DAFTAR HARGA SATUAN UPAH KERJA

TAHUN ANGGARAN 2012

NO.

URAIAN TENAGA KERJA

SATUAN

HARGA SATUAN
(Rp.)
4

Mandor

HOK

53,000.00

Kep. Tukang Gali Tanah

HOK

46,000.00

Kep. Tukang Batu

HOK

51,000.00

Kep. Tukang Kayu

HOK

51,000.00

Kep. Tukang Besi

HOK

51,000.00

Kep. Tukang Cat

HOK

50,000.00

Kep. Tukang Listrik

HOK

55,125.00

Tukang Gali Tanah

HOK

36,900.00

Tukang Batu

HOK

46,000.00

10

Tukang Kayu

HOK

49,000.00

11

Tukang Besi

HOK

47,000.00

12

Tukang Cat

HOK

42,400.00

13

Tukang Listrik

HOK

48,000.00

14

Tukang Aspal

HOK

44,400.00

15

Tukang Politur

HOK

43,600.00

16

Pekerja

HOK

35,000.00

17

Buruh Terampil

HOK

38,000.00

18

Buruh Tak Terampil

HOK

34,000.00

19

Operator Terampil

HOK

54,100.00

20

Pembantu Operator

HOK

39,500.00

21

Sopir Terampil

HOK

57,100.00

22

Pembantu Sopir

HOK

36,500.00

23

Masinis

HOK

50,166.67

24

Kernet

HOK

35,625.00

25

Penjaga

HOK

33,750.00

26

Penjaga Api

HOK

37,500.00

27

Penganyam

HOK

40,000.00

Tuban,

KETERANGAN

Januari 2012

KEPALA BIDANG TATA RUANG DAN PEMUKIMAN

Ir. S A T R I Y O

NIP. 19590405 199003 1 005

DAFTAR HARGA SATUAN BAHAN


TAHUN ANGGARAN 2012
NO.

JENIS / NAMA BAHAN

SATUAN

I
1
2
3
4
5
6
7
8

BAHAN TANAH / PASIR


Tanah Urug
Pasir Urug
Pasir Cor
Pasir Lokal / Pasir Kali
Pasir Batu/ Sirtu Alam Hitam
Pasir Pasang
Pedel
Pasir Grosok

II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

BAHAN BATU
Batu Brongkol
Batu Kali hitam
Kerikil kali
Kerikil hias
Batu Pecah 3-5 mesin
Batu Pecah 2-3 mesin
Batu Pecah 1-2 mesin
Batu Pecah 1/2-1 mesin
Batu Pecah 5/7, 6/8 tangan
Batu Pecah 3/5 tangan
Batu Belah 20/25 tangan
Batu Belah 15/20 tangan
Batu Bata Kw. 1
Batu Bata Kw. 2
Batu Putih Lokal / kumbung
Pavingstone Beton Blok 6 Cm warna (K.200)
Pavingstone Beton Blok 6 Cm abu-abu ( k.200)
Pavingstone Beton abu-abu 8 cm (k.300)
Pavingstone Segienam Abu - abu 6 cm K 200
Pavingstone Segienam Warna 6 cm K 200
Pavingstone Segienam Warna tanpa K tb. 6 cm
Pavingstone Segienam Abu - abu tanpa K tb. 6 cm
Kerep uk. 0175x0,2x0,3x0,6
Batu Palimanan uk.10/20 kasar
Batu Palimanan uk.15/15 halus
Batu Palimanan uk.15/30
Batu Palimanan uk.20/20 halus
Batu Palimanan uk.20/30 halus
Batu Palimanan uk. 5/20
Batu Palimanan uk. 10/10
Batu Palimanan uk. 20/40
Batu Palimanan uk. 25/25
Batu Palimanan uk. 30/30
Batu Palimanan Hijau Segala Ukuran
Batu Candi
Ornamen Batu Paras uk. 25/25
Ornamen Batu Paras uk. 20/20
Ornamen Batu Paras uk. 15/15
Ornamen Batu Paras uk. 20/40
Ornamen Batu Paras uk. 10/10
Ornamen Batu Paras uk. 30/30
Ornamen Batu Paras uk. 40/40
Batu Gilang Hitam / Lempeng
Batu Raen Hitam
Batu Raen Kuning / Putih
Batu Alur Andesit
Batu Candi Alur / Beton
Beton alur 20X40 cm
Lis Beton / Batu Alam 40 cm
3

HARGA SATUAN
(Rp.)
4

m3
m3
m3
m3
m3
m3
m3
m3

63,250.00
74,250.00
141,710.00
85,800.00
102,666.67
102,116.67
66,660.00
137,500.00

m3
m3
m3

82,775.00
97,900.00
60,500.00
50,050.00
194,857.14
212,850.00
224,675.00
189,200.00
69,575.00
103,675.00
66,550.00
73,700.00
889.17
733.33
1,003.75
50,600.00
45,540.00
60,500.00
45,100.00
50,600.00
38,940.00
35,200.00
49,500.00
74,800.00
79,016.67
81,400.00
82,500.00
87,083.33
72,966.67
71,500.00
89,833.33
85,983.33
96,800.00
90,750.00
107,250.00
85,250.00
88,000.00
77,000.00
99,000.00
11,000.00
38,500.00
57,750.00
42,625.00
385.00
275.00
143,000.00
126,500.00
66,000.00
18,150.00

m3
m3
m3
m3
m3
m3
m3
m3
bj
bj
bj
m2
m2
m2
m2
m2
m2
m2
bj
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
m2
bj
bj
m2
m2
m2
bh

KETERANGAN
5

NO.

JENIS / NAMA BAHAN

SATUAN

1
50
51
52
53

2
Batu Alur Marmer 20x20 cm
Batu Alur Marmer 30x30 cm
Batu Alur Marmer 40x40 cm
Roster Terawang

3
m2
m2
m2
Bj

HARGA SATUAN
(Rp.)
4
121,000.00
132,000.00
143,000.00
5,000.00

III
1
2
3

BAHAN SEMEN / PC
Semen 40 kg
Semen Putih 40 kg
Semen Warna

zak
zak
kg

56,100.00
78,100.00
6,500.00

IV
1
2

BAHAN KAPUR
Kapur Bubuk / Kapur Pasang
Kapur Gamping

m3
kg

199,833.33
3,162.50

V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

BAHAN BESI
Besi Beton Polos (tulangan)
Besi Beton Ulir
Besi Beton Polos 16 mm Panjang 12 m
Besi Beton Polos 12 mm Panjang 12 m
Besi Beton Polos 10 mm Panjang 12 m
Besi Beton Polos 8 mm Panjang 12 m
Besi Beton Polos 6 mm Panjang 12 m
Besi Beton Polos 5 mm Panjang 12 m
Baja Konstruksi
Besi WF 150 Berat/Batang 168 kg
Besi WF 200 Berat/Batang 256 kg
Besi WF 250 Berat/Batang 355 kg
Besi WF 298 Berat/Batang 375 kg
Besi WF 300 Berat/Batang 432 kg
Besi WF 346 Berat/Batang 485 kg
Besi WF 350 Berat/Batang 584 kg
Besi WF 396 Berat/Batang 664 kg
Besi WF 400 Berat/Batang 778 kg
Besi WF 450 Berat/Batang 893 kg
Besi WF 500 Berat/Batang 1.053 kg
Besi WF 588 Berat/Batang 1.763 kg
Besi WF 600 Berat/Batang 1.238 kg
Besi Siku
Kawat Beton / Bendrat
Kawat Bronjong ( f 42,7 mm ) BMG 10
Besi Sheet Pile (400mm x 100mm X 10,5mm X 12m)
Besi strip

kg
kg
ljr
ljr
ljr
ljr
ljr
ljr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

9,900.00
10,560.00
158,007.14
89,283.33
61,600.00
40,700.00
24,860.00
16,280.00
14,535.00
12,100.00
11,550.00
11,550.00
12,100.00
12,650.00
12,650.00
12,650.00
12,650.00
11,700.00
11,700.00
11,700.00
11,700.00
11,700.00
8,250.00
19,030.00
16,500.00
12,100.00
14,500.00

VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

BAHAN KAYU
Ky. Jati balok ( Macam-macam Ukuran kelas 1 )
Ky. Jati Papan ( Macam-macam Ukuran kelas 1 )
Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. I
Ky. Kamper Papan 2/20, 3/20 = 4m kw. I
Ky. Kamper Usuk 5/7, 4/6 = 4m kw. I
Ky. Kamper Reng 2/3, 3/5 = 4m kw. I
Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. II
Ky. Kamper Papan 2/20, 3/20 = 4m kw. II
Ky. Kamper Usuk 5/7, 4/6 = 4m kw. II
Ky. Kamper Reng 2/3, 3/5 = 4m kw. II
Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. I
Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. I
Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. I
Ky. Bengkirai Reng kw. I
Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. II
Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. II
Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. II
Ky. Bengkirai Reng kw. II
Ky. Meranti Balok 8/12, 6/12 = 4 m kw. I
Ky. Meranti Papan 2/20, 3/20 = 4 m kw. I
Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. I

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

11,000,000.00
12,460,000.00
7,700,000.00
8,847,142.86
6,128,571.43
5,028,571.43
6,875,000.00
8,800,000.00
4,950,000.00
4,317,500.00
7,768,750.00
8,786,250.00
6,084,375.00
5,293,750.00
6,992,857.14
8,030,000.00
4,730,000.00
4,436,666.67
4,739,166.67
4,968,333.33
3,593,333.33

KETERANGAN
5

Semen Gresik
Tiga Roda

NO.

JENIS / NAMA BAHAN

SATUAN

HARGA SATUAN
(Rp.)
4
4,418,333.33
4,675,000.00
4,400,000.00
3,031,875.00
4,950,000.00
2,970,000.00
198,000.00
35,000.00
17,600.00
4,022,857.14

1
23
24
21
22
25
26
27
28
29
30

2
Ky. Meranti Balok 8/12, 6/12 = 4 m kw. II
Ky. Meranti Papan 2/20, 3/20 = 4 m kw. II
Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. II
Ky. Meranti Reng
Ky. Papan Begesting 2/20 = 4 m
Ky. Acuan / cetakan
Dolken dia. 16X19 cm Pj. 4m
Dolken dia. 8 cm Pj. 4m
Bongkotan Pj. 3 m
Ky. Gelam Balok 6/12 & 8/12

VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

BAHAN PIPA PARALON / PVC / 4M


Pipa PVC 1/2" AW
Pipa PVC 3/4" AW
Pipa PVC 1" AW
Pipa PVC 1 1/4" AW
Pipa PVC 1 1/2" AW
Pipa PVC 2" AW
Pipa PVC 3" AW
Pipa PVC 4" AW
Pipa PVC 6" AW
Pipa PVC 8" AW
Pipa PVC 10" AW
Pipa PVC 12" AW
Talang PVC f 4" = 4m
Knee PVC f 3/4"
Klem PVC
Socket PVC f 3/4"
Lem PVC Isarflas
Seal Tape

VIII
1
2
3
4

BAHAN TEGEL
Tegel abu-abu 20x20 cm
Tegel Plin abu 15x20 cm
Tegel wafel 20x20 cm
Tegel teraso 30x30 cm

m2
m2
m2
m2

35,200.00
35,200.00
35,200.00
-

IX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

BAHAN KERAMIK
Keramik 10x20 cm Mulia KW 1
Keramik Kembang 20x20 cm Kw. I Mulia
Keramik Kembang 20x25 KW 1 Roman
Keramik Kembang 20x25 KW 1 Asia
Keramik Kembang 20x25 KW 2 Asia
Keramik Motif 20x25 Kw. I Kobin
Keramik Motif 20x25 Kw. I Yupiter
Keramik Polos 20x25 Kw. I Mulia
Keramik Polos 20x25 Kw. I Asia
Keramik Sembur 30x30 cm KW 1 Mulia
Keramik Polos ( 30x30 cm ) KW 1 Mulia
Keramik Polos ( 30x30 cm ) KW 1 Roman
Keramik Polos ( 30x30 cm ) KW 2 Roman
Keramik Motif 30x30 Kw. I
Keramik Motif 30x30 Kw. I Yupiter
Keramik Motif ( 40x40 cm ) KW 1 Platinum
Keramik Motif ( 40x40 cm ) KW 1 Yupiter
Keramik Motif ( 40x40 cm ) KW 1 Arwana
Keramik Motif ( 40x40 cm ) KW 2 Arwana
Keramik Motif ( 40x40 cm ) KW 1 Garuda
Keramik Motif ( 40x40 cm ) KW 1 Indogres
Keramik Polos ( 40x40 cm ) KW 1 MAS
Keramik Kembang 50x50 cm KW 1 Milan
Keramik Motif 50x50 cm KW 1 Milan
Keramik Motif 50x50 cm KW 1 Platinum
Keramik Motif 60x60 cm KW 1 Platinum
Keramik Motif 25x40 cm KW 1 KIA

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

42,240.00
40,333.33
51,700.00
55,000.00
46,750.00
46,650.00
35,750.00
38,500.00
39,600.00
35,475.00
31,114.29
37,766.67
35,200.00
44,000.00
37,510.00
54,780.00
46,750.00
53,350.00
40,700.00
44,000.00
132,000.00
36,850.00
84,700.00
74,800.00
71,500.00
126,500.00
71,500.00

3
m3
m3
m3
m3
m3
m3
bt
bt
bt
m3

ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
bh
bh
bh
kaleng
bh

23,818.67
28,261.33
31,882.67
50,709.87
66,210.67
99,209.60
183,780.80
263,696.53
597,200.80
928,636.80
1,324,069.60
1,892,912.00
73,920.00
1,437.33
840.00
1,456.00
6,626.67
2,500.00

KETERANGAN
5

Maspion

NO.

JENIS / NAMA BAHAN

SATUAN

HARGA SATUAN
(Rp.)
4
52,250.00
3,300.00
4,400.00
921.25
1,003.75
44,000.00
31,900.00
27,500.00
26,400.00
17,600.00
24,750.00
18,700.00
19,800.00
269,500.00
500,000.00

1
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

2
Keramik Motif 20x33 cm KW 1 Platinum
Border list 5x20 cm
Border list 7x20 cm
Kuku Macan Polos
Kuku Macan Ulir / Kembang
Roster Keramik (Besar)
Roster Keramik (Kecil)
Roster tanpa warna 40x40 cm
Roster tanpa warna 30x30 cm
Roster tanpa warna 30x60 cm
Roster tanpa warna 30x80 cm
Glass Blok Kecil
Glass Blok Besar 20x20 cm
Granito 60 x 60 cm
Marmer 100 x 100 cm

3
m2
bj
bj
bj
bj
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2

X
1
2
3
4
5
6
7
8
9

BAHAN BUIS BETON


Buis beton bulat Dia 15 # 1 m
Buis beton bulat Dia 20 # 1 m
Buis beton bulat Dia 20 # 1/2 lingk.
Buis beton bulat Dia 30 # 1 m
Buis beton bulat Dia 30 # 1/2 lingk.
Buis beton bulat Dia 40 # 1 m
Buis beton bulat Dia 60 # 1 m
Buis decker Dia. 60 cm 1/2 lingk.
Buis beton Uk. 80x50 cm

bh
bh
bh
bh
bh
bh
bh
bh
bh

26,125.00
33,825.00
17,875.00
49,500.00
24,750.00
63,250.00
65,560.00
49,500.00
74,250.00

XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

BAHAN GENTENG
Genteng Pres
Genteng Bubungan Pres
Genteng Beton Besar isi 9,5 (buah) polos
Genteng Beton Kecil Isi 11 ( buah )
Bubungan Beton
Genteng Jatiwangi isi 14,5 Bj/m2
Wuwung Jatiwangi 3,5/m'
Genteng Keramik KIA Kecil
Bubungan Keramik KIA
Genteng Karangpilang Goodyear isi 21 bh
Bubungan Karangpilang goodyear
Genteng Kodok Ex. Wisma ( Kw. 2 )
Genteng Kodok Ex. Wisma ( Kw. 1 )
Genteng Karangpilang wisma isi 21 bh
Bubungan wisma
Genteng Pres Super mutiara soka Kebumen isi 25 bh
Bubungan mutiara sokka kebumen
Genteng Pres lokal SGN Purwodadi (kodok) isi 21
Bubungan SGN
Jatiwangi Morando Atlas isi 21 bh (bakar gas)
Jatiwangi Morando Atlas isi 21 bh (bakar kayu)
Genteng Beton Besar isi 9,5 buah berwarna
Ornamen Wuwung sedang
Ornamen Wuwung besar

bj
bj
bj
bj
bj
bj
bj
bj
bj
bh
bh
bj
bj
bh
bh
bh
bh
bh
bh
bh
bh
bj
bh
bh

858.00
1,815.00
2,970.00
2,750.00
4,653.00
4,840.00
6,050.00
7,535.00
44,825.00
2,750.00
4,290.00
2,933.33
3,116.67
2,750.00
3,850.00
2,035.00
3,300.00
785.71
3,135.00
2,750.00
2,090.00
3,300.00
38,500.00
69,666.67

XII
1
2
3
4
5
6
7

BAHAN ASBES
Asbes Gel. Kecil 3,05 x 1,05 # 4 mm ( ex. Gresik )
Asbes Gel. Besar 3,05 x 1,05 # 4 m ( ex.Gresik )
Asbes Plat 1 x 1 m Gresik
Asbes Plat 1 x 1 m Atrisco
Papan Gibsum
Nok Asbes Gelombang Besar Atrisco
Nok Asbes Gelombang Kecil Atrisco

lbr
lbr
lbr
lbr
lbr
lbr
lbr

106,150.00
109,725.00
13,310.00
13,566.67
52,433.33
53,075.00
28,526.67

XIII
1

BAHAN KACA
Kaca Polos / Bening 3 mm 122X155

m2

49,500.00

KETERANGAN
5

HARGA SATUAN
(Rp.)
4
66,000.00
77,000.00

NO.

JENIS / NAMA BAHAN

SATUAN

1
2
3

2
Kaca Polos 5 mm
Kaca Rayban 5 mm

3
m2
m2

XIV
1
2
3
4
5
6
7

BAHAN TRIPLEK
Triplek 122 x 244 x 4 mm
Triplek 110 x 210 x 3 mm
Teakwood 122 x 244 x 4 mm
Teakwood 110 x 210 x 4 mm
Tripleks Lapis Aluminium
Kalsibout Uk. 2,44 x 1,22 m x 3,5 mm
Multiplek / Flywood tb. 9 mm

lbr
lbr
lbr
lbr
lbr
lbr
lbr

57,585.00
46,828.57
77,916.67
68,750.00
83,875.00
58,643.75
138,050.00

XV
1
2
3
4

BAHAN SENG GELOMBANG


Seng Gel. BJLS 30.30 # 3 m
Seng Gel. BJLS 30.30 # 1,8 m
Seng Plat datar BJLS 30.45 # 1 m 8mm
Seng Gel. BJLS 0,2 x 80 # 3 m

lbr
lbr
lbr
lbr

121,733.33
74,158.33
107,250.00
67,375.00

XVI
1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN ALAT PENGGANTUNG & PENGUNCI


Kunci Merk Kuda Terbang 2 X putar
Kunci Merk Anchor 2 X putar
Kunci Merk Union 2 X putar
Kunci selot (KM/WC)
Engsel Nylon ARCH Asli (pintu)
Engsel Nylon ARCH kecil
Grendel pintu tanam
Grendel besar
Grendel kecil
Grendel Pring Kenit Kuningan
Hak Angin Panjang (Cantolan)
Hak Angin Sikutan
Pintu Plastik PVC 2 m x 0,70
Pintu Plastik Germin 2 m x 0,70

unit
unit
unit
unit
set
set
bh
bh
bh
bh
stel
stel
bh
bh

58,378.57
84,700.00
49,500.00
46,200.00
10,862.50
8,800.00
25,000.00
22,550.00
8,616.67
10,230.00
8,800.00
10,266.67
145,000.00
225,000.00

XVII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN SANITASI
Kloset Jongkok Porselin
Kloset Duduk Porselin (Monoblok) Warna Muda
Kloset Duduk Porselin Warna Muda
Kloset Duduk Porselin Komplit (Monoblok)
Sarangan Air / Avour (Stainlessteel)
Kurasan Air Kuningan
Avour biasa
Kurasan Air Plastik
Kran Air f 3/4" Sedang
Kran Air Wastafel
Urinoir
Sink Stainlees steel (1 bak cuci)
Bak Mandi Fiberglass
Wastafel
Wastafel Besar INA
Wastafel Besar PINK
Bak WC Plastik

bh
set
set
set
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

107,387.50
1,200,000.00
423,500.00
1,600,000.00
36,928.57
16,971.43
15,000.00
5,000.00
30,250.00
50,000.00
175,000.00
180,000.00
220,000.00
385,000.00
130,000.00
175,000.00
197,500.00

XVIII
1
2
3
4
5
6
7
8
9

BAHAN PAKU
Paku Reng
Paku Usuk
Paku Triplek
Paku Seng
Paku Jembatan
Paku Kalsibout
Paku Sumbat
Paku Beton
Paku Asbes / paku payung

kg
kg
kg
kg
bj
kg
bj
bj
kg

14,223.00
13,343.00
18,656.00
25,928.57
14,300.00
24,322.20
385.00
3,674.00
27,500.00

KETERANGAN
5
Asahimas

Kuda Terbang
Anchor
Union

INA
INA
INA
TOTO

NO.

JENIS / NAMA BAHAN

SATUAN

1
XIX
1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN LISTRIK
Lampu TL 18 / 20 watt komplit
Lampu TL 36 / 40 watt komplit
Lampu Pijar 10 watt
Lampu Pijar 15 watt
Lampu Pijar 25 watt
Lampu Pijar 40 watt
Lampu Pijar 100 watt
Lampu Pijar warna 5 watt
Lampu Spot Light 100 W (warna) PNR 38/80 watt
Sakelar tunggal
Saklar Ganda
Stop Kontak
Sekring Otomatis 6 Amp
Sekring Otomatis 10 Amp

XX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

BAHAN CAT
Cat Kayu / Besi
Cat Tembok 5 Kg
Cat Tembok 5 Kg
Cat Genteng
Cat Genteng Super Gloss
Minyak Cat / Thiner B
Cat Hermplastic
Lem kayu
Meni Kayu
Meni besi
Plamir Tembok 5 kg
Plamir untuk Plituran
Plamir Kayu Pedang
Cat Biru Berlin
Cat Hitam Gading
Cat Putih seng
Cat Kolam Rettar
Kertas Gosok 02
Kuas
Soda api
Vernis
Politur
Dempul / Wood filter
Pewarna / Wood sten
Melamine Seanding sealer
Melamin lack (glass / dop)
Compound
Spiritus
Serlaag India ( Warna Kuning Tua Tipis )
Batu Kambang
Kain Pop
No Drop

XXI
1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN LAIN - LAIN


Solar ( Umum )
Gemuk / Grase ( Stempet )
Gemuk / Grase ( Alat Berat )
Dek Baut
Teer
Bron Ach
Minyak Tanah ( umum )
Premium
Aspal Curah
Aspal Drum
Minyak Solar (Industri)
Minyak Tanah (Industri)
Kayu Bakar
Minyak Pelumas
8

HARGA SATUAN
(Rp.)
4

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

83,050.00
100,650.00
3,960.00
3,960.00
4,015.00
4,125.00
4,950.00
3,245.00
65,450.00
12,925.00
16,225.00
13,750.00
99,275.00
109,450.00

kg
Galon
Galon
Galon
Galon
ltr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
lbr
bh
kg
ltr
ltr
kg
kg
kg
kg
kaleng
ltr
kg
kg
lbr
kg

58,300.00
70,537.50
77,000.00
116,668.75
222,750.00
17,710.00
82,500.00
17,500.00
20,507.14
20,507.14
44,000.00
27,500.00
19,595.71
57,860.00
55,110.00
45,173.33
72,930.00
3,272.50
9,900.00
27,500.00
36,300.00
70,400.00
44,000.00
57,500.00
57,500.00
60,500.00
38,500.00
13,475.00
75,130.00
26,400.00
27,500.00
34,500.00

ltr
kg
kg
bh
kg
kg
ltr
ltr
kg
kg
ltr
ltr
m
ltr

4,500.00
13,700.00
39,000.00
10,000.00
8,200.00
29,150.00
7,000.00
4,500.00
8,000.00
9,600.00
12,400.00
7,460.00
214,500.00
24,400.00

KETERANGAN
5

Broco
Broco
Broco

Emco
Paragon
Decolith

Emco
Emco
Emco

NO.

