Harga Perkiraan Sendiri (HPS)
PEKERJAAN : PEMELIHARAAN GEDUNG DAN BANGUNAN BERUPA : PERBAIKAN GEDUNG KANTOR PUSAT
DAN PONDOK ASI
LOKASI
: Jl. Ir. Sutami No 36 Surakarta
TAHUN ANGGARAN : 2011
NO
1

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN JUMLAH HARGA


(RP)
(RP)
5
6

1.00
1.00
1.00

ls
ls
ls

300,000.00
750,000.00
500,000.00
JUMLAH I

300,000.00
750,000.00
500,000.00
1,550,000.00

1.00
43.00
43.00
43.00
22.40
555.00

ls
m2
m2
m2
m2
m2

250,000.00
4,000.00
21,218.52
11,746.17
26,298.79
8,428.35
JUMLAH II

250,000.00
172,000.00
912,396.36
505,085.12
589,092.84
4,677,732.59
7,106,306.90

I
1
2
3

PEKERJAAN PERSIAPAN
Pengukuran
Alat bantu kerja
Pembersihan

II
1
2
3
4
5
6

GEDUNG PONDOK ASI


Perbaikan genteng
Bongkar harflek
Pasang harflek
Cat harflek
Cat kayu ulang
Cat dinding & Plafond Ulang

III
A
1
2
3
4
5
6
7
8
9
10

GEDUNG KANTOR PUSAT


PEKERJAAN KAMAR MANDI
Perbaikan kebocoran
Bongkar plafond
Pasang rangka plafond
Pasang harflek
Pasang list profil
Cat plafond
Cat dinding ulang
Plituran ulang
Pasang rambu km Putra & Putri
Perbaikan daun pintu

1.00
21.15
21.15
21.15
41.70
21.15
36.96
36.40
10.00
2.00

ls
m2
m2
m2
m'
m2
m2
m2
bh
bh

650,000.00
7,500.00
125,494.75
21,218.52
13,000.00
11,746.17
8,428.35
28,289.05
25,000.00
150,000.00
JUMLAH A

650,000.00
158,625.00
2,654,213.96
448,771.70
542,100.00
248,431.40
311,511.71
1,029,721.35
250,000.00
300,000.00
6,593,375.11

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

PEKERJAAN KANTOR REKTOR


Bongkar dinding bata
1.00
Bongkar dinding gipsum
1.00
Bongkar wallpaper
115.31
Bongkar list dinding
43.50
Pasang C penutup pintu
9.04
Pasang C& penutup gipsum lobang pintu 15.00
Finishing abang pintu ke mushola
5.00
Pasang keramik esensa
1.00
Pasang tratag mushola
3.36
Pasang list kayu
14.50
Pasang list gipsum
59.00
Pasang GRC daun pintu
8.00
Pasang gipsum dinding dan plafond
18.80
Pasang list dinding bahan lama
43.50
Cat dinding mowilex
16.40

ls
ls
m2
m'
m2
m'
m'
m2
m2
m'
m'
m2
m2
m'
m2

125,000.00
300,000.00
7,500.00
4,000.00
60,000.00
50,000.00
40,000.00
181,451.05
338,891.97
13,500.00
26,955.32
21,218.52
30,101.40
7,500.00
24,697.35

125,000.00
300,000.00
864,825.00
174,000.00
542,400.00
750,000.00
200,000.00
181,451.05
1,138,677.02
195,750.00
1,590,363.88
169,748.16
565,906.32
326,250.00
405,036.49

16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

53

Cat dinding dan plafond ulang mowilex


305.00
Plituran list dan teakwood
18.24
Plituran ulang list dinding dan plafond
37.41
Pasang handdryer
2.00
Pasang wastafel
1.00
Pasang kran wastafel
1.00
Instalasi air bersih PVC 1/2'
28.00
Instalasi air bekas PVC 2"
8.00
Pasang pigura besar gambar presiden
2.00
Pasang pigura sedang gambar presiden
2.00
Pasang acrylic penutup lampu
20.00
Pasang teakwood
3.50
Bongkar plafond
5.76
Pasang rangka hollo galvanis
5.76
Perbaikan daun pintu rak
1.00
Pasang handle jendela
7.00
Pasang hak angin
14.00
Pasang grendel
7.00
Servis pintu alumunium
1.00
Pindah daun pintu
2.00
Pasang daun pintu alumunium
3.00
Pasang kaca pintu
1.70
Psang kaca meja
3.86
Pasang kaca jendela
1.65
Pasang engsel tanam
2.00
Pasang kunci rak
4.00
Pasang handle pintu stainlis
3.00
Pasang sun blust
1.72
Pasang moher
18.00
Pasang vetical blint R Sidang I
22.50
Pasang wallpaper R Kerja Rektor
107.27
Pasang wallpaper bahan lama
12.00
Pasang karpet
3.36
Pasang List Kayu Jati 2/5
6.60
Pasang Kayu Rangka Untuk Ukiran
5.04
Pasang Vertikal Blint R Kerja Rektor
25.76
List Jati Profil tinggi 12 cm R Sidang I
42.90
Buang bongkaran
1.00

C
1
2
3
4

PEKERJAAN PLAFOND
Bongkar plafond
Pasang rangka plafond
Pasang triplek 4 mm
Cat plafond

49

50
51

52

8.64
8.64
8.64
8.64

m2
m2
m2
bh
bh
bh
m'
m'
bh
bh
bh
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
bh
bh
unit
m2
m'
m2
m2
m2
m2

20,992.74
35,361.31
28,289.05
600,000.00
977,500.00
65,000.00
10,651.03
12,979.78
185,000.00
90,000.00
85,000.00
284,996.97
7,500.00
60,000.00
350,000.00
12,500.00
15,000.00
10,000.00
150,000.00
225,000.00
950,000.00
90,891.28
90,891.28
90,891.28
1,437,500.00
25,000.00
150,000.00
112,500.00
7,000.00
138,000.00
90,052.74
32,265.24
106,859.97
22,500.00
125,494.75
138,000.00
96,000.00
375,000.00
JUMLAH B

6,402,787.21
644,990.29
1,058,293.29
1,200,000.00
977,500.00
65,000.00
298,228.90
103,838.26
370,000.00
180,000.00
1,700,000.00
997,489.40
43,200.00
345,600.00
350,000.00
87,500.00
210,000.00
70,000.00
150,000.00
450,000.00
2,850,000.00
154,515.18
350,840.34
149,970.61
2,875,000.00
100,000.00
450,000.00
193,500.00
126,000.00
3,105,000.00
9,659,957.42
387,182.88
359,049.50
148,500.00
632,493.54
3,554,880.00
4,118,400.00
375,000.00
52,824,130.72

7,500.00
125,494.75
23,435.16
11,746.17
JUMLAH C
JUMLAH III

64,800.00
1,084,274.64
202,479.78
101,486.87
1,453,041.29
60,870,547.13

JUMLAH I-III
PPN 10 %
JUMLAH
PEMBULATAN

69,526,854.03
6,952,685.40
76,479,539.43
76,479,000.00

m`
m2
m2
m

ls

m2
m2
m2
m2

Menetapkan
Pejabat Pembuat Komitmen

Dra. Kartini Hariyati


NIP. 19570421 198403 2 002

NG KANTOR PUSAT

Lampiran : Surat Penawaran


NO
URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN JUMLAH HARGA


(RP)
(RP)
5
6

1.00
1.00
1.00

ls
ls
ls

300,000.00
750,000.00
500,000.00
JUMLAH I

300,000.00
750,000.00
500,000.00
1,550,000.00

1.00
43.00
43.00
43.00
22.40
555.00

ls
m2
m2
m2
m2
m2

200,000.00
4,000.00
21,218.52
11,746.17
26,298.79
8,428.35
JUMLAH II

200,000.00
172,000.00
912,396.36
505,085.12
589,092.84
4,677,732.59
7,056,306.90

1
I
1
2
3

2
PEKERJAAN PERSIAPAN
Pengukuran
Alat bantu kerja
Pembersihan

II
1
2
3
4
5
6

GEDUNG PONDOK ASI


Perbaikan genteng
Bongkar harflek
Pasang harflek
Cat harflek
Cat kayu ulang
Cat dinding & Plafond Ulang

III
A
1
2
3
4
5
6
7
8
9
10

GEDUNG KANTOR PUSAT


PEKERJAAN KAMAR MANDI
Perbaikan kebocoran
Bongkar plafond
Pasang rangka plafond
Pasang harflek
Pasang list profil
Cat plafond
Cat dinding ulang
Plituran ulang
Pasang rambu km Putra & Putri
Perbaikan daun pintu

1.00
21.15
21.15
21.15
41.70
21.15
36.96
36.40
10.00
2.00

ls
m2
m2
m2
m'
m2
m2
m2
bh
bh

400,000.00
7,500.00
125,494.75
21,218.52
13,000.00
11,746.17
8,428.35
28,289.05
25,000.00
200,000.00
JUMLAH A

400,000.00
158,625.00
2,654,213.96
448,771.70
542,100.00
248,431.40
311,511.71
1,029,721.35
250,000.00
400,000.00
6,443,375.11

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

PEKERJAAN KANTOR REKTOR


Bongkar dinding bata
1.00
Bongkar dinding gipsum
1.00
Bongkar wallpaper
115.31
Bongkar list dinding
43.50
Pasang C penutup pintu
9.04
Pasang C& penutup gipsum lobang pintu 15.00
Finishing abang pintu ke mushola
5.00
Pasang keramik esensa
1.00
Pasang tratag mushola
3.36
Pasang list kayu
14.50
Pasang list gipsum
59.00
Pasang GRC daun pintu
8.00
Pasang gipsum dinding dan plafond
18.80
Pasang list dinding bahan lama
43.50
Cat dinding mowilex
16.40
Cat dinding dan plafond ulang mowilex 305.00
Plituran list dan teakwood
18.24

ls
ls
m2
m'
m2
m'
m'
m2
m2
m'
m'
m2
m2
m'
m2
m2
m2

125,000.00
200,000.00
7,500.00
4,000.00
60,000.00
50,000.00
40,000.00
181,451.05
338,891.97
13,500.00
26,955.32
21,218.52
30,101.40
7,500.00
24,697.35
20,992.74
35,361.31

125,000.00
200,000.00
864,825.00
174,000.00
542,400.00
750,000.00
200,000.00
181,451.05
1,138,677.02
195,750.00
1,590,363.88
169,748.16
565,906.32
326,250.00
405,036.49
6,402,787.21
644,990.29

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

Plituran ulang list dinding dan plafond


Pasang handdryer
Pasang wastafel
Pasang kran wastafel
Instalasi air bersih PVC 1/2'
Instalasi air bekas PVC 2"
Pasang pigura besar gambar presiden
Pasang pigura sedang gambar presiden
Pasang acrylic penutup lampu
Pasang teakwood
Bongkar plafond
Pasang rangka hollo galvanis
Perbaikan daun pintu rak
Pasang handle jendela
Pasang hak angin
Pasang grendel
Servis pintu alumunium
Pindah daun pintu
Pasang daun pintu alumunium
Pasang kaca pintu
Psang kaca meja
Pasang kaca jendela
Pasang engsel tanam
Pasang kunci rak
Pasang handle pintu stainlis
Pasang sun blust
Pasang moher
Pasang vetical blint R Sidang I
Pasang wallpaper R Kerja Rektor
Pasang wallpaper bahan lama
Pasang karpet
Pasang List Kayu Jati 2/5
Pasang Kayu Rangka Untuk Ukiran
Pasang Vertikal Blint R Kerja Rektor
List Jati Profil tinggi 12 cm R Sidang I
Buang bongkaran

C
1
2
3
4

PEKERJAAN PLAFOND
Bongkar plafond
Pasang rangka plafond
Pasang triplek 4 mm
Cat plafond

37.41
2.00
1.00
1.00
28.00
8.00
2.00
2.00
20.00
3.50
5.76
5.76
1.00
7.00
14.00
7.00
1.00
2.00
3.00
1.70
3.86
1.65
2.00
4.00
3.00
1.72
18.00
22.50
107.27
12.00
3.36
6.60
5.04
25.76
42.90
1.00

m2
bh
bh
bh
m'
m'
bh
bh
bh
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
bh
bh
unit
m2
m'
m2
m2
m2
m2
m`
m2
m2
m
ls

28,289.05
650,000.00
977,500.00
65,000.00
10,651.03
12,979.78
185,000.00
90,000.00
85,000.00
284,996.97
7,500.00
60,000.00
250,000.00
12,500.00
15,000.00
10,000.00
125,000.00
225,000.00
850,000.00
90,891.28
90,891.28
90,891.28
1,437,500.00
25,000.00
100,000.00
112,500.00
7,000.00
138,000.00
90,052.74
32,265.24
106,859.97
22,500.00
125,494.75
138,000.00
96,000.00
400,000.00
JUMLAH B

1,058,293.29
1,300,000.00
977,500.00
65,000.00
298,228.90
103,838.26
370,000.00
180,000.00
1,700,000.00
997,489.40
43,200.00
345,600.00
250,000.00
87,500.00
210,000.00
70,000.00
125,000.00
450,000.00
2,550,000.00
154,515.18
350,840.34
149,970.61
2,875,000.00
100,000.00
300,000.00
193,500.00
126,000.00
3,105,000.00
9,659,957.42
387,182.88
359,049.50
148,500.00
632,493.54
3,554,880.00
4,118,400.00
400,000.00
52,274,124.72

8.64
8.64
8.64
8.64

m2
m2
m2
m2

7,500.00
125,494.75
23,435.16
11,746.17
JUMLAH C
JUMLAH III

64,800.00
1,084,274.64
202,479.78
101,486.87
1,453,041.29
60,170,541.13

JUMLAH I-III
PPN 10 %
JUMLAH
PEMBULATAN

68,776,848.03
6,877,684.80
75,654,532.83
75,654,000.00

CV. Fani Solo Raya

Sudarman, S.Pd, ST, MT


Direktur

NO
1

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN JUMLAH HARGA


(RP)
(RP)
5
6

1.00
1.00
1.00

ls
ls
ls

300,000.00
750,000.00
500,000.00
JUMLAH I

300,000.00
750,000.00
500,000.00
1,550,000.00

1.00
43.00
43.00
43.00
22.40
555.00

ls
m2
m2
m2
m2
m2

200,000.00
4,000.00
21,218.52
11,746.17
26,298.79
8,428.35
JUMLAH II

200,000.00
172,000.00
912,396.36
505,085.12
589,092.84
4,677,732.59
7,056,306.90

I
1
2
3

PEKERJAAN PERSIAPAN
Pengukuran
Alat bantu kerja
Pembersihan

II
1
2
3
4
5
6

GEDUNG PONDOK ASI


Perbaikan genteng
Bongkar harflek
Pasang harflek
Cat harflek
Cat kayu ulang
Cat dinding & Plafond Ulang

III
A
1
2
3
4
5
6
7
8
9
10

GEDUNG KANTOR PUSAT


PEKERJAAN KAMAR MANDI
Perbaikan kebocoran
Bongkar plafond
Pasang rangka plafond
Pasang harflek
Pasang list profil
Cat plafond
Cat dinding ulang
Plituran ulang
Pasang rambu km Putra & Putri
Perbaikan daun pintu

1.00
21.15
21.15
21.15
41.70
21.15
36.96
36.40
10.00
2.00

ls
m2
m2
m2
m'
m2
m2
m2
bh
bh

400,000.00
7,500.00
125,494.75
21,218.52
13,000.00
11,746.17
8,428.35
28,289.05
25,000.00
150,000.00
JUMLAH A

400,000.00
158,625.00
2,654,213.96
448,771.70
542,100.00
248,431.40
311,511.71
1,029,721.35
250,000.00
300,000.00
6,343,375.11

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

PEKERJAAN KANTOR REKTOR


Bongkar dinding bata
1.00
Bongkar dinding gipsum
1.00
Bongkar wallpaper
115.31
Bongkar list dinding
43.50
Pasang C penutup pintu
9.04
Pasang C& penutup gipsum lobang pintu 15.00
Finishing abang pintu ke mushola
5.00
Pasang keramik esensa
1.00
Pasang tratag mushola
3.36
Pasang list kayu
14.50
Pasang list gipsum
59.00
Pasang GRC daun pintu
8.00
Pasang gipsum dinding dan plafond
18.80
Pasang list dinding bahan lama
43.50
Cat dinding mowilex
16.40

ls
ls
m2
m'
m2
m'
m'
m2
m2
m'
m'
m2
m2
m'
m2

125,000.00
200,000.00
7,500.00
4,000.00
60,000.00
50,000.00
40,000.00
181,451.05
338,891.97
13,500.00
26,955.32
21,218.52
30,101.40
7,500.00
24,697.35

125,000.00
200,000.00
864,825.00
174,000.00
542,400.00
750,000.00
200,000.00
181,451.05
1,138,677.02
195,750.00
1,590,363.88
169,748.16
565,906.32
326,250.00
405,036.49

16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

53

Cat dinding dan plafond ulang mowilex


305.00
Plituran list dan teakwood
18.24
Plituran ulang list dinding dan plafond
37.41
Pasang handdryer
2.00
Pasang wastafel
1.00
Pasang kran wastafel
1.00
Instalasi air bersih PVC 1/2'
28.00
Instalasi air bekas PVC 2"
8.00
Pasang pigura besar gambar presiden
2.00
Pasang pigura sedang gambar presiden
2.00
Pasang acrylic penutup lampu
20.00
Pasang teakwood
3.50
Bongkar plafond
5.76
Pasang rangka hollo galvanis
5.76
Perbaikan daun pintu rak
1.00
Pasang handle jendela
7.00
Pasang hak angin
14.00
Pasang grendel
7.00
Servis pintu alumunium
1.00
Pindah daun pintu
2.00
Pasang daun pintu alumunium
3.00
Pasang kaca pintu
1.70
Psang kaca meja
3.86
Pasang kaca jendela
1.65
Pasang engsel tanam
2.00
Pasang kunci rak
4.00
Pasang handle pintu stainlis
3.00
Pasang sun blust
1.72
Pasang moher
18.00
Pasang vetical blint R Sidang I
22.50
Pasang wallpaper R Kerja Rektor
107.27
Pasang wallpaper bahan lama
12.00
Pasang karpet
3.36
Pasang List Kayu Jati 2/5
6.60
Pasang Kayu Rangka Untuk Ukiran
5.04
Pasang Vertikal Blint R Kerja Rektor
25.76
List Jati Profil tinggi 12 cm R Sidang I
42.90
Buang bongkaran
1.00

