Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Topic today

Plant Reliability
Concerns & Mitigation

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Session - Structure
Warm up discussions Business needs Asset Management Reliability Measurement Reliability Improvement Maintenance practices Turnaround Maintenance Q&A Reliability Incident Case study

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Plant reliability
Concerns
Business Safety Environment

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

The value comes from an integrated view of the business


Supply Refining
Asset management Margin Improvement Benchmarking Product portfolio Technology Crude Supply Assessment Project Management Product quality management

Distribution

Markets

Retail

HS&E
Operational Excellence

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

ATU
CPCL

REFINERY 1

Plant VRU 2 Crude Tanks Bombay High Gulf Plant 1 Plant 11

Plant 12

Plant Sulphur 75
Plt 76

Plt 74

Hexane

SULPHUR
Plt 78
Plt 77 Plt 79

HEXANE

NAPHTHA
LPG PETROL ATF

Platformer Plant

3 Plant 4 Plant 5
HDS LUBE HIFI

KEROSENE
LAB FEEDSTOCK DISEL

CPCL

REFINERY 3

DWU FEU Plant

Plt 202

Plt 203

8
NMP PDA

Plant 9 Plant 13
VAC.DIS HDS

Plant 10

LUBE BASED STOCKS INDUSTRIAL FUEL

Plant CDU 201


CRU

Plant 71

Plant 73

Plant 206

Plant 7

ASPHALT

Plant 204

HGU

WAX

VBU

Plant 205

Plant 207
CPCL

Plant 14
CDU
REFINERY 2

Plant 18
ATU

Plant 17
PRU

Plant 15
FCCU

Plant 19

FEED STOCK FOR MEK & POLY BUTENES

SRU

Plant 210

Plant 209
ATU & ARU

PROPYLENE Plant 16

o8 PARAFFIN of 39
WAX

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Sour FG to ATU

LPG to Merox
NSU LSRN HN Kero to Merox

Swt FG LPG

LSRG
CRU 40 m3/hr

MS
Swt FG LPG H2 LSRG OHCU LSRN

Crude

CDU III 430 m3/hr

Diesel VGO

HGU 70000 Nm3/hr

Sour FG to ATU

Kero
249 m3/hr Diesel

VDU EGO VBU 175 m3/hr 140 m3/hr


18-March-2011

Naph. Diesel VGO

UCO to FCCU

Ref II VGO Ref I/II VR

o9 of 39 Refinery

III

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai VR

COMOX Reactor preheat

Desulphuriser steam

reformer furnace T T, P,T HP steam

hot shift converter

H2
(Start up)

Naphtha feed

Steam superheater S, T T methanator heater waste heat boiler

BFW Preheater

Cl, O2, T,H2O

DMW Preheater

PG Air cooler

T,H2O

CO2 to atmosphere PSA Purge Gas Hydrogen gas

Degassifier
Hot & Cold Condensate seperators Cl,O2,T,H2O process condensate

steam stripped condensate

Reformer Section
S.Shanmugasundaram, CPCL, Chennai

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

10 10 of 19

FURNACE MAINTENANCE

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

contd 11

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

Plant Reliability
Concerns
Business
Plant availability Operating cost Margin

Safety
Personal Equipment/Property

Environment
Air, Water, Soil & Noise pollution

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

13

Business demands from Assets

Safety Environment Efficiency / Yield Availability


Petrofed - Plant Reliability Concerns & Mitigation 18-March-2011

S.Shanmugasundaram, CPCL, Chennai

14

Asset Management Concept


Make every effort to keep units operating for a maximum economical period and Use best practice to minimize downtime and limit costs during a turnaround

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

15

Business Drivers
Margin Profit Essential Service Economic development Survival Owners choice Strategy / Perspective plan

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

16

Refinery KPIs
Energy Loss Routine Maintenance Personnel Productivity Cash Opex Cash Margin Plant availability Inventory Safety

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

17

120
LP.
LP.

80 60 40 20 0
GIVEN PERIOD OF TIME
Petrofed - Plant Reliability Concerns & Mitigation 18-March-2011

S.Shanmugasundaram, CPCL, Chennai

18

C t ude I , I I & I I I - 2 0 0 7 - 2 0 0 8 1600 1400 1200

Cu.M/Hr

1000 800 600 400 200 0

A M M J
CRUDE 2

J A
CRUDE 3

S O N D J
CRUDE 1

F M

CRUDE 1,2&3

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

19

Interruptions
FCCU
Year 2004-05 2005-06 2006-07 2007-08
Sl No PLANT

Apr

May 1

Jun

Jul

Aug

Sep

Oct 5 6 13 14

Nov 7 8 9 15 18 19

Dec

Jan

Feb

Mar

2 to 4

10 16

11 12 17 23 24
MONTH FROM HRS

20 21

22

25
TO HRS 5/22/2004 3:30 9/1/2004 0:00 10/1/2004 0:00 10/11/2004 3:00 10/11/2004 16:00 10/18/2004 17:45 11/13/2004 21:00 11/25/2004 19:00 11/26/2004 8:30 4/9/2005 17:00 5/11/2005 4:20

