Você está na página 1de 3

ICOMM TELE LTD

NEPAL ELECTRICITY AUTHORITY

MULTI CIRCUIT TOWER


TOWER TYPE '4DD+'

DATE
REV

10/4/2014
1

LEG FORCE CALUCLATION COMPRESSION


FOR MAIN LEG:M23 :

LOAD CASE = 10 FIRST THREE CONDS BROKEN MAX 123M - X009


GROUNDWIRE
CONDUCTOR
cond.gw
wind load
NC
BKN.
NC
BKN.
51.035
51.035
4189
0
17344
9163
43.235
44.9
497
0
4338
3183
37.186
38.9
0
0
0
13175
31.136
32.8

TRANSVERSE LOAD
=
VERTICAL LOAD
=
LONGITUDINAL LOAD
=
MOMENT DUE TO TRANSVERSE LOAD
GW
8378x51.035
1ST L C
(17344+9163)x43.235
2nd L C
(17344+9163)x37.186
3rd L C
(17344+9163)x31.136
4th L C
(34688)x25.086
5th L C
(34688)x19.036
6th L C
(34688)x12.986
Total

=
=
=
=
=
=
=

MOMENT DUE TO LONGITUDINAL LOAD


GW
0x51.035
=
1ST L C
(0+13175)x43.235
=
2nd L C
(0+13175)x37.186
=
3rd L C
(0+13175)x31.136
=
4th L C
(0)x25.086
=
5th L C
(0)x19.036
=
6th L C
(0)x12.986
=
Total
MOMENT DUE TO WIND ON TOWER
GW
515X51.035
1ST L C
1390X44.9
2nd L C
1919X38.9
3rd L C
2259X32.8
4th L C
2640X26.79
5th L C
2975X20.73
6th L C
2863X14.63
4426X8.7
Total
MOMENT DUE TO UVL
GW
4.05X(497)-4.05X(497)
TLC
6.6X(4338)-6.6X(3182)
2nd L C
6.8X(4338)-6.8X(3182)
3rd L C
7.0X(4338)-7.0X(3182)
4th L C
7.2X(4338)-7.2X(4338)
5th L C
7.4X(4338)-7.4X(4338)
BLC
7.6X(4338)-7.6X(4338)

=
=
=

=
=
=
=
=

25.086
19.036
12.986

427571
1146030
985689
825322
870183
660321
606554
5521671

0
569621
489926
410217
0
0
0
1469763

26283
62411
74649
74095
70726
61672
41886
38506
450228

=
=
=
=
=
=
=

Total

0
7623
7854
8085
0
0
0

23562

TOTAL MOMENT

7465224

COMPRESSION
M/2W*cos(t) =
V/4
=
S wt./4
=

9.878 degrees
0.1724036 radians
378046
12396
9270.25
399712.53

cos(t)
W

=
=

0.9851753
10.022

ULTIMATE COMPRESSION

AS PER ITOWER SOFTWARE


COMPRESSION FORCE

26.79
20.73
14.63
8.7

=
=

394108*1.02
407706.78 KG

414348.00 KG
% Difference between software/Theoritical Values

1.0162892

ICOMM TELE LTD


NEPAL ELECTRICITY AUTHORITY

MULTI CIRCUIT TOWER


TOWER TYPE '4DD+'

DATE
REV

10/4/2014
1

LEG FORCE CALUCLATION


FOR MAIN LEG:M23 :

DEAD END NORMAL MIN DEI - X020


CONDUCTOR
GROUNDWIRE
NC
BKN.
NC
BKN.
1305
0
5564
0
-234
0
-444
0
3305
0
13640
0

TRANSVERSE LOAD
=
VERTICAL LOAD
=
LONGITUDINAL LOAD
=
MOMENT DUE TO TRANSVERSE LOAD
GW
2610x51.035
1ST L C
(11128)x43.235
2nd L C
(11128)x37.186
3rd L C
(11128)x31.136
4th L C
(11128)x25.086
5th L C
(11128)x19.036
6th L C
(11128)x12.986
Total

