Escolar Documentos
Profissional Documentos
Cultura Documentos
State Region 9 - California Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District 172 MW each, 262 with HRSG & STG each, ABB turbines 1000 MW total 520 MW total 880 MW total 680-720 MW total 500 MW total CC 8,760 2.5 ppm SCR; 3-hr 4 ppm CatOx CC 2.5 ppm SCR 1 hr 10 ppm >80%; 20 ppm @ 70-80% 10 ppm ? Facility # of New MW Application Date App. Comp Date Time to Final Final Permit Permit Issued (months) Permiting Status # of CTs # of DB Turbine Model Fuel Mode Hours NOx Limit Control Method Avg. Time S/S Nox Limits CO Limit Control Method
Avg. Time
S/S CO Limits
CA # SG98-01
1,048
7/16/98
12
CC
8,760
2.5 ppm
1-hr
10 ppm
CatOx
CA
1,000
CA
Blythe Energy Delta Energy Center -Calpine and Bechtel Sempra/OXY - Elk Hills OXY & Sempra Energy; Elk Hills Power LLC (joint venture) Elk Hills Power project Pastoria Power project High Desert Power Project LLC
520
05/05/2000
06/13/2000
3-hr
CA
880
10/21/1999
CC
8,760
2.5 ppm
SCR
1-hr
CatOx
3-hr
CA
720
CA CA CA CA
500
7.5
24-hr
13 Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District 9.0 Delegated & SIP approved by District Delegated & SIP approved by District Delegated & SIP approved by District 700 MW total 4 ABB (262 MW) 500 MW total 600 MW total, 2 @ 200 MW + HRSG 500 MW total 2 @ 530 MW, 2 @ 15 MW (1260 MW total) 530 MW total 600 MW total 510 MW total 750 MW total 500 MW total 550 MW total 800 MW total 320 MW total 500 MW total CC 2 ppm SCONOx/S CR backup SCR 1-hr 6 ppm CatOx 6 ppm CatOx 3-hr CC 8,760 2.5 ppm SCR SCR or SCONOx 1-hr 4 ppm CatOx 24-hr
700
01/30/1998
CA
US Generating - La Paloma Long Beach District Energy Facility (ENRON) Calpine and Bechtel - Metcalf Energy
1,048
07/10/1998
07/30/1998
11
CC
8,760
2.5 ppm
1-hr
CA
500
CA
600
CA
500
02/22/2000
04/17/2000
CA
1,206
05/12/2000
NG
CC
2.5 ppm
SCR/DLN
1-hr
9 ppm
GCP
3-hr
CA
Duke Energy - Morro Bay Calpine and Bechtel - Newark Energy Center PG&E Generating - Otay Mesa
530
11/03/2000
CA
600
CA
510
6/00
CA
Pastoria Power Project Pittsburg District Energy Facility (ENRON) AES South City
750
5/15/00 ?
CC
8,760
2.5 ppm
CA
500
06/10/1999
CC
2.5 ppm
SCR
1-hr
6 ppm
CatOx
3-hr
CA
550
SC/CC
CA
800
CC
1 -2 ppm
SCONOx
1-hr
1 -2 ppm
CA
320
pending
CC
2.5 ppm
SCR
1-hr
6 ppm
CA
500
01/22/1998
03/03/1998
12/02/1999
CC
2.5 ppm
SCR
1-hr
4 ppm
1 hr
CA
CA
500
01/01/1999
500 MW total
CC
2.5 ppm
SCR
1-hr
4 ppm
CatOx
3-hr
Page 1 of 1