NO.
SATUAN
HARGA SATUAN
(Rp.)
4
Mandor
HOK
53,000.00
HOK
46,000.00
HOK
51,000.00
HOK
51,000.00
HOK
51,000.00
HOK
50,000.00
HOK
55,125.00
HOK
36,900.00
Tukang Batu
HOK
46,000.00
10
Tukang Kayu
HOK
49,000.00
11
Tukang Besi
HOK
47,000.00
12
Tukang Cat
HOK
42,400.00
13
Tukang Listrik
HOK
48,000.00
14
Tukang Aspal
HOK
44,400.00
15
Tukang Politur
HOK
43,600.00
16
Pekerja
HOK
35,000.00
17
Buruh Terampil
HOK
38,000.00
18
HOK
34,000.00
19
Operator Terampil
HOK
54,100.00
20
Pembantu Operator
HOK
39,500.00
21
Sopir Terampil
HOK
57,100.00
22
Pembantu Sopir
HOK
36,500.00
23
Masinis
HOK
50,166.67
24
Kernet
HOK
35,625.00
25
Penjaga
HOK
33,750.00
26
Penjaga Api
HOK
37,500.00
27
Penganyam
HOK
40,000.00
Tuban,
KETERANGAN
Januari 2012
Ir. S A T R I Y O
SATUAN
I
1
2
3
4
5
6
7
8
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
BAHAN BATU
Batu Brongkol
Batu Kali hitam
Kerikil kali
Kerikil hias
Batu Pecah 3-5 mesin
Batu Pecah 2-3 mesin
Batu Pecah 1-2 mesin
Batu Pecah 1/2-1 mesin
Batu Pecah 5/7, 6/8 tangan
Batu Pecah 3/5 tangan
Batu Belah 20/25 tangan
Batu Belah 15/20 tangan
Batu Bata Kw. 1
Batu Bata Kw. 2
Batu Putih Lokal / kumbung
Pavingstone Beton Blok 6 Cm warna (K.200)
Pavingstone Beton Blok 6 Cm abu-abu ( k.200)
Pavingstone Beton abu-abu 8 cm (k.300)
Pavingstone Segienam Abu - abu 6 cm K 200
Pavingstone Segienam Warna 6 cm K 200
Pavingstone Segienam Warna tanpa K tb. 6 cm
Pavingstone Segienam Abu - abu tanpa K tb. 6 cm
Kerep uk. 0175x0,2x0,3x0,6
Batu Palimanan uk.10/20 kasar
Batu Palimanan uk.15/15 halus
Batu Palimanan uk.15/30
Batu Palimanan uk.20/20 halus
Batu Palimanan uk.20/30 halus
Batu Palimanan uk. 5/20
Batu Palimanan uk. 10/10
Batu Palimanan uk. 20/40
Batu Palimanan uk. 25/25
Batu Palimanan uk. 30/30
Batu Palimanan Hijau Segala Ukuran
Batu Candi
Ornamen Batu Paras uk. 25/25
Ornamen Batu Paras uk. 20/20
Ornamen Batu Paras uk. 15/15
Ornamen Batu Paras uk. 20/40
Ornamen Batu Paras uk. 10/10
Ornamen Batu Paras uk. 30/30
Ornamen Batu Paras uk. 40/40
Batu Gilang Hitam / Lempeng
Batu Raen Hitam
Batu Raen Kuning / Putih
Batu Alur Andesit
Batu Candi Alur / Beton
Beton alur 20X40 cm
Lis Beton / Batu Alam 40 cm
3
HARGA SATUAN
(Rp.)
4
m3
m3
m3
m3
m3
m3
m3
m3
63,250.00
74,250.00
141,710.00
85,800.00
102,666.67
102,116.67
66,660.00
137,500.00
m3
m3
m3
82,775.00
97,900.00
60,500.00
50,050.00
194,857.14
212,850.00
224,675.00
189,200.00
69,575.00
103,675.00
66,550.00
73,700.00
889.17
733.33
1,003.75
50,600.00
45,540.00
60,500.00
45,100.00
50,600.00
38,940.00
35,200.00
49,500.00
74,800.00
79,016.67
81,400.00
82,500.00
87,083.33
72,966.67
71,500.00
89,833.33
85,983.33
96,800.00
90,750.00
107,250.00
85,250.00
88,000.00
77,000.00
99,000.00
11,000.00
38,500.00
57,750.00
42,625.00
385.00
275.00
143,000.00
126,500.00
66,000.00
18,150.00
m3
m3
m3
m3
m3
m3
m3
m3
bj
bj
bj
m2
m2
m2
m2
m2
m2
m2
bj
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
m2
bj
bj
m2
m2
m2
bh
KETERANGAN
5
NO.
SATUAN
1
50
51
52
53
2
Batu Alur Marmer 20x20 cm
Batu Alur Marmer 30x30 cm
Batu Alur Marmer 40x40 cm
Roster Terawang
3
m2
m2
m2
Bj
HARGA SATUAN
(Rp.)
4
121,000.00
132,000.00
143,000.00
5,000.00
III
1
2
3
BAHAN SEMEN / PC
Semen 40 kg
Semen Putih 40 kg
Semen Warna
zak
zak
kg
56,100.00
78,100.00
6,500.00
IV
1
2
BAHAN KAPUR
Kapur Bubuk / Kapur Pasang
Kapur Gamping
m3
kg
199,833.33
3,162.50
V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
BAHAN BESI
Besi Beton Polos (tulangan)
Besi Beton Ulir
Besi Beton Polos 16 mm Panjang 12 m
Besi Beton Polos 12 mm Panjang 12 m
Besi Beton Polos 10 mm Panjang 12 m
Besi Beton Polos 8 mm Panjang 12 m
Besi Beton Polos 6 mm Panjang 12 m
Besi Beton Polos 5 mm Panjang 12 m
Baja Konstruksi
Besi WF 150 Berat/Batang 168 kg
Besi WF 200 Berat/Batang 256 kg
Besi WF 250 Berat/Batang 355 kg
Besi WF 298 Berat/Batang 375 kg
Besi WF 300 Berat/Batang 432 kg
Besi WF 346 Berat/Batang 485 kg
Besi WF 350 Berat/Batang 584 kg
Besi WF 396 Berat/Batang 664 kg
Besi WF 400 Berat/Batang 778 kg
Besi WF 450 Berat/Batang 893 kg
Besi WF 500 Berat/Batang 1.053 kg
Besi WF 588 Berat/Batang 1.763 kg
Besi WF 600 Berat/Batang 1.238 kg
Besi Siku
Kawat Beton / Bendrat
Kawat Bronjong ( f 42,7 mm ) BMG 10
Besi Sheet Pile (400mm x 100mm X 10,5mm X 12m)
Besi strip
kg
kg
ljr
ljr
ljr
ljr
ljr
ljr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
9,900.00
10,560.00
158,007.14
89,283.33
61,600.00
40,700.00
24,860.00
16,280.00
14,535.00
12,100.00
11,550.00
11,550.00
12,100.00
12,650.00
12,650.00
12,650.00
12,650.00
11,700.00
11,700.00
11,700.00
11,700.00
11,700.00
8,250.00
19,030.00
16,500.00
12,100.00
14,500.00
VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
BAHAN KAYU
Ky. Jati balok ( Macam-macam Ukuran kelas 1 )
Ky. Jati Papan ( Macam-macam Ukuran kelas 1 )
Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. I
Ky. Kamper Papan 2/20, 3/20 = 4m kw. I
Ky. Kamper Usuk 5/7, 4/6 = 4m kw. I
Ky. Kamper Reng 2/3, 3/5 = 4m kw. I
Ky. Kamper Balok 8/15, 8/12, 6/12 = 4m kw. II
Ky. Kamper Papan 2/20, 3/20 = 4m kw. II
Ky. Kamper Usuk 5/7, 4/6 = 4m kw. II
Ky. Kamper Reng 2/3, 3/5 = 4m kw. II
Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. I
Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. I
Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. I
Ky. Bengkirai Reng kw. I
Ky. Bengkirai Balok 8/15, 8/12 = 4 m Kw. II
Ky. Bengkirai Papan 2/20, 3/20 = 4 m Kw. II
Ky. Bengkirai Usuk 5/7, 4/6 = 4 m Kw. II
Ky. Bengkirai Reng kw. II
Ky. Meranti Balok 8/12, 6/12 = 4 m kw. I
Ky. Meranti Papan 2/20, 3/20 = 4 m kw. I
Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. I
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
11,000,000.00
12,460,000.00
7,700,000.00
8,847,142.86
6,128,571.43
5,028,571.43
6,875,000.00
8,800,000.00
4,950,000.00
4,317,500.00
7,768,750.00
8,786,250.00
6,084,375.00
5,293,750.00
6,992,857.14
8,030,000.00
4,730,000.00
4,436,666.67
4,739,166.67
4,968,333.33
3,593,333.33
KETERANGAN
5
Semen Gresik
Tiga Roda
NO.
SATUAN
HARGA SATUAN
(Rp.)
4
4,418,333.33
4,675,000.00
4,400,000.00
3,031,875.00
4,950,000.00
2,970,000.00
198,000.00
35,000.00
17,600.00
4,022,857.14
1
23
24
21
22
25
26
27
28
29
30
2
Ky. Meranti Balok 8/12, 6/12 = 4 m kw. II
Ky. Meranti Papan 2/20, 3/20 = 4 m kw. II
Ky. Meranti Usuk 4/6, 5/7 = 4 m kw. II
Ky. Meranti Reng
Ky. Papan Begesting 2/20 = 4 m
Ky. Acuan / cetakan
Dolken dia. 16X19 cm Pj. 4m
Dolken dia. 8 cm Pj. 4m
Bongkotan Pj. 3 m
Ky. Gelam Balok 6/12 & 8/12
VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
VIII
1
2
3
4
BAHAN TEGEL
Tegel abu-abu 20x20 cm
Tegel Plin abu 15x20 cm
Tegel wafel 20x20 cm
Tegel teraso 30x30 cm
m2
m2
m2
m2
35,200.00
35,200.00
35,200.00
-
IX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
BAHAN KERAMIK
Keramik 10x20 cm Mulia KW 1
Keramik Kembang 20x20 cm Kw. I Mulia
Keramik Kembang 20x25 KW 1 Roman
Keramik Kembang 20x25 KW 1 Asia
Keramik Kembang 20x25 KW 2 Asia
Keramik Motif 20x25 Kw. I Kobin
Keramik Motif 20x25 Kw. I Yupiter
Keramik Polos 20x25 Kw. I Mulia
Keramik Polos 20x25 Kw. I Asia
Keramik Sembur 30x30 cm KW 1 Mulia
Keramik Polos ( 30x30 cm ) KW 1 Mulia
Keramik Polos ( 30x30 cm ) KW 1 Roman
Keramik Polos ( 30x30 cm ) KW 2 Roman
Keramik Motif 30x30 Kw. I
Keramik Motif 30x30 Kw. I Yupiter
Keramik Motif ( 40x40 cm ) KW 1 Platinum
Keramik Motif ( 40x40 cm ) KW 1 Yupiter
Keramik Motif ( 40x40 cm ) KW 1 Arwana
Keramik Motif ( 40x40 cm ) KW 2 Arwana
Keramik Motif ( 40x40 cm ) KW 1 Garuda
Keramik Motif ( 40x40 cm ) KW 1 Indogres
Keramik Polos ( 40x40 cm ) KW 1 MAS
Keramik Kembang 50x50 cm KW 1 Milan
Keramik Motif 50x50 cm KW 1 Milan
Keramik Motif 50x50 cm KW 1 Platinum
Keramik Motif 60x60 cm KW 1 Platinum
Keramik Motif 25x40 cm KW 1 KIA
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
42,240.00
40,333.33
51,700.00
55,000.00
46,750.00
46,650.00
35,750.00
38,500.00
39,600.00
35,475.00
31,114.29
37,766.67
35,200.00
44,000.00
37,510.00
54,780.00
46,750.00
53,350.00
40,700.00
44,000.00
132,000.00
36,850.00
84,700.00
74,800.00
71,500.00
126,500.00
71,500.00
3
m3
m3
m3
m3
m3
m3
bt
bt
bt
m3
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
bh
bh
bh
kaleng
bh
23,818.67
28,261.33
31,882.67
50,709.87
66,210.67
99,209.60
183,780.80
263,696.53
597,200.80
928,636.80
1,324,069.60
1,892,912.00
73,920.00
1,437.33
840.00
1,456.00
6,626.67
2,500.00
KETERANGAN
5
Maspion
NO.
SATUAN
HARGA SATUAN
(Rp.)
4
52,250.00
3,300.00
4,400.00
921.25
1,003.75
44,000.00
31,900.00
27,500.00
26,400.00
17,600.00
24,750.00
18,700.00
19,800.00
269,500.00
500,000.00
1
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
2
Keramik Motif 20x33 cm KW 1 Platinum
Border list 5x20 cm
Border list 7x20 cm
Kuku Macan Polos
Kuku Macan Ulir / Kembang
Roster Keramik (Besar)
Roster Keramik (Kecil)
Roster tanpa warna 40x40 cm
Roster tanpa warna 30x30 cm
Roster tanpa warna 30x60 cm
Roster tanpa warna 30x80 cm
Glass Blok Kecil
Glass Blok Besar 20x20 cm
Granito 60 x 60 cm
Marmer 100 x 100 cm
3
m2
bj
bj
bj
bj
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
X
1
2
3
4
5
6
7
8
9
bh
bh
bh
bh
bh
bh
bh
bh
bh
26,125.00
33,825.00
17,875.00
49,500.00
24,750.00
63,250.00
65,560.00
49,500.00
74,250.00
XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
BAHAN GENTENG
Genteng Pres
Genteng Bubungan Pres
Genteng Beton Besar isi 9,5 (buah) polos
Genteng Beton Kecil Isi 11 ( buah )
Bubungan Beton
Genteng Jatiwangi isi 14,5 Bj/m2
Wuwung Jatiwangi 3,5/m'
Genteng Keramik KIA Kecil
Bubungan Keramik KIA
Genteng Karangpilang Goodyear isi 21 bh
Bubungan Karangpilang goodyear
Genteng Kodok Ex. Wisma ( Kw. 2 )
Genteng Kodok Ex. Wisma ( Kw. 1 )
Genteng Karangpilang wisma isi 21 bh
Bubungan wisma
Genteng Pres Super mutiara soka Kebumen isi 25 bh
Bubungan mutiara sokka kebumen
Genteng Pres lokal SGN Purwodadi (kodok) isi 21
Bubungan SGN
Jatiwangi Morando Atlas isi 21 bh (bakar gas)
Jatiwangi Morando Atlas isi 21 bh (bakar kayu)
Genteng Beton Besar isi 9,5 buah berwarna
Ornamen Wuwung sedang
Ornamen Wuwung besar
bj
bj
bj
bj
bj
bj
bj
bj
bj
bh
bh
bj
bj
bh
bh
bh
bh
bh
bh
bh
bh
bj
bh
bh
858.00
1,815.00
2,970.00
2,750.00
4,653.00
4,840.00
6,050.00
7,535.00
44,825.00
2,750.00
4,290.00
2,933.33
3,116.67
2,750.00
3,850.00
2,035.00
3,300.00
785.71
3,135.00
2,750.00
2,090.00
3,300.00
38,500.00
69,666.67
XII
1
2
3
4
5
6
7
BAHAN ASBES
Asbes Gel. Kecil 3,05 x 1,05 # 4 mm ( ex. Gresik )
Asbes Gel. Besar 3,05 x 1,05 # 4 m ( ex.Gresik )
Asbes Plat 1 x 1 m Gresik
Asbes Plat 1 x 1 m Atrisco
Papan Gibsum
Nok Asbes Gelombang Besar Atrisco
Nok Asbes Gelombang Kecil Atrisco
lbr
lbr
lbr
lbr
lbr
lbr
lbr
106,150.00
109,725.00
13,310.00
13,566.67
52,433.33
53,075.00
28,526.67
XIII
1
BAHAN KACA
Kaca Polos / Bening 3 mm 122X155
m2
49,500.00
KETERANGAN
5
HARGA SATUAN
(Rp.)