26
NATURE EMERG

27
REASONS SS BREAKER PROBLEM HOURS 11.00 576.00 720.00 243.00 13.00 169.75 9.25 4.25 3.75

DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11

PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU PLANT 16 FCCU

MAY '04 5/21/2004 16:30 AUG '04 8/8/2004 0:00 SEP '04 9/1/2004 0:00 OCT'04 OCT'04 OCT'04 10/1/2004 0:00 10/11/2004 3:00 10/11/2004 16:00

PLANNED TA M/C PLANNED TA M/C PLANNED TA M/C & REVAMP PLANNED STARTUP EMERG EMERG EMERG EMERG CAT CARRY OVER PROBLEM FCC FEED PUMP TRIP FCC FEED PUMP TRIP FCC FEED PUMP TRIP

NOV '04 11/13/2004 11:45 NOV '04 11/25/2004 14:45 NOV '04 11/26/2004 4:45 APR '05 4/8/2005 19:00 MAY '05 5/9/2005 12:30

EMERG POWER FAILURE EMERG POWER FAILURE

22.00 39.83

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

20

MC Botto m 140 valve

FCCU T'Put 2007-2008

120 100

Cu.M/Hr

80 60 40 20 0
MAB Trip Gascon Cooler leak MC Botto m pump failure

Inspectio n

M o nt h

M M

M
21

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Interruptions
OHCU
Year 2004-05 2005-06 2006-07 2007-08
Sl No PLANT

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

1 2 11

4 6 12 18

7 13 14 19
MONTH APR '05 APR '05 APR '05 MAY '05 MAY '05 MAY '05 JUL '05 AUG '05 AUG '05 MAR'06 Apr-06 May-06

9 15 16 17 22
TO HRS 4/7/2005 4:00 4/9/2005 21:00 4/30/2005 9:45 5/1/2005 18:45 5/5/2005 23:30 5/12/2005 15:17 7/22/2005 3:15 8/16/2005 19:00 8/31/2005 21:30 3/30/2006 0:00 4/13/2006 5:00 5/24/2006 6:30 NATURE EMERG EMERG EMERG EMERG EMERG EMERG EMERG EMERG EMERG EMERG EMERG EMERG

10

20

21

23
REASONS

24
HOURS 38.00 47.50 11.50 30.00 49.00 47.50 8.25 41.50 66.00 28.00

DESCRIPTION

FROM HRS 4/5/2005 14:00 4/8/2005 19:00 4/28/2005 10:15 5/1/2005 7:15 5/4/2005 17:30 5/7/2005 19:05 7/20/2005 2:15 8/14/2005 19:30 8/31/2005 13:15 3/28/2006 6:30 4/10/2006 11:00 5/23/2006 2:30

1 2 3 4 5 6 7 8 9 10 11 12

PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU PLANT 207 OHCU

MAKE UP H2 FAILURE TOTAL POWER FAILURE POWER FAILURE/REFORMER TRIP REFORMER TRIP RGC TRIP RGC TRIP POWER DIP UNIT TRIP REFORMER TRIP REFORMER TRIP

POWER DIP & MAKEUP H2 FAILURE 26.00

POWER FAILURE/REFORMER TRIP 116.20

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

22

300 250

OHCU T'put 2007-2008

GT Trip

Cu.M/Hr

200 150 100 50 0

Reforme r Trip

Catalyst change

HGU ID Fan

M o nt h

M M

S O

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

23

CRUDE-1
450 400

350
300 250 200 150

100
50 0
2-May
2-Dec 2-Apr 2-Jul 2-Aug 2-Sep 2-Jun 2-Jan 2-Feb 2-Nov 2-Mar
24

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

2-Oct

S.Shanmugasundaram, CPCL, Chennai

CRUDE-2
600 500 400 300 200 100 0

2-May

2-Dec

2-Apr

2-Jul

2-Aug

2-Sep

2-Jun

2-Jan

2-Feb

2-Nov

2-Mar
25

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

2-Oct

S.Shanmugasundaram, CPCL, Chennai

FCCU
160 140 120 100

80
60 40 20 0

2-May

2-Jun

2-Jul

2-Aug

2-Sep

2-Dec

2-Feb

2-Apr

2-Jan

2-Nov

2-Mar
26

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

2-Oct

S.Shanmugasundaram, CPCL, Chennai

CRUDE 3
800 700 600 500 400 300 200 100 0

2-May

2-Dec

2-Apr

2-Jul

2-Aug

2-Sep

2-Jun

2-Jan

2-Feb

2-Nov

2-Mar
27

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

2-Oct

S.Shanmugasundaram, CPCL, Chennai

OHCU
300 250 200 150 100 50 0

2-May

2-Dec

2-Apr

2-Jul

2-Aug

2-Sep

2-Jun

2-Jan

2-Feb

OHCU

2-Nov

2-Mar
28

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

2-Oct

S.Shanmugasundaram, CPCL, Chennai

Focus areas
Plant availability
Mechanical Power/Utilities Upstream/Downstream Statutory

Operating cost
Maintenance Cost Chemicals & Catalysts Purchased power & utilities