C
1
2
3
4

PEKERJAAN PLAFOND
Bongkar plafond
Pasang rangka plafond
Pasang triplek 4 mm
Cat plafond

49

50
51

52

8.64
8.64
8.64
8.64

m2
m2
m2
bh
bh
bh
m'
m'
bh
bh
bh
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
bh
bh
unit
m2
m'
m2
m2
m2
m2

20,992.74
35,361.31
28,289.05
600,000.00
977,500.00
65,000.00
10,651.03
12,979.78
185,000.00
90,000.00
85,000.00
284,996.97
7,500.00
60,000.00
250,000.00
12,500.00
15,000.00
10,000.00
125,000.00
225,000.00
850,000.00
90,891.28
90,891.28
90,891.28
1,437,500.00
25,000.00
100,000.00
112,500.00
7,000.00
138,000.00
90,052.74
32,265.24
106,859.97
22,500.00
125,494.75
138,000.00
96,000.00
375,000.00
JUMLAH B

6,402,787.21
644,990.29
1,058,293.29
1,200,000.00
977,500.00
65,000.00
298,228.90
103,838.26
370,000.00
180,000.00
1,700,000.00
997,489.40
43,200.00
345,600.00
250,000.00
87,500.00
210,000.00
70,000.00
125,000.00
450,000.00
2,550,000.00
154,515.18
350,840.34
149,970.61
2,875,000.00
100,000.00
300,000.00
193,500.00
126,000.00
3,105,000.00
9,659,957.42
387,182.88
359,049.50
148,500.00
632,493.54
3,554,880.00
4,118,400.00
375,000.00
52,149,130.72

7,500.00
125,494.75
23,435.16
11,746.17
JUMLAH C
JUMLAH III

64,800.00
1,084,274.64
202,479.78
101,486.87
1,453,041.29
59,945,547.13

JUMLAH I-III
PPN 10 %
JUMLAH
PEMBULATAN

68,551,854.03
6,855,185.40
75,407,039.43
75,407,000.00

m`
m2
m2
m

ls

m2
m2
m2
m2

Lampiran : Berita Acara Pemeriksaan/ Penerimaan Pekerjaan


NO
1

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN JUMLAH HARGA


(RP)
(RP)
5
6

1.00
1.00
1.00

ls
ls
ls

300,000.00
750,000.00
500,000.00
JUMLAH I

300,000.00
750,000.00
500,000.00
1,550,000.00

1.00
43.00
43.00
43.00
22.40
555.00

ls
m2
m2
m2
m2
m2

200,000.00
4,000.00
21,218.52
11,746.17
26,298.79
8,428.35
JUMLAH II

200,000.00
172,000.00
912,396.36
505,085.12
589,092.84
4,677,732.59
7,056,306.90

I
1
2
3

PEKERJAAN PERSIAPAN
Pengukuran
Alat bantu kerja
Pembersihan

II
1
2
3
4
5
6

GEDUNG PONDOK ASI


Perbaikan genteng
Bongkar harflek
Pasang harflek
Cat harflek
Cat kayu ulang
Cat dinding & Plafond Ulang

III
A
1
2
3
4
5
6
7
8
9
10

GEDUNG KANTOR PUSAT


PEKERJAAN KAMAR MANDI
Perbaikan kebocoran
Bongkar plafond
Pasang rangka plafond
Pasang harflek
Pasang list profil
Cat plafond
Cat dinding ulang
Plituran ulang
Pasang rambu km Putra & Putri
Perbaikan daun pintu

1.00
21.15
21.15
21.15
41.70
21.15
36.96
36.40
10.00
2.00

ls
m2
m2
m2
m'
m2
m2
m2
bh
bh

400,000.00
7,500.00
125,494.75
21,218.52
13,000.00
11,746.17
8,428.35
28,289.05
25,000.00
150,000.00
JUMLAH A

400,000.00
158,625.00
2,654,213.96
448,771.70
542,100.00
248,431.40
311,511.71
1,029,721.35
250,000.00
300,000.00
6,343,375.11

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

PEKERJAAN KANTOR REKTOR


Bongkar dinding bata
1.00
Bongkar dinding gipsum
1.00
Bongkar wallpaper
115.31
Bongkar list dinding
43.50
Pasang C penutup pintu
9.04
Pasang C& penutup gipsum lobang pintu 15.00
Finishing abang pintu ke mushola
5.00
Pasang keramik esensa
1.00
Pasang tratag mushola
3.36
Pasang list kayu
14.50
Pasang list gipsum
59.00
Pasang GRC daun pintu
8.00
Pasang gipsum dinding dan plafond
18.80
Pasang list dinding bahan lama
43.50
Cat dinding mowilex
16.40
Cat dinding dan plafond ulang mowilex
305.00
Plituran list dan teakwood
18.24
Plituran ulang list dinding dan plafond
37.41
Pasang handdryer
2.00
Pasang wastafel
1.00
Pasang kran wastafel
1.00
Instalasi air bersih PVC 1/2'
28.00
Instalasi air bekas PVC 2"
8.00
Pasang pigura besar gambar presiden
2.00
Pasang pigura sedang gambar presiden
2.00
Pasang acrylic penutup lampu
20.00
Pasang teakwood
3.50
Bongkar plafond
5.76
Pasang rangka hollo galvanis
5.76
Perbaikan daun pintu rak
1.00
Pasang handle jendela
7.00
Pasang hak angin
14.00

ls
ls
m2
m'
m2
m'
m'
m2
m2
m'
m'
m2
m2
m'
m2
m2
m2
m2
bh
bh
bh
m'
m'
bh
bh
bh
m2
m2
m2
bh
bh
bh

125,000.00
200,000.00
7,500.00
4,000.00
60,000.00
50,000.00
40,000.00
181,451.05
338,891.97
13,500.00
26,955.32
21,218.52
30,101.40
7,500.00
24,697.35
20,992.74
35,361.31
28,289.05
600,000.00
977,500.00
65,000.00
10,651.03
12,979.78
185,000.00
90,000.00
85,000.00
284,996.97
7,500.00
60,000.00
250,000.00
12,500.00
15,000.00

125,000.00
200,000.00
864,825.00
174,000.00
542,400.00
750,000.00
200,000.00
181,451.05
1,138,677.02
195,750.00
1,590,363.88
169,748.16
565,906.32
326,250.00
405,036.49
6,402,787.21
644,990.29
1,058,293.29
1,200,000.00
977,500.00
65,000.00
298,228.90
103,838.26
370,000.00
180,000.00
1,700,000.00
997,489.40
43,200.00
345,600.00
250,000.00
87,500.00
210,000.00

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

Pasang grendel
Servis pintu alumunium
Pindah daun pintu
Pasang daun pintu alumunium
Pasang kaca pintu
Psang kaca meja
Pasang kaca jendela
Pasang engsel tanam
Pasang kunci rak
Pasang handle pintu stainlis
Pasang sun blust
Pasang moher
Pasang vetical blint R Sidang I
Pasang wallpaper R Kerja Rektor
Pasang wallpaper bahan lama
Pasang karpet

49

Pasang List Kayu Jati 2/5

50 Pasang Kayu Rangka Untuk Ukiran


51

Pasang Vertikal Blint R Kerja Rektor

52 List Jati Profil tinggi 12 cm R Sidang I


53 Buang bongkaran

C
1
2
3
4

PEKERJAAN PLAFOND
Bongkar plafond
Pasang rangka plafond
Pasang triplek 4 mm
Cat plafond

Pihak Kedua

7.00
1.00
2.00
3.00
1.70
3.86
1.65
2.00
4.00
3.00
1.72
18.00
22.50
107.27
12.00
3.36
6.60
5.04
25.76
42.90
1.00

bh
bh
bh
bh
m2
m2
m2
bh
bh
unit
m2
m'
m2
m2
m2
m2

8.64
8.64
8.64
8.64

m2
m2
m2
m2

m`
m2
m2
m

ls

70,000.00
125,000.00
450,000.00
2,550,000.00
154,515.18
350,840.34
149,970.61
2,875,000.00
100,000.00
300,000.00
193,500.00
126,000.00
3,105,000.00
9,659,957.42
387,182.88
359,049.50
148,500.00
632,493.54
3,554,880.00
4,118,400.00
375,000.00
52,149,124.72

7,500.00
125,494.75
23,435.16
11,746.17
JUMLAH C
JUMLAH III

64,800.00
1,084,274.64
202,479.78
101,486.87
1,453,041.29
59,945,541.13

JUMLAH I-III
PPN 10 %
JUMLAH
PEMBULATAN

68,551,848.03
6,855,184.80
75,407,032.83
75,407,000.00

Panitia Pemeriksa / Penerima Menetapkan


1. Mugiman, ST,MT
Ketua : .............
2. Widyatmoko,SH,MM

Sudarman, S.Pd, ST, MT


Direktur CV. Fani Solo Raya

10,000.00
125,000.00
225,000.00
850,000.00
90,891.28
90,891.28
90,891.28
1,437,500.00
25,000.00
100,000.00
112,500.00
7,000.00
138,000.00
90,052.74
32,265.24
106,859.97
22,500.00
125,494.75
138,000.00
96,000.00
375,000.00
JUMLAH B

Sekretaris : .............

3. Drs. Sutrisno

Anggota : .............

Mengetahui
Pejabat Pembuat Komitmen

Dra. Kartini Hariyati


NIP. 19570421 198403 2 002

Lampiran : Dokumen Pengadaan


NO
1

URAIAN PEKERJAAN

VOLUME

SAT

1.00
1.00
1.00

ls
ls
ls

I
1
2
3

PEKERJAAN PERSIAPAN
Pengukuran
Alat bantu kerja
Pembersihan

II
1
2
3
4
5
6

GEDUNG PONDOK ASI


Perbaikan genteng
Bongkar harflek
Pasang harflek
Cat harflek
Cat kayu ulang
Cat dinding & Plafond Ulang

III
A
1
2
3
4
5
6
7
8
9
10

GEDUNG KANTOR PUSAT


PEKERJAAN KAMAR MANDI
Perbaikan kebocoran
Bongkar plafond
Pasang rangka plafond
Pasang harflek
Pasang list profil
Cat plafond
Cat dinding ulang
Plituran ulang
Pasang rambu km Putra & Putri
Perbaikan daun pintu

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

1.00
43.00
43.00
43.00
22.40
555.00

ls
m2
m2
m2
m2
m2

1.00
21.15
21.15
21.15
41.70
21.15
36.96
36.40
10.00
2.00

ls
m2
m2
m2
m'
m2
m2
m2
bh
bh

PEKERJAAN KANTOR REKTOR


Bongkar dinding bata
1.00
Bongkar dinding gipsum
1.00
Bongkar wallpaper
115.31
Bongkar list dinding
43.50
Pasang C penutup pintu
9.04
Pasang C& penutup gipsum lobang pintu 15.00
Finishing abang pintu ke mushola
5.00
Pasang keramik esensa
1.00
Pasang tratag mushola
3.36
Pasang list kayu
14.50
Pasang list gipsum
59.00
Pasang GRC daun pintu
8.00
Pasang gipsum dinding dan plafond
18.80
Pasang list dinding bahan lama
43.50
Cat dinding mowilex
16.40
Cat dinding dan plafond ulang mowilex
305.00
Plituran list dan teakwood
18.24
Plituran ulang list dinding dan plafond
37.41
Pasang handdryer
2.00
Pasang wastafel
1.00
Pasang kran wastafel
1.00
Instalasi air bersih PVC 1/2'
28.00
Instalasi air bekas PVC 2"
8.00

ls
ls
m2
m'
m2
m'
m'
m2
m2
m'
m'
m2
m2
m'
m2
m2
m2
m2
bh
bh
bh
m'
m'

HARGA SATUANJUMLAH HARGA


(RP)
(RP)
5
6

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

53

Pasang pigura besar gambar presiden


2.00
Pasang pigura sedang gambar presiden
2.00
Pasang acrylic penutup lampu
20.00
Pasang teakwood
3.50
Bongkar plafond
5.76
Pasang rangka hollo galvanis
5.76
Perbaikan daun pintu rak
1.00
Pasang handle jendela
7.00
Pasang hak angin
14.00
Pasang grendel
7.00
Servis pintu alumunium
1.00
Pindah daun pintu
2.00
Pasang daun pintu alumunium
3.00
Pasang kaca pintu
1.70
Psang kaca meja
3.86
Pasang kaca jendela
1.65
Pasang engsel tanam
2.00
Pasang kunci rak
4.00
Pasang handle pintu stainlis
3.00
Pasang sun blust
1.72
Pasang moher
18.00
Pasang vetical blint R Sidang I
22.50
Pasang wallpaper R Kerja Rektor
107.27
Pasang wallpaper bahan lama
12.00
Pasang karpet
3.36
Pasang List Kayu Jati 2/5
6.60
Pasang Kayu Rangka Untuk Ukiran
5.04
Pasang Vertikal Blint R Kerja Rektor
25.76
List Jati Profil tinggi 12 cm R Sidang I
42.90
Buang bongkaran
1.00

C
1
2
3
4

PEKERJAAN PLAFOND
Bongkar plafond
Pasang rangka plafond
Pasang triplek 4 mm
Cat plafond

49

50
51

52

8.64
8.64
8.64
8.64

bh
bh
bh
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
bh
bh
unit
m2
m'
m2
m2
m2
m2
m`
m2
m2
m

ls

m2
m2
m2
m2

Pejabat Pengadaan

Rusdia Rasih Hendrato, SH


NIP. 19600905 198903 1 001

Dinas Pekerjaan Umum Kota Surakarta

HARGA SATUAN PEKERJAAN


PEKERJAAN : PEMELIHARAAN GEDUNG DAN BANGUNAN BERUPA : PERBAIKAN
GEDUNG KANTOR PUSAT DAN PONDOK ASI
TAHUN ANGGARAN : 2012

No.

Harga Satuan (Rp.)

Uraian

A.

PEKERJAAN PERSIAPAN :

1 m2 Membuat Stegger dari bambu Uk (40x50x20) cm

B.

PEKERJAAN TANAH :

Upah

Bahan

Alat

Pekerjaan

9,532.11

10,350.00

19,882.11

Menggali 1 m tanah biasa sedalam 1 meter

25,089.75

25,089.75

Menggali 1 m tanah biasa sedalam 2 meter

30,844.80

30,844.80

Membuang 1 m tanah sejauh 30 meter

10,990.35

10,990.35

Mengurug kembali 1 m galian

8,363.25

8,363.25

Mengurug 1 m pasir urug

10,035.90

84,000.00

94,035.90

Mengurug 1 m sirtu padat untuk peniggian lantai bangunan

9,182.25

108,000.00

117,182.25

C.

PEKERJAAN PONDASI :

Memasang 1 m pondasi batu belah, campuran 1 PC : 4 PP

80,375.40

374,950.00

455,325.40

Memasang 1 m batu kosong ( aanstamping )

45,560.97

182,040.00

227,600.97

D.

PEKERJAAN DINDING :

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata,

30,219.00

111,247.50

141,466.50

30,219.00

97,377.50

127,596.50

30,219.00

93,710.00

123,929.00

30,219.00

91,825.00

122,044.00

15,109.50

49,188.50

64,298.00

15,109.50

46,475.00

61,584.50

15,109.50

44,764.00

59,873.50

15,109.50

43,736.00

58,845.50

15,109.50

41,925.00

57,034.50

campuran spesi 1 PC : 3 PP
2

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata,


campuran spesi 1 PC : 4 PP

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata,


campuran spesi 1 PC : 5 PP

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata,


campuran spesi 1 PC : 6 PP

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata,


campuran spesi 1 PC : 3 PP

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata,


campuran spesi 1 PC : 4 PP

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata,


campuran spesi 1 PC : 5 PP

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata,


campuran spesi 1 PC : 6 PP

Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata,


campuran spesi 1 PC : 8 PP

13

Dinas Pekerjaan Umum Kota Surakarta

No.

Harga Satuan (Rp.)

Uraian

Upah

Bahan

Alat

Pekerjaan

E.

PEKERJAAN PLESTERAN :

Memasang 1 m plesteran 1PC : 2 PP, tebal 20 mm

18,566.52

17,013.60

35,580.12

Memasang 1 m plesteran 1PC : 3 PP, tebal 20 mm

18,566.52

13,986.40

32,552.92

Memasang 1 m plesteran 1PC : 4 PP, tebal 20 mm

18,566.52

11,936.00

30,502.52

Memasang 1 m plesteran 1PC : 5 PP, tebal 20 mm

18,566.52

10,757.60

29,324.12

Memasang 1 m plesteran 1 PC : 4 PP, tebal 30 mm

22,987.65

16,149.00

39,136.65

Memasang 1 m beraben 1 PC : 5 PP, tebal 15 mm

8,544.90

8,043.20

16,588.10

Memasang 1 m plesteran skoning 1 PC : 2 PP, tabal 10 mm

5,426.93

725.00

6,151.93

Memasang 1 m plesteran ciprat 1 PC : 2 PP

13,420.47

5,136.00

18,556.47

17,040.66

7,857.00

24,897.66

9,993.27

3,412.50

13,405.77

Memasang 1 m finishing siar pasangan batu kali adukan 1 PC : 2 PP

10

Memasang 1 m acian

F.