4
66,000.00
77,000.00
NO.
SATUAN
1
2
3
2
Kaca Polos 5 mm
Kaca Rayban 5 mm
3
m2
m2
XIV
1
2
3
4
5
6
7
BAHAN TRIPLEK
Triplek 122 x 244 x 4 mm
Triplek 110 x 210 x 3 mm
Teakwood 122 x 244 x 4 mm
Teakwood 110 x 210 x 4 mm
Tripleks Lapis Aluminium
Kalsibout Uk. 2,44 x 1,22 m x 3,5 mm
Multiplek / Flywood tb. 9 mm
lbr
lbr
lbr
lbr
lbr
lbr
lbr
57,585.00
46,828.57
77,916.67
68,750.00
83,875.00
58,643.75
138,050.00
XV
1
2
3
4
lbr
lbr
lbr
lbr
121,733.33
74,158.33
107,250.00
67,375.00
XVI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
unit
unit
unit
unit
set
set
bh
bh
bh
bh
stel
stel
bh
bh
58,378.57
84,700.00
49,500.00
46,200.00
10,862.50
8,800.00
25,000.00
22,550.00
8,616.67
10,230.00
8,800.00
10,266.67
145,000.00
225,000.00
XVII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
BAHAN SANITASI
Kloset Jongkok Porselin
Kloset Duduk Porselin (Monoblok) Warna Muda
Kloset Duduk Porselin Warna Muda
Kloset Duduk Porselin Komplit (Monoblok)
Sarangan Air / Avour (Stainlessteel)
Kurasan Air Kuningan
Avour biasa
Kurasan Air Plastik
Kran Air f 3/4" Sedang
Kran Air Wastafel
Urinoir
Sink Stainlees steel (1 bak cuci)
Bak Mandi Fiberglass
Wastafel
Wastafel Besar INA
Wastafel Besar PINK
Bak WC Plastik
bh
set
set
set
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
107,387.50
1,200,000.00
423,500.00
1,600,000.00
36,928.57
16,971.43
15,000.00
5,000.00
30,250.00
50,000.00
175,000.00
180,000.00
220,000.00
385,000.00
130,000.00
175,000.00
197,500.00
XVIII
1
2
3
4
5
6
7
8
9
BAHAN PAKU
Paku Reng
Paku Usuk
Paku Triplek
Paku Seng
Paku Jembatan
Paku Kalsibout
Paku Sumbat
Paku Beton
Paku Asbes / paku payung
kg
kg
kg
kg
bj
kg
bj
bj
kg
14,223.00
13,343.00
18,656.00
25,928.57
14,300.00
24,322.20
385.00
3,674.00
27,500.00
KETERANGAN
5
Asahimas
Kuda Terbang
Anchor
Union
INA
INA
INA
TOTO
NO.
SATUAN
1
XIX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
BAHAN LISTRIK
Lampu TL 18 / 20 watt komplit
Lampu TL 36 / 40 watt komplit
Lampu Pijar 10 watt
Lampu Pijar 15 watt
Lampu Pijar 25 watt
Lampu Pijar 40 watt
Lampu Pijar 100 watt
Lampu Pijar warna 5 watt
Lampu Spot Light 100 W (warna) PNR 38/80 watt
Sakelar tunggal
Saklar Ganda
Stop Kontak
Sekring Otomatis 6 Amp
Sekring Otomatis 10 Amp
XX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
BAHAN CAT
Cat Kayu / Besi
Cat Tembok 5 Kg
Cat Tembok 5 Kg
Cat Genteng
Cat Genteng Super Gloss
Minyak Cat / Thiner B
Cat Hermplastic
Lem kayu
Meni Kayu
Meni besi
Plamir Tembok 5 kg
Plamir untuk Plituran
Plamir Kayu Pedang
Cat Biru Berlin
Cat Hitam Gading
Cat Putih seng
Cat Kolam Rettar
Kertas Gosok 02
Kuas
Soda api
Vernis
Politur
Dempul / Wood filter
Pewarna / Wood sten
Melamine Seanding sealer
Melamin lack (glass / dop)
Compound
Spiritus
Serlaag India ( Warna Kuning Tua Tipis )
Batu Kambang
Kain Pop
No Drop
XXI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
HARGA SATUAN
(Rp.)
4
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
83,050.00
100,650.00
3,960.00
3,960.00
4,015.00
4,125.00
4,950.00
3,245.00
65,450.00
12,925.00
16,225.00
13,750.00
99,275.00
109,450.00
kg
Galon
Galon
Galon
Galon
ltr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
lbr
bh
kg
ltr
ltr
kg
kg
kg
kg
kaleng
ltr
kg
kg
lbr
kg
58,300.00
70,537.50
77,000.00
116,668.75
222,750.00
17,710.00
82,500.00
17,500.00
20,507.14
20,507.14
44,000.00
27,500.00
19,595.71
57,860.00
55,110.00
45,173.33
72,930.00
3,272.50
9,900.00
27,500.00
36,300.00
70,400.00
44,000.00
57,500.00
57,500.00
60,500.00
38,500.00
13,475.00
75,130.00
26,400.00
27,500.00
34,500.00
ltr
kg
kg
bh
kg
kg
ltr
ltr
kg
kg
ltr
ltr
m
ltr
4,500.00
13,700.00
39,000.00
10,000.00
8,200.00
29,150.00
7,000.00
4,500.00
8,000.00
9,600.00
12,400.00
7,460.00
214,500.00
24,400.00
KETERANGAN
5
Broco
Broco
Broco
Emco
Paragon
Decolith
Emco
Emco
Emco
NO.
SATUAN
1
15
16
17
18
19
20
21
22
23
24
25
3
ltr
kg
jam
set
lbr
ljr
kg
kg
kg
lbr
kg
Oli SAE 40
Stempet
Compressor
Alat Bantu
Gedek Guling
Bambu Petung
Timah Hitam
Plat L
Plat U ( KAVEL )
Karung Plastik ( Glangsing )
Ijuk
Tuban,
HARGA SATUAN
(Rp.)
4
27,500.00
13,700.00
105,600.00
71,500.00
55,000.00
16,500.00
21,780.00
15,950.00
15,950.00
3,300.00
4,950.00
Januari 2012
Ir. S A T R I Y O
KETERANGAN
5
2.
3.
4.
5.
6.
1 M'
1 M
1 M'
1 M2
1 M3
1 M3
(SNI 03-2835-01)
48,274.29
34,650.00
266.86
3,500.00
4,900.00
510.00
265.00
92,366.15
92,366.00
a. Rp.
4,022,857.14
a. Rp.
4,950,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
844,800.00
59,500.00
4,002.90
14,726.25
4,251.30
10,642.50
111,237.50
35,000.00
98,000.00
10,200.00
2,650.00
1,195,010.44
1,195,010.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
289,645.71
43,750.00
800.58
3,506.25
708.55
1,915.65
88,990.00
14,000.00
9,800.00
1,020.00
1,060.00
455,196.74
455,196.00
35,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
3,500.00
2,650.00
6,150.00
6,150.00
35,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
233,345.00
1,749.00
235,094.00
28,211.26
28,211.00
35,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
233,345.00
17,649.00
250,994.00
250,994.00
( SNI 03-2835-04 )
a. Rp.
a. Rp.
Jumlah
Dibulatkan
10
PEKERJAAN TANAH
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1 M
1 M
1 M
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
11
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
74,250.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
63,250.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
102,666.67
35,000.00
53,000.00
(SNI DT 91-0006-2007-01)
= Rp.
26,250.00
= Rp.
1,325.00
= Rp.
27,575.00
= Rp.
27,575.00
(SNI DT 91-0006-2007-02)
= Rp.
31,500.00
= Rp.
2,385.00
= Rp.
33,885.00
= Rp.
33,885.00
(SNI DT 91-0006-2007-03)
= Rp.
36,750.00
= Rp.
3,551.00
= Rp.
40,301.00
= Rp.
40,301.00
(SNI DT 91-0006-2007-04)
= Rp.
36,820.00
= Rp.
5,512.00
= Rp.
42,332.00
= Rp.
42,332.00
(SNI DT 91-0006-2007-05)
= Rp.
35,000.00
= Rp.
1,696.00
= Rp.
36,696.00
= Rp.
36,696.00
(SNI DT 91-0006-2007-06)
= Rp.
52,500.00
= Rp.
3,180.00
= Rp.
55,680.00
= Rp.
55,680.00
(SNI DT 91-0006-2007-07)
= Rp.
42,000.00
= Rp.
2,385.00
= Rp.
44,385.00
= Rp.
44,385.00
(SNI DT 91-0006-2007-08)
= Rp.
7,875.00
= Rp.
397.50
= Rp.
8,272.50
= Rp.
8,272.00
(SNI DT 91-0006-2007-09)
= Rp.
89,100.00
= Rp.
10,500.00
= Rp.
530.00
= Rp.
100,130.00
= Rp.
100,130.00
(SNI DT 91-0006-2007-10)
= Rp.
75,900.00
= Rp.
10,500.00
= Rp.
530.00
= Rp.
86,930.00
= Rp.
86,930.00
(SNI DT 91-0006-2007-11)
= Rp.
123,200.00
= Rp.
8,750.00
= Rp.
1,325.00
= Rp.
133,275.00
= Rp.
133,275.00
12.
13.
14.
1 M3
1 M
1 M
2.
3.
4.
5.
1 M3
1 M3
1 M3
66,660.00
35,000.00
53,000.00
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
PEKERJAAN PONDASI
1.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
53,000.00
(SNI DT 91-0006-2007-12)
= Rp.
79,992.00
= Rp.
8,750.00
= Rp.
1,325.00
= Rp.
90,067.00
= Rp.
90,067.00
(SNI DT 91-0006-2007-13)
= Rp.
11,550.00
= Rp.
530.00
= Rp.
12,080.00
= Rp.
12,080.00
(SNI DT 91-0006-2007-14)
= Rp.
1,750.00
= Rp.
265.00
= Rp.
2,015.00
= Rp.
2,015.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
82,775.00
74,250.00
53,000.00
46,000.00
51,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
82,775.00
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
82,775.00
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
1 M3
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
82,775.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
82,775.00
1,402.50
102,116.67
46,000.00
1 M3
(SNI DT 91-0007-2007-01)
= Rp.
99,330.00
= Rp.
32,076.00
= Rp.
2,067.00
= Rp.
17,940.00
= Rp.
1,989.00
= Rp.
27,300.00
= Rp.
180,702.00
= Rp.
180,702.00
(SNI DT 91-0007-2007-02)
= Rp.
99,330.00
= Rp.
85,552.50
= Rp.
29,375.50
= Rp.
50,241.40
= Rp.
27,600.00
= Rp.
3,060.00
= Rp.
3,975.00
= Rp.
52,500.00
= Rp.
351,634.40
= Rp.
351,634.00
(SNI DT 91-0007-2007-03)
= Rp.
99,330.00
= Rp.
57,502.50
= Rp.
26,178.17
= Rp.
53,407.02
= Rp.
27,600.00
= Rp.
3,060.00
= Rp.
3,975.00
= Rp.
52,500.00
= Rp.
323,552.68
= Rp.
323,552.00
(SNI DT 91-0007-2007-04)
= Rp.
99,330.00
= Rp.
283,305.00
= Rp.
49,526.58
= Rp.
27,600.00
= Rp.
3,060.00
= Rp.
3,975.00
= Rp.
52,500.00
= Rp.
519,296.58
= Rp.
519,296.00
(SNI DT 91-0007-2007-05)
= Rp.
99,330.00
= Rp.
228,607.50
= Rp.
53,100.67
= Rp.
27,600.00
0.0600
0.0750
1.5000
6.
2.
3.
4.
5.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
82,775.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
1 M3
PEKERJAAN DINDING
1.
1 M2
1 M2
1 M2
1 M2
1 M2
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
3,060.00
3,975.00
52,500.00
468,173.17
468,173.00
(SNI DT 91-0007-2007-06)
= Rp.
99,330.00
= Rp.
190,740.00
= Rp.
55,551.47
= Rp.
27,600.00
= Rp.
3,060.00
= Rp.
3,975.00
= Rp.
52,500.00
= Rp.
432,756.47
= Rp.
432,756.00
( An.D.02 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
( An.D.04 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
13
1,003.75
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
100,375.00
14,137.20
5,495.42
9,445.79
9,200.00
1,020.00
1,590.00
21,000.00
162,263.41
162,263.00
1,003.75
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
100,375.00
37,236.38
9,496.85
9,200.00
1,020.00
1,590.00
21,000.00
179,918.23
179,918.00
1,003.75
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
50,187.50
6,311.25
2,997.50
5,105.83
4,600.00
510.00
795.00
10,500.00
81,007.08
81,007.00
1,003.75
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
50,187.50
16,128.75
4,391.02
4,600.00
510.00
795.00
10,500.00
87,112.27
87,112.00
889.17
1,402.50
102,116.67
46,000.00
51,000.00
(SNI DT 91-0009-2007-01)
= Rp.
124,483.80
= Rp.
61,008.75
= Rp.
8,169.33
= Rp.
9,200.00
= Rp.
1,020.00
0.0300
0.6000
6.
7.
8.
9.
10.
11.
1M
1M
1M
1 M2
1 M2
1 M2
Mandor
Pekerja
14
a. Rp.
a. Rp.
Jumlah
Dibulatkan
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
1,590.00
21,000.00
226,471.88
226,471.00
(SNI DT 91-0009-2007-02)
= Rp.
102,666.20
= Rp.
61,008.75
= Rp.
8,169.33
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
204,654.28
= Rp.
204,654.00
(SNI DT 91-0009-2007-03)
= Rp.
102,666.20
= Rp.
14,137.20
= Rp.
5,495.42
= Rp.
9,445.79
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
164,554.61
= Rp.
164,554.00
(SNI DT 91-0009-2007-04)
= Rp.
124,483.80
= Rp.
46,212.38
= Rp.
9,292.62
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
212,798.79
= Rp.
212,798.00
(SNI DT 91-0009-2007-05)
= Rp.
102,666.20
= Rp.
46,212.38
= Rp.
9,292.62
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
190,981.19
= Rp.
190,981.00
(SNI DT 91-0009-2007-06)
= Rp.
124,483.80
= Rp.
37,236.38
= Rp.
9,496.85
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
204,027.03
= Rp.
204,027.00
(SNI DT 91-0009-2007-07)
= Rp.
102,666.20
= Rp.
37,236.38
= Rp.
9,496.85
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
182,209.43
= Rp.
182,209.00
12.
13.
14.
15.
16.
17.
18.
1M
1 M2
1 M2
1M
1 M2
1 M2
1 M2
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
733.33
1,402.50
102,116.67
(SNI DT 91-0009-2007-08)
= Rp.
102,666.20
= Rp.
31,135.50
= Rp.
10,415.90
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
1,590.00
= Rp.
21,000.00
= Rp.
177,027.60
= Rp.
177,027.00
(SNI DT 91-0009-2007-09)
= Rp.
62,241.90
= Rp.
26,577.38
= Rp.
3,880.43
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
109,104.71
= Rp.
109,104.00
(SNI DT 91-0009-2007-10)
= Rp.
51,333.10
= Rp.
26,577.38
= Rp.
3,880.43
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
98,195.91
= Rp.
98,195.00
(SNI DT 91-0009-2007-11)
= Rp.
62,241.90
= Rp.
20,153.93
= Rp.
4,084.67
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
102,885.49
= Rp.
102,885.00
(SNI DT 91-0009-2007-12)
= Rp.
51,333.10
= Rp.
20,153.93
= Rp.
4,084.67
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
91,976.69
= Rp.
91,976.00
(SNI DT 91-0009-2007-13)
= Rp.
62,241.90
= Rp.
16,128.75
= Rp.
4,391.02
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
99,166.67
= Rp.
99,166.00
(SNI DT 91-0009-2007-14)
= Rp.
51,333.10
= Rp.
