M1
PARTIDAS
SEMANAS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.1 Suministro y colocacin de soleras Tipo A 2.2 Suministro y colocacin de soleras especiales 3.1 Base estabilizada e = 20 cm. 3.2 Base estabilizada e = 5 cm. 4.1 Calzada hcv e = 0,20 m. 4.2 Veredas hc e = 0,07 m. 4.3 Calzada hcv e = 0,15 m. 4.4 Estabilizado e = 0,20 m. 4.5 Csped en bandejn central y veredones 1.1 Excavacin de zanja 0-2 m. 1.2 Excavacin de zanja 2-4 m. 1.4 Relleno de excavacines con arena 1.5 Relleno de excavacines con material de excavaciones 1.6 Retiro y transporte de excedentes
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
2.1 Suministro tuberias de HDPE D= 600 mm. 2.3 Suministro tuberias de HDPE D= 300 mm. 3.1 Cmaras tipo a 3.2 Tapas para cmara tipo calzada 3.3 Suministro de escalines 3.4 Sumidero Simple Tipo Serviu 3.5 Dado refuerzo tuberas sumideros y colectores 4.1 Tuberas de HDPE D= 600 mm. 4.3 Tuberas de HDPE D= 300 mm. 5.1 Muros de descarga 5.2 Muros de boca 5.3 Profundizacin y perfilamiento foso existente 5.4 Relleno foso existente 1.1 Seal Signo Pare 1.2 Seal Signo Ceda el Paso 2.1 Linea Central Segmentada 2.2 Paso de Cebra 2.3 Smbolo Ceda el Paso 2.4 Smbolo Pare 1.1 Traslado de Postacin 1.2 Proyecto de Alumbrado Pblico 1.3 Ejecucin Proyecto de Alumbrado
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Prof. Residente
I.T.O. SERVIU
Prof. Autocontrol
M2
30/09/2013 180 29/03/2013 1.0
FECHA
CUADRO RESUMEN ESTADOS DE PAGO CURSADOS $ VALOR DEVOLUCION RETENCIONES VALOR NETO DIRECTO ANTICIPADA
PAGO EFECTIVO
Prof. Residente
I.T.O. SERVIU
Prof. Autocontrol
M3
N I 1.1 1.2 II 2.1 2.2 III 3.1 3.2 IV 4.1 4.2 4.3 4.4 4.5 I 1.1 1.2 1.4 1.5 1.6 II 2.1 2.3 III 3.1 3.2 3.3 3.4 3.5 IV 4.1 4.3 V 5.1 5.2 5.3 5.4
PARTIDA
UN.
PRECIO TOTAL
ESTADO DE PAGO. CANTIDADES ESTADODE PAGO ($) MES ACUMULAD MES ACUMULAD PRESENTE PRESENTE ANTERIOR O ANTERIOR O
OBRAS DE PAVIMENTACION MOVIMIENTO DE TIERRAS Corte m3 5150 Terraplen m3 0 SOLERAS Y PAVIMENTOS Y OTROS Suministro y colocacin de soleras Tipo A m 560 Suministro y colocacin de soleras especiales m 0 BASES ESTABILIZADAS Base estabilizada e = 20 cm. m2 2262 Base estabilizada e = 5 cm. m2 0 CALZADAS Calzada hcv e = 0,20 m. m2 1400 Veredas hc e = 0,07 m. m2 4719 Calzada hcv e = 0,15 m. m2 500 Estabilizado e = 0,20 m. m2 4544 Csped en bandejn central y veredones m2 11910 OBRAS DE AGUAS LLUVIAS MOVIMIENTO DE TIERRAS Excavacin de zanja 0-2 m. m3 362.3 Excavacin de zanja 2-4 m. m3 1987 Relleno de excavacines con arena m3 654 Relleno de excavacines con material de excavaciones m3 1695 Retiro y transporte de excedentes m3 904 SUMINISTRO DE TUBERIAS Suministro tuberias de HDPE D= 600 mm. ml 558 Suministro tuberias de HDPE D= 300 mm. ml 84 OBRAS DE HORMIGON Cmaras tipo a N 8 Tapas para cmara tipo calzada N 8 Suministro de escalines N 96 Sumidero Simple Tipo Serviu N 12 Dado refuerzo tuberas sumideros y colectores ml 42 TRANSPORTE INTERNO, COLOCACION Y PRUEBAS DE TUBERIAS Tuberas de HDPE D= 600 mm. ml 548 Tuberas de HDPE D= 300 mm. ml 79 OBRAS VARIAS Muros de descarga N 2 Muros de boca N 2 ProfundIzacin y perfilamiento foso existente ml 448 Relleno foso existente ml 412
$ $ $ $ $ $ $ $ $ $ $
3,291 3,809 11,328 16,968 3,754 1,464 25,223 10,556 20,654 3,754 1,692
$ $ $ $ $ $ $
$ $ $ $ $ $ $