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

29

NON - AVAILABILITY

The non availability is classified as follows


MECHANICAL REGULATORY OTHERS

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

30

MECHANICAL
Non T/A unit downtimes, including scheduled and unscheduled unit outages for the purposes of unit mechanical repair
Rotary / Static equipment failure Electrical / instruments problems Fire / Accidents due to equipment problems Planned unit shut downs Regulatory S/Ds if the scheduled duration is extended by 25% for maintenance work

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

31

REGULATORY

Process related non T/A down time


Furnace decoking Catalyst regeneration / replacement S/D for inspection by statutory bodies

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

32

OTHERS

Non T/A downtimes caused by factors outside of the unit


Electrical power interruption Hydrogen supply Other upstream / downstream outage Non availability of Feed / Utilities Any other process related downtimes

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

33

Plant Reliability
Concerns
Plant shut downs Breakdowns / low MTBF Poor efficiency Safety hazard Low thruput Poor yield High maintenance cost High inventory

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

34

Plant Reliability
Practices
Online protection alarms/trips Criticality ranking Condition monitoring Preventive maintenance Unit shutdowns / Turn Around AMC / CMC O&Ms Zonal contracts Statutory Inspections IBR / Tanks / Pr. Vessels / Sphere PSVs / Cryogenic storage Modifications / Replacements

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

35

Plant Reliability
Organisation
Maintenance
Planning Mechanical Field (Onsite / Offsite / Civil) Mechanical Rotary Electrical Instrumentation Garage / Material Handling Prefabrication / Soot blowers / Machine Shop

Engineering & Inspection


General Engineering Inspection

Process Engineering Operations Projects

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

36

Plant Reliability
Job inputs
Maintenance Notification Inspection work list Process schemes Engineering Drawings Operations Work lists Checklists Internal / External audit points Work packages Tag items Hot / Cold PM Work orders Investigation reports OEM Recommendation

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

37

Focus is on reducing..
Integrity and Reliability Reliability & Integrity Management Equipment strategy through RRM methodology Effective maintenance execution Defect Elimination to eliminate bad actors Maintenance Downtime Duration through better predictability Frequency by controlling deterioration Maintenance Effort Routine Maintenance effort and cost Turnaround Maintenance effort by virtue of better overall equipment condition Unplanned

Outages

Duration of Planned Outages

Maint Effort & Cost

All through structured Risk Based Processes, Tools & Organization Need significant shift in the mindset of management & people..

Petrofed - Plant Reliability Concerns & Mitigation

38

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

38

TYPES OF MAINTENANCE

ROOT CAUSE FAILURE ANALYSIS

BREAKDOWN MAINTENANCE

PREVENTIVE MAINTENANCE

PREDICTIVE MAINTENANCE

PROACTIVE MAINTENANCE

RELIABILITY CENTERED MAINTENANCE


39

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Present

Future

Minimize reactive maintenance Reduce Time based tasks

Increase condition based tasks

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

40

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

41

P F Interval
P
100 90 80 70 60 50 40 30 20 10 0 0 5 10 15 20 25 30

35

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

42

RISK ASSESSMENT MATRIX (RAM)


ENVIRONMENT CONSEQUENCES REPUTATION SEVERITY A
Never heard of in industry

INCREASING LIKELIHOOD B C D E
Heard of in industry Incident has occurred in our Compan y

PEOPLE

Happens several times per year in our Company

Happens several times per year in a location

ASSET S

0 1 2 3 4 5

no health effect/injury

no damage

no effect

no impact slight impact limited impact considerable impact national impact international impact

slight health effect/injury


minor health effect/injury major health effect/injury PTD* or 1 to 3 fatalities multiple fatalities

slight damage
minor damage localised damage major damage extensive damage

slight effect
minor effect localised effect major effect massive effect

LO W RIS K

MEDIU M RISK

* PTD = Permanent Total Disability


Petrofed - Plant Reliability Concerns & Mitigation

HIGH RISK

43

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

43

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

44

Reliability

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

45

Reliability

Reliability is defined as the ability of an asset to perform consistently at the desired level over a period of time.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

46

ASSET
PLANT & MACHINERY PROCESS PERSON SYSTEMS PROCEDURES

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

47

Focus Areas
Reliability and availability of Plant & Machinery Proactive Maintenance Preservation Functions Interface between Process and Machinery Reliability in Systems and Procedures Reliability in Projects

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

48

Reliability Issue
AN ISSUE WHICH DETRACT THE ASSETS FROM PERFORMING CONSISTENTLY AT THE DESIRED LEVEL, OVER A PERIOD OF TIME.
ISSUES ARE GLOBAL IN NATURE COMMON TO MORE THAN ONE FUNCTIONS / ASSET TO BE SOLVED AT DIVISION / ORGANISATION LEVEL NEEDS POLICY DECISIONS TO RESOLVE

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

49

Reliability Problems
UNSOLVED SPECIFIC ISSUE WHICH AFFECTS THE RELIABILITY AND AVAILABILITY OF A PARTICULAR ASSET.
CAN BE IDENTIFIED AND ANALYSED FOR AN ASSET SOLUTION POSSIBLE WITH THE EXISTING POLICIES HAVE DIRECT IMPACT ON AVAILABILITY AFFECTS THE PROFITABILITY