16,128.75
= Rp.
4,391.02
0.1000
0.0100
0.0150
0.3000
19.
20.
21.
1M
1M
1 M2
22.
1 M2
23.
1M
24.
1 M2
Tukang batu
Kep. Tukang batu
Mandor
Pekerja
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
889.17
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
733.33
1,402.50
199,833.33
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
4,600.00
510.00
795.00
10,500.00
88,257.87
88,257.00
(SNI DT 91-0009-2007-15)
= Rp.
62,241.90
= Rp.
13,576.20
= Rp.
4,595.25
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
96,818.35
= Rp.
96,818.00
(SNI DT 91-0009-2007-16)
= Rp.
51,333.10
= Rp.
13,576.20
= Rp.
4,595.25
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
85,909.55
= Rp.
85,909.00
(SNI DT 91-0009-2007-17)
= Rp.
51,333.10
= Rp.
6,311.25
= Rp.
2,997.50
= Rp.
5,105.83
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
82,152.68
= Rp.
82,152.00
(SNI DT 91-0009-2007-18)
= Rp.
150,000.00
= Rp.
19,635.00
= Rp.
3,267.73
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
189,307.73
= Rp.
189,307.00
(SNI DT 91-0009-2007-19)
= Rp.
46,887.50
= Rp.
16,479.38
= Rp.
3,574.08
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
1,590.00
= Rp.
21,700.00
= Rp.
108,115.96
= Rp.
108,115.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
42,625.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
88,000.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
(SNI DT 91-0009-2007-20)
= Rp.
96,800.00
= Rp.
16,479.38
= Rp.
3,574.08
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
1,590.00
= Rp.
21,700.00
Jumlah
Dibulatkan
25.
26.
27
28
1M
1 M2
1 M2
1M
PEKERJAAN PLESTERAN
1.
2.
3.
1 M2
1 M2
1 M2
= Rp.
= Rp.
158,028.46
158,028.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
79,016.67
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
( An.D.05 )
86,918.34
16,479.38
3,574.08
16,100.00
1,785.00
1,590.00
21,700.00
148,146.80
148,146.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
66,000.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
( An.D.06 )
72,600.00
16,479.38
3,574.08
16,100.00
1,785.00
1,590.00
21,700.00
133,828.46
133,828.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
107,250.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
( An.D.07 )
117,975.00
16,479.38
3,574.08
16,100.00
1,785.00
1,590.00
21,700.00
179,203.46
179,203.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
143,000.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
( An.D.08 )
157,300.00
16,479.38
3,574.08
16,100.00
1,785.00
1,590.00
21,700.00
218,528.46
218,528.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
1,402.50
102,116.67
( SNI DT 91-0010-2007 )
(SNI DT 91-0010-2007-01)
= Rp.
14,339.16
= Rp.
2,042.33
= Rp.
6,900.00
= Rp.
765.00
= Rp.
530.00
= Rp.
7,000.00
= Rp.
31,576.49
= Rp.
31,576.00
(SNI DT 91-0010-2007-02)
= Rp.
10,905.84
= Rp.
2,348.68
= Rp.
6,900.00
= Rp.
765.00
= Rp.
530.00
= Rp.
7,000.00
= Rp.
28,449.52
= Rp.
28,449.00
(SNI DT 91-0010-2007-03)
= Rp.
8,751.60
= Rp.
2,450.80
0.1500
0.0150
0.0100
0.2000
4.
5.
6.
7.
8.
9.
10.
1M
1M
1 M2
1 M2
1 M2
1 M2
1 M2
Tukang batu
Kep. Tukang batu
Mandor
Pekerja
PLESTERAN 1 : 3 Tebal 2 cm
10.3680 kg
Semen / PC
3
0.0310 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0130
Mandor
0.2600
Pekerja
PLESTERAN 1 : 4 Tebal 2 cm
8.3200 kg
Semen / PC
3
0.0320 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0130
Mandor
0.2600
Pekerja
PLESTERAN 1 : 5 Tebal 2 cm
6.9120 kg
Semen / PC
3
0.0350 m
Pasir pasang
0.2000
Tukang batu
0.0200
Kep. Tukang batu
0.0130
Mandor
0.2600
Pekerja
PLESTERAN CIPRAT 1 : 2
4.3200 kg
Semen / PC
3
0.0060 m
Pasir pasang
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0150
Mandor
0.3000
Pekerja
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
18
1,402.50
46,000.00
51,000.00
53,000.00
35,000.00
1,402.50
102,116.67
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
6,900.00
765.00
530.00
7,000.00
26,397.40
26,397.00
(SNI DT 91-0010-2007-04)
= Rp.
7,270.56
= Rp.
2,655.03
= Rp.
6,900.00
= Rp.
765.00
= Rp.
530.00
= Rp.
7,000.00
= Rp.
25,120.59
= Rp.
25,120.00
(SNI DT 91-0010-2007-05)
= Rp.
14,541.12
= Rp.
3,165.62
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
689.00
= Rp.
9,100.00
= Rp.
37,715.74
= Rp.
37,715.00
(SNI DT 91-0010-2007-06)
= Rp.
11,668.80
= Rp.
3,267.73
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
689.00
= Rp.
9,100.00
= Rp.
34,945.53
= Rp.
34,945.00
(SNI DT 91-0010-2007-07)
= Rp.
9,694.08
= Rp.
3,574.08
= Rp.
9,200.00
= Rp.
1,020.00
= Rp.
689.00
= Rp.
9,100.00
= Rp.
33,277.16
= Rp.
33,277.00
(SNI DT 91-0010-2007-08)
= Rp.
6,058.80
= Rp.
612.70
= Rp.
4,600.00
= Rp.
510.00
= Rp.
795.00
= Rp.
10,500.00
= Rp.
23,076.50
= Rp.
23,076.00
(SNI DT 91-0010-2007-09)
= Rp.
4,358.97
= Rp.
3,450.00
= Rp.
382.50
= Rp.
424.00
= Rp.
5,250.00
= Rp.
13,865.47
= Rp.
13,865.00
(SNI DT 91-0010-2007-10)
= Rp.
8,891.85
= Rp.
1,225.40
= Rp.
6,900.00
= Rp.
765.00
= Rp.
795.00
0.3000
11.
1M
Pekerja
PEKERJAAN ACIAN
3.2500 kg
Semen / PC
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0100
Mandor
0.2000
Pekerja
a. Rp.
Jumlah
Dibulatkan
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,402.50
46,000.00
51,000.00
53,000.00
35,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
212,850.00
= Rp.
= Rp.
= Rp.
10,500.00
29,077.25
29,077.00
(SNI DT 91-0010-2007-11)
= Rp.
4,558.13
= Rp.
4,600.00
= Rp.
510.00
= Rp.
530.00
= Rp.
7,000.00
= Rp.
17,198.13
= Rp.
17,198.00
2.
3.
4.
5.
6.
1M
1M
1M
1 M3
1 M3
1 M3
(SNI DT 91-0008-2007-01)
= Rp.
185,179.50
= Rp.
73,689.20
= Rp.
305,745.00
= Rp.
57,750.00
= Rp.
1,275.00
= Rp.
11,500.00
= Rp.
4,240.00
= Rp.
639,378.70
= Rp.
639,378.00
(SNI DT 91-0008-2007-02)
= Rp.
161,915.00
= Rp.
90,390.74
= Rp.
322,575.00
= Rp.
42,000.00
= Rp.
1,020.00
= Rp.
9,200.00
= Rp.
3,180.00
= Rp.
630,280.73
= Rp.
630,280.00
(SNI DT 91-0008-2007-03)
= Rp.
157,509.00
= Rp.
87,959.40
= Rp.
346,417.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
668,112.90
= Rp.
668,112.00
(SNI DT 91-0008-2007-04)
= Rp.
159,552.36
= Rp.
83,807.29
= Rp.
387,090.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
706,676.65
= Rp.
706,676.00
(SNI DT 91-0008-2007-05)
= Rp.
160,346.29
= Rp.
80,873.90
= Rp.
419,347.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
736,794.69
= Rp.
736,794.00
(SNI DT 91-0008-2007-06)
= Rp.
162,234.27
0.5428
326.0000
1.6500
0.0280
0.2750
0.0830
7.
8.
9.
10.
11.
12.
1M
1M
1 M3
1 M3
1 M3
1 M3
m3
kg
Pasir cor
Semen / PC
Pekerja
Kep. Tukang batu
Tukang batu
Mandor
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
76,920.19
457,215.00
57,750.00
1,428.00
12,650.00
4,399.00
772,596.46
772,596.00
(SNI DT 91-0008-2007-07)
= Rp.
162,553.55
= Rp.
73,986.79
= Rp.
493,680.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
806,447.34
= Rp.
806,447.00
(SNI DT 91-0008-2007-08)
= Rp.
165,086.46
= Rp.
70,656.61
= Rp.
520,327.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
832,297.57
= Rp.
832,297.00
(SNI DT 91-0008-2007-09)
= Rp.
163,809.36
= Rp.
70,047.25
= Rp.
538,560.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
848,643.61
= Rp.
848,643.00
(SNI DT 91-0008-2007-10)
= Rp.
161,766.00
= Rp.
69,239.51
= Rp.
569,415.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
876,647.51
= Rp.
876,647.00
(SNI DT 91-0008-2007-11)
= Rp.
160,978.46
= Rp.
68,927.74
= Rp.
579,232.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
885,365.70
= Rp.
885,365.00
(SNI DT 91-0008-2007-12)
= Rp.
158,615.82
= Rp.
67,822.41
= Rp.
615,697.50
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
0.0830
13.
14.
15.
16.
17.
18.
1 M3
Mandor
1 M3
1 M3
1 M3
1 M3
1 M3
a. Rp.
Jumlah
Dibulatkan
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
212,850.00
141,710.00
1,402.50
35,000.00
51,000.00
46,000.00
53,000.00
= Rp.
= Rp.
= Rp.
4,399.00
918,362.73
918,362.00
(SNI DT 91-0008-2007-13)
= Rp.
157,658.00
= Rp.
67,510.64
= Rp.
628,320.00
= Rp.
57,750.00
= Rp.
1,428.00
= Rp.
12,650.00
= Rp.
4,399.00
= Rp.
929,715.64
= Rp.
929,715.00
a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-14)
= Rp.
718,666.67
= Rp.
20,014.50
= Rp.
9,760.00
= Rp.
91,000.00
= Rp.
63,700.00
= Rp.
6,630.00
= Rp.
6,466.00
= Rp.
916,237.17
= Rp.
916,237.00
a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-15)
= Rp.
970,200.00
= Rp.
24,017.40
= Rp.
14,640.00
= Rp.
91,000.00
= Rp.
76,440.00
= Rp.
7,956.00
= Rp.
6,360.00
= Rp.
1,190,613.40
= Rp.
1,190,613.00
a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
3,593,333.33
a. Rp.
138,050.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-16)
= Rp.
1,149,866.67
= Rp.
42,697.60
= Rp.
39,040.00
= Rp.
431,200.00
= Rp.
386,540.00
= Rp.
91,000.00
= Rp.
63,700.00
= Rp.
6,732.00
= Rp.
6,466.00
= Rp.
2,217,242.27
= Rp.
2,217,242.00
a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
3,593,333.33
a. Rp.
138,050.00
a. Rp.
35,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-17)
= Rp.
1,149,866.67
= Rp.
42,697.60
= Rp.
39,040.00
= Rp.
503,066.67
= Rp.
386,540.00
= Rp.
560,000.00
= Rp.
115,500.00
= Rp.
80,850.00
= Rp.
8,415.00
= Rp.
8,215.00
= Rp.
2,894,190.93
= Rp.
2,894,190.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
(SNI DT 91-0008-2007-18)
= Rp.
1,149,866.67
= Rp.
42,697.60
= Rp.
39,040.00
= Rp.
431,200.00
= Rp.
386,540.00
= Rp.
875,000.00
3,593,333.33
13,343.00
24,400.00
3,593,333.33
138,050.00
35,000.00
3.3000
1.6500
0.1650
0.1550
19.
20.
21.
22.
23.
24.
1M
10 Kg
10 Kg
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
22
35,000.00
49,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
115,500.00
80,850.00
8,415.00
8,215.00
3,137,324.27
3,137,324.00
a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
3,593,333.33
a. Rp.
138,050.00
a. Rp.
35,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-19)
= Rp.
898,333.33
= Rp.
40,029.00
= Rp.
29,280.00
= Rp.
377,300.00
= Rp.
345,125.00
= Rp.
490,000.00
= Rp.
115,500.00
= Rp.
80,850.00
= Rp.
8,415.00
= Rp.
8,215.00
= Rp.
2,393,047.33
= Rp.
2,393,047.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
(SNI DT 91-0008-2007-20)
= Rp.
103,950.00
= Rp.
2,854.50
= Rp.
2,450.00
= Rp.
3,290.00
= Rp.
357.00
= Rp.
212.00
= Rp.
113,113.50
= Rp.
113,113.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
10,560.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
(SNI DT 91-0008-2007-21)
= Rp.
110,880.00
= Rp.
2,854.50
= Rp.
2,450.00
= Rp.
3,290.00
= Rp.
357.00
= Rp.
212.00
= Rp.
120,043.50
= Rp.
120,043.00
(SNI DT 91-0008-2007-22)
= Rp.
1,143,450.00
= Rp.
31,399.50
= Rp.
26,950.00
= Rp.
36,190.00
= Rp.
3,927.00
= Rp.
2,332.00
= Rp.
1,244,248.50
= Rp.
1,244,248.00
(SNI DT 91-0008-2007-23)
= Rp.
1,247,400.00
= Rp.
34,254.00
= Rp.
29,400.00
= Rp.
39,480.00
= Rp.
4,284.00
= Rp.
2,544.00
= Rp.
1,357,362.00
= Rp.
1,357,362.00
(SNI DT 91-0008-2007-24)
= Rp.
1,351,350.00
= Rp.
37,108.50
= Rp.
31,850.00
= Rp.
42,770.00
= Rp.
4,641.00
= Rp.
2,756.00
= Rp.
1,470,475.50
= Rp.
1,470,475.00
25.
26.
27.
28.
29.
30.
31.
32.
33.
1 M3
MEMBUAT PONDASI BETON BERTULANG K.175
1.00
BETON BERTULANG 1:2:3 K.175
1.00
BEGESTING PONDASI
1.00
PEMBESIAN 120 KG
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
(SNI DT 91-0008-2007-25)
= Rp.
1,455,300.00
= Rp.
39,963.00
= Rp.
34,300.00
= Rp.
46,060.00
= Rp.
4,998.00
= Rp.
2,968.00
= Rp.
1,583,589.00
= Rp.
1,583,589.00
(SNI DT 91-0008-2007-26)
= Rp.
1,559,250.00
= Rp.
42,817.50
= Rp.
36,750.00
= Rp.
49,350.00
= Rp.
5,355.00
= Rp.
3,180.00
= Rp.
1,696,702.50
= Rp.
1,696,702.00
(SNI DT 91-0008-2007-27)
= Rp.
2,079,000.00
= Rp.
57,090.00
= Rp.
49,000.00
= Rp.
65,800.00
= Rp.
7,140.00
= Rp.
4,240.00
= Rp.
2,262,270.00
= Rp.
2,262,270.00
(SNI DT 91-0008-2007-28)
= Rp.
2,598,750.00
= Rp.
71,362.50
= Rp.
61,250.00
= Rp.
82,250.00
= Rp.
8,925.00
= Rp.
5,300.00
= Rp.
2,827,837.50
= Rp.
2,827,837.00
a. Rp.
772,596.00
a. Rp.
916,237.00
a. Rp.
1,357,362.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-29)
= Rp.
772,596.00
= Rp.
916,237.00
= Rp.
1,357,362.00
= Rp.
3,046,195.00
= Rp.
3,046,195.00
a. Rp.
806,447.00
a. Rp.
916,237.00
a. Rp.
1,357,362.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-30)
= Rp.
806,447.00
= Rp.
916,237.00
= Rp.
1,357,362.00
= Rp.