$ 25,417,600 $ 1,075,360 $ 624,480 $ 7,785,144 $ 1,191,120 $ 12,486,728 $ 940,100 $ $ $ $ 2,350,000 1,654,400 947,520 871,380
OBRAS DE SEALIZACION Y DEMARCACION SEALIZACION Seal Signo Pare Seal Signo Ceda el Paso DEMARCACION Linea Central Segmentada Paso de Cebra Smbolo Ceda el Paso Smbolo Pare OBRAS DE ALUMBRADO PUBLICO PROYECTO DE A. PUBLICO I 1.1 Traslado de Postacin 1.2 Proyecto de Alumbrado Pblico 1.3 Ejecucin Proyecto de Alumbrado I 1.1 1.2 II 2.1 2.2 2.3 2.4 TOTAL PRESUPUESTO
N N ml m2 N N
4 $ 6 $ 704 140 6 4 $ $ $ $
$ $ $ $ $ $
N GL GL
Prof. Residente
I.T.O. SERVIU
Prof. Autocontrol
M4
10/5/2013 1.0
MESES
1 2 3 4 5 6 7
Prof. Residente
I.T.O. SERVIU
Prof. Autocontrol
M5
10/5/2013 1.0
90% 80%
70%
60% 50%
40%
PROGRAMADO REAL
ESTADOS DE PAGO
Prof. Residente
I.T.O. SERVIU
Prof. Autocontrol
P1
FECHA: VERSION:
05/10/13 1.0
A. ACTIVIDAD CONTRACTUAL 1. Apertura Propuesta 2. Resolucin inicio Contrato 3. Protocolizacin Contrato 4. Garanta 3% 5. Garanta Adicional 6. Giro Anticipado 7. Entrega de Terreno 8. Entrega Programa trabajo definitivo 9. Recepcion de obras 10. Oficio ITO 11. Designacion comision recepcion 12. Constitucion comision en terreno 13. Solucion observaciones recepcion 14. Recepcion Final 15. Acta Recepcion Definitiva 16. Calificacion Contratista 17. Aprobacion Acta y Calificacion 18. Devolucion Retenciones 19. Canje retenciones 20. Liquidacion contrato
ATRASO ADELANTO
OBSERVACIONES
B. ENTREGA Y RECEPCIN OBRAS DE SERVICIOS PUBLICOS 1. Aguas Lluvias Recepcion 2. Alumbrado Pubico Recepcion
Prof. Residente
ITO SERVIU
Prof. Autocontrol
P2
FECHA
: 05/10/2013
VERSION : 1.0
ACTIVIDAD CONTRACTUAL
1. Entrega Terreno 2. Letrero Indicativo 3. Recepcin Obras Aguas Lluvias 4. Recepcin Obras Elctricas Pblicas 5. Prerecepcin ITO 6. Solicitud Contratista Recepcin Final 7. Estados de Pagos Programados 8. Plazo Total Contrato
1 X X
SEMANAS 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X
Prof. Residente
ITO SERVIU
Prof. Autocontrol
P3
PARTIDA
INICIO
DURAC.
TERMINO
SEMANAS 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
OBRAS DE PAVIMENTACION MOVIMIENTO DE TIERRAS Corte 30/09/2013 150 dias Terraplen 28/10/2013 120 dias SOLERAS Y PAVIMENTOS Y OTROS Suministro y colocacin de soleras Tipo A 28/10/2013 120 dias Suministro y colocacin de soleras especiales 27/01/2014 60 dias BASES ESTABILIZADAS Base estabilizada e = 20 cm. 28/10/2013 120 dias Base estabilizada e = 5 cm. 28/10/2013 150 dias CALZADAS Calzada hcv e = 0,20 m. 28/10/2013 120 dias Veredas hc e = 0,07 m. 28/10/2013 140 dias Calzada hcv e = 0,15 m. 18/11/2013 70 dias Estabilizado e = 0,20 m. 28/01/2014 60 dias Csped en bandejn central y veredones 01/03/2014 28 dias OBRAS DE AGUAS LLUVIAS MOVIMIENTO DE TIERRAS Excavacin de zanja 0-2 m. 28/10/2013 120 dias Excavacin de zanja 2-4 m. 28/10/2013 120 dias Relleno de excavacines con arena 11/11/2013 115 dias Relleno de excavacines con material de excavaciones 11/11/2013 115 dias Retiro y transporte de excedentes 19/12/2013 80 dias SUMINISTRO DE TUBERIAS Suministro tuberias de HDPE D= 600 mm. 11/11/2013 110 dias Suministro tuberias de HDPE D= 300 mm. 11/11/2013 110 dias OBRAS DE HORMIGON Cmaras tipo a 04/11/2013 70 dias Tapas para cmara tipo calzada 04/11/2013 70 dias 04/11/2013 70 dias Suministro de escalines Sumidero Simple Tipo Serviu 16/12/2013 55 dias Dado refuerzo tuberas sumideros y