Escolar Documentos
Profissional Documentos
Cultura Documentos
START TIME:9.00AM
Date: 28-11-2013
LINE NO:36"-DO-560-F10A
SNO
TIME(PM)
9.00AM
9.30AM
10.00AM
10.30 AM
11.00AM
11.30AM
12.00PM
12.30PM
1.00PM
10
1.30PM
11
2.00PM
12
2.30PM
13
3.00PM
22.1
29.2
20.9
32
22.1
37.3
26
39.3
25.3
42.6
22.1
42.7
23.3
43
21.9
42.2
24
34.6
22.4
39.6
23.3
37.1
20.4
35.8
19.8
32.3
Sub contractor
Name
Signature
Date
Contractor
Client
Date: 12-11-2013
LINE NO:1"-AI-515-S10A
SNO
TIME(AM)
TEMPERATURE( OC)
RAISING PRESSURE
(barg)
REDUCED PRESSURE
(Barg)
9.30
31
1.3
13
9.32
34
2.6
7.8
9.35
36
3.9
3.9
9.40
33
5.2
0.39
9.45
30
6.5
9.50
20
7.8
9.55
21
9.1
10.00
21
10.4
10.05
20.5
13
Holding
10
10.35
20
13
Holding
Sub contractor
Contractor
Name
Signature
Date
Client
REMARKS
SNO
Date: 12-11-2013
LINE NO:1"-AI-515-S10A
REDUCED
RAISING PRESSURE PRESSUR
TIME(AM) TEMPERATURE( OC)
REMARKS
(barg)
E
(Barg)
1
2
3
4
5
6
7
8
9
10
Name
Signature
Date
9.30
9.32
9.35
9.40
9.45
9.50
9.55
10.00
10.05
10.35
31
34
36
33
30
20
21
21
20.5
20
1.3
2.6
3.9
5.2
6.5
7.8
9.1
10.4
13
13
Sub contractor
Contractor
13
7.8
3.9
0.39
0
Holding
Holding
Client
Date: 12-11-2013
LINE NO:1"-AI-515-S10A
SNO
TIME(AM)
TEMPERATURE( OC)
RAISING PRESSURE
(barg)
REDUCED PRESSURE
(Barg)
9.50
31
1.3
13
10.20
34
2.6
7.8
10.5
36
3.9
3.9
11.20
33
5.2
0.39
11.5
30
6.5
9.50
20
7.8
9.55
21
9.1
10.00
21
10.4
10.05
20.5
13
Holding
10
10.35
20
13
Holding
Sub contractor
Contractor
Name
Signature
Date
Client
REMARKS
Date: 22-01-2014
LINE NO:TPU-068-WF-HT-004
TIME(PM)
PIPE TOP
9.50
10.20
10.50
11.20
11.50
PIPE BOTTOM
PIPE TOP
TEMPERATURE
PIPE BOTTOM
Signature
Date
PIPE BOTTOM
19.5
14.1
15.2
13
20.5
15.7
19.1
14
17.2
12.7
20.1
15.2
20.8
15
19.5
13.7
22.2
15.3
21.4
16.1
20.5
14.6
23.4
15.9
22.1
17.2
21.7
15.7
23.9
16.2
Sub contractor
Name
REMARKS
PIPE TOP
Contractor
Client