JENIS / NAMA BAHAN

SATUAN

1
15
16
17
18
19
20
21
22
23
24
25

3
ltr
kg
jam
set
lbr
ljr
kg
kg
kg
lbr
kg

Oli SAE 40
Stempet
Compressor
Alat Bantu
Gedek Guling
Bambu Petung
Timah Hitam
Plat L
Plat U ( KAVEL )
Karung Plastik ( Glangsing )
Ijuk

Tuban,

HARGA SATUAN
(Rp.)
4
27,500.00
13,700.00
105,600.00
71,500.00
55,000.00
16,500.00
21,780.00
15,950.00
15,950.00
3,300.00
4,950.00

Januari 2012

KEPALA BIDANG TATA RUANG DAN PEMUKIMAN

Ir. S A T R I Y O

NIP. 19590405 199003 1 005

KETERANGAN
5

PEMERINTAH KABUPATEN TUBAN

DINAS PEKERJAAN UMUM


ANALISA HARGA SATUAN BAHAN DAN UPAH TENAGA
APBD TAHUN ANGGARAN 2012

PEKERJAAN PERSIAPAN / SNI 03-2835-2002


1.

2.

3.

4.

5.

6.

1 M'

1 M

1 M'

1 M2

1 M3

1 M3

PENGUKURAN DAN PEMASANGAN BOUWPLANK


3
0.0120 m
Kayu gelam 5/7
3
0.0070 m
Kayu papan begesting
0.0200 kg
Paku
0.1000
Pekerja
0.1000
Tukang kayu
0.0100
Kep. Tukang kayu
0.0050
Mandor

(SNI 03-2835-01)
48,274.29
34,650.00
266.86
3,500.00
4,900.00
510.00
265.00
92,366.15
92,366.00

a. Rp.
4,022,857.14
a. Rp.
4,950,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT ( SNI 03-2835-02 )


3
0.2100 m
Kayu gelam
a. Rp.
4,022,857.14
Dolken kayu f 8 / 400 cm
1.7000 Btg
a. Rp.
35,000.00
0.3000 kg
Paku
a. Rp.
13,343.00
10.5000 kg
Semen / PC
a. Rp.
1,402.50
3
0.0300 m
Pasir beton
a. Rp.
141,710.00
3
0.0500 m
Koral beton
a. Rp.
212,850.00
1.5000 lbr
Seng gelombang BJLS 30
a. Rp.
74,158.33
1.0000
Pekerja
a. Rp.
35,000.00
2.0000
Tukang kayu
a. Rp.
49,000.00
0.2000
Kep. Tukang kayu
a. Rp.
51,000.00
0.0500
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

844,800.00
59,500.00
4,002.90
14,726.25
4,251.30
10,642.50
111,237.50
35,000.00
98,000.00
10,200.00
2,650.00
1,195,010.44
1,195,010.00

PAGAR SEMENTARA DARI SENG GELOMBANG t = 2m ( SNI 03-2835-03 )


3
0.0720 m
Kayu gelam 5/7
a. Rp.
4,022,857.14
Dolken kayu f 8 / 400 cm
1.2500 Btg
a. Rp.
35,000.00
0.0600 kg
Paku
a. Rp.
13,343.00
2.5000 kg
Semen / PC
a. Rp.
1,402.50
3
0.0050 m
Pasir beton
a. Rp.
141,710.00
3
0.0090 m
Koral beton
a. Rp.
212,850.00
1.2000 lbr
Seng gelombang BJLS 30
a. Rp.
74,158.33
0.4000
Pekerja
a. Rp.
35,000.00
0.2000
Tukang kayu
a. Rp.
49,000.00
0.0200
Kep. Tukang kayu
a. Rp.
51,000.00
0.0200
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

289,645.71
43,750.00
800.58
3,506.25
708.55
1,915.65
88,990.00
14,000.00
9,800.00
1,020.00
1,060.00
455,196.74
455,196.00

35,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.

3,500.00
2,650.00
6,150.00
6,150.00

35,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

233,345.00
1,749.00
235,094.00
28,211.26
28,211.00

35,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.

233,345.00
17,649.00
250,994.00
250,994.00

PEMBERSIHAN LOKASI DAN PERATAAN


0.1000
Pekerja
0.0500
Mandor

( SNI 03-2835-04 )
a. Rp.
a. Rp.
Jumlah
Dibulatkan

PEMBONGKARAN DINDING BATA MERAH ( SNI 03-2835-05 )


6.6670
Pekerja
a. Rp.
0.0330
Mandor
a. Rp.
Analog biaya per M3
Jumlah
Analog biaya per M2
Jumlah
Dibulatkan
PEMBONGKARAN BETON BERTULANG ( SNI 03-2835-06 )
6.6670
Pekerja
a. Rp.
0.3330
Mandor
a. Rp.
Jumlah
Dibulatkan

10

PEKERJAAN TANAH
1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

1 M

1 M

1 M

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

1 M3

( Rev. SNI 03-2835-2002 )

GALIAN TANAH s/d 1 M


0.7500
Pekerja
0.0250
Mandor

GALIAN TANAH s/d 2 M


0.9000
Pekerja
0.0450
Mandor

GALIAN TANAH s/d 3 M


1.0500
Pekerja
0.0670
Mandor

GALIAN TANAH BERBATU


1.0520
Pekerja
0.1040
Mandor

GALIAN TANAH KERAS SEDALAM 1 M


1.0000
Pekerja
0.0320
Mandor

GALIAN TANAH CADAS SEDALAM 1 M


1.5000
Pekerja
0.0600
Mandor

GALIAN TANAH LUMPUR SEDALAM 1 M


1.2000
Pekerja
0.0450
Mandor

URUGAN TANAH KEMBALI


0.2250
Pekerja
0.0075
Mandor

MENGURUK PONDASI DENGAN PASIR


3
1.2000 m
Pasir urug
0.3000
Pekerja
0.0100
Mandor

MENGURUK DENGAN TANAH


3
1.2000 m
Tanah Urug
0.3000
Pekerja
0.0100
Mandor

MENGURUK DENGAN SIRTU


3
1.2000 m
Sirtu
0.2500
Pekerja
0.0250
Mandor

11

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

74,250.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

63,250.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

102,666.67
35,000.00
53,000.00

(SNI DT 91-0006-2007-01)
= Rp.
26,250.00
= Rp.
1,325.00
= Rp.
27,575.00
= Rp.
27,575.00
(SNI DT 91-0006-2007-02)
= Rp.
31,500.00
= Rp.
2,385.00
= Rp.
33,885.00
= Rp.
33,885.00
(SNI DT 91-0006-2007-03)
= Rp.
36,750.00
= Rp.
3,551.00
= Rp.
40,301.00
= Rp.
40,301.00
(SNI DT 91-0006-2007-04)
= Rp.
36,820.00
= Rp.
5,512.00
= Rp.
42,332.00
= Rp.
42,332.00
(SNI DT 91-0006-2007-05)
= Rp.
35,000.00
= Rp.
1,696.00
= Rp.
36,696.00
= Rp.
36,696.00
(SNI DT 91-0006-2007-06)
= Rp.
52,500.00
= Rp.
3,180.00
= Rp.
55,680.00
= Rp.
55,680.00
(SNI DT 91-0006-2007-07)
= Rp.
42,000.00
= Rp.
2,385.00
= Rp.
44,385.00
= Rp.
44,385.00
(SNI DT 91-0006-2007-08)
= Rp.
7,875.00
= Rp.
397.50
= Rp.
8,272.50
= Rp.
8,272.00
(SNI DT 91-0006-2007-09)
= Rp.
89,100.00
= Rp.
10,500.00
= Rp.
530.00
= Rp.
100,130.00
= Rp.
100,130.00
(SNI DT 91-0006-2007-10)
= Rp.
75,900.00
= Rp.
10,500.00
= Rp.
530.00
= Rp.
86,930.00
= Rp.
86,930.00
(SNI DT 91-0006-2007-11)
= Rp.
123,200.00
= Rp.
8,750.00
= Rp.
1,325.00
= Rp.
133,275.00
= Rp.
133,275.00

12.

13.

14.

1 M3

1 M

1 M

MENGURUK DENGAN PEDEL


3
1.2000 m
Pedel
0.2500
Pekerja
0.0250
Mandor

MEMBUANG TANAH SEJAUH 30 M


0.3300
Pekerja
0.0100
Mandor

2.

3.

4.

5.

1 M3

1 M3

1 M3

66,660.00
35,000.00
53,000.00

a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

MENGERJAKAN STRIPPING TEBING SETINGGI 1 M


0.0500
Pekerja
a. Rp.
0.0050
Mandor
a. Rp.
Jumlah
Dibulatkan

PEKERJAAN PONDASI
1.

a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
53,000.00

(SNI DT 91-0006-2007-12)
= Rp.
79,992.00
= Rp.
8,750.00
= Rp.
1,325.00
= Rp.
90,067.00
= Rp.
90,067.00
(SNI DT 91-0006-2007-13)
= Rp.
11,550.00
= Rp.
530.00
= Rp.
12,080.00
= Rp.
12,080.00
(SNI DT 91-0006-2007-14)
= Rp.
1,750.00
= Rp.
265.00
= Rp.
2,015.00
= Rp.
2,015.00

( Rev. SNI 03-2836-2002 )

PASANGAN AANSTAMPENG / BATU KOSONG


3
1.2000 m
Brongkol
3
0.4320 m
Pasir urug
0.0390
Mandor
0.3900
Tukang batu
0.0390
Kep. Tukang batu
0.7800
Pekerja

PASANGAN BATU GUNUNG/BRONGKOL 1:3:10


3
1.2000 m
Batu Brongkol
61.0000 kg
Semen / PC
3
0.1470 m
Kapur Pasang
3
0.4920 m
Pasir pasang
0.6000
Tukang batu
0.0600
Kep. Tukang batu
0.0750
Mandor
1.5000
Pekerja

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

82,775.00
74,250.00
53,000.00
46,000.00
51,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

82,775.00
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

PASANGAN BATU GUNUNG/BRONGKOL 1/4Pc : 1Kpr : 4Ps


3
1.2000 m
Batu Brongkol
a. Rp.
41.0000 kg
Semen / PC
a. Rp.
3
0.1310 m
Kapur Pasang
a. Rp.
3
0.5230 m
Pasir pasang
a. Rp.
0.6000
Tukang batu
a. Rp.
0.0600
Kep. Tukang batu
a. Rp.
0.0750
Mandor
a. Rp.
1.5000
Pekerja
a. Rp.
Jumlah
Dibulatkan

82,775.00
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

1 M3

PASANGAN BATU GUNUNG/BRONGKOL 1 : 3


3
1.2000 m
Batu Brongkol
202.0000 kg
Semen / PC
3
0.4850 m
Pasir pasang
0.6000
Tukang batu
0.0600
Kep. Tukang batu
0.0750
Mandor
1.5000
Pekerja

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

82,775.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.

82,775.00
1,402.50
102,116.67
46,000.00

1 M3

PASANGAN BATU GUNUNG/BRONGKOL 1 : 4


3
1.2000 m
Batu Brongkol
163.0000 kg
Semen / PC
3
0.5200 m
Pasir pasang
0.6000
Tukang batu
12

(SNI DT 91-0007-2007-01)
= Rp.
99,330.00
= Rp.
32,076.00
= Rp.
2,067.00
= Rp.
17,940.00
= Rp.
1,989.00
= Rp.
27,300.00
= Rp.
180,702.00
= Rp.
180,702.00
(SNI DT 91-0007-2007-02)
= Rp.
99,330.00
= Rp.
85,552.50
= Rp.
29,375.50
= Rp.
50,241.40
= Rp.
27,600.00
= Rp.
3,060.00
= Rp.
3,975.00
= Rp.
52,500.00
= Rp.
351,634.40
= Rp.
351,634.00
(SNI DT 91-0007-2007-03)
= Rp.
99,330.00
= Rp.
57,502.50
= Rp.
26,178.17
= Rp.
53,407.02
= Rp.
27,600.00
= Rp.
3,060.00
= Rp.
3,975.00
= Rp.
52,500.00
= Rp.
323,552.68
= Rp.
323,552.00
(SNI DT 91-0007-2007-04)
= Rp.
99,330.00
= Rp.
283,305.00
= Rp.
49,526.58
= Rp.
27,600.00
= Rp.
3,060.00
= Rp.
3,975.00
= Rp.
52,500.00
= Rp.
519,296.58
= Rp.
519,296.00
(SNI DT 91-0007-2007-05)
= Rp.
99,330.00
= Rp.
228,607.50
= Rp.
53,100.67
= Rp.
27,600.00

0.0600
0.0750
1.5000

6.

2.

3.

4.

5.

a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

82,775.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

1 M3

PASANGAN BATU GUNUNG/BRONGKOL 1 : 5


3
1.2000 m
Batu Brongkol
136.0000 kg
Semen / PC
3
0.5440 m
Pasir pasang
0.6000
Tukang batu
0.0600
Kep. Tukang batu
0.0750
Mandor
1.5000
Pekerja

PEKERJAAN DINDING
1.

Kep. Tukang batu


Mandor
Pekerja

1 M2

1 M2

1 M2

1 M2

1 M2

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

3,060.00
3,975.00
52,500.00
468,173.17
468,173.00

(SNI DT 91-0007-2007-06)
= Rp.
99,330.00
= Rp.
190,740.00
= Rp.
55,551.47
= Rp.
27,600.00
= Rp.
3,060.00
= Rp.
3,975.00
= Rp.
52,500.00
= Rp.
432,756.47
= Rp.
432,756.00

( Rev. SNI 03-6897-2002 )

PASANGAN BATU KUMBUNG 1 BATA 1:3:10 ( An.D.01 )


100 bj
Batu kumbung
a. Rp.
10.0800 kg
Semen / PC
a. Rp.
3
0.0275 m
Kapur Pasang
a. Rp.
3
0.0925 m
Pasir pasang
a. Rp.
0.2000
Tukang batu
a. Rp.
0.0200
Kep. Tukang batu
a. Rp.
0.0300
Mandor
a. Rp.
0.6000
Pekerja
a. Rp.
Jumlah
Dibulatkan
PASANGAN BATU KUMBUNG 1 BATA 1 : 4
100 bj
Batu kumbung
26.5500 kg
Semen / PC
3
0.0930 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0300
Mandor
0.6000
Pekerja

( An.D.02 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

PASANGAN BATU KUMBUNG 1/2 BATA 1:3:10 ( An.D.03 )


50 bj
Batu kumbung
a. Rp.
4.5000 kg
Semen / PC
a. Rp.
3
0.0150 m
Kapur Pasang
a. Rp.
3
0.0500 m
Pasir pasang
a. Rp.
0.1000
Tukang batu
a. Rp.
0.0100
Kep. Tukang batu
a. Rp.
0.0150
Mandor
a. Rp.
0.3000
Pekerja
a. Rp.
Jumlah
Dibulatkan
PASANGAN BATU KUMBUNG 1/2 BATA 1:4
50 bj
Batu kumbung
11.5000 kg
Semen / PC
3
0.0430 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

( An.D.04 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

PASANGAN BATA MERAH 1 : 2 TB. 1 BATA


140 bj
Bata merah Kw I
43.5000 kg
Semen / PC
3
0.0800 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
13

1,003.75
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

100,375.00
14,137.20
5,495.42
9,445.79
9,200.00
1,020.00
1,590.00
21,000.00
162,263.41
162,263.00

1,003.75
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

100,375.00
37,236.38
9,496.85
9,200.00
1,020.00
1,590.00
21,000.00
179,918.23
179,918.00

1,003.75
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

50,187.50
6,311.25
2,997.50
5,105.83
4,600.00
510.00
795.00
10,500.00
81,007.08
81,007.00

1,003.75
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

50,187.50
16,128.75
4,391.02
4,600.00
510.00
795.00
10,500.00
87,112.27
87,112.00

889.17
1,402.50
102,116.67
46,000.00
51,000.00

(SNI DT 91-0009-2007-01)
= Rp.
124,483.80
= Rp.
61,008.75
= Rp.
8,169.33
= Rp.
9,200.00
= Rp.
1,020.00

0.0300
0.6000

6.

7.

8.

9.

10.

11.

1M

1M

1M

1 M2

1 M2

1 M2

Mandor
Pekerja

PASANGAN BATA MERAH 1 : 2 TB. 1 BATA


140 bj
Bata merah Kw II
43.5000 kg
Semen / PC
3
0.0800 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0300
Mandor
0.6000
Pekerja

PASANGAN BATA MERAH 1 : 3 : 10 TB. 1 BATA


140 bj
Bata merah Kw II
10.0800 kg
Semen / PC
3
0.0275 m
Kapur Pasang
3
0.0925 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0300
Mandor
0.6000
Pekerja

PASANGAN BATA MERAH 1 : 3 TB. 1 BATA


140 bj
Bata merah kw I
32.9500 kg
Semen / PC
3
0.0910 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0300
Mandor
0.6000
Pekerja

PASANGAN BATA MERAH 1 : 3 TB. 1 BATA


140 bj
Bata merah kw II
32.9500 kg
Semen / PC
3
0.0910 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0300
Mandor
0.6000
Pekerja

PASANGAN BATA MERAH 1 : 4 TB. 1 BATA


140 bj
Bata merah kw I
26.5500 kg
Semen / PC
3
0.0930 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0300
Mandor
0.6000
Pekerja

PASANGAN BATA MERAH 1 : 4 TB. 1 BATA


140 bj
Bata merah kw II
26.5500 kg
Semen / PC
3
0.0930 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0300
Mandor
0.6000
Pekerja

14

a. Rp.
a. Rp.
Jumlah
Dibulatkan

53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.

1,590.00
21,000.00
226,471.88
226,471.00

(SNI DT 91-0009-2007-02)
= Rp.
102,666.20
= Rp.
61,008.75
= Rp.
8,169.33
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
204,654.28
= Rp.
204,654.00
(SNI DT 91-0009-2007-03)
= Rp.
102,666.20
= Rp.
14,137.20
= Rp.
5,495.42
= Rp.
9,445.79
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
164,554.61
= Rp.
164,554.00
(SNI DT 91-0009-2007-04)
= Rp.
124,483.80
= Rp.
46,212.38
= Rp.
9,292.62
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
212,798.79
= Rp.
212,798.00
(SNI DT 91-0009-2007-05)
= Rp.
102,666.20
= Rp.
46,212.38
= Rp.
9,292.62
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
190,981.19
= Rp.
190,981.00
(SNI DT 91-0009-2007-06)
= Rp.
124,483.80
= Rp.
37,236.38
= Rp.
9,496.85
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
204,027.03
= Rp.
204,027.00
(SNI DT 91-0009-2007-07)
= Rp.
102,666.20
= Rp.
37,236.38
= Rp.
9,496.85
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
182,209.43
= Rp.
182,209.00

12.

13.

14.

15.

16.

17.

18.

1M

1 M2

1 M2

1M

1 M2

1 M2

1 M2

PASANGAN BATA MERAH 1 : 5 TB. 1 BATA


140 bj
Bata merah kw II
22.2000 kg
Semen / PC
3
0.1020 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0300
Mandor
0.6000
Pekerja

PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA


70 bj
Bata merah Kw I
18.9500 kg
Semen / PC
3
0.0380 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA


70 bj
Bata merah Kw II
18.9500 kg
Semen / PC
3
0.0380 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA


70 bj
Bata merah kw I
14.3700 kg
Semen / PC
3
0.0400 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA


70 bj
Bata merah kw II
14.3700 kg
Semen / PC
3
0.0400 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA


70 bj
Bata merah kw I
11.5000 kg
Semen / PC
3
0.0430 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA


70 bj
Bata merah kw II
11.5000 kg
Semen / PC
3
0.0430 m
Pasir pasang
15

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.

733.33
1,402.50
102,116.67

(SNI DT 91-0009-2007-08)
= Rp.
102,666.20
= Rp.
31,135.50
= Rp.
10,415.90
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
177,027.60
= Rp.
177,027.00
(SNI DT 91-0009-2007-09)
= Rp.
62,241.90
= Rp.
26,577.38
= Rp.
3,880.43
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
109,104.71
= Rp.
109,104.00
(SNI DT 91-0009-2007-10)
= Rp.
51,333.10
= Rp.
26,577.38
= Rp.
3,880.43
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
98,195.91
= Rp.
98,195.00
(SNI DT 91-0009-2007-11)
= Rp.
62,241.90
= Rp.
20,153.93
= Rp.
4,084.67
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
102,885.49
= Rp.
102,885.00
(SNI DT 91-0009-2007-12)
= Rp.
51,333.10
= Rp.
20,153.93
= Rp.
4,084.67
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
91,976.69
= Rp.
91,976.00
(SNI DT 91-0009-2007-13)
= Rp.
62,241.90
= Rp.
16,128.75
= Rp.
4,391.02
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
99,166.67
= Rp.
99,166.00
(SNI DT 91-0009-2007-14)
= Rp.
51,333.10
= Rp.
16,128.75
= Rp.
4,391.02

0.1000
0.0100
0.0150
0.3000

19.

20.

21.

1M

1M

1 M2

22.

1 M2

23.

1M

24.

1 M2

Tukang batu
Kep. Tukang batu
Mandor
Pekerja

PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA


70 bj
Bata merah kw I
9.6800 kg
Semen / PC
3
0.0450 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA


70 bj
Bata merah kw II
9.6800 kg
Semen / PC
3
0.0450 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

PASANGAN BATA MERAH 1 : 3 : 10 TB. 1/2 BATA


70 bj
Bata merah Kw II
4.5000 kg
Semen / PC
3
0.0150 m
Kapur Pasang
3
0.0500 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

733.33
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

4,600.00
510.00
795.00
10,500.00
88,257.87
88,257.00

(SNI DT 91-0009-2007-15)
= Rp.
62,241.90
= Rp.
13,576.20
= Rp.
4,595.25
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
96,818.35
= Rp.
96,818.00
(SNI DT 91-0009-2007-16)
= Rp.
51,333.10
= Rp.
13,576.20
= Rp.
4,595.25
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
85,909.55
= Rp.
85,909.00
(SNI DT 91-0009-2007-17)
= Rp.
51,333.10
= Rp.
6,311.25
= Rp.
2,997.50
= Rp.
5,105.83
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
82,152.68
= Rp.
82,152.00

PASANGAN DINDING ROSTER/TERAWANG 12X11X24 CM 1 : 3


30 bh
Roster/terawang
a. Rp.
5,000.00
14.0000 kg
Semen / PC
a. Rp.
1,402.50
3
0.0320 m
Pasir pasang
a. Rp.
102,116.67
0.1000
Tukang batu
a. Rp.
46,000.00
0.0100
Kep. Tukang batu
a. Rp.
51,000.00
0.0150
Mandor
a. Rp.
53,000.00
0.3000
Pekerja
a. Rp.
35,000.00
Jumlah
Dibulatkan

(SNI DT 91-0009-2007-18)
= Rp.
150,000.00
= Rp.
19,635.00
= Rp.
3,267.73
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
189,307.73
= Rp.
189,307.00

PASANGAN DINDING BATU TEMPEL HITAM


2
1.1000 m
Batu Tempel Hitam
11.7500 kg
Semen / PC
3
0.0350 m
Pasir pasang
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.0300
Mandor
0.6200
Pekerja

(SNI DT 91-0009-2007-19)
= Rp.
46,887.50
= Rp.
16,479.38
= Rp.
3,574.08
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
1,590.00
= Rp.
21,700.00
= Rp.
108,115.96
= Rp.
108,115.00

PASANGAN DINDING BATU PARAS


2
1.1000 m
Batu Paras 20x20 cm
11.7500 kg
Semen / PC
3
0.0350 m
Pasir pasang
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.0300
Mandor
0.6200
Pekerja
16

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

42,625.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.

88,000.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

(SNI DT 91-0009-2007-20)
= Rp.
96,800.00
= Rp.
16,479.38
= Rp.
3,574.08
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
1,590.00
= Rp.
21,700.00

Jumlah
Dibulatkan
25.

26.

27

28

1M

1 M2

1 M2

1M

PASANGAN BATU PALIMANAN


2
1.1000 m
Batu Palimanan Halus 15/15
11.7500 kg
Semen / PC
3
0.0350 m
Pasir pasang
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.0300
Mandor
0.6200
Pekerja

PASANGAN BETON ALUR


2
1.1000 m
Beton alur
11.7500 kg
Semen / PC
3
0.0350 m
Pasir pasang
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.0300
Mandor
0.6200
Pekerja

PASANGAN BATU CANDI


2
1.1000 m
Batu Candi
11.7500 kg
Semen / PC
3
0.0350 m
Pasir pasang
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.0300
Mandor
0.6200
Pekerja

PASANGAN BATU SISIR (ANDESIT)


2
1.1000 m
Batu sisir
11.7500 kg
Semen / PC
3
0.0350 m
Pasir pasang
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.0300
Mandor
0.6200
Pekerja

PEKERJAAN PLESTERAN
1.

2.

3.

1 M2

1 M2

1 M2

= Rp.
= Rp.

158,028.46
158,028.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

79,016.67
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

( An.D.05 )
86,918.34
16,479.38
3,574.08
16,100.00
1,785.00
1,590.00
21,700.00
148,146.80
148,146.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

66,000.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

( An.D.06 )
72,600.00
16,479.38
3,574.08
16,100.00
1,785.00
1,590.00
21,700.00
133,828.46
133,828.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

107,250.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

( An.D.07 )
117,975.00
16,479.38
3,574.08
16,100.00
1,785.00
1,590.00
21,700.00
179,203.46
179,203.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

143,000.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

( An.D.08 )
157,300.00
16,479.38
3,574.08
16,100.00
1,785.00
1,590.00
21,700.00
218,528.46
218,528.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.