colectores 11/11/2013 110 dias TRANSPORTE INTERNO, COLOCACION Y PRUEBAS DE TUBERIAS Tuberas de HDPE D= 600 mm. 11/11/2013 110 dias Tuberas de HDPE D= 300 mm. 11/11/2013 110 dias OBRAS VARIAS Muros de descarga 03/03/2014 25 dias Muros de boca 03/03/2014 25 dias ProfundIzacin y perfilamiento foso existente 03/03/2014 25 dias Relleno foso existente 03/03/2014 25 dias OBRAS DE SEALIZACION Y DEMARCACION SEALIZACION Seal Signo Pare 03/03/2014 25 dias Seal Signo Ceda el Paso 03/03/2014 25 dias DEMARCACION Linea Central Segmentada 03/03/2014 25 dias Paso de Cebra 03/03/2014 25 dias Smbolo Ceda el Paso 03/03/2014 25 dias Smbolo Pare 03/03/2014 25 dias OBRAS DE ALUMBRADO PUBLICO PROYECTO DE A. PUBLICO Traslado de Postacin 25/11/2013 95 dias Proyecto de Alumbrado Pblico 25/11/2013 125 dias Ejecucin Proyecto de Alumbrado 25/11/2013 125 dias
27/02/2014 X 25/02/2014 17/03/2014 28/03/2014 25/02/2014 29/03/2014 25/02/2014 17/03/2014 29/03/2014 29/03/2014 29/03/2014
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X
X X X X X X X X X X X X X
X X X X
X X X X
X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X
X X X X
X X X
X X X
25/02/2014 25/02/2014 06/03/2014 06/03/2014 13/03/2014 11/03/2014 11/03/2014 29/03/2014 29/03/2014 29/03/2014 15/04/2014 11/03/2014 11/03/2014 11/03/2014 29/03/2014 29/03/2014 29/03/2014 29/03/2014
X X
X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X X X X
X X X X X X X X X X X X X X
X X X X X X X X X X X X X X
X X X X X X X
X X X X X X X
X X X X X X X
X X X X X X X X X X
X X X X X X X X X X X X X
X X X X X X X
X X X X X X X
X X X X X
X X X
X X X X X X X X X X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X
X X X
X X X
X X X X
X X X X
X X X
X X X
X X X
X X X X
X X X X
X X X
X X X
X X X X
X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X X
X X
X X
X X
X X
Prof. Residente
I.T.O SERVIU
Prof. Autocontrol
P.4
CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. FECHA: 05/10/13 SR. JUAN ARRIAGADA N 017 DEL 20/08/2013 VERSION: 1.0
MES
VALOR ETADO DE PAGO $ 45,854,225 $ 61,138,966 $ 76,423,708 $ 101,898,277 $ 91,708,449 $ 96,803,363 $ 35,664,397 $ 509,491,386
% MENSUAL
% VALOR ESTADO DE PAGO ACUMULADO 9% 21% 36% 56% 74% 93% 100%
1 2 3 4 5 6 7 TOTALES
Prof. Residente
ITO SERVIU
Prof. Autocontrol
P5
05/10/13 1.0
N MATERIAL DE CONSTRUCCIN 1 2 5 6 7 9 TUBERIAS, D=300 mm TUBERIAS, D=600 mm CUERPO CAMARA CONO CAMARA CHIMENEA CAMARA ANILLO TAPAS CAMARAS
TIPO/COLOR HDPE HDPE H.C.V. H.C.V. H.C.V. FE FUNDIDO FE GALVANIZADO ALTA RESISTENCIA ARIDO GRUESO Y FINO
OBSERVACIONES
11 ESCALINES 12 CEMENTO 14 ARIDOS 15 FIERRO D=8 mm 17 FIERRO D=12 mm 19 HORMIGON 20 MEMBRANA DE CURADO 22 SELLO ASFALTICO
CON RESALTE CON RESALTE PREMEZCLADO SIKA CURE 116 JAC 946 ASFALTO CALIENTE
Prof. Residente
ITO SERVIU
Prof. Autocontrol
P6
ENSAYO ELEMENTO
Terreno de Fundacion Terraplenes Subrasante
TIPO ENSAYO
CBR Densidad CBR CBR Densidad CBR Granulometra Lmites de Atterberg Desgaste de Los Angeles Densidad in Situ Granulometra Finos por Lavado Desgaste de Los Angeles Resistencia Traccion por flexion Hormigon Fresco Resistencia Compresin Probetas Hormigon Fresco Resistencia Testigo Hormigon Endurecido Regularidad Superficial Granulometra Finos por Lavado Desgaste de Los Angeles Resistencia Compresin Resistencia a la Flexin Resistencia al Impacto
NORMA NCH.
