000.00
1,595,000.00
1,650,000.00
2,585,000.00
4,950,000.00
7,150.00
8,525.00
8,635.00
8,745.00
8,745.00
9,350.00
10,450.00
11,000.00
11,550.00
12,100.00
12,650.00
13,200.00
13,750.00
14,300.00
14,850.00
1,540.00
1,595.00
1,650.00
2,585.00
4,950.00
72,215.00
86,102.50
87,213.50
88,324.50
88,324.50
94,435.00
105,545.00
111,100.00
116,655.00
122,210.00
127,765.00
133,320.00
138,875.00
144,430.00
149,985.00
154,154.00
159,659.50
165,165.00
258,758.50
495,495.00
3,971.83
4,735.64
4,796.74
4,857.85
4,857.85
5,193.93
5,804.98
6,110.50
6,416.03
6,721.55
7,027.08
7,332.60
7,638.13
7,943.65
8,249.18
8,478.47
8,781.27
9,084.08
14,231.72
27,252.23
794,365.00
947,127.50
959,348.50
971,569.50
971,569.50
1,038,785.00
1,160,995.00
1,222,100.00
1,283,205.00
1,344,310.00
1,405,415.00
1,466,520.00
1,527,625.00
1,588,730.00
1,649,835.00
1,695,694.00
1,756,254.50
1,816,815.00
2,846,343.50
5,450,445.00
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
Stop Kontak AC
Stop Kontak Tanam
Stop Kontak Timbul
Saklar Engkel Timbul
Saklar Ganda Timbul
Saklar 3 Kutub Timbul
Saklar Tukar Timbul
Saklar Engkel Tanam
Saklar Ganda Tanam
Saklar 3 Kutub Tanam
Saklar Tukar Tanam
Box Saklar
T Dos 3 Lobang
T Dos 4 Lobang
Veteng
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
75,000.00
45,000.00
20,000.00
20,000.00
25,000.00
5,000.00
5,000.00
27,500.00
42,500.00
5,000.00
22,500.00
2,500.00
3,500.00
5,000.00
45,000.00
82,500.00
49,500.00
22,000.00
22,000.00
27,500.00
5,500.00
5,500.00
30,250.00
46,750.00
5,500.00
24,750.00
2,750.00
3,850.00
5,500.00
49,500.00
825.00
495.00
220.00
220.00
275.00
55.00
0.55
3.03
46.75
5.50
24.75
2.75
38.50
55.00
495.00
8,332.50
4,999.50
2,222.00
2,222.00
2,777.50
555.50
550.06
3,025.30
4,679.68
550.55
2,477.48
275.28
388.85
555.50
4,999.50
458.29
274.97
122.21
122.21
152.76
30.55
30.25
166.39
257.38
30.28
136.26
15.14
21.39
30.55
274.97
91,657.50
54,994.50
24,442.00
24,442.00
30,552.50
6,110.50
6,050.61
33,278.33
51,476.43
6,056.05
27,252.23
3,028.03
4,277.35
6,110.50
54,994.50
HPS
NO
JENIS BAHAN
1
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
2
Veteng Dowlight
Pipa Listrik
Sok Pipa Listrik
Pipa Listrik Spiral
Klem 12
Klem 19
Isolasi Ban
Volmeter
Pengadaan
dan
dan pemasangan
pemasangan Peralatan
Instalasi
Ampere meter
Cos
Curent Transformer
Frekwensi Meter
Selector Volt
Busbar cu
Sepatu Busbar
Isolator Busbar
Conektor Kabel SR
Tap Conextor
SPESIFIKASI
MERK / MODEL
UKURAN
3
16/36 "
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
3,888.50
777.70
166.65
777.70
1,666.50
3,333.00
888.80
10,554.50
10,554.50
21,664.50
32,774.50
32,774.72
10,554.50
3,888.50
388.85
555.50
1,777.60
2,888.60
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
213.87
42.77
9.17
42.77
91.66
183.32
48.88
580.50
580.50
1,191.55
1,802.60
1,802.61
580.50
213.87
21.39
30.55
97.77
158.87
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
42,773.50
8,554.70
1,833.15
8,554.70
18,331.50
36,663.00
9,776.80
116,099.50
116,099.50
238,309.50
360,519.50
360,521.94
116,099.50
42,773.50
4,277.35
6,110.50
19,553.60
31,774.60
4
Bh
Staf
Bh
Staf
Dos
Dos
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M
Bh
Bh
Bh
Bh
35,000.00
7,000.00
1,500.00
7,000.00
15,000.00
30,000.00
8,000.00
95,000.00
95,000.00
195,000.00
295,000.00
295,002.00
95,000.00
35,000.00
3,500.00
5,000.00
16,000.00
26,000.00
5
38,500.00
7,700.00
1,650.00
7,700.00
16,500.00
33,000.00
8,800.00
104,500.00
104,500.00
214,500.00
324,500.00
324,502.20
104,500.00
38,500.00
3,850.00
5,500.00
17,600.00
28,600.00
KE LOKASI
PROYEK
6
385.00
77.00
16.50
77.00
165.00
330.00
88.00
1,045.00
1,045.00
2,145.00
3,245.00
3,245.02
1,045.00
385.00
38.50
55.00
176.00
286.00
Bh
Bh
Bh
Bh
Bh
3,300,000.00
1,300,000.00
500,000.00
450,000.00
320,000.00
3,630,000.00
1,430,000.00
550,000.00
495,000.00
352,000.00
36,300.00
14,300.00
5,500.00
4,950.00
3,520.00
366,630.00
144,430.00
55,550.00
49,995.00
35,552.00
20,164.65
7,943.65
3,055.25
2,749.73
1,955.36
4,032,930.00
1,588,730.00
611,050.00
549,945.00
391,072.00
HPS
501
502
503
504
505
Panel 180X120X40
Panel 80X100X40
Panel 60x40x30
Panel 50x40x20
Panel 40x40x20
506
507
508
509
Join Sleeve al
Join Sleeve al
Join Sleeve al
Join Sleeve al
75 mm
70 mm
35 mm
25 mm
Bh
Bh
Bh
Bh
55,000.00
50,000.00
45,000.00
35,000.00
60,500.00
55,000.00
49,500.00
38,500.00
605.00
550.00
495.00
385.00
6,110.50
5,555.00
4,999.50
3,888.50
336.08
305.53
274.97
213.87
67,215.50
61,105.00
54,994.50
42,773.50
510
511
512
513
25 mm
35 mm
70 mm
75 mm
Bh
Bh
Bh
Bh
35,000.00
45,000.00
50,000.00
55,000.00
38,500.00
49,500.00
55,000.00
60,500.00
385.00
495.00
550.00
605.00
3,888.50
4,999.50
5,555.00
6,110.50
213.87
274.97
305.53
336.08
42,773.50
54,994.50
61,105.00
67,215.50
514
515
Paralel Grove Al
Paralel Grove Al
36-70 mm
25/50 mm
Bh
Bh
50,000.00
45,000.00
55,000.00
49,500.00
880.00
792.00
5,588.00
5,029.20
307.34
276.61
61,468.00
55,321.20
NO
JENIS BAHAN
1
516
517
518
2
Paralel Grove Al-Cu
Pararel Grove Al/Cu
Pararel Grove Al/Cu
519
520
521
522
523
524
525
Schoen Primodure
Schun CCLAC 50-90 mm
Schoen Press Cu
Schoen Press Cu
Schoen Press Cu
Schoen Press Cu
Schoen Press Cu
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
Schun 185 mm
Schun 100 mm
Schun 85 mm
Schun 80 mm
Schun 75 mm
Schun 50 mm
Schun 35 mm
Schun 25 mm
Schun 12 mm
Schun 10 mm
Schun 8 mm
Schun 6 mm
Schun 4 mm
Schun 2 mm
545
546
547
548
549
Generator
Generator
Generator
Generator
Generator
SPESIFIKASI
MERK / MODEL
UKURAN
3
14/35-35 70 mm
16/35 - 35 70 mm
20/35 - 35 70 mm
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
2,235.20
2,794.00
3,911.60
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
122.94
153.67
215.14
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
24,587.20
30,734.00
43,027.60
4
Bh
Bh
Bh
20,000.00
25,000.00
35,000.00
5
22,000.00
27,500.00
38,500.00
KE LOKASI
PROYEK
6
352.00
440.00
616.00
50-90 mm
50-90 mm
75 mm
70 mm
50 mm
35 mm
25 mm
Bh
Bh
Bh
Bh
Bh
Bh
Bh
12,000.00
10,000.00
9,500.00
9,000.00
8,000.00
6,000.00
5,000.00
13,200.00
11,000.00
10,450.00
9,900.00
8,800.00
6,600.00
5,500.00
0.40
0.33
0.31
0.30
0.26
0.07
0.06
1,320.04
1,100.03
1,045.03
990.03
880.03
660.01
550.01
72.60
60.50
57.48
54.45
48.40
36.30
30.25
14,520.44
12,100.36
11,495.34
10,890.33
9,680.29
7,260.07
6,050.06
75 mm
70 mm
50 mm
35 mm
25 mm
Bh
Bh
Bh
Bh
Bh
9,500.00
9,000.00
8,000.00
6,000.00
5,000.00
10,450.00
9,900.00
8,800.00
6,600.00
5,500.00
0.10
0.10
0.09
0.07
0.06
1,045.01
990.01
880.01
660.01
550.01
57.48
54.45
48.40
36.30
30.25
11,495.11
10,890.11
9,680.10
7,260.07
6,050.06
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
18,000.00
15,000.00
12,000.00
9,000.00
7,000.00
7,001.00
5,000.00
4,000.00
3,500.00
3,000.00
2,600.00
2,500.00
1,500.00
1,000.00
19,800.00
16,500.00
13,200.00
9,900.00
7,700.00
7,701.10
5,500.00
4,400.00
3,850.00
3,300.00
2,860.00
2,750.00
1,650.00
1,100.00
217.80
181.50
145.20
108.90
84.70
84.71
60.50
48.40
42.35
36.30
31.46
30.25
18.15
12.10
2,001.78
1,668.15
1,334.52
1,000.89
778.47
778.58
556.05
444.84
389.24
333.63
289.15
278.03
166.82
111.21
110.10
91.75
73.40
55.05
42.82
42.82
30.58
24.47
21.41
18.35
15.90
15.29
9.17
6.12
22,019.58
18,349.65
14,679.72
11,009.79
8,563.17
8,564.39
6,116.55
4,893.24
4,281.59
3,669.93
3,180.61
3,058.28
1,834.97
1,223.31
5,200,000.00
35,500,000.00
79,500,000.00
115,500,000.00
135,500,000.00
5,720,000.00
39,050,000.00
87,450,000.00
127,050,000.00
149,050,000.00
62,920.00
624,800.00
87,450.00
127,050.00
149,050.00
578,292.00
3,967,480.00
8,753,745.00
12,717,705.00
14,919,905.00
31,806.06
218,211.40
481,455.98
699,473.78
820,594.78
6,361,212.00
43,642,280.00
96,291,195.00
139,894,755.00
164,118,955.00
5 KVA
10 KVA
20 KVA
30 KVA
60 KVA
HPS
NO
JENIS BAHAN
1
550
551
552
553
554
555
556
Generator
Generator
Generator
Generator
Generator
Generator
Generator
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
Rel Mcb
Wire Ducting
Tie Kabel / Kaki belalang
Visher 10
Visher 12
Pilot Lamp
Lampu Pijar 5 W
Lampu Pijar 7 W
Lampu Pijar 9 W
Lampu Pijar 11 W
Lampu Pijar 14 W
Lampu Pijar 18 W
Lampu Pijar 24 W
Lampu Pijar 32 W
Lampu Pijar 40 W
Lampu Pijar 60 W
Lampu Pijar 100 W
Lampu TL + Armaturnya 5 W
Lampu TL + Armaturnya 10 W
Lampu TL + Armaturnya 18 W
Lampu TL + Armaturnya 20 W
Lampu TL + Armaturnya 32 W
Lampu TL + Armaturnya 40 W
Lampu TL Baret + Armaturnya 5 W
Lampu TL Baret + Armaturnya 10 W
Lampu TL Baret + Armaturnya 18 W
Lampu TL Baret + Armaturnya 20 W
Lampu TL Baret + Armaturnya 32 W
Lampu TL Baret + Armaturnya 40 W
Lampu Halogen + Armaturnya 25 W
SPESIFIKASI
MERK / MODEL
UKURAN
3
80 KVA
100 KVA
150 KVA
170 KVA
250 KVA
350 KVA
450 KVA
SATUAN
HARGA
STANDART
MALUKU UTARA
177,000,000.00
210,500,000.00
225,500,000.00
259,000,000.00
310,800,000.00
372,960,000.00
447,552,000.00
5
194,700,000.00
231,550,000.00
248,050,000.00
284,900,000.00
341,880,000.00
410,256,000.00
492,307,200.00
KE LOKASI
PROYEK
6
194,700.00
231,550.00
248,050.00
284,900.00
341,880.00
410,256.00
492,307.20
25,000.00
8,000.00
6,500.00
1,000.00
1,000.00
15,000.00
5,000.00
6,500.00
7,000.00
9,000.00
12,000.00
16,000.00
18,000.00
18,500.00
20,000.00
22,000.00
35,000.00
125,000.00
130,000.00
137,500.00
145,000.00
155,000.00
165,000.00
125,000.00
130,000.00
137,500.00
145,000.00
155,000.00
165,000.00
125,000.00
27,500.00
8,800.00
7,150.00
1,100.00
1,100.00
16,500.00
5,500.00
7,150.00
7,700.00
9,900.00
13,200.00
17,600.00
19,800.00
20,350.00
22,000.00
24,200.00
38,500.00
137,500.00
143,000.00
151,250.00
159,500.00
170,500.00
181,500.00
137,500.00
143,000.00
151,250.00
159,500.00
170,500.00
181,500.00
137,500.00
27.50
8.80
7.15
1.10
1.10
16.50
5.50
7.15
7.70
9.90
13.20
17.60
19.80
20.35
22.00
24.20
38.50
137.50
14.30
15.13
15.95
17.05
18.15
13.75
14.30
15.13
15.95
17.05
18.15
13.75
M
M
Pcs
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
ONGKOS ANGKUT
HPS
PROFIT
10%
(Rp)
7=10% *(5+6)
19,489,470.00
23,178,155.00
24,829,805.00
28,518,490.00
34,222,188.00
41,066,625.60
49,279,950.72
2,752.75
880.88
715.72
110.11
110.11
1,651.65
550.55
715.72
770.77
990.99
1,321.32
1,761.76
1,981.98
2,037.04
2,202.20
2,422.42
3,853.85
13,763.75
14,301.43
15,126.51
15,951.60
17,051.71
18,151.82
13,751.38
14,301.43
15,126.51
15,951.60
17,051.71
18,151.82
13,751.38
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
1,071,920.85
1,274,798.53
1,365,639.28
1,568,516.95
1,882,220.34
2,258,664.41
2,710,397.29
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
214,384,170.00
254,959,705.00
273,127,855.00
313,703,390.00
376,444,068.00
451,732,881.60
542,079,457.92
151.40
48.45
39.36
6.06
6.06
90.84
30.28
39.36
42.39
54.50
72.67
96.90
109.01
112.04
121.12
133.23
211.96
757.01
786.58
831.96
877.34
937.84
998.35
756.33
786.58
831.96
877.34
937.84
998.35
756.33
30,280.25
9,689.68
7,872.87
1,211.21
1,211.21
18,168.15
6,056.05
7,872.87
8,478.47
10,900.89
14,534.52
19,379.36
21,801.78
22,407.39
24,224.20
26,646.62
42,392.35
151,401.25
157,315.73
166,391.64
175,467.55
187,568.76
199,669.97
151,265.13
157,315.73
166,391.64
175,467.55
187,568.76
199,669.97
151,265.13
NO
JENIS BAHAN
1
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
2
Lampu Halogen + Armaturnya 50 W
Lampu Halogen + Armaturnya 100 W
Lampu Halogen + Armaturnya 150 W
Lampu Halogen + Armaturnya 200 W
Lampu Halogen + Armaturnya 250 W
Lampu Halogen + Armaturnya 500 W
Lampu Mercury + Armaturnya 25 W
Lampu Mercury + Armaturnya 50 W
Lampu Mercury + Armaturnya 100 W
Lampu Mercury + Armaturnya 150 W
Lampu Mercury + Armaturnya 200 W
Lampu Mercury + Armaturnya 250 W
Lampu Mercury + Armaturnya 500 W
Timer DC line Gardu Teg Out 220
Photo Cell Teg 220
602
603
604
605
606
607
608
609
610
611
612
613
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
Tiang Besi
614
615
616
617
618
619
620
Tiang Beton
Tiang Beton
Tiang Beton
Tiang Beton
Tiang Beton
Tiang Beton
Tiang Beton
621
SPESIFIKASI
MERK / MODEL
UKURAN
3
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
14,301.43
15,126.51
15,951.60
17,051.71
18,151.82
23,102.31
13,751.38
14,301.43
15,126.51
16,205.20
17,322.80
18,440.40
24,587.20
19,558.00
21,793.20
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
786.58
831.96
877.34
937.84
998.35
1,270.63
756.33
786.58
831.96
891.29
952.75
1,014.22
1,352.30
1,075.69
1,198.63
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
157,315.73
166,391.64
175,467.55
187,568.76
199,669.97
254,125.41
151,265.13
157,315.73
166,391.64
178,257.20
190,550.80
202,844.40
270,459.20
215,138.00
239,725.20
4
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
130,000.00
137,500.00
145,000.00
155,000.00
165,000.00
210,000.00
125,000.00
130,000.00
137,500.00
145,000.00
155,000.00
165,000.00
220,000.00
175,000.00
195,000.00
5
143,000.00
151,250.00
159,500.00
170,500.00
181,500.00
231,000.00
137,500.00
143,000.00
151,250.00
159,500.00
170,500.00
181,500.00
242,000.00
192,500.00
214,500.00
KE LOKASI
PROYEK
6
14.30
15.13
15.95
17.05
18.15
23.10
13.75
14.30
15.13
2,552.00
2,728.00
2,904.00
3,872.00
3,080.00
3,432.00
7 m, 100 dAN
9 m, 90 dAN
9 m, 100 dAN
9 m, 156 dAN
9 m, 200 dAN
9 m, 350 dAN
11 m, 156 dAN
11 m, 200 dAN
11 m, 350 dAN
12 m, 200 dAN
12 m, 350 dAN
13 m, 350 dAN
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
595,000.00
848,750.00
1,312,500.00
1,137,500.00
1,575,000.00
1,662,500.00
1,260,875.00
2,362,500.00
3,062,500.00
1,662,500.00
3,675,000.00
4,112,500.00
654,500.00
933,625.00
1,443,750.00
1,251,250.00
1,732,500.00
1,828,750.00
1,386,962.50
2,598,750.00
3,368,750.00
1,828,750.00
4,042,500.00
4,523,750.00
65.45
93.36
144.38
125.13
173.25
182.88
138.70
259.88
336.88
182.88
404.25
452.38
65,456.55
93,371.84
144,389.44
125,137.51
173,267.33
182,893.29
138,710.12
259,900.99
336,908.69
182,893.29
404,290.43
452,420.24
3,600.11
5,135.45
7,941.42
6,882.56
9,529.70
10,059.13
7,629.06
14,294.55
18,529.98
10,059.13
22,235.97
24,883.11
720,022.00
1,027,090.20
1,588,283.81
1,376,512.64
1,905,940.58
2,011,826.16
1,525,811.32
2,858,910.86
3,705,995.56
2,011,826.16
4,447,194.68
4,976,622.61
7 m, 100 dAN
9 m,100 dAN
9 m, 200 dAN
11 m, 200 dAN
11 m, 350 dAN
13 m, 350 dAN
14 m, 350 dAN
Bh
Bh
Bh
Bh
Bh
Bh
Bh
612,500.00
787,500.00
910,000.00
1,312,500.00
1,662,500.00
2,187,500.00
2,537,500.00
673,750.00
866,250.00
1,001,000.00
1,443,750.00
1,828,750.00
2,406,250.00
2,791,250.00
67.38
86.63
100.10
144.38
182.88
240.63
279.13
67,381.74
86,633.66
100,110.01
144,389.44
182,893.29
240,649.06
279,152.91
3,706.00
4,764.85
5,506.05
7,941.42
10,059.13
13,235.70
15,353.41
741,199.11
952,970.29
1,101,210.11
1,588,283.81
2,011,826.16
2,647,139.69
3,070,682.04
Bh
813,750.00
895,125.00
89.51
89,521.45
4,923.68
984,735.96
HPS
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
24 kv, 10 ka
25 kv, 5 ka
20 kv 600 a
24 kv 630 a
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
PROFIT
10%
(Rp)
7=10% *(5+6)
86,633.66
89,521.45
2,119,617.50
2,697,695.00
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
4,764.85
4,923.68
116,578.96
148,373.23
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
952,970.29
984,735.96
23,315,792.50
29,674,645.00
4
Bh
Bh
Bh
Bh
787,500.00
813,750.00
19,250,000.00
24,500,000.00
5
866,250.00
895,125.00
21,175,000.00
26,950,000.00
KE LOKASI
PROYEK
6
86.63
89.51
21,175.00
26,950.00
Bh
Bh
Bh
148,750.00
173,250.00
173,250.00
163,625.00
190,575.00
190,575.00
163.63
190.58
190.58
16,378.86
19,076.56
19,076.56
900.84
1,049.21
1,049.21
180,167.49
209,842.13
209,842.13
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
14,875,000.00
16,625,000.00
23,625,000.00
23,625,001.00
17,150,000.00
22,662,500.00
28,875,000.00
38,500,000.00
49,000,000.00
50,750,000.00
56,000,000.00
63,000,000.00
16,362,500.00
18,287,500.00
25,987,500.00
25,987,501.10
18,865,000.00
24,928,750.00
31,762,500.00
42,350,000.00
53,900,000.00
55,825,000.00
61,600,000.00
69,300,000.00
16,362.50
18,287.50
25,987.50
25,987.50
18,865.00
24,928.75
31,762.50
42,350.00
53,900.00
55,825.00
61,600.00
69,300.00
1,637,886.25
1,830,578.75
2,601,348.75
2,601,348.86
1,888,386.50
2,495,367.88
3,179,426.25
4,239,235.00
5,395,390.00
5,588,082.50
6,166,160.00
6,936,930.00
90,083.74
100,681.83
143,074.18
143,074.19
103,861.26
137,245.23
174,868.44
233,157.93
296,746.45
307,344.54
339,138.80
381,531.15
18,016,748.75
20,136,366.25
28,614,836.25
28,614,837.46
20,772,251.50
27,449,046.63
34,973,688.75
46,631,585.00
59,349,290.00
61,468,907.50
67,827,760.00
76,306,230.00
LBS Kubikel
Voltage Transformer Kubikel
Transformer Protection - 3 (TP-3) Kubikel
Transformer Protection - 1 (TP-3) Kubikel
Transformer Protection dengan relay Kubikel
CB Main Protection
Out Going CB Kubikel
VT CB Out Kubikel
Out Going Busbar Kubikel
Double Incoming
Double Incoming dengan ACO Kubikel
