Você está na página 1de 3

POSITION CONTROL, BLOCK, PRS, UTS & FOIS RAJKOT DIVISION As on 28/04/14

( A ) TRAFFIC CONTROL CIRCUIT FAILURE POSITION


Sr No. Name of Control Sub - Section Duration CCT IN TIME and DATE CCT RT TIME and DATE Action taken

NIL

( B ) BLOCK FAILURE POSITION Sr No .


CCT IN TIME and DATE CCT RT TIME and DATE

Name of Section

Block - Section

Duration

Action taken

NIL

( C ) PRS FAILURE POSITION

Sr No.
1

Name of Location

CCT IN TIME and DATE

CCT RT TIME and DATE

Duration

Remarks

NIL

Note: - Channel Failure: Direct-00, Indirect-00, Total failure 00.

(D ) UTS FAILURE POSITION

1
Note: - Channel Failure Direct-00, Indirect-00, Total failure 00.

Page 1 of 3

( E ) FOIS FAILURE POSITION

Sr No.

Name of Location

CCT IN TIME and DATE

CCT RT TIME and DATE

Duration

Remarks

NIL

( F ) ISS/CCTV FAILURE POSITION Sr Name of Location No.


1 NIL

Gear failed

CCT IN TIME and DATE

CCT RT TIME and DATE

Duration

Action Taken

(G) 4 QUAD CABLE CUT POSITION Sr No. Name of Section Sub Section
CCT IN TIME and DATE CCT RT TIME and DATE

Duration

Action taken

NIL

(H) OFC SYSTEM FAILURE POSITION


CCT IN TIME and DATE CCT RT TIME and DATE

Sr No

Name of Section

Sub Section

Duration

Action taken

NIL

Page 2 of 3

(I) OTHER SERVICES FAILURE POSITION


CCT IN TIME and DATE CCT RT TIME and DATE

Sr No.

Name of Location

Duration

Remarks

1 ) Railnet 2)Byte Intercom 3) MMIS 4) 25 Watt VHF Set 5) NMS 6) MW/UHF 7) V-SAT 8) LC GATE 9) Exchanges : Main/intercom/ byte/WLL/DSLA M 10) Passenger Amenities (LA system, Clocks, indicators and Coach Guidance System) 11) Train Lost On Telecom Account.

NIL NIL NIL NIL NIL NIL NIL


NIL

NIL NIL

J.R. Parmar C.C.E. C.S.T.E. SSE/Tele/RJT

Page 3 of 3

Você também pode gostar