NCh 1852 NCh 1532 NCh 1852 NCh 1852 NCh 1532 NCh 1852 NCh 165 NCh 1517 NCh 1369 NCh 1532 NCh 165 NCh 1223 NCh 1369 NCh 1998 NCh 1038 NCh 1998 NCh 1037 NCh 1171 LNV 107 NCh 165 NCh 1223 NCh 1369 NCh 1037
FRECUENCIA
1 por obra 1 cada 500 m2 1 por obra 1 por obra 1 cada 500 m2 1 por Obra 1 por Obra 1 por Obra 1 por Obra 1 cada 500 m2 1 por Obra 1 por Obra 1 por Obra 1 cada 700 m2 1 cada 700 m2 1 cada 700 m2 1 por Obra 1 por Obra 1 por Obra 1 cada 200 m2 1 cada 2000 un 1 cada 2000 un
OBSERVACIONES
Min. 10% Min. 90% de la DMCS Proctor Modificado Min. 10% Min. 10% Min. 90% de la DMCS Proctor Modificado Min. 60% LL 25 max, IP 6 max Max. 20% Min. 95% de la DMCS Proctor Modificado A. fino 3% max, A.grueso 0,5% max A. grueso 20% max Min. 3 muestras x obra Min. 3 muestras x obra Min. 3 testigos x obra
Base
Hormigon de Calzada
A. fino 3% max, A.grueso 0,5% max Arido grueso 20% max Prom.3100kg, Valor ind.min.2500 kg Prom. 80cm, Valor ind.min. 70cm
AGUAS LLUVIAS Sello de Excavacion Arena Cama Apoyo Arena Primera capa Relleno Superior Medio Relleno Superior Final
1 por Obra 1 cada tramo entre CI Min. 90% de la DMCS Proctor Modificado 1 cada tramo entre CI Min. 75% 1 cada tramo entre CI Min. 75%
1 cada tramo entre CI Min. 90% de la DMCS Proctor Modificado 1 cada tramo entre CI solo bajo calzada Min. 90% de la DMCS Proctor Modificado
Prof. Residente
ITO SERVIU
Prof. Autocontrol
P7
10/5/2013 1.0
OBJETIVO 1. Visitas Permanentes ITO Fiscalizacin Ejecucin del Contrato 2. Entrega terreno/Constitucin en Terreno/Inicio Obra. 3. Verificar condiciones de Terreno (Ensayos) 4. Recepcin de Obras
30-09-2013
Inspector Tcnico - Contratista Laboratorio de Suelos Inspector Tcnico - Contratista Comisin SERVIU
03-04-2014
Prof. Residente
ITO SERVIU
Prof. Autocontrol
P8
FECHA: VERSION:
10/5/2013 1.0
CARTILLA
N DESIGNACION ACTIVIDAD
OBRAS DE PAVIMENTACION
CC 01 CC 02 CC 03 CC 04 CC 05 CC 06 CC 07 CC 08 CC 09 CC 10 CC 11
MOVIMIENTO DE TIERRAS Corte Terraplen SOLERAS Y PAVIMENTOS Y OTROS Suministro y colocacin de soleras Tipo A Suministro y colocacin de soleras especiales BASES ESTABILIZADAS Base estabilizada e = 20 cm. Base estabilizada e = 5 cm. CALZADAS Calzada hcv e = 0,20 m. Veredas hc e = 0,07 m. Calzada hcv e = 0,15 m. Estabilizado e = 0,20 m. Csped en bandejn central y veredones OBRAS DE AGUAS LLUVIAS MOVIMIENTO DE TIERRAS Excavacin de zanja 0-2 m. Excavacin de zanja 2-4 m. Relleno de excavacines con arena Relleno de excavacines con material de excavaciones Retiro y transporte de excedentes SUMINISTRO DE TUBERIAS Suministro tuberias de HDPE D= 600 mm. Suministro tuberias de HDPE D= 300 mm. OBRAS DE HORMIGON Cmaras tipo A Tapas para cmara tipo calzada Suministro de escalines Sumidero Simple Tipo Serviu Dado refuerzo tuberas sumideros y colectores TRANSPORTE INTERNO, COLOCACION Y PRUEBAS DE TUBERIAS Tuberas de HDPE D= 600 mm. Tuberas de HDPE D= 300 mm. OBRAS VARIAS Muros de descarga Muros de boca ProfundIzacin y perfilamiento foso existente Relleno foso existente OBRAS DE SEALIZACION Y DEMARCACION SEALIZACION Seal Signo Pare Seal Signo Ceda el Paso DEMARCACION
Linea Central Segmentada
CC 12 CC 13 CC 14 CC 15 CC 16 CC 17 CC 18 CC 19 CC 20 CC 21 CC 22 CC 23 CC 24 CC 25 CC 26 CC 27 CC 28 CC 29
CC 30 CC 31 CC 32 CC 33 CC 34 CC 35
Paso de Cebra
Smbolo Ceda el Paso Smbolo Pare
CC 36 CC 37 CC 38
OBRAS DE ALUMBRADO PUBLICO PROYECTO DE A. PUBLICO Traslado de Postacin Proyecto de Alumbrado Pblico Ejecucin Proyecto de Alumbrado
Prof. Residente
ITO SERVIU
Prof. Autocontrol
P9
FECHA:
05-10-2013
VERSION: 1.0
ITEM 1 2 3 4 5 6 7 8 9 10
IDENTIFICACION EQUIPOS Y MAQUINARIA Retroexcavadora Camin Tolva Placa compactadora Vibrador de inmersin Trompo Concretero Nivel Topogrfico Moldajes metlicos Rompe pavimento Cortadora de pavimento Cercha Vibradora
CANTIDAD 1 1 3 2 2 1 1 1 1 2
ITEM 1
SUBCONTRATISTA NO SE SUBCONTRATARA
OBRA
SUBCONTRATO
Prof. Residente
ITO SERVIU
Prof. Autocontrol
E1
N CERTIF.