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
42,875,000.00
62,125,000.00
67,375,000.00
60,375,000.00
46,375,000.00
253,750,000.00
245,875,000.00
289,625,000.00
30,625,000.00
192,500,000.00
149,625,000.00
47,162,500.00
68,337,500.00
74,112,500.00
66,412,500.00
51,012,500.00
279,125,000.00
270,462,500.00
318,587,500.00
33,687,500.00
211,750,000.00
164,587,500.00
47,162.50
68,337.50
74,112.50
66,412.50
51,012.50
279,125.00
1,622,775.00
1,911,525.00
202,125.00
423,500.00
987,525.00
4,720,966.25
6,840,583.75
7,418,661.25
6,647,891.25
5,106,351.25
27,940,412.50
27,208,527.50
32,049,902.50
3,388,962.50
21,217,350.00
16,557,502.50
259,653.14
376,232.11
408,026.37
365,634.02
280,849.32
1,536,722.69
1,496,469.01
1,762,744.64
186,392.94
1,166,954.25
910,662.64
51,930,628.75
75,246,421.25
81,605,273.75
73,126,803.75
56,169,863.75
307,344,537.50
299,293,802.50
352,548,927.50
37,278,587.50
233,390,850.00
182,132,527.50
Bh
Bh
Bh
1,000,000.00
1,500,000.00
1,600,000.00
1,100,000.00
1,650,000.00
1,760,000.00
6,600.00
9,900.00
10,560.00
110,660.00
165,990.00
177,056.00
6,086.30
9,129.45
9,738.08
1,217,260.00
1,825,890.00
1,947,616.00
1
622
623
624
625
2
Ligthing Arrester
Ligthing Arrester
Load Breacker Swicth
Load Breacker Swicth
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
Trafo Distribusi
641
642
643
644
645
646
647
648
649
650
651
663
664
665
HPS
NO
JENIS BAHAN
SPESIFIKASI
MERK / MODEL
UKURAN
3
SATUAN
HARGA
STANDART
MALUKU UTARA
ONGKOS ANGKUT
1
666
667
668
669
670
AC casette 3 PK
AC casette 2 PK
AC spit 1.5 PK
AC spit 1 PK
AC spit 0.75PK
4
Bh
Bh
Bh
Bh
Bh
6,650,000.00
5,000,000.00
4,450,000.00
3,350,000.00
2,255,000.00
5
7,315,000.00
5,500,000.00
4,895,000.00
3,685,000.00
2,480,500.00
KE LOKASI
PROYEK
6
43,890.00
33,000.00
29,370.00
22,110.00
14,883.00
671
672
673
674
Bh
Bh
Bh
Bh
650,000.00
550,000.00
350,000.00
855,000.00
715,000.00
605,000.00
385,000.00
940,500.00
4,290.00
3,630.00
2,310.00
5,643.00
HPS
PROFIT
10%
(Rp)
7=10% *(5+6)
735,889.00
553,300.00
492,437.00
370,711.00
249,538.30
71,929.00
60,863.00
38,731.00
94,614.30
PPN
10%
(Rp)
8
JAMSOSTEK
0.50%
(Rp)
9=0.5%*(5+6+7)
40,473.90
30,431.50
27,084.04
20,389.11
13,724.61
HARGA SATUAN
DILOKASI PROYEK
(Rp)
10
8,094,779.00
6,086,300.00
5,416,807.00
4,077,821.00
2,744,921.30
3,956.10
3,347.47
2,130.21
5,203.79
791,219.00
669,493.00
426,041.00
1,040,757.30
PEMBULATAN
(Rp)
11
96,800.00
1,936.00
8,000.00
16,100.00
31,400.00
847,000.00
1,374,700.00
26,600.00
3,900.00
19,600.00
13,900.00
15,100.00
15,400.00
1,278,000.00
1,543,000.00
133,200.00
157,400.00
177,400.00
49,600.00
52,600.00
63,500.00
67,200.00
135,000.00
238,300.00
363,100.00
242,200.00
708,500.00
1,160,300.00
PEMBULATAN
(Rp)
11
26,000.00
32,000.00
34,500.00
36,300.00
27,200.00
30,800.00
211,900.00
236,700.00
109,600.00
98,700.00
98,700.00
108,400.00
84,100.00
93,200.00
105,900.00
119,900.00
132,100.00
99,700.00
63,500.00
67,100.00
79,200.00
97,400.00
145,200.00
163,900.00
357,000.00
121,000.00
121,000.00
32,600.00
30,200.00
26,600.00
21,700.00
21,700.00
22,900.00
PEMBULATAN
(Rp)
11
30,200.00
32,600.00
33,800.00
18,100.00
38,700.00
38,700.00
38,700.00
21,700.00
21,700.00
47,100.00
43,500.00
21,700.00
21,700.00
35,000.00
30,200.00
38,700.00
38,700.00
99,200.00
224,400.00
285,000.00
375,100.00
496,100.00
514,900.00
663,200.00
884,000.00
1,083,100.00
1,089,200.00
1,192,600.00
284,400.00
387,200.00
556,700.00
738,200.00
859,200.00
1,179,900.00
1,633,800.00
1,875,800.00
PEMBULATAN
(Rp)
11
2,002,900.00
2,117,900.00
284,400.00
387,200.00
556,700.00
738,200.00
859,200.00
1,179,900.00
1,633,800.00
1,875,800.00
2,002,900.00
2,117,900.00
575,400.00
466,500.00
254,700.00
260,200.00
296,500.00
332,800.00
514,900.00
562,700.00
816,900.00
907,600.00
1,028,700.00
1,119,400.00
1,132,100.00
6,600.00
7,800.00
11,400.00
12,100.00
15,100.00
24,200.00
30,800.00
53,800.00
68,300.00
136,700.00
PEMBULATAN
(Rp)
11
672,200.00
406,000.00
272,900.00
163,900.00
149,400.00
139,700.00
99,800.00
3,500.00
4,800.00
6,600.00
7,800.00
18,700.00
19,900.00
21,100.00
24,800.00
30,800.00
42,300.00
3,500.00
4,800.00
6,600.00
7,800.00
18,700.00
19,900.00
21,100.00
24,800.00
30,800.00
42,900.00
3,500.00
4,800.00
6,600.00
7,800.00
18,700.00
19,900.00
21,100.00
24,800.00
PEMBULATAN
(Rp)
11
30,800.00
42,900.00
10,200.00
7,800.00
6,600.00
5,400.00
4,200.00
3,500.00
4,800.00
6,600.00
7,800.00
18,700.00
19,900.00
21,100.00
24,800.00
30,800.00
42,900.00
3,500.00
4,800.00
6,600.00
7,800.00
18,700.00
19,900.00
21,100.00
24,800.00
30,800.00
42,900.00
54,500.00
60,500.00
78,600.00
90,700.00
102,800.00
163,500.00
PEMBULATAN
(Rp)
11
160,300.00
269,700.00
412,900.00
579,500.00
406,300.00
806,000.00
806,000.00
10,900,800.00
7,872,800.00
7,872,800.00
10,900,800.00
58,700.00
592,200.00
781,800.00
769,700.00
443,900.00
359,100.00
884,700.00
630,400.00
618,300.00
69,600.00
80,500.00
3,028,000.00
5,450,400.00
102,900.00
709,100.00
545,000.00
969,500.00
79,334,200.00
116,881,700.00
152,127,900.00
193,793,600.00
206,511,300.00
230,129,900.00
PEMBULATAN
(Rp)
11
76,911,800.00
114,459,300.00
152,006,800.00
156,851,600.00
109,614,500.00
115,791,600.00
156,003,800.00
167,873,700.00
76,911,800.00
87,812,700.00
99,924,800.00
115,064,900.00
133,233,100.00
191,976,700.00
53,898,800.00
84,784,700.00
121,726,600.00
133,233,100.00
75,095,000.00
89,023,900.00
133,233,100.00
139,894,700.00
7,200.00
3,900.00
3,100.00
363,300.00
363,300.00
245,200.00
208,900.00
9,300.00
9,300.00
4,800.00
84,700.00
9,500.00
9,500.00
38,100.00
PEMBULATAN
(Rp)
11
58,700.00
71,400.00
84,100.00
69,600.00
84,100.00
109,000.00
96,200.00
119,300.00
155,600.00
44,500.00
147,700.00
89,000.00
100,500.00
68,400.00
66,600.00
74,400.00
15,100.00
60,500.00
5,500.00
145,300.00
700.00
900.00
900.00
78,700.00
66,600.00
79,300.00
242,200.00
68,800.00
68,800.00
PEMBULATAN
(Rp)
11
68,800.00
58,700.00
69,600.00
70,800.00
73,200.00
85,300.00
82,900.00
58,700.00
68,000.00
75,700.00
59,300.00
90,200.00
60,500.00
89,000.00
72,900.00
89,600.00
98,700.00
104,700.00
101,100.00
116,800.00
79,300.00
83,500.00
60,500.00
60,500.00
21,100.00
26,600.00
11,500.00
22,400.00
118,000.00
25,400.00
73,800.00
32,000.00
35,700.00
25,100.00
22,400.00
39,300.00
PEMBULATAN
(Rp)
11
23,600.00
26,000.00
15,100.00
9,900.00
20,900.00
32,000.00
9,900.00
7,800.00
27,200.00
13,500.00
53,800.00
68,400.00
46,600.00
83,500.00
56,800.00
57,500.00
75,700.00
54,000.00
7,900.00
8,100.00
31,000.00
7,200.00
7,200.00
37,500.00
2,800.00
1,453,400.00
478,400.00
244,500.00
9,804,700.00
127,700.00
61,100.00
61,100.00
116,800.00
319,100.00
72,600.00
193,700.00
PEMBULATAN
(Rp)
11
282,800.00
225,800.00
371,700.00
87,200.00
414,200.00
205,900.00
3,088,500.00
3,088,500.00
347,000.00
339,700.00
515,300.00
393,600.00
11,500.00
33,300.00
11,500.00
35,100.00
42,900.00
91,400.00
21,800.00
7,200.00
7,200.00
10,900.00
19,900.00
42,900.00
13,500.00
15,100.00
22,400.00
27,200.00
75,000.00
26,000.00
52,300.00
419,600.00
176,200.00
97,100.00
2,846,300.00
4,839,300.00
726,700.00
PEMBULATAN
(Rp)
11
551,100.00
997,900.00
115,600.00
236,100.00
211,900.00
431,100.00
218,000.00
36,500.00
12,100.00
22,400.00
14,500.00
23,600.00
16,300.00
47,800.00
35,700.00
8,100.00
96,800.00
63,500.00
22,400.00
48,400.00
18,100.00
16,300.00
18,100.00
29,600.00
95,000.00
139,800.00
212,500.00
605,600.00
817,500.00
684,300.00
817,500.00
314,900.00
320,900.00
333,000.00
314,900.00
PEMBULATAN
(Rp)
11
127,100.00
238,000.00
345,100.00
90,800.00
58,700.00
24,200.00
30,800.00
42,900.00
22,400.00
24,200.00
30,200.00
36,300.00
32,000.00
3,200.00
4,200.00
5,400.00
6,100.00
10,900.00
20,500.00
30,200.00
2,400.00
3,600.00
4,200.00
6,000.00
9,000.00
23,600.00
30,200.00
9,600.00
14,500.00
18,100.00
30,200.00
9,600.00
14,500.00
PEMBULATAN
(Rp)
11
15,700.00
17,500.00
21,800.00
15,100.00
17,500.00
22,400.00
30,200.00
39,900.00
50,800.00
72,600.00
90,800.00
117,400.00
159,800.00
218,000.00
272,500.00
16,900.00
20,500.00
29,600.00
36,300.00
48,400.00
60,500.00
92,000.00
121,100.00
151,400.00
211,900.00
284,600.00
351,200.00
19,300.00
24,200.00
35,100.00
43,600.00
59,300.00
78,700.00
115,000.00
151,400.00
PEMBULATAN
(Rp)
11
199,800.00
272,500.00
369,400.00
460,200.00
71,000.00
79,400.00
98,500.00
125,000.00
140,900.00
168,500.00
254,300.00
296,700.00
593,400.00
890,200.00
12,100.00
16,300.00
17,500.00
19,300.00
21,800.00
23,000.00
24,200.00
55,100.00
60,400.00
68,800.00
78,400.00
95,300.00
102,800.00
127,100.00
145,100.00
71,600.00
80,200.00
99,400.00
126,100.00
142,200.00
PEMBULATAN
(Rp)
11
170,000.00
256,600.00
299,400.00
212,700.00
244,800.00
279,000.00
311,100.00
343,200.00
482,200.00
556,000.00
386,000.00
460,800.00
684,300.00
876,800.00
54,900.00
79,400.00
104,400.00
117,900.00
128,300.00
5,300.00
7,400.00
10,600.00
13,900.00
18,100.00
20,300.00
32,000.00
9,600.00
11,700.00
13,900.00
16,000.00
18,100.00
20,300.00
26,700.00
PEMBULATAN
(Rp)
11
43,800.00
18,100.00
26,700.00
28,800.00
34,200.00
48,100.00
13,900.00
18,100.00
24,500.00
33,100.00
5,300.00
7,400.00
11,600.00
9,500.00
12,700.00
18,000.00
26,400.00
21,800.00
23,000.00
25,400.00
27,200.00
29,000.00
30,800.00
30,200.00
42,300.00
54,500.00
60,500.00
66,600.00
72,600.00
5,400.00
6,100.00
7,300.00
8,500.00
PEMBULATAN
(Rp)
11
9,700.00
10,900.00
11,600.00
10,900.00
19,500.00
36,600.00
42,300.00
48,400.00
54,500.00
14,500.00
29,000.00
43,600.00
48,400.00
60,500.00
66,600.00
102,900.00
109,000.00
121,100.00
133,200.00
145,300.00
157,400.00
5,400.00
6,600.00
7,800.00
9,000.00
9,600.00
10,900.00
12,100.00
13,300.00
14,500.00
15,700.00
29,000.00
28,100.00
PEMBULATAN
(Rp)
11
26,800.00
25,600.00
21,900.00
302,800.00
199,800.00
187,700.00
78,700.00
60,500.00
90,800.00
7,800.00
6,600.00
19,900.00
19,300.00
29,000.00
102,900.00
80,500.00
9,000.00
302,800.00
24,200.00
102,600.00
54,900.00
54,900.00
68,400.00
67,800.00
274,900.00
17,100.00
18,300.00
19,300.00
21,800.00
24,200.00
302,800.00
266,400.00
242,200.00
181,600.00
181,600.00
PEMBULATAN
(Rp)
11
102,900.00
423,900.00
302,800.00
181,600.00
145,300.00
151,400.00
157,400.00
163,500.00
4,200.00
5,400.00
6,000.00
6,600.00
4,200.00
5,400.00
6,000.00
6,600.00
102,900.00
90,800.00
78,700.00
66,600.00
54,500.00
42,300.00
30,200.00
18,100.00
14,500.00
12,700.00
42,300.00
42,300.00
54,400.00
54,400.00
60,500.00
66,600.00
72,600.00
PEMBULATAN
(Rp)
11
393,600.00
423,800.00
460,200.00
544,900.00
605,500.00
1,059,700.00
1,211,000.00
1,453,300.00
393,600.00
423,800.00
460,200.00
545,000.00
605,600.00
1,059,800.00
1,211,200.00
1,453,400.00
139,200.00
145,300.00
169,500.00
181,500.00
199,700.00
213,000.00
220,300.00
121,000.00
133,100.00
145,200.00
163,400.00
181,500.00
199,700.00
296,500.00
397,100.00
427,700.00
519,300.00
549,900.00
684,300.00
PEMBULATAN
(Rp)
11
702,700.00
794,300.00
947,100.00
959,300.00
971,500.00
971,500.00
1,038,700.00
1,160,900.00
1,222,100.00
1,283,200.00
1,344,300.00
1,405,400.00
1,466,500.00
1,527,600.00
1,588,700.00
1,649,800.00
1,695,600.00
1,756,200.00
1,816,800.00
2,846,300.00
5,450,400.00
91,600.00
54,900.00
24,400.00
24,400.00
30,500.00
6,100.00
6,000.00
33,200.00
51,400.00
6,000.00
27,200.00
3,000.00
4,200.00
6,100.00
54,900.00
PEMBULATAN
(Rp)
11
42,700.00
8,500.00
1,800.00
8,500.00
18,300.00
36,600.00
9,700.00
116,000.00
116,000.00
238,300.00
360,500.00
360,500.00
116,000.00
42,700.00
4,200.00
6,100.00
19,500.00
31,700.00
4,032,900.00
1,588,700.00
611,000.00
549,900.00
391,000.00
67,200.00
61,100.00
54,900.00
42,700.00
42,700.00
54,900.00
61,100.00
67,200.00
61,400.00
55,300.00
PEMBULATAN
(Rp)
11
24,500.00
30,700.00
43,000.00
14,500.00
12,100.00
11,400.00
10,800.00
9,600.00
7,200.00
6,000.00
11,400.00
10,800.00
9,600.00
7,200.00
6,000.00
22,000.00
18,300.00
14,600.00
11,000.00
8,500.00
8,500.00
6,100.00
4,800.00
4,200.00
3,600.00
3,100.00
3,000.00
1,800.00
1,200.00
6,361,200.00
43,642,200.00
96,291,100.00
139,894,700.00
164,118,900.00
PEMBULATAN
(Rp)
11
214,384,100.00
254,959,700.00
273,127,800.00
313,703,300.00
376,444,000.00
451,732,800.00
542,079,400.00
30,200.00
9,600.00
7,800.00
1,200.00
1,200.00
18,100.00
6,000.00
7,800.00
8,400.00
10,900.00
14,500.00
19,300.00
21,800.00
22,400.00
24,200.00
26,600.00
42,300.00
151,400.00
157,300.00
166,300.00
175,400.00
187,500.00
199,600.00
151,200.00
157,300.00
166,300.00
175,400.00
187,500.00
199,600.00
151,200.00
PEMBULATAN
(Rp)
11
157,300.00
166,300.00
175,400.00
187,500.00
199,600.00
254,100.00
151,200.00
157,300.00
166,300.00
178,200.00
190,500.00
202,800.00
270,400.00
215,100.00
239,700.00
720,000.00
1,027,000.00
1,588,200.00
1,376,500.00
1,905,900.00
2,011,800.00
1,525,800.00
2,858,900.00
3,705,900.00
2,011,800.00
4,447,100.00
4,976,600.00
741,100.00
952,900.00
1,101,200.00
1,588,200.00
2,011,800.00
2,647,100.00
3,070,600.00
984,700.00
PEMBULATAN
(Rp)
11
952,900.00
984,700.00
23,315,700.00
29,674,600.00
180,100.00
209,800.00
209,800.00
18,016,700.00
20,136,300.00
28,614,800.00
28,614,800.00
20,772,200.00
27,449,000.00
34,973,600.00
46,631,500.00
59,349,200.00
61,468,900.00
67,827,700.00
76,306,200.00
51,930,600.00
75,246,400.00
81,605,200.00
73,126,800.00
56,169,800.00
307,344,500.00
299,293,800.00
352,548,900.00
37,278,500.00
233,390,800.00
182,132,500.00
1,217,200.00
1,825,800.00
1,947,600.00
PEMBULATAN
(Rp)
11
8,094,700.00
6,086,300.00
5,416,800.00
4,077,800.00
2,744,900.00
791,200.00
669,400.00
426,000.00
1,040,700.00
TENAGA KERJA
KODE
SATUAN
UPAH (Rp./Hari)
Mandor Lapangan
L 061
OH
80,500
Mekanik
L 071
OH
87,500
Pembantu Mekanik
OH
69,000
Kepala Tukang
OH
77,000
Tukang
L 073
OH
72,300
Operator Terlatih
L 081
OH
84,700
L 082
OH
77,000
Pembantu Operator
L 083
OH
66,000
L 091
OH
72,300
10
L 099
OH
60,000
11
L 106
OH
53,900
12
Pekerja
Pekerja Pompa/listrik
OH
50,400
13
Tukang Pompa/listrik
OH
70,000
14
OH
85,000
OH
90,000
Pekerja
L01
Jam
7,700
Tukang
L02
Jam
10,329
Mandor
L03
Jam
11,500
Operator
L04
Jam
12,100
10
Pembantu Operator
L05
Jam
9,429
11
Sopir / Driver
L06
Jam
10,329
12
L07
Jam
8,571
13
Mekanik
L08
Jam
12,500
14
Pembantu Mekanik
L09
Jam
9,857
15
Kepala Tukang
L10
Jam
11,000
KET
ALAT
NO
TENAGA KERJA
KODE
SATUAN
SEWA ALAT/JAM
ASPHALT SPRAYER
E03
Jam
58,073.41
BULLDOZER 100-150 HP
E04
Jam
399,252.26
E05
Jam
139,976.66
E06
Jam
70,012.24
E07
Jam
399,948.33
E08
Jam
162,130.59
DUMP TRUCK
E09
Jam
253,828.45
EXCAVATOR 80-140 HP
E10
Jam
286,567.37
E11
Jam
204,236.88
10
GENERATOR SET
E12
Jam
328,893.26
11
E13
Jam
263,379.62
12
E14
Jam
268,956.87
13
E15
Jam
257,987.29
14
E16
Jam
140,216.99
15
E17
Jam
139,534.23
16
E18
Jam
151,675.80
17
E19
Jam
140,809.98
18
CONCRETE VIBRATOR
E20
Jam
27,086.32
19
STONE CRUSHER
E21
Jam
638,939.91
20
E22
Jam
30,827.10
21
E23
Jam
195,076.76
22
PEDESTRIAN ROLLER
E24
Jam
55,240.08
23
TAMPER
E25
Jam
28,504.93
24
JACK HAMMER
E26
Jam
41,456.85
25
FULVI MIXER
E27
Jam
123,996.37
26
CONCRETE PUMP
E28
Jam
170,025.83
27
TRAILER 20 TON
E29
Jam
288,168.99
28
E30
Jam
66,950.82
29
E31
Jam
256,301.33
30
WELDING SET
E32
Jam
72,820.75
31
E33
Jam
725,996.54
32
E34
Jam
28,504.93
33
TRAILLER 15 TON
E35
Jam
237,468.53
34
E36
Jam
1,250,000.00
35
350,000.00
M1
750,000.00
36
37
ALAT BANTU
E34
Ls
38
CONCRET PUNP
E28
Jam
KET
75.00
500,000.00
SELVIA ONG
KUASA KSO
NO
1
JENIS BAHAN
Spesifikasi l
Merk / Mode
/ Ukuran
SATUAN
HARGA (Rp.)
282,500.00
302,500.00
Batu Belah 10 - 15 cm
Batu Belah 7 - 10 cm
M3
363,000.00
363,000.00
Batu Belah 5 - 7 cm
Batu Belah 3 - 5 cm
M3
363,000.00
Batu Belah 2 - 3 cm
363,000.00
Batu Belah 1 - 2 cm
451,550.00
525,000.00
Agregat Kasar
M3
363,000.00
10
Agregat Halus
451,550.00
11
Situ
234,739.27
231,000.00
12
Timbunan Pilihan
13
M3
214,500.00
396,000.00
323,400.00
5,500.00
14
15
16
Pasir Urug
Filler
M3
17
Koral / Kerikil
Kg
M3
8x12 cm
4,385,000.00
5x10 cm
4,400,000.00
8x12 cm
M3
2,572,200.00
5x10 cm
M3
2,587,200.00
2,314,950.00
18
19
249,000.00
20
Kayu Begisting
M3
21
Papan Klas I
M3
4,395,000.00
2,581,700.00
2,314,950.00
11,915.00
22
Papan Klas II
23
24
Btg
KET
SELVIA ONG
KUASA KSO
2.000
5.000
2.000
5.000
2.000
2.000
1.000
2.000
1.000
1.000
4.000
4.000
1.000
2.000
2.000
2.000
9.000
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Set
x Rp.
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
JUMLAH
3,000,000.00
750,000.00
500,000.00
1,000,000.00
1,000,000.00
300,000.00
2,000,000.00
3,000,000.00
2,000,000.00
2,000,000.00
562,500.00
250,000.00
2,000,000.00
2,000,000.00
1,500,000.00
5,000,000.00
1,000,000.00
0.600
Set
x
JUMLAH
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,000,000.00
3,750,000.00
1,000,000.00
5,000,000.00
2,000,000.00
600,000.00
2,000,000.00
6,000,000.00
2,000,000.00
2,000,000.00
2,250,000.00
1,000,000.00
2,000,000.00
4,000,000.00
3,000,000.00
10,000,000.00
9,000,000.00
61,600,000.00
61,600,000.00
= Rp.