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

50

Reliability Incidents
Failure resulting in S/D Consecutive 3 failures on same mode Failure within 50 % of MTBF Accident Fire Production loss Margin loss

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

51

How to improve ?
Measure Identify incidents / Problems Prevent Reduce Effect

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

52

KED Total MECHANICAL C hrs. KEDC * month S/D availabili ly hrs. ty Plant 1 Atm 71 672 71.0 Plant 3 12 672 12.0 Plant 4 28 672 28.0 Plant 5 9.6 672 9.6 Plant 7 5 672 5.0 Plant 11 36 672 36.0 Plant 13 5.4 672 5.4 Plant 15 Atm 106 672 106.0 Plant 15 Vac 39 672 39.0 Plant 16 136 672 136.0 Plant 19 3 672 3.0

Plant No

KED Total MECHANICAL C hrs. KEDC * month S/D availabili ly hrs. ty Plant 74 4 672 4.0 Plant 75 5 672 5.0 Plant 76 68 672 68.0 Plant 77 82 672 82.0 Plant 78 31 672 2.13 30.9 FG Recovery 1 672 1.0 CDU 3 85.9 672 85.9 VDU 3 39 672 39.0 Visbreaker 3 13 672 13.0 Reformer 3(CRU) 7 672 7.0 H2 UNIT 3 68 672 68.0 OHCU 300 672 300.0 Nap 3 (NHT) 5 672 5.0 Sulfur 3 (210) 69 672 69.0 1229 1228.8 99.99%

Plant No

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

53

MECHANICAL Plant No Plant 1 Vac Plant 8 Plant 9 plant 10 plant 13 Plant 14 DOU Plant 14 HiFi Plant 71 Plant 72 Plant 73 KEDC 29 37 121 62 12 13 4 16 15 76 385
Total hrs. monthly S/D hrs. KEDC * availability

672 672 672 672 672 672 672 672 672 672

29.0 37.0 121.0 62.0 12.0 13.0 4.0 16.0 15.0 76.0 385.00 100.00%

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

54

Mechanical Availability REPORT JANUARY 2010 Lube Month Fuel (Act) Fuel (Plan) Lube(Act) (Plan) April 95.50 98.50 100.00 94.00 May 98.83 98.50 98.98 94.00 June 99.76 98.50 99.13 94.00 I Qtr. 98.04 99.37 July 99.66 98.50 96.78 94.00 August 98.73 98.50 97.75 94.00 September 100.00 98.50 93.77 94.00 II Qtr 99.46 96.13 October 99.99 98.50 91.84 94.00 November 98.22 98.50 90.55 94.00 December 99.83 98.50 99.91 94.00 III Qtr 99.36 94.14 January 99.46 98.50 99.55 94.00 February 98.50 94.00 March 98.50 94.00 IV Qtr 99.46 99.55 Cumulative MoU Target 99.01 98.50
18-March-2011

96.84 94.00
S.Shanmugasundaram, CPCL, Chennai

Petrofed - Plant Reliability Concerns & Mitigation

55

Prevention
Design reliability Condition monitoring Preventive maintenance Failure Finding

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

56

Reduce Effect
Protective Devices Modification Redesign / Replacement Standby / redundancy

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

57

Maintenance

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

58

Changing Maintenance Techniques


Second Generation Schedule overhauls Systems for planning & controlling work Big, slow computers 1960-80
18-March-2011

Third Generation

Condition monitoring
Design for reliability and maintainability Hazard studies

Small, fast computers


FMEA Expert systems Multiskilling and teamwork After 1980

First generation Fix it when it broke Till 1960

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

59

400 350 300 250

WO

200 150 100 50 0


1
BHS CDU1

2
CDU2

4
DHDS

5
FCCU

6
HYD

Year

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

60

Rotary WO Details
100% 90% 80% 70%

% of WOs

60% 50% 40% 30% 20% 10% 0% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

% of equipment

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

61

RELIABILITY TOOLS
FMEA ( Failure Mode Effect Analysis) RCM ( Reliability Centered Maintenance) RCFA ( Root Cause Failure Analysis) LCCA ( Life Cycle Cost Analysis)

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

62

RCFA
Root Cause Failure Analysis

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

63

RCFA - Methodology
Failure defined All hypothesis are developed Elimination of false hypothesis with objective evidence Physical Roots are identified Human Roots (Who has failed) Latent Roots ( Why the human has failed)

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

64

Reliability Incidents Analysis


Record all the reliability Incidents and calculate mechanical availability on monthly basis. Carry out simple failure analysis on the reliability incidents. The failure analysis includes
Event description Effect of the event Chronology Observation Analysis Recommendation

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

65

Defect Elimination Management


Defect Elimination Management is an important process to prevent failures fro reoccurring, eliminate bad actors, making the journey from a reactive to a pro-active mode..
Practiced in Shell D/S and U/S facilities