ENSAYO
LOCALIZACIN
FECHA
RESULTADO
OBSERVACIONES
Prof. Residente
ITO SERVIU
Prof. Autocontrol
HOJA N 01 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: CORTE RESPONSABLE: VICTORIA RODRIGUEZ
CC.01
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR TRAZADO Y ALINEAMIENTO VERIFICAR COTAS Y NIVELES VERIFICAR CALIDAD DE MATERIAL EXCAVADO VERIFICAR LUGAR A DEJAR ESCOMBROS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR TRAZADO Y ALINEAMIENTO VERIFICAR COTAS Y NIVELES VERIFICAR CALIDAD DE MATERIAL EXCAVADO VERIFICAR LUGAR A DEJAR ESCOMBROS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 02 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: TERRAPLEN RESPONSABLE: VICTORIA RODRIGUEZ
CC.02
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 5 ELEMENTOS DE VERIFICACION: VERIFICAR TRAZADO Y ALINEAMIENTO VERIFICAR COTAS Y NIVELES VERIFICAR CALIDAD DE MATERIAL VERIFICAR ESPESOR DE CAPAS VERIFICAR TOMA DE MUESTRAS PARA ENSAYOS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4 5
ELEMENTOS DE VERIFICACION: VERIFICAR TRAZADO Y ALINEAMIENTO VERIFICAR COTAS Y NIVELES VERIFICAR CALIDAD DE MATERIAL VERIFICAR ESPESOR DE CAPAS VERIFICAR TOMA DE MUESTRAS PARA ENSAYOS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 03 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SUMINISTRO Y COLOCACION ACTIVIDAD: SOLERAS TIPO A RESPONSABLE: VICTORIA RODRIGUEZ
CC.03
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD Y DIMENSION DE SOLERAS VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR BASE DE HORMIGON Y RESPALDO VERIFICAR EMBOQUILLADOS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD Y DIMENSION DE SOLERAS VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR BASE DE HORMIGON Y RESPALDO VERIFICAR EMBOQUILLADOS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 04 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SUMINISTRO Y COLOCACION ACTIVIDAD: SOLERAS ESPECIAL RESPONSABLE: VICTORIA RORIGUEZ
CC.04
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD Y DIMENSION DE SOLERAS VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR BASE DE HORMIGON Y RESPALDO VERIFICAR EMBOQUILLADOS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD Y DIMENSION DE SOLERAS VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR BASE DE HORMIGON Y RESPALDO VERIFICAR EMBOQUILLADOS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 05 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: BASE ESTABILIZADA e=0,20m RESPONSABLE: VICTORIA RORIGUEZ
CC.05
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 06 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: BASE ESTABILIZADA e=0,05m RESPONSABLE: VICTORIA RODRIGUEZ
CC.06
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR NIVELES VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR NIVELES VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 07 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: CALZADA HCV e= 0,20m RESPONSABLE: VICTORIA RODRIGUEZ
CC.07
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 5 6 ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR MOLDAJE DE CALZADA Y BORDE VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS VERIFICAR CURADO (MEMBRANA, OTROS) E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4 5 6
ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR MOLDAJE DE CALZADA Y BORDE VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS VERIFICAR CURADO (MEMBRANA, OTROS)
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 08 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: VEREDA HCV e= 0,07m RESPONSABLE: VICTORIA RODRIGUEZ
CC.08
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR MOLDAJE VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR MOLDAJE DE CALZADA Y BORDE VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 09 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: CALZADA HCV e= 0,15m RESPONSABLE: VICTORIA RODRIGUEZ
CC.09
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 5 6 ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR MOLDAJE DE CALZADA Y BORDE VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS VERIFICAR CURADO (MEMBRANA, OTROS) E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4 5 6
ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR MOLDAJE DE CALZADA Y BORDE VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS VERIFICAR CURADO (MEMBRANA, OTROS)
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 10 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: ESTABILIZADO e=0,20m RESPONSABLE: VICTORIA RORIGUEZ
CC.10
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES VERIFICAR TOMA DE MUESTRAS DE ENSAYOS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 11 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
CC.11
10/5/2013
1.0
ACTIVIDAD: CESPED EN BANDEJON CENTRAL FECHA: ACTIVIDAD: Y VEREDONES RESPONSABLE: VICTORIA RORIGUEZ VERSIN:
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR AREA VERIFICAR COLOCACION EN BANDEJON VERIFICAR COLOCACION EN VEREDONES E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR COTAS Y ALINEAMIENTOS VERIFICAR NIVELES Y BOMBEO VERIFICAR ESPESORES