3,080,046.00
= Rp.
3,080,046.00
a. Rp.
832,297.00
a. Rp.
916,237.00
a. Rp.
1,357,362.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-31)
= Rp.
832,297.00
= Rp.
916,237.00
= Rp.
1,357,362.00
= Rp.
3,105,896.00
= Rp.
3,105,896.00
a. Rp.
848,643.00
a. Rp.
916,237.00
a. Rp.
1,357,362.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-32)
= Rp.
848,643.00
= Rp.
916,237.00
= Rp.
1,357,362.00
= Rp.
3,122,242.00
= Rp.
3,122,242.00
1 M3
MEMBUAT SLOOF BETON BERTULANG K.200 UK. 15/15, 15/20
1.00
BETON BERTULANG 1:2:3 K.200
a. Rp.
806,447.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
(SNI DT 91-0008-2007-33)
= Rp.
806,447.00
= Rp.
1,190,613.00
1 M3
MEMBUAT PONDASI BETON BERTULANG K.200
1.00
BETON BERTULANG 1:2:3 K.200
1.00
BEGESTING PONDASI
1.00
PEMBESIAN 120 KG
1 M3
MEMBUAT PONDASI BETON BERTULANG K.225
1.00
BETON BERTULANG 1:2:3 K.225
1.00
BEGESTING PONDASI
1.00
PEMBESIAN 120 KG
1 M3
MEMBUAT PONDASI BETON BERTULANG K.250
1.00
BETON BERTULANG 1:2:3 K.250
1.00
BEGESTING PONDASI
1.00
PEMBESIAN 120 KG
23
1.00
PEMBESIAN 130 KG
a. Rp.
1,470,475.00
Jumlah
Dibulatkan
34.
1 M3
MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/25, 20/30
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
1.00
PEMBESIAN 140 KG
a. Rp.
1,583,589.00
Jumlah
Dibulatkan
35.
1M
MEMBUAT SLOOF BETON BERTULANG K.225 UK. 20/40, 30/40
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan
36.
= Rp.
= Rp.
= Rp.
1,470,475.00
3,467,535.00
3,467,535.00
(SNI DT 91-0008-2007-34)
= Rp.
832,297.00
= Rp.
1,190,613.00
= Rp.
1,583,589.00
= Rp.
3,606,499.00
= Rp.
3,606,499.00
(SNI DT 91-0008-2007-35)
= Rp.
832,297.00
= Rp.
1,190,613.00
= Rp.
1,696,702.00
= Rp.
3,719,612.00
= Rp.
3,719,612.00
1M
MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/25, 20/30
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
1.00
PEMBESIAN 140 KG
a. Rp.
1,583,589.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-36)
= Rp.
848,643.00
= Rp.
1,190,613.00
= Rp.
1,583,589.00
= Rp.
3,622,845.00
= Rp.
3,622,845.00
37.
1 M3
MEMBUAT SLOOF BETON BERTULANG K.250 UK. 20/40, 30/40
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
1.00
BEGESTING SLOOF
a. Rp.
1,190,613.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-37)
= Rp.
848,643.00
= Rp.
1,190,613.00
= Rp.
1,696,702.00
= Rp.
3,735,958.00
= Rp.
3,735,958.00
38.
1M
MEMBUAT KOLOM PRAKTIS BTN BERTULANG K.175 UK. 11/11,15/15
1.00
BETON BERTULANG 1:2:3 K.175
a. Rp.
772,596.00
0.25
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 130 KG
a. Rp.
1,470,475.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-38)
= Rp.
772,596.00
= Rp.
554,310.50
= Rp.
1,470,475.00
= Rp.
2,797,381.50
= Rp.
2,797,381.00
39.
1 M3
MEMBUAT KOLOM BETON BERTULANG K.200 UK. 15/25, 15/30, 20/30
1.00
BETON BERTULANG 1:2:3 K.200
a. Rp.
806,447.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-39)
= Rp.
806,447.00
= Rp.
1,108,621.00
= Rp.
1,696,702.00
= Rp.
3,611,770.00
= Rp.
3,611,770.00
40.
1 M3
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 15/25, 15/30, 20/30
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-40)
= Rp.
832,297.00
= Rp.
1,108,621.00
= Rp.
1,696,702.00
= Rp.
3,637,620.00
= Rp.
3,637,620.00
41.
1 M3
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 20/40, 30/40
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 200 KG
a. Rp.
2,262,270.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-41)
= Rp.
832,297.00
= Rp.
1,108,621.00
= Rp.
2,262,270.00
= Rp.
4,203,188.00
= Rp.
4,203,188.00
42.
1 M3
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 20/40, 30/40
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 200 KG
a. Rp.
2,262,270.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-42)
= Rp.
848,643.00
= Rp.
1,108,621.00
= Rp.
2,262,270.00
= Rp.
4,219,534.00
= Rp.
4,219,534.00
43.
1 M3
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/50, 35/50
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING KOLOM
a. Rp.
2,217,242.00
(SNI DT 91-0008-2007-43)
= Rp.
832,297.00
= Rp.
1,108,621.00
24
1.00
PEMBESIAN 225 KG
a. Rp.
2,522,145.00
Jumlah
Dibulatkan
44.
1 M3
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/50, 35/50
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 225 KG
a. Rp.
2,522,145.00
Jumlah
Dibulatkan
45.
1M
MEMBUAT KOLOM BETON BERTULANG K.225 UK. 30/60, 35/60, 40/70
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.5
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 250 KG
a. Rp.
2,827,837.00
Jumlah
Dibulatkan
46.
= Rp.
= Rp.
= Rp.
2,522,145.00
4,463,063.00
4,463,063.00
(SNI DT 91-0008-2007-44)
= Rp.
848,643.00
= Rp.
1,108,621.00
= Rp.
2,522,145.00
= Rp.
4,479,409.00
= Rp.
4,479,409.00
(SNI DT 91-0008-2007-45)
= Rp.
832,297.00
= Rp.
1,108,621.00
= Rp.
2,827,837.00
= Rp.
4,768,755.00
= Rp.
4,768,755.00
1M
MEMBUAT KOLOM BETON BERTULANG K.250 UK. 30/60, 35/60, 40/70
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING KOLOM
a. Rp.
2,217,242.00
1.00
PEMBESIAN 250 KG
a. Rp.
2,827,837.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-46)
= Rp.
848,643.00
= Rp.
1,108,621.00
= Rp.
2,827,837.00
= Rp.
4,785,101.00
= Rp.
4,785,101.00
47.
1 M3
MEMBUAT RING BALOK BETON BERTULANG K.175 UK. 15/15, 15/20
1.00
BETON BERTULANG 1:2:3 K.175
a. Rp.
772,596.00
0.25
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 110 KG
a. Rp.
1,244,248.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-47)
= Rp.
772,596.00
= Rp.
723,547.50
= Rp.
1,244,248.00
= Rp.
2,740,391.50
= Rp.
2,740,391.00
48.
1M
MEMBUAT BALOK BETON BERTULANG K.200 UK. 15/20, 15/30, 20/30
1.00
BETON BERTULANG 1:2:3 K.200
a. Rp.
806,447.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 120 KG
a. Rp.
1,357,362.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-48)
= Rp.
806,447.00
= Rp.
1,447,095.00
= Rp.
1,357,362.00
= Rp.
3,610,904.00
= Rp.
3,610,904.00
49.
1 M3
MEMBUAT BALOK BETON BERTULANG K.225 UK. 15/30, 20/30
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 120 KG
a. Rp.
1,357,362.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-49)
= Rp.
832,297.00
= Rp.
1,447,095.00
= Rp.
1,357,362.00
= Rp.
3,636,754.00
= Rp.
3,636,754.00
50.
1 M3
MEMBUAT BALOK BETON BERTULANG K.225 UK. 25/40, 30/50
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-50)
= Rp.
832,297.00
= Rp.
1,447,095.00
= Rp.
1,696,702.00
= Rp.
3,976,094.00
= Rp.
3,976,094.00
51.
1 M3
MEMBUAT BALOK BETON BERTULANG K.250 UK. 25/40, 30/50
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 150 KG
a. Rp.
1,696,702.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-51)
= Rp.
848,643.00
= Rp.
1,447,095.00
= Rp.
1,696,702.00
= Rp.
3,992,440.00
= Rp.
3,992,440.00
52.
1 M3
MEMBUAT BALOK BETON BERTULANG K.225 UK. 30/60, 30/70, 30/80
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
1.00
PEMBESIAN 200 KG
a. Rp.
2,262,270.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-52)
= Rp.
832,297.00
= Rp.
1,447,095.00
= Rp.
2,262,270.00
= Rp.
4,541,662.00
= Rp.
4,541,662.00
53.
1 M3
MEMBUAT BALOK BETON BERTULANG K.250 UK. 30/60, 30/70, 30/80
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING BALOK
a. Rp.
2,894,190.00
(SNI DT 91-0008-2007-53)
= Rp.
848,643.00
= Rp.
1,447,095.00
25
1.00
PEMBESIAN 200 KG
a. Rp.
2,262,270.00
Jumlah
Dibulatkan
54.
1 M3
MEMBUAT PLAT LANTAI BETON BERTULANG K.225 TB. 10 & 12 CM
1.00
BETON BERTULANG 1:2:3 K.225
a. Rp.
832,297.00
0.50
BEGESTING LANTAI
a. Rp.
3,137,324.00
1.00
PEMBESIAN 110 KG
a. Rp.
1,244,248.00
Jumlah
Dibulatkan
55.
1M
MEMBUAT PLAT LANTAI BETON BERTULANG K.250 TB. 10 & 12 CM
1.00
BETON BERTULANG 1:2:3 K.250
a. Rp.
848,643.00
0.50
BEGESTING LANTAI
a. Rp.
3,137,324.00
1.00
PEMBESIAN 110 KG
a. Rp.
1,244,248.00
Jumlah
Dibulatkan
56.
1M
MEMBUAT TANGGA BETON BERTULANG K.225
1.00
BETON BERTULANG 1:2:3 K.225
0.50
BEGESTING TANGGA
1.00
PEMBESIAN 150 KG
57.
58.
59
60
1 M3
MEMBUAT TANGGA BETON BERTULANG K.250
1.00
BETON BERTULANG 1:2:3 K.250
0.50
BEGESTING TANGGA
1.00
PEMBESIAN 150 KG
1 M3
43 Kg
= Rp.
= Rp.
= Rp.
2,262,270.00
4,558,008.00
4,558,008.00
(SNI DT 91-0008-2007-54)
= Rp.
832,297.00
= Rp.
1,568,662.00
= Rp.
1,244,248.00
= Rp.
3,645,207.00
= Rp.
3,645,207.00
(SNI DT 91-0008-2007-55)
= Rp.
848,643.00
= Rp.
1,568,662.00
= Rp.
1,244,248.00
= Rp.
3,661,553.00
= Rp.
3,661,553.00
a. Rp.
832,297.00
a. Rp.
2,393,047.00
a. Rp.
1,696,702.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-56)
= Rp.
832,297.00
= Rp.
1,196,523.50
= Rp.
1,696,702.00
= Rp.
3,725,522.50
= Rp.
3,725,522.00
a. Rp.
848,643.00
a. Rp.
2,393,047.00
a. Rp.
1,696,702.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-57)
= Rp.
848,643.00
= Rp.
1,196,523.50
= Rp.
1,696,702.00
= Rp.
3,741,868.50
= Rp.
3,741,868.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-58)
= Rp.
2,338,875.00
= Rp.
57,090.00
= Rp.
49,000.00
= Rp.
65,800.00
= Rp.
7,140.00
= Rp.
4,240.00
= Rp.
2,522,145.00
= Rp.
2,522,145.00
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
a. Rp.
3,593,333.33
a. Rp.
13,343.00
a. Rp.
24,400.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-59)
= Rp.
19,404.00
= Rp.
20,014.50
= Rp.
9,760.00
= Rp.
91,000.00
= Rp.
63,700.00
= Rp.
6,630.00
= Rp.
6,466.00
= Rp.
216,974.50
= Rp.
216,974.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-60)
= Rp.
446,985.00
= Rp.
12,274.35
= Rp.
10,535.00
= Rp.
14,147.00
= Rp.
1,535.10
= Rp.
911.60
= Rp.
486,388.05
= Rp.
486,388.00
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
61
1 M3
MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175
1.00
BETON BERTULANG 1:2:3 K.175
a. Rp.
772,596.00
0.50
BEGESTING PONDASI
a. Rp.
216,974.00
1.00
PEMBESIAN 43 KG
a. Rp.
486,388.00
Jumlah
Dibulatkan
(SNI DT 91-0008-2007-61)
= Rp.
772,596.00
= Rp.
108,487.00
= Rp.
486,388.00
= Rp.
1,367,471.00
= Rp.
1,367,471.00
62
61 Kg
(SNI DT 91-0008-2007-62)
64.0500
0.6450
0.3010
0.3010
0.0301
0.0172
63
kg
kg
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
19,030.00
35,000.00
47,000.00
51,000.00
53,000.00
1M
MEMBUAT PLAT LANTAI DIBAWAH BETON BERTULANG K.175
1.00
BETON BERTULANG 1:2:3 K.175
a. Rp.
772,596.00
0.50
BEGESTING PONDASI
a. Rp.
216,974.00
1.00
PEMBESIAN 61 KG
a. Rp.
673,498.00
Jumlah
Dibulatkan
PEKERJAAN KAYU
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
634,095.00
12,274.35
10,535.00
14,147.00
1,535.10
911.60
673,498.05
673,498.00
(SNI DT 91-0008-2007-63)
= Rp.
772,596.00
= Rp.
108,487.00
= Rp.
673,498.00
= Rp.
1,554,581.00
= Rp.
1,554,581.00
( SNI DT 91-0011-2007 )
2.
1 M
1 M
PASANGAN GORDENG
3
1.1000 m
Kayu balok bengkirai kw. II
15.0000 kg
Besi strip
3.0000 kg
Paku
2.4000
Pekerja
7.2000
Tukang kayu
0.7200
Kep. Tukang kayu
0.1200
Mandor
a. Rp.
4,418,333.33
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-01)
= Rp.
4,860,166.66
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
140,000.00
= Rp.
588,000.00
= Rp.
61,200.00
= Rp.
10,600.00
= Rp.
5,952,187.46
= Rp.
5,952,187.00
a. Rp.
4,418,333.33
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-02)
= Rp.
4,860,166.66
= Rp.
217,500.00
= Rp.
40,029.00
= Rp.
84,000.00
= Rp.
352,800.00
= Rp.
36,720.00
= Rp.
6,360.00
= Rp.
5,597,575.66
= Rp.
5,597,575.00
3.
1 M2
(SNI DT 91-0011-2007-03)
= Rp.
43,120.00
= Rp.
10,914.75
= Rp.
2,001.45
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
65,211.20
= Rp.
65,211.00
4.
1 M2
(SNI DT 91-0011-2007-04)
= Rp.
43,120.00
= Rp.
17,281.69
= Rp.
3,335.75
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
72,912.44
= Rp.
72,912.00
5.
1 M2
(SNI DT 91-0011-2007-05)
= Rp.
55,337.33
= Rp.
2,668.60
= Rp.
5,250.00
= Rp.
12,250.00
= Rp.
1,275.00
27
3,593,333.33
13,343.00
35,000.00
49,000.00
51,000.00
0.0750
6.
1 M2
7.
1 M3
8.
9.
10.
11.
12.
1 M2
1 M2
1 M2
1 M2
1 M'
Mandor
a. Rp.
Jumlah
Dibulatkan
53,000.00
= Rp.
= Rp.
= Rp.
3,975.00
80,755.93
80,755.00
(SNI DT 91-0011-2007-06)
= Rp.
51,025.33
= Rp.
3,335.75
= Rp.
7,000.00
= Rp.
14,700.00
= Rp.
1,530.00
= Rp.
530.00
= Rp.
78,121.08
= Rp.
78,121.00
a. Rp.
4,739,166.67
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-07)
= Rp.
