Você está na página 1de 1

1-Check if the cost allocation was entered after the batch release you should run gmf_recreat batch

h period layers, then actual cost process then test the issue 2-the co-product cost equals zero if the plan qty and WIP plan qty both equals zero, change the WIP plan qty to equal the actual qty and run recreate batch period layers then actual cost process then test the issue . note (1129263.1)
UPDATE gme_material_details set plan_qty = actual_qty, wip_plan_qty=actual_qty WHERE line_type = 1 AND actual_qty != 0 AND (plan_qty = 0 and wip_plan_qty = 0) AND batch_id = &batch_id -- <> ; COMMIT;

Você também pode gostar