=
=
=
=
=
=
=

133201
481119
413806
346481
279157
211833
144508
2010105

MOMENT DUE TO LONGITUDINAL LOAD


GW
3305x2x51.035
1ST L C
(13640+13640)x43.235
2nd L C
(13640+136400)x37.186
3rd L C
(13640+136400)x31.136
4th L C
(27280)x25.086
5th L C
(27280)x19.036
6th L C
(27280)x12.986
Total

=
=
=
=
=
=
=

337341
1179451
1014434
849390
684346
519302
354258
4938523

=
=

26283
62411

=
=
=
=
=

74649
74095
70726
61672
41886
38506
450228

=
=
=
=
=
=
=

0
0
0
0
0
0
0

MOMENT DUE TO WIND ON TOWER


GW
515X51.035
1ST L C
1390X44.9
2nd L C
1919X38.9
3rd L C
2259X32.8
4th L C
2640X26.79
5th L C
2975X20.73
6th L C
2863X14.63
4426X8.7
Total
MOMENT DUE TO UVL
GW
4.05X(-477)-4.05X(-477)
T LC
6.6X(-733)-6.6X(-1888)
2nd L C
6.8X(-733)-6.8X(-1888)
3rd L C
7.0X(-733)-7.0X(-1888)
4th L C
7.2X(-1888)-7.2X(-1888)
5th L C
7.4X(-1888)-7.4X(-1888)
BLC
7.6X(-1888)-7.6X(-1888)
Total

cond.gw
wind load
51.035
51.035
43.235
44.9
37.186
38.9
31.136
32.8
25.086
26.79
19.036
20.73
12.986
14.63
8.7

TOTAL MOMENT

7398856

=
=

373540*1.02
386677.46 KG

376942.00 KG

TENSION
M/(2W*cos(t)
V/4
S wt./4

=
=
=

374685
-4860.00
9270.25
379095.55

ULTIMATE TENSION

AS PER ITOWER SOFTWARE


TENSION FORCE

% Difference between software/Theoritical Values

0.9748228

ICOMM TELE LTD


NEPAL ELECTRICITY AUTHORITY

MULTI CIRCUIT TOWER


TOWER TYPE '4DD+'

DATE
REV

10/4/2014
1

DIAGNOL FORCE CALUCLATION


FOR DIAGNOL:D45 :

GW & FIRST TWO CONDS BROKEN MIN G12I


GROUNDWIRE
CONDUCTOR
NC
BKN.
NC
BKN.
4189
2183
17344
9163
-477
-283
-1888
-733
0
3192
0
13175

TRANSVERSE LOAD
=
VERTICAL LOAD
=
LONGITUDINAL LOAD
=
MOMENT DUE TO TRANSVERSE LOAD
GW
(4189+2183)*2.5
1ST L C
(17344+9163)*2.5
2nd L C
0
3rd L C
0
4th L C
0
5th L C
0
6th L C
0
Total

=
=
=
=
=
=
=

15930
66268
0
0
0
0
0
82198

TORSIONAL LOAD
GW
3192*4.05
1ST L C
13175*6.72
2nd L C
0
3rd L C
0
4th L C
0
5th L C
0
6th L C
0
Total

=
=
=
=
=
=
=

12928
88536
0
0
0
0
0
101464

=
=

2475
4895

=
=
=
=
=

0
0
0
0
0
0
7370

191031

MOMENT DUE TO WIND ON TOWER


GW
990x2.5
1ST L C
1958x2.5
2nd L C
0
3rd L C
0
4th L C
0
5th L C
0
6th L C
0
0 base
0
Total
TOTAL MOMENT
COMPRESSION
M/4W*cos(a) =

a
cos(a)
W

26141.01

LEVER ARMWIND LOAD


2.500
990
2.500
1958
3.100
6.72
4.05

=
=
=

46
0.69465
2.63

ULTIMATE COMPRESSION

AS PER ITOWER SOFTWARE


COMPRESSION FORCE

=
=

26141*1.02
26663.83 KG

26219.00 KG
% Difference between software/Theoritical Values

0.9833172

Você também pode gostar