5,687,000.00
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
882,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
6,931,078.75
= Rp.
6,931,078.00
a. Rp.
4,968,333.33
a. Rp.
17,500.00
a. Rp.
66,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-08)
= Rp.
119,240.00
= Rp.
5,250.00
= Rp.
66,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
328,810.00
= Rp.
328,810.00
a. Rp.
4,968,333.33
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-09)
= Rp.
317,973.33
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
147,000.00
= Rp.
15,300.00
= Rp.
2,650.00
= Rp.
526,673.33
= Rp.
526,673.00
a. Rp.
4,968,333.33
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-10)
= Rp.
298,100.00
= Rp.
2,001.45
= Rp.
17,500.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,325.00
= Rp.
427,126.45
= Rp.
427,126.00
a. Rp.
4,968,333.33
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-11)
= Rp.
198,733.33
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
122,500.00
= Rp.
12,750.00
= Rp.
2,650.00
= Rp.
380,383.33
= Rp.
380,383.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
(SNI DT 91-0011-2007-12)
= Rp.
50,490.00
= Rp.
1,334.30
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,275.00
4,675,000.00
13,343.00
35,000.00
49,000.00
51,000.00
0.0050
13.
Mandor
a. Rp.
Jumlah
Dibulatkan
1 M'
53,000.00
= Rp.
= Rp.
= Rp.
265.00
66,664.30
66,664.00
a. Rp.
4,675,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-13)
= Rp.
51,425.00
= Rp.
667.15
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,020.00
= Rp.
265.00
= Rp.
66,677.15
= Rp.
66,677.00
a. Rp.
7,768,750.00
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-14)
= Rp.
9,322,500.00
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
10,922,620.80
= Rp.
10,922,620.00
a. Rp.
6,992,857.14
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-15)
= Rp.
7,692,142.85
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
140,000.00
= Rp.
588,000.00
= Rp.
61,200.00
= Rp.
10,600.00
= Rp.
8,784,163.65
= Rp.
8,784,163.00
15.
15.
16.
16.
17.
1 M
1 M3
1 M3
1 M3
1 M3
1 M2
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
PASANGAN GORDENG
3
1.1000 m
Kayu balok bengkirai kw. II
15.0000 kg
Besi strip
3.0000 kg
Paku
2.4000
Pekerja
7.2000
Tukang kayu
0.7200
Kep. Tukang kayu
0.1200
Mandor
14,500.00
13,343.00
35,000.00
49,000.00
51,000.00
53,000.00
a. Rp.
6,992,857.14
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
14,500.00
13,343.00
35,000.00
49,000.00
51,000.00
53,000.00
(SNI DT 91-0011-2007-15.a)
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
140,000.00
= Rp.
588,000.00
= Rp.
61,200.00
= Rp.
10,600.00
= Rp.
1,092,020.80
= Rp.
1,092,020.00
(SNI DT 91-0011-2007-16)
= Rp.
7,692,142.85
= Rp.
217,500.00
= Rp.
40,029.00
= Rp.
84,000.00
= Rp.
352,800.00
= Rp.
36,720.00
= Rp.
6,360.00
= Rp.
8,429,551.85
= Rp.
8,429,551.00
(SNI DT 91-0011-2007-16.a)
= Rp.
217,500.00
= Rp.
40,029.00
= Rp.
84,000.00
= Rp.
352,800.00
= Rp.
36,720.00
= Rp.
6,360.00
= Rp.
737,409.00
= Rp.
737,409.00
(SNI DT 91-0011-2007-17)
= Rp.
56,760.00
0.0036
0.2500
0.1000
0.1000
0.0100
0.0050
m3
kg
Reng bengkirai
Paku usuk
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
a. Rp.
4,436,666.67
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
15,972.00
3,335.75
3,500.00
4,900.00
510.00
265.00
85,242.75
85,242.00
17.
1 M
18.
1 M2
18.a 1 M
19.
20.
21.
1 M2
1 M2
1 M3
(SNI DT 91-0011-2007-18)
= Rp.
56,760.00
= Rp.
25,289.00
= Rp.
3,335.75
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
94,559.75
= Rp.
94,559.00
30
a. Rp.
4,730,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-19)
= Rp.
72,842.00
= Rp.
2,668.60
= Rp.
5,250.00
= Rp.
12,250.00
= Rp.
1,275.00
= Rp.
3,975.00
= Rp.
98,260.60
= Rp.
98,260.00
a. Rp.
4,730,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-20)
= Rp.
67,166.00
= Rp.
3,335.75
= Rp.
7,000.00
= Rp.
14,700.00
= Rp.
1,530.00
= Rp.
530.00
= Rp.
94,261.75
= Rp.
94,261.00
a. Rp.
7,768,750.00
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-21)
= Rp.
8,545,625.00
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
9,887,703.75
= Rp.
9,887,703.00
22.
23.
24.
25.
26.
27.
28.
1 M
1 M2
1 M2
1 M
1 M2
1 M2
1 M'
a. Rp.
6,992,857.14
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-22)
= Rp.
7,692,142.85
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
9,034,221.60
= Rp.
9,034,221.00
a. Rp.
8,030,000.00
a. Rp.
17,500.00
a. Rp.
77,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-23)
= Rp.
192,720.00
= Rp.
5,250.00
= Rp.
77,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
413,290.00
= Rp.
413,290.00
a. Rp.
8,030,000.00
a. Rp.
17,500.00
a. Rp.
66,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-24)
= Rp.
192,720.00
= Rp.
5,250.00
= Rp.
66,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
402,290.00
= Rp.
402,290.00
a. Rp.
8,030,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-25)
= Rp.
513,920.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
147,000.00
= Rp.
15,300.00
= Rp.
2,650.00
= Rp.
722,620.00
= Rp.
722,620.00
a. Rp.
8,030,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-26)
= Rp.
481,800.00
= Rp.
2,001.45
= Rp.
17,500.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,325.00
= Rp.
610,826.45
= Rp.
610,826.00
a. Rp.
8,030,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-27)
= Rp.
321,200.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
122,500.00
= Rp.
12,750.00
= Rp.
2,650.00
= Rp.
502,850.00
= Rp.
502,850.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
(SNI DT 91-0011-2007-28)
= Rp.
86,724.00
= Rp.
1,334.30
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,275.00
8,030,000.00
13,343.00
35,000.00
49,000.00
51,000.00
0.0050
29.
Mandor
a. Rp.
Jumlah
Dibulatkan
1 M'
53,000.00
= Rp.
= Rp.
= Rp.
265.00
102,898.30
102,898.00
a. Rp.
8,030,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-29)
= Rp.
88,330.00
= Rp.
667.15
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,020.00
= Rp.
265.00
= Rp.
103,582.15
= Rp.
103,582.00
a. Rp.
6,875,000.00
a. Rp.
14,500.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-30)
= Rp.
7,562,500.00
= Rp.
217,500.00
= Rp.
74,720.80
= Rp.
140,000.00
= Rp.
588,000.00
= Rp.
61,200.00
= Rp.
10,600.00
= Rp.
8,654,520.80
= Rp.
8,654,520.00
1 M
31.
1 M2
(SNI DT 91-0011-2007-31)
= Rp.
59,400.00
= Rp.
15,543.00
= Rp.
3,335.75
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
87,453.75
= Rp.
87,453.00
32.
1 M2
(SNI DT 91-0011-2007-32)
= Rp.
59,400.00
= Rp.
24,609.75
= Rp.
3,335.75
= Rp.
3,500.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
265.00
= Rp.
96,520.50
= Rp.
96,520.00
33.
1 M3
34.
1 M2
PASANGAN KUSEN
3
1.1000 m
Kayu balok kamper kw. II
1.2500 kg
Paku
1.0000 kg
Lem Kayu
6.0000
Pekerja
20.0000
Tukang kayu
2.0000
Kep. Tukang kayu
0.3000
Mandor
32
a. Rp.
6,875,000.00
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-33)
= Rp.
7,562,500.00
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
8,904,578.75
= Rp.
8,904,578.00
a. Rp.
8,800,000.00
a. Rp.
17,500.00
a. Rp.
77,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-34)
= Rp.
211,200.00
= Rp.
5,250.00
= Rp.
77,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
431,770.00
= Rp.
431,770.00
35.
36.
37.
38.
1 M2
1 M
1 M2
1 M2
a. Rp.
8,800,000.00
a. Rp.
17,500.00
a. Rp.
66,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-35)
= Rp.
211,200.00
= Rp.
5,250.00
= Rp.
66,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
420,770.00
= Rp.
420,770.00
a. Rp.
8,800,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-36)
= Rp.
563,200.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
147,000.00
= Rp.
15,300.00
= Rp.
2,650.00
= Rp.
771,900.00
= Rp.
771,900.00
a. Rp.
8,800,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-37)
= Rp.
528,000.00
= Rp.
2,001.45
= Rp.
17,500.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,325.00
= Rp.
657,026.45
= Rp.
657,026.00
a. Rp.
8,800,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-38)
= Rp.
352,000.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
122,500.00
= Rp.
12,750.00
= Rp.
2,650.00
= Rp.
533,650.00
= Rp.
533,650.00
a. Rp.
11,000,000.00
a. Rp.
13,343.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-39)
= Rp.
12,100,000.00
= Rp.
16,678.75
= Rp.
17,500.00
= Rp.
210,000.00
= Rp.
980,000.00
= Rp.
102,000.00
= Rp.
15,900.00
= Rp.
13,442,078.75
= Rp.
13,442,078.00
a. Rp.
12,460,000.00
a. Rp.
17,500.00
a. Rp.
77,000.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-40)
= Rp.
299,040.00
= Rp.
5,250.00
= Rp.
77,000.00
= Rp.
28,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
2,120.00
= Rp.
519,610.00
= Rp.
519,610.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
(SNI DT 91-0011-2007-41)
= Rp.
797,440.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
147,000.00
= Rp.
15,300.00
40.
41.
1 M3
1 M2
1 M2
12,460,000.00
17,500.00
35,000.00
49,000.00
51,000.00
0.0500
42.
43.
44.
1 M2
1 M
Mandor
a. Rp.
Jumlah
Dibulatkan
1 M'
53,000.00
= Rp.
= Rp.
= Rp.
2,650.00
1,006,140.00
1,006,140.00
a. Rp.
12,460,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-42)
= Rp.
747,600.00
= Rp.
2,001.45
= Rp.
17,500.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,325.00
= Rp.
876,626.45
= Rp.
876,626.00
a. Rp.
12,460,000.00
a. Rp.
17,500.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-43)
= Rp.
498,400.00
= Rp.
8,750.00
= Rp.
35,000.00
= Rp.
122,500.00
= Rp.
12,750.00
= Rp.
2,650.00
= Rp.
680,050.00
= Rp.
680,050.00
a. Rp.
12,460,000.00
a. Rp.
13,343.00
a. Rp.
35,000.00
a. Rp.
49,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0011-2007-44)
= Rp.
137,060.00
= Rp.
667.15
= Rp.
3,500.00
= Rp.
9,800.00
= Rp.
1,020.00
= Rp.
265.00
= Rp.
152,312.15
= Rp.
152,312.00
1 M
(SNI DT 91-0011-2007-45)
= Rp.
200,750.00
= Rp.
46,828.57
= Rp.
400.29
= Rp.
8,750.00
= Rp.
21,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,590.00
= Rp.
387,518.86
= Rp.
387,518.00
46.
1 M2
(SNI DT 91-0011-2007-46)
= Rp.
200,750.00
= Rp.
68,750.00
= Rp.
400.29
= Rp.
8,750.00
= Rp.
21,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,590.00
= Rp.
409,440.29
= Rp.
409,440.00
47.
1 M2
(SNI DT 91-0011-2007-47)
= Rp.
200,750.00
= Rp.
34,375.00
= Rp.
41,937.50
= Rp.
400.29
= Rp.
8,750.00
= Rp.
21,000.00
= Rp.
98,000.00
= Rp.
10,200.00
= Rp.
1,590.00
= Rp.
417,002.79
= Rp.
417,002.00
34
(SNI DT 91-0011-2007-48)
= Rp.
195,800.00
= Rp.
67,008.34
= Rp.
2,001.45
= Rp.
9,800.00
= Rp.
5,250.00
= Rp.
22,050.00
= Rp.
2,295.00
= Rp.
424.00
= Rp.
304,628.79
= Rp.
304,628.00
(SNI DT 91-0011-2007-49)
= Rp.
195,800.00
= Rp.
49,523.10
= Rp.
2,001.45
= Rp.
9,800.00
= Rp.
5,250.00
= Rp.
22,050.00
= Rp.
2,295.00
= Rp.
424.00
= Rp.
287,143.55
= Rp.
287,143.00
48.
1 M
49.
1 M
PEKERJAAN LANGIT-LANGIT
1.
2.
3.
1 M2
1 M
1 M'
PASANG ETERNIT
2
1.1000 m
Eternit Atrisco
0.0100 kg
Paku
0.0300
Pekerja
0.0700
Tukang kayu
0.0070
Kep. Tukang kayu
0.0020
Mandor
PASANG CALSIBOARD
0.3750 lbr
Calsiboard
0.0300 kg
Paku
0.0700
Pekerja
0.1000
Tukang kayu
0.0100
Kep. Tukang kayu
0.0040
Mandor
1.a
1 M2
1 M2
( SNI DT 91-0013-2007 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
13,566.67
13,343.00
35,000.00
49,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
58,643.75
24,322.20
35,000.00
49,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
7,095.00
13,343.00
35,000.00
49,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
858.00
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
49,000.00
35,000.00
(SNI DT 91-0013-2007-01)
= Rp.
14,923.34
= Rp.
133.43
= Rp.
1,050.00
= Rp.
3,430.00
= Rp.
357.00
= Rp.
106.00
= Rp.
19,999.77
= Rp.
19,999.00
(SNI DT 91-0013-2007-02)
= Rp.
21,991.41
= Rp.
729.67
= Rp.
2,450.00
= Rp.
4,900.00
= Rp.
510.00
= Rp.
212.00
= Rp.
30,793.07
= Rp.
30,793.00
(SNI DT 91-0013-2007-03)
= Rp.
7,449.75
= Rp.
133.43
= Rp.
1,750.00
= Rp.
2,450.00
= Rp.
255.00
= Rp.
159.00
= Rp.
12,197.18
= Rp.
12,197.00
( SNI 03-3436-2002 )
(SNI 03-3436-2002-01)
= Rp.
21,450.00
= Rp.
3,675.00
= Rp.
5,250.00
= Rp.
408.00
= Rp.
424.00
= Rp.
31,207.00
= Rp.
31,207.00
(SNI 03-3436-2002-01.a)
= Rp.
3,675.00
= Rp.
5,250.00
0.0080
0.0080
2.
3.
4.
5.
6.
7.
8.
1 M'
Kep. Tukang
Mandor
1 M
1 M
1 M'
1 M2
1 M'
1 M2
a. Rp.
a. Rp.
Jumlah
Dibulatkan
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
1,815.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
2,970.00
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
2,750.00
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
4,653.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
4,840.00
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
4,400.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00
3,300.00
49,000.00
35,000.00
51,000.00
= Rp.
= Rp.
= Rp.
= Rp.
408.00
424.00
9,757.00
9,757.00
(SNI 03-3436-2002-02)
= Rp.
9,075.00
= Rp.
11,220.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
48,488.73
= Rp.
48,488.00
(SNI 03-3436-2002-03)
= Rp.
28,215.00
= Rp.
4,900.00
= Rp.
7,000.00
= Rp.
510.00
= Rp.
530.00
= Rp.
41,155.00
= Rp.
41,155.00
(SNI 03-3436-2002-04)
= Rp.
30,250.00
= Rp.
4,900.00
= Rp.
7,000.00
= Rp.
510.00
= Rp.
530.00
= Rp.
43,190.00
= Rp.
43,190.00
(SNI 03-3436-2002-05)
= Rp.
23,265.00
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
66,605.73
= Rp.
66,605.00
(SNI 03-3436-2002-06)
= Rp.
70,180.00
= Rp.
4,900.00
= Rp.