1,402.50
102,116.67

( SNI DT 91-0010-2007 )

PLESTERAN 1 : 2 Tebal 1.5 cm


10.2240 kg
Semen / PC
3
0.0200 m
Pasir pasang
0.1500
Tukang batu
0.0150
Kep. Tukang batu
0.0100
Mandor
0.2000
Pekerja

PLESTERAN 1 : 3 Tebal 1,5 cm


7.7760 kg
Semen / PC
3
0.0230 m
Pasir pasang
0.1500
Tukang batu
0.0150
Kep. Tukang batu
0.0100
Mandor
0.2000
Pekerja

PLESTERAN 1 : 4 Tebal 1,5 cm


6.2400 kg
Semen / PC
3
0.0240 m
Pasir pasang
17

(SNI DT 91-0010-2007-01)
= Rp.
14,339.16
= Rp.
2,042.33
= Rp.
6,900.00
= Rp.
765.00
= Rp.
530.00
= Rp.
7,000.00
= Rp.
31,576.49
= Rp.
31,576.00
(SNI DT 91-0010-2007-02)
= Rp.
10,905.84
= Rp.
2,348.68
= Rp.
6,900.00
= Rp.
765.00
= Rp.
530.00
= Rp.
7,000.00
= Rp.
28,449.52
= Rp.
28,449.00
(SNI DT 91-0010-2007-03)
= Rp.
8,751.60
= Rp.
2,450.80

0.1500
0.0150
0.0100
0.2000

4.

5.

6.

7.

8.

9.

10.

1M

1M

1 M2

1 M2

1 M2

1 M2

1 M2

Tukang batu
Kep. Tukang batu
Mandor
Pekerja

PLESTERAN 1 : 5 Tebal 1,5 cm


5.1840 kg
Semen / PC
3
0.0260 m
Pasir pasang
0.1500
Tukang batu
0.0150
Kep. Tukang batu
0.0100
Mandor
0.2000
Pekerja

PLESTERAN 1 : 3 Tebal 2 cm
10.3680 kg
Semen / PC
3
0.0310 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0130
Mandor
0.2600
Pekerja

PLESTERAN 1 : 4 Tebal 2 cm
8.3200 kg
Semen / PC
3
0.0320 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0130
Mandor
0.2600
Pekerja

PLESTERAN 1 : 5 Tebal 2 cm
6.9120 kg
Semen / PC
3
0.0350 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0130
Mandor
0.2600
Pekerja

PLESTERAN CIPRAT 1 : 2
4.3200 kg
Semen / PC
3
0.0060 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja

a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00

FINISHING SIAR PASANGAN DINDING BATA MERAH


3.1080 kg
Semen / PC
a. Rp.
0.0750
Tukang batu
a. Rp.
0.0075
Kep. Tukang batu
a. Rp.
0.0080
Mandor
a. Rp.
0.1500
Pekerja
a. Rp.
Jumlah
Dibulatkan
FINISHING SIAR PASANGAN BATU KALI 1 : 2
6.3400 kg
Semen / PC
3
0.0120 m
Pasir pasang
0.1500
Tukang batu
0.0150
Kep. Tukang batu
0.0150
Mandor

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
18

1,402.50
46,000.00
51,000.00
53,000.00
35,000.00

1,402.50
102,116.67
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

6,900.00
765.00
530.00
7,000.00
26,397.40
26,397.00

(SNI DT 91-0010-2007-04)
= Rp.
7,270.56
= Rp.
2,655.03
= Rp.
6,900.00
= Rp.
765.00
= Rp.
530.00
= Rp.
7,000.00
= Rp.
25,120.59
= Rp.
25,120.00
(SNI DT 91-0010-2007-05)
= Rp.
14,541.12
= Rp.
3,165.62
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
689.00
= Rp.
9,100.00
= Rp.
37,715.74
= Rp.
37,715.00
(SNI DT 91-0010-2007-06)
= Rp.
11,668.80
= Rp.
3,267.73
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
689.00
= Rp.
9,100.00
= Rp.
34,945.53
= Rp.
34,945.00
(SNI DT 91-0010-2007-07)
= Rp.
9,694.08
= Rp.
3,574.08
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
689.00
= Rp.
9,100.00
= Rp.
33,277.16
= Rp.
33,277.00
(SNI DT 91-0010-2007-08)
= Rp.
6,058.80
= Rp.
612.70
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
23,076.50
= Rp.
23,076.00
(SNI DT 91-0010-2007-09)
= Rp.
4,358.97
= Rp.
3,450.00
= Rp.
382.50
= Rp.
424.00
= Rp.
5,250.00
= Rp.
13,865.47
= Rp.
13,865.00
(SNI DT 91-0010-2007-10)
= Rp.
8,891.85
= Rp.
1,225.40
= Rp.
6,900.00
= Rp.
765.00
= Rp.
795.00

0.3000

11.

1M

Pekerja

PEKERJAAN ACIAN
3.2500 kg
Semen / PC
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0100
Mandor
0.2000
Pekerja

a. Rp.
Jumlah
Dibulatkan

35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,402.50
46,000.00
51,000.00
53,000.00
35,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.

212,850.00

= Rp.
= Rp.
= Rp.

10,500.00
29,077.25
29,077.00

(SNI DT 91-0010-2007-11)
= Rp.
4,558.13
= Rp.
4,600.00
= Rp.
510.00
= Rp.
530.00
= Rp.
7,000.00
= Rp.
17,198.13
= Rp.
17,198.00

PEKERJAAN BETON ( SNI DT 91-0008-2007 )


1.

2.

3.

4.

5.

6.

1M

1M

1M

1 M3

1 M3

1 M3

PEKERJAAN BETON RABAT 1:3:5


3
0.8700 m
Batu pecah 2-3 cm hitam
3
0.5200 m
Pasir cor
218.0000 kg
Semen / PC
1.6500
Pekerja
0.0250
Kep. Tukang batu
0.2500
Tukang batu
0.0800
Mandor

MEMBUAT LANTAI KERJA BETON 1:2:4


3
0.7607 m
Batu pecah 2-3 cm hitam
3
0.6379 m
Pasir cor
230.0000 kg
Semen / PC
1.2000
Pekerja
0.0200
Kep. Tukang batu
0.2000
Tukang batu
0.0600
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.100


3
0.7400 m
Batu pecah 2-3 cm hitam
3
0.6207 m
Pasir cor
247.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.125


3
0.7496 m
Batu pecah 2-3 cm hitam
3
0.5914 m
Pasir cor
276.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.150


3
0.7533 m
Batu pecah 2-3 cm hitam
3
0.5707 m
Pasir cor
299.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.175


3
0.7622 m
Batu pecah 2-3 cm hitam
19

(SNI DT 91-0008-2007-01)
= Rp.
185,179.50
= Rp.
73,689.20
= Rp.
305,745.00
= Rp.
57,750.00
= Rp.
1,275.00
= Rp.
11,500.00
= Rp.
4,240.00
= Rp.
639,378.70
= Rp.
639,378.00
(SNI DT 91-0008-2007-02)
= Rp.
161,915.00
= Rp.
90,390.74
= Rp.
322,575.00
= Rp.
42,000.00
= Rp.
1,020.00
= Rp.
9,200.00
= Rp.
3,180.00
= Rp.
630,280.73
= Rp.
630,280.00
(SNI DT 91-0008-2007-03)
= Rp.
157,509.00
= Rp.
87,959.40
= Rp.
346,417.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
668,112.90
= Rp.
668,112.00
(SNI DT 91-0008-2007-04)
= Rp.
159,552.36
= Rp.
83,807.29
= Rp.
387,090.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
706,676.65
= Rp.
706,676.00
(SNI DT 91-0008-2007-05)
= Rp.
160,346.29
= Rp.
80,873.90
= Rp.
419,347.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
736,794.69
= Rp.
736,794.00
(SNI DT 91-0008-2007-06)
= Rp.
162,234.27

0.5428
326.0000
1.6500
0.0280
0.2750
0.0830

7.

8.

9.

10.

11.

12.

1M

1M

1 M3

1 M3

1 M3

1 M3

m3
kg

Pasir cor
Semen / PC
Pekerja
Kep. Tukang batu
Tukang batu
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.200


3
0.7637 m
Batu pecah 2-3 cm hitam
3
0.5221 m
Pasir cor
352.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.225


3
0.7756 m
Batu pecah 2-3 cm hitam
3
0.4986 m
Pasir cor
371.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.250


3
0.7696 m
Batu pecah 2-3 cm hitam
3
0.4943 m
Pasir cor
384.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.275


3
0.7600 m
Batu pecah 2-3 cm hitam
3
0.4886 m
Pasir cor
406.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.300


3
0.7563 m
Batu pecah 2-3 cm hitam
3
0.4864 m
Pasir cor
413.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.325


3
0.7452 m
Batu pecah 2-3 cm hitam
3
0.4786 m
Pasir cor
439.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
20

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

76,920.19
457,215.00
57,750.00
1,428.00
12,650.00
4,399.00
772,596.46
772,596.00

(SNI DT 91-0008-2007-07)
= Rp.
162,553.55
= Rp.
73,986.79
= Rp.
493,680.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
806,447.34
= Rp.
806,447.00
(SNI DT 91-0008-2007-08)
= Rp.
165,086.46
= Rp.
70,656.61
= Rp.
520,327.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
832,297.57
= Rp.
832,297.00
(SNI DT 91-0008-2007-09)
= Rp.
163,809.36
= Rp.
70,047.25
= Rp.
538,560.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
848,643.61
= Rp.
848,643.00
(SNI DT 91-0008-2007-10)
= Rp.
161,766.00
= Rp.
69,239.51
= Rp.
569,415.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
876,647.51
= Rp.
876,647.00
(SNI DT 91-0008-2007-11)
= Rp.
160,978.46
= Rp.
68,927.74
= Rp.
579,232.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
885,365.70
= Rp.
885,365.00
(SNI DT 91-0008-2007-12)
= Rp.
158,615.82
= Rp.
67,822.41
= Rp.
615,697.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00

0.0830

13.

14.

15.

16.

17.

18.

1 M3

Mandor

MEMBUAT BETON BERTULANG 1:2:3 K.350


3
0.7407 m
Batu pecah 2-3 cm hitam
3
0.4764 m
Pasir cor
448.0000 kg
Semen / PC
1.6500
Pekerja
0.0280
Kep. Tukang batu
0.2750
Tukang batu
0.0830
Mandor

1 M3

1 M3

1 M3

1 M3

1 M3

BEGESTING UNTUK PONDASI


3
0.2000 m
Kayu terentang
1.5000 kg
Paku
0.4000 ltr
Minyak begesting
2.6000
Pekerja
1.3000
Tukang kayu
0.1300
Kep. Tukang kayu
0.1220
Mandor

BEGESTING UNTUK SLOOF


3
0.2700 m
Kayu terentang
1.8000 kg
Paku
0.6000 ltr
Minyak begesting
2.6000
Pekerja
1.5600
Tukang kayu
0.1560
Kep. Tukang kayu
0.1200
Mandor

BEGESTING UNTUK KOLOM


3
0.3200 m
Kayu terentang
3.2000 kg
Paku
1.6000 ltr
Minyak begesting
0.1200 m3
Kayu Meranti 5/7
2.8000 lbr
Multipleks 9 mm
2.6000
Pekerja
1.3000
Tukang kayu
0.1320
Kep. Tukang kayu
0.1220
Mandor

BEGESTING UNTUK BALOK


3
0.3200 m
Kayu terentang
3.2000 kg
Paku
1.6000 ltr
Minyak begesting
0.1400 m3
Kayu meranti 5/7
2.8000 lbr
Multipleks 9 mm
Dolken kayu f 8 / 400 cm
16.0000 btg
3.3000
Pekerja
1.6500
Tukang kayu
0.1650
Kep. Tukang kayu
0.1550
Mandor

BEGESTING UNTUK LANTAI


3
0.3200 m
Kayu terentang
3.2000 kg
Paku
1.6000 ltr
Minyak begesting
0.1200 m3
Kayu meranti 5/7
2.8000 lbr
Multipleks 9 mm
Dolken kayu f 8 / 400 cm
25.0000 btg
21

a. Rp.
Jumlah
Dibulatkan

53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00

= Rp.
= Rp.
= Rp.

4,399.00
918,362.73
918,362.00

(SNI DT 91-0008-2007-13)
= Rp.
157,658.00
= Rp.
67,510.64
= Rp.
628,320.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
929,715.64
= Rp.
929,715.00

a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-14)
= Rp.
718,666.67
= Rp.
20,014.50
= Rp.
9,760.00
= Rp.
91,000.00
= Rp.
63,700.00
= Rp.
6,630.00
= Rp.
6,466.00
= Rp.
916,237.17
= Rp.
916,237.00

a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-15)
= Rp.
970,200.00
= Rp.
24,017.40
= Rp.
14,640.00
= Rp.
91,000.00
= Rp.
76,440.00
= Rp.
7,956.00
= Rp.
6,360.00
= Rp.
1,190,613.40
= Rp.
1,190,613.00

a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
3,593,333.33
a. Rp.
138,050.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-16)
= Rp.
1,149,866.67
= Rp.
42,697.60
= Rp.
39,040.00
= Rp.
431,200.00
= Rp.
386,540.00
= Rp.
91,000.00
= Rp.
63,700.00
= Rp.
6,732.00
= Rp.
6,466.00
= Rp.
2,217,242.27
= Rp.
2,217,242.00

a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
3,593,333.33
a. Rp.
138,050.00
a. Rp.
35,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-17)
= Rp.
1,149,866.67
= Rp.
42,697.60
= Rp.
39,040.00
= Rp.
503,066.67
= Rp.
386,540.00
= Rp.
560,000.00
= Rp.
115,500.00
= Rp.
80,850.00
= Rp.
8,415.00
= Rp.
8,215.00
= Rp.
2,894,190.93
= Rp.
2,894,190.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.

(SNI DT 91-0008-2007-18)
= Rp.
1,149,866.67
= Rp.
42,697.60
= Rp.
39,040.00
= Rp.
431,200.00
= Rp.
386,540.00
= Rp.
875,000.00

3,593,333.33
13,343.00
24,400.00
3,593,333.33
138,050.00
35,000.00

3.3000
1.6500
0.1650
0.1550

19.

20.

21.

22.

23.

24.

1M

10 Kg

10 Kg

Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor

a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

BEGESTING UNTUK TANGGA


3
0.2500 m
Kayu terentang
3.0000 kg
Paku
1.2000 ltr
Minyak begesting
0.1050 m3
Kayu meranti 5/7
2.5000 lbr
Multipleks 9 mm
Dolken kayu f 8 / 400 cm
14.0000 btg
3.3000
Pekerja
1.6500
Tukang kayu
0.1650
Kep. Tukang kayu
0.1550
Mandor

PEMBESIAN DENGAN BESI POLOS


10.5000 kg
Besi beton polos
0.1500 kg
Kawat bendrat
0.0700
Pekerja
0.0700
Tukang besi
0.0070
Kep. Tukang besi
0.0040
Mandor

PEMBESIAN DENGAN BESI ULIR


10.5000 kg
Besi beton ulir
0.1500 kg
Kawat bendrat
0.0700
Pekerja
0.0700
Tukang besi
0.0070
Kep. Tukang besi
0.0040
Mandor

110 Kg PEMBESIAN DENGAN BESI POLOS


115.5000 kg
Besi beton polos
1.6500 kg
Kawat bendrat
0.7700
Pekerja
0.7700
Tukang besi
0.0770
Kep. Tukang besi
0.0440
Mandor

120 Kg PEMBESIAN DENGAN BESI POLOS


126.0000 kg
Besi beton polos
1.8000 kg
Kawat bendrat
0.8400
Pekerja
0.8400
Tukang besi
0.0840
Kep. Tukang besi
0.0480
Mandor

130 Kg PEMBESIAN DENGAN BESI POLOS


136.5000 kg
Besi beton polos
1.9500 kg
Kawat bendrat
0.9100
Pekerja
0.9100
Tukang besi
0.0910
Kep. Tukang besi
0.0520
Mandor

22

35,000.00
49,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

115,500.00
80,850.00
8,415.00
8,215.00
3,137,324.27
3,137,324.00

a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
3,593,333.33
a. Rp.
138,050.00
a. Rp.
35,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-19)
= Rp.
898,333.33
= Rp.
40,029.00
= Rp.
29,280.00
= Rp.
377,300.00
= Rp.
345,125.00
= Rp.
490,000.00
= Rp.
115,500.00
= Rp.
80,850.00
= Rp.
8,415.00
= Rp.
8,215.00
= Rp.
2,393,047.33
= Rp.
2,393,047.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

(SNI DT 91-0008-2007-20)
= Rp.
103,950.00
= Rp.
2,854.50
= Rp.
2,450.00
= Rp.
3,290.00
= Rp.
357.00
= Rp.
212.00
= Rp.
113,113.50
= Rp.
113,113.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

10,560.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

(SNI DT 91-0008-2007-21)
= Rp.
110,880.00
= Rp.
2,854.50
= Rp.
2,450.00
= Rp.
3,290.00
= Rp.
357.00
= Rp.
212.00
= Rp.
120,043.50
= Rp.
120,043.00
(SNI DT 91-0008-2007-22)
= Rp.
1,143,450.00
= Rp.
31,399.50
= Rp.
26,950.00
= Rp.
36,190.00
= Rp.
3,927.00
= Rp.
2,332.00
= Rp.
1,244,248.50
= Rp.
1,244,248.00
(SNI DT 91-0008-2007-23)
= Rp.
1,247,400.00
= Rp.
34,254.00
= Rp.
29,400.00
= Rp.
39,480.00
= Rp.
4,284.00
= Rp.
2,544.00
= Rp.
1,357,362.00
= Rp.
1,357,362.00
(SNI DT 91-0008-2007-24)
= Rp.
1,351,350.00
= Rp.
37,108.50
= Rp.
31,850.00
= Rp.
42,770.00
= Rp.
4,641.00
= Rp.
2,756.00
= Rp.
1,470,475.50
= Rp.
1,470,475.00

25.

26.

27.

28.

29.

30.

31.

32.

33.

140 Kg PEMBESIAN DENGAN BESI POLOS


147.0000 kg
Besi beton polos
2.1000 kg
Kawat bendrat
0.9800
Pekerja
0.9800
Tukang besi
0.0980
Kep. Tukang besi
0.0560
Mandor

150 Kg PEMBESIAN DENGAN BESI POLOS


157.5000 kg
Besi beton polos
2.2500 kg
Kawat bendrat
1.0500
Pekerja
1.0500
Tukang besi
0.1050
Kep. Tukang besi
0.0600
Mandor

200 Kg PEMBESIAN DENGAN BESI POLOS


210.0000 kg
Besi beton polos
3.0000 kg
Kawat bendrat
1.4000
Pekerja
1.4000
Tukang besi
0.1400
Kep. Tukang besi
0.0800
Mandor

250 Kg PEMBESIAN DENGAN BESI POLOS


262.5000 kg
Besi beton polos
3.7500 kg
Kawat bendrat
1.7500
Pekerja
1.7500
Tukang besi
0.1750
Kep. Tukang besi
0.1000
Mandor

1 M3
MEMBUAT PONDASI BETON BERTULANG K.175
1.00
BETON BERTULANG 1:2:3 K.175
1.00
BEGESTING PONDASI
1.00
PEMBESIAN 120 KG

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

(SNI DT 91-0008-2007-25)
= Rp.
1,455,300.00
= Rp.
39,963.00
= Rp.
34,300.00
= Rp.
46,060.00
= Rp.
4,998.00
= Rp.
2,968.00
= Rp.
1,583,589.00
= Rp.
1,583,589.00
(SNI DT 91-0008-2007-26)
= Rp.
1,559,250.00
= Rp.
42,817.50
= Rp.
36,750.00
= Rp.
49,350.00
= Rp.
5,355.00
= Rp.
3,180.00
= Rp.
1,696,702.50
= Rp.
1,696,702.00
(SNI DT 91-0008-2007-27)
= Rp.
2,079,000.00
= Rp.
57,090.00
= Rp.
49,000.00
= Rp.
65,800.00
= Rp.
7,140.00
= Rp.
4,240.00
= Rp.
2,262,270.00
= Rp.
2,262,270.00
(SNI DT 91-0008-2007-28)
= Rp.
2,598,750.00
= Rp.
71,362.50
= Rp.
61,250.00
= Rp.
82,250.00
= Rp.
8,925.00
= Rp.
5,300.00
= Rp.
2,827,837.50
= Rp.
2,827,837.00

a. Rp.
772,596.00
a. Rp.
916,237.00
a. Rp.
1,357,362.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-29)
= Rp.
772,596.00
= Rp.
916,237.00
= Rp.
1,357,362.00
= Rp.
3,046,195.00
= Rp.
3,046,195.00

a. Rp.
806,447.00
a. Rp.
916,237.00
a. Rp.
1,357,362.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-30)
= Rp.
806,447.00
= Rp.
916,237.00
= Rp.
1,357,362.00
= Rp.
3,080,046.00
= Rp.
3,080,046.00

a. Rp.
832,297.00
a. Rp.
916,237.00
a. Rp.
1,357,362.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-31)
= Rp.
832,297.00
= Rp.
916,237.00
= Rp.
1,357,362.00
= Rp.
3,105,896.00
= Rp.
3,105,896.00

a. Rp.
848,643.00
a. Rp.
916,237.00
a. Rp.
1,357,362.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-32)
= Rp.
848,643.00
= Rp.
916,237.00
= Rp.
1,357,362.00
= Rp.
3,122,242.00
= Rp.
3,122,242.00

1 M3
MEMBUAT SLOOF BETON BERTULANG K.200 UK. 15/15, 15/20
1.00
BETON BERTULANG 1:2:3 K.200
a. Rp.
806,447.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00

(SNI DT 91-0008-2007-33)
= Rp.
806,447.00
= Rp.
1,190,613.00

1 M3
MEMBUAT PONDASI BETON BERTULANG K.200
1.00
BETON BERTULANG 1:2:3 K.200
1.00
BEGESTING PONDASI
1.00
PEMBESIAN 120 KG

1 M3
MEMBUAT PONDASI BETON BERTULANG K.225
1.00
BETON BERTULANG 1:2:3 K.225
1.00
BEGESTING PONDASI
1.00
PEMBESIAN 120 KG

1 M3
MEMBUAT PONDASI BETON BERTULANG K.250
1.00
BETON BERTULANG 1:2:3 K.250
1.00
BEGESTING PONDASI
1.00
PEMBESIAN 120 KG

23

1.00

PEMBESIAN 130 KG

a. Rp.
1,470,475.00
Jumlah
Dibulatkan

34.

1 M3
MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/25, 20/30
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
1.00
PEMBESIAN 140 KG
a. Rp.
1,583,589.00
Jumlah
Dibulatkan

35.

1M
MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/40, 30/40
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan

36.

= Rp.
= Rp.
= Rp.

1,470,475.00
3,467,535.00
3,467,535.00

(SNI DT 91-0008-2007-34)
= Rp.
832,297.00
= Rp.
1,190,613.00
= Rp.
1,583,589.00
= Rp.
3,606,499.00
= Rp.
3,606,499.00

(SNI DT 91-0008-2007-35)
= Rp.
832,297.00
= Rp.
1,190,613.00
= Rp.
1,696,702.00
= Rp.
3,719,612.00
= Rp.
3,719,612.00

1M
MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/25, 20/30
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
1.00
PEMBESIAN 140 KG
a. Rp.
1,583,589.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-36)
= Rp.
848,643.00
= Rp.
1,190,613.00
= Rp.
1,583,589.00
= Rp.
3,622,845.00
= Rp.
3,622,845.00

37.

1 M3
MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/40, 30/40
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-37)
= Rp.
848,643.00
= Rp.
1,190,613.00
= Rp.
1,696,702.00
= Rp.
3,735,958.00
= Rp.
3,735,958.00

38.

1M
MEMBUAT KOLOM PRAKTIS BTN BERTULANG K.175 UK. 11/11,15/15
1.00
BETON BERTULANG 1:2:3 K.175
a. Rp.
772,596.00
0.25
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 130 KG
a. Rp.
1,470,475.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-38)
= Rp.
772,596.00
= Rp.
554,310.50
= Rp.
1,470,475.00
= Rp.
2,797,381.50
= Rp.
2,797,381.00

39.

1 M3
MEMBUAT KOLOM BETON BERTULANG K.200 UK. 15/25, 15/30, 20/30
1.00
BETON BERTULANG 1:2:3 K.200
a. Rp.
806,447.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-39)
= Rp.
806,447.00
= Rp.
1,108,621.00
= Rp.
1,696,702.00
= Rp.
3,611,770.00
= Rp.
3,611,770.00

40.

