Você está na página 1de 2

SC-109

SMITH
30-45 KLBS
5

SONDA:
DIMETRO BROCA:
PESO SOBRE BROCA
NUMERO DE BROCA

HORA

0:00
6:00
17:00
1:00
6:00
11:30
19:30
0:00
6:00
12:00
13:30
14:35
16:00
17:30

14/1/13 18:00
17/1/13 17:30
163

DATA E HORA DESCIDA:


DATA E HORA RETIRADA:
RPM (MR+MF)
RESPONSVEL

JOS PAULO / MA CORREIA

CUSTO DA BROCA(U$)

CUSTO SONDA+ DIR. (PERF.) - US$/h

5,116

2,189

TBF (H)

2.67
4.80
8.43
5.50
3.30
4.30
6.10
3.00
4.50
4.60
1.10
0.90
0.90
1.20

P. INICIAL

P. FINAL

1150
1170
1207
1311
1397
1443
1493
1560
1599
1665
1714
1723
1733
1742

1170
1207
1311
1397
1443
1493
1560
1599
1665
1714
1723
1733
1742
1751

TBF EFETIVO
51.30 horas

METROS

20
37
104
86
46
50
67
39
66
49
9
10
9
9

7.5
7.7
12.3
15.6
13.9
11.6
11.0
13.0
14.7
10.7
8.2
11.1
10.0
7.5

PERF. (m)
601

TX TOTAL (m/h)
11.7

CUSTO SONDA + DIR. (MAN.) US$/h

1,819

METRO/HORA

TEMPO TOTAL

METROS TOTAL

2.67
7.47
15.90
21.40
24.70
29.00
35.10
38.10
42.60
47.20
48.30
49.20
50.10
51.30

CUSTO U$/M

20
57
161
247
293
343
410
449
515
564
573
583
592
601

ROTAO ACUMULADA
501,714

CUSTO MTRICO (U$/m)

1041
552
312
254
240
233
229
224
215
215
216
216
216
217

DESGASTE I.A.D.C
1-2-ID-T-F1-1-TBF

TAXA DE PENETRAO (m/h)


18.0
16.0

15.6

14.0

12.3

10.0

ROP

4.0

254 240

233

229 224

215

217
216
216
216
215

13.0
11.6

11.0

11.1

10.7

10.0

8.0

6.0

312

14.7

13.9

12.0

CUSTO

1500
1400
1300
1200
1100
1000
900 1041
800
700
600
500
552
400
300
200
100

SB517PS
PW5537
390-420

TIPO
SRIE
VAZO

2.0

212550904.xls.ms_office

7.5 7.7

8.2

7.5 7.5 7.5 7.5 7.5 7.5 7.5

200
100
0

312

100

254 240
200

300

233

229 224
400

215
500

2.0

217
216
216
216
215

600

700

0.0
0

METROS PERFURADOS

10
TBF

CPT/CIP-SEAL/IPERF

212550904.xls.ms_office

15

20

Você também pode gostar