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 12 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: EXCAVACION EN ZANJA 0-2M RESPONSABLE: VICTORIA RODRIGUEZ
CC.12
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR TRAZADO Y ALINEAMIENTO VERIFICAR COTAS Y NIVELES VERIFICAR CALIDAD DE MATERIAL EXCAVADO E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR TRAZADO Y ALINEAMIENTO VERIFICAR COTAS Y NIVELES VERIFICAR CALIDAD DE MATERIAL EXCAVADO
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 13 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: EXCAVACION EN ZANJA 2-4M RESPONSABLE: VICTORIA RODRIGUEZ
CC.13
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR TRAZADO Y ALINEAMIENTO VERIFICAR COTAS Y NIVELES VERIFICAR CALIDAD DE MATERIAL EXCAVADO VERIFICAR TOMA DE MUESTRAS DE ENSAYO E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR TRAZADO Y ALINEAMIENTO VERIFICAR COTAS Y NIVELES VERIFICAR CALIDAD DE MATERIAL EXCAVADO VERIFICAR TOMA DE MUESTRAS DE ENSAYO
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 14 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: RELLENO EXCAVACIONES ACTIVIDAD: CON ARENA RESPONSABLE: VICTORIA RODRIGUEZ
CC.14
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD MATERIAL VERIFICAR ESPESOR DE CAPAS VERIFICAR TOMA DE MUESTRAS DE ENSAYO E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD MATERIAL VERIFICAR ESPESOR DE CAPAS VERIFICAR TOMA DE MUESTRAS DE ENSAYO
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 15 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: RELLENO EXCAVACIONES CON ACTIVIDAD: MATERIAL DE EXCAVACIONES RESPONSABLE: VICTORIA RODRIGUEZ
CC.15
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD MATERIAL VERIFICAR ESPESOR DE CAPAS VERIFICAR TOMA DE MUESTRAS DE ENSAYO E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD MATERIAL VERIFICAR ESPESOR DE CAPAS VERIFICAR TOMA DE MUESTRAS DE ENSAYO
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 16 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: RETIRO Y TRANPORTE ACTIVIDAD: DE EXCEDENTES RESPONSABLE: VICTORIA RODRIGUEZ
CC.16
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR RETIRO MATERIAL NO UTILIZABLE VERIFICAR CANTIDAD REMOVIDA VERIFICAR LUGAR A DEJAR EXCEDENTES E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR CALIDAD MATERIAL VERIFICAR ESPESOR DE CAPAS VERIFICAR LUGAR A DEJAR EXCEDENTES
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 17 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SUMINISTRO TUBERIAS ACTIVIDAD: HDPE D=600mm RESPONSABLE: VICTORIA RODRIGUEZ
CC.17
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 18 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SUMINISTRO TUBERIAS ACTIVIDAD: HDPE D=300mm RESPONSABLE: VICTORIA RODRIGUEZ
CC.18
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 19 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: CAMARAS TIPO A RESPONSABLE: VICTORIA RODRIGUEZ
CC.19
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 4 5 ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR EMPLANTILLADO VERIFICAR RADIER VERIFICAR UNION ELEM. PREFABRICADOS VERIFICAR NIVELES DE CMARA E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4 5
ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR EMPLANTILLADO VERIFICAR RADIER VERIFICAR UNION ELEM. PREFABRICADOS VERIFICAR NIVELES DE CMARA
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 20 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: TAPA CAMARAS TIPO CALZADA RESPONSABLE: VICTORIA RODRIGUEZ
CC.20
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 21 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SUMINISTRO DE ESCALINES RESPONSABLE: VICTORIA RODRIGUEZ
CC.21
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 22 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
CC.22
10/5/2013
1.0
ACTIVIDAD: SUMIDERO SIMPLE TIPO SERVIU FECHA: RESPONSABLE: VICTORIA RODRIGUEZ VERSIN:
1 N 1 2 3 4 5 6 7 8 9 ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR EMPLANTILLADO VERIFICAR RADIER VERIFICAR COLOCACION BLOQUES VERIFICAR NIVELES DE SUMIDERO VERIFICAR TERMINACION ESTUCOS VERIFICAR REJILLA VERIFICAR ESCALINES VERIFICAR TAPA CAMARA E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4 5 6 7 8 9
ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR EMPLANTILLADO VERIFICAR RADIER VERIFICAR COLOCACION BLOQUES VERIFICAR NIVELES DE SUMIDERO VERIFICAR TERMINACION ESTUCOS VERIFICAR REJILLA VERIFICAR ESCALINES VERIFICAR TAPA CAMARA
OBSERVACIONES
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 23 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: DADO REFUERZO TUBERIAS, ACTIVIDAD: SUMIDEROS Y COLECTORES RESPONSABLE: VICTORIA RODRIGUEZ
CC.23
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 24 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
CC.24
10/5/2013
1.0
ACTIVIDAD: TRANSP. COLOCACION Y PRUEBA FECHA: ACTIVIDAD: TUBERIAS HDPE D=600mm RESPONSABLE: VICTORIA RODRIGUEZ VERSIN:
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION TUBERIAS VERIFICAR ESPESOR CAMA DE APOYO VERIFICAR PENDIENTE Y ALINEACIN TUBERIAS VERIFICAR PRUEBA DE TUBERIAS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION TUBERIAS VERIFICAR ESPESOR CAMA DE APOYO VERIFICAR PENDIENTE Y ALINEACIN TUBERIAS VERIFICAR PRUEBA DE TUBERIAS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 25 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
CC.25
10/5/2013
1.0
ACTIVIDAD: TRANSP. COLOCACION Y PRUEBA FECHA: ACTIVIDAD: TUBERIAS HDPE D=300mm RESPONSABLE: VICTORIA RODRIGUEZ VERSIN:
1 N 1 2 3 4 ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION TUBERIAS VERIFICAR ESPESOR CAMA DE APOYO VERIFICAR PENDIENTE Y ALINEACIN TUBERIAS VERIFICAR PRUEBA DE TUBERIAS E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3 4
ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION TUBERIAS VERIFICAR ESPESOR CAMA DE APOYO VERIFICAR PENDIENTE Y ALINEACIN TUBERIAS VERIFICAR PRUEBA DE TUBERIAS
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 26 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: MURO DE DESCARGA RESPONSABLE: VICTORIA RODRIGUEZ
CC.26
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR COLOCACION HORMIGON VERIFICAR ESPESORES Y LONGITUD E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR COLOCACION HORMIGON VERIFICAR ESPESORES Y LONGITUD
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 27 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: MURO DE BOCA RESPONSABLE: VICTORIA RODRIGUEZ
CC.27
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR COLOCACION HORMIGON VERIFICAR ESPESORES Y LONGITUD E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR COLOCACION HORMIGON VERIFICAR ESPESORES Y LONGITUD
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 28 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
CC.28
10/5/2013
1.0
ACTIVIDAD: PROFUNDIZACION Y PERFILAMIENTO FECHA: ACTIVIDAD: FOSO EXISTENTE RESPONSABLE: VICTORIA RODRIGUEZ VERSIN:
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR PROFUNDIDAD Y PERFIL VERIFICAR RETIRO EXCEDENTES E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR EXCAVACION VERIFICAR PROFUNDIDAD Y PERFIL VERIFICAR RETIRO EXCEDENTES
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 29 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: RELLENO FOSO EXISTENTE RESPONSABLE: VICTORIA RODRIGUEZ
CC.29
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 30 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SEAL SIGNO PARE RESPONSABLE: VICTORIA RODRIGUEZ
CC.30
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 31 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SEAL SIGNO CEDA EL PASO RESPONSABLE: VICTORIA RODRIGUEZ
CC.31
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 32 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: LINEA CENTRAL SEGMENTADA RESPONSABLE: VICTORIA RODRIGUEZ
CC.32
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR UBICACIN Y LONGITUD VERIFICAR PINTURA Y HERRAMIENTAS VERIFICAR ALINEAMIENTO E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR UBICACIN Y LONGITUD VERIFICAR PINTURA Y HERRAMIENTAS VERIFICAR ALINEAMIENTO
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 33 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: PASO DE CEBRA RESPONSABLE: VICTORIA RODRIGUEZ
CC.33
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR UBICACIN Y LONGITUD VERIFICAR PINTURA Y HERRAMIENTAS VERIFICAR ALINEAMIENTO E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR UBICACIN Y LONGITUD VERIFICAR PINTURA Y HERRAMIENTAS VERIFICAR ALINEAMIENTO
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 34 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SIMBOLO CEDA EL PASO RESPONSABLE: VICTORIA RODRIGUEZ
CC.34
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR UBICACIN Y LONGITUD VERIFICAR PINTURA Y HERRAMIENTAS VERIFICAR ALINEAMIENTO E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR UBICACIN Y LONGITUD VERIFICAR PINTURA Y HERRAMIENTAS VERIFICAR ALINEAMIENTO
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 35 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: SIMBOLO PARE RESPONSABLE: VICTORIA RODRIGUEZ
CC.35
FECHA: VERSIN:
10/5/2013
1.0
1 N 1 2 3 ELEMENTOS DE VERIFICACION: VERIFICAR UBICACIN Y LONGITUD VERIFICAR PINTURA Y HERRAMIENTAS VERIFICAR ALINEAMIENTO E I E
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
ELEMENTOS DE VERIFICACION: VERIFICAR UBICACIN Y LONGITUD VERIFICAR PINTURA Y HERRAMIENTAS VERIFICAR ALINEAMIENTO
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 36 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
ACTIVIDAD: TRASLADO DE POSTACION RESPONSABLE: VICTORIA RODRIGUEZ
CC.36
FECHA: VERSIN:
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
N 1 2 3
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 37 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
CC.37
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
HOJA N 38 de 38
CARTILLAS DE CONTROL
OBRA: COMUNA: CONTRATISTA: INSP. TECNICO: RESOLUCION: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT CONSTRUCTORA CONFE LTDA. SR. JUAN ARRIAGADA N 017 DEL 20/08/2013