1 M3
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 15/25, 15/30, 20/30
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-40)
= Rp.
832,297.00
= Rp.
1,108,621.00
= Rp.
1,696,702.00
= Rp.
3,637,620.00
= Rp.
3,637,620.00

41.

1 M3
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 20/40, 30/40
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 200 KG
a. Rp.
2,262,270.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-41)
= Rp.
832,297.00
= Rp.
1,108,621.00
= Rp.
2,262,270.00
= Rp.
4,203,188.00
= Rp.
4,203,188.00

42.

1 M3
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 20/40, 30/40
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 200 KG
a. Rp.
2,262,270.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-42)
= Rp.
848,643.00
= Rp.
1,108,621.00
= Rp.
2,262,270.00
= Rp.
4,219,534.00
= Rp.
4,219,534.00

43.

1 M3
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/50, 35/50
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING KOLOM
a. Rp.
2,217,242.00

(SNI DT 91-0008-2007-43)
= Rp.
832,297.00
= Rp.
1,108,621.00

24

1.00

PEMBESIAN 225 KG

a. Rp.
2,522,145.00
Jumlah
Dibulatkan

44.

1 M3
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/50, 35/50
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 225 KG
a. Rp.
2,522,145.00
Jumlah
Dibulatkan

45.

1M
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/60, 35/60, 40/70
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 250 KG
a. Rp.
2,827,837.00
Jumlah
Dibulatkan

46.

= Rp.
= Rp.
= Rp.

2,522,145.00
4,463,063.00
4,463,063.00

(SNI DT 91-0008-2007-44)
= Rp.
848,643.00
= Rp.
1,108,621.00
= Rp.
2,522,145.00
= Rp.
4,479,409.00
= Rp.
4,479,409.00

(SNI DT 91-0008-2007-45)
= Rp.
832,297.00
= Rp.
1,108,621.00
= Rp.
2,827,837.00
= Rp.
4,768,755.00
= Rp.
4,768,755.00

1M
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/60, 35/60, 40/70
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 250 KG
a. Rp.
2,827,837.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-46)
= Rp.
848,643.00
= Rp.
1,108,621.00
= Rp.
2,827,837.00
= Rp.
4,785,101.00
= Rp.
4,785,101.00

47.

1 M3
MEMBUAT RING BALOK BETON BERTULANG K.175 UK. 15/15, 15/20
1.00
BETON BERTULANG 1:2:3 K.175
a. Rp.
772,596.00
0.25
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 110 KG
a. Rp.
1,244,248.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-47)
= Rp.
772,596.00
= Rp.
723,547.50
= Rp.
1,244,248.00
= Rp.
2,740,391.50
= Rp.
2,740,391.00

48.

1M
MEMBUAT BALOK BETON BERTULANG K.200 UK. 15/20, 15/30, 20/30
1.00
BETON BERTULANG 1:2:3 K.200
a. Rp.
806,447.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 120 KG
a. Rp.
1,357,362.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-48)
= Rp.
806,447.00
= Rp.
1,447,095.00
= Rp.
1,357,362.00
= Rp.
3,610,904.00
= Rp.
3,610,904.00

49.

1 M3
MEMBUAT BALOK BETON BERTULANG K.225 UK. 15/30, 20/30
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 120 KG
a. Rp.
1,357,362.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-49)
= Rp.
832,297.00
= Rp.
1,447,095.00
= Rp.
1,357,362.00
= Rp.
3,636,754.00
= Rp.
3,636,754.00

50.

1 M3
MEMBUAT BALOK BETON BERTULANG K.225 UK. 25/40, 30/50
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-50)
= Rp.
832,297.00
= Rp.
1,447,095.00
= Rp.
1,696,702.00
= Rp.
3,976,094.00
= Rp.
3,976,094.00

51.

1 M3
MEMBUAT BALOK BETON BERTULANG K.250 UK. 25/40, 30/50
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-51)
= Rp.
848,643.00
= Rp.
1,447,095.00
= Rp.
1,696,702.00
= Rp.
3,992,440.00
= Rp.
3,992,440.00

52.

1 M3
MEMBUAT BALOK BETON BERTULANG K.225 UK. 30/60, 30/70, 30/80
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 200 KG
a. Rp.
2,262,270.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-52)
= Rp.
832,297.00
= Rp.
1,447,095.00
= Rp.
2,262,270.00
= Rp.
4,541,662.00
= Rp.
4,541,662.00

53.

1 M3
MEMBUAT BALOK BETON BERTULANG K.250 UK. 30/60, 30/70, 30/80
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00

(SNI DT 91-0008-2007-53)
= Rp.
848,643.00
= Rp.
1,447,095.00

25

1.00

PEMBESIAN 200 KG

a. Rp.
2,262,270.00
Jumlah
Dibulatkan

54.

1 M3
MEMBUAT PLAT LANTAI BETON BERTULANG K.225 TB. 10 & 12 CM
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING LANTAI
a. Rp.
3,137,324.00
1.00
PEMBESIAN 110 KG
a. Rp.
1,244,248.00
Jumlah
Dibulatkan

55.

1M
MEMBUAT PLAT LANTAI BETON BERTULANG K.250 TB. 10 & 12 CM
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING LANTAI
a. Rp.
3,137,324.00
1.00
PEMBESIAN 110 KG
a. Rp.
1,244,248.00
Jumlah
Dibulatkan

56.

1M
MEMBUAT TANGGA BETON BERTULANG K.225
1.00
BETON BERTULANG 1:2:3 K.225
0.50
BEGESTING TANGGA
1.00
PEMBESIAN 150 KG

57.

58.

59

60

1 M3
MEMBUAT TANGGA BETON BERTULANG K.250
1.00
BETON BERTULANG 1:2:3 K.250
0.50
BEGESTING TANGGA
1.00
PEMBESIAN 150 KG

225 Kg PEMBESIAN DENGAN BESI POLOS


236.2500 kg
Besi beton polos
3.0000 kg
Kawat bendrat
1.4000
Pekerja
1.4000
Tukang besi
0.1400
Kep. Tukang besi
0.0800
Mandor

1 M3

43 Kg

BEGESTING UNTUK PONDASI


3
0.0054 m
Kayu terentang
1.5000 kg
Paku
0.4000 ltr
Minyak begesting
2.6000
Pekerja
1.3000
Tukang kayu
0.1300
Kep. Tukang kayu
0.1220
Mandor

PEMBESIAN DENGAN BESI POLOS


45.1500 kg
Besi beton polos
0.6450 kg
Kawat bendrat
0.3010
Pekerja
0.3010
Tukang besi
0.0301
Kep. Tukang besi
0.0172
Mandor

= Rp.
= Rp.
= Rp.

2,262,270.00
4,558,008.00
4,558,008.00

(SNI DT 91-0008-2007-54)
= Rp.
832,297.00
= Rp.
1,568,662.00
= Rp.
1,244,248.00
= Rp.
3,645,207.00
= Rp.
3,645,207.00
(SNI DT 91-0008-2007-55)
= Rp.
848,643.00
= Rp.
1,568,662.00
= Rp.
1,244,248.00
= Rp.
3,661,553.00
= Rp.
3,661,553.00

a. Rp.
832,297.00
a. Rp.
2,393,047.00
a. Rp.
1,696,702.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-56)
= Rp.
832,297.00
= Rp.
1,196,523.50
= Rp.
1,696,702.00
= Rp.
3,725,522.50
= Rp.
3,725,522.00

a. Rp.
848,643.00
a. Rp.
2,393,047.00
a. Rp.
1,696,702.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-57)
= Rp.
848,643.00
= Rp.
1,196,523.50
= Rp.
1,696,702.00
= Rp.
3,741,868.50
= Rp.
3,741,868.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-58)
= Rp.
2,338,875.00
= Rp.
57,090.00
= Rp.
49,000.00
= Rp.
65,800.00
= Rp.
7,140.00
= Rp.
4,240.00
= Rp.
2,522,145.00
= Rp.
2,522,145.00

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-59)
= Rp.
19,404.00
= Rp.
20,014.50
= Rp.
9,760.00
= Rp.
91,000.00
= Rp.
63,700.00
= Rp.
6,630.00
= Rp.
6,466.00
= Rp.
216,974.50
= Rp.
216,974.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-60)
= Rp.
446,985.00
= Rp.
12,274.35
= Rp.
10,535.00
= Rp.
14,147.00
= Rp.
1,535.10
= Rp.
911.60
= Rp.
486,388.05
= Rp.
486,388.00

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

61

1 M3
MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175
1.00
BETON BERTULANG 1:2:3 K.175
a. Rp.
772,596.00
0.50
BEGESTING PONDASI
a. Rp.
216,974.00
1.00
PEMBESIAN 43 KG
a. Rp.
486,388.00
Jumlah
Dibulatkan

(SNI DT 91-0008-2007-61)
= Rp.
772,596.00
= Rp.
108,487.00
= Rp.
486,388.00
= Rp.
1,367,471.00
= Rp.
1,367,471.00

62

61 Kg

(SNI DT 91-0008-2007-62)

PEMBESIAN DENGAN BESI POLOS


26

64.0500
0.6450
0.3010
0.3010
0.0301
0.0172

63

kg
kg

Besi beton polos


Kawat bendrat
Pekerja
Tukang besi
Kep. Tukang besi
Mandor

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00

1M
MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175
1.00
BETON BERTULANG 1:2:3 K.175
a. Rp.
772,596.00
0.50
BEGESTING PONDASI
a. Rp.
216,974.00
1.00
PEMBESIAN 61 KG
a. Rp.
673,498.00
Jumlah
Dibulatkan
PEKERJAAN KAYU

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

634,095.00
12,274.35
10,535.00
14,147.00
1,535.10
911.60
673,498.05
673,498.00

(SNI DT 91-0008-2007-63)
= Rp.
772,596.00
= Rp.
108,487.00
= Rp.
673,498.00
= Rp.
1,554,581.00
= Rp.
1,554,581.00

( SNI DT 91-0011-2007 )

BAHAN KAYU MERANTI


1.

2.

1 M

1 M

PASANGAN KUDA - KUDA


3
1.1000 m
Kayu balok meranti kw. II
15.0000 kg
Besi strip
5.6000 kg
Paku
4.0000
Pekerja
12.0000
Tukang kayu
1.2000
Kep. Tukang kayu
0.2000
Mandor

PASANGAN GORDENG
3
1.1000 m
Kayu balok bengkirai kw. II
15.0000 kg
Besi strip
3.0000 kg
Paku
2.4000
Pekerja
7.2000
Tukang kayu
0.7200
Kep. Tukang kayu
0.1200
Mandor

a. Rp.
4,418,333.33
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-01)
= Rp.
4,860,166.66
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
140,000.00
= Rp.
588,000.00
= Rp.
61,200.00
= Rp.
10,600.00
= Rp.
5,952,187.46
= Rp.
5,952,187.00

a. Rp.
4,418,333.33
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-02)
= Rp.
4,860,166.66
= Rp.
217,500.00
= Rp.
40,029.00
= Rp.
84,000.00
= Rp.
352,800.00
= Rp.
36,720.00
= Rp.
6,360.00
= Rp.
5,597,575.66
= Rp.
5,597,575.00

3.

1 M2

PASANGAN USUK DAN RENG GENTENG PRES/LOKAL


3
0.0120 m
Kayu meranti 5/7
a. Rp.
3,593,333.33
3
0.0036 m
Reng Meranti
a. Rp.
3,031,875.00
0.1500 kg
Paku usuk
a. Rp.
13,343.00
0.1000
Pekerja
a. Rp.
35,000.00
0.1000
Tukang kayu
a. Rp.
49,000.00
0.0100
Kep. Tukang kayu
a. Rp.
51,000.00
0.0050
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-03)
= Rp.
43,120.00
= Rp.
10,914.75
= Rp.
2,001.45
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
65,211.20
= Rp.
65,211.00

4.

1 M2

PASANGAN USUK/RENG UNTUK GENTENG BETON DAN MONIER


3
0.0120 m
Kayu meranti 5/7
a. Rp.
3,593,333.33
3
0.0057 m
Reng Meranti
a. Rp.
3,031,875.00
0.2500 kg
Paku usuk
a. Rp.
13,343.00
0.1000
Pekerja
a. Rp.
35,000.00
0.1000
Tukang kayu
a. Rp.
49,000.00
0.0100
Kep. Tukang kayu
a. Rp.
51,000.00
0.0050
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-04)
= Rp.
43,120.00
= Rp.
17,281.69
= Rp.
3,335.75
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
72,912.44
= Rp.
72,912.00

5.

1 M2

PAS. RANGKA PLAFOND (50X100) Cm KAYU MERANTI


3
0.0154 m
Kayu meranti 5/7
a. Rp.
0.2000 kg
Paku usuk
a. Rp.
0.1500
Pekerja
a. Rp.
0.2500
Tukang kayu
a. Rp.
0.0250
Kep. Tukang kayu
a. Rp.

(SNI DT 91-0011-2007-05)
= Rp.
55,337.33
= Rp.
2,668.60
= Rp.
5,250.00
= Rp.
12,250.00
= Rp.
1,275.00

27

3,593,333.33
13,343.00
35,000.00
49,000.00
51,000.00

0.0750

6.

1 M2

7.

1 M3

8.

9.

10.

11.

12.

1 M2

1 M2

1 M2

1 M2

1 M'

Mandor

a. Rp.
Jumlah
Dibulatkan

53,000.00

PAS. RANGKA PLAFOND (60X120) Cm KAYU MERANTI


3
0.0142 m
Kayu meranti 5/7
a. Rp.
3,593,333.33
0.2500 kg
Paku usuk
a. Rp.
13,343.00
0.2000
Pekerja
a. Rp.
35,000.00
0.3000
Tukang kayu
a. Rp.
49,000.00
0.0300
Kep. Tukang kayu
a. Rp.
51,000.00
0.0100
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan
PASANGAN KUSEN KAYU MERANTI
3
1.2000 m
Kayu balok meranti kw. 1
1.2500 kg
Paku
1.0000 kg
Lem Kayu
6.0000
Pekerja
18.0000
Tukang kayu
2.0000
Kep. Tukang kayu
0.3000
Mandor

PAS. DAUN PINTU / JENDELA KACA POLOS


3
0.0240 m
Kayu papan meranti kw. 1
0.3000 kg
Lem Kayu
2
1.0000 m
Kaca 5 mm polos putih
0.8000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0400
Mandor

PAS. PINTU / JENDELA JALUSI


3
0.0640 m
Kayu papan meranti kw. 1
0.5000 kg
Lem Kayu
1.0000
Pekerja
3.0000
Tukang kayu
0.3000
Kep. Tukang kayu
0.0500
Mandor

PAS. JALUSI MATI KUSEN KAYU MERANTI


3
0.0600 m
Kayu papan meranti kw. 1
0.1500 kg
Paku
0.5000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0250
Mandor

PAS. DAUN PINTU / JENDELA PANIL


3
0.0400 m
Kayu papan meranti kw. 1
0.5000 kg
Lem Kayu
1.0000
Pekerja
2.5000
Tukang kayu
0.2500
Kep. Tukang kayu
0.0500
Mandor

PASANG LISPLANK KAYU MERANTI 3/20


3
0.0108 m
Kayu papan meranti kw. 2
0.1000 kg
Paku usuk
0.1000
Pekerja
0.2000
Tukang kayu
0.0250
Kep. Tukang kayu
28

= Rp.
= Rp.
= Rp.

3,975.00
80,755.93
80,755.00

(SNI DT 91-0011-2007-06)
= Rp.
51,025.33
= Rp.
3,335.75
= Rp.
7,000.00
= Rp.
14,700.00
= Rp.
1,530.00
= Rp.
530.00
= Rp.
78,121.08
= Rp.
78,121.00

a. Rp.
4,739,166.67
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-07)
= Rp.
5,687,000.00
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
882,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
6,931,078.75
= Rp.
6,931,078.00

a. Rp.
4,968,333.33
a. Rp.
17,500.00
a. Rp.
66,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-08)
= Rp.
119,240.00
= Rp.
5,250.00
= Rp.
66,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
328,810.00
= Rp.
328,810.00

a. Rp.
4,968,333.33
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-09)
= Rp.
317,973.33
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
147,000.00
= Rp.
15,300.00
= Rp.
2,650.00
= Rp.
526,673.33
= Rp.
526,673.00

a. Rp.
4,968,333.33
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-10)
= Rp.
298,100.00
= Rp.
2,001.45
= Rp.
17,500.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,325.00
= Rp.
427,126.45
= Rp.
427,126.00

a. Rp.
4,968,333.33
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-11)
= Rp.
198,733.33
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
122,500.00
= Rp.
12,750.00
= Rp.
2,650.00
= Rp.
380,383.33
= Rp.
380,383.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.

(SNI DT 91-0011-2007-12)
= Rp.
50,490.00
= Rp.
1,334.30
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,275.00

4,675,000.00
13,343.00
35,000.00
49,000.00
51,000.00

0.0050

13.

Mandor

a. Rp.
Jumlah
Dibulatkan

PASANG LISPLANK KAYU MERANTI 3/30


3
0.0110 m
Kayu papan meranti kw. 2
0.0500 kg
Paku usuk
0.1000
Pekerja
0.2000
Tukang kayu
0.0200
Kep. Tukang kayu
0.0050
Mandor

1 M'

53,000.00

= Rp.
= Rp.
= Rp.

265.00
66,664.30
66,664.00

a. Rp.
4,675,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-13)
= Rp.
51,425.00
= Rp.
667.15
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,020.00
= Rp.
265.00
= Rp.
66,677.15
= Rp.
66,677.00

a. Rp.
7,768,750.00
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-14)
= Rp.
9,322,500.00
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
10,922,620.80
= Rp.
10,922,620.00

a. Rp.
6,992,857.14
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-15)
= Rp.
7,692,142.85
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
140,000.00
= Rp.
588,000.00
= Rp.
61,200.00
= Rp.
10,600.00
= Rp.
8,784,163.65
= Rp.
8,784,163.00

BAHAN KAYU BENGKIRAI


14.

15.

15.

16.

16.

17.

1 M

1 M3

1 M3

1 M3

1 M3

1 M2

PASANGAN KUDA - KUDA EXPOSE


3
1.2000 m
Kayu balok bengkirai kw. I
15.0000 kg
Besi strip
5.6000 kg
Paku
6.0000
Pekerja
20.0000
Tukang kayu
2.0000
Kep. Tukang kayu
0.3000
Mandor

PASANGAN KUDA - KUDA


3
1.1000 m
Kayu balok bengkirai kw. II
15.0000 kg
Besi strip
5.6000 kg
Paku
4.0000
Pekerja
12.0000
Tukang kayu
1.2000
Kep. Tukang kayu
0.2000
Mandor

PASANGAN KUDA - KUDA KAYU LAMA


15.0000 kg
Besi strip
5.6000 kg
Paku
4.0000
Pekerja
12.0000
Tukang kayu
1.2000
Kep. Tukang kayu
0.2000
Mandor

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

PASANGAN GORDENG
3
1.1000 m
Kayu balok bengkirai kw. II
15.0000 kg
Besi strip
3.0000 kg
Paku
2.4000
Pekerja
7.2000
Tukang kayu
0.7200
Kep. Tukang kayu
0.1200
Mandor

14,500.00
13,343.00
35,000.00
49,000.00
51,000.00
53,000.00

a. Rp.
6,992,857.14
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

PASANGAN GORDENG KAYU LAMA


15.0000 kg
Besi strip
3.0000 kg
Paku
2.4000
Pekerja
7.2000
Tukang kayu
0.7200
Kep. Tukang kayu
0.1200
Mandor

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

14,500.00
13,343.00
35,000.00
49,000.00
51,000.00
53,000.00

PASANGAN USUK/RENG BENGKIRAI UNTUK GENTENG PRESS/LOKAL


3
0.0120 m
Kayu gergajian 4/6 ; 5/7 kw. II
a. Rp.
4,730,000.00
29

(SNI DT 91-0011-2007-15.a)
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
140,000.00
= Rp.
588,000.00
= Rp.
61,200.00
= Rp.
10,600.00
= Rp.
1,092,020.80
= Rp.
1,092,020.00
(SNI DT 91-0011-2007-16)
= Rp.
7,692,142.85
= Rp.
217,500.00
= Rp.
40,029.00
= Rp.
84,000.00
= Rp.
352,800.00
= Rp.
36,720.00
= Rp.
6,360.00
= Rp.
8,429,551.85
= Rp.
8,429,551.00
(SNI DT 91-0011-2007-16.a)
= Rp.
217,500.00
= Rp.
40,029.00
= Rp.
84,000.00
= Rp.
352,800.00
= Rp.
36,720.00
= Rp.
6,360.00
= Rp.
737,409.00
= Rp.
737,409.00
(SNI DT 91-0011-2007-17)
= Rp.
56,760.00

0.0036
0.2500
0.1000
0.1000
0.0100
0.0050

m3
kg

Reng bengkirai
Paku usuk
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor

a. Rp.
4,436,666.67
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

15,972.00
3,335.75
3,500.00
4,900.00
510.00
265.00
85,242.75
85,242.00

17.

1 M

PASANGAN USUK KAYU LAMA DAN RENG KAYU BENGKIRAI BARU


(SNI DT 91-0011-2007-17.a)
3
0.0036 m
Reng bengkirai
a. Rp.
4,436,666.67
= Rp.
15,972.00
0.2500 kg
Paku usuk
a. Rp.
13,343.00
= Rp.
3,335.75
0.1000
Pekerja
a. Rp.
35,000.00
= Rp.
3,500.00
0.1000
Tukang kayu
a. Rp.
49,000.00
= Rp.
4,900.00
0.0100
Kep. Tukang kayu
a. Rp.
51,000.00
= Rp.
510.00
0.0050
Mandor
a. Rp.
53,000.00
= Rp.
265.00
Jumlah
= Rp.
28,482.75
Dibulatkan
= Rp.
28,482.00

18.

1 M2

PAS.USUK/RENG BENGKIRAI UNTUK GENTENG BETON DAN MONIER


3
0.0120 m
Kayu gergajian 4/6 ; 5/7 kw. II
a. Rp.
4,730,000.00
3
0.0057 m
Reng bengkirai
a. Rp.
4,436,666.67
0.2500 kg
Paku usuk
a. Rp.
13,343.00
0.1000
Pekerja
a. Rp.
35,000.00
0.1000
Tukang kayu
a. Rp.
49,000.00
0.0100
Kep. Tukang kayu
a. Rp.
51,000.00
0.0050
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

18.a 1 M

19.

20.

21.

1 M2

1 M2

1 M3

(SNI DT 91-0011-2007-18)
= Rp.
56,760.00
= Rp.
25,289.00
= Rp.
3,335.75
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
94,559.75
= Rp.
94,559.00

PAS.USUK KAYU LAMA & RENG KAYU BENGKIRAI BARU


(SNI DT 91-0011-2007-18.a)
3
0.0057 m
Reng bengkirai
a. Rp.
4,436,666.67
= Rp.
25,289.00
0.2500 kg
Paku usuk
a. Rp.
13,343.00
= Rp.
3,335.75
0.1000
Pekerja
a. Rp.
35,000.00
= Rp.
3,500.00
0.1000
Tukang kayu
a. Rp.
49,000.00
= Rp.
4,900.00
0.0100
Kep. Tukang kayu
a. Rp.
51,000.00
= Rp.
510.00
0.0050
Mandor
a. Rp.
53,000.00
= Rp.
265.00
Jumlah
= Rp.
37,799.75
Dibulatkan
= Rp.
37,799.00
PAS. RANGKA PLAFOND (50X100) Cm BENGKIRAI
3
0.0154 m
Kayu bengkirai 5/7 kw. II
0.2000 kg
Paku usuk
0.1500
Pekerja
0.2500
Tukang kayu
0.0250
Kep. Tukang kayu
0.0750
Mandor

PAS. RANGKA PLAFOND (60X120) Cm BENGKIRAI


3
0.0142 m
Kayu bengkirai 5/7 kw. II
0.2500 kg
Paku usuk
0.2000
Pekerja
0.3000
Tukang kayu
0.0300
Kep. Tukang kayu
0.0100
Mandor

PASANGAN KUSEN KAYU BENGKIRAI


3
1.1000 m
Kayu balok bengkirai KW. 1
1.2500 kg
Paku
1.0000 kg
Lem Kayu
6.0000
Pekerja
20.0000
Tukang kayu
2.0000
Kep. Tukang kayu
0.3000
Mandor

30

a. Rp.
4,730,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-19)
= Rp.
72,842.00
= Rp.
2,668.60
= Rp.
5,250.00
= Rp.
12,250.00
= Rp.
1,275.00
= Rp.
3,975.00
= Rp.
98,260.60
= Rp.
98,260.00

a. Rp.
4,730,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-20)
= Rp.
67,166.00
= Rp.
3,335.75
= Rp.
7,000.00
= Rp.
14,700.00
= Rp.
1,530.00
= Rp.
530.00
= Rp.
94,261.75
= Rp.
94,261.00

a. Rp.
7,768,750.00
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-21)
= Rp.
8,545,625.00
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
9,887,703.75
= Rp.
9,887,703.00

22.

23.