PEKERJAAN KAYU :

Membuat dan memasang 1 m kusen pintu & kusen jendela, ky. Kelas I

1,292,592.00

19,261,500.00

20,554,092.00

Membuat dan memasang 1 m kusen pintu & kusen jendela, ky. Kelas II/III

1,292,592.00

8,891,500.00

10,184,092.00

Membuat dan memasang 1 m daun pintu panil, kayu kelas I atau II

170,142.00

825,750.00

995,892.00

Membuat dan memasang 1 m pintu dan jendela kaca, kayu kelas I atau II

136,113.60

495,450.00

631,563.60

Membuat 1 m daun pintu kayu lapis (plywood) rangkap, rangka tertutup

129,259.20

299,345.00

428,604.20

kayu kelas II ( lebar sampai 90 cm)


6

Membuat 1 m pintu plywood rangkap, rangkap expose kayu kelas I atau II

136,113.60

576,895.00

713,008.60

Memasang 1 m teakwood rangkap, rangkap expose kayu kelas I

136,113.60

562,295.00

698,408.60

Memasang 1 m teakwood rangkap lapis formika, rangka expose ky. kelas II

163,287.60

302,795.00

466,082.60

Memasang 1 m konstruksi kuda-kuda konvensional, kayu kelas I bentang 6

1,292,592.00

10,422,950.00

11,715,542.00

10

Memasang 1 m Rangka plafond kayu bangkirai

22,044.75

103,450.00

125,494.75

11

Memasang 1 m konstruksi gordeng , kayu kelas II

473,558.40

9,535,250.00

10,008,808.40

12

Memasang 1 m rangka atap genteng keramik, kayu kelas II

8,862.00

72,072.50

80,934.50

13

Memasang 1 m rangka atap genteng beton, kayu kelas II

8,862.00

119,725.00

128,587.00

14

Memasang 1 m lysplank ukuran (3x20) cm, kayu kelas I atau kelas II

14,557.20

104,536.00

119,093.20

15

Memasang 1 m lysplank ukuran (3x30) cm, kayu kelas I atau kelas II

14,296.80

226,190.00

240,486.80

16

Memasang 1 m rangka dinding pemisah (60x120) cm kayu kelas II atau III

29,621.97

209,270.00

238,891.97

17

Memasang 1 m dinding pemisah teakwood rangkap, rangka kayu kelas II

29,621.97

255,375.00

284,996.97

18

Memasang 1 m dinding pemisah plywood rangkap, rangka kayu kelas II

39,463.20

255,375.00

294,838.20

G.

PEKERJAAN BETON :

Membuat 1 m beton mutu f'c = 19,3 MPa ( K.225 ),

68,495.70

563,951.19

632,446.89

68,495.70

576,240.87

644,736.57

68,495.70

597,267.86

665,763.56

68,495.70

603,826.59

672,322.29

88,868.85

628,595.63

717,464.48

88,868.85

637,143.25

726,012.10

5,803.14

101,130.00

106,933.14

31,951.92

90,160.00

122,111.92

slump (12 2) cm, w/c = 0,58


2

Membuat 1 m beton mutu f'c = 21,7 MPa ( K.250 ),


slump (12 2) cm, w/c = 0,56

Membuat 1 m beton mutu f'c = 24,0 MPa ( K.275 ),


slump (12 2) cm, w/c = 0,53

Membuat 1 m beton mutu f'c = 26,4 MPa ( K.300 ),


slump (12 2) cm, w/c = 0,52

Membuat 1 m beton mutu f'c = 28,8 MPa ( K.325 ),


slump (12 2) cm, w/c = 0,49

Membuat 1 m beton mutu f'c = 31,2 MPa ( K.350 ),


slump (12 2) cm, w/c = 0,48

Pembesian per 10 kg besi polos atau besi ulir

Memasang 1 m bekisting untuk pondasi

14

Dinas Pekerjaan Umum Kota Surakarta

No.

Harga Satuan (Rp.)

Uraian
Upah
3

Bahan

Alat

Pekerjaan

Memasang 1 m bekisting untuk sloof

31,951.92

100,797.50

132,749.42

10

Memasang 1 m bekisting untuk kolom

40,554.36

213,785.00

254,339.36

11

Memasang 1 m bekisting untuk balok

40,554.36

226,205.00

266,759.36

12

Memasang 1 m bekisting untuk lantai

40,554.36

243,685.00

284,239.36

13

Memasang 1 m bekisting untuk dinding

40,554.36

246,265.00

286,819.36

14

Memasang 1 m bekisting untuk tangga

40,554.36

14,950.00

55,504.36

15

Membuat 1 m pondasi beton bertulang ( 150 kg besi + bekisting )

316,627.19

2,501,580.00

2,818,207.19

16

Membuat 1 m sloof beton bertulang ( 200 kg besi + bekisting )

359,777.99

3,165,245.00

3,525,022.99

17

Membuat 1 m balok beton bertulang ( 200 kg besi + bekisting )

388,711.79

4,351,620.00

4,740,331.79

18

Membuat 1 m kolom beton bertulang ( 150 kg besi + bekisting )

316,783.43

3,882,770.00

4,199,553.43

19

Membuat 1 m dinding beton bertulang ( 150 kg besi + bekisting )

316,627.19

3,818,370.00

4,134,997.19

20

Membuat 1 m dinding beton bertulang ( 200 kg besi + bekisting )

364,200.59

3,998,315.00

4,362,515.59

21

Membuat 1 m' kolom praktis beton bertulang ( 11 x 11 ) cm

9,198.84

44,675.00

53,873.84

22

Membuat 1 m' ring balok beton bertulang ( 10 x 15 ) cm

15,190.67

50,342.50

65,533.17

23

Memasang 1 m beton dengan spesi 1 PC : 2 Ps : 3 Kr

68,495.70

529,100.00

597,595.70

24

Memasang 1 m beton dengan spesi 1 PC : 3 Ps : 5 Kr

68,495.70

403,100.00

471,595.70

25

1 m' Pasang begesting untuk penutup plat beton penutup saluran

6,462.96

64,866.00

71,328.96

H.

PEKERJAAN PENUTUP ATAP :

1 m2 Pasang atap genteng plentong kecil

9,267.51

35,000.00

44,267.51

1 m2 Pasang atap genteng pres lokal

9,267.51

22,500.00

31,767.51

1 m2 Pasang atap genteng plentong besar

8,426.25

25,200.00

33,626.25

1 m2 Pasang genteng bumbung plentong

23,693.88

41,600.00

65,293.88

1 m2 Pasang bumbung genteng plentong besar

23,693.88

35,600.00

59,293.88

1 m2 Pasang Atap Asbes gelombang mini ( 2,40 x 1,05 m)

8,455.02

27,700.00

36,155.02

1 m' Pasang atap asbes gelombang besar ( 2,40 x 1,08)

8,455.02

38,372.00

46,827.02

1 m' Pasang atap asbes gelombang besar ( 1,80 x 1,08)

8,455.02

40,419.00

48,874.02

1 m' Pasang Nok stel gelombang 1,05 m

15,781.92

175,545.00

191,326.92

10

1 m' Pasang Nok stel gelombang 1,08 m

15,781.92

211,942.50

227,724.42

11

1 m2 Pasang Nok Paten 1,05 m

9,688.56

147,600.00

157,288.56

12

1 m2 Pasang Nok Paten 1,08 m

9,688.56

166,230.00

175,918.56

13

1 m2 Pasang atap genteng beton warna

12,289.20

61,341.00

73,630.20

14

1 m' Pasang Nok Genteng Beton

24,578.40

33,115.00

57,693.40

15

1 m2 Pasang atap seng gelombang

7,373.52

46,980.00

54,353.52

16

1 m' Pasang Atap Nok Seng

8,923.53

20,590.00

29,513.53

17 1 m2 Pasang Aluminium foil

7,882.77

4,830.00

12,712.77

I.

PEKERJAAN LANGIT-LANGIT :

Memasang 1 m langit-langit asbes semen, tebal 4 mm, 5 mm dan 6 mm

4,832.52

16,386.00

21,218.52

Memasang 1 m langit-langit tripleks uk. (120 x 240) cm tb. 3 , 4 dan 6 mm

7,858.41

15,576.75

23,435.16

Memasang 1 m langit-langit gypsum board uk. (120x240x9) mm, tb. 9 mm

6,144.60

23,956.80

30,101.40

Memasang 1 m list langit-langit kayu profil

4,455.57

22,499.75

26,955.32

memasang 1 m' list gypsum

14,500.00

J.

PEKERJAAN SANITASI :

Memasang 1 buah kloset duduk/monoblok sekelas INA

160,602.54

1,676,125.00

1,836,727.54

Memasang 1 buah kloset jongkok Porselin sekelas INA

178,434.90

185,550.00

363,984.90

Memasang 1 buah urinoir sekelas INA

85,008.00

1,490,782.00

1,575,790.00

Memasang 1 buah wastafel sekelas INA

113,342.25

361,500.00

474,842.25

Memasang 1 buah bakmandi batubata volume 0,30 m3

350,469.00

393,900.00

744,369.00

15

Dinas Pekerjaan Umum Kota Surakarta

No.

Harga Satuan (Rp.)

Uraian
Upah

1
6

Memasang 1 buah bak kontrol pasangan batu bata ukuran (30 x 30) cm

Bahan

Alat

Pekerjaan
6

71,487.47

119,820.00

191,307.47

146,683.43

190,660.00

337,343.43

112,418.40

289,802.50

402,220.90

tinggi 35 cm
7

Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm
tinggi 50 cm

Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cm
tinggi 65 cm

Memasang 1 m' pipa PVC tipe AW diameter 1/2 "

4,130.53

6,520.50

10,651.03

10

Memasang 1 m' pipa PVC tipe AW diameter 3/4 "

4,130.53

8,849.25

12,979.78

11

Memasang 1 buah bak cuci piring staninless steel

15,511.86

235,750.00

251,261.86

12

Memasang 1 buah kran diameter 3/4 " atau 1/2 "

5,391.75

34,543.13

39,934.88

13

Memasang 1 buah Floor drain

5,391.75

55,000.00

60,391.75

K.

PEKERJAAN BESI DAN ALUMUNIUM :

Memasang 1 kg besi profil

4,788.72

13,512.50

18,301.22

Memasang 1 kg rangka kuda-kuda baja IWF

4,788.72

17,250.00

22,038.72

Membuat 1 m pintu besi plat baja tb. 2 mm rangkap, rangka baja siku

86,653.98

565,100.00

651,753.98

Memasang 1 m pintu rolling door besi

96,407.64

218,500.00

314,907.64

Memasang 1 m pintu lipat (folding doo r)

36,322.44

690,000.00

726,322.44

Memasang 1 m kusen pintu alluminium

3,547.24

70,255.00

73,802.24

Memasang 1 m pintu alluminium strip lebar 8 cm

7,014.38

309,290.00

316,304.38

Memasang 1 m pintu kaca rangka alluminium

6,979.98

4,323,792.50

4,330,772.48

Memasang 1 m jendela naco & tralis

16,067.94

155,998.70

172,066.64

10

Memasang 1 m' talang datar / jurai seng bjls 28 lebar 90 cm

25,428.90

124,932.50

150,361.40

11

Memasang 1 m' talang lingkaran D-15, seng plat bjls 30 lebar 45 cm

19,599.93

30,197.50

49,797.43

L.

PEKERJAAN KUNCI DAN KACA :

1 buah pasang kunci tanam Union

34,665.12

115,000.00

149,665.12

1 buah pasang kunci tanambesar 2 kali putar

25,654.65

63,250.00

88,904.65

1 buah pasang kunci tanam kamar mandi

25,112.33

34,500.00

59,612.33

1 buah pasang kunci silinder

25,001.76

80,500.00

105,501.76

1 buah pasang engsel pintu

8,666.28

8,050.00

16,716.28

1 buah pasang engsel jendela kupu-kupu

1 buah pasang engsel angin

5,777.52

8,050.00

13,827.52

11,997.30

23,000.00

34,997.30

1 buah pasang kait angin

8,666.28

7,475.00

16,141.28

28,887.60

120,000.00

148,887.60

5,777.52

5,750.00

11,527.52

1 buah pasang door closer

10

1 buah pasang door stop

11

1 buah pasang rel pintu dorong

34,665.12

172,500.00

207,165.12

12

1 buah pasang kunci lemari

14,443.80

32,200.00

46,643.80

13

1 m2 pasang kaca bening, tebal 5 mm

8,666.28

82,225.00

90,891.28

14

1 m2 pasang kaca cermin, tebal 5 mm

8,666.28

170,775.00

179,441.28

M.

PEKERJAAN PENUTUP LANTAI DAN DINDING :

Memasang 1 m lantai keramik esensa ukuran (60 x 60) cm

14,386.05

167,065.00

181,451.05

Memasang 1 m lantai ubin granit ukuran (30 x 30) cm

14,970.17

213,125.00

228,095.17

Memasang 1 m' plint ubin PC warna ukuran (10 x 30) cm

7,454.16

48,356.25

55,810.41

Memasang 1 m' plint ubin PC warna ukuran (10 x 40) cm

7,454.16

36,718.25

44,172.41

Memasang 1 m' plint ubin granit ukuran (10 x 40) cm

7,402.19

38,242.00

45,644.19

Memasang 1 m' plint ubin granit ukuran (10 x 30) cm

7,454.16

32,147.00

39,601.16

Memasang 1 m lantai keramik ukuran (33 x 33) cm

38,097.15

64,234.50

102,331.65

16

Dinas Pekerjaan Umum Kota Surakarta

No.

Harga Satuan (Rp.)

Uraian
Upah

Bahan

Alat

Memasang 1 m lantai keramik ukuran (30 x 30) cm

38,097.15

Memasang 1 m lantai keramik ukuran (20 x 20) cm

10

Memasang 1 m lantai keramik ukuran (10 x 33) cm, variasi / border

11 Memasang 1 m lantai keramik Roman ukuran ( 20 x 20 ) cm

Pekerjaan
6

63,625.00

101,722.15

38,097.15

64,255.00

102,352.15

57,268.58

591,687.50

648,956.08

38,097.15

82,257.50

120,354.65

12

Memasang 1 m' plint keramik ukuran (10 x 20) cm

7,454.16

50,300.75

57,754.91

13

Memasang 1 m lantai karpet

15,089.97

91,770.00

106,859.97

14

Memasang 1 m lantai perquet

41,323.17

203,895.00

245,218.17

15

Memasang 1 m dinding keramik ukuran (10 x 20) cm

42,288.75

61,480.50

103,769.25

16

Memasang 1 m dinding keramik ukuran (20 x 25) cm

42,288.75

59,960.00

102,248.75

17

Memasang 1 m dinding batu paras

38,097.15

110,712.50

148,809.65

18

Memasang 1 m dinding batu tempel hitam

38,097.15

107,550.00

145,647.15

19

Memasang 1 m wall paper, lebar 50 cm

32,265.24

57,787.50

90,052.74

N.

PEKERJAAN CAT / PELITUR :

1 m2 Mendempul dan menggosok kayu

3,314.19

2,697.50

6,011.69

1 m Pengecatan bidang kayu baru

3,016.40

28,708.75

31,725.15

( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)


3

1 m Pengecatan bidang kayu lama

5,947.54

20,351.25

26,298.79

1 m Pelaburan bidang kayu dengan politur

3,461.31

31,900.00

35,361.31

1 m Pelaburan bidang kayu dengan cat residu dan ter

3,476.34

2,324.00

5,800.34

1 m Pengecatan tembok baru

3,781.17

7,965.00

11,746.17

(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)


7

1 m Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )

3,028.35

5,400.00

8,428.35

1 m Pengecatan permukaan baja dengan meni besi

3,028.35

21,669.00

24,697.35

O.

PEKERJAAN KANSTEEN DAN PASANGAN BUIS BETON :

1 m' Pasang Buis beton 20 cm dengan Rolag Bata 1 : 4 (Rolag pnh)

46,412.12

102,611.92

149,024.04

1 m' Pasang Buis beton 30 cm dengan Rolag Bata 1 : 4 (Rolag pnh)

57,885.43

109,611.92

167,497.35

1 m' Pasang Buis beton 40 cm dengan Rolag Bata 1 : 4 (Rolag pnh)

68,231.43

169,006.10

237,237.53

1 m' Pasang Buis beton 50 cm dengan Rolag Bata 1 : 4 (Rolag pnh)

79,667.67

200,653.19

280,320.86

1 m' Pasang Buis beton 60 cm dengan Rolag Bata 1 : 4 (Rolag pnh)

96,312.03

208,106.10

304,418.13

1 m' Pasang Buis beton 80 cm dengan Rolag Bata 1 : 4 (Rolag pnh)

119,740.29

356,294.47

476,034.76

1 m' Pasang Buis beton 20 cm dengan Cincin bata 1 : 4

18,529.11

55,759.57

74,288.68

1 m' Pasang Buis beton 30 cm dengan Cincin bata 1 : 4

30,662.40

67,981.70

98,644.11

1 m' Pasang Buis beton 40 cm dengan Cincin bata 1 : 4

38,410.43

101,703.83

140,114.26

10

1 m' Pasang Buis beton 50 cm dengan Cincin bata 1 : 4

46,772.25

123,125.96

169,898.21

11

1 m' Pasang Buis beton 60 cm dengan Cincin bata 1 : 4

56,338.17

146,025.96

202,364.12

12

1 m' Pasang Buis beton U 20 cm lengkap dengan Cincin bata 1 : 4

14,274.07

34,503.12

48,777.18

13

1 m' Pasang Buis beton U 30 cm lengkap dengan Cincin bata 1 : 4

15,749.46

40,996.03

56,745.49

14 1 m2 Pasang paving kawung lokal tebal 6 cm

12,087.60

70,327.50

82,415.10

15 1 m2 Pasang paving kawung lokal tebal 8 cm

12,087.60

86,261.25

98,348.85

16

1 m2 Pasang paving kawung tebal 6 cm SNI

12,087.60

88,665.00

100,752.60

17

1 m2 Pasang Paving kawung tebal 8 cm SNI

12,087.60

84,990.00

97,077.60

SURAKARTA, 13 APRIL 2011

CV FANI SOLO RAYA

SUDARMAN,SPd,ST,MT
DIREKTUR

17

HARGA SATUAN UPAH


PEKERJAAN : PEMELIHARAAN GEDUNG DAN BANGUNAN BERUPA : PERBAIKAN
GEDUNG KANTOR PUSAT DAN PONDOK ASI
TAHUN ANGGARAN : 2012

I
NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

UPAH
NAMA BAHAN

Pekerja / Buruh tak terlatih


Buruh semi terlatih
Buruh terlatih
Mandor
Kepala tukang kayu
Kepala tukang batu
Kepala tukang besi
Kepala tukang cat
Kepala tukang gali
Kepala tukang las
Tukang kayu
Tukang batu
Tukang besi
Tukang cat
Tukang gali
Tukang las
Tukang listrik
Tukang pipa
Sopir
Mekanik terlatih
Operator semi terlatih / stoker
Operator terlatih
Penjaga Malam
Penganyam

SATUAN

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

SURAKARTA, 13 APRIL 2011

CV FANI SOLO RAYA

SUDARMAN,SPd,ST,MT
DIREKTUR

12

NAN BERUPA : PERBAIKAN


ASI

HARGA
lama

31,815.00
32,000.00
33,550.00
49,140.00
52,080.00
49,140.00
49,140.00
46,035.00
40,700.00
48,400.00
49,140.00
43,365.00
43,365.00
43,365.00
36,300.00
40,700.00
40,000.00
39,600.00
37,100.00
40,200.00
43,300.00
45,100.00
30,900.00
28,000.00

NAIK 1,1

27,000.00
30,500.00

RTA, 13 APRIL 2011

NI SOLO RAYA

RMAN,SPd,ST,MT

13

45,000.00
43,600.00
37,000.00
37,000.00
36,000.00
37,000.00
36,000.00
33,000.00

#######
#######
#######
#######
#######
#######
#######
#######

94,500.00
91,560.00
77,700.00
77,700.00
75,600.00
77,700.00
75,600.00
69,300.00

33,750.00
36,550.00
39,400.00
41,000.00
28,150.00

#######
#######
#######
#######
#######
-

70,875.00
76,755.00
82,740.00
86,100.00
59,115.00
0.00

Dinas Pekerjaan Umum Kota Surakarta

DAFTAR ANALISA
PEKERJAAN : PEMELIHARAAN GEDUNG DAN BANGUNAN BERUPA : PERBAIKAN GEDUNG KANTOR PUSAT
DAN PONDOK ASI
TAHUN ANGGARAN : 2011
F. PEKERJAAN KAYU :
1. Membuat dan memasang 1 m kusen pintu dan kusen jendela, kayu jati
Upah
6.000
20.000
2.000
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.100 m Balok kayu jati
1.250 kg Bahan paku 10 cm
1.000 kg Lem kayu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

17,500,000.00
11,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

190,890.00
982,800.00
104,160.00
14,742.00
Rp.