7,000.00
= Rp.
510.00
= Rp.
530.00
= Rp.
83,120.00
= Rp.
83,120.00
(SNI 03-3436-2002-07)
= Rp.
15,400.00
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
58,740.73
= Rp.
58,740.00
(SNI 03-3436-2002-08)
= Rp.
29,700.00
= Rp.
4,900.00
= Rp.
7,000.00
= Rp.
510.00
0.0100
9.
10.
11.
12.
13.
14.
15.
1 M'
1 M
1 M'
1 M2
1 M'
1 M2
1 M'
Mandor
a. Rp.
Jumlah
Dibulatkan
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
3,575.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00
3,740.00
49,000.00
35,000.00
51,000.00
53,000.00
6,050.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
7,535.00
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
44,825.00
1,402.50
102,116.67
49,000.00
35,000.00
51,000.00
53,000.00
2,750.00
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
530.00
42,640.00
42,640.00
(SNI 03-3436-2002-09)
= Rp.
12,512.50
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
55,853.23
= Rp.
55,853.00
(SNI 03-3436-2002-10)
= Rp.
33,660.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
4,900.00
7,000.00
510.00
530.00
46,600.00
46,600.00
(SNI 03-3436-2002-11)
= Rp.
21,175.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
15,147.00
3,267.73
9,800.00
14,000.00
1,020.00
106.00
64,515.73
64,515.00
(SNI 03-3436-2002-12)
= Rp.
109,257.50
= Rp.
3,675.00
= Rp.
5,250.00
= Rp.
408.00
= Rp.
424.00
= Rp.
119,014.50
= Rp.
119,014.00
(SNI 03-3436-2002-13)
= Rp.
156,887.50
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
= Rp.
14,000.00
= Rp.
1,020.00
= Rp.
106.00
= Rp.
200,228.23
= Rp.
200,228.00
(SNI 03-3436-2002-14)
= Rp.
57,750.00
= Rp.
3,675.00
= Rp.
5,250.00
= Rp.
408.00
= Rp.
424.00
= Rp.
67,507.00
= Rp.
67,507.00
(SNI 03-3436-2002-15)
= Rp.
12,870.00
= Rp.
15,147.00
= Rp.
3,267.73
= Rp.
9,800.00
0.4000
0.0200
0.0020
16.
17.
18.
19.
1 M
1 M2
1 M'
1 M'
Pekerja
Kep. Tukang
Mandor
2.
1 M'
1 M'
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
109,725.00
27,500.00
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
106,150.00
27,500.00
49,000.00
35,000.00
51,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
53,075.00
27,500.00
49,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
28,526.67
27,500.00
49,000.00
51,000.00
35,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
14,000.00
1,020.00
106.00
56,210.73
56,210.00
(SNI 03-3436-2002-16)
= Rp.
38,403.75
= Rp.
3,300.00
= Rp.
3,430.00
= Rp.
4,900.00
= Rp.
357.00
= Rp.
371.00
= Rp.
50,761.75
= Rp.
50,761.00
(SNI 03-3436-2002-17)
= Rp.
37,152.50
= Rp.
3,300.00
= Rp.
3,430.00
= Rp.
4,900.00
= Rp.
357.00
= Rp.
371.00
= Rp.
49,510.50
= Rp.
49,510.00
(SNI 03-3436-2002-18)
= Rp.
58,382.50
= Rp.
5,500.00
= Rp.
6,125.00
= Rp.
663.00
= Rp.
2,940.00
= Rp.
212.00
= Rp.
73,822.50
= Rp.
73,822.00
(SNI 03-3436-2002-19)
= Rp.
31,379.34
= Rp.
5,500.00
= Rp.
6,125.00
= Rp.
663.00
= Rp.
2,940.00
= Rp.
212.00
= Rp.
46,819.34
= Rp.
46,819.00
( SNI DT 91-0014-2007 )
38
a. Rp.
107,250.00
a. Rp.
13,343.00
a. Rp.
4,950,000.00
a. Rp.
47,000.00
a. Rp.
51,000.00
a. Rp.
35,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
(SNI DT 91-0014-2007-01)
= Rp.
112,612.50
= Rp.
200.15
= Rp.
94,050.00
= Rp.
18,800.00
= Rp.
1,275.00
= Rp.
7,000.00
= Rp.
530.00
= Rp.
234,467.65
= Rp.
234,467.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
(SNI DT 91-0014-2007-02)
= Rp.
112,612.50
= Rp.
133.43
= Rp.
7,250.00
= Rp.
14,100.00
= Rp.
1,530.00
= Rp.
5,250.00
= Rp.
371.00
= Rp.
141,246.93
= Rp.
141,246.00
107,250.00
13,343.00
14,500.00
47,000.00
51,000.00
35,000.00
53,000.00
3.
4.
5.
1 Kg
1M
1M
2.
3.
4.
1M
1 M2
1 M2
1 M2
14,535.00
47,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
341,250.00
47,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
14,500.00
900.00
47,000.00
51,000.00
35,000.00
53,000.00
(SNI DT 91-0014-2007-03)
= Rp.
16,715.25
= Rp.
2,820.00
= Rp.
306.00
= Rp.
2,100.00
= Rp.
159.00
= Rp.
22,100.25
= Rp.
22,100.00
(SNI DT 91-0014-2007-04)
= Rp.
341,250.00
= Rp.
47,000.00
= Rp.
5,100.00
= Rp.
35,000.00
= Rp.
2,650.00
= Rp.
431,000.00
= Rp.
431,000.00
(SNI DT 91-0014-2007-05)
= Rp.
89,566.50
= Rp.
24,372.00
= Rp.
78,490.00
= Rp.
8,517.00
= Rp.
58,450.00
= Rp.
4,399.00
= Rp.
263,794.50
= Rp.
263,794.00
( SNI P.C )
( SNI P.C.01 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
( SNI P.C.02 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
( SNI P.C.02A )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
( SNI P.C.03 )
a. Rp.
a. Rp.
a. Rp.
19,595.71
17,710.00
26,400.00
42,400.00
50,000.00
35,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
1,567.66
354.20
264.00
1,696.00
200.00
1,400.00
132.50
5,614.36
5,614.00
70,400.00
70,400.00
3,272.50
42,400.00
50,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
10,560.00
26,188.80
6,545.00
2,544.00
800.00
132.50
46,770.30
46,770.00
44,000.00
57,500.00
57,500.00
60,500.00
17,710.00
3,272.50
38,500.00
35,000.00
42,400.00
50,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
6,287.60
11,500.00
28,750.00
12,100.00
44,275.00
6,545.00
7,700.00
2,625.00
3,816.00
450.00
1,325.00
5,000.00
130,373.60
130,373.00
36,300.00
27,500.00
3,272.50
= Rp.
= Rp.
= Rp.
5,445.00
1,375.00
327.25
0.0100
0.1600
0.0160
0.1600
0.0025
bh
Kuas
Tukang cat
Kep. Tukang cat
Pekerja
Mandor
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,900.00
42,400.00
50,000.00
35,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
99.00
6,784.00
800.00
5,600.00
132.50
20,562.75
20,562.00
5.
1 M2
PENGECATAN KY BARU (1 LPS PLAMIR + 1 LPS CAT DASAR + 3 LPS CAT PENUTUP) ( SNI P.C.04 )
0.2000 kg
Meni Kayu Pedang
a. Rp.
20,507.14
= Rp.
4,101.43
0.3500 kg
Cat EMCO
a. Rp.
58,300.00
= Rp.
20,405.00
0.1700 kg
Cat Dasar
a. Rp.
58,300.00
= Rp.
9,911.00
0.1500 kg
Dempul / Plamir
a. Rp.
19,595.71
= Rp.
2,939.36
0.1050
Tukang cat
a. Rp.
42,400.00
= Rp.
4,452.00
0.0040
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
200.00
0.0700
Pekerja
a. Rp.
35,000.00
= Rp.
2,450.00
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
132.50
Jumlah
= Rp.
44,591.28
Dibulatkan
= Rp.
44,591.00
6.
1M
PENGECATAN KAYU BARU (1 LPS PLAMIR+1 LPS CAT DASAR+2 LPS CAT PENUTUP) ( SNI P.C.05)
0.2000 kg
Meni Kayu Pedang
a. Rp.
20,507.14
= Rp.
4,101.43
0.2600 kg
Cat EMCO
a. Rp.
58,300.00
= Rp.
15,158.00
0.1700 kg
Cat Dasar
a. Rp.
58,300.00
= Rp.
9,911.00
0.1500 kg
Dempul / Plamir
a. Rp.
19,595.71
= Rp.
2,939.36
0.0090
Tukang cat
a. Rp.
42,400.00
= Rp.
381.60
0.0060
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
300.00
0.0700
Pekerja
a. Rp.
35,000.00
= Rp.
2,450.00
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
132.50
Jumlah
= Rp.
35,373.88
Dibulatkan
= Rp.
35,373.00
7.
1M
PENGECATAN KAYU LAMA (1 LPS PLAMIR+ 1 LPS CAT DASAR+ 1 LPS CAT PENUTUP) (SNI P.C.06)
0.17 kg
Cat EMCO
a. Rp.
58,300.00
= Rp.
9,911.00
0.17 kg
Cat Dasar
a. Rp.
58,300.00
= Rp.
9,911.00
0.15 kg
Dempul / Plamir
a. Rp.
19,595.71
= Rp.
2,939.36
0.075
Tukang cat
a. Rp.
42,400.00
= Rp.
3,180.00
0.0075
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
375.00
0.07
Pekerja
a. Rp.
35,000.00
= Rp.
2,450.00
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
132.50
Jumlah
= Rp.
28,898.86
Dibulatkan
= Rp.
28,898.00
8.
1 M2
( SNI.P.C.07 )
27,500.00
= Rp.
35,000.00
= Rp.
53,000.00
= Rp.
= Rp.
= Rp.
1,375.00
5,250.00
132.50
6,757.50
6,757.00
9.
1 M2
PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP) (SNI P.C.08)
0.2600 kg
Cat tembok Paragon
a. Rp.
14,107.50
= Rp.
3,667.95
0.1000 kg
Cat Dasar
a. Rp.
14,107.50
= Rp.
1,410.75
0.1000 kg
Dempul / Plamir
a. Rp.
8,800.00
= Rp.
880.00
0.0630
Tukang cat
a. Rp.
42,400.00
= Rp.
2,671.20
0.0063
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
315.00
0.0200
Pekerja
a. Rp.
35,000.00
= Rp.
700.00
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
132.50
Jumlah
= Rp.
9,777.40
Dibulatkan
= Rp.
9,777.00
10.
1 M2
PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP)
0.2600 kg
Cat tembok Decolith
a. Rp.
15,400.00
= Rp.
0.1000 kg
Cat Dasar
a. Rp.
15,400.00
= Rp.
0.1000 kg
Dempul / Plamir
a. Rp.
8,800.00
= Rp.
0.0630
Tukang cat
a. Rp.
42,400.00
= Rp.
0.0063
Kep. Tukang cat
a. Rp.
50,000.00
= Rp.
0.0200
Pekerja
a. Rp.
35,000.00
= Rp.
0.0025
Mandor
a. Rp.
53,000.00
= Rp.
Jumlah
= Rp.
Dibulatkan
= Rp.
40
( SNI P.C.09 )
4,004.00
1,540.00
880.00
2,671.20
315.00
700.00
132.50
10,242.70
10,242.00
11.
1M
( SNI.P.C.10 )
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
2,539.35
1,692.90
1,780.80
210.00
980.00
132.50
7,335.55
7,335.00
11.
1M
( SNI.P.C.10.A )
= Rp.
1,269.68
= Rp.
1,692.90
= Rp.
1,780.80
= Rp.
210.00
= Rp.
980.00
= Rp.
132.50
= Rp.
6,065.88
= Rp.
6,065.00
12.
1 M2
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
2,050.71
99.00
8,480.00
1,000.00
700.00
530.00
12,859.71
12,859.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
6,066.78
2,671.20
315.00
700.00
132.50
9,885.48
9,885.00
13.
1 M2
2.
3.
1 M2
1 M2
1 M2
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
23,333.75
42,400.00
50,000.00
35,000.00
53,000.00
( SNI DT 91-0012-2007 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,200.00
1,402.50
102,116.67
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
51,700.00
1,402.50
6,500.00
102,116.67
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
46,650.00
1,402.50
6,500.00
102,116.67
46,000.00
(SNI DT 91-0012-2007-01)
= Rp.
36,960.00
= Rp.
14,586.00
= Rp.
4,595.25
= Rp.
5,980.00
= Rp.
663.00
= Rp.
9,450.00
= Rp.
742.00
= Rp.
72,976.25
= Rp.
72,976.00
(SNI DT 91-0012-2007-02)
= Rp.
54,285.00
= Rp.
13,043.25
= Rp.
12,610.00
= Rp.
1,838.10
= Rp.
20,700.00
= Rp.
2,295.00
= Rp.
21,000.00
= Rp.
1,590.00
= Rp.
127,361.35
= Rp.
127,361.00
(SNI DT 91-0012-2007-03)
= Rp.
48,982.50
= Rp.
13,043.25
= Rp.
12,610.00
= Rp.
1,838.10
= Rp.
20,700.00
0.0450
0.6000
0.0300
4.
5.
6.
7.
8.
9.
1M
1M
1M
1 M2
1 M2
1 M2
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
38,500.00
1,402.50
6,500.00
102,116.67
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
37,766.67
1,402.50
6,500.00
102,116.67
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
31,114.29
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
44,000.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
35,475.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
54,780.00
1,402.50
102,116.67
6,500.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
2,295.00
21,000.00
1,590.00
122,058.85
122,058.00
(SNI DT 91-0012-2007-04)
= Rp.
40,425.00
= Rp.
13,043.25
= Rp.
12,610.00
= Rp.
1,838.10
= Rp.
20,700.00
= Rp.
2,295.00
= Rp.
21,000.00
= Rp.
1,590.00
= Rp.
113,501.35
= Rp.
113,501.00
(SNI DT 91-0012-2007-05)
= Rp.
39,655.00
= Rp.
14,025.00
= Rp.
9,750.00
= Rp.
4,595.25
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
109,200.25
= Rp.
109,200.00
(SNI DT 91-0012-2007-06)
= Rp.
32,670.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
102,215.25
= Rp.
102,215.00
(SNI DT 91-0012-2007-07)
= Rp.
46,200.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
115,745.25
= Rp.
115,745.00
(SNI DT 91-0012-2007-08)
= Rp.
37,248.75
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
106,794.00
= Rp.
106,794.00
(SNI DT 91-0012-2007-09)
= Rp.
57,519.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
0.3500
0.0350
0.6200
0.0300
10.
11.
12.
13.
14
1M
1M
1 M2
1 M2
1 M2
Tukang batu
Kep. Tukang batu
Pekerja
Mandor
`
PASANGAN LANTAI KERAMIK 40x40 POLOS
2
1.0500 m
Keramik 40x40 Polos MAS
10.0000 kg
Semen / PC
3
0.0450 m
Pasir pasang
1.5000 kg
Semen warna
0.3500
Tukang batu
0.0350
Kep. Tukang batu
0.6200
Pekerja
0.0300
Mandor
1 Bh
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
53,350.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
33,000.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
40,333.33
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
500,000.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
269,500.00
1,402.50
102,116.67
6,500.00
46,000.00
51,000.00
35,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
16,100.00
1,785.00
21,700.00
1,590.00
127,064.25
127,064.00
(SNI DT 91-0012-2007-10)
= Rp.
56,017.50
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
125,562.75
= Rp.
125,562.00
(SNI DT 91-0012-2007-11)
= Rp.
34,650.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
104,195.25
= Rp.
104,195.00
(SNI DT 91-0012-2007-12)
= Rp.
42,350.00
= Rp.
14,586.00
= Rp.
4,595.25
= Rp.
10,530.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
113,236.25
= Rp.
113,236.00
(SNI DT 91-0012-2007-13)
= Rp.
530,000.00
= Rp.
11,486.48
= Rp.