24.

25.

26.

27.

28.

1 M

1 M2

1 M2

1 M

1 M2

1 M2

1 M'

PASANGAN KUSEN KAYU BENGKIRAI


3
1.1000 m
Kayu balok bengkirai KW. 2
1.2500 kg
Paku
1.0000 kg
Lem Kayu
6.0000
Pekerja
20.0000
Tukang kayu
2.0000
Kep. Tukang kayu
0.3000
Mandor

PAS. DAUN PINTU / JENDELA KACA RAYBEN


3
0.0240 m
Kayu papan bengkirai
0.3000 kg
Lem Kayu
2
1.0000 m
Kaca 5 mm Rayben ( Asahimas )
0.8000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0400
Mandor

PAS. DAUN PINTU / JENDELA KACA POLOS


3
0.0240 m
Kayu papan bengkirai
0.3000 kg
Lem Kayu
2
1.0000 m
Kaca 5 mm polos putih
0.8000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0400
Mandor

PAS. PINTU / JENDELA JALUSI


3
0.0640 m
Kayu papan bengkirai
0.5000 kg
Lem Kayu
1.0000
Pekerja
3.0000
Tukang kayu
0.3000
Kep. Tukang kayu
0.0500
Mandor

PAS. JALUSI MATI KUSEN KAYU BENGKIRAI


3
0.0600 m
Kayu papan bengkirai
0.1500 kg
Paku
0.5000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0250
Mandor

PAS. DAUN PINTU / JENDELA PANIL


3
0.0400 m
Kayu papan bengkirai
0.5000 kg
Lem Kayu
1.0000
Pekerja
2.5000
Tukang kayu
0.2500
Kep. Tukang kayu
0.0500
Mandor

PASANG LISPLANK KAYU BENGKIRAI 3/20


3
0.0108 m
Kayu papan bengkirai
0.1000 kg
Paku usuk
0.1000
Pekerja
0.2000
Tukang kayu
0.0250
Kep. Tukang kayu
31

a. Rp.
6,992,857.14
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-22)
= Rp.
7,692,142.85
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
9,034,221.60
= Rp.
9,034,221.00

a. Rp.
8,030,000.00
a. Rp.
17,500.00
a. Rp.
77,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-23)
= Rp.
192,720.00
= Rp.
5,250.00
= Rp.
77,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
413,290.00
= Rp.
413,290.00

a. Rp.
8,030,000.00
a. Rp.
17,500.00
a. Rp.
66,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-24)
= Rp.
192,720.00
= Rp.
5,250.00
= Rp.
66,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
402,290.00
= Rp.
402,290.00

a. Rp.
8,030,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-25)
= Rp.
513,920.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
147,000.00
= Rp.
15,300.00
= Rp.
2,650.00
= Rp.
722,620.00
= Rp.
722,620.00

a. Rp.
8,030,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-26)
= Rp.
481,800.00
= Rp.
2,001.45
= Rp.
17,500.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,325.00
= Rp.
610,826.45
= Rp.
610,826.00

a. Rp.
8,030,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-27)
= Rp.
321,200.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
122,500.00
= Rp.
12,750.00
= Rp.
2,650.00
= Rp.
502,850.00
= Rp.
502,850.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.

(SNI DT 91-0011-2007-28)
= Rp.
86,724.00
= Rp.
1,334.30
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,275.00

8,030,000.00
13,343.00
35,000.00
49,000.00
51,000.00

0.0050

29.

Mandor

a. Rp.
Jumlah
Dibulatkan

PASANG LISPLANK KAYU BENGKIRAI 3/30


3
0.0110 m
Kayu papan bengkirai
0.0500 kg
Paku usuk
0.1000
Pekerja
0.2000
Tukang kayu
0.0200
Kep. Tukang kayu
0.0050
Mandor

1 M'

53,000.00

= Rp.
= Rp.
= Rp.

265.00
102,898.30
102,898.00

a. Rp.
8,030,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-29)
= Rp.
88,330.00
= Rp.
667.15
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,020.00
= Rp.
265.00
= Rp.
103,582.15
= Rp.
103,582.00

a. Rp.
6,875,000.00
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-30)
= Rp.
7,562,500.00
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
140,000.00
= Rp.
588,000.00
= Rp.
61,200.00
= Rp.
10,600.00
= Rp.
8,654,520.80
= Rp.
8,654,520.00

BAHAN KAYU KAMFER


30.

1 M

PASANGAN KUDA - KUDA


3
1.1000 m
Kayu balok kamfer kw. 2
15.0000 kg
Besi strip
5.6000 kg
Paku
4.0000
Pekerja
12.0000
Tukang kayu
1.2000
Kep. Tukang kayu
0.2000
Mandor

31.

1 M2

PASANGAN USUK/RENG KAMPER UNTUK GENTENG PRESS/LOKAL


3
0.0120 m
Kayu gergajian 4/6 ; 5/7
a. Rp.
4,950,000.00
3
0.0036 m
Reng kamper
a. Rp.
4,317,500.00
0.2500 kg
Paku usuk
a. Rp.
13,343.00
0.1000
Pekerja
a. Rp.
35,000.00
0.1000
Tukang kayu
a. Rp.
49,000.00
0.0100
Kep. Tukang kayu
a. Rp.
51,000.00
0.0050
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-31)
= Rp.
59,400.00
= Rp.
15,543.00
= Rp.
3,335.75
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
87,453.75
= Rp.
87,453.00

32.

1 M2

PAS. USUK/RENG KAMPER UNTUK GENTENG BETON DAN MONIER


3
0.0120 m
Kayu gergajian 4/6 ; 5/7
a. Rp.
4,950,000.00
3
0.0057 m
Reng kamper
a. Rp.
4,317,500.00
0.2500 kg
Paku usuk
a. Rp.
13,343.00
0.1000
Pekerja
a. Rp.
35,000.00
0.1000
Tukang kayu
a. Rp.
49,000.00
0.0100
Kep. Tukang kayu
a. Rp.
51,000.00
0.0050
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-32)
= Rp.
59,400.00
= Rp.
24,609.75
= Rp.
3,335.75
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
96,520.50
= Rp.
96,520.00

33.

1 M3

34.

1 M2

PASANGAN KUSEN
3
1.1000 m
Kayu balok kamper kw. II
1.2500 kg
Paku
1.0000 kg
Lem Kayu
6.0000
Pekerja
20.0000
Tukang kayu
2.0000
Kep. Tukang kayu
0.3000
Mandor

PAS. DAUN PINTU / JENDELA KACA RAYBEN


3
0.0240 m
Kayu papan kamper
0.3000 kg
Lem Kayu
2
1.0000 m
Kaca 5 mm Rayben ( Asahimas )
0.8000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0400
Mandor

32

a. Rp.
6,875,000.00
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-33)
= Rp.
7,562,500.00
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
8,904,578.75
= Rp.
8,904,578.00

a. Rp.
8,800,000.00
a. Rp.
17,500.00
a. Rp.
77,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-34)
= Rp.
211,200.00
= Rp.
5,250.00
= Rp.
77,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
431,770.00
= Rp.
431,770.00

35.

36.

37.

38.

1 M2

1 M

1 M2

1 M2

PAS. DAUN PINTU / JENDELA KACA POLOS


3
0.0240 m
Kayu papan kamper
0.3000 kg
Lem Kayu
2
1.0000 m
Kaca 5 mm polos putih
0.8000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0400
Mandor

PAS. DAUN PINTU / JENDELA JALUSI


3
0.0640 m
Kayu papan kamper
0.5000 kg
Lem Kayu
1.0000
Pekerja
3.0000
Tukang kayu
0.3000
Kep. Tukang kayu
0.0500
Mandor

PAS. JALUSI MATI KUSEN KAYU KAMPER


3
0.0600 m
Kayu papan kamper
0.1500 kg
Paku
0.5000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0250
Mandor

PAS. DAUN PINTU / JENDELA PANIL


3
0.0400 m
Kayu papan kanfer
0.5000 kg
Lem Kayu
1.0000
Pekerja
2.5000
Tukang kayu
0.2500
Kep. Tukang kayu
0.0500
Mandor

a. Rp.
8,800,000.00
a. Rp.
17,500.00
a. Rp.
66,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-35)
= Rp.
211,200.00
= Rp.
5,250.00
= Rp.
66,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
420,770.00
= Rp.
420,770.00

a. Rp.
8,800,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-36)
= Rp.
563,200.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
147,000.00
= Rp.
15,300.00
= Rp.
2,650.00
= Rp.
771,900.00
= Rp.
771,900.00

a. Rp.
8,800,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-37)
= Rp.
528,000.00
= Rp.
2,001.45
= Rp.
17,500.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,325.00
= Rp.
657,026.45
= Rp.
657,026.00

a. Rp.
8,800,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-38)
= Rp.
352,000.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
122,500.00
= Rp.
12,750.00
= Rp.
2,650.00
= Rp.
533,650.00
= Rp.
533,650.00

a. Rp.
11,000,000.00
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-39)
= Rp.
12,100,000.00
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
13,442,078.75
= Rp.
13,442,078.00

a. Rp.
12,460,000.00
a. Rp.
17,500.00
a. Rp.
77,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-40)
= Rp.
299,040.00
= Rp.
5,250.00
= Rp.
77,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
519,610.00
= Rp.
519,610.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.

(SNI DT 91-0011-2007-41)
= Rp.
797,440.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
147,000.00
= Rp.
15,300.00

BAHAN KAYU JATI


39.

40.

41.

1 M3

1 M2

1 M2

PASANGAN KUSEN JAYU JATI


3
1.1000 m
Kayu balok jati
1.2500 kg
Paku
1.0000 kg
Lem Kayu
6.0000
Pekerja
20.0000
Tukang kayu
2.0000
Kep. Tukang kayu
0.3000
Mandor

PAS. DAUN PINTU / JENDELA KACA KAYU JATI


3
0.0240 m
Kayu jati (papan)
0.3000 kg
Lem Kayu
2
1.0000 m
Kaca 5 mm Rayban Asahimas
0.8000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0400
Mandor

PAS. DAUN PINTU / JENDELA JALUSI


3
0.0640 m
Kayu jati (papan)
0.5000 kg
Lem Kayu
1.0000
Pekerja
3.0000
Tukang kayu
0.3000
Kep. Tukang kayu
33

12,460,000.00
17,500.00
35,000.00
49,000.00
51,000.00

0.0500

42.

43.

44.

1 M2

1 M

Mandor

a. Rp.
Jumlah
Dibulatkan

PAS. JALUSI MATI KUSEN KAYU JATI


3
0.0600 m
Kayu jati, papan
0.1500 kg
Paku
0.5000
Pekerja
2.0000
Tukang kayu
0.2000
Kep. Tukang kayu
0.0250
Mandor

PAS. DAUN PINTU / JENDELA PANIL KAYU JATI


3
0.0400 m
Kayu jati, papan
0.5000 kg
Lem Kayu
1.0000
Pekerja
2.5000
Tukang kayu
0.2500
Kep. Tukang kayu
0.0500
Mandor

PASANG LISPLANK KAYU JATI 3/30


3
0.0110 m
Kayu jati, papan
0.0500 kg
Paku usuk
0.1000
Pekerja
0.2000
Tukang kayu
0.0200
Kep. Tukang kayu
0.0050
Mandor

1 M'

53,000.00

= Rp.
= Rp.
= Rp.

2,650.00
1,006,140.00
1,006,140.00

a. Rp.
12,460,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-42)
= Rp.
747,600.00
= Rp.
2,001.45
= Rp.
17,500.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,325.00
= Rp.
876,626.45
= Rp.
876,626.00

a. Rp.
12,460,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-43)
= Rp.
498,400.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
122,500.00
= Rp.
12,750.00
= Rp.
2,650.00
= Rp.
680,050.00
= Rp.
680,050.00

a. Rp.
12,460,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-44)
= Rp.
137,060.00
= Rp.
667.15
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,020.00
= Rp.
265.00
= Rp.
152,312.15
= Rp.
152,312.00

PEMBUATAN DAUN PINTU LAPIS


45.

1 M

PINTU DOUBLE TRIPLEK RANGKA KAYU BENGKIRAI


3
0.025 m
Papan kayu bengkirai
a. Rp.
8,030,000.00
1.0000 lbr
Triplek 4 mm (Uk. 110x210)
a. Rp.
46,828.57
0.0300 kg
Paku
a. Rp.
13,343.00
0.5000 kg
Lem kayu
a. Rp.
17,500.00
0.6000
Pekerja
a. Rp.
35,000.00
2.0000
Tukang kayu
a. Rp.
49,000.00
0.2000
Kep. Tukang kayu
a. Rp.
51,000.00
0.0300
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-45)
= Rp.
200,750.00
= Rp.
46,828.57
= Rp.
400.29
= Rp.
8,750.00
= Rp.
21,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,590.00
= Rp.
387,518.86
= Rp.
387,518.00

46.

1 M2

PINTU DOUBLE TEAKWOOD RANGKA KAYU BENGKIRAI


3
0.025 m
Papan kayu bengkirai
a. Rp.
8,030,000.00
1.0000 lbr
Teakwood 4 mm (Uk. 110x210)
a. Rp.
68,750.00
0.0300 kg
Paku
a. Rp.
13,343.00
0.5000 kg
Lem kayu
a. Rp.
17,500.00
0.6000
Pekerja
a. Rp.
35,000.00
2.0000
Tukang kayu
a. Rp.
49,000.00
0.2000
Kep. Tukang kayu
a. Rp.
51,000.00
0.0300
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-46)
= Rp.
200,750.00
= Rp.
68,750.00
= Rp.
400.29
= Rp.
8,750.00
= Rp.
21,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,590.00
= Rp.
409,440.29
= Rp.
409,440.00

47.

1 M2

PINTU TEAKWOOD DAN LAPIS ALUMINIUM RANGKA BENGKIRAI


3
0.025 m
Kayu bengkirai
a. Rp.
8,030,000.00
0.5000 lbr
Teakwood 4 mm (Uk. 110x210)
a. Rp.
68,750.00
0.5000 lbr
Triplek Aluminium 4 mm
a. Rp.
83,875.00
0.0300 kg
Paku
a. Rp.
13,343.00
0.5000 kg
Lem kayu
a. Rp.
17,500.00
0.6000
Pekerja
a. Rp.
35,000.00
2.0000
Tukang kayu
a. Rp.
49,000.00
0.2000
Kep. Tukang kayu
a. Rp.
51,000.00
0.0300
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-47)
= Rp.
200,750.00
= Rp.
34,375.00
= Rp.
41,937.50
= Rp.
400.29
= Rp.
8,750.00
= Rp.
21,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,590.00
= Rp.
417,002.79
= Rp.
417,002.00

34

PAS. DINDING PEMISAH DOUBLE TEAKWOOD RANGKA KY. BENGKIRAI


3
0.028 m
Kayu bengkirai balok 6/12 kw. II
a. Rp.
6,992,857.14
0.8600 lbr
Teakwood 4 mm (Uk. 120x240)
a. Rp.
77,916.67
0.1500 kg
Paku
a. Rp.
13,343.00
0.5600 kg
Lem kayu
a. Rp.
17,500.00
0.1500
Pekerja
a. Rp.
35,000.00
0.4500
Tukang kayu
a. Rp.
49,000.00
0.0450
Kep. Tukang kayu
a. Rp.
51,000.00
0.0080
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-48)
= Rp.
195,800.00
= Rp.
67,008.34
= Rp.
2,001.45
= Rp.
9,800.00
= Rp.
5,250.00
= Rp.
22,050.00
= Rp.
2,295.00
= Rp.
424.00
= Rp.
304,628.79
= Rp.
304,628.00

PAS. DINDING PEMISAH DOUBLE TRIPLEK RANGKA KAYU BENGKIRAI


3
0.028 m
Kayu bengkirai balok 6/12 kw. II
a. Rp.
6,992,857.14
0.8600 lbr
Triplek 4 mm (Uk. 120x240)
a. Rp.
57,585.00
0.1500 kg
Paku
a. Rp.
13,343.00
0.5600 kg
Lem kayu
a. Rp.
17,500.00
0.1500
Pekerja
a. Rp.
35,000.00
0.4500
Tukang kayu
a. Rp.
49,000.00
0.0450
Kep. Tukang kayu
a. Rp.
51,000.00
0.0080
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0011-2007-49)
= Rp.
195,800.00
= Rp.
49,523.10
= Rp.
2,001.45
= Rp.
9,800.00
= Rp.
5,250.00
= Rp.
22,050.00
= Rp.
2,295.00
= Rp.
424.00
= Rp.
287,143.55
= Rp.
287,143.00

48.

1 M

49.

1 M

PEKERJAAN LANGIT-LANGIT
1.

2.

3.

1 M2

1 M

1 M'

PASANG ETERNIT
2
1.1000 m
Eternit Atrisco
0.0100 kg
Paku
0.0300
Pekerja
0.0700
Tukang kayu
0.0070
Kep. Tukang kayu
0.0020
Mandor

PASANG CALSIBOARD
0.3750 lbr
Calsiboard
0.0300 kg
Paku
0.0700
Pekerja
0.1000
Tukang kayu
0.0100
Kep. Tukang kayu
0.0040
Mandor

LIST PLAFOND KAYU PROFIL


1.0500 m'
Kayu profil bengkirai
0.0100 kg
Paku
0.0500
Pekerja
0.0500
Tukang kayu
0.0050
Kep. Tukang kayu
0.0030
Mandor

PEKERJAAN PENUTUP ATAP


1.

1.a

1 M2

1 M2

( SNI DT 91-0013-2007 )

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

13,566.67
13,343.00
35,000.00
49,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

58,643.75
24,322.20
35,000.00
49,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

7,095.00
13,343.00
35,000.00
49,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

858.00
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.

49,000.00
35,000.00

(SNI DT 91-0013-2007-01)
= Rp.
14,923.34
= Rp.
133.43
= Rp.
1,050.00
= Rp.
3,430.00
= Rp.
357.00
= Rp.
106.00
= Rp.
19,999.77
= Rp.
19,999.00
(SNI DT 91-0013-2007-02)
= Rp.
21,991.41
= Rp.
729.67
= Rp.
2,450.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
212.00
= Rp.
30,793.07
= Rp.
30,793.00
(SNI DT 91-0013-2007-03)
= Rp.
7,449.75
= Rp.
133.43
= Rp.
1,750.00
= Rp.
2,450.00
= Rp.
255.00
= Rp.
159.00
= Rp.
12,197.18
= Rp.
12,197.00

( SNI 03-3436-2002 )

PASANGAN GENTENG PRES BIASA


25 bj
Genteng pres biasa
0.0750
Tukang kayu
0.1500
Pekerja
0.0080
Kep. Tukang
0.0080
Mandor

PASANGAN GENTENG PRES BIASA LAMA


0.0750
Tukang kayu
0.1500
Pekerja
35

(SNI 03-3436-2002-01)
= Rp.
21,450.00
= Rp.
3,675.00
= Rp.
5,250.00
= Rp.
408.00
= Rp.
424.00
= Rp.
31,207.00
= Rp.
31,207.00
(SNI 03-3436-2002-01.a)
= Rp.
3,675.00
= Rp.
5,250.00

0.0080
0.0080

2.

3.

4.

5.

6.

7.

8.

1 M'

Kep. Tukang
Mandor

PASANGAN BUBUNGAN PRES BIASA


5 bj
Genteng bubung pres biasa
8.0000 kg
Semen / PC
3
0.0320 m
Pasir pasang
0.2000
Tukang kayu
0.4000
Pekerja
0.0200
Kep. Tukang
0.0020
Mandor

1 M

1 M

1 M'

1 M2

1 M'

1 M2

PASANGAN GENTENG BETON BESAR


9.5 bj
Genteng Beton besar
0.1000
Tukang kayu
0.2000
Pekerja
0.0100
Kep. Tukang
0.0100
Mandor

PASANGAN GENTENG BETON KECIL


11 bj
Genteng beton kecil
0.1000
Tukang kayu
0.2000
Pekerja
0.0100
Kep. Tukang
0.0100
Mandor

PASANGAN BUBUNGAN BETON


5 bj
Genteng bubung beton
10.8000 kg
Semen / PC
3
0.0320 m
Pasir pasang
0.2000
Tukang kayu
0.4000
Pekerja
0.0200
Kep. Tukang
0.0020
Mandor

PASANGAN GENTENG JATIWANGI ISI 14,5 BJ


14.5 bj
Genteng Jatiwangi
0.1000
Tukang kayu
0.2000
Pekerja
0.0100
Kep. Tukang
0.0100
Mandor

PASANGAN BUBUNGAN JATIWANGI


3.5 bj
Genteng bubung Jatiwangi
10.8000 kg
Semen / PC
3
0.0320 m
Pasir pasang
0.2000
Tukang kayu
0.4000
Pekerja
0.0200
Kep. Tukang
0.0020
Mandor

a. Rp.
a. Rp.
Jumlah
Dibulatkan

51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

1,815.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

2,970.00
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

2,750.00
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

4,653.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

4,840.00
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

4,400.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00

PASANGAN GENTENG BETON BESAR BERWARNA


9 bj
Genteng Beton besar berwarna
a. Rp.
0.1000
Tukang kayu
a. Rp.
0.2000
Pekerja
a. Rp.
0.0100
Kep. Tukang
a. Rp.
36

3,300.00
49,000.00
35,000.00
51,000.00

= Rp.
= Rp.
= Rp.
= Rp.

408.00
424.00
9,757.00
9,757.00

(SNI 03-3436-2002-02)
= Rp.
9,075.00
= Rp.
11,220.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
48,488.73
= Rp.
48,488.00
(SNI 03-3436-2002-03)
= Rp.
28,215.00
= Rp.
4,900.00
= Rp.
7,000.00
= Rp.
510.00
= Rp.
530.00
= Rp.
41,155.00
= Rp.
41,155.00
(SNI 03-3436-2002-04)
= Rp.
30,250.00
= Rp.
4,900.00
= Rp.
7,000.00
= Rp.
510.00
= Rp.
530.00
= Rp.
43,190.00
= Rp.
43,190.00
(SNI 03-3436-2002-05)
= Rp.
23,265.00
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
66,605.73
= Rp.
66,605.00
(SNI 03-3436-2002-06)
= Rp.
70,180.00
= Rp.
4,900.00
= Rp.
7,000.00
= Rp.
510.00
= Rp.
530.00
= Rp.
83,120.00
= Rp.
83,120.00
(SNI 03-3436-2002-07)
= Rp.
15,400.00
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
58,740.73
= Rp.
58,740.00
(SNI 03-3436-2002-08)
= Rp.
29,700.00
= Rp.
4,900.00
= Rp.
7,000.00
= Rp.
510.00

0.0100

9.

10.

11.

12.

13.

14.

15.

1 M'

PASANGAN BUBUNGAN BETON BERWARNA


3.5 bj
Genteng bubung beton berwarna
10.8000 kg
Semen / PC
3
0.0320 m
Pasir pasang
0.2000
Tukang kayu
0.4000
Pekerja
0.0200
Kep. Tukang
0.0020
Mandor

1 M

1 M'

1 M2

1 M'

1 M2

1 M'

Mandor

a. Rp.
Jumlah
Dibulatkan

53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

3,575.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00

PASANGAN GENTENG BETON BESAR BERWARNA + COATING


9 bj
Genteng Beton besar berwarna +
a. Rp.
Coatingan
0.1000
Tukang kayu
a. Rp.
0.2000
Pekerja
a. Rp.
0.0100
Kep. Tukang
a. Rp.
0.0100
Mandor
a. Rp.
Jumlah
Dibulatkan
PASANGAN BUBUNGAN BETON BERWARNA + COATING
3.5 bj
Genteng bubung beton berwarna
a. Rp.
+ Coatingan
10.8000 kg
Semen / PC
a. Rp.
3
0.0320 m
Pasir pasang
a. Rp.
0.2000
Tukang kayu
a. Rp.
0.4000
Pekerja
a. Rp.
0.0200
Kep. Tukang
a. Rp.
0.0020
Mandor
a. Rp.
Jumlah
Dibulatkan
PASANGAN GENTENG KERAMIK
14.5 bj
Genteng keramik
0.0750
Tukang kayu
0.1500
Pekerja
0.0080
Kep. Tukang
0.0080
Mandor

PASANGAN BUBUNGAN KERAMIK


3.5 bj
Genteng bubungan keramik
10.8000 kg
Semen / PC
3
0.0320 m
Pasir pasang
0.2000
Tukang kayu
0.4000
Pekerja
0.0200
Kep. Tukang
0.0020
Mandor

3,740.00
49,000.00
35,000.00
51,000.00
53,000.00

6,050.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

7,535.00
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

44,825.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00

PASANGAN GENTENG PRES KARANGPILANG EXS. GOODYEAR


21 bj
Genteng Karangpilang exs. Goodyear a. Rp.
0.0750
Tukang kayu
a. Rp.
0.1500
Pekerja
a. Rp.
0.0080
Kep. Tukang
a. Rp.
0.0080
Mandor
a. Rp.
Jumlah
Dibulatkan

2,750.00
49,000.00
35,000.00
51,000.00
53,000.00

PASANGAN BUBUNGAN PRES KARANGPILANG EXS. GOODYEAR


3 bj
Genteng bubungan
a. Rp.
4,290.00
10.8000 kg
Semen / PC
a. Rp.
1,402.50
3
0.0320 m
Pasir pasang
a. Rp.
102,116.67
0.2000
Tukang kayu
a. Rp.
49,000.00
37

= Rp.
= Rp.
= Rp.