1,292,592.00

Rp.

19,261,500.00

Rp.

20,554,092.00

Rp.

1,292,592.00

Rp.

8,891,500.00

Rp.

10,184,092.00

Rp.

170,142.00

Rp.

825,750.00

Rp.

995,892.00

19,250,000.00
11,500.00

2. Membuat dan memasang 1 m kusen pintu dan kusen jendela, kayu kamper
Upah
6.000
20.000
2.000
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.200 m Balok kayu kamper
1.250 kg Bahan paku 10 cm
1.000 kg Lem kayu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

7,400,000.00
11,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

190,890.00
982,800.00
104,160.00
14,742.00

8,880,000.00
11,500.00

3 Membuat dan memasang 1 m daun pintu panil, kayu jati


Upah
1.000
2.500
0.250
0.050

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.040 m Papan kayu jati
0.500 kg Lem kayu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
11,500.00

4 Membuat dan memasang 1 m pintu dan jendela kaca, kayu jati


Upah

27

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

31,815.00
122,850.00
13,020.00
2,457.00

820,000.00
5,750.00

Dinas Pekerjaan Umum Kota Surakarta

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.024 m Papan kayu jati
0.300 kg Lem kayu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
11,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

25,452.00
98,280.00
10,416.00
1,965.60
Rp.

136,113.60

Rp.

495,450.00

Rp.

631,563.60

492,000.00
3,450.00

5 Membuat 1 m daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper (lebar sampai 90 cm)
Upah
0.600
2.000
0.200
0.030

Bahan
0.025
0.030
0.500
1.000

Oh
Oh
Oh
Oh

m
kg
kg
lbr

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Papan kayu
@ Rp.
Paku 1 cm - 2,5 cm
@ Rp.
Lem kayu
@ Rp.
Plywood tb.4 mm uk.(90x220)
@ Rp.
cm

9,890,000.00
11,500.00
11,500.00
46,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,089.00
98,280.00
10,416.00
1,474.20
Rp.

129,259.20

Rp.

299,345.00

Rp.

428,604.20

Rp.

136,113.60

Rp.

576,895.00

Rp.

713,008.60

Rp.

136,113.60

247,250.00
345.00
5,750.00
46,000.00

6 Membuat 1 m pintu plywood rangkap, rangka expose kayu jati


Upah
0.800
2.000
0.200
0.040

Bahan
0.0256
0.030
0.500
1.000

Oh
Oh
Oh
Oh

m
kg
kg
lbr

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Papan kayu jati


@ Rp.
Paku 1 cm - 2,5 cm
@ Rp.
Lem kayu
@ Rp.
Plywood tb.4 mm uk.(90x220)
@ Rp.
cm

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
11,500.00
11,500.00
46,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

25,452.00
98,280.00
10,416.00
1,965.60

524,800.00
345.00
5,750.00
46,000.00

7 Memasang 1 m teakwood rangkap, rangka expose kayu jati


Upah
0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan

28

=
=
=
=

Rp.
Rp.
Rp.
Rp.

25,452.00
98,280.00
10,416.00
1,965.60

Dinas Pekerjaan Umum Kota Surakarta

0.025
0.030
0.300
1.000

m
kg
kg
lbr

Papan kayu kamper


@ Rp.
Paku 1 cm - 2,5 cm
@ Rp.
Lem kayu
@ Rp.
Plywood tb.4 mm uk.(90x220)
@ Rp.
cm

20,500,000.00
11,500.00
11,500.00
46,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

512,500.00
345.00
3,450.00
46,000.00
Rp.

562,295.00

Rp.

698,408.60

Rp.

163,287.60

Rp.

302,795.00

Rp.

466,082.60

Rp.

1,292,592.00

Rp.

10,422,950.00

Rp.

11,715,542.00

Rp.

22,044.75

Rp.

103,450.00

Rp.

125,494.75

8 Memasang 1 m teakwood rangkap lapis formika, rangka expose kayu kamper


Upah
0.800
2.500
0.250
0.040

Bahan
0.025
0.030
0.800
1.000

Oh
Oh
Oh
Oh

m
kg
kg
lbr

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Papan kayu
@ Rp.
Paku 1 cm - 2,5 cm
@ Rp.
Lem kayu
@ Rp.
Plywood tb.4 mm uk.(90x220)
@ Rp.
cm

9,890,000.00
11,500.00
11,500.00
46,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

25,452.00
122,850.00
13,020.00
1,965.60

247,250.00
345.00
9,200.00
46,000.00

9 Memasang 1 m konstruksi kuda-kuda konvensional, kayu Bangkirai


Upah
6.000
20.000
2.000
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.200 m Balok kayu bangkirai
15.000 kg Besi strip tebal 5 mm
5.600 kg Paku 12 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

8,500,000.00
9,450.00
14,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

190,890.00
982,800.00
104,160.00
14,742.00

10,200,000.00
141,750.00
81,200.00

10 Memasang 1 m konstruksi rangka plafond, kayu Bangkirai


Upah
0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.012 m Balok kayu bangkirai
0.100 kg Paku 12 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

8,500,000.00
14,500.00

11 Memasang 1 m konstruksi gordeng, kayu bangkirai

29

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

4,772.25
12,285.00
1,302.00
3,685.50

102,000.00
1,450.00

Dinas Pekerjaan Umum Kota Surakarta

Upah
2.400
7.200
0.720
0.120

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.100 m Balok kayu bangkirai
15.000 kg Besi strip tebal 5 mm
3.000 kg Paku 12 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

8,500,000.00
9,450.00
14,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

76,356.00
353,808.00
37,497.60
5,896.80
Rp.

473,558.40

Rp.

9,535,250.00

Rp.

10,008,808.40

Rp.

8,862.00

Rp.

72,072.50

Rp.

80,934.50

Rp.

8,862.00

Rp.
Rp.

119,725.00
128,587.00

9,350,000.00
141,750.00
43,500.00

12 Memasang 1 m rangka atap genteng keramik, kaso kayu kruing + reng kayu jati
Upah
0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan
0.014 m Kaso-kaso ( 5 x 7 ) cm, kruing
@ Rp.
5.000 m' Reng ( 2 x 3 ) cm, jati
0.250 kg Paku 5 cm dan 10 cm

=
=
=
=

Rp.
Rp.
Rp.
Rp.

3,181.50
4,914.00
520.80
245.70

3,996,250.00

= Rp.

55,947.50

2,500.00
14,500.00

= Rp.
= Rp.

12,500.00
3,625.00

@ Rp.
@ Rp.

13 Memasang 1 m rangka atap genteng beton, kaso kayu kruing + reng kayu jati
Upah
0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan
0.014 m Kaso-kaso ( 5 x 7 ) cm,kruing
@ Rp.
5.000 m' Reng ( 3 x 4 ) cm, jati
0.250 kg Paku 5 cm dan 10 cm

=
=
=
=

Rp.
Rp.
Rp.
Rp.

3,181.50
4,914.00
520.80
245.70

7,400,000.00

= Rp.

103,600.00

2,500.00
14,500.00

= Rp.
= Rp.

12,500.00
3,625.00

@ Rp.
@ Rp.

14 Memasang 1 m lysplank ukuran ( 3 x 20 ) cm, kayu kamper


Upah
0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

30

=
=
=
=

Rp.
Rp.
Rp.
Rp.

3,181.50
9,828.00
1,302.00
245.70

Dinas Pekerjaan Umum Kota Surakarta

Bahan
0.0108 m Papan kayu kamper
0.100 kg Paku biasa 2" - 5"

@ Rp.
@ Rp.

9,545,000.00
14,500.000

= Rp.
= Rp.

Rp.

14,557.20

Rp.
Rp.

104,536.00
119,093.20

Rp.

14,296.80

Rp.
Rp.

226,190.00
240,486.80

Rp.

29,621.97

Rp.
Rp.
Rp.

209,270.00
238,891.97
338,891.97

Rp.

29,621.97

Rp.
Rp.

255,375.00
284,996.97

103,086.00
1,450.00

15 Memasang 1 m lysplank ukuran ( 3 x 30 ) cm, kayu jati


Upah
0.100
0.200
0.020
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.011 m Papan kayu jati
0.050 kg Paku 5 cm dan 7 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
13,800.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

3,181.50
9,828.00
1,041.60
245.70

225,500.00
690.00

16 Memasang 1 m rangka dinding pemisah ( 60 x 120 ) cm kayu kamper


Upah
0.150
0.450
0.045
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.028 m Balok kayu kamper
0.150 kg Paku 5 cm dan 7 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

7,400,000.00
13,800.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

4,772.25
22,113.00
2,343.60
393.12

207,200.00
2,070.00

PENUTUP MULTIPLEK 18 MM 1 SISI


17 Memasang 1 m dinding pemisah teakwood rangkap, rangka kayu kamper
Upah
0.150
0.450
0.045
0.008

Bahan
0.028
0.150
0.860
0.560

Oh
Oh
Oh
Oh

m
kg
lbr
kg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Balok kayu uk. (6x12) cm@ Rp.


Paku 5 cm dan 10 cm
@ Rp.
Teakwood tb.4 mm uk.120x240
@ Rp.
Lem kayu
@ Rp.

7,400,000.00
14,500.00
46,000.00
11,500.00

18 Memasang 1 m dinding pemisah plywood rangkap, rangka kayu kamper


Upah

31

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

4,772.25
22,113.00
2,343.60
393.12

207,200.00
2,175.00
39,560.00
6,440.00

Dinas Pekerjaan Umum Kota Surakarta

0.200
0.600
0.060
0.010

Bahan
0.028
0.150
0.860
0.560

Oh
Oh
Oh
Oh

m
kg
lbr
kg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Balok kayu uk. (6x12) cm@ Rp.


Paku 5 cm dan 10 cm
@ Rp.
Plywood tb.4 mm uk.120x240
@ Rp.
Lem kayu
@ Rp.

7,400,000.00
14,500.00
46,000.00
11,500.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

6,363.00
29,484.00
3,124.80
491.40
Rp.

39,463.20

Rp.

255,375.00

Rp.

294,838.20

Rp.

4,832.52

Rp.

16,386.00

Rp.

21,218.52

Rp.

7,858.41

Rp.

15,576.75

Rp.

23,435.16

Rp.

6,144.60

207,200.00
2,175.00
39,560.00
6,440.00

I PEKERJAAN LANGIT-LANGIT
1. Memasang 1 m langit-langit harflek
Upah
0.030
0.070
0.007
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.100 m harflek
0.010 kg Paku tripleks

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

14,750.00
16,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

954.45
3,439.80
364.56
73.71

16,225.00
161.00

2 Memasang 1 m langit-langit tripleks ukuran (120 x 240) cm tebal 3 mm , 4 mm dan 6 mm


Upah
0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.375 lbr Tripleks
0.030 kg Paku tripleks

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

40,250.00
16,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

2,227.05
4,914.00
520.80
196.56

15,094
483

3 Memasang 1 m langit-langit gypsum board ukuran ( 120 x 240 x 9 ) mm, tb. 9 mm


Upah
0.100
0.050
0.005
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.364 lbr Gypsum board
0.110 kg Paku tripleks

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

60,950.00
16,100.00

32

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

3,181.50
2,457.00
260.40
245.70

22,185.80
1,771.00

Dinas Pekerjaan Umum Kota Surakarta

Rp.

23,956.80

Rp.

30,101.40

Rp.

4,455.57

Rp.

22,499.75

Rp.

26,955.32

Rp.

160,602.54

Rp.

1,676,125.00

Rp.

1,836,727.54

Rp.

178,434.90

Rp.

185,550.00

Rp.

363,984.90

4 Memasang 1 m' list langit-langit gipsum


Upah
0.050
0.050
0.005
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.050 m' List gipsum
0.010 kg Paku

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

21,275.00
16,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

1,590.75
2,457.00
260.40
147.42

22,338.75
161.00

J. PEKERJAAN SANITASI :
1. Memasang 1 buah kloset duduk/monoblok sekelas INA
Upah
3.300
1.100
0.001
0.160

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Bahan
1.000 bh Kloset duduk/monoblok @ Rp.
6%
Perlengkapan
@ Rp.

1,581,250.00
1,581,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

104,989.50
47,701.50
49.14
7,862.40

1,581,250.00
94,875.00

2 Memasang 1 buah kloset jongkok Porselin sekelas INA


Upah
1.000
1.500
1.500
0.160

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Bahan
1.000 bh Kloset jongkok porselin @ Rp.
6.000 kg Semen Portland
@ Rp.
0.010 m3 Pasir pasang
@ Rp.

178,250.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

31,815.00
65,047.50
73,710.00
7,862.40

178,250.00
6,300.00
1,000.00

3 Memasng 1 buah urinoir sekelas INA


Upah
1.000 Oh Pekerja
1.000 Oh Tukang batu
0.100 Oh Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00

33

= Rp.
= Rp.
= Rp.

31,815.00
43,365.00
4,914.00

Dinas Pekerjaan Umum Kota Surakarta

0.100 Oh Mandor

Bahan
1.000 bh Urionir
30 %
Perlengkapan
6.000 Kg Semen Portland
0.010 m3 Pasir pasang

@ Rp.

@
@
@
@

49,140.00

Rp.
Rp.
Rp.
Rp.

1,141,140.00
1,141,140.00
1,050.00
100,000.00

= Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

4,914.00
Rp.

85,008.00

Rp.

1,490,782.00

Rp.

1,575,790.00

Rp.

113,342.25

Rp.

361,500.00

Rp.

474,842.25

Rp.

350,469.00

Rp.

393,900.00

Rp.

744,369.00

Rp.

71,487.47

1,141,140.00
342,342.00
6,300.00
1,000.00

4 Memasang 1 buah wastafel sekelas INA


Upah
1.200
1.450
0.150
0.100

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Wastafel
12 %
Perlengkapan
6.000 Kg Semen Portland
0.010 m3 Pasir pasang

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

316,250.00
316,250.00
1,050.00
100,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

38,178.00
62,879.25
7,371.00
4,914.00

316,250.00
37,950.00
6,300.00
1,000.00

5 Memasang 1 buah bakmandi batubata volume 0,30 m3


Upah
6.000
3.000
0.300
0.300

Bahan
0.400
120.000
0.300
360.000
6.000

Oh
Oh
Oh
Oh

m3
Kg
m3
bh
Kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Batu bata
Semen Portland
Pasir pasang
Porselen ( 11 x 11 ) cm
Semen Nat

@
@
@
@

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.
Rp.

258,000.00
1,050.00
100,000.00
345.00
1,750.00

=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

190,890.00
130,095.00
14,742.00
14,742.00

103,200.00
126,000.00
30,000.00
124,200.00
10,500.00

6 Memasang 1 buah bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
Upah
1.420
0.473
0.047
0.071

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
80.000 bh Batu bata

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.

430.00

34

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

45,177.30
20,511.65
2,309.58
3,488.94

34,400.00

Dinas Pekerjaan Umum Kota Surakarta

44.000
0.070
0.070
1.600
0.060

Kg
m3
m3
kg
m3

Semen portland
Pasir pasang
Koral Beton
Besi beton
Pasir beton

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1,050.00
100,000.00
150,000.00
9,450.00
110,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

46,200.00
7,000.00
10,500.00
15,120.00
6,600.00
Rp.

119,820.00

Rp.

191,307.47

Rp.

146,683.43

Rp.

190,660.00

Rp.

337,343.43

Rp.

112,418.40

Rp.

289,802.50

Rp.

402,220.90

Rp.