CC.38
10/5/2013
1.0
2 I E
3 I E
4 I E
5 I E
6 I E
7 I E
8 I
TRAMOS 9 10 E I E I
11 E I
12 E I
13 E I
14 E I
15 E I
16 E I
17 E I
18 E I
19 E I
20 E I
21 E I
22 E I
23 E I
24 E I
25 E I
26 E I
27 E I
28 E I
29 E I
30 E I
31 E I
32 E I
33 E I
34 E I
35 E I
OBSERVACIONES
Fecha
Fecha
Fecha
Fecha
Fecha
PROFESIONAL RESIDENTE
ITO SERVIU
PROFESIONAL AUTOCONTROL
CR1
ETAPA:
N 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
ACTIVIDAD Corte Terraplen Suministro y colocacin de soleras Tipo A Suministro y colocacin de soleras especiales Base estabilizada e = 20 cm. Base estabilizada e = 5 cm. Calzada hcv e = 0,20 m. Veredas hc e = 0,07 m. Calzada hcv e = 0,15 m. Estabilizado e = 0,20 m. Csped en bandejn central y veredones Excavacin de zanja 0-2 m. Excavacin de zanja 2-4 m. Relleno de excavacines con arena Relleno de excavacines con material de exc. Retiro y transporte de excedentes Suministro tuberias de HDPE D= 600 mm. Suministro tuberias de HDPE D= 300 mm. Cmaras tipo A Tapas para cmara tipo calzada Suministro de escalines Sumidero Simple Tipo Serviu Dado refuerzo tuberas sumideros y colectores Tuberas de HDPE D= 600 mm. Tuberas de HDPE D= 300 mm. Muros de descarga Muros de boca ProfundIzacin y perfilamiento foso existente Relleno foso existente Seal Signo Pare Seal Signo Ceda el Paso
Linea Central Segmentada
TRAMOS 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Paso de Cebra
Smbolo Ceda el Paso Smbolo Pare
Prof. Residente
I.T.O. SERVIU
Prof. Autocontrol
CUADRO DE CUBICACIN
OBRA: COMUNA: CONSTRUCCION AV. NORTE-SUR 3, SECTOR ALERCE, PUERTO MONTT PUERTO MONTT
CONTRATISTA: CONSTRUCTORA CONFE LTDA. INSP. TECNICO: SR. JUAN ARRIAGADA RESOLUCION: N 017 DEL 20/08/2013
TRAMOS N ACTIVIDAD UN CANT. AVANCE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
I 1.1 1.2 II 2.1 2.2 III 3.1 3.2 IV 4.1 4.2 4.3 4.4 4.5 I 1.1 1.2 1.4 1.5 1.6 II 2.1 2.3 III 3.1 3.2 3.3 3.4 3.5 IV 4.1 4.3 V 5.1 5.2 5.3 5.4 I 1.1 1.2 II 2.1 2.2 2.3 2.4 I 1.1 1.2 1.3
OBRAS DE PAVIMENTACION MOVIMIENTO DE TIERRAS Corte m3 18445 Terraplen m3 765 SOLERAS Y PAVIMENTOS Y OTROS Suministro y colocacin de soleras Tipo A m 2774 Suministro y colocacin de soleras especiales m 32 BASES ESTABILIZADAS Base estabilizada e = 20 cm. m2 7065 Base estabilizada e = 5 cm. m2 4719 CALZADAS Calzada hcv e = 0,20 m. m2 5726 Veredas hc e = 0,07 m. m2 4719 Calzada hcv e = 0,15 m. m2 500 Estabilizado e = 0,20 m. m2 4544 Csped en bandejn central y veredones m2 11910 OBRAS DE AGUAS LLUVIAS MOVIMIENTO DE TIERRAS Excavacin de zanja 0-2 m. m3 362.3 Excavacin de zanja 2-4 m. m3 1987 Relleno de excavacines con arena m3 654 Relleno de excavac. con material de excavaciones m3 1695 Retiro y transporte de excedentes m3 904 SUMINISTRO DE TUBERIAS Suministro tuberias de HDPE D= 600 mm. ml 558 Suministro tuberias de HDPE D= 300 mm. ml 84 OBRAS DE HORMIGON Cmaras tipo a N 8 Tapas para cmara tipo calzada N 8 Suministro de escalines N 96 Sumidero Simple Tipo Serviu N 12 Dado refuerzo tuberas sumideros y colectores ml 42 TRANSP. INTERNO, COLOC. Y PRUEBAS DE TUBERIAS Tuberas de HDPE D= 600 mm. ml 548 Tuberas de HDPE D= 300 mm. ml 79 OBRAS VARIAS Muros de descarga N 2 Muros de boca N 2 Profundizacin y perfilamiento foso existente ml 448 Relleno foso existente ml 412 OBRAS DE SEALIZACION Y DEMARCACION SEALIZACION Seal Signo Pare N 4 Seal Signo Ceda el Paso N 6 DEMARCACION Linea Central Segmentada ml 704 Paso de Cebra m2 140 Smbolo Ceda el Paso N 6 Smbolo Pare N 4 OBRAS DE ALUMBRADO PUBLICO PROYECTO DE A. PUBLICO Traslado de Postacin N 13 Proyecto de Alumbrado Pblico GL 1 Ejecucin Proyecto de Alumbrado GL 1
- 458 1789 707 2321 767 524 1103 1210 2279 1637 1406 1076 227 1929 1012 249 130 227 122 13 24 81 324 161 284 161 378 60 210 105 210 105 270 80 320 140 280 140 360 80 32 384 128 280 128 64 360 80 378 128 280 128 58 360 80 320 140 280 140 360 80 320 140 280 140 360 80 561 127 488 127 231 80 320 140 280 140 360 80 320 140 280 140 360 80 80 80 80 80 320 140 280 140 360 80 320 140 280 140 360 82 325 143 285 143 360 80 -
82 -
80 -
80 -
80 -
80 -
80 -
80 -
80 -
80 -
88 -
80 -
80 -
80 -
80 -
80 -
60 -
81 -
397 404 407 320 128 128 128 140 280 280 280 280 128 128 128 140 77 84 87 360 360 360 360
153 309 140 140 113 140 140 140 186 140 140 140 140 140 105 161 268 186 140 140 140 140 140 105 161 129 280 280 280 280 280 210 280 231 350 350 350 350 350 270 378
551 35 143 140 140 140 140 113 140 140 140 130 285 280 280 280 280 280 280 280 280 212 350 350 350 350 350 350 350 350 350
33 180 60 162 83 61 1 1 12 60 2 41
23 125 41 107 58 41 40 40
23 125 41 107 58 41 40 40
23 125 41 107 58 41 1 1 12 40 40
23 125 41 107 58 41 40 40
23 125 41 107 58 41 1 1 12 40 9
27 150 50 132 67 41 7 1 1 12 2 7 40 7 40
23 125 41 107 58 41 40 40
13 75 22 56 29 7 12 1 1 12 2 7 7 11 -
12 74 23 55 27 18 2 7 17 -
2 7 -
12 74 23 55 27 18 17 -
12 74 23 55 27 18 2 7 17 1 -
1 -
1 40 28 1
30 -
40 -
1 40 1 -
1 40 1 -
40 -
40 -
2 40 84 2
40 -
40 -
1 40 1 -
2 40 2 -
1 40 1 -
40 -
40 -
40 -
41 -
1 33 28 1
Prof. Residente
I.T.O. SERVIU
Prof. Autocontrol