Você está na página 1de 4

KARNATAKA DIASTER CONTROL BUILDING YELAKANKA- BANGALORE TO INSTALL ROOFTOP SOLAR POWER PLANT CAPACITY AND REPLACEMENT OF EXISTING

FITTINGS WITH LED AND ENERGY EFFICIENT FAN REGULATOR (EER) REQUIREMENT
SL. No. 1 MAIN BUILDING TOTAL NO. DETAILS TUBE WITH LED FITTING 200 200 12 1 2400 19 150 80 1 12000 120 100 150 1 15000 150 50 18 1 900 11 300 67 70 10 1000 600 900 WITH EER FITTING 200 60 1 12000 120 150 20 1 3000 30 100 150 1 15000 150 50 150 1 7500 90 390 87 90 15 15 15 15 WITH LED AND EER FITTING 200 12 1 2400 19 150 20 1 3000 30 100 150 1 15000 150 50 18 1 900 11 210 47 50 150 15000 9000 13500 SQ.FT SQ.FT SQ.FT SQ.FT ENERGY SAVING PER DAY 0 48 0 9600 100.8 0 60 0 9000 90 0 0 0 0 0 0 132 0 6600 79.2 270 60 60

LIGHTING

TOTAL NO. OF LIGHTING POINTS CAPACITY OF FITTING - AVERAGE TOTAL NO. OF BLOCKS TOTAL LOAD TOTAL ENERGY CONSUMPTON FOR 10 HOURS/DAY

Maximum WATTS Nos. WATTS kWh/DAY Maximum WATTS Nos. WATTS kWh/DAY Maximum WATTS Nos. WATTS kWh/DAY Maximum WATTS Nos. WATTS kWh/DAY kWh/DAY KWP KWP

60 1 12000 120 150 80 1 12000 120 100 150 1 15000 150 50 150 1 7500 90 480 107 100 1 100 60 90

FANS

TOTAL NO. OF POINTS CAPACITY OF FITTING - AVERAGE TOTAL NO. OF BLOCKS TOTAL LOAD TOTAL ENERGY CONSUMPTON FOR 10 HOURS/DAY TOTAL NO. OF POINTS CAPACITY OF FITTING - AVERAGE TOTAL NO. OF BLOCKS TOTAL LOAD TOTAL ENERGY CONSUMPTON FOR 10 HOURS/DAY

COMPUTERS

STREET LIGHTS

TOTAL NO. OF POINTS CAPACITY OF FITTING - AVERAGE TOTAL NO. OF BLOCKS TOTAL LOAD TOTAL ENERGY CONSUMPTON FOR 12 HOURS/DAY TOTAL ENERGY CONSUMPTON PER DAY

SPV POWER PLANT REQUIREMENT 2 TOTAL AREA REQUIREMENT TO INSTALL ROOFTOP SPV POWER PLANT A AREA REQUIRED TO INSTALL 1 KWP SPV ROOFTOP POWER PLANT IS 10FT WIDTH X 15FT BREADTH B AREA REQUIRED TO INSTALL 100 KWP SPV ROOFTOP POWER PLANT C AREA REQUIRED TO INSTALL 60 KWP SPV ROOFTOP POWER PLANT D AREA REQUIRED TO INSTALL 90 KWP SPV ROOFTOP POWER PLANT 3 A TOTAL COST AND MNRE SUBSIDY TO INSTALL ROOFTOP SPV POWER PLANT FOR 1 KWP SPV ROOFTOP POWER PLANT AS MNRE BASE RATE

KWP KWP KWP KWP

a COST OF 1 KWP SPV ROOFTOP POWER PLANT AS MNRE BASE RATE b MNRE SUBSIDY BASE RATE FOR 1 KWP SPV ROOFTOP POWER PLANT AS PER MNRE

Rs.Lakhs Rs.Lakhs Rs.Lakhs KWP Rs.Lakhs Rs.Lakhs Rs.Lakhs KWP Rs.Lakhs Rs.Lakhs Rs.Lakhs

3 0.9 2.1 107 320 96 224 100 300 90 210 67 200 60 140 70 210 63 147 87 260 78 182 90 270 81 189 47 140 42 98 50 150 45 105

c BENEFICIARY COST OF 1 KWP SPV ROOFTOP POWER PLANT AS MNRE BASE RATE B COST DETAILS OF SPV ROOFTOP POWER PLANT - CAPACITY a COST OF SPV ROOFTOP POWER PLANT AS MNRE BASE RATE LAKHS/KWP @ Rs.3

b MNRE SUBSIDY SPV ROOFTOP POWER PLANT AS PER MNRE BASE RATE @ Rs.0.9 LAKHS/KWP c BENEFICIARY COST OF SPV ROOFTOP POWER PLANT AS MNRE BASE RATE C COST DETAILS OF SPV ROOFTOP POWER PLANT - CAPACITY a COST OF SPV ROOFTOP POWER PLANT AS MNRE BASE RATE LAKHS/KWP

@ Rs.3

b MNRE SUBSIDY SPV ROOFTOP POWER PLANT AS PER MNRE BASE RATE @ Rs.0.9 LAKHS/KWP c BENEFICIARY COST OF SPV ROOFTOP POWER PLANT AS MNRE BASE RATE

Power Saved is Power Generated


Sl. No. Consumption and Specification Power rating of Bulb - Watts - Watts

1 2 3 4 5 6 NOTE:

Energy Consumed for bulb using 8 Hrs a day Energy Consumed for Month -- Watts Energy Consumed for Month - Units

Amount we pay to Electricity Department for a Month (if Rs. 3.50 / Unit) - Rs. Amont we pay to Electricity Department for a year ( if Rs.3.50 / Unit) - Rs.

1. If We use C F L lamp we save 2. If We use L E D lamp we save

Rs Rs

/ Year / Year

Power Generated
Bed Lamp 15 120 3600 3.6 12.60 151.20 CFL Lamp 5 40 1200 1.2 4.20 50.40 LED Lamp 0.1 0.8 24 0.024 0.084 1.008

100.80 150.19

Você também pode gostar