= Rp.
36,960,000.00
36,960,000.00
2 Demobilisasi
-
Demobilisasi
1.250
Btg
x Rp.
11,915.00
= Rp.
14,893.75
Semen Portland
2.500
Kg
x Rp.
96,800.00
= Rp.
242,000.00
Pasir Beton
0.005
x Rp.
396,000.00
= Rp.
1,980.00
Koral Beton
0.009
x Rp.
249,000.00
= Rp.
2,241.00
185,198.40
Kayu 5/7
0.072
2,572,200.00
= Rp.
0.060
M
Kg
x Rp.
x Rp.
26,000.00
= Rp.
1,560.00
Residu
0.400
Lt
x Rp.
39,300.00
= Rp.
15,720.00
= Rp.
463,593.15
JUMLAH
b. Tenaga
-
Tukang Kayu
0.200
Oh
x Rp.
72,300.00
= Rp.
14,460.00
Pekerja
0.400
Oh
x Rp.
53,900.00
= Rp.
21,560.00
Kepala Tukang
0.020
Oh
x Rp.
77,000.00
= Rp.
1,540.00
Mandor
0.020
Oh
x Rp.
80,500.00
= Rp.
1,610.00
JUMLAH
= Rp.
39,170.00
= Rp.
502,763.15
1.250
Btg
x Rp.
11,915.00
= Rp.
14,893.75
Semen Portland
2.500
Kg
x Rp.
96,800.00
= Rp.
242,000.00
1.200
Lbr
x Rp.
18,700.00
= Rp.
22,440.00
Pasir Beton
0.005
x Rp.
396,000.00
= Rp.
1,980.00
Koral Beton
0.009
M3
x Rp.
249,000.00
= Rp.
2,241.00
Kayu 5/7
0.072
x Rp.
2,572,200.00
= Rp.
185,198.40
0.060
M
Kg
x Rp.
26,000.00
= Rp.
1,560.00
Meni Besi
0.450
Kg
x Rp.
35,700.00
= Rp.
16,065.00
= Rp.
470,313.15
JUMLAH
b. Tenaga
-
Tukang Kayu
0.200
Oh
x Rp.
72,300.00
= Rp.
14,460.00
Pekerja
0.400
Oh
x Rp.
53,900.00
= Rp.
21,560.00
Kepala Tukang
0.020
Oh
x Rp.
77,000.00
= Rp.
1,540.00
Mandor
0.020
Oh
x Rp.
80,500.00
= Rp.
1,610.00
JUMLAH
= Rp.
39,170.00
= Rp.
509,483.15
1.000
Btg
x Rp.
11,915.00
= Rp.
11,915.00
Semen Portland
2.000
Kg
x Rp.
96,800.00
= Rp.
193,600.00
Kawat Duri
25.000
Kg
x Rp.
31,400.00
= Rp.
785,000.00
Pasir Beton
0.005
M3
x Rp.
396,000.00
= Rp.
1,980.00
Koral Beton
0.009
x Rp.
249,000.00
= Rp.
2,241.00
0.060
M3
Kg
x Rp.
26,000.00
= Rp.
1,560.00
= Rp.
996,296.00
JUMLAH
b. Tenaga
-
Tukang Kayu
0.200
Oh
x Rp.
72,300.00
= Rp.
14,460.00
Pekerja
0.300
Oh
x Rp.
53,900.00
= Rp.
16,170.00
Kepala Tukang
0.020
Oh
x Rp.
77,000.00
= Rp.
1,540.00
Mandor
0.020
Oh
x Rp.
80,500.00
= Rp.
1,610.00
JUMLAH
= Rp.
33,780.00
= Rp.
1,030,076.00
Kayu 5/7
0.012
Btg
x Rp.
2,587,200.00
= Rp.
0.020
Kg
0.007
Kg
x Rp.
26,000.00
= Rp.
520.00
x Rp.
2,581,700.00
= Rp.
18,071.90
= Rp.
49,638.30
JUMLAH
31,046.40
b. Tenaga
-
Tukang Kayu
0.100
Oh
x Rp.
72,300.00
= Rp.
7,230.00
Pekerja
0.100
Oh
x Rp.
53,900.00
= Rp.
5,390.00
Kepala Tukang
0.010
Oh
x Rp.
77,000.00
= Rp.
770.00
Mandor
0.005
Oh
x Rp.
80,500.00
= Rp.
402.50
JUMLAH
= Rp.
13,792.50
= Rp.
63,430.80
2,572,200.00
= Rp.
290,658.60
0.125
M3
Kg
x Rp.
2,572,200.00
= Rp.
321,525.00
1.000
Kg
x Rp.
26,000.00
= Rp.
26,000.00
25.000
Kg
x Rp.
1,936.00
= Rp.
48,400.00
Pasir Pasang
0.120
x Rp.
396,000.00
= Rp.
47,520.00
0.025
x Rp.
69,600.00
= Rp.
1,740.00
1.230
M2
Lbr
x Rp.
58,700.00
= Rp.
72,201.00
= Rp.
808,044.60
0.113
kayuPapan Kelas II
Paku Biasa
Semen Portland
JUMLAH
b. Tenaga
-
Tukang Kayu
1.000
Oh
x Rp.
72,300.00
= Rp.
72,300.00
Tukang Batu
0.230
Oh
x Rp.
72,300.00
= Rp.
16,629.00
Pekerja
1.000
Oh
x Rp.
53,900.00
= Rp.
53,900.00
Kepala Tukang
0.200
Oh
x Rp.
77,000.00
= Rp.
15,400.00
Mandor
0.050
Oh
x Rp.
80,500.00
= Rp.
4,025.00
JUMLAH
= Rp.
162,254.00
= Rp.
970,298.60
0.132
kayuPapan Kelas II
Paku Biasa
Semen Portland
x Rp.
2,572,200.00
= Rp.
339,530.40
0.125
M
Kg
x Rp.
2,572,200.00
= Rp.
321,525.00
1.000
Kg
x Rp.
26,000.00
= Rp.
26,000.00
25.000
Kg
x Rp.
1,936.00
= Rp.
48,400.00
Pasir Pasang
0.120
M3
x Rp.
396,000.00
= Rp.
47,520.00
0.025
x Rp.
69,600.00
= Rp.
1,740.00
1.230
M2
Lbr
x Rp.
58,700.00
= Rp.
72,201.00
= Rp.
856,916.40
JUMLAH
b. Tenaga
-
Tukang Kayu
1.000
Oh
x Rp.
72,300.00
= Rp.
72,300.00
Tukang Batu
0.230
Oh
x Rp.
72,300.00
= Rp.
16,629.00
Pekerja
1.000
Oh
x Rp.
53,900.00
= Rp.
53,900.00
Kepala Tukang
0.200
Oh
x Rp.
77,000.00
= Rp.
15,400.00
Mandor
0.050
Oh
x Rp.
80,500.00
= Rp.
4,025.00
JUMLAH
= Rp.
162,254.00
= Rp.
1,019,170.40
Pekerja
0.100
Oh
x Rp.
53,900.00
= Rp.
5,390.00
Mandor
0.050
Oh
x Rp.
80,500.00
= Rp.
4,025.00
JUMLAH
= Rp.
9,415.00
JUMLAH (a)
= Rp.
9,415.00
93,139.20
2,587,200.00
= Rp.
0.080
M3
Kg
x Rp.
26,000.00
= Rp.
2,080.00
1.000
Btg
x Rp.
36,220.80
= Rp.
36,220.80
= Rp.
131,440.00
21,690.00
Kayu Terentang
0.036
Paku Biasa
Kaso 5/7
JUMLAH
b. Tenaga
-
Tukang Kayu
Mandor
0.300
Oh
x Rp.
72,300.00
= Rp.
0.0015
Oh
x Rp.
80,500.00
= Rp.
120.75
JUMLAH
= Rp.
21,810.75
= Rp.
153,250.75
x Rp.
302,500.00
= Rp.
45,375.00
x Rp.
363,000.00
= Rp.
32,670.00
M3
x Rp.
396,000.00
= Rp.
3,960.00
= Rp.
82,005.00
0.150
0.090
Pasir Pasang
0.010
JUMLAH
b. Tenaga
-
Pekerja
1.000
Oh
x Rp.
53,900.00
= Rp.
53,900.00
Mandor
0.050
Oh
x Rp.
80,500.00
= Rp.
4,025.00
JUMLAH
= Rp.
57,925.00
= Rp.
139,930.00
Pekerja (L01)
0.0161
Jam
x Rp.
53,900.00
= Rp.
867.79
Mandor (L02)
0.0040
Jam
x Rp.
80,500.00
= Rp.
322.00
= Rp.
1,189.79
JUMLAH (a)
b. PERALATAN
-
0.0142
Jam
x Rp.
399,252.26
= Rp.
5,669.38
0.0022
Jam
x Rp.
257,987.29
= Rp.
567.57
Alat Bantu
Ls
x Rp.
75.00
= Rp.
75.00
JUMLAH (b)
= Rp.
6,311.95
= Rp.
7,501.74
359,351.30
1.000
Pekerja
6.667
Oh
x Rp.
53,900.00
= Rp.
Mandor
0.333
Oh
x Rp.
80,500.00
= Rp.
26,806.50
JUMLAH
= Rp.
386,157.80
JUMLAH (a)
= Rp.
386,157.80
359,351.30
Pekerja
6.667
Oh
x Rp.
53,900.00
= Rp.
Mandor
0.033
Oh
x Rp.
80,500.00
= Rp.
2,656.50
JUMLAH
= Rp.
362,007.80
JUMLAH (a)
= Rp.
362,007.80
Pekerja
0.100
Oh
x Rp.
53,900.00
= Rp.
5,390.00
Mandor
0.050
Oh
x Rp.
80,500.00
= Rp.
4,025.00
JUMLAH
= Rp.
9,415.00
JUMLAH (a)
= Rp.
9,415.00
5,390.00
Pekerja
0.100
Oh
x Rp.
53,900.00
= Rp.
Mandor
0.005
Oh
x Rp.
80,500.00
= Rp.
402.50
JUMLAH
= Rp.
5,792.50
JUMLAH (a)
= Rp.
5,792.50
3,234.00
17 1 m2 Bongkaran Listplank papan, daun pintu, daun jendela dan jalusi kayu
a. Tenaga
-
Pekerja
0.060
Oh
x Rp.
53,900.00
= Rp.
Mandor
0.006
Oh
x Rp.
80,500.00
= Rp.
483.00
JUMLAH
= Rp.
3,717.00
JUMLAH (a)
= Rp.
3,717.00
5,390.00
Pekerja
0.100
Oh
x Rp.
53,900.00
= Rp.
Mandor
0.010
Oh
x Rp.
80,500.00
= Rp.
805.00
JUMLAH
= Rp.
6,195.00
JUMLAH (a)
= Rp.
6,195.00
215,600.00
Pekerja
4.000
Oh
x Rp.
53,900.00
= Rp.
Mandor
0.200
Oh
x Rp.
80,500.00
= Rp.
16,100.00
Tukang Kayu
2.000
Oh
x Rp.
72,300.00
= Rp.
144,600.00
Kepala Tukang
0.200
Oh
x Rp.
77,000.00
= Rp.
15,400.00
JUMLAH
= Rp.
391,700.00
JUMLAH (a)
= Rp.
391,700.00
:
:
:
:
:
SATUAN PEMBAYARAN
NO.
KOMPONEN
A.
TENAGA
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
PERALATAN
BULLDOZER 100-150 HP
CONCRETE MIXER 0.3-0.6 M3
PORTAL BORE PILE
DUMP TRUCK 3-4 M3
DUMP TRUCK
GENERATOR SET
MOTOR GRADER >100 HP
WHEEL LOADER 1.0-1.6 M3
TANDEM ROLLER 6-8 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
BORE PILE MACHINE
PICK UP TRUCK, 1 T.
EXCAVATOR 80-140 HP
SCAFFOLDING
SATUAN
E04
E06
E08
E09
E12
E13
E15
E17
E19
E20
E22
E23
E33
-
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Set
PERKIRAAN
KUANTITAS
2.00
5.00
2.00
5.00
2.00
2.00
1.00
2.00
1.00
1.00
4.00
4.00
1.00
2.00
2.00
2.00
5.00
HARGA
SATUAN
(Rp.)
3,000,000.00
750,000.00
500,000.00
1,000,000.00
1,000,000.00
300,000.00
2,000,000.00
3,000,000.00
2,000,000.00
2,000,000.00
562,500.00
250,000.00
1,500,000.00
1,000,000.00
1,500,000.00
5,000,000.00
1,000,000.00
FASILITAS KONTRAKTOR
Base Camp
Kantor
Gudang Penyimpanan
Bengkel
(E13)
(E19)
(E04)
M2
M2
M2
M2
90.00
60.00
120.00
36.00
1,019,170.40
970,298.60
1,019,170.40
970,298.60
LAIN-LAIN
Papan nama Proyek
Adminstrasi Pelaporan
Dokumentasi
Asbuilt Drawing
Set
Bh
LS
LS
1.00
1.00
1.00
1.00
1,500,000
1,500,000
3,500,000
10,000,000
DEMOBILISASI
Ls
1.0000
33,060,000.00
Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head
dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
JUMLAH
HARGA
(Rp.)
6,000,000.00
3,750,000.00
1,000,000.00
5,000,000.00
2,000,000.00
600,000.00
2,000,000.00
6,000,000.00
2,000,000.00
2,000,000.00
2,250,000.00
1,000,000.00
1,500,000.00
2,000,000.00
3,000,000.00
10,000,000.00
5,000,000.00
55,100,000.00
91,725,336.00
58,217,916.00
122,300,448.00
34,930,749.60
307,174,449.60
1,500,000.00
1,500,000.00
3,500,000.00
10,000,000.00
16,500,000.00
33,060,000.00
NO.
:
:
:
:
:
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L02)
jam
jam
PERKIRAAN
KUANTITAS
0.0161
0.0040
HARGA
SATUAN
(Rp.)
7,700.00
11,500.00
PERALATAN
Motor Grader
Vibro Roller
Buldozer
Alat Bantu
(E13)
(E19)
(E04)
jam
jam
jam
Ls
0.0025
0.0040
0.0142
1.0000
263,379.62
140,809.98
399,252.26
75.00
JUMLAH
HARGA
(Rp.)
123.69
46.18
169.88
661.09
565.50
5,669.38
75.00
6,970.98
7,140.86
714.09
7,854.94
:
:
:
:
:
SATUAN PEMBAYARAN
NO.
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L02)
jam
jam
PERKIRAAN
KUANTITAS
0.0161
0.0040
HARGA
SATUAN
(Rp.)
7,700.00
11,500.00
PERALATAN
Motor Grader
Vibro Roller
Buldozer
Alat Bantu
(E13)
(E19)
(E04)
jam
jam
jam
Ls
0.0025
0.0040
0.0142
1.0000
263,379.62
140,809.98
399,252.26
75.00
JUMLAH
HARGA
(Rp.)
123.69
46.18
169.88
661.09
565.50
5,669.38
75.00
6,970.98
7,140.86
714.09
7,854.94
:
:
:
:
:
SATUAN PEMBAYARAN
NO.
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.1071
0.0535
HARGA
SATUAN
(Rp.)
7,700.00
11,500.00
C.
PERALATAN
1.
2.
3.
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.0535
0.1537
1.0000
286,567.37
162,130.59
75.00
JUMLAH
HARGA
(Rp.)
824.63
615.80
1,440.43
15,344.97
24,949.37
75.00
40,369.34
41,809.77
4,180.98
45,990.74
:
:
:
:
:
SATUAN PEMBAYARAN
NO.
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L02)
Jam
Jam
PERKIRAAN
KUANTITAS
0.0714
0.0178
HARGA
SATUAN
(Rp.)
7,700.00
11,500.00
PERALATAN
BULLDOZER 100-150 HP
Dump Truck
EXCAVATOR 80-140 HP
Vibro Roller
Water Tanker
Alat Bantu
(E04)
(E08)
(E10)
(E19)
(E23)
Jam
Jam
Jam
Jam
Jam
Ls
0.0132
0.0162
0.0665
0.0100
0.0070
1.0000
399,252.26
162,130.59
286,567.37
140,809.98
195,076.76
75.00
JUMLAH
HARGA
(Rp.)
549.75
205.27
755.02
5,270.13
2,626.52
19,056.73
1,413.75
1,371.02
75.00
29,813.15
30,568.17
3,056.82
33,624.99
NO.
:
:
:
:
:
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
0.2142
0.0535
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
7,700.00
11,500.00
PERALATAN
1.
2
Excavator
Alat Bantu
(E10)
jam
Ls
0.0535
1.0000
286,567.37
75.00
1,649.26
615.80
2,265.06
15,344.97
75.00
15,419.97
17,685.03
1,768.50
19,453.54
NO.
:
:
:
:
:
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
5.3012
1.7671
0.4418
HARGA
SATUAN
(Rp.)
7,700.00
10,328.57
11,500.00
BAHAN
1.
2.
3.
4.
5.
Semen
Pasir Pasang
Koral
Kayu Perancah
Paku
(M12)
(M01)
(M03)
(M19)
(M18)
Kg
M3
M3
M3
Kg
354.8077
0.4435
0.6406
0.1000
1.0000
1,936.00
396,000.00
249,000.00
2,572,200.00
26,000.00
PERALATAN
1.
2.
3.
4.
Conc. Mixer
Water Tanker
Con. Vibrator
Alat Bantu
(E06)
(E23)
(E20)
jam
jam
jam
Ls
0.4418
0.0534
0.4418
1.0000
70,012.24
195,076.76
27,086.32
75.00
JUMLAH
HARGA
(Rp.)
40,819.28
18,251.29
5,080.32
64,150.89
686,907.69
175,629.81
159,515.63
257,220.00
26,000.00
1,305,273.13
30,929.10
10,423.91
11,965.84
75.00
53,393.85
1,422,817.86
142,281.79
1,565,099.65
NO.
:
:
:
:
:
KOMPONEN
A.
TENAGA
1.
3.
Pekerja
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
0.00056
0.00006
HARGA
SATUAN
(Rp.)
7,700.00
11,500.00
BAHAN
1.
2.
(M39a) Kg
(M14) Kg
1.0500
0.0150
15,100.00
31,400.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
75.00
JUMLAH
HARGA
(Rp.)
4.29
0.64
4.93
15,855.00
471.00
16,326.00
75.00
75.00
16,405.93
1,640.59
18,046.52
NO.
:
:
:
:
:
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
14.5000
5.6000
1.4000
HARGA
SATUAN
(Rp.)
7,700.00
10,328.57
11,500.00
BAHAN
1.
2.
3.
Batu Kali
Semen (PC)
Pasir
(M02)
(M12)
(M01)
M3
zak
M3
1.1000
176.0000
0.3140
282,500.00
1,936.00
396,000.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
75.00
JUMLAH
HARGA
(Rp.)
111,650.00
57,840.00
16,100.00
185,590.00
310,750.00
340,736.00
124,344.00
775,830.00
75.00
75.00
961,495.00
96,149.50
1,057,644.50
NO.
:
:
:
:
:
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
B.
BAHAN
1.
2.
3.
Batu
Semen (PC)
Pasir
SATUAN
(L01)
(L02)
(L03)
(M02)
(M12)
(M01)
jam
jam
jam
M3
Kg
M3
PERKIRAAN
KUANTITAS
14.5000
5.6000
1.4000
HARGA
SATUAN
(Rp.)
7,700.00
10,328.57
11,500.00
PERALATAN
1.
Alat Bantu
Ls
185,590.00
1.10
233.50
0.3140
310,750.00
452,051.13
124,344.00
282,500.00
1,936.00
396,000.00
1.0000
75.00
111,650.00
57,840.00
16,100.00
JUMLAH
HARGA
(Rp.)
887,145.13
75.00
75.00
1,072,810.13
107,281.01
1,180,091.14
NO.
:
:
:
:
:
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.0573
0.0082
HARGA
SATUAN
(Rp.)
7,700.00
11,500.00
BAHAN
1.
Sirtu (M 16)
M3
1.0500
234,739.27
PERALATAN
1.
2.
3.
4.
5
Wheel Loader
Dump Truck
Motor Grader
Vibratory Roller
Alat Bantu
(E15)
(E08)
(E13)
(E19)
Jam
Jam
Jam
Jam
Ls
0.0082
0.1398
0.0117
0.0214
1.0000
257,987.29
162,130.59
263,379.62
140,809.98
75.00
JUMLAH
HARGA
(Rp.)
440.95
94.08
535.03
246,476.23
246,476.23
2,110.56
22,670.54
3,085.10
3,016.01
75.00
30,957.22
277,968.47
27,796.85
305,765.32
PEKERJAAN TANAH
Analisa EI-21
1.
Tenaga
Pekerja (E01)
Mandor (E03)
Alat
Excavator (E10)
Alat Bantu
c
d
e
Tenaga
Pekerja (E01)
Mandor (E03)
Alat
Excavator (E10)
Dump Truck (E08)
Alat Bantu
c
d
e
Tenaga
Pekerja
Mandor
Tenaga
Pekerja
Mandor
Tenaga
Pekerja
Mandor
0.214
0.054
Jam
Jam
x
x
Rp.
Rp.
7,700.00
11,500.00
= Rp.
= Rp.
1,649.26
615.80
2,265.06
0.054
0.040
Jam
Ls
x
x
Rp.
Rp.
286,567.37
75.00
= Rp.
= Rp.
15,344.97
3.00
15,347.97
17,613.03
1,761.30
19,374.34
Analisa EI-311
0.107
0.054
Jam
Jam
x
x
Rp.
Rp.
7,700.00
11,500.00
= Rp.
= Rp.
824.63
615.80
1,440.43
0.054
0.154
1.000
Jam
Jam
Ls
Rp.
= Rp.
Rp.
286,567.37
162,130.59
75.00
15,344.97
24,923.25
75.00
40,343.23
41,783.66
4,178.37
45,962.02
= Rp.
0.400
0.040
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
21,560.00
3,220.00
24,780.00
0.526
0.052
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
28,351.40
4,186.00
32,537.40
0.735
0.073
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
39,616.50
5,876.50
45,493.00
Tenaga
Pekerja
Mandor
Tenaga
Pekerja
Mandor
Tenaga
Pekerja
Mandor
0.625
0.063
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
33,687.50
5,031.25
38,718.75
1.250
0.125
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
67,375.00
10,062.50
77,437.50
0.825
0.083
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
44,467.50
6,641.25
51,108.75
Tenaga
Pekerja
Mandor
Tenaga
Pekerja
Mandor
0.050
0.005
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
2,695.00
402.50
3,097.50
0.516
0.050
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
27,812.40
4,025.00
31,837.40
0.192
0.019
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
10,348.80
1,529.50
11,878.30
0.500
0.050
Oh
Oh
x Rp.
x Rp.
JUMLAH
53,900.00
80,500.00
= Rp.
= Rp.
= Rp.
26,950.00
4,025.00
30,975.00
10 1 m3 Urugan Kembali
a
Tenaga
Pekerja
Mandor
11 1 m3 Pemadatan Tanah
a Tenaga
Pekerja
Mandor
12 1 m3 Urugan Pasir
a
Bahan
Pasir Urug
b. Tenaga
Pekerja
Mandor
1.200
M3
x Rp.
JUMLAH
0.300
0.010
Oh
Oh
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
1.200
M3
x Rp.
JUMLAH
0.150
0.015
Oh
Oh
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
1.200
M3
x Rp.
JUMLAH
0.250
0.025
Oh
Oh
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
1.200
M3
x Rp.