Process

Tools

People

Defect Elimination contains the well known methodology of Root Cause Analysis but does not stop there DEM is a fact based and structured Problem Solving Process DEM includes the process steps that are needed to ensure that the failure does not repeat itself the effective designing out of the root cause Defect Elimination needs to be structured as Information sources are not always fully tapped Contributing/related circumstances are not always obvious and require a through investigation and understanding Root causes can go deeper than manifestations and can be located in equipment defects, organisational problems or have process related deficiencies People tend to jump to conclusions as many are close to problems and have though about possible solutions but usually in isolation without the benefit of a structured and multidisciplinary approach
Petrofed - Plant Reliability Concerns & Mitigation 18-March-2011

S.Shanmugasundaram, CPCL, Chennai

66

FMEA
Failure Mode Effect Analysis

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

67

FMEA
Failure Mode and Effects analysis is a structured qualitative analysis of a system, subsystem, component or function that highlights potential failure modes, their causes, and the effects of a failure on system operation

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

68

FMEA Methodology
All the possible failure modes for an equipment is identified Risk Priority Number is calculated for each failure mode and equipment as a whole All possible PM tasks for each failure mode is identified with man-hour requirement Failure Mode PM Task matrix is developed PM tasks are selected to cover more than 70 % of risk assessed with optimum man-hour requirement

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

69

FMEA - RPN
Calculation of Risk Priority Number for the purpose of criticality assessment. Factors
Likelihood of Failure

Severity of the failure effects


Cost to repair

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

70

Mode F -1 FM 1 FM 2 FM 3 1 2 1

F-2 7 3 9

F-3 1 4 3

RPN 7 24 27 58

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

71

FEMA RANKING CHART


Sl.No.
Failure Mode LOF

Effect CTR ABCDEFGHI JKL

Ranking

1 2 X SUM (A TO L) = Y 3 4 CRITICALITY RANKING


T=X*Y*Z

CRITICALITY RANKING (N) = sum of Ts


Petrofed - Plant Reliability Concerns & Mitigation 18-March-2011

S.Shanmugasundaram, CPCL, Chennai

72

PRODUCTIVITY TAG NO SERVICE UNIT LOSS OF SHUTD PRODUCTION OWN REDUNDANCY FACTOR "P" Factor

No.in No. service installed A 1G - 2A/B 1G 4/1G-7B 1G - 5 1G - 6A/B 1G - 7A/B 1G - 8 QUALITY Crude Booster Overhead Product Sour Water 1C-7 Boot to1E1 Water Circulation Stabilizer Feed 1C - 12 Bottom liquid COST Maint. MTBF "C" Factor Cost DELIVERY 5 5 1 1 5 1 B 2 2 1 1 4 1 C 1 1 1 2 1 1 D 2 2 1 2 2 1

RF E = C/D 0.5 0.5 1 1 0.5 1 F=A*B*E 5 5 1 1 10 1

"Q" Factor

SAFETY/ENVIRONMENTAL HAZARD VIOLATION SAFETY / DETECTIO OF "D"owntime ENVIRON N STATUTORY "S" Factor CRITICALITY Factor MENTAL PROBABIL REGULATIO RATING HAZARD ITY N

G 3 3 1 1 3 1

H 3 2 1 1 2 1

I 3 3 1 3 3 1

J=H*I 9 6 1 3 6 1

K 1 1 1 1 1 1

L 1 1 1 1 1 1
18-March-2011

M 1 1 1 1 1 1

N 1 1 1 1 1 1

O=L*M*N 1 1 1 1 1 1

P=F*G*J*K*O 135 90 1 3 180 1

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

73

5 4 3 2 1

Productivity Loss of Production Above 50 Lacs Rs. 20 to 50 Lacs Rs. 10 Lacs to 20 Lacs 5 < loss < 10 Lacs Loss less than 5 Lacs Unit shutdown Could result in unit shutdown as well as downstream unit shutdown Could result in unit shutdown Could result in throughput reduction No effect on unit operation Redundancy factor Please fill the figures

4 3 2

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

74

3 2 1

Quality Could result product getting out of spec. Could result in contamination No effect on quality

4 3 2 1 1 2 1 2

Safety SAFETY / ENVIRONMENTAL HAZARD Failure results in fatal accident / Major Env. Impact Failure results in minor injury/ Env. Impact Failure results in property loss / Minimal impact No Loss / No environmental impact STATUTORY OBLIGATION No Yes DETECTION PROBABILITY Easily detectable Remote probability
18-March-2011

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

75

Cost Maint. Cost 3 Maint. Cost / occasion more than Rs. 5 lacs 2 Maint. Cost / occasion between Rs. 2 & 5 Lacs 1 Maint. Cost / occasion less than Rs. 2 Lacs MTBF 1 IF (MTBF 3 YEARS) 2 IF (MTBF 2-3 YEARS) 3 IF (MTBF 1-2 YEARS) 4 IF (MTBF < 1 YEARS)

1 2 3 4

Delivery IF (0/1 < DOWNTIME IN DAYS/hour < 3/24) IF (3/24 < DOWNTIME IN DAYS/HOURS < 5/40) IF (5/40 < DOWNTIME IN DAYS/HOURS < 10/80) IF (EXCESS OF 10 DAYS/80 HOURS)

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

76

RCM
Reliability Centered Maintenance

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

77

RCM

A process used to determine the maintenance requirements of any physical asset in its operating context

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

78

RCM

A PROCESS TO DETERMINE PREVENTIVE MAINTENANCE TASKS TO BE DONE ON INDIVIDUAL PIECES OF EQUIPMENT IN ORDER TO PRESERVE CRITICAL PLANT FUNCTIONS WHAT SHOULD BE DONE THAN DO EVERYTHING POSSIBLE

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

79

RCM - OBJECTIVES
Preserve System Function Identify Failure Modes that can defeat the functions Prioritize Function need (via the failure modes) Select applicable and effective PM tasks

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

80

Seven basic Q s
1. What are the functions and associated performance standards of the asset in its present operating context ?
In what way does it fail to fulfill its functions ? What causes each functional failure ?