4,130.53

7 Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Upah
3.200
1.015
0.0015
0.016

Bahan
138.000
77.000
0.130
0.020
2.600
0.090

Oh
Oh
Oh
Oh

bh
Kg
m3
m3
kg
m3

Pekerja
Tukang batu
Kepala Tukang
Mandor

Batu bata
Semen portland
Pasir pasang
Koral Beton
Besi beton
Pasir beton

@
@
@
@

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

430.00
1,050.00
100,000.00
150,000.00
9,450.00
110,000.00

=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

101,808.00
44,015.48
73.71
786.24

59,340.00
80,850.00
13,000.00
3,000.00
24,570.00
9,900.00

8 Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cm, tinggi 65 cm
Upah
2.160
0.720
0.072
0.108
0.100

Bahan
204.000
114.000
0.184
0.033
4.850
0.120

Oh
Oh
Oh
Oh
Oh

bh
Kg
m3
m3
kg
m3

Pekerja
Tukang batu
Kepala Tukang
Mandor
Tukang gali

Batu bata
Semen portland
Pasir pasang
Koral Beton
Besi beton
Pasir beton

@
@
@
@
@

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00
36,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

430.00
1,050.00
100,000.00
150,000.00
9,450.00
110,000.00

=
=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,720.40
31,222.80
3,538.08
5,307.12
3,630.00

87,720.00
119,700.00
18,400.00
4,950.00
45,832.50
13,200.00

9 Memasang 1 m' pipa PVC tipe AW diameter 1/2 "


Upah
0.036
0.060
0.006
0.0018

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Bahan

35

=
=
=
=

Rp.
Rp.
Rp.
Rp.

1,145.34
2,601.90
294.84
88.45

Dinas Pekerjaan Umum Kota Surakarta

1.200 m' Pipa PVC


35 %
perlengkapan

@ Rp.
@ Rp.

4,025.00
4,830.00

= Rp.
= Rp.

4,830.00
1,690.50
Rp.

6,520.50

Rp.

10,651.03

Rp.

4,130.53

Rp.

8,849.25

Rp.

12,979.78

Rp.

15,511.86

Rp.

235,750.00

Rp.

251,261.86

Rp.

5,391.75

Rp.

34,543.13

Rp.

39,934.88

10 Memasang 1 m' pipa PVC tipe AW diameter 3/4 "


Upah
0.036
0.060
0.006
0.0018

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.200 m' Pipa PVC
35 %
perlengkapan

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

5,462.50
6,555.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

1,145.34
2,601.90
294.84
88.45

6,555.00
2,294.25

11 Memasang 1 buah bak cuci piring staninless steel


Upah
0.030
0.300
0.030
0.0015

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Bak cuci staniless steel
1.000 set Water drain + asesories

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

195,500.00
40,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

954.45
13,009.50
1,474.20
73.71

195,500.00
40,250.00

12 Memasang 1 buah kran SAN EI diameter 3/4 " atau 1/2 "
Upah
0.010
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Kran air
0.025 bh Seal tape

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

34,500.00
1,725.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

318.15
4,336.50
491.40
245.70

34,500.00
43.13

13 Memasang 1 buah Floor drain


Upah
0.010
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

36

=
=
=
=

Rp.
Rp.
Rp.
Rp.

318.15
4,336.50
491.40
245.70

Dinas Pekerjaan Umum Kota Surakarta

Bahan
1.000 bh Floor drain

@ Rp.

55,000.00

= Rp.

Rp.

5,391.75

Rp.

55,000.00

Rp.

60,391.75

Rp.

3,547.24

Rp.

70,255.00

Rp.

73,802.24

Rp.

7,014.38

Rp.

309,290.00

Rp.

316,304.38

Rp.

6,979.98

Rp.

4,323,792.50

Rp.

4,330,772.48

55,000.00

K. PEKERJAAN BESI DAN ALUMUNIUM :

6 Memasang 1 m' kusen pintu alluminium


Upah
0.043
0.043
0.0043
0.0021

Oh
Oh
Oh
Oh

Pekerja
Tukang besi konstruksi
Kepala Tukang
Mandor

Bahan
1.100 m' Profil alluminium
2.000 bh Skrup fixer
0.060 tube Sealant

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

61,500.00
95.00
40,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

1,368.05
1,864.70
211.30
103.19

67,650.00
190.00
2,415.00

7 Memasang 1 m pintu alluminium strip lebar 8 cm


Upah
0.085
0.085
0.0085
0.0042

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
4.400 m' Profil alluminium
14.600 m' Alluminium strip

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

61,500.00
2,650.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

2,704.28
3,686.03
417.69
206.39

270,600.00
38,690.00

8 Memasang 1 m pintu kaca rangka alluminium


Upah
0.085
0.085
0.008
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
4.400 m' Pintu alluminium
4.500 m' Profil kaca
0.270 tube Sealant

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

977,500.00
2,650.00
40,250.00

37

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

2,704.28
3,686.03
393.12
196.56

4,301,000.00
11,925.00
10,867.50

Dinas Pekerjaan Umum Kota Surakarta

9 Memasang 1 m jendela nako & tralis


Upah
0.200
0.200
0.020
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Bahan
1.100 m Jendela nako (rk.+kaca 5mm)
@ Rp.
11.110 bh Paku skrup 1 cm - 2,5 cm @ Rp.
1.716 m' Besi strip
@ Rp.

10,925.00
11,500.00
9,450.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

6,363.00
8,673.00
982.80
49.14
Rp.

16,067.94

Rp.

155,998.70

Rp.

172,066.64

Rp.

25,428.90

Rp.

124,932.50

Rp.

150,361.40

Rp.

19,599.93

Rp.

30,197.50

Rp.

49,797.43

12,017.50
127,765.00
16,216.20

10 Memasang 1 m' talang datar / jurai seng bjls 28 lebar 90 cm


Upah
0.200
0.400
0.025
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Bahan
1.050 m' Seng plat
@ Rp.
0.015 kg Paku 1 cm - 2,5 cm
@ Rp.
0.019 m Papan kayu kelas II atau III
@ Rp.

33,500.00
11,500.00
4,715,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

6,363.00
17,346.00
1,228.50
491.40

35,175.00
172.50
89,585.00

11 Memasang 1 m' talang lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Upah
0.150
0.300
0.030
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
1.050 m' Seng plat
0.010 kg Paku 1 cm - 2,5 cm
0.500 kg Besi strip

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

24,150.00
11,500.00
9,450.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

4,772.25
13,009.50
1,474.20
343.98

25,357.50
115.00
4,725.00

M. PEKERJAAN PENUTUP LANTAI DAN DINDING


7. Memasang 1 m lantai keramik esensa ukuran ( 60 x 60 ) cm
Upah
0.250 Oh Pekerja
0.120 Oh Tukang batu
0.012 Oh Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00

38

= Rp.
= Rp.
= Rp.

7,953.75
5,203.80
589.68

Dinas Pekerjaan Umum Kota Surakarta

0.013 Oh Mandor

Bahan
1.000
9.800
0.045
1.300

dos
kg
m
kg

@ Rp.

Keramik esensa 60x60 cm@


Portland Cement
@
Pasir pasang
@
Semen warna
@

49,140.00

Rp.
Rp.
Rp.
Rp.

150,000.00
1,050.00
100,000.00
1,750.00

= Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

638.82
Rp.

14,386.05

Rp.

167,065.00

Rp.

181,451.05

Rp.

14,970.17

Rp.

213,125.00

Rp.

228,095.17

Rp.

7,454.16

Rp.

48,356.25

Rp.

55,810.41

Rp.

7,454.16

150,000.00
10,290.00
4,500.00
2,275.00

8. Memasang 1 m lantai ubin granit ukuran ( 30 x 30 ) cm


Upah
0.260
0.125
0.013
0.013

Bahan
11.870
10.000
0.045
1.500

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin granit 30x30 cm


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

16,470.09
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

8,271.90
5,420.63
638.82
638.82

195,500.00
10,500.00
4,500.00
2,625.00

16. Memasang 1 m' plin ubin PC warna ukuran ( 10 x 30 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
3.530
1.140
0.003
0.100

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint ubin PC warna


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

13,225.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
442.26
245.70

46,684.25
1,197.00
300.00
175.00

17. Memasang 1 m' plin ubin PC warna ukuran ( 10 x 40 ) cm


Upah
0.090
0.090
0.009
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
2.650 bh Plint ubin PC warna
1.140 kg Portland Cement

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

13,225.00
1,050.00

39

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

2,863.35
3,902.85
442.26
245.70

35,046.25
1,197.00

Dinas Pekerjaan Umum Kota Surakarta

0.003 m Pasir pasang


0.100 kg Semen warna

@ Rp.
@ Rp.

100,000.00
1,750.00

= Rp.
= Rp.

300.00
175.00
Rp.

36,718.25

Rp.

44,172.41

Rp.

7,402.19

Rp.

38,242.00

Rp.

45,644.19

Rp.

7,454.16

Rp.

32,147.00

Rp.

39,601.16

Rp.

38,097.15

Rp.

64,234.50

Rp.

102,331.65

18. Memasang 1 m' plin ubin granit ukuran ( 10 x 40 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
2.650
1.140
0.003
0.100

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint ubin granit


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
43,365.00
49,140.00

Rp.
Rp.
Rp.
Rp.

13,800.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
390.29
245.70

36,570.00
1,197.00
300.00
175.00

19. Memasang 1 m' plin ubin granit ukuran ( 10 x 30 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
2.650
1.140
0.003
0.100

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint ubin granit


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

11,500.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
442.26
245.70

30,475.00
1,197.00
300.00
175.00

22. Memasang 1 m lantai keramik ukuran ( 33 x 33 ) cm


Upah
0.620
0.350
0.035
0.030

Bahan
10.000
8.190
0.045
1.620

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

4,830.00
1,050.00
100,000.00
1,750.00

40

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,725.30
15,177.75
1,719.90
1,474.20

48,300.00
8,599.50
4,500.00
2,835.00

Dinas Pekerjaan Umum Kota Surakarta

23. Memasang 1 m lantai keramik ukuran ( 30 x 30 ) cm


Upah
0.620
0.350
0.035
0.030

Bahan
11.870
10.000
0.045
1.500

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

3,875.32
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,725.30
15,177.75
1,719.90
1,474.20
Rp.

38,097.15

Rp.

63,625.00

Rp.

101,722.15

Rp.

38,097.15

Rp.

64,255.00

Rp.

102,352.15

Rp.

57,268.58

Rp.

591,687.50

Rp.

648,956.08

46,000.00
10,500.00
4,500.00
2,625.00

24. Memasang 1 m lantai keramik ukuran ( 20 x 20 ) cm


Upah
0.620
0.350
0.035
0.030

Bahan
26.500
10.400
0.045
1.620

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

1,735.85
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,725.30
15,177.75
1,719.90
1,474.20

46,000.00
10,920.00
4,500.00
2,835.00

25. Memasang 1 m lantai keramik ukuran ( 10 x 33 ) cm, variasi / border


Upah
0.930
0.525
0.053
0.047

Bahan
33.000
9.800
0.045
4.370

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

17,250.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

29,587.95
22,766.63
2,604.42
2,309.58

569,250.00
10,290.00
4,500.00
7,647.50

26. Memasang 1 m lantai keramik Roman ukuran ( 20 x 20 ) cm


Upah
0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

41

=
=
=
=

Rp.
Rp.
Rp.
Rp.

19,725.30
15,177.75
1,719.90
1,474.20

Dinas Pekerjaan Umum Kota Surakarta

Bahan
26.500
14.150
0.039
2.000

bh
kg
m
kg

Keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

Rp.
Rp.
Rp.
Rp.

2,264.15
1,050.00
100,000.00
1,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.

38,097.15

Rp.

82,257.50

Rp.

120,354.65

Rp.

7,454.16

Rp.

50,300.75

Rp.

57,754.91

Rp.

15,089.97

Rp.

91,770.00

Rp.

106,859.97

Rp.

41,323.17

Rp.

203,895.00

Rp.

245,218.17

60,000.00
14,857.50
3,900.00
3,500.00

27. Memasang 1 m plint keramik ukuran ( 10 x 20 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
5.300
1.140
0.003
0.025

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint keramik artistik


Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

9,200.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
442.26
245.70

48,760.00
1,197.00
300.00
43.75

31. Memasang 1 m lantai karpet


Upah
0.170
0.170
0.017
0.009

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.050 m Karpet
0.350 kg Lem

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

74,750.00
37,950.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

5,408.55
8,353.80
885.36
442.26

78,487.50
13,282.50

32. Memasang 1 m lantai parquet


Upah
0.650
0.350
0.035
0.033

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.050 m Parquet
0.600 kg Lem

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

172,500.00
37,950.00

42

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

20,679.75
17,199.00
1,822.80
1,621.62

181,125.00
22,770.00

Dinas Pekerjaan Umum Kota Surakarta

36. Memasang 1 m dinding keramik ukuran ( 10 x 20 ) cm


Upah
0.600
0.450
0.045
0.030

Bahan
53.000
9.300
0.018
2.750

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

851.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,089.00
19,514.25
2,211.30
1,474.20
Rp.

42,288.75

Rp.

61,480.50

Rp.

103,769.25

Rp.

42,288.75

Rp.

59,960.00

Rp.

102,248.75

Rp.

38,097.15

Rp.

110,712.50

Rp.

148,809.65

45,103.00
9,765.00
1,800.00
4,812.50

37. Memasang 1 m dinding keramik ukuran ( 20 x 25 ) cm


Upah
0.600
0.450
0.045
0.030

Bahan
20.000
9.300
0.018
1.940

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

2,250.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,089.00
19,514.25
2,211.30
1,474.20

45,000.00
9,765.00
1,800.00
3,395.00

39. Memasang 1 m dinding batu paras


Upah
0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.100 m Batu paras
11.750 kg Portland Cement
0.035 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

86,250.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

19,725.30
15,177.75
1,719.90
1,474.20

94,875.00
12,337.50
3,500.00

40. Memasang 1 m dinding batu tempel hitam


Upah
0.620 Oh Pekerja

@ Rp.

31,815.00

43

= Rp.

19,725.30

Dinas Pekerjaan Umum Kota Surakarta

0.350 Oh Tukang batu


0.035 Oh Kepala Tukang
0.030 Oh Mandor

Bahan
1.100 m Batu tempel hitam
11.750 kg Portland Cement
0.035 m Pasir Pasang

@ Rp.
@ Rp.
@ Rp.

43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

83,375.00
1,050.00
100,000.00

= Rp.
= Rp.
= Rp.

= Rp.
= Rp.
= Rp.

15,177.75
1,719.90
1,474.20
Rp.

38,097.15

Rp.

107,550.00

Rp.

145,647.15

Rp.

32,265.24

Rp.

57,787.50

Rp.

90,052.74

Rp.

3,314.19

Rp.

2,697.50

Rp.

6,011.69

91,712.50
12,337.50
3,500.00

42. Memasang 1 m wall paper, lebar 50 cm


Upah
0.750
0.170
0.017
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
2.200 m' Wallpaper
0.250 kg Lem

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

23,000.00
28,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

23,861.25
7,372.05
835.38
196.56

50,600.00
7,187.50

N. PEKERJAAN CAT / PLITUR :


1. 1 m2 Mendempul dan menggosok kayu
Upah
0.0400
0.0400
0.0040
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Bahan
0.0800 kg Dempul jadi
0.0200 kg Minyak cat
0.0100 kg Batu apung

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

28,750.00
17,250.00
5,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

1,272.60
1,734.60
184.14
122.85

2,300.00
345.00
52.50

2. 1 m Pengecatan bidang kayu merk Bee Brand baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Upah
0.0700
0.0090
0.0060
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,227.05
390.29
276.21
122.85
Rp.

Bahan
0.2000 kg Cat meni
0.1500 kg Plamir

@ Rp.
@ Rp.

18,500.00
18,375.00

44

= Rp.
= Rp.

3,700.00
2,756.25

3,016.40

Dinas Pekerjaan Umum Kota Surakarta

0.1700 kg Cat dasar


0.2600 kg Cat penutup 2 kali

@ Rp.
@ Rp.

51,750.00
51,750.00

= Rp.
= Rp.

8,797.50
13,455.00
Rp.

28,708.75

Rp.

31,725.15

Rp.

5,947.54

Rp.

20,351.25

Rp.

26,298.79

Rp.

3,461.31

Rp.

31,900.00

Rp.
Rp.

35,361.31
28,289.05

Rp.

3,476.34

Rp.

2,324.00

Rp.

5,800.34

Rp.

3,781.17

3 1 m Pengecatan bidang kayu lama Merk Bee Brand


Upah
0.0700
0.0750
0.0075
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Bahan
0.1500 kg Plamir kayu
0.1700 kg Cat dasar
0.1700 kg Cat penutup

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

18,375.00
51,750.00
51,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

2,227.05
3,252.38
345.26
122.85

2,756.25
8,797.50
8,797.50

4. 1 m Pelaburan bidang kayu dengan politur


Upah
0.0600 Oh Tukang cat
0.0160 Oh Kepala Tukang
0.0025 Oh Mandor

Bahan
0.1500 ltr Politur
0.3720 ltr Politur jadi
2.0000 lbr Amplas

@ Rp.
@ Rp.
@ Rp.

43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

50,000.00
50,000.00
2,900.00

= Rp.
= Rp.
= Rp.

= Rp.
= Rp.
= Rp.

2,601.90
736.56
122.85

7,500.00
18,600.00
5,800.00

POLITUR ULANG
5. 1 m Pelaburan bidang kayu dengan cat residu dan ter
Upah
0.1000 Oh Pekerja
0.0060 Oh Mandor

Bahan
0.3500 ltr Residu atau ter

@ Rp.
@ Rp.

31,815.00
49,140.00

@ Rp.

6,640.00

= Rp.
= Rp.

= Rp.

3,181.50
294.84

2,324.00

6. 1 m Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Upah
0.0200
0.0630
0.0063
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

45

=
=
=
=

Rp.
Rp.
Rp.
Rp.