JUMLAH
0.250
0.025
Oh
Oh
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
0.275
0.030
0.050
M3
M3
M3
x Rp.
x Rp.
x Rp.
JUMLAH
1.000
0.100
Oh
Oh
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
323,400.00
= Rp.
= Rp.
388,080.00
388,080.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
16,170.00
805.00
16,975.00
405,055.00
= Rp.
= Rp.
138,720.00
138,720.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
8,085.00
1,207.50
9,292.50
148,012.50
= Rp.
= Rp.
281,687.12
281,687.12
=
=
=
=
Rp.
Rp.
Rp.
Rp.
13,475.00
2,012.50
15,487.50
297,174.62
= Rp.
= Rp.
257,400.00
257,400.00
53,900.00
80,500.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
13,475.00
2,012.50
15,487.50
272,887.50
282,500.00
249,000.00
323,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
77,687.50
7,470.00
16,170.00
101,327.50
53,900.00
80,500.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
53,900.00
8,050.00
61,950.00
163,277.50
53,900.00
80,500.00
Bahan
Ijuk
b. Tenaga
Pekerja
Mandor
115,600.00
53,900.00
80,500.00
14 1 m3 Urugan Sirtu
a.
Bahan
Sirtu
b. Tenaga
Pekerja
Mandor
234,739.27
53,900.00
80,500.00
Bahan
Tanah Urug / Timbunan
b. Tenaga
Pekerja
Mandor
214,500.00
Bahan
Batu Belah
Kerikil
Pasir
b. Tenaga
Pekerja
Mandor
PEKERJAAN PONDASI
1.
a.
-
Bahan
Batu Kali
Semen Portland
Pasir Beton/Pasangan
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
a.
-
Bahan
Batu Kali
Semen Portland
Pasir Beton/Pasangan
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
a.
-
Bahan
Batu Kali
Semen Portland
Pasir Beton/Pasangan
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.100
392.000
0.314
M
Kg
3
M
x Rp.
x Rp.
x Rp.
JUMLAH
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
1.100
267.000
0.427
M3
Kg
M3
x Rp.
x Rp.
x Rp.
JUMLAH
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
1.100
225.000
0.445
M3
Kg
3
M
x Rp.
x Rp.
x Rp.
JUMLAH
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
4
a.
-
M3
Kg
M3
x Rp.
x Rp.
x Rp.
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
1.500
0.600
0.060
0.075
282,500.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
310,750.00
758,912.00
124,344.00
1,194,006.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,850.00
43,380.00
4,620.00
6,037.50
134,887.50
1,328,893.50
282,500.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
310,750.00
516,912.00
169,092.00
996,754.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,850.00
43,380.00
4,620.00
6,037.50
134,887.50
1,131,641.50
282,500.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
310,750.00
435,600.00
176,220.00
922,570.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,850.00
43,380.00
4,620.00
6,037.50
134,887.50
1,057,457.50
282,500.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
310,750.00
391,072.00
192,060.00
893,882.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,850.00
43,380.00
4,620.00
6,037.50
134,887.50
1,028,769.50
5
a.
-
M
Kg
M3
x Rp.
x Rp.
x Rp.
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
6
a.
-
M
Kg
M3
x Rp.
x Rp.
x Rp.
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
7
a.
-
M
Kg
3
M
x Rp.
x Rp.
x Rp.
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
8
a.
-
1.200
0.300
M3
M3
x Rp.
x Rp.
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.780
0.390
0.039
0.039
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
282,500.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
310,750.00
315,568.00
205,920.00
832,238.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,850.00
43,380.00
4,620.00
6,037.50
134,887.50
967,125.50
282,500.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
310,750.00
263,296.00
215,424.00
789,470.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,850.00
43,380.00
4,620.00
6,037.50
134,887.50
924,357.50
282,500.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
310,750.00
226,512.00
222,156.00
759,418.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,850.00
43,380.00
4,620.00
6,037.50
134,887.50
894,305.50
= Rp.
= Rp.
= Rp.
339,000.00
97,020.00
436,020.00
=
=
=
=
=
=
42,042.00
28,197.00
3,003.00
3,139.50
76,381.50
512,401.50
282,500.00
323,400.00
53,900.00
72,300.00
77,000.00
80,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7
a.
-
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.100
75.500
0.235
M
Kg
M3
x Rp.
x Rp.
x Rp.
JUMLAH
1.100
0.500
0.050
0.055
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
9
a.
-
Kg
Kg
3
M
M3
Kg
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
3.000
0.850
0.085
0.150
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
10
a.
-
M3
Kg
3
M
M3
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
11
a.
-
b.
-
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
2.380
0.300
0.030
0.080
1.000
0.670
0.067
0.050
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
282,500.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
310,750.00
146,168.00
93,060.00
549,978.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
59,290.00
36,150.00
3,850.00
4,427.50
103,717.50
653,695.50
15,100.00
1,936.00
396,000.00
249,000.00
31,400.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,132,500.00
391,072.00
126,720.00
122,010.00
25,120.00
1,797,422.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
161,700.00
61,455.00
6,545.00
12,075.00
241,775.00
2,039,197.00
282,500.00
1,936.00
396,000.00
249,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
127,125.00
542,080.00
178,200.00
166,830.00
1,014,235.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
128,282.00
21,690.00
2,310.00
6,440.00
158,722.00
1,172,957.00
323,400.00
396,000.00
249,000.00
1,936.00
15,100.00
31,400.00
2,572,200.00
26,000.00
31,000.00
13,500.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,144.60
37,224.00
37,350.00
117,128.00
679,500.00
28,260.00
82,310.40
3,120.00
2,790.00
3,240.00
997,067.00
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
48,441.00
5,159.00
4,025.00
111,525.00
1,108,592.00
Bahan
Pasir Urug darat
Pasir Beton/Pasangan
Koral Beton
Semen Portland
Besi Beton
Kawat Beton
Kayu Kaso 5/7
Paku
Minyak Bekisting
Plamur Tembok
0.016
0.080
0.125
49.000
34.500
0.700
0.027
0.120
0.090
0.200
M
M3
3
M
Kg
Kg
Kg
M3
Kg
Ltr
Kg
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
0.800
0.500
0.050
0.040
Oh
Oh
Oh
Oh
x Rp.
x Rp.
x Rp.
x Rp.
JUMLAH
JUMLAH (a) + (b)
323,400.00
396,000.00
249,000.00
1,936.00
15,100.00
31,400.00
2,572,200.00
26,000.00
31,000.00
13,500.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,174.40
31,680.00
31,125.00
94,864.00
520,950.00
21,980.00
69,449.40
3,120.00
2,790.00
2,700.00
783,832.80
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
43,120.00
36,150.00
3,850.00
3,220.00
86,340.00
870,172.80
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Bahan
Beton K-275 ( EI 715 )
Baja Tulangan ( EI 73 )
Casing
0.071
3.534
0.942
M
Kg
2
M
x Rp.
x Rp.
x Rp.
JUMLAH
1,570,504.22
17,602.45
35,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
111,012.40
62,212.19
32,986.72
206,211.32
5.7982
2.3193
0.5798
Jam
Jam
Jam
x Rp.
x Rp.
x Rp.
JUMLAH
7,700.00
10,328.57
11,500.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
44,646.08
23,954.82
6,667.92
75,268.83
0.083
0.017
1.000
Jam
Jam
Ls
= Rp.
= Rp.
= Rp.
103,539.16
8,516.37
75.00
112,130.52
393,610.67
59,041.60
452,652.27
b. Tenaga
-
Pekerja
Tukang Batu
Mandor
c.
Bore Pile ( E 33 )
Concr. Pump ( E 28 )
Alat Bantu
x
x
x
Rp.
Rp.
Rp.
1,250,000.00
500,000.00
75.00
= Rp.
Rp.
Rp.
PEKERJAAN BETON
1.
a.
-
Bahan
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
a.
-
Bahan
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
a.
-
Bahan
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
a.
-
Bahan
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
218.000 Kg
0.520 M3
0.870 M3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
197.000 Kg
0.470 M3
0.940 M3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
10.000 Kg
0.026 M3
0.044 M3
1.150
0.020
0.002
0.006
Oh
Oh
Oh
Oh
282.000 Kg
0.560 M3
0.780 M3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
x
x
x
JUMLAH
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
422,048.00
205,920.00
216,630.00
844,598.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
88,935.00
18,075.00
1,925.00
6,440.00
115,375.00
959,973.00
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
381,392.00
186,120.00
234,060.00
801,572.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
88,935.00
18,075.00
1,925.00
6,440.00
115,375.00
916,947.00
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
19,360.00
10,296.00
10,956.00
40,612.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
61,985.00
1,446.00
154.00
483.00
64,068.00
104,680.00
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
545,952.00
221,760.00
194,220.00
961,932.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
88,935.00
18,075.00
1,925.00
6,440.00
115,375.00
1,077,307.00
x
x
x
JUMLAH
x
x
x
JUMLAH
x
x
x
JUMLAH
a.
-
Bahan
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
a.
-
Bahan
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
a.
-
Bahan
Semen Portland
Pasir Beton
Koral Beton
Rapidrant
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
a.
-
Bahan
Besi Beton (Polos/Ulir)
Kawat Beton
b.
-
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
352.000 Kg
0.560 M3
0.700 M3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
386.000 Kg
0.470 M3
0.780 M3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
x
x
x
JUMLAH
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
681,472.00
221,760.00
174,300.00
1,077,532.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
88,935.00
18,075.00
1,925.00
6,440.00
115,375.00
1,192,907.00
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
747,296.00
186,120.00
194,220.00
1,127,636.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
88,935.00
18,075.00
1,925.00
6,440.00
115,375.00
1,243,011.00
x
x
x
JUMLAH
440.000
0.500
0.800
2.460
Bh
Kg
M3
Gin
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
-
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
851,840.00
198,000.00
199,200.00
1,249,040.00
1.650
0.250
0.025
0.800
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
88,935.00
18,075.00
1,925.00
64,400.00
173,335.00
1,422,375.00
x
x
JUMLAH
Rp.
Rp.
15,400.00
31,400.00
= Rp.
= Rp.
= Rp.
16,170.00
471.00
16,641.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
377.30
506.10
53.90
24.15
961.45
17,602.45
1.050 Kg
0.015 Kg
0.007
0.007
0.0007
0.0003
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
a.
-
Bahan
Besi Jaring Kawat Baja
Kawat Beton
b.
-
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
1.020 Kg
0.805 Kg
0.025
0.025
0.0025
0.0015
Oh
Oh
Oh
Oh
x
x
JUMLAH
Rp.
Rp.
26,600.00
31,400.00
= Rp.
= Rp.
= Rp.
27,132.00
25,277.00
52,409.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,347.50
1,807.50
192.50
120.75
3,468.25
55,877.25
Bahan
Kayu terentang
Paku biasa 2 - 5 "
Minyak Bekisting
0.040 M3
0.300 Kg
0.100 Ltr
x
x
x
JUMLAH
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
102,888.00
7,800.00
3,100.00
113,788.00
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.300
0.260
0.026
0.005
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,170.00
18,798.00
2,002.00
402.50
37,372.50
151,160.50
Oh
Oh
Oh
Oh
Bahan
Kayu terentang
Paku biasa 2 - 5 "
Minyak Bekisting
0.045 M3
0.300 Kg
0.100 Ltr
x
x
x
JUMLAH
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
115,749.00
7,800.00
3,100.00
126,649.00
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.300
0.260
0.026
0.005
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,170.00
18,798.00
2,002.00
402.50
37,372.50
164,021.50
Bahan
Kayu terentang
Paku biasa 2 - 5 "
Minyak Bekisting
Balok Kayu
Plywood tebal 9 mm
Dolken kayu galam 8-10/4 m
0.040
0.400
0.200
0.015
0.350
2.000
M3
Kg
Lt
M3
Lbr
Btg
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
102,888.00
10,400.00
6,200.00
38,583.00
127,085.00
23,830.00
308,986.00
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.300
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,170.00
23,859.00
2,541.00
483.00
43,053.00
352,039.00
Bahan
Kayu terentang
Paku biasa 2 - 5 "
Minyak Bekisting
Balok Kayu
Plywood tebal 9 mm
Dolken kayu galam 8-10/4 m
0.040
0.400
0.200
0.018
0.350
2.000
M3
Kg
Lt
M3
Lbr
Btg
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
102,888.00
10,400.00
6,200.00
46,299.60
127,085.00
23,830.00
316,702.60
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
23,859.00
2,541.00
483.00
44,131.00
360,833.60
Bahan
Kayu terentang
Paku biasa 2 - 5 "
Minyak Bekisting
Balok Kayu
Plywood tebal 9 mm
Dolken kayu galam 8-10/4 m
0.040
0.400
0.200
0.015
0.350
6.000
M3
Kg
Lt
M3
Lbr
Btg
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
102,888.00
10,400.00
6,200.00
38,583.00
127,085.00
71,490.00
356,646.00
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
23,859.00
2,541.00
483.00
44,131.00
400,777.00
Bahan
Kayu terentang
Paku biasa 2 - 5 "
Minyak Bekisting
Balok Kayu
Plywood tebal 9 mm
Dolken kayu galam 8-10/4 m
Spacer/Jarak Bekisting
0.030
0.400
0.200
0.020
0.350
3.000
4.000
M
Kg
Lt
M3
Lbr
Btg
Btg
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
2,572,200.00
363,100.00
11,915.00
11,915.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
77,166.00
10,400.00
6,200.00
51,444.00
127,085.00
35,745.00
47,660.00
355,700.00
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
23,859.00
2,541.00
483.00
44,131.00
399,831.00
Bahan
Kayu terentang
Paku biasa 2 - 5 "
Minyak Bekisting
Balok Kayu
Plywood tebal 9 mm
Dolken kayu galam 8-10/4 m
0.030
0.400
0.150
0.015
0.350
2.000
M
Kg
Lt
M3
Lbr
Btg
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
77,166.00
10,400.00
4,650.00
38,583.00
127,085.00
23,830.00
281,714.00
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
23,859.00
2,541.00
483.00
44,131.00
325,845.00
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
639,944.80
257,400.00
161,850.00
1,059,194.80
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
323,400.00
72,300.00
7,700.00
24,150.00
427,550.00
1,486,744.80
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
668,317.85
253,757.03
196,471.23
1,118,546.11
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
285,734.94
127,759.04
7,700.00
35,562.25
456,756.22
1,575,302.34
Rp.
Rp.
Rp.
1,936.00
396,000.00
249,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
751,168.00
158,400.00
204,180.00
1,113,748.00
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
285,734.94
127,759.04
7,700.00
35,562.25
456,756.22
1,570,504.22
Bahan
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
330.550 Kg
0.650 M3
0.650 M3
6.000
1.000
0.100
0.300
Oh
Oh
Oh
Oh
x
x
x
JUMLAH
Bahan
Semen Portland
Pasir Beton
Koral Beton
345.206 Kg
0.641 M3
0.789 M3
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
5.30
1.77
0.100
0.44
Oh
Oh
Oh
Oh
x
x
x
JUMLAH
Bahan
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
388.000 Kg
0.400 M3
0.820 M3
5.301
1.767
0.100
0.442
Oh
Oh
Oh
Oh
x
x
x
JUMLAH
Bahan
Kayu Terentang
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
0.200
1.500
0.400
150.000
2.250
393.750
0.492
0.683
M
Kg
Lt
Kg
Kg
Kg
M3
3
M
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
514,440.00
39,000.00
12,400.00
2,265,000.00
36,225.00
762,300.00
194,906.25
170,029.36
3,994,300.61
3.900
0.350
1.040
1.050
0.400
0.820
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
210,210.00
25,305.00
75,192.00
75,915.00
30,800.00
66,010.00
483,432.00
4,477,732.61
Bahan
Kayu Terentang
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
0.200
1.500
0.400
185.000
2.500
393.750
0.492
0.683
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
514,440.00
39,000.00
12,400.00
2,793,500.00
40,250.00
762,300.00
194,906.25
170,029.36
4,526,825.61
3.900
0.350
1.040
1.050
0.245
0.165
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
210,210.00
25,305.00
75,192.00
75,915.00
18,865.00
13,282.50
418,769.50
4,945,595.11
Bahan
Kayu Terentang
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
0.270
2.000
0.600
100.000
3.000
323.000
0.520
0.780
M3
Kg
Lt
Kg
Kg
Kg
3
M
M3
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,581,700.00
26,000.00
29,000.00
15,100.00
31,400.00
1,936.00
396,000.00
249,000.00
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
697,059.00
52,000.00
17,400.00
1,510,000.00
94,200.00
625,328.00
205,920.00
194,220.00
3,396,127.00
4.850
0.350
1.560
1.400
0.331
0.170
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
261,415.00
25,305.00
112,788.00
101,220.00
25,487.00
13,685.00
539,900.00
3,936,027.00
Bahan
Kayu Terentang
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
0.200
1.500
0.400
250.000
3.000
393.750
0.492
0.683
M3
Kg
Lt
Kg
Kg
Kg
3
M
3
M
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
29,000.00
15,100.00
31,400.00
1,936.00
396,000.00
249,000.00
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
514,440.00
39,000.00
11,600.00
3,775,000.00
94,200.00
762,300.00
194,906.25
170,029.36
5,561,475.61
3.900
0.350
1.040
1.050
0.245
0.165
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
210,210.00
25,305.00
75,192.00
75,915.00
18,865.00
13,282.50
418,769.50
5,980,245.11
Bahan
Kayu Terentang
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
0.270
2.000
0.600
150.000
3.000
393.750
0.492
0.683
M
Kg
Lt
Kg
Kg
Kg
M3
M3
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
694,494.00
52,000.00
18,600.00
2,265,000.00
48,300.00
762,300.00
194,906.25
170,029.36
4,205,629.61
4.850
0.350
1.560
1.400
0.331
0.170
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
261,415.00
25,305.00
112,788.00
101,220.00
25,487.00
13,685.00
539,900.00
4,745,529.61
Bahan
Kayu Terentang
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
0.270
2.000
0.600
185.000
3.000
393.750
0.492
0.683
M3
Kg
Lt
Kg
Kg
Kg
M3
M3
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
694,494.00
52,000.00
18,600.00
2,793,500.00
48,300.00
762,300.00
194,906.25
170,029.36
4,734,129.61
4.850
0.350
1.560
1.400
0.331
0.170
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
261,415.00
25,305.00
112,788.00
101,220.00
25,487.00
13,685.00
539,900.00
5,274,029.61
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
4.000
2.000
185.000
4.500
393.750
0.492
0.683
0.150
3.500
26.000
Kg
Lt
Kg
Kg
Kg
3
M
M3
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
104,000.00
62,000.00
2,793,500.00
72,450.00
762,300.00
194,906.25
170,029.36
385,830.00
1,270,850.00
309,790.00
6,125,655.61
7.300
0.350
3.300
2.100
0.750
0.250
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
393,470.00
25,305.00
238,590.00
151,830.00
57,750.00
20,125.00
887,070.00
7,012,725.61
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
4.000
2.000
60.000
1.100
282.000
0.560
0.780
0.094
2.500
Kg
Lt
Kg
Kg
Kg
3
M
3
M
M3
Lbr
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
104,000.00
62,000.00
906,000.00
17,710.00
545,952.00
221,760.00
194,220.00
241,786.80
907,750.00
3,201,178.80
7.020
0.350
3.300
1.820
0.470
0.222
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
378,378.00
25,305.00
238,590.00
131,586.00
36,190.00
17,871.00
827,920.00
4,029,098.80
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
4.000
2.000
100.000
4.250
330.550
0.520
0.780
0.130
3.500
Kg
Lt
Kg
Kg
Kg
3
M
M3
3
M
Lbr
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
104,000.00
62,000.00
1,510,000.00
68,425.00
639,944.80
205,920.00
194,220.00
334,386.00
1,270,850.00
4,389,745.80
7.200
0.350
3.300
2.000
0.650
0.240
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
388,080.00
25,305.00
238,590.00
144,600.00
50,050.00
19,320.00
865,945.00
5,255,690.80
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
4.000
2.000
150.000
3.750
393.750
0.492
0.683
0.090
3.500
20.000
Kg
Lt
Kg
Kg
Kg
M3
3
M
M3
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
104,000.00
62,000.00
2,265,000.00
60,375.00
762,300.00
194,906.25
170,029.36
231,498.00
1,270,850.00
238,300.00
5,359,258.61
7.000
0.350
3.300
1.800
0.450
0.220
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
377,300.00
25,305.00
238,590.00
130,140.00
34,650.00
17,710.00
823,695.00
6,182,953.61
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
3.200
1.600
200.000
4.500
393.750
0.492
0.683
0.180
2.800
64.000
Kg
Lt
Kg
Kg
Kg
3
M
M3
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
49,600.00
3,020,000.00
72,450.00
762,300.00
194,906.25
170,029.36
462,996.00
1,016,680.00
762,560.00
6,594,721.61
6.280
0.350
2.800
2.100
0.525
0.254
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
338,492.00
25,305.00
202,440.00
151,830.00
40,425.00
20,447.00
778,939.00
7,373,660.61
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
3.200
1.600
185.000
4.500
393.750
0.492
0.683
0.180
2.800
64.000
Kg
Lt
Kg
Kg
Kg
3
M
M3
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
49,600.00
2,793,500.00
72,450.00
762,300.00
194,906.25
170,029.36
462,996.00
1,016,680.00
762,560.00
6,368,221.61
6.280
0.350
2.800
2.100
0.525
0.254
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
338,492.00
25,305.00
202,440.00
151,830.00
40,425.00
20,447.00
778,939.00
7,147,160.61
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
3.200
1.600
100.000
2.700
282.000
0.560
0.780
0.132
2.800
25.600
Kg
Lt
Kg
Kg
Kg
3
M
3
M
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
49,600.00
1,510,000.00
43,470.00
545,952.00
221,760.00
194,220.00
339,530.40
1,016,680.00
305,024.00
4,309,436.40
1.650
0.250
2.800
1.260
0.441
0.199
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
88,935.00
18,075.00
202,440.00
91,098.00
33,957.00
16,019.50
450,524.50
4,759,960.90
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
3.200
1.600
100.000
4.500
282.000
0.520
0.780
0.180
2.800
16.000
Kg
Lt
Kg
Kg
Kg
3
M
3
M
M3
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
49,600.00
1,510,000.00
72,450.00
545,952.00
205,920.00
194,220.00
462,996.00
1,016,680.00
190,640.00
4,331,658.00
6.280
0.350
2.800
2.100
0.525
0.254
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
338,492.00
25,305.00
202,440.00
151,830.00
40,425.00
20,447.00
778,939.00
5,110,597.00
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
3.200
1.600
150.000
2.250
393.750
0.492
0.683
0.120
2.800
64.000
Kg
Lt
Kg
Kg
Kg
3
M
3
M
M3
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
49,600.00
2,265,000.00
36,225.00
762,300.00
194,906.25
170,029.36
308,664.00
1,016,680.00
762,560.00
5,649,164.61
5.800
0.350
2.800
1.050
0.420
0.185
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
312,620.00
25,305.00
202,440.00
75,915.00
32,340.00
14,892.50
663,512.50
6,312,677.11
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
3.200
1.600
75.000
1.020
282.000
0.520
0.780
0.123
2.800
12.000
Kg
Lt
Kg
Kg
Kg
3
M
M3
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
49,600.00
1,132,500.00
16,422.00
545,952.00
205,920.00
194,220.00
316,380.60
1,016,680.00
142,980.00
3,703,854.60
5.800
0.350
2.800
1.050
0.420
0.185
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
312,620.00
25,305.00
202,440.00
75,915.00
32,340.00
14,892.50
663,512.50
4,367,367.10
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
3.200
1.600
150.000
2.250
393.750
0.492
0.683
0.160
2.800
20.000
Kg
Lt
Kg
Kg
Kg
3
M
3
M
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
31,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
49,600.00
2,265,000.00
36,225.00
762,300.00
194,906.25
170,029.36
411,552.00
1,016,680.00
238,300.00
5,227,792.61
5.600
0.350
2.640
1.050
0.400
0.193
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
301,840.00
25,305.00
190,872.00
75,915.00
30,800.00
15,536.50
640,268.50
5,868,061.11
Bahan
Paku biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
1.100
60.000
2.250
282.000
0.560
0.780
0.160
Kg
Kg
Kg
Kg
3
M
3
M
M3
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
28,600.00
906,000.00
36,225.00
545,952.00
221,760.00
194,220.00
411,552.00
2,344,309.00
2.100
0.350
0.500
1.000
0.200
0.120
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
113,190.00
25,305.00
36,150.00
72,300.00
15,400.00
9,660.00
272,005.00
2,616,314.00
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
3.200
1.600
100.000
2.250
393.750
0.492
0.683
0.120
2.800
64.000
Kg
Lt
Kg
Kg
Kg
3
M
M3
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
29,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
46,400.00
1,510,000.00
36,225.00
762,300.00
194,906.25
170,029.36
308,664.00
1,016,680.00
762,560.00
4,890,964.61
5.800
0.350
2.800
1.050
0.420
0.185
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
312,620.00
25,305.00
202,440.00
75,915.00
32,340.00
14,892.50
663,512.50
5,554,477.11
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Bahan
3.200
1.600
150.000
2.250
393.750
0.492
0.683
0.160
2.800
24.000
Kg
Lt
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
29,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
46,400.00
2,265,000.00
36,225.00
762,300.00
194,832.00
170,067.00
411,552.00
1,016,680.00
285,960.00
5,272,216.00
5.600
0.350
2.640
1.050
0.400
0.193
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
301,840.00
25,305.00
190,872.00
75,915.00
30,800.00
15,536.50
640,268.50
5,912,484.50
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
40 1 m3 Membuat Lesplank dan Talang beton bertulang K 300 ( 100 kg besi + bekisting )
a.
