LEAK TEST FOR 36" RTRP(FROM MH-04 TO MH-06)

START TIME:9.00AM

Date: 28-11-2013
LINE NO:36"-DO-560-F10A

SNO

TIME(PM)

9.00AM

9.30AM

10.00AM

10.30 AM

11.00AM

11.30AM

12.00PM

12.30PM

1.00PM

10

1.30PM

11

2.00PM

12

2.30PM

13

3.00PM

TEMPERATURE PIPE BOTTOM( OC)

TEMPERATURE PIPE TOP( OC)

22.1

29.2

20.9

32

22.1

37.3

26

39.3

25.3

42.6

22.1

42.7

23.3

43

21.9

42.2

24

34.6

22.4

39.6

23.3

37.1

20.4

35.8

19.8

32.3

Sub contractor

Name
Signature
Date

Contractor

Client

PNEUMATIC TEST (FIELD)


START TIME:9.30 am
TEST PRESSURE:13 barg

Date: 12-11-2013
LINE NO:1"-AI-515-S10A

SNO

TIME(AM)

TEMPERATURE( OC)

RAISING PRESSURE
(barg)

REDUCED PRESSURE
(Barg)

9.30

31

1.3

13

9.32

34

2.6

7.8

9.35

36

3.9

3.9

9.40

33

5.2

0.39

9.45

30

6.5

9.50

20

7.8

9.55

21

9.1

10.00

21

10.4

10.05

20.5

13

Holding

10

10.35

20

13

Holding

Sub contractor

Contractor

Name
Signature
Date

Client

REMARKS

PNEUMATIC TEST (FIELD)


START TIME:9.30 am
TEST PRESSURE:13 barg

SNO

Date: 12-11-2013
LINE NO:1"-AI-515-S10A

REDUCED
RAISING PRESSURE PRESSUR
TIME(AM) TEMPERATURE( OC)
REMARKS
(barg)
E
(Barg)

1
2
3
4
5
6
7
8
9
10

Name
Signature
Date

9.30
9.32
9.35
9.40
9.45
9.50
9.55
10.00
10.05
10.35

31
34
36
33
30
20
21
21
20.5
20

1.3
2.6
3.9
5.2
6.5
7.8
9.1
10.4
13
13

Sub contractor

Contractor

13
7.8
3.9
0.39
0

Holding
Holding

Client

PNEUMATIC TEST (FIELD)


START TIME:9.30 am
TEST PRESSURE:13 barg

Date: 12-11-2013
LINE NO:1"-AI-515-S10A

SNO

TIME(AM)

TEMPERATURE( OC)

RAISING PRESSURE
(barg)

REDUCED PRESSURE
(Barg)

9.50

31

1.3

13

10.20

34

2.6

7.8

10.5

36

3.9

3.9

11.20

33

5.2

0.39

11.5

30

6.5

9.50

20

7.8

9.55

21

9.1

10.00

21

10.4

10.05

20.5

13

Holding

10

10.35

20

13

Holding

Sub contractor

Contractor

Name
Signature
Date

Client

REMARKS

LEAK TEST FOR 36" RTRP(FROM MH-04 TO MH-06)


START TIME:9.00AM
END TIME:11.50AM
SNO

Date: 22-01-2014
LINE NO:TPU-068-WF-HT-004

TIME(PM)
PIPE TOP

9.50

10.20

10.50

11.20

11.50

PIPE BOTTOM

PIPE TOP

TEMPERATURE
PIPE BOTTOM

Signature
Date

PIPE BOTTOM

19.5

14.1

15.2

13

20.5

15.7

19.1

14

17.2

12.7

20.1

15.2

20.8

15

19.5

13.7

22.2

15.3

21.4

16.1

20.5

14.6

23.4

15.9

22.1

17.2

21.7

15.7

23.9

16.2

Sub contractor

Name

REMARKS

PIPE TOP

Contractor

Client