530.00
42,640.00
42,640.00

(SNI 03-3436-2002-09)
= Rp.
12,512.50
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
55,853.23
= Rp.
55,853.00
(SNI 03-3436-2002-10)
= Rp.
33,660.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

4,900.00
7,000.00
510.00
530.00
46,600.00
46,600.00

(SNI 03-3436-2002-11)
= Rp.
21,175.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

15,147.00
3,267.73
9,800.00
14,000.00
1,020.00
106.00
64,515.73
64,515.00

(SNI 03-3436-2002-12)
= Rp.
109,257.50
= Rp.
3,675.00
= Rp.
5,250.00
= Rp.
408.00
= Rp.
424.00
= Rp.
119,014.50
= Rp.
119,014.00
(SNI 03-3436-2002-13)
= Rp.
156,887.50
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
200,228.23
= Rp.
200,228.00
(SNI 03-3436-2002-14)
= Rp.
57,750.00
= Rp.
3,675.00
= Rp.
5,250.00
= Rp.
408.00
= Rp.
424.00
= Rp.
67,507.00
= Rp.
67,507.00
(SNI 03-3436-2002-15)
= Rp.
12,870.00
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00

0.4000
0.0200
0.0020

16.

17.

18.

19.

1 M

1 M2

1 M'

1 M'

Pekerja
Kep. Tukang
Mandor

PASANGAN ASBES GELOMBANG BESAR


0.3500 lbr
Asbes gelombang besar
0.1200 kg
Sekrup / Paku payung
0.0700
Tukang kayu
0.1400
Pekerja
0.0070
Kep. Tukang kayu
0.0070
Mandor

PASANGAN ASBES GELOMBANG KECIL


0.3500 lbr
Asbes gelombang kecil
0.1200 kg
Sekrup / Paku payung
0.0700
Tukang kayu
0.1400
Pekerja
0.0070
Kep. Tukang kayu
0.0070
Mandor

PASANG BUBUNG ASBES GELOMBANG BESAR


1.1000 lbr
Nok Asbes gelombang besar
0.2000 kg
Sekrup / Paku payung
0.1250
Tukang kayu
0.0130
Kep. Tukang kayu
0.0840
Pekerja
0.0040
Mandor

PASANG BUBUNG ASBES GELOMBANG KECIL


1.1000 lbr
Nok Asbes gelombang kecil
0.2000 bj
Sekrup / Paku payung
0.1250
Tukang kayu
0.0130
Kep. Tukang kayu
0.0840
Pekerja
0.0040
Mandor

PEKERJAAN BESI DAN ALUMINIUM


1.

2.

1 M'

1 M'

a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

109,725.00
27,500.00
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

106,150.00
27,500.00
49,000.00
35,000.00
51,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

53,075.00
27,500.00
49,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

28,526.67
27,500.00
49,000.00
51,000.00
35,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

14,000.00
1,020.00
106.00
56,210.73
56,210.00

(SNI 03-3436-2002-16)
= Rp.
38,403.75
= Rp.
3,300.00
= Rp.
3,430.00
= Rp.
4,900.00
= Rp.
357.00
= Rp.
371.00
= Rp.
50,761.75
= Rp.
50,761.00
(SNI 03-3436-2002-17)
= Rp.
37,152.50
= Rp.
3,300.00
= Rp.
3,430.00
= Rp.
4,900.00
= Rp.
357.00
= Rp.
371.00
= Rp.
49,510.50
= Rp.
49,510.00
(SNI 03-3436-2002-18)
= Rp.
58,382.50
= Rp.
5,500.00
= Rp.
6,125.00
= Rp.
663.00
= Rp.
2,940.00
= Rp.
212.00
= Rp.
73,822.50
= Rp.
73,822.00
(SNI 03-3436-2002-19)
= Rp.
31,379.34
= Rp.
5,500.00
= Rp.
6,125.00
= Rp.
663.00
= Rp.
2,940.00
= Rp.
212.00
= Rp.
46,819.34
= Rp.
46,819.00

( SNI DT 91-0014-2007 )

PASANGAN TALANG DATAR / JURAI


1.05000 m'
Seng BJLS 30
0.01500 kg
Paku
3
0.01900 m
Kayu papan
0.40000
Tukang besi
0.02500
Kep. Tukang
0.20000
Pekerja
0.01000
Mandor

PASANGAN TALANG 1/2 LINGKARAN dia. 15 CM


1.05000 m'
Seng BJLS 30
0.01000 kg
Paku
0.50000 kg
Besi strip
0.30000
Tukang besi
0.03000
Kep. Tukang
0.15000
Pekerja
0.00700
Mandor

38

a. Rp.
107,250.00
a. Rp.
13,343.00
a. Rp.
4,950,000.00
a. Rp.
47,000.00
a. Rp.
51,000.00
a. Rp.
35,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

(SNI DT 91-0014-2007-01)
= Rp.
112,612.50
= Rp.
200.15
= Rp.
94,050.00
= Rp.
18,800.00
= Rp.
1,275.00
= Rp.
7,000.00
= Rp.
530.00
= Rp.
234,467.65
= Rp.
234,467.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

(SNI DT 91-0014-2007-02)
= Rp.
112,612.50
= Rp.
133.43
= Rp.
7,250.00
= Rp.
14,100.00
= Rp.
1,530.00
= Rp.
5,250.00
= Rp.
371.00
= Rp.
141,246.93
= Rp.
141,246.00

107,250.00
13,343.00
14,500.00
47,000.00
51,000.00
35,000.00
53,000.00

3.

4.

5.

1 Kg

1M

1M

PASANG RANGKA KUDA-KUDA BAJA WF 150 - 250


1.15000 kg
Besi baja / WF
a. Rp.
0.06000
Tukang las
a. Rp.
0.00600
Kep. Tukang
a. Rp.
0.06000
Pekerja
a. Rp.
0.00300
Mandor
a. Rp.
Jumlah
Dibulatkan
PASANG ROOLING DOOR ALUMINIUM
2
1.00000 m
Rolling Door
1.00000
Tukang besi
0.10000
Kep. Tukang
1.00000
Pekerja
0.05000
Mandor

PASANG TERALI BESI


6.17700 kg
Besi Strip
27.08000 cm
Pengelasan
1.67000
Tukang besi
0.16700
Kep. Tukang
1.67000
Pekerja
0.08300
Mandor

PEKERJAAN PLITURAN DAN PENGECATAN


1.

2.

3.

4.

1M

1 M2

1 M2

1 M2

14,535.00
47,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

341,250.00
47,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

14,500.00
900.00
47,000.00
51,000.00
35,000.00
53,000.00

(SNI DT 91-0014-2007-03)
= Rp.
16,715.25
= Rp.
2,820.00
= Rp.
306.00
= Rp.
2,100.00
= Rp.
159.00
= Rp.
22,100.25
= Rp.
22,100.00
(SNI DT 91-0014-2007-04)
= Rp.
341,250.00
= Rp.
47,000.00
= Rp.
5,100.00
= Rp.
35,000.00
= Rp.
2,650.00
= Rp.
431,000.00
= Rp.
431,000.00
(SNI DT 91-0014-2007-05)
= Rp.
89,566.50
= Rp.
24,372.00
= Rp.
78,490.00
= Rp.
8,517.00
= Rp.
58,450.00
= Rp.
4,399.00
= Rp.
263,794.50
= Rp.
263,794.00

( SNI P.C )

MENGGOSOK DAN MENDEMPUL KAYU


0.0800 kg
Dempul / Plamir
0.0200 kg
Minyak Cat
0.0100 kg
Batu kambang
0.04
Tukang cat
0.004
Kep. Tukang cat
0.04
Pekerja
0.0025
Mandor

( SNI P.C.01 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

PELABURAN BIDANG KAYU DENGAN POLITUR


0.1500 ltr
Politur
0.3720 ltr
Politur Jadi
2.0000 lbr
Kertas gosok
0.0600
Tukang cat
0.0160
Kep. Tukang cat
0.0025
Mandor

( SNI P.C.02 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

PELABURAN BIDANG KAYU DENGAN MELAMIN


0.1429 kg
Dempul/wood filter
0.2000 kg
Pewarna/wood sten
0.5000 kg
Melamin Seanding sealler
0.2000 kg
Melamin lack (glass/dop)
2.5000 ltr
Thinner B
2.0000 lbr
Kertas gosok
0.2000 klng
Compound
0.0750
Pekerja
0.0900
Tukang cat
0.0090
Kep. Tukang cat
0.0250
Mandor
Alat bantu compressor

( SNI P.C.02A )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

PELABURAN BIDANG KAYU DENGAN VERNIS


0.1500 ltr
Vernis
0.0500 ltr
Dempul/plamir
0.1000 lbr
Kertas gosok
39

( SNI P.C.03 )
a. Rp.
a. Rp.
a. Rp.

19,595.71
17,710.00
26,400.00
42,400.00
50,000.00
35,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

1,567.66
354.20
264.00
1,696.00
200.00
1,400.00
132.50
5,614.36
5,614.00

70,400.00
70,400.00
3,272.50
42,400.00
50,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

10,560.00
26,188.80
6,545.00
2,544.00
800.00
132.50
46,770.30
46,770.00

44,000.00
57,500.00
57,500.00
60,500.00
17,710.00
3,272.50
38,500.00
35,000.00
42,400.00
50,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

6,287.60
11,500.00
28,750.00
12,100.00
44,275.00
6,545.00
7,700.00
2,625.00
3,816.00
450.00
1,325.00
5,000.00
130,373.60
130,373.00

36,300.00
27,500.00
3,272.50

= Rp.
= Rp.
= Rp.

5,445.00
1,375.00
327.25

0.0100
0.1600
0.0160
0.1600
0.0025

bh

Kuas
Tukang cat
Kep. Tukang cat
Pekerja
Mandor

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,900.00
42,400.00
50,000.00
35,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

99.00
6,784.00
800.00
5,600.00
132.50
20,562.75
20,562.00

5.

1 M2

PENGECATAN KY BARU (1 LPS PLAMIR + 1 LPS CAT DASAR + 3 LPS CAT PENUTUP) ( SNI P.C.04 )
0.2000 kg
Meni Kayu Pedang
a. Rp.
20,507.14
= Rp.
4,101.43
0.3500 kg
Cat EMCO
a. Rp.
58,300.00
= Rp.
20,405.00
0.1700 kg
Cat Dasar
a. Rp.
58,300.00
= Rp.
9,911.00
0.1500 kg
Dempul / Plamir
a. Rp.
19,595.71
= Rp.
2,939.36
0.1050
Tukang cat
a. Rp.
42,400.00
= Rp.
4,452.00
0.0040
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
200.00
0.0700
Pekerja
a. Rp.
35,000.00
= Rp.
2,450.00
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
132.50
Jumlah
= Rp.
44,591.28
Dibulatkan
= Rp.
44,591.00

6.

1M

PENGECATAN KAYU BARU (1 LPS PLAMIR+1 LPS CAT DASAR+2 LPS CAT PENUTUP) ( SNI P.C.05)
0.2000 kg
Meni Kayu Pedang
a. Rp.
20,507.14
= Rp.
4,101.43
0.2600 kg
Cat EMCO
a. Rp.
58,300.00
= Rp.
15,158.00
0.1700 kg
Cat Dasar
a. Rp.
58,300.00
= Rp.
9,911.00
0.1500 kg
Dempul / Plamir
a. Rp.
19,595.71
= Rp.
2,939.36
0.0090
Tukang cat
a. Rp.
42,400.00
= Rp.
381.60
0.0060
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
300.00
0.0700
Pekerja
a. Rp.
35,000.00
= Rp.
2,450.00
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
132.50
Jumlah
= Rp.
35,373.88
Dibulatkan
= Rp.
35,373.00

7.

1M

PENGECATAN KAYU LAMA (1 LPS PLAMIR+ 1 LPS CAT DASAR+ 1 LPS CAT PENUTUP) (SNI P.C.06)
0.17 kg
Cat EMCO
a. Rp.
58,300.00
= Rp.
9,911.00
0.17 kg
Cat Dasar
a. Rp.
58,300.00
= Rp.
9,911.00
0.15 kg
Dempul / Plamir
a. Rp.
19,595.71
= Rp.
2,939.36
0.075
Tukang cat
a. Rp.
42,400.00
= Rp.
3,180.00
0.0075
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
375.00
0.07
Pekerja
a. Rp.
35,000.00
= Rp.
2,450.00
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
132.50
Jumlah
= Rp.
28,898.86
Dibulatkan
= Rp.
28,898.00

8.

1 M2

MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA / M2


0.0500 kg
Soda api
a. Rp.
0.1500
Pekerja
a. Rp.
0.0025
Mandor
a. Rp.
Jumlah
Dibulatkan

( SNI.P.C.07 )
27,500.00
= Rp.
35,000.00
= Rp.
53,000.00
= Rp.
= Rp.
= Rp.

1,375.00
5,250.00
132.50
6,757.50
6,757.00

9.

1 M2

PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP) (SNI P.C.08)
0.2600 kg
Cat tembok Paragon
a. Rp.
14,107.50
= Rp.
3,667.95
0.1000 kg
Cat Dasar
a. Rp.
14,107.50
= Rp.
1,410.75
0.1000 kg
Dempul / Plamir
a. Rp.
8,800.00
= Rp.
880.00
0.0630
Tukang cat
a. Rp.
42,400.00
= Rp.
2,671.20
0.0063
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
315.00
0.0200
Pekerja
a. Rp.
35,000.00
= Rp.
700.00
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
132.50
Jumlah
= Rp.
9,777.40
Dibulatkan
= Rp.
9,777.00

10.

1 M2

PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP)
0.2600 kg
Cat tembok Decolith
a. Rp.
15,400.00
= Rp.
0.1000 kg
Cat Dasar
a. Rp.
15,400.00
= Rp.
0.1000 kg
Dempul / Plamir
a. Rp.
8,800.00
= Rp.
0.0630
Tukang cat
a. Rp.
42,400.00
= Rp.
0.0063
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
0.0200
Pekerja
a. Rp.
35,000.00
= Rp.
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
Jumlah
= Rp.
Dibulatkan
= Rp.
40

( SNI P.C.09 )
4,004.00
1,540.00
880.00
2,671.20
315.00
700.00
132.50
10,242.70
10,242.00

11.

1M

PENGECATAN TEMBOK LAMA ( 1 LAPIS CAT DASAR + 2 LPS CAT PENUTUP )


0.1800 kg
Cat tembok Paragon
a. Rp.
14,107.50
0.1200 kg
Cat dasar
a. Rp.
14,107.50
0.0420
Tukang cat
a. Rp.
42,400.00
0.0042
Kep. Tukang cat
a. Rp.
50,000.00
0.0280
Pekerja
a. Rp.
35,000.00
0.0025
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

( SNI.P.C.10 )
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

2,539.35
1,692.90
1,780.80
210.00
980.00
132.50
7,335.55
7,335.00

11.

1M

PENGECATAN TEMBOK LAMA ( 1 LAPIS CAT DASAR + 1 LPS CAT PENUTUP )


0.0900 kg
Cat tembok Paragon
a. Rp.
14,107.50
0.1200 kg
Cat dasar
a. Rp.
14,107.50
0.0420
Tukang cat
a. Rp.
42,400.00
0.0042
Kep. Tukang cat
a. Rp.
50,000.00
0.0280
Pekerja
a. Rp.
35,000.00
0.0025
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

( SNI.P.C.10.A )
= Rp.
1,269.68
= Rp.
1,692.90
= Rp.
1,780.80
= Rp.
210.00
= Rp.
980.00
= Rp.
132.50
= Rp.
6,065.88
= Rp.
6,065.00

12.

1 M2

PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI ( SNI.P.C.11 )


0.1000 kg
Meni besi
a. Rp.
20,507.14
0.0100 bh
Kuas
a. Rp.
9,900.00
0.2000
Tukang cat
a. Rp.
42,400.00
0.0200
Kep. Tukang cat
a. Rp.
50,000.00
0.0200
Pekerja
a. Rp.
35,000.00
0.0100
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

2,050.71
99.00
8,480.00
1,000.00
700.00
530.00
12,859.71
12,859.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

6,066.78
2,671.20
315.00
700.00
132.50
9,885.48
9,885.00

13.

1 M2

PENGECATAN GENTENG ( SNI.P.C.12 )


0.2600 kg
Cat Genteng
0.0630
Tukang cat
0.0063
Kep. Tukang cat
0.0200
Pekerja
0.0025
Mandor

PEK. PENUTUP LANTAI & DINDING


1.

2.

3.

1 M2

1 M2

1 M2

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

23,333.75
42,400.00
50,000.00
35,000.00
53,000.00

( SNI DT 91-0012-2007 )

PASANGAN TEGEL ABU-ABU 20x20


2
1.0500 m
Tegel abu-abu
10.4000 kg
Semen / PC
3
0.0450 m
Pasir pasang
0.1300
Tukang batu
0.0130
Kep. Tukang batu
0.2700
Pekerja
0.0140
Mandor

PASANGAN DINDING KERAMIK 20x25 Kw. 1


2
Keramik 20x25 ( Roman Kembang )
1.0500 m
9.3000 kg
Semen / PC
1.9400 kg
Semen Warna
3
0.0180 m
Pasir pasang
0.4500
Tukang batu
0.0450
Kep. Tukang batu
0.6000
Pekerja
0.0300
Mandor

PASANGAN DINDING KERAMIK 20x25 Kw. 1


2
Keramik 20x25 ( Kobin Motif )
1.0500 m
9.3000 kg
Semen / PC
1.9400 kg
Semen Warna
3
0.0180 m
Pasir pasang
0.4500
Tukang batu
41

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,200.00
1,402.50
102,116.67
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

51,700.00
1,402.50
6,500.00
102,116.67
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.

46,650.00
1,402.50
6,500.00
102,116.67
46,000.00

(SNI DT 91-0012-2007-01)
= Rp.
36,960.00
= Rp.
14,586.00
= Rp.
4,595.25
= Rp.
5,980.00
= Rp.
663.00
= Rp.
9,450.00
= Rp.
742.00
= Rp.
72,976.25
= Rp.
72,976.00
(SNI DT 91-0012-2007-02)
= Rp.
54,285.00
= Rp.
13,043.25
= Rp.
12,610.00
= Rp.
1,838.10
= Rp.
20,700.00
= Rp.
2,295.00
= Rp.
21,000.00
= Rp.
1,590.00
= Rp.
127,361.35
= Rp.
127,361.00
(SNI DT 91-0012-2007-03)
= Rp.
48,982.50
= Rp.
13,043.25
= Rp.
12,610.00
= Rp.
1,838.10
= Rp.
20,700.00

0.0450
0.6000
0.0300

4.

5.

6.

7.

8.

9.

1M

1M

1M

1 M2

1 M2

1 M2

Kep. Tukang batu


Pekerja
Mandor

PASANGAN DINDING KERAMIK 20x25 Kw. 1


2
1.0500 m
Keramik 20x25 polos Mulia
9.3000 kg
Semen / PC
1.9400 kg
Semen Warna
3
0.0180 m
Pasir pasang
0.4500
Tukang batu
0.0450
Kep. Tukang batu
0.6000
Pekerja
0.0300
Mandor

PASANGAN LANTAI KERAMIK 30x30 Kw. 1


2
1.0500 m
Keramik 30x30 polos Roman
10.0000 kg
Semen / PC
1.5000 kg
Semen warna
3
0.0450 m
Pasir pasang
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

PASANGAN LANTAI KERAMIK 30x30 Kw. 1


2
1.0500 m
Keramik 30x30 polos Mulia
10.0000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.5000 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

PASANGAN LANTAI KERAMIK 30x30 Kw. 1


2
1.0500 m
Keramik 30x30 motif
10.0000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.5000 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

PASANGAN LANTAI KERAMIK 30x30 Kw. 1


2
1.0500 m
Keramik 30x30 Mulia sembur
10.0000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.5000 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

PASANGAN LANTAI KERAMIK MOTIF 40x40 Kw. 1


2
1.0500 m
Keramik 40x40 Kw. 1 Platinum
10.0000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.5000 kg
Semen warna
42

a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

38,500.00
1,402.50
6,500.00
102,116.67
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

37,766.67
1,402.50
6,500.00
102,116.67
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

31,114.29
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

44,000.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

35,475.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.

54,780.00
1,402.50
102,116.67
6,500.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

2,295.00
21,000.00
1,590.00
122,058.85
122,058.00

(SNI DT 91-0012-2007-04)
= Rp.
40,425.00
= Rp.
13,043.25
= Rp.
12,610.00
= Rp.
1,838.10
= Rp.
20,700.00
= Rp.
2,295.00
= Rp.
21,000.00
= Rp.
1,590.00
= Rp.
113,501.35
= Rp.
113,501.00
(SNI DT 91-0012-2007-05)
= Rp.
39,655.00
= Rp.
14,025.00
= Rp.
9,750.00
= Rp.
4,595.25
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
109,200.25
= Rp.
109,200.00
(SNI DT 91-0012-2007-06)
= Rp.
32,670.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
102,215.25
= Rp.
102,215.00
(SNI DT 91-0012-2007-07)
= Rp.
46,200.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
115,745.25
= Rp.
115,745.00
(SNI DT 91-0012-2007-08)
= Rp.
37,248.75
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
106,794.00
= Rp.
106,794.00
(SNI DT 91-0012-2007-09)
= Rp.
57,519.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00

0.3500
0.0350
0.6200
0.0300

10.

11.

12.

13.

14

1M

1M

1 M2

1 M2

1 M2

Tukang batu
Kep. Tukang batu
Pekerja
Mandor

PASANGAN LANTAI KERAMIK MOTIF 40x40 Kw. 1


2
1.0500 m
Keramik 40x40 Kw. 1 Arwana
10.0000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.5000 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

`
PASANGAN LANTAI KERAMIK 40x40 POLOS
2
1.0500 m
Keramik 40x40 Polos MAS
10.0000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.5000 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

PASANGAN LANTAI KERAMIK 20x20 Kw. 1


2
1.0500 m
Keramik 20x20 Mulia Kembang
10.4000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.6200 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

PASANGAN LANTAI MARMER (100 x 100 cm)


1.0600 Bh
Marmer
8.1900 kg
Semen / PC
3
0.0450 m
Pasir pasang
0.6500 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

PASANGAN GRANITO (60 x 60 cm)


2
1.0500 m
Granito 60 x 60 cm
10.0000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.5000 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor

PEKERJAAN KUNCI DAN KACA


1.

1 Bh

a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

53,350.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

33,000.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

40,333.33
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

500,000.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

269,500.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

16,100.00
1,785.00
21,700.00
1,590.00
127,064.25
127,064.00

(SNI DT 91-0012-2007-10)
= Rp.
56,017.50
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
125,562.75
= Rp.
125,562.00
(SNI DT 91-0012-2007-11)
= Rp.
34,650.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
104,195.25
= Rp.
104,195.00
(SNI DT 91-0012-2007-12)
= Rp.
42,350.00
= Rp.
14,586.00
= Rp.
4,595.25
= Rp.
10,530.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
113,236.25
= Rp.
113,236.00
(SNI DT 91-0012-2007-13)
= Rp.
530,000.00
= Rp.
11,486.48
= Rp.
4,595.25
= Rp.
4,225.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
591,481.73
= Rp.
591,481.00
(SNI DT 91-0012-2007-14)
= Rp.
282,975.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
352,520.25
= Rp.
352,520.00

( SNI K.K )

PASANG KUNCI TANAM ( SNI K.K.01 )


1.0000 bh
Kunci pegangan besar

a. Rp.
43

49,500.00

= Rp.

49,500.00

0.5000
0.0100
0.0100
0.0050

2.

3.

4.

5.

6.

7.

8.