-
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
3.200
1.600
100.000
2.250
393.750
0.492
0.683
0.160
2.800
24.000
Kg
Lt
Kg
Kg
Kg
3
M
3
M
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
29,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
83,200.00
46,400.00
1,510,000.00
36,225.00
762,300.00
194,832.00
170,067.00
411,552.00
1,016,680.00
285,960.00
4,517,216.00
5.600
0.350
2.640
1.050
0.400
0.193
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
301,840.00
25,305.00
190,872.00
75,915.00
30,800.00
15,536.50
640,268.50
5,157,484.50
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
b.
-
Tenaga
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
2.750
1.600
60.000
2.250
393.750
0.492
0.683
0.160
2.800
24.000
Kg
Lt
Kg
Kg
Kg
3
M
3
M
M3
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
29,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
71,500.00
46,400.00
906,000.00
36,225.00
762,300.00
194,832.00
170,067.00
411,552.00
1,016,680.00
285,960.00
3,901,516.00
5.600
0.350
2.640
1.050
0.400
0.193
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
301,840.00
25,305.00
190,872.00
75,915.00
30,800.00
15,536.50
640,268.50
4,541,784.50
Bahan
Paku biasa 2" - 5"
Minyak bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok
Plywood 9 mm
Dolken kayu galam 8-10/4 m
2.500
1.600
60.000
2.250
393.750
0.492
0.683
0.160
2.800
12.000
Kg
Lt
Kg
Kg
Kg
3
M
3
M
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
29,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.00
46,400.00
906,000.00
36,225.00
762,300.00
194,832.00
170,067.00
411,552.00
1,016,680.00
142,980.00
3,752,036.00
5.600
0.350
2.640
1.050
0.400
0.193
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
301,840.00
25,305.00
190,872.00
75,915.00
30,800.00
15,536.50
640,268.50
4,392,304.50
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
Bahan
3.000
1.200
150.000
3.000
323.000
0.520
0.780
0.105
2.500
10.000
Kg
Lt
Kg
Kg
Kg
M3
M3
3
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
JUMLAH
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
29,000.00
15,100.00
16,100.00
1,936.00
396,000.00
249,000.00
2,572,200.00
363,100.00
11,915.00
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
78,000.00
34,800.00
2,265,000.00
48,300.00
625,328.00
205,920.00
194,220.00
270,081.00
907,750.00
119,150.00
4,748,549.00
5.600
0.350
2.300
1.400
0.405
0.202
Oh
Oh
Oh
Oh
Oh
Oh
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
x
Rp.
JUMLAH
JUMLAH (a) + (b)
53,900.00
72,300.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
301,840.00
25,305.00
166,290.00
101,220.00
31,185.00
16,261.00
642,101.00
5,390,650.00
b. Tenaga
-
Pekerja
Tukang Batu
Tukang kayu
Tukang besi
Kepala Tukang
Mandor
:
:
:
:
:
NO.
KOMPONEN
1
2
3
4
5
6
7
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
M3
Kg
Lbr
Lbr
Kg
Lot
Lot
0.10
0.25
1.10
0.50
0.10
0.10
0.10
2,572,200.00
26,000.00
58,700.00
67,100.00
96,800.00
100,000.00
500,000.00
JUMLAH HARGA
257,220.00
6,500.00
64,570.00
33,550.00
9,680.00
10,000.00
50,000.00
431,520.00
Unit
Unit
3
M
Ls
1.00
1.00
0.40
1.00
100,000.00
100,000.00
916,947.00
100,000.00
JUMLAH HARGA
100,000.00
100,000.00
366,778.80
100,000.00
666,778.80
M3
M3
M1
1.000
1.000
4.000
32,537.40
25,000.00
JUMLAH HARGA
32,537.40
25,000.00
0.00
57,537.40
Org / jam
Org / jam
Org / jam
Org / jam
Org / jam
Org / jam
Unit
Ltr
Ltr
0.125
0.125
0.125
0.125
0.125
0.125
1.000
2.500
7.143
11,000.00
10,328.57
7,700.00
9,857.14
9,428.57
7,700.00
350,000.00
31,000.00
7,200.00
JUMLAH HARGA
1,375.00
1,291.07
962.50
1,232.14
1,178.57
962.50
350,000.00
77,500.00
51,429.60
485,931.39
Org / jam
Org / jam
Org / jam
Org / jam
Org / jam
0.167
0.167
0.167
0.167
0.167
11,000.00
10,328.57
7,700.00
9,857.14
9,857.14
1,837.00
1,724.87
1,285.90
1,646.14
1,646.14
PERKIRAAN
KUANTITAS
SATUAN
Crew Bor
Mesin/Peralatan Bor
Pelumas
Solar
0.250
0.250
0.250
0.250
0.250
0.250
1.000
2.857
9.000
11,000.00
10,328.57
7,700.00
9,857.14
9,857.14
7,700.00
350,000.00
31,000.00
7,200.00
JUMLAH HARGA
2,750.00
2,582.14
1,925.00
2,464.29
2,464.29
1,925.00
350,000.00
88,567.00
64,800.00
517,477.71
0.333
0.667
0.800
0.200
214,500.00
150,000.00
7,700.00
9,857.14
71,428.50
100,050.00
6,160.00
1,971.43
M
M3
OH
OH
JUMLAH HARGA
179,609.93
Apl
Apl
Apl
Apl
0.200
0.150
0.100
0.0020
100,000.00
100,000.00
50,000.00
250,000.00
JUMLAH HARGA
20,000.00
15,000.00
5,000.00
500.00
40,500.00
Ttk
Ttk
Ttk
0.0130
0.0070
0.0200
1,500,000.00
1,750,000.00
1,850,000.00
JUMLAH HARGA
19,500.00
12,250.00
37,000.00
68,750.00
Org / jam
Org / jam
Org / jam
Org / jam
Org / jam
Org / jam
Unit
Ltr
Ltr
0.1000
0.1000
0.1000
0.1000
0.1000
0.1000
0.0070
2.2220
7.1430
11,000.00
10,328.57
7,700.00
9,857.14
9,857.14
7,700.00
350,000.00
31,000.00
7,200.00
JUMLAH HARGA
1,100.00
1,032.86
770.00
985.71
985.71
770.00
2,450.00
68,882.00
51,429.60
128,405.89
Org / jam
Org / jam
Org / jam
Org / jam
Org / jam
0.1000
0.1000
0.1000
0.1000
0.1000
11,000.00
10,328.57
7,700.00
9,857.14
9,857.14
1,100.00
1,032.86
770.00
985.71
985.71
11
Org / jam
Org / jam
Org / jam
Org / jam
Org / jam
Org / jam
Unit
Ltr
Ltr
10
1,285.90
350,000.00
88,567.00
59,997.60
507,990.56
7,700.00
350,000.00
31,000.00
7,200.00
JUMLAH HARGA
0.167
1.000
2.857
8.333
Org / jam
Unit
Ltr
Ltr
Crew Bor
Mesin/Peralatan Bor
Pelumas
Solar
12
1.0000
0.3500
0.0240
0.0500
0.0670
0.0330
0.0170
0.0280
0.0070
352,983.33
35,000.00
42,900.00
84,700.00
53,900.00
84,700.00
84,700.00
350,000.00
350,000.00
JUMLAH HARGA
352,983.33
12,250.00
1,029.60
4,235.00
3,611.30
2,795.10
1,439.90
9,800.00
2,450.00
390,594.23
1.0000
0.0500
0.0670
0.0330
0.0170
0.0070
68,300.00
84,700.00
53,900.00
84,700.00
84,700.00
350,000.00
JUMLAH HARGA
68,300.00
4,235.00
3,611.30
2,795.10
1,439.90
2,450.00
82,831.30
M
Kg
Set
Org
Org
Org
Org
Lot
Unit
1.0000
0.1750
0.0120
0.0250
0.0330
0.0170
0.0080
0.0140
0.0030
350,000.00
35,000.00
450,000.00
84,700.00
53,900.00
84,700.00
84,700.00
350,000.00
350,000.00
JUMLAH HARGA
350,000.00
6,125.00
5,400.00
2,117.50
1,778.70
1,439.90
677.60
4,900.00
1,050.00
373,488.70
M1
Org
Org
Org
Org
Unit
1.0000
0.0670
0.0830
0.0500
0.0170
0.0070
250,000.00
84,700.00
53,900.00
84,700.00
84,700.00
350,000.00
JUMLAH HARGA
250,000.00
5,674.90
4,473.70
4,235.00
1,439.90
2,450.00
268,273.50
M2
Org
Org
Org
Unit
1.2000
1.0000
0.3000
0.0300
0.0030
249,000.00
53,900.00
84,700.00
84,700.00
350,000.00
JUMLAH HARGA
298,800.00
53,900.00
25,410.00
2,541.00
1,050.00
381,701.00
M
Org
Org
Org
Org
Unit
17
M1
Kg
Set
Org
Org
Org
Org
Lot
Unit
16
770.00
2,450.00
68,882.00
51,429.60
128,405.89
15
7,700.00
350,000.00
31,000.00
7,200.00
JUMLAH HARGA
14
0.1000
0.0070
2.2220
7.1430
13
Org / jam
Unit
Ltr
Ltr
1 JAM.PEMBERSIHAN SUMUR
Water Jetting
Water Jetting
Over Pumping
Mesin/peralatan bor lengkap
18
250,000.00
500,000.00
300,000.00
JUMLAH HARGA
250,000.00
150,000.00
300,000.00
700,000.00
Jam
Jam
Jam
0.5000
0.1500
1.0000
250,000.00
500,000.00
300,000.00
JUMLAH HARGA
125,000.00
75,000.00
300,000.00
500,000.00
Jam
Jam
Jam
0.2500
0.0750
1.0000
250,000.00
500,000.00
300,000.00
JUMLAH HARGA
62,500.00
37,500.00
300,000.00
400,000.00
11.5000
1.5000
0.5000
0.0500
0.0100
0.0500
96,800.00
53,900.00
72,300.00
77,000.00
80,500.00
75,000.00
JUMLAH HARGA
1,113,200.00
80,850.00
36,150.00
3,850.00
805.00
3,750.00
1,238,605.00
1.0000
2.0000
3.0000
1.0000
2.0000
1.0000
167,873,700.00
90,000.00
53,900.00
77,000.00
85,000.00
350,000.00
JUMLAH HARGA
167,873,700.00
180,000.00
161,700.00
77,000.00
170,000.00
350,000.00
168,812,400.00
Unit
Jam
Jam
Jam
Jam
Ls
1.0000
2.0000
3.0000
1.0000
2.0000
1.0000
139,894,700.00
90,000.00
53,900.00
77,000.00
85,000.00
350,000.00
JUMLAH HARGA
139,894,700.00
180,000.00
161,700.00
77,000.00
170,000.00
350,000.00
140,833,400.00
M1
Bh
Org
Org
0.1670
0.1670
0.0830
0.3330
196,650.00
24,800.00
84,700.00
53,900.00
32,840.55
4,141.60
7,030.10
17,948.70
Zak
Org
Org
Org
Org
Lot
Unit
Jam
Jam
Jam
Jam
Ls
23
1.0000
0.3000
1.0000
22
Jam
Jam
Jam
22
87,500.00
100,050.00
250,000.00
2,450.00
440,000.00
21
175,000.00
150,000.00
250,000.00
350,000.00
JUMLAH HARGA
20
0.5000
0.6670
1.0000
0.0070
19
Jam
Jam
Jam
Unit
24
Unit
Unit
Unit
Unit
Unit
Unit
Kg
Org
Org
Org
Ls
1.0000
1.0000
1.0000
1.0000
1.0000
8.0000
0.3000
0.5000
0.5000
0.0500
0.2500
35,000.00
25,000.00
24,800.00
19,900.00
750,000.00
29,000.00
35,000.00
53,900.00
90,000.00
77,000.00
350,000.00
JUMLAH HARGA
35,000.00
25,000.00
24,800.00
19,900.00
750,000.00
232,000.00
10,500.00
26,950.00
45,000.00
3,850.00
87,500.00
1,260,500.00
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Set
Unit
Lot
Unit
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
3.0000
1.0000
0.1000
1.0000
1,059,800.00
605,500.00
650,000.00
750,000.00
750,000.00
850,000.00
1,250,000.00
850,000.00
250,000.00
450,000.00
100,000.00
250,000.00
JUMLAH HARGA
1,059,800.00
605,500.00
650,000.00
750,000.00
750,000.00
850,000.00
1,250,000.00
850,000.00
750,000.00
450,000.00
10,000.00
250,000.00
8,225,300.00
M1
M1
Bh
Org
Org
Org
Lot
1.2000
1.0200
0.0650
0.0330
0.0500
0.0170
1.0000
29,600.00
16,900.00
25,000.00
125,000.00
53,900.00
80,500.00
125,000.00
JUMLAH HARGA
35,520.00
17,238.00
1,625.00
4,125.00
2,695.00
1,368.50
125,000.00
187,571.50
M1
Org
Org
Lot
1.0000
0.0330
0.0170
1.0000
5,300.00
53,900.00
80,500.00
125,000.00
JUMLAH HARGA
5,300.00
1,778.70
1,368.50
125,000.00
133,447.20
Set
Unit
Bh
Kg
1.0000
1.0000
1.0000
0.3000
35,000.00
25,000.00
29,000.00
35,000.00
35,000.00
25,000.00
29,000.00
10,500.00
28
12,859.00
5,695.00
2,800.00
83,314.95
27
77,000.00
85,000.00
350,000.00
JUMLAH HARGA
26
0.1670
0.0670
0.0080
25
Org
Org
Ls
Pekerja
Tukang Las
Kepala Tukang Las
Mesin Las / Peralatan
29
53,900.00
90,000.00
85,000.00
350,000.00
JUMLAH HARGA
26,950.00
45,000.00
4,250.00
105,000.00
245,700.00
M1
Lot
3
M
3
M
M3
Lot
Lot
1.0000
0.2000
0.2400
0.2180
0.0020
0.1200
0.2000
24,200.00
150,000.00
24,780.00
11,878.30
31,837.40
150,000.00
25,000.00
JUMLAH HARGA
24,200.00
30,000.00
5,947.20
2,589.47
63.67
18,000.00
5,000.00
85,800.34
Org
Org
Org
Org
0.5000
0.0500
0.0050
0.0100
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH HARGA
26,950.00
3,615.00
385.00
805.00
31,755.00
Org
Org
Lot
4.0000
1.0000
0.3000
53,900.00
80,500.00
100,000.00
JUMLAH HARGA
215,600.00
80,500.00
30,000.00
326,100.00
31
0.5000
0.5000
0.0500
0.3000
30
Org
Org
Org
Set
PEKERJAAN LANTAI
1
a.
Bahan
Genteng palentong
25 Buah
Rp.
1,000.00
JUMLAH
= Rp.
25,000.00
= Rp.
25,000.00
b.
Tenaga
Pekerja
0.150
Oh
Rp.
53,900.00
= Rp.
8,085.00
Tukang kayu
0.075
Oh
Rp.
72,300.00
= Rp.
5,422.50
Kepala Tukang
0.008
Oh
Rp.
77,000.00
= Rp.
616.00
Mandor
0.008
Oh
Rp.
80,500.00
a.
Bahan
= Rp.
644.00
JUMLAH
= Rp.
14,767.50
= Rp.
39,767.50
= Rp.
25,000.00
= Rp.
25,000.00
Genteng kodok
25 Buah
Rp.
1,000.00
b.
Tenaga
Pekerja
0.150
Oh
Rp.
53,900.00
= Rp.
8,085.00
Tukang kayu
0.075
Oh
Rp.
72,300.00
= Rp.
5,422.50
Kepala Tukang
0.008
Oh
Rp.
77,000.00
= Rp.
616.00
Mandor
0.008
Oh
Rp.
80,500.00
= Rp.
644.00
JUMLAH
= Rp.
14,767.50
= Rp.
39,767.50
= Rp.
12,000.00
= Rp.
12,000.00
JUMLAH
a.
Bahan
12 Buah
Rp.
1,000.00
JUMLAH
b.
Tenaga
Pekerja
0.150
Oh
Rp.
53,900.00
= Rp.
8,085.00
Tukang kayu
0.060
Oh
Rp.
72,300.00
= Rp.
4,338.00
Kepala Tukang
0.006
Oh
Rp.
77,000.00
= Rp.
462.00
Mandor
0.008
Oh
Rp.
80,500.00
= Rp.
644.00
JUMLAH
= Rp.
13,529.00
= Rp.
25,529.00
a.
Bahan
Bh
Rp.
15,100.00
= Rp.
75,500.00
semen portland
Kg
Rp.
1,936.00
= Rp.
15,488.00
0.032
Rp.
396,000.00
= Rp.
12,672.00
= Rp.
103,660.00
pasir pasang
JUMLAH
b.
Tenaga
Pekerja
0.150
Oh
Rp.
53,900.00
= Rp.
8,085.00
Tukang kayu
0.060
Oh
Rp.
72,300.00
= Rp.
4,338.00
Kepala Tukang
0.006
Oh
Rp.
77,000.00
= Rp.
462.00
Mandor
0.008
Oh
Rp.
80,500.00
= Rp.
644.00
a.
Bahan
JUMLAH
= Rp.
13,529.00
= Rp.
117,189.00
Bh
Rp.
15,100.00
= Rp.
75,500.00
semen portland
Kg
Rp.
1,936.00
= Rp.
15,488.00
0.032
Rp.
396,000.00
= Rp.
12,672.00
= Rp.
103,660.00
pasir pasang
JUMLAH
b.
Tenaga
Pekerja
0.400
Oh
Rp.
53,900.00
= Rp.
21,560.00
Tukang kayu
0.200
Oh
Rp.
72,300.00
= Rp.
14,460.00
Kepala Tukang
0.020
Oh
Rp.
77,000.00
= Rp.
1,540.00
Mandor
0.002
Oh
Rp.
80,500.00
a.
Bahan
semen portland
pasir pasang
= Rp.
161.00
JUMLAH
= Rp.
37,721.00
= Rp.
141,381.00
15,100.00
= Rp.
60,400.00
Bh
Rp.
Kg
Rp.
1,936.00
= Rp.
15,488.00
0.032
M3
Rp.
396,000.00
= Rp.
12,672.00
= Rp.
88,560.00
JUMLAH
b.
Tenaga
Pekerja
0.400
Oh
Rp.
53,900.00
= Rp.
21,560.00
Tukang kayu
0.200
Oh
Rp.
72,300.00
= Rp.
14,460.00
Kepala Tukang
0.020
Oh
Rp.
77,000.00
= Rp.
1,540.00
Mandor
0.002
Oh
Rp.
80,500.00
= Rp.
161.00
JUMLAH
= Rp.
37,721.00
= Rp.
126,281.00
7
a.
20.000
- Semen Portland
- Pasir Pasang
- Semen Portland Isian
bh
Rp.
5,500.00
= Rp.
110,000.00
11.38
Kg
0.042
m3
Rp.
1,936.00
= Rp.
22,031.68
Rp.
396,000.00
= Rp.
16,632.00
1.5
Kg
Rp.
1,936.00
= Rp.
2,904.00
= Rp.
151,567.68
JUMLAH
b.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
a.
Bahan
- Keramik warna 30x30 cm
JUMLAH
= Rp.
63,833.00
= Rp.
215,400.68
11.000
bh
Rp.
5,336.36
= Rp.
58,700.00
- Semen Portland
11.38
Kg
Rp.
1,936.00
= Rp.
22,031.68
- Pasir Pasang
0.042
m3
Rp.
396,000.00
= Rp.
16,632.00
1.5
Kg
Rp.
8,000.00
= Rp.
12,000.00
= Rp.
109,363.68
JUMLAH
b.
9
a.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
JUMLAH
= Rp.
63,833.00
= Rp.
173,196.68
4,145.00
= Rp.
82,900.00
20.000
bh
Rp.
- Semen Portland
11.38
Kg
Rp.
1,936.00
= Rp.
22,031.68
- Pasir Pasang
0.042
m3
Rp.
396,000.00
= Rp.
16,632.00
1.5
Kg
Rp.
8,000.00
= Rp.
12,000.00
= Rp.
133,563.68
JUMLAH
b.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
JUMLAH
= Rp.
63,833.00
= Rp.
197,396.68
10
a.
25.000
bh
Rp.
3,028.00
= Rp.
75,700.00
- Semen Portland
11.38
Kg
Rp.
1,936.00
= Rp.
22,031.68
- Pasir Pasang
0.042
m3
Rp.
396,000.00
= Rp.
16,632.00
1.5
Kg
Rp.
8,000.00
= Rp.
12,000.00
= Rp.
126,363.68
JUMLAH
b.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
11
a.
Bahan
JUMLAH
= Rp.
63,833.00
= Rp.
190,196.68
6.000
bh
Rp.
16,450.00
= Rp.
98,700.00
- Semen Portland
11.38
Kg
Rp.
1,936.00
= Rp.
22,031.68
- Pasir Pasang
0.042
m3
Rp.
396,000.00
= Rp.
16,632.00
1.5
Kg
Rp.
8,000.00
= Rp.
12,000.00
= Rp.
149,363.68
JUMLAH
b.
12
a.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
JUMLAH
= Rp.
63,833.00
= Rp.
213,196.68
1,710.00
= Rp.
85,500.00
50.000
bh
Rp.
- Semen Portland
11.38
Kg
Rp.
1,936.00
= Rp.
22,031.68
- Pasir Pasang
0.042
m3
Rp.
396,000.00
= Rp.
16,632.00
1.5
Kg
Rp.
8,000.00
= Rp.
12,000.00
= Rp.
136,163.68
- Semen Warna
JUMLAH
b.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
JUMLAH
= Rp.
63,833.00
= Rp.
199,996.68
13
a.
100.000
bh
Rp.
1,600.00
= Rp.