2. 3.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

81

Seven basic Q s
4. 5. What happens when each failure occurs ? In what way does each failure matter ?

6.

What can be done to predict or prevent each failure ?


What should be done if a suitable proactive task cannot be found ?

7.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

82

RCM

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

83

Preventive Maintenance Task Categories

Time Directed Condition Directed Failure Finding

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

84

Time Directed
The task action and periodicity are preset The action is known directly provide failure prevention/mitigation benefits Tasks requires some form of intrusion into the equipment

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

85

TD - Examples
Periodic overhauls (Pumps, motors etc) Time specific part replacement like filters replacement

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

86

CONDITION DIRECTED
Identification of a measurable parameter that correlates with failure onset Specification of a value of that parameter when action may be taken before full failure Tasks are non-intrusive in nature with respect to the equipment

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

87

CD - EXAMPLES
Monitoring Diff. Pressure across filters Monitoring flow parameters for deciding strainer cleaning or pump overhauls Monitoring vibration / noise to detect onset of some mechanical damage

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

88

FAILURE FINDING
Periodic surveillance tasks Availability checks Tasks directed to identify failures hidden in nature and fix the before an operational demand

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

89

FF - EXAMPLES
Check standby equipment availability Checking auto cut-in mechanism of a pump Stroke check of a control valve Ensuring tripping logic by simulation

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

90

RUN - TO - FAILURE
No PM task available PM task available but too expensive Equipment failure is low on the priority list for the existing set-up

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

91

PRESENT PM PRACTICE
Determines what can be done for failure prevention than why it should be done Preserve Equipment not Preserve Function

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

92

RCM - Methodology
The refinery is divided into System & Sub-System using P & I Drawings. Functions of each Sub-system is defined All the hardware are listed In / Out interface of the system defined Functional block diagram is developed All possible functional failures are identified and listed Functional failure and Equipment Matrix is drawn. All possible failure Modes and causes for all the functional failures are identified. Failure Mode Effect Analysis is carried out at Local, System and Plant Level.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

93

RCM Methodology contd..


Logic Tree Analysis is performed on all the possible failure causes and effects. Failure Modes are classified based on the effect ( Safety and Outage) PM tasks which can improve the functional performance of the system are selected. Carry out task comparison Sanity check Consolidation of PM Schedules and RCM recommendations.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

94

466. .

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

95

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

96

Clarity
Turnaround / Planned shutdown: Maintenance activity required to undertake work that cannot be accomplished while plant is in operation Unplanned Shutdown : Usually unscheduled as a result of equipment failure or process upset

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

97

Necessity for a Turnaround


Successful plant turnaround management should lead to better asset leverage and increased organizational profitability

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

98

Objective of a Turnaround
Bring plant and equipment to their optimal health Make plants safe to operate till next outage Enhance plant life Improve efficiency and throughput of plant by suitable modification Reduce routine maintenance costs Increase reliability / availability of equipment during operation Upgrade technology by introducing modern equipment and techniques
18-March-2011

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

99

Objective of a Turnaround
To avoid surprises Up-gradation of critical equipment Review on stream factor and remove primary causes of shutdowns Increased productivity / profitability

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

10

Planning Cycle
Planning cycle of next turnaround shall start with review of the just concluded turnaround

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

10

PLANNING CYCLE
Time 0 Year 1 Begin planning Long lead items Budget approval Review TA scope Pre-turnaround jobs Review contractor availability Formulate tendering strategy Review resources Finalise TA organisation Work scope cut off Freeze work scope Procure material Award Contracts Schedule activities Mobilise resources Shutdown unit Start-up unit Review turnaround success
10

Year 2

Year 3

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Equipment repaired to capability that meets business needs

Decision based on accurate input of relevant facts & data to work list

Reliable turnaround performance

Zero failures during start-up

Able to produce to max. limits

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

10

Work packaging
Systemisation Standardisation Cut-off date Clarity Self sufficient Spares details Tools requirement Specifications Activity details Inspection requirements Technical data
18-March-2011

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

10

Integration
Process performance Operations Inspection Maintenance Statutory Safety Maintenance Reliability Projects Customer
18-March-2011