4,595.25
= Rp.
4,225.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
591,481.73
= Rp.
591,481.00
(SNI DT 91-0012-2007-14)
= Rp.
282,975.00
= Rp.
14,025.00
= Rp.
4,595.25
= Rp.
9,750.00
= Rp.
16,100.00
= Rp.
1,785.00
= Rp.
21,700.00
= Rp.
1,590.00
= Rp.
352,520.25
= Rp.
352,520.00
( SNI K.K )
a. Rp.
43
49,500.00
= Rp.
49,500.00
0.5000
0.0100
0.0100
0.0050
2.
3.
4.
5.
6.
7.
8.
1 Bh
1 Set
1 Set
1 Set
1 M2
1 Bh
1 Bh
Tukang kayu
Pekerja
Kep. Tukang kayu
Mandor
44
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
24,500.00
350.00
510.00
265.00
75,125.00
75,125.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
46,200.00
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
46,200.00
9,800.00
700.00
1,020.00
53.00
57,773.00
57,773.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
10,862.50
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
10,862.50
7,350.00
525.00
765.00
39.75
19,542.25
19,542.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
8,800.00
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
8,800.00
7,350.00
525.00
765.00
39.75
17,479.75
17,479.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
8,800.00
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
8,800.00
7,350.00
525.00
765.00
39.75
17,479.75
17,479.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
66,000.00
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
72,600.00
7,350.00
525.00
765.00
39.75
81,279.75
81,279.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
165,000.00
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
165,000.00
29,400.00
2,100.00
3,060.00
159.00
199,719.00
199,719.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
9,000.00
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
9,000.00
12,250.00
875.00
1,275.00
66.25
23,466.25
23,466.00
1 M2
PEKERJAAN SANITASI
1.
2.
3.
4.
5.
6.
1 Bh
1 Bh
1 Bh
1 Bh
1 Bh
1 Bh
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
77,000.00
49,000.00
35,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
84,700.00
7,350.00
525.00
765.00
39.75
93,379.75
93,379.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
1,600,000.00
96,000.00
115,500.00
50,600.00
51.00
8,480.00
1,870,631.00
1,870,631.00
107,387.50
1,402.50
102,116.67
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
107,387.50
8,415.00
1,021.17
35,000.00
69,000.00
76,500.00
8,480.00
305,803.67
305,803.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
175,000.00
52,500.00
1,402.50
102,116.67
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
175,000.00
52,500.00
8,415.00
1,021.17
35,000.00
46,000.00
5,100.00
5,300.00
328,336.17
328,336.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
385,000.00
46,200.00
1,402.50
102,116.67
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
385,000.00
46,200.00
8,415.00
1,021.17
42,000.00
66,700.00
7,650.00
5,300.00
562,286.17
562,286.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
180,000.00
21,600.00
1,050.00
13,800.00
1,530.00
79.50
218,059.50
218,059.00
= Rp.
= Rp.
= Rp.
= Rp.
30,250.00
62.50
350.00
4,600.00
( SNI S. )
( SNI.S.02 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
( SNI.S.05 )
a. Rp.
180,000.00
a. Rp.
21,600.00
a. Rp.
35,000.00
a. Rp.
46,000.00
a. Rp.
51,000.00
a. Rp.
53,000.00
Jumlah
Dibulatkan
( SNI.S.06 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
45
30,250.00
2,500.00
35,000.00
46,000.00
0.0100
0.0050
6.
7.
8.
1 Bh
1 Bh
1 Bh
9.
1 Bh
10.
1 M'
11.
12.
1 M'
1 M'
a. Rp.
a. Rp.
Jumlah
Dibulatkan
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
510.00
265.00
36,037.50
36,037.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
50,000.00
2,500.00
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
50,000.00
62.50
350.00
4,600.00
510.00
265.00
55,787.50
55,787.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
15,000.00
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
15,000.00
350.00
4,600.00
510.00
265.00
20,725.00
20,725.00
220,000.00
39,600.00
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
220,000.00
39,600.00
350.00
4,600.00
510.00
265.00
265,325.00
265,325.00
( SNI.S.06.a )
MEMASANG BAK KONTROL PASANGAN BATU BATA (Uk. 30x30 cm tinggi 35 cm)
( SNI.S.09 )
3
0.1450 m
Batu bata kw. 2
a. Rp.
733.33
= Rp.
106.33
44.0000 kg
Semen / PC
a. Rp.
1,402.50
= Rp.
61,710.00
3
0.0700 m
Pasir Pasang
a. Rp.
102,116.67
= Rp.
7,148.17
3
0.0700 m
Batu Kerikil
a. Rp.
212,850.00
= Rp.
14,899.50
1.6000 kg
Besi beton
a. Rp.
9,900.00
= Rp.
15,840.00
3
0.0600 m
Pasir Beton
a. Rp.
141,710.00
= Rp.
8,502.60
0.0100
Pekerja
a. Rp.
35,000.00
= Rp.
350.00
0.1000
Tukang batu
a. Rp.
46,000.00
= Rp.
4,600.00
0.0100
Kep. Tukang batu
a. Rp.
51,000.00
= Rp.
510.00
0.0050
Mandor
a. Rp.
53,000.00
= Rp.
265.00
Jumlah
= Rp.
113,931.60
Dibulatkan
= Rp.
113,931.00
MEMASANG PIPA PVC TIPE AW F 1/2" ( SNI.S.15 )
1.2000 m'
Pipa PVC
a. Rp.
1.0000
Perlengkapan (35% harga pipa)
a. Rp.
0.0360
Pekerja
a. Rp.
0.0600
Tukang batu
a. Rp.
0.0060
Kep. Tukang batu
a. Rp.
0.0018
Mandor
a. Rp.
Jumlah
Dibulatkan
MEMASANG PIPA PVC TIPE AW F 3/4" ( SNI.S.16 )
1.2000 m'
Pipa PVC
a. Rp.
1.0000
Perlengkapan (35% harga pipa)
a. Rp.
0.0360
Pekerja
a. Rp.
0.0600
Tukang batu
a. Rp.
0.0060
Kep. Tukang batu
a. Rp.
0.0018
Mandor
a. Rp.
Jumlah
Dibulatkan
MEMASANG PIPA PVC TIPE AW F 1" ( SNI.S.17 )
1.2000 m'
Pipa PVC
a. Rp.
1.0000
Perlengkapan (35% harga pipa)
a. Rp.
46
5,954.67
2,084.13
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
7,145.60
2,084.13
1,260.00
2,760.00
306.00
95.40
13,651.13
13,651.00
7,065.33
2,472.87
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
8,478.40
2,472.87
1,260.00
2,760.00
306.00
95.40
15,372.67
15,372.00
7,970.67
2,789.73
= Rp.
= Rp.
9,564.80
2,789.73
0.0360
0.0600
0.0060
0.0018
13.
14.
15.
16.
1 M'
1 M'
1 M'
1 M'
Pekerja
Tukang batu
Kep. Tukang batu
Mandor
2.
3.
1 M2
1 M2
1 M2
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
1,260.00
2,760.00
306.00
95.40
16,775.93
16,775.00
16,552.67
5,793.43
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
19,863.20
5,793.43
1,260.00
2,760.00
306.00
95.40
30,078.03
30,078.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
24,802.40
8,680.84
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
29,762.88
8,680.84
1,890.00
4,140.00
459.00
143.10
45,075.82
45,075.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
45,945.20
16,080.82
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
55,134.24
16,080.82
2,835.00
6,210.00
688.50
217.30
81,165.86
81,165.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
65,924.13
23,073.45
35,000.00
46,000.00
51,000.00
53,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
79,108.96
23,073.45
2,835.00
6,210.00
688.50
217.30
112,133.21
112,133.00
45,100.00
74,250.00
46,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
45,100.00
3,712.50
9,200.00
14,000.00
72,012.50
72,012.00
50,600.00
74,250.00
46,000.00
35,000.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
50,600.00
3,712.50
9,200.00
14,000.00
77,512.50
77,512.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
45,540.00
3,712.50
9,200.00
14,000.00
72,452.50
72,452.00
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
( An. Pav. )
47
( An.Pav.1 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
( An.Pav.2 )
a. Rp.
a. Rp.
a. Rp.
a. Rp.
Jumlah
Dibulatkan
K.200
( An.Pav.3 )
a. Rp.
45,540.00
a. Rp.
74,250.00
a. Rp.
46,000.00
a. Rp.
35,000.00
Jumlah
Dibulatkan
4.
5.
6.
1M
1M
1 M2
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
50,600.00
3,712.50
9,200.00
14,000.00
77,512.50
77,512.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
60,500.00
3,712.50
9,200.00
14,000.00
87,412.50
87,412.00
35,200.00
3,712.50
9,200.00
14,000.00
62,112.50
62,112.00
K.300
( An.Pav.5 )
a. Rp.
60,500.00
a. Rp.
74,250.00
a. Rp.
46,000.00
a. Rp.
35,000.00
Jumlah
Dibulatkan
Tuban,
Januari 2012
Ir. S A T R I Y O
NIP. 19590405 199003 1 005
48
REKAPITULASI
ANALISA HARGA SATUAN BAHAN DAN UPAH TENAGA
TAHUN ANGGARAN 2012
NO.
URAIAN PEKERJAAN
KODE
SATUAN
ANALISA
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
1.
2.
3.
4.
5.
6.
PEKERJAAN PONDASI
( SNI DT 91-0007-2007 )
PASANGAN AANSTAMPENG / BATU KOSONG
PASANGAN BATU GUNUNG/BRONGKOL 1:3:10
PASANGAN BATU GUNUNG/BRONGKOL 1/4Pc : 1Kpr : 4Ps
PASANGAN BATU GUNUNG/BRONGKOL 1 : 3
PASANGAN BATU GUNUNG/BRONGKOL 1 : 4
PASANGAN BATU GUNUNG/BRONGKOL 1 : 5
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
PEKERJAAN DINDING
( SNI DT 90-0009-2007 )
PASANGAN BATU KUMBUNG 1 BATA 1:3:10
PASANGAN BATU KUMBUNG 1 BATA 1 : 4
PASANGAN BATU KUMBUNG 1/2 BATA 1:3:10
PASANGAN BATU KUMBUNG 1/2 BATA 1:4
PASANGAN BATA MERAH 1 : 2 TB. 1 BATA KW. 1
PASANGAN BATA MERAH 1 : 2 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 3 : 10 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 3 TB. 1 BATA KW. 1
PASANGAN BATA MERAH 1 : 3 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 4 TB. 1 BATA KW. 1
PASANGAN BATA MERAH 1 : 4 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 5 TB. 1 BATA KW. 2
PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA KW. 1
PASANGAN BATA MERAH 1 : 2 TB. 1/2 BATA KW. 2
PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA KW. 1
PASANGAN BATA MERAH 1 : 3 TB. 1/2 BATA KW. 2
PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA KW. 1
PASANGAN BATA MERAH 1 : 4 TB. 1/2 BATA KW. 2
PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA KW. 1
PASANGAN BATA MERAH 1 : 5 TB. 1/2 BATA KW. 2
PASANGAN BATA MERAH 1 : 3 : 10 TB. 1/2 BATA KW. 2
PASANGAN DINDING ROSTER/TERAWANG 12X11X24 CM 1 : 3
PASANGAN DINDING BATU TEMPEL HITAM
PASANGAN DINDING BATU PARAS
PASANGAN BATU PALIMANAN
PASANGAN BETON ALUR
PASANGAN BATU CANDI
PASANGAN BATU SISIR
1.
2.
3.
4.
5.
6.
7.
8.
PEKERJAAN PLESTERAN
( Rev. SNI 03-2837-2007 )
PLESTERAN 1 : 2 Tebal 1.5 cm
PLESTERAN 1 : 3 Tebal 1,5 cm
PLESTERAN 1 : 4 Tebal 1,5 cm
PLESTERAN 1 : 5 Tebal 1,5 cm
PLESTERAN 1 : 3 Tebal 2 cm
PLESTERAN 1 : 4 Tebal 2 cm
PLESTERAN 1 : 5 Tebal 2 cm
PLESTERAN CIPRAT 1 : 2
SNI 03-2835-01
SNI 03-2835-02
SNI 03-2835-03
SNI 03-2835-04
SNI 03-2835-05
SNI 03-2835-06
(SNI DT 91-0006-2007-01)
(SNI DT 91-0006-2007-02)
(SNI DT 91-0006-2007-03)
(SNI DT 91-0006-2007-04)
(SNI DT 91-0006-2007-05)
(SNI DT 91-0006-2007-06)
(SNI DT 91-0006-2007-07)
(SNI DT 91-0006-2007-08)
(SNI DT 91-0006-2007-09)
(SNI DT 91-0006-2007-10)
(SNI DT 91-0006-2007-11)
(SNI DT 91-0006-2007-12)
(SNI DT 91-0006-2007-13)
(SNI DT 91-0006-2007-14)
49
(SNI DT 91-0007-2007-01)
(SNI DT 91-0007-2007-02)
(SNI DT 91-0007-2007-03)
(SNI DT 91-0007-2007-04)
(SNI DT 91-0007-2007-05)
(SNI DT 91-0007-2007-06)
An.D.01
An.D.02
An.D.03
An.D.04
(SNI DT 91-0009-2007-01)
(SNI DT 91-0009-2007-02)
(SNI DT 91-0009-2007-03)
(SNI DT 91-0009-2007-04)
(SNI DT 91-0009-2007-05)
(SNI DT 91-0009-2007-06)
(SNI DT 91-0009-2007-07)
(SNI DT 91-0009-2007-08)
(SNI DT 91-0009-2007-09)
(SNI DT 91-0009-2007-10)
(SNI DT 91-0009-2007-11)
(SNI DT 91-0009-2007-12)
(SNI DT 91-0009-2007-13)
(SNI DT 91-0009-2007-14)
(SNI DT 91-0009-2007-15)
(SNI DT 91-0009-2007-16)
(SNI DT 91-0009-2007-17)
(SNI DT 91-0009-2007-18)
(SNI DT 91-0009-2007-19)
(SNI DT 91-0009-2007-20)
An.D.05
An.D.06
An.D.07
An.D.08
(SNI DT 91-0010-2007-01)
(SNI DT 91-0010-2007-02)
(SNI DT 91-0010-2007-03)
(SNI DT 91-0010-2007-04)
(SNI DT 91-0010-2007-05)
(SNI DT 91-0010-2007-06)
(SNI DT 91-0010-2007-07)
(SNI DT 91-0010-2007-08)
1
1
1
1
1
1
1
M'
M2
M'
2
M
3
M
2
M
3
M
1
1
1
1
1
1
1
1
1
1
1
1
1
1
M
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
1
1
1
1
1
1
M3
M3
M3
3
M
M3
M3
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
2
1M
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
KODE
NO.
URAIAN PEKERJAAN
1
9.
10.
11.
2
FINISHING SIAR PASANGAN DINDING BATA MERAH
FINISHING SIAR PASANGAN BATU KALI 1 : 2
PEKERJAAN ACIAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
1.
2.
3.
4.
5.
6.