160,000.00
- Semen Portland
11.38
Kg
Rp.
1,936.00
= Rp.
22,031.68
- Pasir Pasang
0.042
m3
Rp.
396,000.00
= Rp.
16,632.00
- Semen Warna
2.00
Kg
Rp.
8,000.00
= Rp.
16,000.00
= Rp.
214,663.68
JUMLAH
b.
14
a.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
JUMLAH
= Rp.
63,833.00
= Rp.
278,496.68
50.000
bh
Rp.
1,710.00
= Rp.
85,500.00
- Semen Portland
9.30
Kg
Rp.
1,936.00
= Rp.
18,004.80
- Semen Warna
1.50
Kg
Rp.
8,000.00
= Rp.
12,000.00
= Rp.
115,504.80
JUMLAH
b.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
15
a.
Bahan
- Keramik 20x25 cm
JUMLAH
= Rp.
63,833.00
= Rp.
179,337.80
20.000
bh
Rp.
4,145.00
= Rp.
82,900.00
- Semen Portland
9.30
Kg
Rp.
1,936.00
= Rp.
18,004.80
- Semen Warna
1.50
Kg
Rp.
8,000.00
= Rp.
12,000.00
= Rp.
112,904.80
JUMLAH
b.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
JUMLAH
= Rp.
63,833.00
= Rp.
176,737.80
16
a.
25.000
bh
Rp.
3,420.00
= Rp.
85,500.00
- Semen Portland
9.30
Kg
Rp.
1,936.00
= Rp.
18,004.80
- Semen Warna
1.50
Kg
Rp.
8,000.00
= Rp.
12,000.00
= Rp.
115,504.80
JUMLAH
b.
17
a.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang kayu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
JUMLAH
= Rp.
63,833.00
= Rp.
179,337.80
2,400.00
= Rp.
120,000.00
50.000
bh
Rp.
9.30
Kg
Rp.
1,936.00
= Rp.
18,004.80
0.018
m3
Rp.
396,000.00
= Rp.
7,128.00
= Rp.
145,132.80
JUMLAH
b.
18
a.
Tenaga
- Pekerja
0.620
Oh
Rp.
53,900.00
= Rp.
33,418.00
- Tukang Batu
0.350
Oh
Rp.
72,300.00
= Rp.
25,305.00
- Kepala Tukang
0.035
Oh
Rp.
77,000.00
= Rp.
2,695.00
- Mandor
0.030
Oh
Rp.
80,500.00
= Rp.
2,415.00
JUMLAH
= Rp.
63,833.00
= Rp.
208,965.80
= Rp.
= Rp.
= Rp.
169,600.00
7,128.00
176,728.00
32.000
0.018
bh
m3
x
x
Rp.
Rp.
5,300.00
396,000.00
x
x
x
Rp.
Rp.
Rp.
53,900.00
77,000.00
80,500.00
JUMLAH
b.
Tenaga
- Pekerja
- Kepala Tukang
- Mandor
0.520
0.032
0.030
Oh
Oh
Oh
JUMLAH
=
=
=
=
Rp.
Rp.
Rp.
Rp.
28,028.00
2,464.00
2,415.00
32,907.00
= Rp.
209,635.00
PEKERJAAN DINDING
1.
a.
Bahan
Bata Merah
Semen Portland
Pasir pasang
46.000 Bh
64.030 Kg
0.059 M3
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
142,600.00
123,962.08
23,364.00
289,926.08
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,035.00
14,460.00
1,540.00
2,415.00
53,450.00
343,376.08
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
142,600.00
84,216.00
31,680.00
258,496.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,035.00
14,460.00
1,540.00
2,415.00
53,450.00
311,946.00
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
142,600.00
63,791.20
36,036.00
242,427.20
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,035.00
14,460.00
1,540.00
2,415.00
53,450.00
295,877.20
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.650
0.200
0.020
0.030
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
a.
Bahan
Bata Merah
Semen Portland
Pasir pasang
46.000 Bh
43.500 Kg
0.080 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.650
0.200
0.020
0.030
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
3
a.
Bahan
Bata Merah
Semen Portland
Pasir pasang
46.000 Bh
32.950 Kg
0.091 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.650
0.200
0.020
0.030
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN DINDING
4
a.
Bahan
Bata Merah
Semen Portland
Pasir pasang
46.000 Bh
26.550 Kg
0.093 M3
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
142,600.00
51,400.80
36,828.00
230,828.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,035.00
14,460.00
1,540.00
2,415.00
53,450.00
284,278.80
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
142,600.00
42,979.20
40,392.00
225,971.20
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,035.00
14,460.00
1,540.00
2,415.00
53,450.00
279,421.20
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
142,600.00
42,979.20
40,392.00
225,971.20
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,035.00
14,460.00
1,540.00
2,415.00
53,450.00
279,421.20
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.650
0.200
0.020
0.030
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
5
a.
Bahan
Bata Merah
Semen Portland
Pasir pasang
46.000 Bh
22.200 Kg
0.102 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.650
0.200
0.020
0.030
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
6
a.
-
Bahan
Bata Merah
Semen Portland
Pasir pasang
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
46.000 Bh
22.200 Kg
0.102 M3
JUMLAH
0.650
0.200
0.020
0.030
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN DINDING
7
a.
-
Bahan
Bata Merah
Semen Portland
Pasir pasang
23.000 Bh
27.800 Kg
0.028 M3
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
71,300.00
53,820.80
11,088.00
136,208.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
770.00
1,207.50
26,455.50
162,664.30
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
71,300.00
36,687.20
15,048.00
123,035.20
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
770.00
1,207.50
26,455.50
26,455.50
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
71,300.00
27,820.32
15,840.00
114,960.32
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
770.00
1,207.50
26,455.50
141,415.82
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
8
a.
Bahan
Bata Merah
Semen Portland
Pasir pasang
23.000 Bh
18.950 Kg
0.038 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
9
a.
Bahan
Bata Merah
Semen Portland
Pasir pasang
23.000 Bh
14.370 Kg
0.040 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN DINDING
10 1 m2 pasang bata bata tebal 1/2 bata, 1 Pc : 4 Ps
a.
-
Bahan
Bata Merah
Semen Portland
Pasir pasang
23.000 Bh
11.500 Kg
0.035 M3
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
71,300.00
22,264.00
13,860.00
107,424.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
770.00
1,207.50
26,455.50
133,879.50
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
71,300.00
19,766.56
13,860.00
104,926.56
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
770.00
1,207.50
26,455.50
131,382.06
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
71,300.00
18,508.16
13,860.00
103,668.16
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
770.00
1,207.50
26,455.50
130,123.66
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Bata Merah
Semen Portland
Pasir pasang
23.000 Bh
10.210 Kg
0.035 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
12 1 m2 pasang bata bata tebal 1/2 bata, 1 Pc : 6 Ps
a.
-
Bahan
Bata Merah
Semen Portland
Pasir pasang
23.000 Bh
9.560 Kg
0.035 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN DINDING
13 1 m2 pasang dinding hollowblock (HB. 20)
a.
-
Bahan
Hollow Block (HB.20)
Semen Portland
Pasir pasang
Besi Beton Polos
12.500
13.500
0.048
1.950
M'
Kg
M3
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
20,833.33
1,936.00
396,000.00
15,100.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
260,416.67
26,136.00
19,008.00
29,445.00
335,005.67
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
18,865.00
10,845.00
1,155.00
1,368.50
32,233.50
367,239.17
x
x
x
x
Rp.
Rp.
Rp.
Rp.
20,833.33
1,936.00
396,000.00
15,100.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
260,416.67
20,231.20
15,048.00
29,445.00
325,140.87
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
8,676.00
924.00
1,207.50
28,055.50
353,196.37
x
x
x
x
Rp.
Rp.
Rp.
Rp.
20,833.33
1,936.00
396,000.00
15,100.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
260,416.67
14,520.00
10,692.00
29,445.00
315,073.67
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
770.00
1,207.50
26,455.50
341,529.17
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.350
0.150
0.015
0.017
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
14 1 m2 pasang dinding hollowblock (HB. 15)
a.
-
Bahan
Hollow Block (HB.15)
Semen Portland
Pasir pasang
Besi Beton Polos
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
12.500
10.450
0.038
1.950
Bh
Kg
M3
Kg
JUMLAH
0.320
0.120
0.012
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
15 1 m2 Pasangan dinding hollowblock (HB. 10)
a.
-
Bahan
Hollow Block (HB.10)
Semen Portland
Pasir pasang
Besi Beton Polos
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
12.500
7.500
0.027
1.950
Bh
Kg
M3
Kg
JUMLAH
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN DINDING
16 1 m2 Pasangan dinding conblock (CB. 20)
a.
-
Bahan
Concrete block (CB. 20)
Semen Portland
Pasir Beton
Pasir pasang
Besi beton polos
Paku biasa 2" - 5"
Kayu Terentang
Kawat Beton
Koral Beton
12.500
14.050
0.004
0.042
3.870
0.006
0.001
0.030
0.005
Bh
Kg
M3
M3
Kg
Kg
Kg
Kg
Kg
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,500.00
1,936.00
396,000.00
396,000.00
15,100.00
26,000.00
2,581,700.00
31,400.00
249,000.00
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
93,750.00
27,200.80
1,584.00
16,632.00
58,437.00
156.00
2,581.70
942.00
1,245.00
202,528.50
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
7,230.00
770.00
1,207.50
33,685.50
33,685.50
x
x
x
Rp.
Rp.
Rp.
3,000.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
108,000.00
24,780.80
13,860.00
146,640.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,170.00
7,230.00
770.00
1,207.50
25,377.50
172,018.30
x
x
x
Rp.
Rp.
Rp.
7,200.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
576,000.00
45,786.40
225,720.00
847,506.40
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
10,845.00
1,155.00
1,207.50
30,455.50
877,961.90
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Tukang Besi
Kepala Tukang
Mandor
0.320
0.100
0.100
0.010
0.015
Oh
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Roster/terawang
Semen Portland
Pasir pasang
36.000 Bh
12.800 Kg
0.035 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.300
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
18 1 m2 Pasang bata berongga ukuran ( 5 x 11 x 24 ) Cm
a.
-
Bahan
Bata berongga
Semen Portland
Pasir pasang
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
80.000 Bh
23.650 Kg
0.570 M3
JUMLAH
0.320
0.150
0.015
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN DINDING
19 1 m2 pasang bata bata tebal 1/2 bata, 1 Pc : 5 Ps
a.
-
Bahan
Bata Merah
Semen Portland
Pasir pasang
23.000 Bh
9.500 Kg
0.045 M3
x
x
x
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
71,300.00
18,392.00
17,820.00
107,512.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
17,248.00
7,230.00
770.00
1,207.50
26,455.50
133,967.50
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN PLESTERAN
1.
a.
-
Bahan
Semen Portland
Pasir pasang
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
12.920 Kg
0.013 M3
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
2
a.
-
Bahan
Semen Portland
Pasir pasang
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
8.520 Kg
0.017 M3
JUMLAH
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
3
a.
-
Bahan
Semen Portland
Pasir pasang
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
6.480 Kg
0.019 M3
JUMLAH
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
4
a.
-
Bahan
Semen Portland
Pasir pasang
b.
-
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
5.200 Bh
0.020 Kg
JUMLAH
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
= Rp.
= Rp.
= Rp.
25,013.12
5,148.00
30,161.12
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
10,845.00
1,155.00
805.00
23,585.00
53,746.12
= Rp.
= Rp.
= Rp.
16,494.72
6,732.00
23,226.72
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
10,845.00
1,155.00
805.00
23,585.00
46,811.72
= Rp.
= Rp.
= Rp.
12,545.28
7,524.00
20,069.28
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
10,845.00
1,155.00
805.00
23,585.00
43,654.28
= Rp.
= Rp.
= Rp.
10,067.20
7,920.00
17,987.20
=
=
=
=
=
=
10,780.00
10,845.00
1,155.00
805.00
23,585.00
41,572.20
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN PLESTERAN
5
a.
Bahan
Semen Portland
Pasir pasang
4.320 Kg
0.022 M3
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
= Rp.
= Rp.
= Rp.
8,363.52
8,712.00
17,075.52
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
10,845.00
1,155.00
805.00
23,585.00
40,660.52
= Rp.
= Rp.
= Rp.
7,124.48
9,108.00
16,232.48
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
10,845.00
1,155.00
805.00
23,585.00
39,817.48
= Rp.
= Rp.
= Rp.
5,575.68
9,504.00
15,079.68
=
=
=
=
=
=
10,780.00
10,845.00
1,155.00
805.00
23,585.00
38,664.68
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
6
a.
Bahan
Semen Portland
Pasir pasang
3.680 Kg
0.023 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Untuk Lantai I
a.
Bahan
Semen Portland
Pasir pasang
2.880 Kg
0.024 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN PLESTERAN
8
a.
Bahan
Semen Portland
Pasir pasang
14.280 Kg
0.023 M3
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
= Rp.
= Rp.
= Rp.
27,646.08
9,108.00
36,754.08
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,475.00
14,460.00
1,540.00
1,006.25
30,481.25
67,235.33
= Rp.
= Rp.
= Rp.
20,908.80
10,296.00
31,204.80
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
1,446.00
962.50
1,006.25
14,194.75
45,399.55
= Rp.
= Rp.
= Rp.
16,804.48
11,088.00
27,892.48
=
=
=
=
=
=
10,780.00
1,446.00
962.50
1,006.25
13,188.50
41,080.98
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
9
a.
Bahan
Semen Portland
Pasir pasang
10.800 Kg
0.026 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
10 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20. mm.
a.
-
Bahan
Semen Portland
Pasir pasang
8.680 Kg
0.028 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Untuk Lantai I
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN PLESTERAN
11 1 m2 Plesteran 1 Pc : 5 Ps, tebal 20. mm.
a.
-
Bahan
Semen Portland
Pasir pasang
7.290 Kg
0.028 M3
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
= Rp.
= Rp.
= Rp.
14,113.44
11,088.00
25,201.44
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
1,446.00
962.50
1,006.25
14,194.75
39,396.19
= Rp.
= Rp.
= Rp.
12,080.64
11,880.00
23,960.64
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
1,446.00
962.50
1,006.25
14,194.75
38,155.39
= Rp.
= Rp.
= Rp.
30,008.00
5,148.00
35,156.00
=
=
=
=
=
=
10,780.00
1,446.00
1,001.00
1,046.50
14,273.50
49,429.50
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Semen Portland
Pasir pasang
6.240 Kg
0.030 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 25. mm.
a.
-
Bahan
Semen Portland
Pasir pasang
15.500 Kg
0.013 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN PLESTERAN
14 1 m2 Plesteran 1 Pc : 3 Ps, tebal 25. mm.
a.
-
Bahan
Semen Portland
Pasir pasang
11.750 Kg
0.035 M3
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
= Rp.
= Rp.
= Rp.
22,748.00
14,018.40
36,766.40
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
1,446.00
1,001.00
1,046.50
14,273.50
51,039.90
= Rp.
= Rp.
= Rp.
18,353.28
15,048.00
33,401.28
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
1,446.00
1,001.00
1,046.50
14,273.50
47,674.78
= Rp.
= Rp.
= Rp.
15,371.84
15,444.00
30,815.84
=
=
=
=
=
=
10,780.00
1,446.00
1,001.00
1,046.50
14,273.50
45,089.34
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Semen Portland
Pasir pasang
9.480 Kg
0.038 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Semen Portland
Pasir pasang
7.940 Kg
0.039 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN PLESTERAN
17 1 m2 Plesteran Beton 1 Pc : 2 Ps, tebal 15. mm.
a.
-
Bahan
Semen Portland
Pasir pasang
9.300 Kg
0.018 M3
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,936.00
396,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
= Rp.
= Rp.
= Rp.
18,004.80
7,128.00
25,132.80
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
1,446.00
1,001.00
1,046.50
14,273.50
39,406.30
= Rp.
= Rp.
= Rp.
13,687.52
8,434.80
22,122.32
=
=
=
=
=
=
10,780.00
1,446.00
1,001.00
1,046.50
14,273.50
36,395.82
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.260
0.200
0.020
0.013
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Semen Portland
Pasir pasang
7.070 Kg
0.021 M3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.260
0.200
0.020
0.013
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN KAYU
1
a.
-
Bahan
kayu klas I, balok
1.100 m3
Rp.
4,385,000.00
= Rp.
= Rp.
4,823,500.00
4,823,500.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
970,200.00
144,600.00
23,100.00
24,150.00
1,162,050.00
5,985,550.00
Rp.
4,395,000.00
= Rp.
= Rp.
175,800.00
175,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
180,750.00
19,250.00
4,025.00
257,925.00
= Rp.
433,725.00
4,395,000.00 = Rp.
152,699.78 = Rp.
= Rp.
153,825.00
167,969.76
321,794.76
JUMLAH
b.
-
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
6.000
18.000
2.000
0.300
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
2
a.
-
Bahan
kayu kls I, papan
0.040 m3
JUMLAH
b.
-
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
1.000
2.500
0.250
0.050
Oh
Oh
Oh
Oh
a.
Bahan
kayu Papan kelas I
Kaca Polos 5 mm
b.
-
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
0.035 m3 x
1.100 m2
x
JUMLAH
Rp.
Rp.
0.800
2.000
0.200
0.040
Rp.
Rp.
Rp.
Rp.
Oh
Oh
Oh
Oh
x
x
x
x
53,900.00
72,300.00
77,000.00
80,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
43,120.00
144,600.00
15,400.00
3,220.00
206,340.00
528,134.76
4,395,000.00 = Rp.
152,699.78 = Rp.
= Rp.
197,775.00
167,969.76
365,744.76
JUMLAH
JUMLAH (a) + (b)
4
a.
Bahan
kayu Papan kelas I
Kaca Polos 5 mm
b.
-
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
0.045 m3
1.100 m2
0.800
2.000
0.200
0.040
Oh
Oh
Oh
Oh
x
x
Rp.
Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
JUMLAH
JUMLAH
JUMLAH (a) + (b)
72,300.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
57,840.00
144,600.00
15,400.00
3,220.00
221,060.00
586,804.76
PEKERJAAN KAYU
a.
-
Bahan
kayu klas I, papan
b.
-
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
0.064 m3
1.000
3.000
0.300
0.300
a.
Bahan
= Rp.
= Rp.
281,280.00
281,280.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
216,900.00
23,100.00
24,150.00
318,050.00
= Rp.
599,330.00
= Rp.
= Rp.
281,280.00
281,280.00
Oh
Oh
Oh
Oh
Rp.
4,395,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
0.064 m3
Rp.
4,395,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
216,900.00
23,100.00
40,250.00
334,150.00
615,430.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
4,395,000.00
26,000.00
61,100.00
98,700.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
86,142.00
780.00
18,330.00
197,400.00
302,652.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
32,340.00
144,600.00
15,400.00
2,415.00
194,755.00
497,407.00
JUMLAH
b. Tenaga
-
Pekerja
Tukang kayu
Kepala Tukang
Mandor
1.000
3.000
0.300
0.500
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
7
a.
Bahan
0.020
0.030
0.300
2.000
m3
kg
Lt
Lbr
JUMLAH
b. Tenaga
-
Pekerja
Tukang kayu
Kepala Tukang
Mandor
0.600
2.000
0.200
0.030
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN KAYU
a.
Bahan
0.06 m3
0.15 kg
x
x
Rp.
Rp.
2,581,700.00
26,000.00
= Rp.
= Rp.
= Rp.
154,902.00
3,900.00
158,802.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,950.00
144,600.00
15,400.00
2,012.50
188,962.50
347,764.50
x
x
x
x
Rp.
Rp.
Rp.
Rp.
2,581,700.00
26,000.00
61,100.00
99,700.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
50,601.32
7,800.00
18,330.00
199,400.00
217,730.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
32,340.00
144,600.00
15,400.00
2,415.00
194,755.00
412,485.00
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,395,000.00
26,000.00
61,100.00
99,700.00
53,800.00
99,700.00
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
86,142.00
7,800.00
48,880.00
49,850.00
26,900.00
49,850.00
183,280.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
43,120.00
180,750.00
19,250.00
3,220.00
246,340.00
429,620.00
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.500
2.000
0.200
0.025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
a.
Bahan
0.0196
0.3
0.3
2
m3
kg
Lt
Lbr
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.600
2.000
0.200
0.030
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
10 1 m2 pasang pintu teakwood & formika rangka kayu klas I ( divernis )
a.
-
Bahan
kayu klas I, papan
paku biasa 1/2 " -1 "
lem kayu
teakwood
vernis
formika 4 x 8
0.0196
0.3
0.8
0.5
0.5
0.5
m3
kg
Lt
Lbr
Ltr
Lbr
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.800
2.500
0.250
0.040
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN KAYU
Bahan
kayu klas I, balok
besi strip
paku biasa 2" - 5"
1.1 m3
15 kg
0.8 kg
x
x
x
Rp.
Rp.
Rp.
4,385,000.00
52,600.00
26,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
4,823,500.00
789,000.00
20,800.00
5,633,300.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
215,600.00
867,600.00
308,000.00
966,000.00
2,357,200.00
7,990,500.00
x
x
Rp.
Rp.
4,385,000.00
26,000.00
= Rp.
= Rp.
= Rp.
4,823,500.00
13,000.00
4,836,500.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,800.00
578,400.00
154,000.00
644,000.00
1,484,200.00
6,320,700.00
x
x
Rp.
Rp.
2,572,200.00
26,000.00
= Rp.
= Rp.
= Rp.
2,829,420.00
104,000.00
2,933,420.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
129,360.00
520,560.00
184,800.00
579,600.00
1,414,320.00
4,347,740.00
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
4.000
12.000
1.200
0.200
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
12 1 m3 pasang konsul kayu klas I
a.
-
Bahan
kayu klas I, balok
paku biasa 2" - 5"
1.1 m3
0.5 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
2.000
8.000
0.720
0.200
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
13 1 m3 pasang gording kayu klas II
a.
-
Bahan
kayu klas II, balok
paku campur
1.1 m3
4.000 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
2.400
7.200
0.720
0.120
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN KAYU
14 1 m3 pasang kaso + reng genteng kodok kayu klas I
a.
-
Bahan
kayu klas I, balok
paku biasa 2" - 5"
0.012 m3
0.150 kg
x
x
Rp.
Rp.
4,385,000.00
26,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
4,385,000.00
26,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
4,385,000.00
26,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
= Rp.
= Rp.
= Rp.
52,620.00
3,900.00
56,520.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,390.00
7,230.00
7,700.00
8,050.00
28,370.00
84,890.00
= Rp.
= Rp.
= Rp.
61,390.00
3,900.00
65,290.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,390.00
7,230.00
7,700.00
8,050.00
28,370.00
93,660.00
= Rp.
= Rp.
= Rp.
61,390.00
3,900.00
65,290.00
=
=
=
=
=
=
5,390.00
7,230.00
7,700.00
8,050.00
28,370.00
93,660.00
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
kayu klas I, balok
paku biasa 2" - 5"
0.014 m3
0.150 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
kayu klas I, balok
paku biasa 2" - 5"
0.014 m3
0.150 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN KAYU
17 1 m2 pasang kaso + reng genteng beton kayu klas I
a.
-
Bahan
kayu klas I, balok
paku biasa 2" - 5"
0.014 m3
0.150 kg
x
x
Rp.
Rp.
4,385,000.00
26,000.00
= Rp.
= Rp.
= Rp.
61,390.00
3,900.00
65,290.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,390.00
7,230.00
7,700.00
8,050.00
28,370.00
93,660.00
x
x
Rp.
Rp.
52,600.00
27,200.00
= Rp.
= Rp.
= Rp.
52,600.00
4,080.00
56,680.00
x
x
Rp.
Rp.
53,900.00
80,500.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
26,950.00
1,997.59
28,947.59
81,547.59
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
18 1 m2 pasang langit - langit gypsumboard
a.