636.30
2,732.00
290.02
122.85

Dinas Pekerjaan Umum Kota Surakarta

Bahan
0.1000 kg Plamir
0.1000 kg Cat dasar
0.2600 kg Cat penutup 2 x

@ Rp.
@ Rp.
@ Rp.

14,850.00
18,000.00
18,000.00

= Rp.
= Rp.
= Rp.

1,485.00
1,800.00
4,680.00
Rp.

7,965.00

Rp.

11,746.17

Rp.

3,028.35

Rp.

5,400.00

Rp.

8,428.35

Rp.

3,028.35

Rp.

21,669.00

Rp.
Rp.

24,697.35
20,992.74

7 1 m Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )


Upah
0.0280
0.0420
0.0042
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Bahan
0.1200 kg Cat dasar
0.1800 kg Cat penutup 2 x

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.

18,000.00
18,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

890.82
1,821.33
193.35
122.85

2,160.00
3,240.00

8 1 m Pengecatan dinding Mowilex


Upah
0.0280
0.0420
0.0042
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Bahan
0.3600 kg Mowilek
0.0100 bh Kuas

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.

60,000.00
6,900.00

CAT ULANG

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

890.82
1,821.33
193.35
122.85

21,600.00
69.00

Menetapkan
Pejabat Pembuat Komitmen

Dra. Kartini Hariyati


NIP. 19570421 198403 2 002

46

Dinas Pekerjaan Umum Kota Surakarta

HARGA SATUAN BAHAN


PEKERJAAN : PEMELIHARAAN GEDUNG DAN BANGUNAN BERUPA : PERBAIKAN
GEDUNG KANTOR PUSAT DAN PONDOK ASI
TAHUN ANGGARAN : 2011

NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

NAMA BAHAN

SATUAN

Pasir Urug
Pasir Pasang
Pasir Beton
Tanah Keras
Sirtu
Kerikil
Kerikil Sungai
Grasak
Abu Batu
Filler
Agregat Halus
Agregat Kasar
Batu belah
Batu pecah 15/20 cm
Batu pecah 10/15 cm
Batu pecah 5/7 cm
Batu pecah 3/5 cm
Batu pecah 2/3 cm (split) / Mesin
Batu pecah 1/2 cm
Batu pecah /1 cm
Batu merah
Batu apung / kambang
Batu tempel hitam
Batu paras
Batu candi
Batu palimanan
Bataco
Roaster
Roaster Keramik 30/30
Roaster Keramik 20/20
Glass Block Putih 20/20
Glass Block Warna
Kawur
Portland Cement (PC) abu-abu 40 kg
Portland Cement (PC) putih
40 kg
Portland Cement (PC) warna 40 kg
Kalsit
Paving Segi enam tebal 6 cm

13

m
m
m
m
m
m
m
m
m
Kg
m
m
m
m
m
m
m
m
m
m
bj
Kg
m
m
m
m
bj
bj
bj
bj
bj
bj
m
Zak
Zak
Zak
Zak
m

HARGA

70,000.00
100,000.00
110,000.00
40,250.00
90,000.00
150,000.00
120,750.00
150,000.00
97,750.00
750.00
201,250.00
184,000.00
150,000.00
126,500.00
161,000.00
108,000.00
117,000.00
150,000.00
168,000.00
168,000.00
430.00
5,250.00
83,375.00
86,250.00
92,000.00
97,750.00
3,450.00
4,800.00
42,550.00
31,050.00
15,525.00
18,700.00
157,500.00
42,000.00
77,625.00
70,000.00
6,900.00
42,000.00

Dinas Pekerjaan Umum Kota Surakarta

NO

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

NAMA BAHAN

SATUAN

Paving I
tebal 6 cm
Paving tiga berlian tebal 6 cm
Paving Kawung tebal 6 cm
Paving Kawung tebal 8 cm
Paving CB 1 tebal 8 K.175 - 200 Natural
Paving CB 1 tebal 8 K.175 - 200 Merah
Paving CB 1 tebal 8 K.250 - 300 Natural
Paving CB 1 tebal 8 K.250 - 300 Merah
Paving CB 1 tebal 8 K.350 - 400 Natural
Paving CB 1 tebal 8 K.350 - 400 Merah
Paving Holland tebal 8 K.175 - 200 Natural
Paving Holland tebal 8 K.175 - 200 Merah
Paving Holland tebal 8 K.250 - 300 Natural
Paving Holland tebal 8 K.250 - 300 Merah
Paving Holland tebal 8 K.350 - 400 Natural
Paving Holland tebal 8 K.350 - 400 Merah
Paving Kawung lama tebal 8 K.175 - 200 Natural
Paving Kawung lama tebal 8 K.175 - 200 Merah
Paving Kawung lama tebal 8 K.250 - 300 Natural
Paving Kawung lama tebal 8 K.250 - 300 Merah
Paving Kawung lama tebal 8 K.350 - 400 Natural
Paving Kawung lama tebal 8 K.350 - 400 Merah
Paving Kawung sama sisi tebal 8 K.175 - 200 Natural
Paving Kawung sama sisi tebal 8 K.175 - 200 Merah
Paving Kawung sama sisi tebal 8 K.250 - 300 Natural
Paving Kawung sama sisi tebal 8 K.250 - 300 Merah
Paving Kawung sama sisi tebal 8 K.350 - 400 Natural
Paving Kawung sama sisi tebal 8 K.350 - 400 Merah
Paving Prisma tebal 8 cm K.250 - 300 ( 4 per m' )
Paving Sarang Lebah tebal 8 K.175 - 200 Natural
Paving Sarang Lebah tebal 8 K.175 - 200 Merah
Paving Sarang Lebah tebal 8 K.250 - 300 Natural
Paving Sarang Lebah tebal 8 K.250 - 300 Merah
Paving Sarang Lebah tebal 8 K.350 - 400 Natural
Paving Sarang Lebah tebal 8 K.350 - 400 Merah
Paving Segi Enam Sedang tebal 8 K.175 - 200 Natural
Paving Segi Enam Sedang tebal 8 K.175 - 200 Merah
Paving Segi Enam Sedang tebal 8 K.250 - 300 Natural
Paving Segi Enam Sedang tebal 8 K.250 - 300 Merah
Paving Segi Enam Sedang tebal 8 K.350 - 400 Natural
Paving Segi Enam Sedang tebal 8 K.350 - 400 Merah
Paving Segi Enam Kecil tebal 8 K.175 - 200 Natural
Paving Segi Enam Kecil tebal 8 K.175 - 200 Merah
Paving Segi Enam Kecil tebal 8 K.250 - 300 Natural
14

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
bj
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

HARGA

42,000.00
42,000.00
55,550.00
70,725.00
66,650.00
79,000.00
70,800.00
83,300.00
79,800.00
92,350.00
66,650.00
79,000.00
70,800.00
83,300.00
79,800.00
92,345.00
70,800.00
79,000.00
81,200.00
93,700.00
84,700.00
97,175.00
70,800.00
79,000.00
81,200.00
93,725.00
84,700.00
97,175.00
3,900.00
66,650.00
79,100.00
70,800.00
83,300.00
79,800.00
92,350.00
66,650.00
79,000.00
70,800.00
83,300.00
79,800.00
92,350.00
66,650.00
79,000.00
70,800.00

Dinas Pekerjaan Umum Kota Surakarta

NO

83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126

NAMA BAHAN

SATUAN

Paving Segi Enam Kecil tebal 8 K.250 - 300 Merah


Paving Segi Enam Kecil tebal 8 K.350 - 400 Natural
Paving Segi Enam Kecil tebal 8 K.350 - 400 Merah
Paving Tikar tebal 8 K.175 - 200 Natural
Paving Tikar tebal 8 K.175 - 200 Merah
Paving Tikar tebal 8 K.250 - 300 Natural
Paving Tikar tebal 8 K.250 - 300 Merah
Paving Tikar tebal 8 K.350 - 400 Natural
Paving Tikar tebal 8 K.350 - 400 Merah
Kansteen type A1 ( L )
Kansteen type B2 ( I )
Kansteen type B3 ( I )
Kansteen type K2 ( I )
Kansteen type K3 ( I )
Kansteen type K5 ( I )
Kansteen type K6 ( I )
Kansteen type Ram Panjang
Kansteen type Ram Pendek
Kansteen KIU
Kansteen S Besar
Kansteen S Kecil
Keramik 20 x 10 Roman Warna Muda
Keramik 20 x 10 Roman Warna Tua
Keramik 20 x 20 Roman Lantai Muda
Keramik 20 x 20 Roman Lantai Tua
Keramik 20 x 20 Roman Dinding Muda
Keramik 20 x 20 Roman Dinding Tua
Keramik 20 x 25 Roman Polos
Keramik 20 x 25 Roman Warna Motif
Keramik 30 x 30 Roman Polos
Keramik 30 x 30 Roman Warna Motif
Keramik 30 x 30 Mulia Polos / Warna Motif
Keramik 40 x 40 Polos Asia
Keramik 40 x 40 Muda Asia
Keramik 40 x 40 Tua Asia
Keramik 20 x 20 Diamond Muda / Tua
Keramik 30 x 30 cm (anti slip)
Keramik 20 x 20 Asia KM/WC
Keramik 20 x 25 polos / Warna Asia
Keramik 40 x 40 Warna / Motif
Keramik esensa 60 x 60
Porselin 11 x 11
Ubin Marmer Tulung Agung 30 x 60 cm
Ubin Marmer Tulung Agung 40 x 40 cm
15

m
m
m
m
m
m
m
m
m
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
2
m
2
m
m2
m2
m2
m2
m2
m2
m2
m2
2
m
m2
m2
m2
m2
m2
m2
m2
m2
m2
dos
m2
m2

HARGA

83,300.00
79,800.00
92,350.00
66,650.00
79,000.00
70,800.00
83,300.00
79,800.00
92,350.00
46,575.00
23,000.00
23,000.00
16,100.00
23,000.00
19,700.00
9,300.00
43,125.00
34,500.00
56,350.00
51,750.00
21,850.00
40,250.00
42,550.00
60,000.00
60,000.00
60,000.00
60,000.00
65,000.00
90,850.00
58,000.00
62,000.00
46,000.00
37,950.00
41,400.00
44,850.00
46,000.00
48,300.00
40,250.00
45,000.00
40,250.00
150,000.00
34,500.00
138,000.00
138,000.00

Dinas Pekerjaan Umum Kota Surakarta

NO

127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170

NAMA BAHAN

SATUAN

Ubin Marmer Tulung Agung 60 x 60 cm


Ubin Granito 30 x 30 cm Silver Halus
Ubin Granito 30 x 30 cm Silver Kasar
Ubin Granito 40 x 40 cm Silver Halus
Ubin Granito 40 x 40 cm Silver Kasar
Ubin Granito 60 x 60 cm Silver Halus
Plint Granit 10 x 20 cm (love)
Plint Granit 10 x 30 cm
Plint Granit 10 x 40 cm
Plint Ubin PC Warna 15 x 20 cm
Plint keramik 7 x 20
Plint keramik 10 x 20 polos muda / tua
Granit 40 x 40
Marmer 100 x 100
Marmer 60 x 60
Marmer 40 x 40
Marmer 30 x 30
Granito Anti Selip 20 x 20 cm
Wallpaper lebar 50 cm
Lem wallpaper
Tegel wafel warna
Tegel wafel abu-abu
Tegel abu-abu 20 x 20 cm
Tegel abu-abu 30 x 30 cm
Lantai perquet jati
Karpet
Genteng Morando Jatiwangi 18 bh/m
Genteng Kerpus Jatiwangi
Genteng Metal
Genteng Glusur
Genteng Kerpus Glusur
Genteng Pres Ex. Mojolaban / Mantili
Genteng Kerpus Ex. Mojolaban
Genteng Palentong Kecil Kebumen
Genteng Palentong Besar Kebumen
Genteng Kerpus Palentong Kebumen
Genteng beton berwarna besar Garuda
Genteng beton kerpus
Genteng beton polos 11/m SNI
Genteng beton kerpus polos
Sirap Kayu ulin
Atap Polycarbonat
Cat kayu merk Bee Brand
Cat tembok merk Decolith
16

m2
m2
m2
m2
m2
m2
2
m
bh
bh
bh
bh
bh
m
m
m
m
m
m2
m'
Kg
m
m
m
m
m
m2
bh
bh
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
Kg
Kg

HARGA

161,000.00
195,500.00
207,000.00
201,250.00
207,000.00
276,000.00
8,050.00
11,500.00
13,800.00
4,600.00
4,025.00
43,700.00
310,500.00
431,250.00
218,500.00
184,000.00
155,250.00
201,250.00
23,000.00
28,750.00
30,000.00
26,900.00
26,900.00
29,100.00
172,500.00
74,750.00
2,600.00
4,500.00
135,000.00
3,500.00
16,500.00
900.00
4,200.00
1,400.00
2,100.00
6,000.00
5,520.00
6,200.00
3,200.00
4,600.00
166,750.00
132,825.00
51,750.00
18,000.00

Dinas Pekerjaan Umum Kota Surakarta

NO

171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214

NAMA BAHAN

SATUAN

Cat tembok merk Catylac


Cat Besi F'talit Muda / Tua
Cat Genteng Sintex Muda / Tua
Plamur Kayu Merk Pedang / Avian
Plamur tembok Decopil
Minyak cat Tinner B (Afdiner)
Minyak cat Thinner A
Meni Kayu merk Pedang
Meni Besi Merk Pedang
Dempul Jadi / Wood Filler / warna jati
Cat besi Avian / Bee Brand
Politur / politur jadi
Sirlax Ex. India
Spirtus
Oker putih
Melamik
Lem Aica Aibon
Lem Putih (FOX)
Amplas besi
Amplas kayu
Minyak begesting
Grendel
Pengait angin / Hak angin
Kuwas 3" 4"
Kunci Selinder
Engsel angin biasa
Engsel H Nylon 777
Engsel H sedang Putih / Hitam
SpringKnip
Door stop
Door Closer
Wastafel INA muda / tua
Urinoir INA muda / tua
Floor drain Stainless / Biasa
Water drain + Aksesories
Closet Duduk Monoblok INA/TOTO Muda
Closet Jongkok INA/TOTO
Closet Jongkok Teraso
Bak Air teraso volume 0,30 m
Bak mandi fiberglass volume = 0,30 m
Wasbak 2 lubang allumunium Royal / Waren
Wasbak 1 lubang allumunium Royal / Waren
Bak cuci engkel stainless
Bak cuci double stainless
17

Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg
Kg
Ltr
Ltr
Kg
Ltr
Ltr
Ltr
Kg
Kg
Lbr
Lbr
Ltr
bh
bh
bh
bh
bh
bh
stel
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

HARGA

18,000.00
68,250.00
120,750.00
18,375.00
14,850.00
11,000.00
17,250.00
18,500.00
30,450.00
28,750.00
37,500.00
50,000.00
74,750.00
7,350.00
3,450.00
55,000.00
37,950.00
12,650.00
2,900.00
2,900.00
9,200.00
11,550.00
7,475.00
6,900.00
28,750.00
23,000.00
8,050.00
13,800.00
6,900.00
5,750.00
120,000.00
316,250.00
1,141,140.00
55,000.00
40,250.00
1,581,250.00
178,250.00
33,000.00
57,500.00
207,000.00
431,250.00
373,750.00
195,500.00
431,250.00

Dinas Pekerjaan Umum Kota Surakarta

NO

215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

NAMA BAHAN

SATUAN

Bak air porselin


Kran merk NIVAN " Toha / Avos
Kran merk San Ei "
Seal tape
Pegangan pintu / door holder
Rel pintu dorong
Pintu plastik 70 x 200
Pintu allumunium 62 x 197
Pintu allumunium 90 x 197 (Coklat)
Pintu allumunium 80 x 197 (putih)
Pintu allumunium 62 x 190
Pintu Rolling Door allumunium
Pintu Rolling Door besi biasa
Pintu Folding Gate
Folding Gate besi biasa
Folding Gate galvalum
Kunci tanam merk Kuda Terbang besar 2 x putar
Kunci tanam merk ROYAL
Kunci tanam merk SES
Kunci tanam merk YULE
Kunci tanam merk UNION
Kunci tanam Kamar Mandi TOP
Kunci silinder
Kunci lemari
Pompa air sanyo Otomatis / Shiimizu
Water Tank (Tangki air) merk Penguin
Water Tank (Tangki air) merk Penguin
Water Tank (Tangki air) merk Penguin
Water Tank (Tangki air) merk Penguin
Paku Triplek 2 cm
Paku Reng
Paku Usuk
Paku beton 5 cm / 10 cm
Paku besar / paku gording / dudur = 12 cm
Paku Payung
Paku Asbes kecil / besar
Paku Sekrup 3,50 "
Paku Pancing
Feezer 8 mm / 12 mm
Besi siku / profil C
Besi IWF pj = 12 m
Besi jaring kawat baja
Kawat Nyamuk Lb 1 m, Lb 1,2 m
Kawat Kasa
18

bh
bh
bh
bh
bh
bh
bh
m
m
m
m
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
1000 ltr
700 ltr
500 ltr
320 ltr
Kg
Kg
Kg
Kg / Bj
Kg
Kg
bh
Kg / bj
Kg / bh
bh
Lj
Kg
Kg
m
m

HARGA

450,000.00
34,500.00
97,750.00
1,725.00
57,500.00
172,500.00
207,000.00
977,500.00
1,035,000.00
977,500.00
109,250.00
345,000.00
218,500.00
460,000.00
299,000.00
356,500.00
63,250.00
210,000.00
207,000.00
63,250.00
115,000.00
34,500.00
80,500.00
32,200.00
862,500.00
1,115,500.00
845,250.00
784,300.00
507,150.00
16,100.00
14,500.00
14,500.00
500.00
14,500.00
20,700.00
15,600.00
20,000.00
20,000.00
20,000.00
17,250.00
15,000.00
20,250.00
31,625.00
23,000.00

Dinas Pekerjaan Umum Kota Surakarta

NO

247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
282
283
284
285
286
287
288
289