1 Bh

1 Set

1 Set

1 Set

1 M2

1 Bh

1 Bh

Tukang kayu
Pekerja
Kep. Tukang kayu
Mandor

PASANG KUNCI SELOT ( SNI K.K.02 )


1.0000 bh
Kunci selot
0.2000
Tukang kayu
0.0200
Pekerja
0.0200
Kep. Tukang kayu
0.0010
Mandor

PASANG ENGSEL PINTU ( SNI K.K.03 )


1.00000 set
Engsel pintu
0.15000
Tukang kayu
0.01500
Pekerja
0.01500
Kep. Tukang kayu
0.00075
Mandor

PASANG ENGSEL JENDELA ( SNI K.K.04 )


1.00000 set
Engsel jendela
0.15000
Tukang kayu
0.01500
Pekerja
0.01500
Kep. Tukang kayu
0.00075
Mandor

PASANG KAIT ANGIN ( SNI K.K.05 )


1.00000 set
Kait angin
0.15000
Tukang kayu
0.01500
Pekerja
0.01500
Kep. Tukang kayu
0.00075
Mandor

PASANG KACA POLOS 5 mm ( SNI K.K.06 )


1.10000 m2
Kaca polos
0.15000
Tukang kayu
0.01500
Pekerja
0.01500
Kep. Tukang kayu
0.00075
Mandor

PASANG REL PINTU DORONG ( SNI K.K.07 )


1.00000 bh
Rel Pintu dorong
0.60000
Tukang kayu
0.06000
Pekerja
0.06000
Kep. Tukang kayu
0.00300
Mandor

PASANG KUNCI LEMARI ( SNI K.K.08 )


1.00000 bh
Kunci lemari
0.25000
Tukang kayu
0.02500
Pekerja
0.02500
Kep. Tukang kayu
0.00125
Mandor

44

a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

24,500.00
350.00
510.00
265.00
75,125.00
75,125.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

46,200.00
49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

46,200.00
9,800.00
700.00
1,020.00
53.00
57,773.00
57,773.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

10,862.50
49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

10,862.50
7,350.00
525.00
765.00
39.75
19,542.25
19,542.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

8,800.00
49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

8,800.00
7,350.00
525.00
765.00
39.75
17,479.75
17,479.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

8,800.00
49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

8,800.00
7,350.00
525.00
765.00
39.75
17,479.75
17,479.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

66,000.00
49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

72,600.00
7,350.00
525.00
765.00
39.75
81,279.75
81,279.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

165,000.00
49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

165,000.00
29,400.00
2,100.00
3,060.00
159.00
199,719.00
199,719.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

9,000.00
49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

9,000.00
12,250.00
875.00
1,275.00
66.25
23,466.25
23,466.00

1 M2

PASANG KACA RAYBAND 5 mm ( SNI K.K.09 )


1.10000 m2
Kaca Rayband 5 mm
0.15000
Tukang kayu
0.01500
Pekerja
0.01500
Kep. Tukang kayu
0.00075
Mandor

PEKERJAAN SANITASI
1.

2.

3.

4.

5.

6.

1 Bh

1 Bh

1 Bh

1 Bh

1 Bh

1 Bh

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

77,000.00
49,000.00
35,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

84,700.00
7,350.00
525.00
765.00
39.75
93,379.75
93,379.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

1,600,000.00
96,000.00
115,500.00
50,600.00
51.00
8,480.00
1,870,631.00
1,870,631.00

107,387.50
1,402.50
102,116.67
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

107,387.50
8,415.00
1,021.17
35,000.00
69,000.00
76,500.00
8,480.00
305,803.67
305,803.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

175,000.00
52,500.00
1,402.50
102,116.67
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

175,000.00
52,500.00
8,415.00
1,021.17
35,000.00
46,000.00
5,100.00
5,300.00
328,336.17
328,336.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

385,000.00
46,200.00
1,402.50
102,116.67
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

385,000.00
46,200.00
8,415.00
1,021.17
42,000.00
66,700.00
7,650.00
5,300.00
562,286.17
562,286.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

180,000.00
21,600.00
1,050.00
13,800.00
1,530.00
79.50
218,059.50
218,059.00

= Rp.
= Rp.
= Rp.
= Rp.

30,250.00
62.50
350.00
4,600.00

( SNI S. )

MEMASANG KLOSET DUDUK / MONOBLOK ( SNI.S.01 )


1.0000 bh
Kloset duduk/monoblok
a. Rp.
1,600,000.00
1.0000
Perlengkapan (6% harga kloset )
a. Rp.
96,000.00
3.3000
Pekerja
a. Rp.
35,000.00
1.1000
Tukang batu
a. Rp.
46,000.00
0.0010
Kep. Tukang batu
a. Rp.
51,000.00
0.1600
Mandor
a. Rp.
53,000.00
Jumlah
Dibulatkan
MEMASANG KLOSET JONGKOK PORSELEN
1.0000 bh
Kloset jongkok porselen
6.0000 kg
Semen / PC
0.0100 m3
Pasir pasang
1.0000
Pekerja
1.5000
Tukang batu
1.5000
Kep. Tukang batu
0.1600
Mandor

( SNI.S.02 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

MEMASANG URINOIR ( SNI.S.03 )


1.0000 bh
Urinoir
1.0000
Perlengkapan (30% harga urinoir)
6.0000 kg
Semen / PC
0.0100 m3
Pasir pasang
1.0000
Pekerja
1.0000
Tukang batu
0.1000
Kep. Tukang batu
0.1000
Mandor

MEMASANG WASTAFEL ( SNI.S.04 )


1.0000 bh
Wastafel
1.0000
Perlengkapan (12% hrg.wastafel)
6.0000 kg
Semen / PC
0.0100 m3
Pasir pasang
1.2000
Pekerja
1.4500
Tukang batu
0.1500
Kep. Tukang batu
0.1000
Mandor

MEMASANG BAK CUCI PIRING STAINLES STEEL


1.0000 bh
Bak cuci stainless
1.0000 set
Waterdrain + aksesoris
0.0300
Pekerja
0.3000
Tukang batu
0.0300
Kep. Tukang batu
0.0015
Mandor

MEMASANG KRAN AIR f 3/4" atau 1/2"


1.0000 bh
Kran air
0.0250 bh
Seal tape
0.0100
Pekerja
0.1000
Tukang batu

( SNI.S.05 )
a. Rp.
180,000.00
a. Rp.
21,600.00
a. Rp.
35,000.00
a. Rp.
46,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan

( SNI.S.06 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
45

30,250.00
2,500.00
35,000.00
46,000.00

0.0100
0.0050

6.

7.

8.

1 Bh

1 Bh

1 Bh

9.

1 Bh

10.

1 M'

11.

12.

1 M'

1 M'

Kep. Tukang batu


Mandor

MEMASANG KRAN AIR WASTAFEL


1.0000 bh
Kran Wastafel
0.0250 bh
Seal tape
0.0100
Pekerja
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0050
Mandor

a. Rp.
a. Rp.
Jumlah
Dibulatkan

51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.

510.00
265.00
36,037.50
36,037.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

50,000.00
2,500.00
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

50,000.00
62.50
350.00
4,600.00
510.00
265.00
55,787.50
55,787.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

15,000.00
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

15,000.00
350.00
4,600.00
510.00
265.00
20,725.00
20,725.00

220,000.00
39,600.00
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

220,000.00
39,600.00
350.00
4,600.00
510.00
265.00
265,325.00
265,325.00

( SNI.S.06.a )

MEMASANG FLOOR DRAIN ( SNI.S.07 )


1.0000 set
Floor drain
0.0100
Pekerja
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0050
Mandor

MEMASANG BAK MANDI FIBERGLASS


( SNI.S.08 )
1.0000 bh
Bak Fiberglass
a. Rp.
1.0000
Perlengkapan (18% hrg.bak)
a. Rp.
0.0100
Pekerja
a. Rp.
0.1000
Tukang batu
a. Rp.
0.0100
Kep. Tukang batu
a. Rp.
0.0050
Mandor
a. Rp.
Jumlah
Dibulatkan

MEMASANG BAK KONTROL PASANGAN BATU BATA (Uk. 30x30 cm tinggi 35 cm)
( SNI.S.09 )
3
0.1450 m
Batu bata kw. 2
a. Rp.
733.33
= Rp.
106.33
44.0000 kg
Semen / PC
a. Rp.
1,402.50
= Rp.
61,710.00
3
0.0700 m
Pasir Pasang
a. Rp.
102,116.67
= Rp.
7,148.17
3
0.0700 m
Batu Kerikil
a. Rp.
212,850.00
= Rp.
14,899.50
1.6000 kg
Besi beton
a. Rp.
9,900.00
= Rp.
15,840.00
3
0.0600 m
Pasir Beton
a. Rp.
141,710.00
= Rp.
8,502.60
0.0100
Pekerja
a. Rp.
35,000.00
= Rp.
350.00
0.1000
Tukang batu
a. Rp.
46,000.00
= Rp.
4,600.00
0.0100
Kep. Tukang batu
a. Rp.
51,000.00
= Rp.
510.00
0.0050
Mandor
a. Rp.
53,000.00
= Rp.
265.00
Jumlah
= Rp.
113,931.60
Dibulatkan
= Rp.
113,931.00
MEMASANG PIPA PVC TIPE AW F 1/2" ( SNI.S.15 )
1.2000 m'
Pipa PVC
a. Rp.
1.0000
Perlengkapan (35% harga pipa)
a. Rp.
0.0360
Pekerja
a. Rp.
0.0600
Tukang batu
a. Rp.
0.0060
Kep. Tukang batu
a. Rp.
0.0018
Mandor
a. Rp.
Jumlah
Dibulatkan
MEMASANG PIPA PVC TIPE AW F 3/4" ( SNI.S.16 )
1.2000 m'
Pipa PVC
a. Rp.
1.0000
Perlengkapan (35% harga pipa)
a. Rp.
0.0360
Pekerja
a. Rp.
0.0600
Tukang batu
a. Rp.
0.0060
Kep. Tukang batu
a. Rp.
0.0018
Mandor
a. Rp.
Jumlah
Dibulatkan
MEMASANG PIPA PVC TIPE AW F 1" ( SNI.S.17 )
1.2000 m'
Pipa PVC
a. Rp.
1.0000
Perlengkapan (35% harga pipa)
a. Rp.
46

5,954.67
2,084.13
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

7,145.60
2,084.13
1,260.00
2,760.00
306.00
95.40
13,651.13
13,651.00

7,065.33
2,472.87
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

8,478.40
2,472.87
1,260.00
2,760.00
306.00
95.40
15,372.67
15,372.00

7,970.67
2,789.73

= Rp.
= Rp.

9,564.80
2,789.73

0.0360
0.0600
0.0060
0.0018

13.

14.

15.

16.

1 M'

1 M'

1 M'

1 M'

Pekerja
Tukang batu
Kep. Tukang batu
Mandor

2.

3.

1 M2

1 M2

1 M2

35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

1,260.00
2,760.00
306.00
95.40
16,775.93
16,775.00

16,552.67
5,793.43
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

19,863.20
5,793.43
1,260.00
2,760.00
306.00
95.40
30,078.03
30,078.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

24,802.40
8,680.84
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

29,762.88
8,680.84
1,890.00
4,140.00
459.00
143.10
45,075.82
45,075.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

45,945.20
16,080.82
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

55,134.24
16,080.82
2,835.00
6,210.00
688.50
217.30
81,165.86
81,165.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

65,924.13
23,073.45
35,000.00
46,000.00
51,000.00
53,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

79,108.96
23,073.45
2,835.00
6,210.00
688.50
217.30
112,133.21
112,133.00

45,100.00
74,250.00
46,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

45,100.00
3,712.50
9,200.00
14,000.00
72,012.50
72,012.00

50,600.00
74,250.00
46,000.00
35,000.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

50,600.00
3,712.50
9,200.00
14,000.00
77,512.50
77,512.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

45,540.00
3,712.50
9,200.00
14,000.00
72,452.50
72,452.00

MEMASANG PIPA PVC TIPE AW F 1 1/2" ( SNI.S.18 )


1.2000 m'
Pipa PVC
a. Rp.
1.0000
Perlengkapan (35% harga pipa)
a. Rp.
0.0360
Pekerja
a. Rp.
0.0600
Tukang batu
a. Rp.
0.0060
Kep. Tukang batu
a. Rp.
0.0018
Mandor
a. Rp.
Jumlah
Dibulatkan
MEMASANG PIPA PVC TIPE AW F 2" ( SNI.S.19 )
1.2000 m'
Pipa PVC
1.0000
Perlengkapan (35% harga pipa)
0.0540
Pekerja
0.0900
Tukang batu
0.0090
Kep. Tukang batu
0.0027
Mandor

MEMASANG PIPA PVC TIPE AW F 3" ( SNI.S.20 )


1.2000 m'
Pipa PVC
1.0000
Perlengkapan (35% harga pipa)
0.0810
Pekerja
0.1350
Tukang batu
0.0135
Kep. Tukang batu
0.0041
Mandor

MEMASANG PIPA PVC TIPE AW F 4" ( SNI.S.21 )


1.2000 m'
Pipa PVC
1.0000
Perlengkapan (35% harga pipa)
0.0810
Pekerja
0.1350
Tukang batu
0.0135
Kep. Tukang batu
0.0041
Mandor

PEKERJAAN PAVING STONE


1.

a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

( An. Pav. )

PAS. PAVING SEGI EMPAT ABU-ABU 6 CM K.200


2
1.0000 m
Paving model segi empat
3
0.0500 m
Pasir urug
0.2000
Tukang batu
0.4000
Pekerja

PAS. PAVING SEGI EMPAT WARNA 6 CM K.200


2
1.0000 m
Paving model segi empat warna
3
0.0500 m
Pasir urug
0.2000
Tukang batu
0.4000
Pekerja

PAS. PAVINGSTONE BETON BLOK ABU-ABU 6 CM


2
1.0000 m
Paving beton blok abu abu
3
0.0500 m
Pasir urug
0.2000
Tukang batu
0.4000
Pekerja

47

( An.Pav.1 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
( An.Pav.2 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan

K.200
( An.Pav.3 )
a. Rp.
45,540.00
a. Rp.
74,250.00
a. Rp.
46,000.00
a. Rp.
35,000.00
Jumlah
Dibulatkan

4.

5.

6.

1M

1M

1 M2

PAS. PAVINGSTONE BETON BLOK WARNA 6 CM K.200


( An.Pav.4 )
2
1.0000 m
Paving beton blok warna
a. Rp.
50,600.00
3
0.0500 m
Pasir urug
a. Rp.
74,250.00
0.2000
Tukang batu
a. Rp.
46,000.00
0.4000
Pekerja
a. Rp.
35,000.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

50,600.00
3,712.50
9,200.00
14,000.00
77,512.50
77,512.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

60,500.00
3,712.50
9,200.00
14,000.00
87,412.50
87,412.00

PAS. PAVINGSTONE BETON SEGIEMPAT ABU-ABU 6 CM TANPA K ( An.Pav.6 )


2
1.0000 m
Paving beton blok segiempat
a. Rp.
35,200.00
= Rp.
3
0.0500 m
Pasir urug
a. Rp.
74,250.00
= Rp.
0.2000
Tukang batu
a. Rp.
46,000.00
= Rp.
0.4000
Pekerja
a. Rp.
35,000.00
= Rp.
Jumlah
= Rp.
Dibulatkan
= Rp.

35,200.00
3,712.50
9,200.00
14,000.00
62,112.50
62,112.00

PAS. PAVINGSTONE BETON BLOK ABU-ABU 8 CM


2
1.0000 m
Paving beton blok abu-abu
3
0.0500 m
Pasir urug
0.2000
Tukang batu
0.4000
Pekerja

K.300
( An.Pav.5 )
a. Rp.
60,500.00
a. Rp.
74,250.00
a. Rp.
46,000.00
a. Rp.
35,000.00
Jumlah
Dibulatkan

Tuban,

Januari 2012

KEPALA BIDANG TATA RUANG DAN PEMUKIMAN

Ir. S A T R I Y O
NIP. 19590405 199003 1 005

48

REKAPITULASI
ANALISA HARGA SATUAN BAHAN DAN UPAH TENAGA
TAHUN ANGGARAN 2012
NO.

URAIAN PEKERJAAN

KODE

SATUAN

ANALISA

1.
2.
3.
4.
5.

PEKERJAAN PERSIAPAN / SNI 03-2835-2002


PENGUKURAN DAN PEMASANGAN BOUWPLANK
PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
PAGAR SEMENTARA DARI SENG GELOMBANG t = 2m
PEMBERSIHAN LOKASI DAN PERATAAN
PEMBONGKARAN DINDING BATA MERAH

6.

PEMBONGKARAN BETON BERTULANG

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

PEKERJAAN TANAH ( SNI DT 91-0006-2007 )


GALIAN TANAH s/d 1 M
GALIAN TANAH s/d 2 M
GALIAN TANAH s/d 3 M
GALIAN TANAH BERBATU
GALIAN TANAH KERAS SEDALAM 1 M
GALIAN TANAH CADAS SEDALAM 1 M
GALIAN TANAH LUMPUR SEDALAM 1 M
URUGAN TANAH KEMBALI
MENGURUK PONDASI DENGAN PASIR
MENGURUK DENGAN TANAH
MENGURUK DENGAN SIRTU
MENGURUK DENGAN PEDEL
MEMBUANG TANAH SEJAUH 30 M
MENGERJAKAN STRIPPING TEBING SETINGGI 1 M

1.
2.
3.
4.
5.
6.

PEKERJAAN PONDASI
( SNI DT 91-0007-2007 )
PASANGAN AANSTAMPENG / BATU KOSONG
PASANGAN BATU GUNUNG/BRONGKOL 1:3:10
PASANGAN BATU GUNUNG/BRONGKOL 1/4Pc : 1Kpr : 4Ps
PASANGAN BATU GUNUNG/BRONGKOL 1 : 3
PASANGAN BATU GUNUNG/BRONGKOL 1 : 4
PASANGAN BATU GUNUNG/BRONGKOL 1 : 5

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

PEKERJAAN DINDING
( SNI DT 90-0009-2007 )
PASANGAN BATU KUMBUNG 1 BATA 1:3:10
PASANGAN BATU KUMBUNG 1 BATA 1 : 4
PASANGAN BATU KUMBUNG 1/2 BATA 1:3:10
PASANGAN BATU KUMBUNG 1/2 BATA 1:4
PASANGAN BATA MERAH 1 : 2 TB. 1 BATA KW. 1
PASANGAN BATA MERAH 1 : 2 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 3 : 10 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 3 TB. 1 BATA KW. 1
PASANGAN BATA MERAH 1 : 3 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 4 TB. 1 BATA KW. 1
PASANGAN BATA MERAH 1 : 4 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 5 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA KW. 1
PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA KW. 2
PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA KW. 1
PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA KW. 2
PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA KW. 1
PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA KW. 2
PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA KW. 1
PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA KW. 2
PASANGAN BATA MERAH 1 : 3 : 10 TB. 1/2 BATA KW. 2
PASANGAN DINDING ROSTER/TERAWANG 12X11X24 CM 1 : 3
PASANGAN DINDING BATU TEMPEL HITAM
PASANGAN DINDING BATU PARAS
PASANGAN BATU PALIMANAN
PASANGAN BETON ALUR
PASANGAN BATU CANDI
PASANGAN BATU SISIR

1.
2.
3.
4.
5.
6.
7.
8.

PEKERJAAN PLESTERAN
( Rev. SNI 03-2837-2007 )
PLESTERAN 1 : 2 Tebal 1.5 cm
PLESTERAN 1 : 3 Tebal 1,5 cm
PLESTERAN 1 : 4 Tebal 1,5 cm
PLESTERAN 1 : 5 Tebal 1,5 cm
PLESTERAN 1 : 3 Tebal 2 cm
PLESTERAN 1 : 4 Tebal 2 cm
PLESTERAN 1 : 5 Tebal 2 cm
PLESTERAN CIPRAT 1 : 2

SNI 03-2835-01
SNI 03-2835-02
SNI 03-2835-03
SNI 03-2835-04
SNI 03-2835-05
SNI 03-2835-06

(SNI DT 91-0006-2007-01)
(SNI DT 91-0006-2007-02)
(SNI DT 91-0006-2007-03)
(SNI DT 91-0006-2007-04)
(SNI DT 91-0006-2007-05)
(SNI DT 91-0006-2007-06)
(SNI DT 91-0006-2007-07)
(SNI DT 91-0006-2007-08)
(SNI DT 91-0006-2007-09)
(SNI DT 91-0006-2007-10)
(SNI DT 91-0006-2007-11)
(SNI DT 91-0006-2007-12)
(SNI DT 91-0006-2007-13)
(SNI DT 91-0006-2007-14)

49

(SNI DT 91-0007-2007-01)
(SNI DT 91-0007-2007-02)
(SNI DT 91-0007-2007-03)
(SNI DT 91-0007-2007-04)
(SNI DT 91-0007-2007-05)
(SNI DT 91-0007-2007-06)

An.D.01
An.D.02
An.D.03
An.D.04
(SNI DT 91-0009-2007-01)
(SNI DT 91-0009-2007-02)
(SNI DT 91-0009-2007-03)
(SNI DT 91-0009-2007-04)
(SNI DT 91-0009-2007-05)
(SNI DT 91-0009-2007-06)
(SNI DT 91-0009-2007-07)
(SNI DT 91-0009-2007-08)
(SNI DT 91-0009-2007-09)
(SNI DT 91-0009-2007-10)
(SNI DT 91-0009-2007-11)
(SNI DT 91-0009-2007-12)
(SNI DT 91-0009-2007-13)
(SNI DT 91-0009-2007-14)
(SNI DT 91-0009-2007-15)
(SNI DT 91-0009-2007-16)
(SNI DT 91-0009-2007-17)
(SNI DT 91-0009-2007-18)
(SNI DT 91-0009-2007-19)
(SNI DT 91-0009-2007-20)
An.D.05
An.D.06
An.D.07
An.D.08

(SNI DT 91-0010-2007-01)
(SNI DT 91-0010-2007-02)
(SNI DT 91-0010-2007-03)
(SNI DT 91-0010-2007-04)
(SNI DT 91-0010-2007-05)
(SNI DT 91-0010-2007-06)
(SNI DT 91-0010-2007-07)
(SNI DT 91-0010-2007-08)

1
1
1
1
1
1
1

M'
M2
M'
2
M
3
M
2
M
3
M

1
1
1
1
1
1
1
1
1
1
1
1
1
1

M
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2

1
1
1
1
1
1

M3
M3
M3
3
M
M3
M3

1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
2
1M
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2

1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2

KODE

NO.

URAIAN PEKERJAAN

1
9.
10.
11.

2
FINISHING SIAR PASANGAN DINDING BATA MERAH
FINISHING SIAR PASANGAN BATU KALI 1 : 2
PEKERJAAN ACIAN

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.

PEKERJAAN BETON ( SNI DT 91-0008-2007 )


PEKERJAAN BETON RABAT 1:3:5
MEMBUAT LANTAI KERJA BETON 1:2:4
MEMBUAT BETON BERTULANG 1:2:3 K.100
MEMBUAT BETON BERTULANG 1:2:3 K.125
MEMBUAT BETON BERTULANG 1:2:3 K.150
MEMBUAT BETON BERTULANG 1:2:3 K.175
MEMBUAT BETON BERTULANG 1:2:3 K.200
MEMBUAT BETON BERTULANG 1:2:3 K.225
MEMBUAT BETON BERTULANG 1:2:3 K.250
MEMBUAT BETON BERTULANG 1:2:3 K.275
MEMBUAT BETON BERTULANG 1:2:3 K.300
MEMBUAT BETON BERTULANG 1:2:3 K.325
MEMBUAT BETON BERTULANG 1:2:3 K.350
BEGESTING UNTUK PONDASI
BEGESTING UNTUK SLOOF
BEGESTING UNTUK KOLOM
BEGESTING UNTUK BALOK
BEGESTING UNTUK LANTAI
BEGESTING UNTUK TANGGA
PEMBESIAN DENGAN BESI POLOS
PEMBESIAN DENGAN BESI ULIR
PEMBESIAN DENGAN BESI POLOS
PEMBESIAN DENGAN BESI POLOS
PEMBESIAN DENGAN BESI POLOS
PEMBESIAN DENGAN BESI POLOS
PEMBESIAN DENGAN BESI POLOS
PEMBESIAN DENGAN BESI POLOS
PEMBESIAN DENGAN BESI POLOS
MEMBUAT PONDASI BETON BERTULANG K.175
MEMBUAT PONDASI BETON BERTULANG K.200
MEMBUAT PONDASI BETON BERTULANG K.225
MEMBUAT PONDASI BETON BERTULANG K.250
MEMBUAT SLOOF BETON BERTULANG K.200 UK. 15/15, 15/20
MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/25, 20/30
MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/40, 30/40
MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/25, 20/30
MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/40, 30/40
MEMBUAT KOLOM PRAKTIS BETON BERTULANG K.175 UK. 11/11, 15/15
MEMBUAT KOLOM BETON BERTULANG K.200 UK. 15/25, 15/30, 20/30
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 15/25, 15/30, 20/30
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 20/40, 30/40
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 20/40, 30/40
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/50, 35/50
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/50, 35/50
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/60, 35/60, 40/70
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/60, 35/60, 40/70
MEMBUAT RING BALOK BETON BERTULANG K.175 UK. 15/15, 15/20
MEMBUAT BALOK BETON BERTULANG K.200 UK. 15/20, 15/30, 20/30
MEMBUAT BALOK BETON BERTULANG K.225 UK. 15/30, 20/30
MEMBUAT BALOK BETON BERTULANG K.225 UK. 25/40, 30/50
MEMBUAT BALOK BETON BERTULANG K.250 UK. 25/40, 30/50
MEMBUAT BALOK BETON BERTULANG K.225 UK. 30/60, 30/70, 30/80
MEMBUAT BALOK BETON BERTULANG K.250 UK. 30/60, 30/70, 30/80
MEMBUAT PLAT LANTAI BETON BERTULANG K.225 TB. 10 & 12 CM
MEMBUAT PLAT LANTAI BETON BERTULANG K.250 TB. 10 & 12 CM
MEMBUAT TANGGA BETON BERTULANG K.225
MEMBUAT TANGGA BETON BERTULANG K.250
PEMBESIAN DENGAN BESI POLOS
BEGESTING UNTUK PONDASI (MENGECOR PLAT DGN CETAKAN)
PEMBESIAN DENGAN BESI POLOS
MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175 (BESI 43 KG)
PEMBESIAN DENGAN BESI POLOS
MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175 (BESI 61 KG)
PEKERJAAN KAYU

1.
2.
3.
4.
5.
6.