-
Bahan
gypsum
paku gypsum
1 Lbr
0.150 kg
JUMLAH
b. Tenaga
-
pekerja
Mandor
0.500 Oh
0.025 Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
0.012 m3
Rp.
2,572,200.00
= Rp.
30,866.40
paku campuran
0.100 kg
Rp.
26,000.00
= Rp.
2,600.00
= Rp.
33,466.40
=
=
=
=
=
=
8,085.00
18,075.00
11,550.00
20,125.00
57,835.00
91,301.40
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.150
0.250
0.025
0.075
Oh
Oh
Oh
Oh
x
x
x
x
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN KAYU
Bahan
kayu Kls II, balok
paku biasa 2" - 5"
Triplek 4 mm
0.012 m3
0.100 kg
1.000 m2
x
x
x
Rp.
Rp.
Rp.
2,572,200.00
26,000.00
79,200.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
30,866.40
2,600.00
79,200.00
112,666.40
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,085.00
18,075.00
11,550.00
20,125.00
57,835.00
170,501.40
x
x
Rp.
Rp.
21,700.00
26,000.00
= Rp.
= Rp.
= Rp.
5,425.00
3,900.00
9,325.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
x
x
Rp.
Rp.
4,385,000.00
26,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.150
0.250
0.025
0.075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
List Profil SK 05
paku biasa 2" - 5"
0.25 m1
0.150 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.020
0.030
0.015
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,078.00
2,169.00
1,540.00
2,415.00
7,202.00
16,527.00
= Rp.
= Rp.
= Rp.
100,855.00
3,900.00
104,755.00
=
=
=
=
=
=
10,780.00
21,690.00
15,400.00
24,150.00
72,020.00
176,775.00
Bahan
kayu Kls I, balok
paku biasa 2" - 5"
0.023 m3
0.150 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.200
0.300
0.030
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN KAYU
23 1 m2 pasang rangka langit - langit (30 x 30) cm, kayu Kls I
a.
-
Bahan
kayu Kls I, balok
paku biasa 2" - 5"
0.027 m3
0.200 kg
x
x
Rp.
Rp.
4,385,000.00
26,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
4,395,000.00
26,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
4,395,000.00
26,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
2,581,700.00
26,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
b.
-
Tenaga
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.250
0.350
0.036
0.013
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
= Rp.
= Rp.
= Rp.
118,395.00
5,200.00
123,595.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,475.00
25,305.00
19,250.00
28,175.00
86,205.00
209,800.00
= Rp.
= Rp.
= Rp.
31,644.00
1,300.00
32,944.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,390.00
14,460.00
1,925.00
402.50
22,177.50
55,121.50
= Rp.
= Rp.
= Rp.
48,345.00
1,300.00
49,645.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,929.00
15,906.00
1,694.00
402.50
23,931.50
73,576.50
= Rp.
= Rp.
= Rp.
28,398.70
1,300.00
29,698.70
=
=
=
=
=
=
5,929.00
15,906.00
1,694.00
402.50
23,931.50
53,630.20
Bahan
kayu Kls I, papan
paku biasa 2" - 5"
0.0072 m3
0.050 kg
JUMLAH
b.
-
Tenaga
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.100
0.200
0.025
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
25 1 m2 pasang lisplang ukuran (2 x 20) cm, kayu Kls I
a.
-
Bahan
kayu Kls I, papan
paku biasa 2" - 5"
b.
-
Tenaga
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.011 m3
0.050 kg
JUMLAH
0.110
0.220
0.022
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
26 1 m2 pasang lisplang ukuran (3 x 20) cm, kayu klas II
a.
-
Bahan
kayu klas II, papan
paku biasa 2" - 5"
0.011 m3
0.050 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.110
0.220
0.022
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN KAYU
Bahan
kayu klas II, papan
paku biasa 2" - 5"
0.0086 m3
0.060 kg
x
x
Rp.
Rp.
2,581,700.00
26,000.00
= Rp.
= Rp.
= Rp.
22,202.62
1,560.00
23,762.62
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,390.00
7,230.00
770.00
4,025.00
17,415.00
41,177.62
x
x
x
Rp.
Rp.
Rp.
2,572,200.00
2,581,700.00
26,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
50,157.90
18,071.90
2,600.00
70,829.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,085.00
32,535.00
3,465.00
6,037.50
50,122.50
120,952.30
x
x
x
Rp.
Rp.
Rp.
2,572,200.00
2,581,700.00
26,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
50,157.90
18,071.90
2,600.00
70,829.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,085.00
32,535.00
3,465.00
6,037.50
50,122.50
120,952.30
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.100
0.100
0.010
0.050
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
28 1 m2 pasang rangka dinding pemisah kayu II
a.
-
Bahan
kayu Kls II, balok
kayu Kls II, papan
paku biasa 2" - 5"
0.0195 m3
0.007 m3
0.100 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.150
0.450
0.045
0.075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
kayu klas II, balok
kayu Kls II, papan
paku biasa 2" - 5"
0.0195 m3
0.007 m3
0.100 kg
JUMLAH
b. Tenaga
-
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.150
0.450
0.045
0.075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN KAYU
30 1 m2 pasang rangka dinding pemisah teakwood rangkap, rangka kayu klas II
a.
-
Bahan
kayu klas II, balok
kayu Kls II, papan
paku biasa 2" - 5"
b.
-
Tenaga
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.0195 m3
0.007 m3
0.100 kg
x
x
x
Rp.
Rp.
Rp.
2,572,200.00
2,581,700.00
26,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
50,157.90
18,071.90
2,600.00
70,829.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,085.00
32,535.00
3,465.00
6,037.50
50,122.50
120,952.30
JUMLAH
0.150
0.450
0.045
0.075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
31 1 m2 pasang rangka dinding pemisah plywood rangkap, rangka kayu klas II
a.
-
Bahan
kayu klas II, balok
kayu Kls II, papan
paku biasa 2" - 5"
lem kayu
plywood
b.
-
Tenaga
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.0195
0.007
0.100
0.560
1.000
m3
m3
kg
Lt
Lb
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
2,572,200.00
2,581,700.00
26,000.00
61,100.00
98,700.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,157.90
18,071.90
2,600.00
34,216.00
98,700.00
203,745.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
43,380.00
4,620.00
805.00
59,585.00
263,330.80
x
x
Rp.
Rp.
98,700.00
26,000.00
= Rp.
= Rp.
= Rp.
39,480.00
1,300.00
40,780.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,347.50
5,422.50
577.50
104.65
7,452.15
48,232.15
x
x
Rp.
Rp.
2,587,200.00
2,581,700.00
= Rp.
= Rp.
= Rp.
51,744.00
61,960.80
113,704.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
1,347.50
5,422.50
577.50
104.65
7,452.15
121,156.95
JUMLAH
0.200
0.600
0.060
0.010
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
32 1 m2 pasang plywood tebal 4 mm, untuk dinding
a.
-
Bahan
plywood 4" x 8" x 4" mm
paku biasa 1/2" - 1"
b.
-
Tenaga
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.4 Lbr
0.050 kg
JUMLAH
0.025
0.075
0.008
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
33 1 m2 pasang Pagar Pakan Ternak Kayu Kls II
a.
-
Bahan
Kayu 5/10 Kls II
Papan Kayu Kelas II
b.
-
Tenaga
pekerja
Tukang kayu
Kepala Tukang
Mandor
0.02 m3
0.024 m3
JUMLAH
Untuk Lantai I
0.025
0.075
0.008
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
a.
Bahan
Onduline Gelombang
Sekrup/Paku
1 M2
24 Bh
x
x
Rp.
Rp.
76,473.68
700.00
= Rp.
= Rp.
= Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
1,446.00
11,550.00
402.50
24,178.50
117,452.18
x
x
Rp.
Rp.
78,700.00
700.00
= Rp.
= Rp.
= Rp.
78,700.00
7,000.00
85,700.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
JUMLAH
b.
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
0.200
0.020
0.150
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
2
a.
-
Bahan
Onduline Bubungan
Sekrup/Paku
1 Lbr
10 Bh
JUMLAH
b.
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
0.025
0.025
0.150
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
76,473.68
16,800.00
93,273.68
1,347.50
1,807.50
11,550.00
402.50
15,107.50
100,807.50
PEKERJAAN PENGECATAN
1
a.
Bahan
Dempul Jadi
Minyak Cat
Batu Apung
0.080 Kg
0.020 Kg
0.010 Kg
x
x
x
Rp.
Rp.
Rp.
27,200.00
39,300.00
4,800.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
2,176.00
786.00
48.00
3,010.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,156.00
2,892.00
308.00
201.25
5,557.25
8,567.25
x
x
x
Rp.
Rp.
Rp.
13,500.00
21,100.00
42,200.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
2,025.00
3,587.00
7,174.00
12,786.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,773.00
5,422.50
577.50
201.25
9,974.25
22,760.25
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.040
0.040
0.004
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
a.
Bahan
Plamir
Cat dasar
Cat penutup
0.150 Kg
0.170 Kg
0.170 Kg
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.070
0.075
0.0075
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
3
1 m2 Pengecatan Bidang Kayu Baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
a.
Bahan
Plamir
Cat dasar
Cat penutup 2 kali
0.150 Kg
0.170 Kg
0.260 Kg
x
x
x
Rp.
Rp.
Rp.
13,500.00
60,500.00
121,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
2,025.00
10,285.00
31,460.00
43,770.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,773.00
650.70
462.00
201.25
5,086.95
48,856.95
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.070
0.009
0.006
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
4
a.
-
1' Pengecatan Listplank ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
Bahan
Plamir
Cat dasar
Cat penutup 2 kali
0.100 Kg
0.170 Kg
0.260 Kg
x
x
x
Rp.
Rp.
Rp.
13,500.00
32,000.00
64,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
1,350.00
5,440.00
16,640.00
23,430.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,773.00
650.70
462.00
201.25
5,086.95
28,516.95
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.070
0.009
0.006
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
1 m2 Pengecatan Bidang Kayu Baru ( 1 lapis plamir ), 1 lapis cat dasar, 3 lapis cat penutup
a.
Bahan
Plamir
Cat dasar
Cat penutup 2 kali
0.150 Kg
0.170 Kg
0.350 Kg
x
x
x
Rp.
Rp.
Rp.
13,500.00
32,000.00
64,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
2,025.00
5,440.00
22,400.00
29,865.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,773.00
7,591.50
308.00
201.25
11,873.75
41,738.75
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.070
0.105
0.004
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
1 m2 Pengecatan Tembok Baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
a.
Bahan
Plamir
Cat dasar
Cat penutup 2 kali
0.100 Kg
0.100 Kg
0.260 Kg
x
x
x
Rp.
Rp.
Rp.
13,500.00
21,100.00
42,200.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
1,350.00
2,110.00
10,972.00
14,432.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,078.00
4,554.90
485.10
201.25
6,319.25
20,751.25
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.020
0.063
0.0063
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
1 m2 Pengecatan Plafon ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
a.
Bahan
Plamir
Cat dasar
Cat penutup 2 kali
0.100 Kg
0.100 Kg
0.260 Kg
x
x
x
Rp.
Rp.
Rp.
13,500.00
21,100.00
42,200.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
1,350.00
2,110.00
10,972.00
14,432.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,617.00
4,554.90
485.10
201.25
6,858.25
21,290.25
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.030
0.063
0.0063
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
1 m2 Pengecatan Batu Candi 1 lapis Politur dasar, 2 lapis cat Politur penutup
a.
Bahan
Teak Oil
Cat penutup 2 kali Politur
0.120 Kg
0.180 Kg
x
x
Rp.
Rp.
46,600.00
53,800.00
= Rp.
= Rp.
= Rp.
5,592.00
9,684.00
15,276.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,509.20
3,036.60
323.40
201.25
5,070.45
20,346.45
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,800.00
27,200.00
9,900.00
20,900.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
8,070.00
1,360.00
990.00
209.00
10,629.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,624.00
11,568.00
1,232.00
201.25
21,625.25
32,254.25
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.028
0.042
0.0042
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
a.
Bahan
Vernis
Dempul
Ampelas
Kuas
0.150
0.050
0.100
0.010
ltr
kg
lbr
bh
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.160
0.160
0.016
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Residu atau ter
0.350 ltr
Rp.
5,000.00
= Rp.
= Rp.
1,750.00
1,750.00
x
x
Rp.
Rp.
53,900.00
80,500.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
5,390.00
483.00
5,873.00
5,873.00
x
x
Rp.
Rp.
35,700.00
20,900.00
= Rp.
= Rp.
= Rp.
3,570.00
209.00
3,779.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,078.00
14,460.00
1,540.00
805.00
17,883.00
21,662.00
x
x
Rp.
Rp.
60,500.00
35,700.00
= Rp.
= Rp.
= Rp.
6,050.00
357.00
6,407.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
JUMLAH
b.
Tenaga
Pekerja
Mandor
0.100 Oh
0.006 Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Meni besi
Kuas
0.100 Kg
0.010 Bh
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.020
0.200
0.0200
0.0100
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Bahan
Cat besi
Cat Dasar Besi
0.100 Kg
0.0100 Bh
JUMLAH
b.
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.250
0.225
0.0225
0.0075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,475.00
16,267.50
1,732.50
603.75
32,078.75
38,485.75
PEKERJAAN SANITASI
a.
Bahan
Kloset duduk/monoblok
Perlengkapan
1.000 Bh
0.060 -
x
x
Rp.
Rp.
3,088,500.00
3,088,500.00
= Rp.
= Rp.
= Rp.
3,088,500.00
185,310.00
3,273,810.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
177,870.00
79,530.00
77.00
12,880.00
270,357.00
3,544,167.00
x
x
Rp.
Rp.
3,088,500.00
3,088,500.00
= Rp.
= Rp.
= Rp.
3,088,500.00
185,310.00
3,273,810.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
177,870.00
79,530.00
77.00
12,880.00
270,357.00
3,544,167.00
x
x
x
Rp.
Rp.
Rp.
347,000.00
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
347,000.00
11,616.00
3,960.00
362,576.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
108,450.00
115,500.00
12,880.00
290,730.00
653,306.00
JUMLAH
b.
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
3.300
1.100
0.001
0.160
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
2
a.
Bahan
Kloset duduk/monoblok
Perlengkapan
1.000 Bh
0.060 JUMLAH
b.
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
3.300
1.100
0.001
0.160
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
3
a.
Bahan
1.000 Bh
6.000 Kg
0.010 Kg
JUMLAH
b.
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000
1.500
1.500
0.160
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN SANITASI
4
a.
-
Bahan
Kloset Jongkok teraso
Bata Merah 5x11x22 cm
Semen Portland
Pasir Pasang
1.000
7.000
6.000
0.010
Bh
Bh
Kg
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
339,700.00
3,100.00
1,936.00
396,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
339,700.00
21,700.00
11,616.00
3,960.00
376,976.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
108,450.00
23,100.00
8,855.00
194,305.00
571,281.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1,550,000.00
1,550,000.00
1,936.00
396,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,550,000.00
46,500.00
11,616.00
3,960.00
1,612,076.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
7,700.00
8,050.00
141,950.00
1,754,026.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
515,300.00
515,300.00
1,936.00
396,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
515,300.00
15,459.00
11,616.00
3,960.00
546,335.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
104,835.00
11,550.00
8,050.00
178,335.00
724,670.00
JUMLAH
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000
1.500
0.300
0.110
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
5
a.
-
Bahan
Urinoir
Perlengkapan
Semen Portland
Pasir Pasang
1.000
0.030
6.000
0.010
Bh
Bh
Kg
Kg
JUMLAH
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000
1.000
0.100
0.100
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
6
a.
-
Bahan
Wastafel
Perlengkapan
Semen abu-abu
Pasir Pasang
1.000
0.030
6.000
0.010
Bh
Bh
Kg
Kg
JUMLAH
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000
1.450
0.150
0.100
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN SANITASI
7
a.
Bahan
1.000
0.030
6.000
0.010
Bh
Bh
Kg
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
969,500.00
969,500.00
1,936.00
396,000.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
969,500.00
29,085.00
11,616.00
3,960.00
1,014,161.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
104,835.00
11,550.00
8,050.00
178,335.00
1,192,496.00
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
3,100.00
1,936.00
396,000.00
58,700.00
1,936.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,400.00
232,320.00
118,800.00
211,320.00
11,616.00
648,456.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
53,900.00
104,835.00
11,550.00
8,050.00
178,335.00
826,791.00
x
x
Rp.
Rp.
284,400.00
341,280.00
= Rp.
= Rp.
= Rp.
341,280.00
119,448.00
460,728.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
2,910.60
6,507.00
693.00
2,173.50
12,284.10
473,012.10
JUMLAH
b.
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000
1.450
0.150
0.100
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
a.
Bahan
Batu bata
Semen Portland
Pasir Pasang
Porselen ( 11x11 ) cm
Semen nat
24.000
120.000
0.300
3.600
6.000
bh
kg
m3
m2
Kg
JUMLAH
b.
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000
1.450
0.150
0.100
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
a.
-
Bahan
Pipa galvanis
Perlengkapan
1.200 m'
0.350 JUMLAH
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
10 Memasang 1 m' pipa galvanis diameter 3/4 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
1.200 m'
0.350 -
x
x
Rp.
Rp.
387,200.00
464,640.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
556,700.00
668,040.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,179,900.00
1,415,880.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
b.
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
= Rp.
= Rp.
= Rp.
464,640.00
162,624.00
627,264.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,910.60
6,507.00
693.00
2,173.50
12,284.10
639,548.10
= Rp.
= Rp.
= Rp.
668,040.00
233,814.00
901,854.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,910.60
6,507.00
693.00
2,173.50
12,284.10
914,138.10
= Rp.
= Rp.
= Rp.
1,415,880.00
495,558.00
1,911,438.00
=
=
=
=
=
=
5,821.20
13,014.00
1,386.00
434.70
20,655.90
1,932,093.90
Bahan
Pipa galvanis
Perlengkapan
1.200 m'
0.350 JUMLAH
b.
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
12 Memasang 1 m' pipa galvanis diameter 2 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
1.200 m'
0.350 JUMLAH
b.
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
13 Memasang 1 m' pipa galvanis diameter 2 1/2 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 -
x
x
Rp.
Rp.
1,633,800.00
1,960,560.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,875,800.00
2,250,960.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
2,002,900.00
2,403,480.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
2,117,900.00
2,541,480.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
= Rp.
= Rp.
= Rp.
1,960,560.00
686,196.00
2,646,756.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,821.20
13,014.00
1,386.00
434.70
20,655.90
2,667,411.90
= Rp.
= Rp.
= Rp.
2,250,960.00
787,836.00
3,038,796.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,821.20
13,014.00
1,386.00
434.70
20,655.90
3,059,451.90
= Rp.
= Rp.
= Rp.
2,403,480.00
841,218.00
3,244,698.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,821.20
13,014.00
1,386.00
434.70
20,655.90
3,265,353.90
= Rp.
= Rp.
= Rp.
2,541,480.00
889,518.00
3,430,998.00
=
=
=
=
=
=
5,821.20
13,014.00
1,386.00
434.70
20,655.90
3,451,653.90
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
15 Memasang 1 m' pipa galvanis diameter 4 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
16 Memasang 1 m' pipa galvanis diameter 6 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
17 Memasang 1 m' pipa gip diameter 1/2 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 -
x
x
Rp.
Rp.
284,400.00
341,280.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
387,200.00
464,640.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
556,700.00
668,040.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,179,900.00
1,415,880.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
= Rp.
= Rp.
= Rp.
341,280.00
119,448.00
460,728.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,910.60
6,507.00
693.00
2,173.50
12,284.10
473,012.10
= Rp.
= Rp.
= Rp.
464,640.00
162,624.00
627,264.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,910.60
6,507.00
693.00
2,173.50
12,284.10
639,548.10
= Rp.
= Rp.
= Rp.
668,040.00
233,814.00
901,854.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,910.60
6,507.00
693.00
2,173.50
12,284.10
914,138.10
= Rp.
= Rp.
= Rp.
1,415,880.00
495,558.00
1,911,438.00
=
=
=
=
=
=
5,821.20
13,014.00
1,386.00
434.70
20,655.90
1,932,093.90
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
19 Memasang 1 m' pipa gip diameter 1 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
20 Memasang 1 m' pipa gip diameter 2 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
21 Memasang 1 m' pipa gip diameter 2 1/2 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 -
x
x
Rp.
Rp.
859,200.00
1,031,040.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
1,875,800.00
2,250,960.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
2,002,900.00
2,403,480.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
2,117,900.00
2,541,480.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
22
a.
-
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
= Rp.
= Rp.
= Rp.
1,031,040.00
360,864.00
1,391,904.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,821.20
13,014.00
1,386.00
434.70
20,655.90
1,412,559.90
= Rp.
= Rp.
= Rp.
2,250,960.00
787,836.00
3,038,796.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,821.20
13,014.00
1,386.00
434.70
20,655.90
3,059,451.90
= Rp.
= Rp.
= Rp.
2,403,480.00
841,218.00
3,244,698.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,821.20
13,014.00
1,386.00
434.70
20,655.90
3,265,353.90
= Rp.
= Rp.
= Rp.
2,541,480.00
889,518.00
3,430,998.00
=
=
=
=
=
=
5,821.20
13,014.00
1,386.00
434.70
20,655.90
3,451,653.90
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
24 Memasang 1 m' pipa gip diameter 6 "
a.
-
Bahan
Pipa galvanis
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang besi
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
25 Memasang 1 m' pipa PVC tipe AW diameter 1/2 "
a.
-
Bahan
Pipa PVC
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang pipa
Kepala Tukang
Mandor
1.200 m'
0.350 -
x
x
Rp.
Rp.
6,600.00
7,920.00
= Rp.
= Rp.
= Rp.
7,920.00
2,772.00
10,692.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,940.40
4,338.00
462.00
144.90
6,885.30
17,577.30
x
x
Rp.
Rp.
7,800.00
9,360.00
= Rp.
= Rp.
= Rp.
9,360.00
3,276.00
12,636.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,940.40
4,338.00
462.00
144.90
6,885.30
19,521.30
x
x
Rp.
Rp.
11,400.00
13,680.00
= Rp.
= Rp.
= Rp.
13,680.00
4,788.00
18,468.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,940.40
4,338.00
462.00
144.90
6,885.30
25,353.30
x
x
Rp.
Rp.
15,100.00
18,120.00
= Rp.
= Rp.
= Rp.
18,120.00
6,342.00
24,462.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
1,940.40
4,338.00
462.00
144.90
6,885.30
31,347.30
JUMLAH
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
26 Memasang 1 m' pipa PVC tipe AW diameter 3/4 "
a.
-
Bahan
Pipa PVC
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang pipa
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
27
a.
-
b.
-
Tenaga
Pekerja
Tukang pipa
Kepala Tukang
Mandor
JUMLAH
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
28 Memasang 1 m' pipa PVC tipe AW diameter 1 1/2 "
a.
-
Bahan
Pipa PVC
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang pipa
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
29 Memasang 1 m' pipa PVC tipe AW diameter 2 "
a.
-
Bahan
Pipa PVC
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang pipa
Kepala Tukang
Mandor
1.200 m'
0.350 -
x
x
Rp.
Rp.
24,200.00
29,040.00
= Rp.
= Rp.
= Rp.
29,040.00
10,164.00
39,204.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,910.60
6,507.00
693.00
217.35
10,327.95
49,531.95
Rp.
Rp.
30,800.00
36,960.00
= Rp.
= Rp.
= Rp.
36,960.00
12,936.00
49,896.00
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,072.30
6,507.00
693.00
225.40
10,497.70
60,393.70
x
x
Rp.
Rp.
53,800.00
64,560.00
= Rp.
= Rp.
= Rp.