NAMA BAHAN

SATUAN

Kawat Kasa Harmonika No.16


Kawat bronjong 3 mm
Kawat bronjong 4 mm
Kawat bronjong 5 mm
Karung plastik
Seng plat Bjls 20 Lb. 0,60
Seng plat Bjls 20 Lb. 0,90
Seng gelombang ( 180 x 80 ) tbl. 0,3
Seng gelombang ( 240 x 80 ) tbl. 0,2
Seng talang Bjls 30 lebar 0,60
Seng talang Bjls 30 lebar 0,90
Asbes gelombang besar ( 180 x 108 )
Asbes gelombang besar ( 240 x 108 )
Asbes gelombang mini ( 108 x 105 )
Asbes gelombang mini ( 240 x 105 )
Fiberglass 80 x 210 tb. 0,50 / 0,80
Fiberglass 80 x 240 tb. 0,50 / 0,80
Fiberglass 80 x 300 tb. 0,50 / 0,80
Fiberglass Plat Lb. 1 m, tb. 0,50
Solar Tup 80 x 210
Solar Tup 80 x 240
Solar Tup 80 x 300
Nok Stel gelombang 1,05 m
Nok Stel gelombang 1,08 m
Nok paten 1,05 m
Nok paten 1,08 m
Alluminium Sheet 0,3 mm ( 90 x 180 )
Formika ukuran pintu
Eternit ( 1,00 x 1,00 ) 3 mm
Harplex 4 mm ( 1,00 x 1,00 )
Harplex 5 mm ( 90 x 1,80 )
Harplex 4 mm ( 1,20 x 1,80 )
Triplex 3 mm
Multiplex 4 mm
Multiplex 6 mm
Multiplex 9 mm
Multiplek 12 mm
Teakwood 4 mm
Teakwood 3 mm
Ornamen Gypsum besar
Lys Gypsum sedang
Gypsum Rangka Alluminium
Gypsum Rangka Kayu 6 mm
Gypsum Rangka Besi 6 mm
19

m
Kg
Kg
Kg
Bh
Lb
Lb
Lb
Lb
m
m
Lb
Lb
Lb
Lb
Lb
Lb
Lb
m'
Lb
Lb
Lb
stel
stel
Lb
Lb
Roll
Lb
Lb
Lb
Lb
Lb
Lb
Lb
Lb
Lb
Lb
Lb
Lb
bh
m'
m
m
m

HARGA

25,300.00
11,250.00
13,800.00
12,700.00
1,725.00
16,100.00
24,150.00
66,700.00
40,250.00
22,500.00
33,500.00
58,650.00
78,200.00
43,125.00
57,500.00
64,400.00
73,600.00
92,000.00
19,550.00
154,675.00
176,525.00
220,800.00
26,450.00
44,850.00
23,000.00
38,525.00
943,000.00
149,500.00
10,350.00
14,750.00
46,000.00
46,000.00
40,250.00
49,000.00
60,375.00
103,500.00
143,750.00
71,875.00
83,375.00
17,250.00
14,375.00
97,750.00
126,500.00
80,500.00

Dinas Pekerjaan Umum Kota Surakarta

NO

290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333

NAMA BAHAN

SATUAN

Gypsum 6 mm (120 x 240 )


Lb
Gypsum 9 mm
Lb
Gypsum 12 mm (120 x 240 mm)
Lb
Langit-langit gypsum board t = 9 mm ( 120 x 240 )
Lb
Ply wood ( 4" x 8" ) 4 mm
Lb
Blackboard 18 mm
Lb
Teakblock 18 mm
Lb
MDF 3"
Lb
MDF 5"
Lb
MDF 9"
Lb
MDF 12"
Lb
Talang paralond Maspion plastik 4 m
Btg
Alluminium foil 1,25 x 60
Roll
Plastik ( di bawah genteng )
m / roll
Buis beton 15 cm
m'
Buis beton 20 cm
m'
Buis beton 30 cm
m'
Buis beton 40 cm
m'
Buis beton 50 cm
m'
Buis beton 60 cm
m'
Buis beton 80 cm m
biji
Buis beton 15 cm
m'
Buis beton 20 cm
m'
Buis beton 30 cm
m'
Pipa galvanis 2 " / 6 m. t= 2,5 mm
Btg
Pipa galvanis 3 " / 6 m. t= 2,5 mm
Btg
Pipa PVC / 4 m
Btg
Pipa PVC / 4 m
Btg
Pipa PVC 1" / 4 m
Btg
Pipa PVC 2" / 4 m
Btg
Pipa PVC 3" / 4 m
Btg
Pipa PVC 4" / 4 m
Btg
Kayu dolken untuk stutwerk 10 -12
m
Kayu jati 6/12 kozyn / kop rangka atap
m
Kayu jati 5/10
m
Kayu jati 5/7
m
Kayu jati reng 3/4
m'
Kayu jati reng 2/3
m'
Kayu jati ram pintu
m
Kayu jati ram jendela
m
Kayu jati papan 20 cm t = 2 cm
m
Kayu jati papan 30 cm t = 2 cm
m
Kayu bangkirai 6/12 pj = 4 m
m
Kayu bangkirai 5/10 pj = 4 m
m
20

HARGA

51,750.00
55,000.00
80,500.00
60,950.00
46,000.00
161,000.00
247,250.00
29,900.00
51,750.00
97,750.00
132,250.00
86,250.00
276,000.00
86,250.00
28,175.00
31,000.00
38,000.00
66,500.00
82,700.00
105,600.00
96,000.00
14,375.00
19,550.00
23,000.00
460,000.00
776,250.00
16,100.00
21,850.00
29,900.00
69,000.00
132,250.00
215,050.00
1,980,000.00
17,500,000.00
17,500,000.00
17,500,000.00
8,500.00
2,500.00
20,500,000.00
20,500,000.00
20,500,000.00
20,500,000.00
8,500,000.00
8,500,000.00

Dinas Pekerjaan Umum Kota Surakarta

NO

334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377

NAMA BAHAN

SATUAN

Kayu bangkirai 5/7 pj = 4 m


Kayu bangkirai reng 3/4 pj = 4 m
Kayu bangkirai reng 2/3 pj = 4 m
Kayu bangkirai ram pintu
Kayu bangkirai ram jendela
Kayu bangkirai papan 20 cm
Kayu bangkirai papan 30 cm
Kayu kamper 6/12
Kayu kamper 5/10
Kayu kamper 5/7
Kayu kamper reng 3/4
Kayu kamper reng 2/3
Kayu kamper ram pintu
Kayu kamper ram jendela
Kayu kamper papan 20 cm
Kayu kamper papan 30 cm
Kayu kruing 6/12
Kayu kruing 5/10
Kayu kruing 5/7
Kayu kruing reng 3/4
Kayu kruing reng 2/3
Kayu kruing ram pintu
Kayu kruing ram jendela
Kayu kruing papan 20 cm
Kayu kruing papan 30 cm
Kayu meranti 6/12
Kayu meranti 5/10
Kayu meranti 5/7
Kayu meranti reng 3/4
Kayu meranti reng 2/3
Kayu meranti ram pintu
Kayu meranti ram jendela
Kayu meranti papan 20 cm Pj = 4 m
Kayu meranti papan 30 cm
Kayu sengon 5/7
Kayu sengon papan
Kayu bakar
Kayu lis 2/3
Kayu lis profil 5 x 5 x 4
Kaca cermin tebal = 5 mm
Kaca Grafir Tebal 5 mm / biasa
Kaca Es Tebal 5 mm
Kaca Flora Tebal 5 mm
Kaca bening 3 mm
21

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
kwt
m'
m'
m2
m2
m2
m2
m2

HARGA

8,500,000.00
8,500,000.00
6,300,000.00
8,610,000.00
8,610,000.00
8,610,000.00
8,610,000.00
7,400,000.00
7,400,000.00
7,400,000.00
4,197,500.00
4,197,500.00
8,300,000.00
8,300,000.00
9,545,000.00
9,890,000.00
4,600,000.00
4,600,000.00
4,600,000.00
3,996,250.00
3,996,250.00
4,900,000.00
4,900,000.00
4,900,000.00
4,900,000.00
4,370,000.00
4,370,000.00
4,140,000.00
3,191,250.00
3,191,250.00
3,852,500.00
3,852,500.00
4,715,000.00
4,945,000.00
1,138,500.00
2,127,500.00
74,750.00
11,500.00
21,275.00
155,250.00
74,750.00
97,750.00
103,500.00
51,750.00

Dinas Pekerjaan Umum Kota Surakarta

NO

378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421

NAMA BAHAN

Kaca bening 5 mm
Kaca bening 8 mm
Kaca rayband 5 mm
Daun kaca naco merk Daici / daun bening
Freme naco (putih)/ coklat
Pagar besi Galvanis 0,60 x 2,40 (K1)
Pagar besi Galvanis 0,90 x 2,40 (K1)
Pagar besi Galvanis 1,20 x 2,40 (K1)
Pagar besi Galvanis 1,50 x 2,40 (K1)
Pagar besi Galvanis 1,75 x 2,40 (K1)
Pagar besi Galvanis 1,90 x 2,40 (K1)
Galvanis 0,60 6 mm
Galvanis 0,90 6 mm
Galvanis 1,20 6 mm
Galvanis 1,20 7 mm
Galvanis 1,50 6 mm
Galvanis 1,50 7 mm
Galvanis 1,75 7 mm
Galvanis 1,90 7 mm
Galvalun plat 0,60
Galvalun plat 0,90
Fiber Plat L 100
Fiber Gelombang tebal
Fiber gelombang tipis
Pipa GIP 1,5" medium A
Pipa GIP 2" medium A
Pipa GIP 2,5 " P = 6 m' medium A
Pipa GIP 3 " P = 6 m' medium A
Pipa GIP 4" P = 6 m' medium A
Pipa GIP 3" P = 6 m'
Pipa GIP 1,5" medium B
Pipa GIP 2" medium B
Aspal bitument
Aspal curah
Aspal campuran panas ( AC/ATB ) dgn tackcoat
Teer
Solar
Solar industri
Pelumas
SAE 20
SAE 40
SAE 140 ( HDA )
SAE 140 ( ETA )
SAE 90 ( HAD )
22

SATUAN

HARGA

m2
m2
m2
m2
daun
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m'
m'
Lbr
Lbr
Lbr
btg
btg
btg
btg
btg
btg
btg
btg
drum / kg
Kg
ton
Kg
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr

74,750.00
149,500.00
92,000.00
10,925.00
10,235.00
575,000.00
690,000.00
805,000.00
920,000.00
1,035,000.00
1,150,000.00
161,000.00
178,250.00
224,250.00
322,000.00
281,750.00
368,000.00
414,000.00
448,500.00
31,050.00
43,700.00
19,200.00
60,000.00
40,000.00
316,250.00
431,250.00
603,750.00
747,500.00
1,092,500.00
402,500.00
201,250.00
258,750.00
9,200.00
8,685.00
899,750.00
6,640.00
5,175.00
5,520.00
32,200.00
31,050.00
29,325.00
31,050.00
27,600.00
31,050.00

Dinas Pekerjaan Umum Kota Surakarta

NO

NAMA BAHAN

422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465

SAE 90 ( ETA )
Vaselin
Bensin
Minyak tanah
Besi Tralis Naco
Cat MarkaThermo Plastik
Glasbit
Teakwood 6 mm (120 x 2,10)
Multiplex 18 mm
Bambu apus / ori
Ijuk
Tanah Liat
Bendrat / Kawat Beton
Besi Beton
Cat Genteng Dulux
Weather sield ( Dulux )
Wastafel TOTO bodi / komplit
Kran
Kayu tahun
Closet duduk INA / TOTO (biasa)
Cat besi / genteng Mowilex 2 lt
Solar tuf 0,80 x 180
Galvalum
Besi angkur = 8 mm
Lem kayu
Paku 1 - 2,5 cm
Paku 5 - 7 cm
Paku sekrup 5 cm
Bilik bambu
Lys kayu 2/4
Plywood tb. 9 mm
Dolken kayu galam
Formite / penjaga jarak bekisting
Asbes semen
Akustik
Profil Alluminium "T"
Kawat Diameter 4 mm
Ramset
Besi Profil
Besi siku L.30.30.3
Besi plat
Kawat las
Pintu lipat
Sunscreen alluminium

SATUAN

Ltr
Kg
Ltr
Ltr
m'
5 Kg
Kg
Lb
Lb
Btg
Kg
m
Kg
Kg
Gln
Gln
bh
bh
bh
Gln
m'
m'
kg
kg
kg
kg
kg
m
m
lbr
btg
bh
m
lbr
m'
kg
bh
kg
kg
kg
kg
m
m
23

HARGA

27,600.00
40,250.00
5,175.00
9,200.00
9,750.00
224,250.00
50,600.00
140,875.00
201,250.00
7,475.00
11,500.00
57,500.00
12,700.00
9,450.00
140,300.00
184,000.00
1,035,000.00
28,750.00
1,437,500.00
1,006,250.00
140,300.00
132,250.00
42,550.00
13,000.00
11,500.00
11,500.00
13,800.00
8,050.00
5,175.00
13,225.00
126,500.00
6,900.00
6,325.00
10,350.00
68,250.00
48,300.00
14,950.00
2,875.00
11,750.00
11,750.00
11,750.00
69,000.00
690,000.00
460,000.00

Dinas Pekerjaan Umum Kota Surakarta

NO

466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509

NAMA BAHAN

SATUAN

Profil alluminium
Skrup fixer
Sealant
Profil kaca
Venetion & Vertical blinds
Besi beton
Baja strip
Alluminium strip
Ubin abu-abu 40 x 40
Ubin warna 40 x 40
Ubin warna 30 x 30
Ubin warna 20 x 20
Ubin teralux marmer 60 x 60
Ubin teralux marmer 40 x 40
Ubin teralux marmer 30 x 30
Ubin keramik artistik ukuran 10 x 20
Ubin keramik artistik ukuran 10 x 10
Ubin keramik artistik ukuran 5 x 20
Mozaik ukuran 30 x 30
Plint ubin PC abu-abu 15 x 20
Plint ubin PC abu-abu 10 x 30
Plint ubin PC abu-abu 10 x 40
Plin ubin PC warna 15 x 20
Plin ubin PC warna 10 x 30
Plin ubin PC warna 10 x 40
Plint keramik artistik 10 x 20
Plint keramik artistik 10 x 10
Plint keramik artistik 5 x 20
Lantai kayu (gymfloor)
Vinyl
Lem vinyl
Air
Kabel listrik 1,50 mm
Kabel listrik 2,50 mm
Fitting porselin
Lampu SL 18 watt
Lampu SL 20 watt
Fotto cell 10 A
Kabel NYM 3 x 1,50 mm
Kabel NYM 3 x 2,50 mm
Kabel DX
KWH meter
Box meter
Box MCB
24

m'
bh
tube
m'
m
kg
kg
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
bh
kg
ltr
m'
m'
bh
bh
bh
bh
m'
m'
m'
bh
bh
bh

HARGA

61,500.00
95.00
40,250.00
2,650.00
2,650.00
9,450.00
12,350.00
2,650.00
2,650.00
2,650.00
15,900.00
4,000.00
7,950.00
26,450.00
13,225.00
4,000.00
52,900.00
4,000.00
26,450.00
6,600.00
19,900.00
6,600.00
26,450.00
13,225.00
13,225.00
9,200.00
9,775.00
10,350.00
287,500.00
5,250.00
12,650.00
15.00
5,175.00
6,900.00
3,450.00
30,150.00
33,925.00
80,500.00
6,325.00
8,625.00
4,025.00
164,600.00
28,750.00
40,250.00

Dinas Pekerjaan Umum Kota Surakarta

NO

510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553

NAMA BAHAN

SATUAN

T. Dos
MCB 10 A
Rumput Lamuran
Rumput Jepang
Bakung daun lebar 2 rmp t = 25 cm
Bakung daun kecil 3 rmp t = 20 cm
Bakung lebar 3 rmp
Terang bulan lebar 1 rmp t = 25 cm
Tela-tela lebar 2 rmp
Lili Brazil lebar 3 rmp
Kacang-kacangan lebar 2 rmp
Adam Hawa lebar 2 rmp
Song of India lebar 2 rmp t = 50 cm
Portulaca (Sutra Bombay) lebar 3 rmp
Suplir lebar 3 rmp
Lantana camara lebar 2 rmp
Iris kuning lebar 3 rmp
Iris cakar ayam lebar 3 cm
Aponika lebar 3 rmp
Bromelia lebar 2 rmp
Sanseviera lebar 3 rmp
Cantik manis lebar 2 rmp
Aralea Castor lebar 1 rmp t = 30 cm
Mandogras lebar 2 rmp
Air Mancur lebar lebar 3 rmp t = 50 cm
Tricolor lebar 1 rmp t = 1 m
Heliconia lebar 3 rmp t = 75 cm
Batavia kecil lebar 1 rmp t = 25 cm
Batavia besar lebar 1 rmp t = 75 cm
Melati Jepang lebar 1 rmp t = 25 cm
Kembang sepatu lebar 13 rmp t = 50 cm
Bougenvil lebar 1 rmp t = 1 m
Mahkota duri lebar 2 rmp t = 25 cm
Euphorbia lebar 1 rmp t = 20 - 30 cm
Hanjuang lebar 1 rmp t = 1 m
Puring lebar 1 rmp t = 1 m
Oliander lebar 2 rmp t = 25 cm
Olyana lebar 1 rmp t = 25 cm
Agave lebar 1 rmp t = 50 cm
Kana lebar 3 rmp t = 50 cm
Alamanda lebar 2 rmp t = 1 m
Palem putri t = 3 m
Palem ekor tupai t = 3 m
Mahoni t = 2 m
25

bh
bh

HARGA

1,725.00
34,500.00
7,250.00
9,650.00
4,200.00
3,600.00
1,800.00
6,000.00
2,400.00
2,400.00
1,800.00
1,800.00
24,150.00
2,400.00
6,000.00
2,400.00
2,400.00
9,000.00
1,800.00
2,400.00
2,400.00
2,400.00
14,500.00
3,600.00
6,000.00
18,100.00
9,050.00
7,250.00
24,150.00
12,075.00
3,600.00
48,300.00
3,600.00
24,150.00
6,050.00
18,100.00
6,050.00
24,150.00
12,075.00
12,075.00
12,075.00
181,125.00
181,125.00
30,200.00