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

10

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

10

Achieving Availability
Plant Availability

Sustainable 1st Quartile Performance

Asset Flexibility
Systems Availability Asset Stability

Equipment Reliability

Operational Reliability

Support Processes

Operations Maint.& Implementatio Reliability n & Flawless Processes Start-up

Information Contracting & Management Procurement Tools

Foundation

Business Risk Techniques

Performance Management

Objectives, Targets and KPIs

Integrated Cost Management

Fit for Design for Purpose IT Reliability & Structure LCC

We want the kit to run at maximum margin for optimum costs


Petrofed - Plant Reliability Concerns & Mitigation 18-March-2011

S.Shanmugasundaram, CPCL, Chennai

10

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

10

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

10

Safety & Environment


Organisation
Oil Industry Safety Directorate Fire & Safety Department Environment Protection & Process Safety Department Occupational Health Services Central Safety Committee Area Safety Committees

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

11

Safety & Environment


Activities
External safety Audit Internal Safety Audit Safety Surveillance Night visits Monthly Safety talk Safety day / contests Seminars Onsite Emergency Plan / Organisation Offsite Emergency Plan / Organisation Mock drills Safety training Mandatory Tool box safety talk
111

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

Safety & Environment


Systems / Procedures
Permit System
Cold work Hot work Height work

Safety manuals Penalty for non compliance Bonus for safety performance Fire alarm Mutual Aid

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

11

How do we build Reliability? Each item of equipment performs a function.


A pump moves fluid around a system A heat exchanger exchanges heat between two fluids Pipes and vessels contain the fluids A motor powers rotating or moving equipment.

Maintenance re-establishes or preserves the function Unplanned Reactive or breakdown maintenance More of this has the potential to reduce reliability Proactive or preventative maintenance More of this improves reliability

Petrofed - Plant Reliability Concerns & Mitigation

113

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

11

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

11

Chennai Petroleum Corporation Ltd.


(A Group company of IndianOil)

H2S rich gas leak in Vis-Breaker Unit


due to multiple breakages of small bore pipe fittings in Pulsation Dampeners of Reciprocating Compressor (204K3B)

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

11

The incident
23rd August 2010 Midnight Mild drop in Suction pressure observed Panel Officer alerted Field Operator.

No response from the Field Operator

Shift in-Charge along another operator followed

Field operator found unconscious.


He was rushed to the nearby Hospital. On arrival he was declared dead.
11

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

The operator was found here and the Compressor was found stopped

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

11

Unit Description
CPCL Vis-Breaker Unit VBU (Plant 204) 1 2 3 Year of commissioning Capacity Feed 2004 1.15 MMTPA (140 M3/Hr) VR from Crude Unit. (Unit is capable of processing 20% PDA-Pitch however no pitch intake on the day of incident) ABB Lummus (Shell Soaker Vis-breaking Technology) M/s. Engineers India Limited M/s Kvaerner E&C, Australia M/s. Petrofac International Limited M/s. Dresser Rand 24 & 14 X 10 2HHE-FB2 1st Stage Suc/dis Pr. : 0.49 / 3.4Kscg 2nd Stage Suc/dis Pr. :3.3 / 13.3 Kscg Capacity 3085 NM3/Hr
18-March-2011

4 5 6 7 8

Licensor Consultant Detailed Engineering LSTK Contractor Compressor Make

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

11

PT-204 VBU PROCESS FLOW


225 Feed
C-1 R-1

9.1 425

Pressure, Kscg Temp, C

E-22

295
F-1

445

Sour water from C-21A/B

G-2

E-28

E-1

Sour water from C-9/C-11

Gas + Naphtha 1.2


E-5 C-7 E-6 E-7 SW to B/L G-7 C-8 G-10 Stabilize r E-12 C-14 VGO C-11 C-10 K-3 M E-8 E-9 C-9

VB Offgas

Soaker Effluent Quench

C-5

Gas oil

Vacuum Flasher

E-13

G5

E-10

Naphtha
G-13 VFCR

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

204 K3B FLOW SKETCH


Pressure, Kscg Temp, C
TI-2811 C-41B LIC2804 LIC-2803

PI-2810

50

0.85 40
C-45B

CBD compressor

C-21B

II
12.4 102
C-42B

I
3.8 105
C-44B

0.95
C-8 C-11

LIC-2802

PDT-2808

PDT-2808
E-7

E-8

E-6

E-9

LV-2802

E-33B

FL

VB Gas to B/L C-9


C-11 off gas

From C-7

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

Chronological events
1:08:00.000 204 PI2801- fist stage suction volume bottle pressure started dropping down from 0.84 Kg/cm2g. (Safe range 0.57 to 0.67 Kg/cm2g) H2S concentration in this area increased from 0 to the maximum value 50PPM) as per PIN trend. CS tag not indicated. Re-contacting drum C-9 O/L pressure controller, 204PIC-2901 started closing to maintain the set pressure of 12.5 Kg/ cm2g. 204FI2901VB gas to B/L low (447 Nm3/ hr). DCS alarm. A204PI2806 Suction pressure in K3B2 low (2.96 Kg/cm2 g). DCS alarm. %D 204 YL 2801 K3B status indication off.(Motor run contact withdrawn ). Motor stopped. PLC - Sequence of Events data.

1:12:37.000

1:14:00.000

1:17:00.000 1:22:16.550 1:22:56.131

1:23:06.650

204K3B stop alarm. DCS alarm.