64,560.00
22,596.00
87,156.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,365.90
9,760.50
1,039.50
330.05
15,495.95
102,651.95
x
x
Rp.
Rp.
68,300.00
81,960.00
= Rp.
= Rp.
= Rp.
81,960.00
28,686.00
110,646.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
4,365.90
9,760.50
1,039.50
330.05
15,495.95
126,141.95
JUMLAH
0.054
0.090
0.009
0.0027
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
30
a.
b.
-
Bahan
Pipa PVC
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang pipa
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.081
0.135
0.0135
0.0041
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
32 Memasang 1 m' pipa PVC tipe AW diameter 4 "
a.
-
Bahan
Pipa PVC
Perlengkapan
b.
-
Tenaga
Pekerja
Tukang pipa
Kepala Tukang
Mandor
1.200 m'
0.350 JUMLAH
0.081
0.135
0.0135
0.0041
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
33
a.
-
b.
-
Tenaga
Pekerja
Tukang pipa
Kepala Tukang
Mandor
x
x
Rp.
Rp.
136,700.00
164,040.00
= Rp.
= Rp.
= Rp.
164,040.00
57,414.00
221,454.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,365.90
9,760.50
1,039.50
330.05
15,495.95
236,949.95
x
x
Rp.
Rp.
997,900.00
150,000.00
= Rp.
= Rp.
= Rp.
997,900.00
150,000.00
1,147,900.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,617.00
21,690.00
2,310.00
120.75
25,737.75
1,173,637.75
x
x
Rp.
Rp.
60,500.00
4,500.00
= Rp.
= Rp.
= Rp.
60,500.00
112.50
60,612.50
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
539.00
7,230.00
770.00
402.50
8,941.50
69,554.00
x
x
Rp.
Rp.
163,500.00
4,500.00
= Rp.
= Rp.
= Rp.
163,500.00
112.50
163,612.50
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
539.00
7,230.00
770.00
402.50
8,941.50
172,554.00
JUMLAH
0.081
0.135
0.0135
0.0041
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
34 Memasang 1 buah bak cuci piring stainles steel
a.
-
Bahan
Bak cuci stainles steel
Water drain + asesories
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000 Bh
1.000 set
JUMLAH
0.030
0.300
0.030
0.0015
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
35 Memasang 1 buah kran diameter 3/4" atau 1/2"
a.
-
Bahan
Kran air
Seal tape
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000 Bh
0.025 Bh
JUMLAH
0.010
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
36 Memasang 1 buah kran diameter 1" atau 2"
a.
-
Bahan
Kran air
Seal tape
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000 Bh
0.025 Bh
JUMLAH
0.010
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
37 Memasang 1 buah kran diameter 3"
a.
-
Bahan
Kran air
Seal tape
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000 Bh
0.025 Bh
x
x
Rp.
Rp.
269,700.00
24,200.00
= Rp.
= Rp.
= Rp.
269,700.00
605.00
270,305.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
539.00
7,230.00
770.00
402.50
8,941.50
279,246.50
x
x
Rp.
Rp.
412,900.00
4,500.00
= Rp.
= Rp.
= Rp.
412,900.00
112.50
413,012.50
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
539.00
7,230.00
770.00
402.50
8,941.50
421,954.00
Rp.
21,800.00
= Rp.
= Rp.
21,800.00
21,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
539.00
7,230.00
770.00
402.50
8,941.50
30,741.50
= Rp.
= Rp.
139,894,700.00
139,894,700.00
=
=
=
=
=
=
161,700.00
140,000.00
85,000.00
80,500.00
467,200.00
140,361,900.00
JUMLAH
0.010
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
38 Memasang 1 buah kran diameter 4"
a.
-
Bahan
Kran air
Seal tape
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000 Bh
0.025 Bh
JUMLAH
0.010
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
39 Memasang 1 buah floor drain
a.
-
Bahan
Floor drain
1.000 Bh
JUMLAH
b.
-
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
0.010
0.100
0.010
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
40 Memasang 1 Unit Pompa Air Kapasitas 100-250 Head Centrifugal CR- 45-6, 10 lt/dt 120 m 22 Kw
a.
-
Bahan
Pompa Air 250 Head
1.000 Unit
Rp.
139,894,700.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
70,000.00
85,000.00
80,500.00
JUMLAH
b.
-
Tenaga
Pekerja Pompa
Tukang Pompa
Kepala Tukang Pompa
Mandor
3.000
2.000
1.000
1.000
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN SANITASI
41 Memasang 1 Unit Pompa Air Kapasitas50-100 Head Submersible 46-14. 10 lt/dt H 120 m. 22 Kw
a.
-
Bahan
Pompa Air 50-100 Head
1.000 Unit
Rp.
167,873,700.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
70,000.00
85,000.00
80,500.00
JUMLAH
b.
Tenaga
Pekerja Pompa
Tukang Pompa
Kepala Tukang Pompa
Mandor
3.000
2.000
1.000
1.000
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
= Rp.
= Rp.
167,873,700.00
167,873,700.00
=
=
=
=
=
=
161,700.00
140,000.00
85,000.00
80,500.00
467,200.00
168,340,900.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
a.
-
Bahan
kunci tanam 2 Slag
1.000 Bh
Rp.
250,000.00
= Rp.
= Rp.
250,000.00
250,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,234.00
43,380.00
4,620.00
241.50
51,475.50
301,475.50
Rp.
175,000.00
= Rp.
= Rp.
175,000.00
175,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,234.00
43,380.00
4,620.00
241.50
51,475.50
226,475.50
Rp.
175,000.00
= Rp.
= Rp.
175,000.00
175,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
269.50
36,150.00
385.00
201.25
37,005.75
212,005.75
Rp.
96,800.00
= Rp.
= Rp.
96,800.00
96,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.060
0.600
0.060
0.003
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
2
a.
-
Bahan
kunci tanam 1 Slag Kw Baik
1.000 Bh
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.060
0.600
0.060
0.003
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
3
a.
-
Bahan
kunci tanam KM Kw. Baik
1.000 Bh
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
4
a.
-
Bahan
Engsel pintu
1.000 Bh
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
808.50
10,845.00
1,155.00
60.38
12,868.88
109,668.88
a.
Bahan
Engsel jendela
1.000 Bh
Rp.
47,800.00
= Rp.
= Rp.
47,800.00
47,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
539.00
7,230.00
770.00
40.25
8,579.25
56,379.25
Rp.
36,500.00
= Rp.
= Rp.
36,500.00
36,500.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,078.00
14,460.00
1,540.00
80.50
17,158.50
53,658.50
Rp.
36,500.00
= Rp.
= Rp.
36,500.00
36,500.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
808.50
10,845.00
1,155.00
60.38
12,868.88
49,368.88
JUMLAH
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.010
0.100
0.010
0.0005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
6
a.
Bahan
Engsel angin
1.000 Bh
JUMLAH
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.020
0.200
0.020
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
7
a.
Bahan
Kait angin
1.000 Bh
JUMLAH
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
a.
Bahan
Kunci selot
1.000 Bh
Rp.
29,600.00
= Rp.
= Rp.
29,600.00
29,600.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,078.00
14,460.00
1,540.00
80.50
17,158.50
46,758.50
= Rp.
= Rp.
225,000.00
225,000.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
269.50
36,150.00
385.00
201.25
37,005.75
262,005.75
= Rp.
= Rp.
450,000.00
450,000.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
269.50
36,150.00
385.00
201.25
37,005.75
487,005.75
= Rp.
= Rp.
275,000.00
275,000.00
=
=
=
=
=
=
269.50
36,150.00
385.00
201.25
37,005.75
312,005.75
JUMLAH
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.020
0.200
0.020
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
9
1 buah pasang pegangan pintu / door holder Kualitas Baik pada Pintu 1x bukaan
a.
Bahan
Door holder
1.000 Set
Rp.
225,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
10 1 Set pasang pegangan pintu Kualitas Baik pada Pintu 2x bukaan (Pintu Kebaya)
a.
-
Bahan
Door holder
2.000 Set
Rp.
225,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
Rp.
275,000.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
11 1 Buah pasang Kunci pintu Kebaya Kualitas Baik
a.
-
Bahan
Kunci Pintu Kebaya
1.000 Bh
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Bahan
Grendel Tanam
1.000 Set
Rp.
75,000.00
= Rp.
= Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
269.50
36,150.00
385.00
201.25
37,005.75
112,005.75
Rp.
23,600.00
= Rp.
= Rp.
23,600.00
23,600.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
269.50
36,150.00
385.00
201.25
37,005.75
60,605.75
Rp.
22,400.00
= Rp.
= Rp.
22,400.00
22,400.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
269.50
36,150.00
385.00
201.25
37,005.75
59,405.75
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
75,000.00
75,000.00
Bahan
Grendel Tempel
1.000 Set
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
14 1 buah pasang Grendel Jendela Kualitas Baik
a.
-
Bahan
Grendel Tempel Kecil
1.000 Set
JUMLAH
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Bahan
Kaca 3 mm
1.100 m2
Rp.
193,700.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
Rp.
282,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
x
x
Rp.
Rp.
371,700.00
12,500.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
JUMLAH
= Rp.
= Rp.
213,070.00
213,070.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
808.50
10,845.00
1,155.00
60.38
12,868.88
225,938.88
= Rp.
= Rp.
311,080.00
311,080.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
808.50
10,845.00
1,155.00
60.38
12,868.88
323,948.88
= Rp.
= Rp.
= Rp.
408,870.00
625.00
409,495.00
=
=
=
=
=
=
1,347.50
18,075.00
1,925.00
100.63
21,448.13
430,943.13
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
16 1 m2 pasang kaca, tebal 5 mm
a.
-
Bahan
Kaca 5 mm
1.100 m2
JUMLAH
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
17 1 m2 pasang kaca buram tebal 5 mm
a.
-
Bahan
Kaca buram
Sealent
1.100 m2
0.050 kg
JUMLAH
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.025
0.250
0.025
0.00125
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PEKERJAAN BESI
1
a.
Bahan
1.000 m1
Rp.
110,533.33
=
=
Rp.
Rp.
110,533.33
110,533.33
x
x
x
x
Rp.
Rp.
Rp.
Rp.
72,300.00
53,900.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,150.00
13,475.00
1,925.00
2,576.00
54,126.00
164,659.33
x
x
Rp.
Rp.
110,533.33
35,000.00
=
=
=
Rp.
Rp.
Rp.
663,200.00
70,000.00
733,200.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
72,300.00
53,900.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,150.00
13,475.00
1,925.00
2,576.00
54,126.00
787,326.00
x
x
x
Rp.
Rp.
Rp.
64,533.33
1,936.00
396,000.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
70,986.67
9,680.00
9,108.00
89,774.67
x
x
x
x
Rp.
Rp.
Rp.
Rp.
72,300.00
53,900.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
75,915.00
56,595.00
8,085.00
422.63
141,017.63
230,792.29
Rp.
52,600.00
=
=
Rp.
Rp.
60,490.00
60,490.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
72,300.00
53,900.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
86,760.00
64,680.00
924.00
48.30
152,412.30
212,902.30
JUMLAH
b.
-
Tenaga
Tukang Besi
Pekerja
Kepala Tukang
Mandor
0.500
0.250
0.025
0.032
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
2
a.
-
Bahan
Pipa Galvenis 2"
Engsel Pipa Galvenis 2"
6.000 m1
2.000 Bh
JUMLAH
b.
-
Tenaga
Tukang Besi
Pekerja
Kepala Tukang
Mandor
0.500
0.250
0.025
0.032
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
3
a.
-
Bahan
Pipa Besi Galvanis 3/4 Inch
Semen
Pasir Pasang
b.
-
Tenaga
Tukang Besi Konstruksi
Pekerja
Kepala Tukang
Mandor
1.100 m1
5.000 Kg
0.023 m3
JUMLAH
1.050
1.050
0.105
0.005
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
6
a.
-
Bahan
Besi Strip 2 x 3
1.150 m2
JUMLAH
b.
-
Tenaga
Tukang Las
Pekerja
Kepala Tukang
Mandor
1.200
1.200
0.012
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
PEKERJAAN BESI
7
a.
Bahan
Besi Hollow 4 x 4
4.000 m1
Rp.
20,833.33
=
=
Rp.
Rp.
83,333.33
83,333.33
x
x
x
x
Rp.
Rp.
Rp.
Rp.
72,300.00
53,900.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
86,760.00
64,680.00
924.00
48.30
152,412.30
235,745.63
x
x
x
Rp.
Rp.
Rp.
18,700.00
26,000.00
52,600.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
20,570.00
520.00
1,315.00
22,405.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,780.00
14,460.00
1,540.00
80.50
26,860.50
49,265.50
x
x
x
x
Rp.
Rp.
Rp.
Rp.
69,600.00
26,000.00
2,572,200.00
35,700.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
34,800.00
390.00
24,693.12
8,925.00
68,808.12
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,085.00
28,920.00
1,925.00
100.63
39,030.63
107,838.75
Rp.
Rp.
Rp.
Rp.
69,600.00
26,000.00
2,581,700.00
35,700.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
34,800.00
390.00
49,052.30
10,710.00
94,952.30
JUMLAH
b. Tenaga
-
Tukang Las
Pekerja
Kepala Tukang
Mandor
1.200
1.200
0.012
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
8
a.
Bahan
jendela nako
paku biasa 1/2" - 1"
besi strip
1.100 m2
0.020 Kg
0.025 m3
JUMLAH
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.200
0.200
0.020
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
9
a.
Bahan
0.500
0.015
0.010
0.250
Lbr
Kg
m3
Kg
JUMLAH
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.150
0.400
0.025
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
10 1 m2 pasang talang miring, seng BJLS 2.8 mm
a.
-
Bahan
seng plat 3 x 6 bjls 28
paku biasa 1/2" - 1"
kayu borneo, papan
flincote / meni besi
0.500
0.015
0.019
0.300
Lbr
Kg
m3
Kg
x
x
x
x
JUMLAH
PEKERJAAN BESI
b. Tenaga
-
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.040
0.400
0.025
0.001
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,156.00
28,920.00
1,925.00
100.63
33,101.63
128,053.93
x
x
x
x
Rp.
Rp.
Rp.
Rp.
69,600.00
26,000.00
2,581,700.00
35,700.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
20,880.00
2,600.00
49,052.30
17,850.00
90,382.30
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,085.00
18,075.00
1,925.00
100.63
28,185.63
118,567.93
x
x
x
x
Rp.
Rp.
Rp.
Rp.
69,600.00
26,000.00
2,581,700.00
35,700.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
20,880.00
2,600.00
49,052.30
17,850.00
90,382.30
x
x
x
x
Rp.
Rp.
Rp.
Rp.
53,900.00
72,300.00
77,000.00
80,500.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,085.00
18,075.00
1,925.00
100.63
28,185.63
118,567.93
JUMLAH
JUMLAH (a) + (b)
11 1 m2 pasang talang 1/2 lingkaran D-10 cm, seng BJLS 2.8 mm
a.
-
Bahan
seng plat 3 x 6 bjls 28
paku biasa 1/2" - 1"
kayu borneo, papan
flincote / meni besi
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.300
0.100
0.019
0.500
Lbr
Kg
m3
Kg
JUMLAH
0.150
0.250
0.025
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
12 1 m2 pasang talang 1/2 lingkaran D-10 cm, seng BJLS 2.4 mm
a.
-
Bahan
seng plat 3 x 6 bjls 24
paku biasa 1/2" - 1"
kayu borneo, papan
flincote / meni besi
b.
-
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.300
0.100
0.019
0.500
Lbr
Kg
m3
Kg
JUMLAH
0.150
0.250
0.025
0.001
Oh
Oh
Oh
Oh
JUMLAH
JUMLAH (a) + (b)
a.
Bahan
Cat Meni
Tiner
Kuas
1.12
0.50
1.00
Kg
Kg
Bh
x
x
x
Rp.
Rp.
Rp.
35,700.00
39,300.00
20,900.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
39,984.00
19,650.00
20,900.00
80,534.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,700.00
5,600.00
9,072.00
16,372.00
= Rp.
96,906.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
3,213.00
393.00
20,900.00
24,506.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,700.00
5,600.00
9,072.00
16,372.00
= Rp.
40,878.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
3,927.00
393.00
20,900.00
25,220.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,700.00
5,600.00
9,072.00
16,372.00
= Rp.
41,592.00
=
=
=
=
2,499.00
393.00
20,900.00
23,792.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
a.
Bahan
Hari
0
1
2
3
Cat Meni
Tiner
Kuas
Jlh Orang
0.02
0.04
0.06
Oh
Oh
Oh
Oh
0.09 Meter
0.01 Kg
1.00 Bh
x
x
x
Rp.
Rp.
Rp.
35,700.00
39,300.00
20,900.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
a.
Bahan
Hari
0
1
2
3
Cat Meni
Tiner
Kuas
Jlh Orang
0.02
0.04
0.06
Oh
Oh
Oh
Oh
0.11 Meter
0.01 Kg
1.00 Bh
x
x
x
Rp.
Rp.
Rp.
35,700.00
39,300.00
20,900.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
a.
Bahan
Cat Meni
Tiner
Kuas
Hari
0
1
2
3
Jlh Orang
0.02
0.04
0.06
Oh
Oh
Oh
Oh
0.07 Meter
0.01 Kg
1.00 Bh
x
x
x
JUMLAH
b.
Tenaga
Rp.
Rp.
Rp.
35,700.00
39,300.00
20,900.00
Rp.
Rp.
Rp.
Rp.
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
a.
Bahan
Hari
0
1
2
3
Cat Meni
Tiner
Kuas
Jlh Orang
0.02
0.04
0.06
Oh
Oh
Oh
Oh
x
x
x
x
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,700.00
5,600.00
9,072.00
16,372.00
= Rp.
40,164.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
3,213.00
393.00
20,900.00
24,506.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,700.00
5,600.00
9,072.00
16,372.00
= Rp.
40,878.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
3,927.00
393.00
20,900.00
25,220.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,700.00
5,600.00
9,072.00
16,372.00
= Rp.
41,592.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
3,927.00
393.00
20,900.00
25,220.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
1,700.00
5,600.00
9,072.00
16,372.00
= Rp.
41,592.00
0.09 Meter
0.01 Kg
1.00 Bh
Rp.
Rp.
Rp.
Rp.
x
x
x
Rp.
Rp.
Rp.
35,700.00
39,300.00
20,900.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
a.
Bahan
Hari
0
1
2
3
Hari
-
Cat Meni
Tiner
Kuas
Jlh Orang
0.02
0.04
0.06
Oh
Oh
Oh
Oh
Jlh Orang
0.11 Meter
0.01 Kg
1.00 Bh
x
x
x
Rp.
Rp.
Rp.
Harga
35,700.00
39,300.00
20,900.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
a.
Bahan
Hari
0
1
2
3
Cat Meni
Tiner
Kuas
Jlh Orang
0.02
0.04
0.06
Oh
Oh
Oh
Oh
0.11 Meter
0.01 Kg
1.00 Bh
x
x
x
Rp.
Rp.
Rp.
35,700.00
39,300.00
20,900.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
0
1
2
3
Jlh Orang
0.02
0.04
0.06
Oh
Oh
Oh
Oh
Bahan
Pasir
Kerikil
Semen
0.3
0.5
0.5
M3
Kg
Kg
x
x
x
Rp.
Rp.
Rp.
396,000.00
249,000.00
96,800.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
118,800.00
124,500.00
48,400.00
291,700.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
22,500.00
42,500.00
70,000.00
100,800.00
235,800.00
= Rp.
527,500.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
79,200.00
124,500.00
48,400.00
252,100.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
42,500.00
70,000.00
100,800.00
213,300.00
= Rp.
465,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
79,200.00
24,900.00
9,680.00
113,780.00
JUMLAH
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
42,500.00
70,000.00
100,800.00
213,300.00
= Rp.
327,080.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
a.
Bahan
Pasir
Kerikil
Semen
Hari
1
1
1
1
Jlh Orang
0.25
0.50
1.00
2.00
0.2
0.5
0.5
Oh
Oh
Oh
Oh
M3
Kg
Kg
x
x
x
Rp.
Rp.
Rp.
396,000.00
249,000.00
96,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
10
a.
Bahan
Pasir
Kerikil
Semen
Hari
1
1
1
1
Jlh Orang
0.50
1.00
2.00
0.2
0.1
0.1
Oh
Oh
Oh
Oh
M3
Kg
Kg
x
x
x
Rp.
Rp.
Rp.
396,000.00
249,000.00
96,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
JUMLAH
b.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
11
Pemasangan Mesin
a.
Tenaga
Supervisor
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
1
Hari
15
15
15
15
15
Jlh Orang
0.50
1.00
2.00
Jlh Orang
0.20
0.30
1.00
2.00
4.00
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
JUMLAH
12
Rp.
Rp.
Rp.
Rp.
Rp.
Harga
80,500.00
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
241,500.00
405,000.00
1,275,000.00
2,100,000.00
3,024,000.00
7,045,500.00
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
1
Jlh Orang
0.25
0.50
1.00
2.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
22,500.00
42,500.00
70,000.00
100,800.00
235,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
135,000.00
255,000.00
420,000.00
604,800.00
1,414,800.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
5,400.00
11,050.00
56,000.00
40,320.00
112,770.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
90,000.00
170,000.00
140,000.00
403,200.00
803,200.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
5,400.00
11,050.00
56,000.00
40,320.00
112,770.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
2,550.00
2,100.00
1,512.00
18,486.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
5,400.00
11,050.00
42,000.00
30,240.00
266,070.00
JUMLAH
13
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
3
3
3
3
Jlh Orang
0.50
1.00
2.00
4.00
Oh
Oh
Oh
Oh
JUMLAH
14
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
1
Jlh Orang
0.06
0.13
0.80
0.80
Oh
Oh
Oh
Oh
JUMLAH
15
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
2
2
2
4
Jlh Orang
0.50
1.00
1.00
2.00
Oh
Oh
Oh
Oh
JUMLAH
16
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
1
Jlh Orang
0.06
0.13
0.80
0.80
Oh
Oh
Oh
Oh
JUMLAH
17
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
1
Jlh Orang
0.03
0.03
0.03
Oh
Oh
Oh
Oh
JUMLAH
18
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
1
Jlh Orang
0.06
0.13
0.60
0.60
Oh
Oh
Oh
Oh
JUMLAH
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
1
Jlh Orang
0.06
0.13
0.60
0.60
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
5,400.00
11,050.00
42,000.00
30,240.00
266,070.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
42,500.00
210,000.00
252,000.00
531,500.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
850.00
700.00
504.00
2,954.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
22,500.00
42,500.00
70,000.00
201,600.00
336,600.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Harga
90,000.00
85,000.00
70,000.00
50,400.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
850.00
700.00
2,016.00
4,466.00
= Rp.
5,000,000.00
= Rp.
= Rp.
Rp.
1,500,000.00
1,000,000.00
7,500,000.00
JUMLAH
20
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
3
5
Jlh Orang
0.30
0.50
1.00
1.00
Oh
Oh
Oh
Oh
JUMLAH
21
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
1
Jlh Orang
0.01
0.01
0.01
0.01
Oh
Oh
Oh
Oh
JUMLAH
22
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
2
Jlh Orang
0.25
0.50
1.00
2.00
Oh
Oh
Oh
Oh
JUMLAH
23
a.
Tenaga
Tenaga Ahli
Kepala Tukang
Tukang
Pekerja
Hari
1
1
1
2
Jlh Orang
0.01
0.01
0.01
0.02
Oh
Oh
Oh
Oh
JUMLAH
24
a.
Tenaga
Hari
1
1
1
1
Jlh Orang
2.00
Oh
Rp.
Harga
2,500,000.00
1.00
1.00
Oh
Oh
x
x
Rp.
Rp.
1,500,000.00
1,000,000.00
JUMLAH