SATUAN
ANALISA
3
(SNI DT 91-0010-2007-09)
(SNI DT 91-0010-2007-10)
(SNI DT 91-0010-2007-11)
(SNI DT 91-0008-2007-01)
(SNI DT 91-0008-2007-02)
(SNI DT 91-0008-2007-03)
(SNI DT 91-0008-2007-04)
(SNI DT 91-0008-2007-05)
(SNI DT 91-0008-2007-06)
(SNI DT 91-0008-2007-07)
(SNI DT 91-0008-2007-08)
(SNI DT 91-0008-2007-09)
(SNI DT 91-0008-2007-10)
(SNI DT 91-0008-2007-11)
(SNI DT 91-0008-2007-12)
(SNI DT 91-0008-2007-13)
(SNI DT 91-0008-2007-14)
(SNI DT 91-0008-2007-15)
(SNI DT 91-0008-2007-16)
(SNI DT 91-0008-2007-17)
(SNI DT 91-0008-2007-18)
(SNI DT 91-0008-2007-19)
(SNI DT 91-0008-2007-20)
(SNI DT 91-0008-2007-21)
(SNI DT 91-0008-2007-22)
(SNI DT 91-0008-2007-23)
(SNI DT 91-0008-2007-24)
(SNI DT 91-0008-2007-25)
(SNI DT 91-0008-2007-26)
(SNI DT 91-0008-2007-27)
(SNI DT 91-0008-2007-28)
(SNI DT 91-0008-2007-29)
(SNI DT 91-0008-2007-30)
(SNI DT 91-0008-2007-31)
(SNI DT 91-0008-2007-32)
(SNI DT 91-0008-2007-33)
(SNI DT 91-0008-2007-34)
(SNI DT 91-0008-2007-35)
(SNI DT 91-0008-2007-36)
(SNI DT 91-0008-2007-37)
(SNI DT 91-0008-2007-38)
(SNI DT 91-0008-2007-39)
(SNI DT 91-0008-2007-40)
(SNI DT 91-0008-2007-41)
(SNI DT 91-0008-2007-42)
(SNI DT 91-0008-2007-43)
(SNI DT 91-0008-2007-44)
(SNI DT 91-0008-2007-45)
(SNI DT 91-0008-2007-46)
(SNI DT 91-0008-2007-47)
(SNI DT 91-0008-2007-48)
(SNI DT 91-0008-2007-49)
(SNI DT 91-0008-2007-50)
(SNI DT 91-0008-2007-51)
(SNI DT 91-0008-2007-52)
(SNI DT 91-0008-2007-53)
(SNI DT 91-0008-2007-54)
(SNI DT 91-0008-2007-55)
(SNI DT 91-0008-2007-56)
(SNI DT 91-0008-2007-57)
(SNI DT 91-0008-2007-58)
4
1 M2
2
1M
2
1M
1M
3
1M
3
1M
3
1M
1 M3
3
1M
3
1M
1 M3
3
1M
3
1M
3
1M
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M2
10 Kg
10 Kg
110 Kg
120 Kg
130 Kg
140 Kg
150 Kg
200 Kg
250 Kg
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
3
1M
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
3
1M
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3
225 Kg
(SNI DT 91-0008-2007-59)
(SNI DT 91-0008-2007-60)
43 Kg
(SNI DT 91-0008-2007-61)
(SNI DT 91-0008-2007-62)
61 Kg
(SNI DT 91-0008-2007-63)
(SNI DT 91-0011-2007-01)
(SNI DT 91-0011-2007-02)
(SNI DT 91-0011-2007-03)
(SNI DT 91-0011-2007-04)
(SNI DT 91-0011-2007-05)
(SNI DT 91-0011-2007-06)
1
1
1
1
1
1
M3
M3
M2
M2
M2
M2
NO.
KODE
URAIAN PEKERJAAN
SATUAN
ANALISA
1
7.
8.
9.
10.
11.
12.
13.
2
PASANGAN KUSEN KAYU MERANTI
PAS. DAUN PINTU / JENDELA KACA POLOS
PAS. PINTU / JENDELA JALUSI
PAS. JALUSI MATI KUSEN KAYU MERANTI
PAS. DAUN PINTU / JENDELA PANIL
PASANG LISPLANK KAYU MERANTI 3/20
PASANG LISPLANK KAYU MERANTI 3/30
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
1.
2.
3.
PEKERJAAN LANGIT-LANGIT
PASANG ETERNIT
PASANG CALSIBOARD
LIST PLAFOND KAYU PROFIL
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
3
(SNI DT 91-0011-2007-07)
(SNI DT 91-0011-2007-08)
(SNI DT 91-0011-2007-09)
(SNI DT 91-0011-2007-10)
(SNI DT 91-0011-2007-11)
(SNI DT 91-0011-2007-12)
(SNI DT 91-0011-2007-13)
(SNI DT 91-0011-2007-14)
(SNI DT 91-0011-2007-15)
(SNI DT 91-0011-2007-16)
(SNI DT 91-0011-2007-17)
(SNI DT 91-0011-2007-18)
(SNI DT 91-0011-2007-19)
(SNI DT 91-0011-2007-20)
(SNI DT 91-0011-2007-21)
(SNI DT 91-0011-2007-22)
(SNI DT 91-0011-2007-23)
(SNI DT 91-0011-2007-24)
(SNI DT 91-0011-2007-25)
(SNI DT 91-0011-2007-26)
(SNI DT 91-0011-2007-27)
(SNI DT 91-0011-2007-28)
(SNI DT 91-0011-2007-29)
(SNI DT 91-0011-2007-30)
(SNI DT 91-0011-2007-31)
(SNI DT 91-0011-2007-32)
(SNI DT 91-0011-2007-33)
(SNI DT 91-0011-2007-34)
(SNI DT 91-0011-2007-35)
(SNI DT 91-0011-2007-36)
(SNI DT 91-0011-2007-37)
(SNI DT 91-0011-2007-38)
(SNI DT 91-0011-2007-39)
(SNI DT 91-0011-2007-40)
(SNI DT 91-0011-2007-41)
(SNI DT 91-0011-2007-42)
(SNI DT 91-0011-2007-43)
(SNI DT 91-0011-2007-44)
(SNI DT 91-0011-2007-45)
(SNI DT 91-0011-2007-46)
(SNI DT 91-0011-2007-47)
(SNI DT 91-0011-2007-48)
(SNI DT 91-0011-2007-49)
4
1 M3
2
1 M
2
1 M
1 M2
2
1 M
1 M'
1 M'
1 M3
3
1 M
3
1 M
1 M2
2
1 M
2
1 M
2
1 M
1 M3
1 M3
1 M2
1 M2
1 M2
1 M2
1 M2
1 M'
1 M'
1
1
1
1
1
1
1
1
1
M3
M2
M2
3
M
M2
M2
M2
M2
M2
1 M3
2
1 M
1 M2
1 M2
1 M2
1 M'
1
1
1
1
1
M2
M2
M2
M2
M2
( SNI DT 91-0013-2007 )
(SNI DT 91-0013-2007-01)
(SNI DT 91-0013-2007-02)
(SNI DT 91-0013-2007-03)
51
(SNI 03-3436-2002-01)
(SNI 03-3436-2002-02)
(SNI 03-3436-2002-03)
(SNI 03-3436-2002-04)
(SNI 03-3436-2002-05)
(SNI 03-3436-2002-06)
(SNI 03-3436-2002-07)
(SNI 03-3436-2002-08)
(SNI 03-3436-2002-09)
(SNI 03-3436-2002-10)
(SNI 03-3436-2002-11)
(SNI 03-3436-2002-12)
(SNI 03-3436-2002-13)
(SNI 03-3436-2002-14)
(SNI 03-3436-2002-15)
(SNI 03-3436-2002-16)
(SNI 03-3436-2002-17)
(SNI 03-3436-2002-18)
(SNI 03-3436-2002-19)
1 M2
1 M2
1 M'
1 M2
1 M'
1 M2
1 M2
1 M'
1 M2
1 M'
1 M2
1 M'
1 M2
1 M'
1 M2
1 M'
1 M2
1 M'
1 M2
1 M2
1 M'
1 M'
NO.
1
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
6.
7.
8.
9.
KODE
URAIAN PEKERJAAN
SATUAN
ANALISA
2
PEKERJAAN BESI DAN ALUMINIUM
( SNI DT 91-0014-2007 )
PASANGAN TALANG DATAR / JURAI
PASANGAN TALANG 1/2 LINGKARAN dia. 15 CM
PASANG RANGKA KUDA-KUDA BAJA
PASANG ROOLING DOOR ALUMINIUM
PASANG TERALI BESI
PEKERJAAN PLITURAN DAN PENGECATAN ( SNI P.C )
MENGGOSOK DAN MENDEMPUL KAYU
PELABURAN BIDANG KAYU DENGAN POLITUR
PELABURAN BIDANG KAYU DENGAN MELAMIN
PELABURAN BIDANG KAYU DENGAN VERNIS
(SNI DT 91-0014-2007-01)
1 M'
1 M'
1 Kg
2
1M
2
1M
(SNI DT 91-0014-2007-02)
(SNI DT 91-0014-2007-03)
(SNI DT 91-0014-2007-04)
(SNI DT 91-0014-2007-05)
PENGECATAN KAYU BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 3 LPS CAT PENUTUP )
SNI P.C.04
PENGECATAN KAYU BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP )
SNI P.C.05
PENGECATAN KAYU LAMA ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 1 LPS CAT PENUTUP )
SNI P.C.06
SNI P.C.07
PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP)
SNI P.C.08
1M
1 M2
2
1M
2
1M
1 M2
2
1M
2
1M
2
1M
1 M2
SNI P.C.09
1 M2
SNI P.C.10
1 M2
1 M2
1 M2
SNI P.C.01
SNI P.C.02
SNI P.C.02A
SNI P.C.03
CAT PARAGON
10.
PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP)
CAT DECOLITH
11.
12.
13.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
PEKERJAAN SANITASI
( SNI S. )
MEMASANG KLOSET DUDUK / MONOBLOK
MEMASANG KLOSET JONGKOK PORSELEN
MEMASANG URINOIR
MEMASANG WASTAFEL
MEMASANG BAK CUCI PIRING STAINLES STEEL
MEMASANG KRAN AIR f 3/4" atau 1/2"
MEMASANG KRAN AIR WASTAFEL
MEMASANG FLOOR DRAIN
MEMASANG BAK MANDI FIBERGLASS
MEMASANG BAK KONTROL PASANGAN BATU BATA (Uk. 30x30 cm tinggi 35 cm)
MEMASANG PIPA PVC TIPE AW F 1/2"
MEMASANG PIPA PVC TIPE AW F 3/4"
MEMASANG PIPA PVC TIPE AW F 1"
MEMASANG PIPA PVC TIPE AW F 1 1/2"
MEMASANG PIPA PVC TIPE AW F 2"
MEMASANG PIPA PVC TIPE AW F 3"
MEMASANG PIPA PVC TIPE AW F 4"
1.
2.
3.
4.
5.
6.
SNI P.C.11
SNI P.C.12
(SNI DT 91-0012-2007-01)
(SNI DT 91-0012-2007-02)
(SNI DT 91-0012-2007-03)
(SNI DT 91-0012-2007-04)
(SNI DT 91-0012-2007-05)
(SNI DT 91-0012-2007-06)
(SNI DT 91-0012-2007-07)
(SNI DT 91-0012-2007-08)
(SNI DT 91-0012-2007-09)
(SNI DT 91-0012-2007-10)
(SNI DT 91-0012-2007-11)
(SNI DT 91-0012-2007-12)
(SNI DT 91-0012-2007-13)
(SNI DT 91-0012-2007-14)
SNI K.K.01
SNI K.K.02
SNI K.K.03
SNI K.K.04
SNI K.K.05
SNI K.K.06
SNI K.K.07
SNI K.K.08
SNI K.K.09
52
SNI.S.01
SNI.S.02
SNI.S.03
SNI.S.04
SNI.S.05
SNI.S.06
SNI.S.06.a
SNI.S.07
SNI.S.08
SNI.S.09
SNI.S.15
SNI.S.16
SNI.S.17
SNI.S.18
SNI.S.19
SNI.S.20
SNI.S.21
An.Pav.1
An.Pav.2
An.Pav.3
An.Pav.4
An.Pav.5
An.Pav.6
1M
1 M2
1 M2
1 M2
1 M2
2
1M
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 Bh
1 Bh
1 Set
1 Set
1 Set
1 M2
1 Bh
1 Bh
1 M2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'
M'
M'
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
NO.
URAIAN PEKERJAAN
KODE
SATUAN
ANALISA
3
Tuban,
Januari 2012
Ir. S A T R I Y O
53
REKAPITULASI
92,366.00
1,195,010.00
455,196.00
6,150.00
235,094.00
28,211.00
250,994.00
27,575.00
33,885.00
40,301.00
42,332.00
36,696.00
55,680.00
44,385.00
8,272.00
100,130.00
86,930.00
133,275.00
90,067.00
12,080.00
2,015.00
180,702.00
351,634.00
323,552.00
519,296.00
468,173.00
432,756.00
162,263.00
179,918.00
81,007.00
87,112.00
226,471.00
204,654.00
164,554.00
212,798.00
190,981.00
204,027.00
182,209.00
177,027.00
109,104.00
98,195.00
102,885.00
91,976.00
99,166.00
88,257.00
96,818.00
85,909.00
82,152.00
189,307.00
108,115.00
158,028.00
148,146.00
133,828.00
179,203.00
218,528.00
31,576.00
28,449.00
26,397.00
25,120.00
37,715.00
34,945.00
33,277.00
23,076.00
54
HARGA
(Rp.)
5
13,865.00
29,077.00
17,198.00
639,378.00
630,280.00
668,112.00
706,676.00
736,794.00
772,596.00
806,447.00
832,297.00
848,643.00
876,647.00
885,365.00
918,362.00
929,715.00
916,237.00
1,190,613.00
2,217,242.00
2,894,190.00
3,137,324.00
2,393,047.00
113,113.00
120,043.00
1,244,248.00
1,357,362.00
1,470,475.00
1,583,589.00
1,696,702.00
2,262,270.00
2,827,837.00
3,046,195.00
3,080,046.00
3,105,896.00
3,122,242.00
3,467,535.00
3,606,499.00
3,719,612.00
3,622,845.00
3,735,958.00
2,797,381.00
3,611,770.00
3,637,620.00
4,203,188.00
4,219,534.00
4,463,063.00
4,479,409.00
4,768,755.00
4,785,101.00
2,740,391.00
3,610,904.00
3,636,754.00
3,976,094.00
3,992,440.00
4,541,662.00
4,558,008.00
3,645,207.00
3,661,553.00
3,725,522.00
3,741,868.00
2,522,145.00
216,974.00
486,388.00
1,367,471.00
673,498.00
1,554,581.00
5,952,187.00
5,597,575.00
65,211.00
72,912.00
80,755.00
78,121.00
55
HARGA
(Rp.)
5
6,931,078.00
328,810.00
526,673.00
427,126.00
380,383.00
66,664.00
66,677.00
10,922,620.00
8,784,163.00
8,429,551.00
85,242.00
94,559.00
98,260.00
94,261.00
9,887,703.00
9,034,221.00
413,290.00
402,290.00
722,620.00
610,826.00
502,850.00
102,898.00
103,582.00
8,654,520.00
87,453.00
96,520.00
8,904,578.00
431,770.00
420,770.00
771,900.00
657,026.00
533,650.00
13,442,078.00
519,610.00
1,006,140.00
876,626.00
680,050.00
152,312.00
387,518.00
409,440.00
417,002.00
304,628.00
287,143.00
19,999.00
30,793.00
12,197.00
31,207.00
48,488.00
41,155.00
43,190.00
66,605.00
83,120.00
58,740.00
42,640.00
55,853.00
46,600.00
64,515.00
119,014.00
200,228.00
67,507.00
56,210.00
50,761.00
49,510.00
73,822.00
46,819.00
56
HARGA
(Rp.)
5
234,467.00
141,246.00
22,100.00
431,000.00
263,794.00
5,614.00
46,770.00
130,373.00
20,562.00
44,591.00
35,373.00
28,898.00
6,757.00
9,777.00
10,242.00
7,335.00
12,859.00
9,885.00
72,976.00
127,361.00
122,058.00
113,501.00
109,200.00
102,215.00
115,745.00
106,794.00
127,064.00
125,562.00
104,195.00
113,236.00
591,481.00
352,520.00
75,125.00
57,773.00
19,542.00
17,479.00
17,479.00
81,279.00
199,719.00
23,466.00
93,379.00
1,870,631.00
305,803.00
328,336.00
562,286.00
218,059.00
36,037.00
55,787.00
20,725.00
265,325.00
113,931.00
13,651.00
15,372.00
16,775.00
30,078.00
45,075.00
81,165.00
112,133.00
72,012.00
77,512.00
72,452.00
77,512.00
87,412.00
62,112.00
57
HARGA
(Rp.)
5
58