Panel in-charge received information from field about a possible gas leak. Mr.Rajendran was found unconscious at plant.
18-March-2011

1:30:00.000

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

12

Observation:
Steam heating for suction bottles and inter stage KOD was kept isolated. (From OVHD) Steam heating to the volume bottles was kept isolated. Take off for suction is taken from bottom of the header for both the compressors Compressor 2nd stage suction volume bottle pressure gauge, boot LT- drain, 2nd stage discharge volume bottle pressure gauge, suction & discharge DP transmitter lead line were found broken and breakages occurred at high stress concentrated areas. Connected nozzles were provided with supports in one plane instead of minimum two and the overhung weight is not kept at minimum as per API 618 Online vibration monitor is not available.

Hooter and Beacon light did not function due to card failure.
Operator did not carry portable gas monitor.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

Typical arrangement of level indicators & pressure gauge connections in 204 K-03A (LI isolation valve oriented 180 deg opposite & not insulated ).

Failure of Drain nipple of Level indicator Pressure gauge connection (both sheared & disconnected) LI vent found bent in second stage suction bottle of compressor 204-K-03B
18-March-2011

Petrofed - Plant Reliability Concerns & Mitigation

S.Shanmugasundaram, CPCL, Chennai

12

Observation
Small bore Instrumentation pipe fittings in 204K3B second stage suction & discharge volume bottle were found broken at 6 locations and lying on the ground/platform.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

Findings:
API-618 (regarding nozzle supports) was not followed. Compressor suction take off was not from top of the header. KOD is not provided for first stage from inception. The responsibility for checking the conformity to the standards for fixing overhung fittings is not clearly visible in LSTK contracts (EIL, Petrofac, Kvaerner and Dresser Rand). Suction volume bottles has inherent design fault to drain liquid completely. Compressor operated at 100% load when the available gas is around 30%. H2S range for the detector is found configured in % instead of ppm. Alarm did not appear in DCS

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

Findings:
2nd stage suction volume bottle boot LIC 2804 was showing constant reading of -0.60% for long time. Vibration monitoring systems were not effective and objective. H2S detector measuring unit configured wrongly from commissioning. Involvement of Operations / Safety personnel in detector calibration is missing. The hooter and beacon light system failed..

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

Marking of piston hit on end cover was noticed in 204K3B second stage. Clearance between piston and head reduced to nil from 4.5 mm. ( Head of K3A compressor

Piston hitting impression on Head and scales due to water


Petrofed - Plant Reliability Concerns & Mitigation 18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

2nd stage suction volume bottle

Suction pipe blocking the water flow to boot

Corrosion due to presence of stagnant water

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

12

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

13

Additional Input:
OEM Compressor experienced liquid entry during commissioning stage and the other compressor suffered a major damage after one year of operation. Piston lock nut thread found damaged. API 618 was not followed for providing supports and to keep the weight of overhanging part to minimum. Compressor 2nd stage observed liquid carry over due to which heavy load was experienced by piston rod. (Torque nuts from cross heads opened.)

IOC

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

13

Additional Input:
IIT-Madrs - Fractographic surface analysis of the crack initiation point showed brittle fracture and later stage of failure revealed ductile type of fracture surface. This indicates that failure is progressive with initial propagation of crack by sulphide stress cracking and subsequently failing due to tensile over load when the vibration levels have gone up. This further justifies the phenomena of multiple failures at the same intense. Fracture analysis revealed sulphide stress cracking due to presence of wet H2S. The gas is 12% H2S rich and presence of moisture is confirmed as the scales are visible in suction volume bottle, cylinder chamber and piston head.
Petrofed - Plant Reliability Concerns & Mitigation 18-March-2011

S.Shanmugasundaram, CPCL, Chennai

13

Lessons learned
Healthiness of Gas detection and alarm systems are to be ensured positively at all time and calibration should be done at least once in a month involving Operating / Safety personal. Carrying of portable gas monitors and hand held radio is must for operating personnel in hazardous area. Pre-Commissioning Safety audit on new facilities should focus on compliance to all standards as per the requirement in Design, Supply, Erection and Commissioning. Operating parameters are to maintained as prescribed in the manual and any change shall be entertained only through MoC. In case of operation of an equipment away from the design conditions is warranted then the with close monitoring. Auto draining and other protection systems are to be checked periodically in compressors handling condensable gas, to avoid liquid entry.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

13

Lessons learned
Online vibration monitoring and trip should be installed on critical equipments like this. Operating the equipment within design parameters as recommended by the OEM /Licensor Improve awareness and the preparedness which are required for handling hazardous gas leak scenarios. Provide sufficient escape routes with proper lighting and ventilation. Operating personnel should enter into hazardous area with hand held Radio and Gas monitors, especially during abnormal conditions. Operator should be more cautious when entering the hazardous area alone in odd hours.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

13

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

13

POLICY

ENSURE SAFE, HEALTHY, PROFITABLE ENVIRONMENT, BY MAKING THE ASSETS PERFORM CONSISTENTLY AT THE DESIRED LEVEL, THROUGH RELIABILITY ENGINEERING.

Petrofed - Plant Reliability Concerns & Mitigation

18-March-2011

S.Shanmugasundaram, CPCL, Chennai

13