SATUAN

ANALISA
3
(SNI DT 91-0010-2007-09)
(SNI DT 91-0010-2007-10)
(SNI DT 91-0010-2007-11)

(SNI DT 91-0008-2007-01)
(SNI DT 91-0008-2007-02)
(SNI DT 91-0008-2007-03)
(SNI DT 91-0008-2007-04)
(SNI DT 91-0008-2007-05)
(SNI DT 91-0008-2007-06)
(SNI DT 91-0008-2007-07)
(SNI DT 91-0008-2007-08)
(SNI DT 91-0008-2007-09)
(SNI DT 91-0008-2007-10)
(SNI DT 91-0008-2007-11)
(SNI DT 91-0008-2007-12)
(SNI DT 91-0008-2007-13)
(SNI DT 91-0008-2007-14)
(SNI DT 91-0008-2007-15)
(SNI DT 91-0008-2007-16)
(SNI DT 91-0008-2007-17)
(SNI DT 91-0008-2007-18)
(SNI DT 91-0008-2007-19)
(SNI DT 91-0008-2007-20)
(SNI DT 91-0008-2007-21)
(SNI DT 91-0008-2007-22)
(SNI DT 91-0008-2007-23)
(SNI DT 91-0008-2007-24)
(SNI DT 91-0008-2007-25)
(SNI DT 91-0008-2007-26)
(SNI DT 91-0008-2007-27)
(SNI DT 91-0008-2007-28)
(SNI DT 91-0008-2007-29)
(SNI DT 91-0008-2007-30)
(SNI DT 91-0008-2007-31)
(SNI DT 91-0008-2007-32)
(SNI DT 91-0008-2007-33)
(SNI DT 91-0008-2007-34)
(SNI DT 91-0008-2007-35)
(SNI DT 91-0008-2007-36)
(SNI DT 91-0008-2007-37)
(SNI DT 91-0008-2007-38)
(SNI DT 91-0008-2007-39)
(SNI DT 91-0008-2007-40)
(SNI DT 91-0008-2007-41)
(SNI DT 91-0008-2007-42)
(SNI DT 91-0008-2007-43)
(SNI DT 91-0008-2007-44)
(SNI DT 91-0008-2007-45)
(SNI DT 91-0008-2007-46)
(SNI DT 91-0008-2007-47)
(SNI DT 91-0008-2007-48)
(SNI DT 91-0008-2007-49)
(SNI DT 91-0008-2007-50)
(SNI DT 91-0008-2007-51)
(SNI DT 91-0008-2007-52)
(SNI DT 91-0008-2007-53)
(SNI DT 91-0008-2007-54)
(SNI DT 91-0008-2007-55)
(SNI DT 91-0008-2007-56)
(SNI DT 91-0008-2007-57)
(SNI DT 91-0008-2007-58)

4
1 M2
2
1M
2
1M

1M
3
1M
3
1M
3
1M
1 M3
3
1M
3
1M
1 M3
3
1M
3
1M
3
1M
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M2
10 Kg
10 Kg
110 Kg
120 Kg
130 Kg
140 Kg
150 Kg
200 Kg
250 Kg
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
3
1M
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
3
1M
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
225 Kg

(SNI DT 91-0008-2007-59)
(SNI DT 91-0008-2007-60)

43 Kg

(SNI DT 91-0008-2007-61)
(SNI DT 91-0008-2007-62)

61 Kg

(SNI DT 91-0008-2007-63)

( Rev. SNI 03-3434-2007 )

BAHAN KAYU MERANTI


PASANGAN KUDA-KUDA
PASANGAN GORDENG
PASANGAN USUK DAN RENG GENTENG PRES/LOKAL
PASANGAN USUK/RENG BENGKIRAI UNTUK GENTENG BETON & MONIER
PAS. RANGKA PLAFOND (50X100) Cm KAYU MERANTI
PAS. RANGKA PLAFOND (60X120) Cm KAYU MERANTI
50

(SNI DT 91-0011-2007-01)
(SNI DT 91-0011-2007-02)
(SNI DT 91-0011-2007-03)
(SNI DT 91-0011-2007-04)
(SNI DT 91-0011-2007-05)
(SNI DT 91-0011-2007-06)

1
1
1
1
1
1

M3
M3
M2
M2
M2
M2

NO.

KODE

URAIAN PEKERJAAN

SATUAN

ANALISA

1
7.
8.
9.
10.
11.
12.
13.

2
PASANGAN KUSEN KAYU MERANTI
PAS. DAUN PINTU / JENDELA KACA POLOS
PAS. PINTU / JENDELA JALUSI
PAS. JALUSI MATI KUSEN KAYU MERANTI
PAS. DAUN PINTU / JENDELA PANIL
PASANG LISPLANK KAYU MERANTI 3/20
PASANG LISPLANK KAYU MERANTI 3/30

14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.

BAHAN KAYU BENGKIRAI


PASANGAN KUDA - KUDA EXPOSE
PASANGAN KUDA - KUDA
PASANGAN GORDENG
PASANGAN USUK/RENG BENGKIRAI UNTUK GENTENG PRESS/LOKAL
PASANGAN USUK/RENG BENGKIRAI UNTUK GENTENG BETON DAN MONIER
PAS. RANGKA PLAFOND (50X100) Cm BENGKIRAI
PAS. RANGKA PLAFOND (60X120) Cm BENGKIRAI
PASANGAN KUSEN KAYU BENGKIRAI KW. I
PASANGAN KUSEN KAYU BENGKIRAI KW.2
PAS. DAUN PINTU / JENDELA KACA RAYBEN
PAS. DAUN PINTU / JENDELA KACA POLOS
PAS. PINTU / JENDELA JALUSI
PAS. JALUSI MATI KUSEN KAYU BENGKIRAI
PAS. DAUN PINTU / JENDELA PANIL
PASANG LISPLANK KAYU BENGKIRAI 3/20
PASANG LISPLANK KAYU BENGKIRAI 3/30

30.
31.
32.
33.
34.
35.
36.
37.
38.

BAHAN KAYU KAMFER


PASANGAN KUDA - KUDA
PASANGAN USUK/RENG KAMPER UNTUK GENTENG PRESS/LOKAL
PASANGAN USUK/RENG KAMPER UNTUK GENTENG BETON DAN MONIER
PASANGAN KUSEN
PAS. DAUN PINTU / JENDELA KACA RAYBEN
PAS. DAUN PINTU / JENDELA KACA POLOS
PAS. DAUN PINTU / JENDELA JALUSI
PAS. JALUSI MATI KUSEN KAYU KAMPER
PAS. DAUN PINTU / JENDELA PANIL

39.
40.
41.
42.
43.
44.

BAHAN KAYU JATI


PASANGAN KUSEN JAYU JATI
PAS. DAUN PINTU / JENDELA KACA KAYU JATI
PAS. DAUN PINTU / JENDELA JALUSI
PAS. JALUSI MATI KUSEN KAYU JATI
PAS. DAUN PINTU / JENDELA PANIL KAYU JATI
PASANG LISPLANK KAYU JATI 3/30

45.
46.
47.
48.
49.

PEMBUATAN DAUN PINTU LAPIS


PINTU DOUBLE TRIPLEK RANGKA KAYU BENGKIRAI
PINTU DOUBLE TEAKWOOD RANGKA KAYU BENGKIRAI
PINTU TEAKWOOD DAN LAPIS ALUMINIUM RANGKA BENGKIRAI
PASANG DINDING PEMISAH DOUBLE TEAKWOOD RANGKA KAYU BENGKIRAI
PASANG DINDING PEMISAH DOUBLE TRIPLEK RANGKA KAYU BENGKIRAI

1.
2.
3.

PEKERJAAN LANGIT-LANGIT
PASANG ETERNIT
PASANG CALSIBOARD
LIST PLAFOND KAYU PROFIL

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

PEKERJAAN PENUTUP ATAP


( SNI 03-3436-2002 )
PASANGAN GENTENG PRES BIASA/LOKAL
PASANGAN BUBUNGAN PRES BIASA
PASANGAN GENTENG BETON BESAR
PASANGAN GENTENG BETON KECIL
PASANGAN BUBUNGAN BETON
PASANGAN GENTENG JATIWANGI ISI 14,5 BJ
PASANGAN BUBUNGAN
PASANGAN GENTENG BETON BESAR BERWARNA
PASANGAN BUBUNGAN BETON BERWARNA
PASANGAN GENTENG BETON BESAR BERWARNA + COATING
PASANGAN BUBUNGAN BETON BERWARNA + COATING
PASANGAN GENTENG KERAMIK KIA KECIL
PASANGAN BUBUNGAN KERAMIK KIA
PASANGAN GENTENG PRES EXS. KARANGPILANG
PASANGAN BUBUNGAN PRES EXS. KARANGPILANG
PASANGAN ASBES GELOMBANG BESAR
PASANGAN ASBES GELOMBANG KECIL
PASANG BUBUNG ASBES GELOMBANG BESAR
PASANG BUBUNG ASBES GELOMBANG KECIL

3
(SNI DT 91-0011-2007-07)
(SNI DT 91-0011-2007-08)
(SNI DT 91-0011-2007-09)
(SNI DT 91-0011-2007-10)
(SNI DT 91-0011-2007-11)
(SNI DT 91-0011-2007-12)
(SNI DT 91-0011-2007-13)

(SNI DT 91-0011-2007-14)
(SNI DT 91-0011-2007-15)
(SNI DT 91-0011-2007-16)
(SNI DT 91-0011-2007-17)
(SNI DT 91-0011-2007-18)
(SNI DT 91-0011-2007-19)
(SNI DT 91-0011-2007-20)
(SNI DT 91-0011-2007-21)
(SNI DT 91-0011-2007-22)
(SNI DT 91-0011-2007-23)
(SNI DT 91-0011-2007-24)
(SNI DT 91-0011-2007-25)
(SNI DT 91-0011-2007-26)
(SNI DT 91-0011-2007-27)
(SNI DT 91-0011-2007-28)
(SNI DT 91-0011-2007-29)

(SNI DT 91-0011-2007-30)
(SNI DT 91-0011-2007-31)
(SNI DT 91-0011-2007-32)
(SNI DT 91-0011-2007-33)
(SNI DT 91-0011-2007-34)
(SNI DT 91-0011-2007-35)
(SNI DT 91-0011-2007-36)
(SNI DT 91-0011-2007-37)
(SNI DT 91-0011-2007-38)

(SNI DT 91-0011-2007-39)
(SNI DT 91-0011-2007-40)
(SNI DT 91-0011-2007-41)
(SNI DT 91-0011-2007-42)
(SNI DT 91-0011-2007-43)
(SNI DT 91-0011-2007-44)

(SNI DT 91-0011-2007-45)
(SNI DT 91-0011-2007-46)
(SNI DT 91-0011-2007-47)
(SNI DT 91-0011-2007-48)
(SNI DT 91-0011-2007-49)

4
1 M3
2
1 M
2
1 M
1 M2
2
1 M
1 M'
1 M'

1 M3
3
1 M
3
1 M
1 M2
2
1 M
2
1 M
2
1 M
1 M3
1 M3
1 M2
1 M2
1 M2
1 M2
1 M2
1 M'
1 M'

1
1
1
1
1
1
1
1
1

M3
M2
M2
3
M
M2
M2
M2
M2
M2

1 M3
2
1 M
1 M2
1 M2
1 M2
1 M'

1
1
1
1
1

M2
M2
M2
M2
M2

( SNI DT 91-0013-2007 )
(SNI DT 91-0013-2007-01)
(SNI DT 91-0013-2007-02)
(SNI DT 91-0013-2007-03)

51

(SNI 03-3436-2002-01)
(SNI 03-3436-2002-02)
(SNI 03-3436-2002-03)
(SNI 03-3436-2002-04)
(SNI 03-3436-2002-05)
(SNI 03-3436-2002-06)
(SNI 03-3436-2002-07)
(SNI 03-3436-2002-08)
(SNI 03-3436-2002-09)
(SNI 03-3436-2002-10)
(SNI 03-3436-2002-11)
(SNI 03-3436-2002-12)
(SNI 03-3436-2002-13)
(SNI 03-3436-2002-14)
(SNI 03-3436-2002-15)
(SNI 03-3436-2002-16)
(SNI 03-3436-2002-17)
(SNI 03-3436-2002-18)
(SNI 03-3436-2002-19)

1 M2
1 M2
1 M'

1 M2
1 M'
1 M2
1 M2
1 M'
1 M2
1 M'
1 M2
1 M'
1 M2
1 M'
1 M2
1 M'
1 M2
1 M'
1 M2
1 M2
1 M'
1 M'

NO.
1
1.
2.
3.
4.
5.

1.
2.
3.
4.
5.
6.
7.
8.
9.

KODE

URAIAN PEKERJAAN

SATUAN

ANALISA

2
PEKERJAAN BESI DAN ALUMINIUM
( SNI DT 91-0014-2007 )
PASANGAN TALANG DATAR / JURAI
PASANGAN TALANG 1/2 LINGKARAN dia. 15 CM
PASANG RANGKA KUDA-KUDA BAJA
PASANG ROOLING DOOR ALUMINIUM
PASANG TERALI BESI
PEKERJAAN PLITURAN DAN PENGECATAN ( SNI P.C )
MENGGOSOK DAN MENDEMPUL KAYU
PELABURAN BIDANG KAYU DENGAN POLITUR
PELABURAN BIDANG KAYU DENGAN MELAMIN
PELABURAN BIDANG KAYU DENGAN VERNIS

(SNI DT 91-0014-2007-01)

1 M'
1 M'
1 Kg
2
1M
2
1M

(SNI DT 91-0014-2007-02)
(SNI DT 91-0014-2007-03)
(SNI DT 91-0014-2007-04)
(SNI DT 91-0014-2007-05)

PENGECATAN KAYU BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 3 LPS CAT PENUTUP )

SNI P.C.04

PENGECATAN KAYU BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP )

SNI P.C.05

PENGECATAN KAYU LAMA ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 1 LPS CAT PENUTUP )

SNI P.C.06

MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA

SNI P.C.07

PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP)

SNI P.C.08

1M
1 M2
2
1M
2
1M
1 M2
2
1M
2
1M
2
1M
1 M2

SNI P.C.09

1 M2

SNI P.C.10

1 M2
1 M2
1 M2

SNI P.C.01
SNI P.C.02
SNI P.C.02A
SNI P.C.03

CAT PARAGON

10.

PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP)
CAT DECOLITH

11.
12.
13.

PENGECATAN TEMBOK LAMA ( 1 LAPIS CAT DASAR + 2 LPS CAT PENUTUP )


PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
PENGECATAN GENTENG

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

PEK. PENUTUP LANTAI & DINDING ( SNI DT 91-0012-2007 )


PASANGAN TEGEL ABU-ABU 20x20
PASANGAN DINDING KERAMIK 20x25 Kw. 1 Roman Kembang
PASANGAN DINDING KERAMIK 20x25 Kw.1 Kobin Motif
PASANGAN DINDING KERAMIK 20x25 Kw.1 polos
PASANGAN LANTAI KERAMIK 30x30 Kw. 1 Roman polos
PASANGAN LANTAI KERAMIK 30x30 Kw. 1 Mulia polos
PASANGAN LANTAI KERAMIK 30x30 Kw. 1 Motif
PASANGAN LANTAI KERAMIK 30x30 Kw. 1 Mulia sembur
PASANGAN LANTAI KERAMIK 40x40 Kw. 1 Platinum Motif
PASANGAN LANTAI KERAMIK 40x40 Kw. 1 Arwana Motif
PASANGAN LANTAI KERAMIK 40x40 MAS Polos
PASANGAN LANTAI KERAMIK 20x20 Kw. 1
PASANGAN LANTAI MARMER (100 x 100 cm)
PASANGAN GRANITO (60 x 60 cm)

1.
2.
3.
4.
5.
6.
7.
8.
9.

PEKERJAAN KUNCI DAN KACA


( SNI K.K )
PASANG KUNCI TANAM
PASANG KUNCI SELOT
PASANG ENGSEL PINTU
PASANG ENGSEL JENDELA
PASANG KAIT ANGIN (CANTOLAN)
PASANG KACA POLOS 5 mm
PASANG REL PINTU DORONG
PASANG KUNCI LEMARI
PASANG KACA RAYBAND 5 mm

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

PEKERJAAN SANITASI
( SNI S. )
MEMASANG KLOSET DUDUK / MONOBLOK
MEMASANG KLOSET JONGKOK PORSELEN
MEMASANG URINOIR
MEMASANG WASTAFEL
MEMASANG BAK CUCI PIRING STAINLES STEEL
MEMASANG KRAN AIR f 3/4" atau 1/2"
MEMASANG KRAN AIR WASTAFEL
MEMASANG FLOOR DRAIN
MEMASANG BAK MANDI FIBERGLASS
MEMASANG BAK KONTROL PASANGAN BATU BATA (Uk. 30x30 cm tinggi 35 cm)
MEMASANG PIPA PVC TIPE AW F 1/2"
MEMASANG PIPA PVC TIPE AW F 3/4"
MEMASANG PIPA PVC TIPE AW F 1"
MEMASANG PIPA PVC TIPE AW F 1 1/2"
MEMASANG PIPA PVC TIPE AW F 2"
MEMASANG PIPA PVC TIPE AW F 3"
MEMASANG PIPA PVC TIPE AW F 4"

1.
2.
3.
4.
5.
6.

PEKERJAAN PAVING STONE ( An. Pav. )


PAS. PAVING SEGI EMPAT ABU-ABU 6 CM K.200
PAS. PAVING SEGI EMPAT WARNA 6 CM K.200
PAS. PAVINGSTONE BETON BLOK ABU-ABU 6 CM K.200
PAS. PAVINGSTONE BETON BLOK WARNA 6 CM K.200
PAS. PAVINGSTONE BETON BLOK ABU-ABU 8 CM K.300
PAS. PAVINGSTONE BETON SEGIEMPAT ABU-ABU 6 CM TANPA K

SNI P.C.11
SNI P.C.12

(SNI DT 91-0012-2007-01)
(SNI DT 91-0012-2007-02)
(SNI DT 91-0012-2007-03)
(SNI DT 91-0012-2007-04)
(SNI DT 91-0012-2007-05)
(SNI DT 91-0012-2007-06)
(SNI DT 91-0012-2007-07)
(SNI DT 91-0012-2007-08)
(SNI DT 91-0012-2007-09)
(SNI DT 91-0012-2007-10)
(SNI DT 91-0012-2007-11)
(SNI DT 91-0012-2007-12)
(SNI DT 91-0012-2007-13)
(SNI DT 91-0012-2007-14)

SNI K.K.01
SNI K.K.02
SNI K.K.03
SNI K.K.04
SNI K.K.05
SNI K.K.06
SNI K.K.07
SNI K.K.08
SNI K.K.09

52

SNI.S.01
SNI.S.02
SNI.S.03
SNI.S.04
SNI.S.05
SNI.S.06
SNI.S.06.a
SNI.S.07
SNI.S.08
SNI.S.09
SNI.S.15
SNI.S.16
SNI.S.17
SNI.S.18
SNI.S.19
SNI.S.20
SNI.S.21

An.Pav.1
An.Pav.2
An.Pav.3
An.Pav.4
An.Pav.5
An.Pav.6

1M
1 M2
1 M2
1 M2
1 M2
2
1M
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2

1 Bh
1 Bh
1 Set
1 Set
1 Set
1 M2
1 Bh
1 Bh
1 M2

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'
M'
M'

1 M2
1 M2
1 M2
1 M2
1 M2
1 M2

NO.

URAIAN PEKERJAAN

KODE

SATUAN

ANALISA
3

Tuban,

Januari 2012

KEPALA BIDANG TATA RUANG DAN PEMUKIMAN

Ir. S A T R I Y O

NIP. 19590405 199003 1 005

53

REKAPITULASI

SA HARGA SATUAN BAHAN DAN UPAH TENAGA


TAHUN ANGGARAN 2012
HARGA
(Rp.)
5

92,366.00
1,195,010.00
455,196.00
6,150.00
235,094.00
28,211.00
250,994.00

27,575.00
33,885.00
40,301.00
42,332.00
36,696.00
55,680.00
44,385.00
8,272.00
100,130.00
86,930.00
133,275.00
90,067.00
12,080.00
2,015.00

180,702.00
351,634.00
323,552.00
519,296.00
468,173.00
432,756.00

162,263.00
179,918.00
81,007.00
87,112.00
226,471.00
204,654.00
164,554.00
212,798.00
190,981.00
204,027.00
182,209.00
177,027.00
109,104.00
98,195.00
102,885.00
91,976.00
99,166.00
88,257.00
96,818.00
85,909.00
82,152.00
189,307.00
108,115.00
158,028.00
148,146.00
133,828.00
179,203.00
218,528.00

31,576.00
28,449.00
26,397.00
25,120.00
37,715.00
34,945.00
33,277.00
23,076.00
54

HARGA
(Rp.)
5
13,865.00
29,077.00
17,198.00

639,378.00
630,280.00
668,112.00
706,676.00
736,794.00
772,596.00
806,447.00
832,297.00
848,643.00
876,647.00
885,365.00
918,362.00
929,715.00
916,237.00
1,190,613.00
2,217,242.00
2,894,190.00
3,137,324.00
2,393,047.00
113,113.00
120,043.00
1,244,248.00
1,357,362.00
1,470,475.00
1,583,589.00
1,696,702.00
2,262,270.00
2,827,837.00
3,046,195.00
3,080,046.00
3,105,896.00
3,122,242.00
3,467,535.00
3,606,499.00
3,719,612.00
3,622,845.00
3,735,958.00
2,797,381.00
3,611,770.00
3,637,620.00
4,203,188.00
4,219,534.00
4,463,063.00
4,479,409.00
4,768,755.00
4,785,101.00
2,740,391.00
3,610,904.00
3,636,754.00
3,976,094.00
3,992,440.00
4,541,662.00
4,558,008.00
3,645,207.00
3,661,553.00
3,725,522.00
3,741,868.00
2,522,145.00
216,974.00
486,388.00
1,367,471.00
673,498.00
1,554,581.00

5,952,187.00
5,597,575.00
65,211.00
72,912.00
80,755.00
78,121.00
55

HARGA
(Rp.)
5
6,931,078.00
328,810.00
526,673.00
427,126.00
380,383.00
66,664.00
66,677.00

10,922,620.00
8,784,163.00
8,429,551.00
85,242.00
94,559.00
98,260.00
94,261.00
9,887,703.00
9,034,221.00
413,290.00
402,290.00
722,620.00
610,826.00
502,850.00
102,898.00
103,582.00

8,654,520.00
87,453.00
96,520.00
8,904,578.00
431,770.00
420,770.00
771,900.00
657,026.00
533,650.00

13,442,078.00
519,610.00
1,006,140.00
876,626.00
680,050.00
152,312.00

387,518.00
409,440.00
417,002.00
304,628.00
287,143.00

19,999.00
30,793.00
12,197.00

31,207.00
48,488.00
41,155.00
43,190.00
66,605.00
83,120.00
58,740.00
42,640.00
55,853.00
46,600.00
64,515.00
119,014.00
200,228.00
67,507.00
56,210.00
50,761.00
49,510.00
73,822.00
46,819.00
56

HARGA
(Rp.)
5
234,467.00
141,246.00
22,100.00
431,000.00
263,794.00

5,614.00
46,770.00
130,373.00
20,562.00
44,591.00
35,373.00
28,898.00
6,757.00
9,777.00
10,242.00
7,335.00
12,859.00
9,885.00

72,976.00
127,361.00
122,058.00
113,501.00
109,200.00
102,215.00
115,745.00
106,794.00
127,064.00
125,562.00
104,195.00
113,236.00
591,481.00
352,520.00

75,125.00
57,773.00
19,542.00
17,479.00
17,479.00
81,279.00
199,719.00
23,466.00
93,379.00

1,870,631.00
305,803.00
328,336.00
562,286.00
218,059.00
36,037.00
55,787.00
20,725.00
265,325.00
113,931.00
13,651.00
15,372.00
16,775.00
30,078.00
45,075.00
81,165.00
112,133.00

72,012.00
77,512.00
72,452.00
77,512.00
87,412.00
62,112.00
57

HARGA
(Rp.)