Dinas Pekerjaan Umum Kota Surakarta

NO

554
555
556
557

NAMA BAHAN

SATUAN

Eucalyptus t = 1 m
Bintaro t = 3 m
Dadap merah t = 3 m
Tabebuya t = 4 m

HARGA

60,375.00
181,125.00
181,125.00
301,875.00

26

Dinas Pekerjaan Umum Kota Surakarta

NO

558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575

NAMA BAHAN

SATUAN

Galian Tanah Untuk Pipa


Dia. 1/2",3/4",1"
Dia. 2"
Dia. 3"
Dia. 4"
Dia. 6"
Dia. 8"
Dia. 10"
Dia. 16"
Dia. 20"
Urugan Tanah dan Pemadatan Untuk Pipa
Dia. 1/2",3/4",1"
Dia. 2"
Dia. 3"
Dia. 4"
Dia. 6"
Dia. 8"
Dia. 10"
Dia. 16"
Dia. 20"

HARGA

/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'

13,180.00
13,180.00
13,180.00
13,180.00
13,180.00
13,180.00
13,180.00
13,180.00
13,180.00

/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'
/m'

16,475.00
16,475.00
16,475.00
16,475.00
16,475.00
16,475.00
16,475.00
16,475.00
16,475.00

SURAKARTA, 13 APRIL 2011

CV FANI SOLO RAYA

SUDARMAN,SPd,ST,MT
DIREKTUR

27

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
100,000
112,500
150,000
35,000
125,000
175,000
105,000
175,000
85,000
650
175,000
160,000
125,000
110,000
140,000
135,000
130,000
150,000
160,000
165,000
340
5,500
72,500
75,000
80,000
85,000
3,000
4,200
37,000
27,000
13,500
16,250
212,500
41,000
67,500
10,000
6,000
35,200

KENAIKAN 15 %
-

15,000.00
16,875.00
22,500.00
5,250.00
18,750.00
26,250.00
15,750.00
26,250.00
12,750.00
97.50
26,250.00
24,000.00
18,750.00
16,500.00
21,000.00
20,250.00
19,500.00
22,500.00
24,000.00
24,750.00
51.00
825.00
10,875.00
11,250.00
12,000.00
12,750.00
450.00
630.00
5,550.00
4,050.00
2,025.00
2,437.50
31,875.00
6,150.00
10,125.00
1,500.00
900.00
5,280.00

28

JUMLAH TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

115,000.00
129,375.00
172,500.00
40,250.00
143,750.00
201,250.00
120,750.00
201,250.00
97,750.00
747.50
201,250.00
184,000.00
143,750.00
126,500.00
161,000.00
155,250.00
149,500.00
172,500.00
184,000.00
189,750.00
391.00
6,325.00
83,375.00
86,250.00
92,000.00
97,750.00
3,450.00
4,830.00
42,550.00
31,050.00
15,525.00
18,687.50
244,375.00
47,150.00
77,625.00
70,000.00
6,900.00
40,480.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
35,200
35,200
48,300
61,500
57,950
68,700
61,580
72,450
69,400
80,300
57,950
68,700
61,580
72,450
69,400
80,300
61,580
68,750
70,600
81,500
73,650
84,500
61,580
68,750
70,600
81,500
73,650
84,500
3,380
57,950
68,760
61,580
72,450
69,400
80,300
57,950
68,700
61,580
72,450
69,400
80,300
57,950
68,700
61,580

KENAIKAN 15 %
-

5,280.00
5,280.00
7,245.00
9,225.00
8,692.50
10,305.00
9,237.00
10,867.50
10,410.00
12,045.00
8,692.50
10,305.00
9,237.00
10,867.50
10,410.00
12,045.00
9,237.00
10,312.50
10,590.00
12,225.00
11,047.50
12,675.00
9,237.00
10,312.50
10,590.00
12,225.00
11,047.50
12,675.00
507.00
8,692.50
10,314.00
9,237.00
10,867.50
10,410.00
12,045.00
8,692.50
10,305.00
9,237.00
10,867.50
10,410.00
12,045.00
8,692.50
10,305.00
9,237.00
29

JUMLAH TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

40,480.00
40,480.00
55,545.00
70,725.00
66,642.50
79,005.00
70,817.00
83,317.50
79,810.00
92,345.00
66,642.50
79,005.00
70,817.00
83,317.50
79,810.00
92,345.00
70,817.00
79,062.50
81,190.00
93,725.00
84,697.50
97,175.00
70,817.00
79,062.50
81,190.00
93,725.00
84,697.50
97,175.00
3,887.00
66,642.50
79,074.00
70,817.00
83,317.50
79,810.00
92,345.00
66,642.50
79,005.00
70,817.00
83,317.50
79,810.00
92,345.00
66,642.50
79,005.00
70,817.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
72,450
69,400
80,300
57,950
68,700
61,580
72,450
69,400
80,300
40,500
20,000
20,000
14,000
20,000
17,150
8,080
37,500
30,000
49,000
45,000
19,000
35,000
37,000
75,000
80,000
70,000
80,000
70,000
79,000
78,000
87,000
40,000
33,000
36,000
39,000
40,000
42,000
35,000
34,000
35,000
75,000
30,000
120,000
120,000

KENAIKAN 15 %
42,000
-

10,867.50
10,410.00
12,045.00
8,692.50
10,305.00
9,237.00
10,867.50
10,410.00
12,045.00
6,075.00
3,000.00
3,000.00
2,100.00
3,000.00
2,572.50
1,212.00
5,625.00
4,500.00
7,350.00
6,750.00
2,850.00
5,250.00
5,550.00
11,250.00
12,000.00
10,500.00
12,000.00
10,500.00
11,850.00
11,700.00
13,050.00
6,000.00
4,950.00
5,400.00
5,850.00
6,000.00
6,300.00
5,250.00
5,100.00
5,250.00
11,250.00
4,500.00
18,000.00
18,000.00
30

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,300.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUMLAH TOTAL
83,317.50
79,810.00
92,345.00
66,642.50
79,005.00
70,817.00
83,317.50
79,810.00
92,345.00
46,575.00
23,000.00
23,000.00
16,100.00
23,000.00
19,722.50
9,292.00
43,125.00
34,500.00
56,350.00
51,750.00
21,850.00
40,250.00
42,550.00
86,250.00
92,000.00
80,500.00
92,000.00
80,500.00
90,850.00
89,700.00
100,050.00
46,000.00
37,950.00
41,400.00
44,850.00
46,000.00
48,300.00
40,250.00
39,100.00
40,250.00
86,250.00
34,500.00
138,000.00
138,000.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
140,000
170,000
180,000
175,000
180,000
240,000
7,000
10,000
12,000
4,000
3,500
38,000
270,000
375,000
190,000
160,000
135,000
175,000
80,000
25,000
23,400
23,400
25,300
150,000
65,000
2,500
6,750
137,500
3,000
14,300
625
4,250
1,150
1,800
6,750
4,800
5,400
2,750
3,985
145,000
115,500
45,000
60,000

KENAIKAN 15 %
40,000
-

21,000.00
25,500.00
27,000.00
26,250.00
27,000.00
36,000.00
1,050.00
1,500.00
1,800.00
600.00
525.00
5,700.00
40,500.00
56,250.00
28,500.00
24,000.00
20,250.00
26,250.00
12,000.00
3,750.00
0.00
3,510.00
3,510.00
3,795.00
22,500.00
9,750.00
375.00
1,012.50
20,625.00
450.00
2,145.00
93.75
637.50
172.50
270.00
1,012.50
720.00
810.00
412.50
597.75
21,750.00
17,325.00
6,750.00
9,000.00
31

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUMLAH TOTAL
161,000.00
195,500.00
207,000.00
201,250.00
207,000.00
276,000.00
8,050.00
11,500.00
13,800.00
4,600.00
4,025.00
43,700.00
310,500.00
431,250.00
218,500.00
184,000.00
155,250.00
201,250.00
92,000.00
28,750.00
0.00
26,910.00
26,910.00
29,095.00
172,500.00
74,750.00
2,875.00
7,762.50
158,125.00
3,450.00
16,445.00
718.75
4,887.50
1,322.50
2,070.00
7,762.50
5,520.00
6,210.00
3,162.50
4,582.75
166,750.00
132,825.00
51,750.00
69,000.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
72,500
40,000
105,000
16,000
32,500
11,000
15,000
17,000
16,000
25,000
36,000
35,000
65,000
6,500
3,000
37,500
33,000
11,000
1,900
2,000
8,000
7,500
6,500
6,000
25,000
20,000
7,000
12,000
6,000
5,000
300,000
275,000
650,000
30,000
35,000
1,375,000
155,000
28,750
50,000
180,000
375,000
325,000
170,000
375,000

KENAIKAN 15 %

45,000
105,000
15,000
30,000
45,000
42,900
275,000
650,000
75,000
1,375,000
155,000
275,000
200,000
-

10,875.00
6,000.00
15,750.00
2,400.00
4,875.00
1,650.00
2,250.00
2,550.00
2,400.00
3,750.00
5,400.00
5,250.00
9,750.00
975.00
450.00
5,625.00
4,950.00
1,650.00
285.00
300.00
1,200.00
1,125.00
975.00
900.00
3,750.00
3,000.00
1,050.00
1,800.00
900.00
750.00
45,000.00
41,250.00
97,500.00
4,500.00
5,250.00
206,250.00
23,250.00
4,312.50
7,500.00
27,000.00
56,250.00
48,750.00
25,500.00
56,250.00
32

0.00
6,750.00
15,750.00
2,250.00
0.00
0.00
0.00
0.00
0.00
4,500.00
6,750.00
2,145.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41,250.00
97,500.00
11,250.00
0.00
206,250.00
23,250.00
0.00
0.00
0.00
41,250.00
30,000.00
0.00
0.00

JUMLAH TOTAL
83,375.00
46,000.00
120,750.00
18,400.00
37,375.00
12,650.00
17,250.00
19,550.00
18,400.00
28,750.00
41,400.00
40,250.00
74,750.00
7,475.00
3,450.00
43,125.00
37,950.00
12,650.00
2,185.00
2,300.00
9,200.00
8,625.00
7,475.00
6,900.00
28,750.00
23,000.00
8,050.00
13,800.00
6,900.00
5,750.00
345,000.00
316,250.00
747,500.00
34,500.00
40,250.00
1,581,250.00
178,250.00
33,062.50
57,500.00
207,000.00
431,250.00
373,750.00
195,500.00
431,250.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
30,000
85,000
1,500
50,000
150,000
180,000
850,000
900,000
850,000
300,000
190,000
400,000
260,000
310,000
55,000
180,000
55,000
100,000
30,000
28,000
750,000
970,000
735,000
682,000
441,000
14,000
12,000
10,000
6,000
12,000
18,000
250
18,000
7,000
8,500
20,000

KENAIKAN 15 %
30,000
700,000
16,500
-

0.00
4,500.00
12,750.00
225.00
7,500.00
22,500.00
27,000.00
127,500.00
135,000.00
127,500.00
0.00
45,000.00
28,500.00
60,000.00
39,000.00
46,500.00
8,250.00
0.00
27,000.00
8,250.00
15,000.00
4,500.00
0.00
4,200.00
112,500.00
145,500.00
110,250.00
102,300.00
66,150.00
2,100.00
1,800.00
1,500.00
900.00
1,800.00
2,700.00
37.50
0.00
2,700.00
0.00
1,050.00
1,275.00
0.00
0.00
3,000.00
33

0.00
4,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
105,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,475.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUMLAH TOTAL
0.00
34,500.00
97,750.00
1,725.00
57,500.00
172,500.00
207,000.00
977,500.00
1,035,000.00
977,500.00
0.00
345,000.00
218,500.00
460,000.00
299,000.00
356,500.00
63,250.00
0.00
207,000.00
63,250.00
115,000.00
34,500.00
0.00
32,200.00
862,500.00
1,115,500.00
845,250.00
784,300.00
507,150.00
16,100.00
13,800.00
11,500.00
6,900.00
13,800.00
20,700.00
287.50
0.00
20,700.00
0.00
8,050.00
9,775.00
0.00
0.00
23,000.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
22,000
1,500
14,000
21,000
58,000
35,000
20,000
30,000
51,000
68,000
37,500
50,000
31,500
36,000
45,000
17,000
134,500
153,500
192,000
23,000
39,000
20,000
18,000
820,000
130,000
9,000
13,000
40,000
35,000
42,500
52,500
90,000
125,000
62,500
72,500
15,000
12,500
85,000
110,000
70,000

KENAIKAN 15 %
56,000
64,000
80,000
-

3,300.00
0.00
0.00
0.00
225.00
2,100.00
3,150.00
8,700.00
5,250.00
3,000.00
4,500.00
7,650.00
10,200.00
5,625.00
7,500.00
4,725.00
5,400.00
6,750.00
2,550.00
20,175.00
23,025.00
28,800.00
3,450.00
5,850.00
3,000.00
2,700.00
123,000.00
19,500.00
1,350.00
1,950.00
6,000.00
0.00
5,250.00
6,375.00
7,875.00
13,500.00
18,750.00
9,375.00
10,875.00
2,250.00
1,875.00
12,750.00
16,500.00
10,500.00
34

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,400.00
9,600.00
12,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUMLAH TOTAL
25,300.00
0.00
0.00
0.00
1,725.00
16,100.00
24,150.00
66,700.00
40,250.00
23,000.00
34,500.00
58,650.00
78,200.00
43,125.00
57,500.00
36,225.00
41,400.00
51,750.00
19,550.00
154,675.00
176,525.00
220,800.00
26,450.00
44,850.00
23,000.00
20,700.00
943,000.00
149,500.00
10,350.00
14,950.00
46,000.00
0.00
40,250.00
48,875.00
60,375.00
103,500.00
143,750.00
71,875.00
83,375.00
17,250.00
14,375.00
97,750.00
126,500.00
80,500.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
45,000
52,000
70,000
53,000
40,000
140,000
215,000
26,000
45,000
85,000
115,000
75,000
240,000
75,000
24,500
32,200
35,000
57,800
71,900
91,850
83,500
12,500
17,000
20,000
400,000
675,000
14,000
19,000
26,000
60,000
115,000
187,000
15,000,000
15,000,000
15,000,000
7,500,000
7,500,000
17,500,000
17,500,000
15,000,000
20,000,000
8,200,000
8,200,000

KENAIKAN 15 %
-

6,750.00
7,800.00
10,500.00
7,950.00
6,000.00
21,000.00
32,250.00
3,900.00
6,750.00
12,750.00
17,250.00
11,250.00
36,000.00
11,250.00
3,675.00
4,830.00
5,250.00
8,670.00
10,785.00
13,777.50
12,525.00
1,875.00
2,550.00
3,000.00
60,000.00
101,250.00
2,100.00
2,850.00
3,900.00
9,000.00
17,250.00
28,050.00
0.00
2,250,000.00
2,250,000.00
2,250,000.00
1,125,000.00
1,125,000.00
2,625,000.00
2,625,000.00
2,250,000.00
3,000,000.00
1,230,000.00
1,230,000.00
35

JUMLAH TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

51,750.00
59,800.00
80,500.00
60,950.00
46,000.00
161,000.00
247,250.00
29,900.00
51,750.00
97,750.00
132,250.00
86,250.00
276,000.00
86,250.00
28,175.00
37,030.00
40,250.00
66,470.00
82,685.00
105,627.50
96,025.00
14,375.00
19,550.00
23,000.00
460,000.00
776,250.00
16,100.00
21,850.00
29,900.00
69,000.00
132,250.00
215,050.00
0.00
17,250,000.00
17,250,000.00
17,250,000.00
8,625,000.00
8,625,000.00
20,125,000.00
20,125,000.00
17,250,000.00
23,000,000.00
9,430,000.00
9,430,000.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
8,200,000
6,750,000
4,750,000
9,000,000
9,000,000
9,000,000
10,200,000
7,200,000
7,200,000
6,500,000
3,650,000
3,650,000
7,400,000
7,400,000
8,300,000
8,600,000
4,100,000
4,100,000
4,000,000
3,475,000
3,475,000
4,210,000
4,210,000
5,405,000
5,000,000
3,800,000
3,800,000
3,600,000
2,775,000
2,775,000
3,350,000
3,350,000
4,100,000
4,300,000
990,000
1,850,000
65,000
10,000
18,500
135,000
400,000
85,000
90,000
45,000

KENAIKAN 15 %
65,000
-

1,230,000.00
1,012,500.00
712,500.00
1,350,000.00
1,350,000.00
1,350,000.00
1,530,000.00
1,080,000.00
1,080,000.00
975,000.00
547,500.00
547,500.00
1,110,000.00
1,110,000.00
1,245,000.00
1,290,000.00
615,000.00
615,000.00
600,000.00
521,250.00
521,250.00
631,500.00
631,500.00
810,750.00
750,000.00
570,000.00
570,000.00
540,000.00
416,250.00
416,250.00
502,500.00
502,500.00
615,000.00
645,000.00
148,500.00
277,500.00
9,750.00
1,500.00
2,775.00
20,250.00
60,000.00
12,750.00
13,500.00
6,750.00
36

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,750.00
0.00
0.00
0.00

JUMLAH TOTAL
9,430,000.00
7,762,500.00
5,462,500.00
10,350,000.00
10,350,000.00
10,350,000.00
11,730,000.00
8,280,000.00
8,280,000.00
7,475,000.00
4,197,500.00
4,197,500.00
8,510,000.00
8,510,000.00
9,545,000.00
9,890,000.00
4,715,000.00
4,715,000.00
4,600,000.00
3,996,250.00
3,996,250.00
4,841,500.00
4,841,500.00
6,215,750.00
5,750,000.00
4,370,000.00
4,370,000.00
4,140,000.00
3,191,250.00
3,191,250.00
3,852,500.00
3,852,500.00
4,715,000.00
4,945,000.00
1,138,500.00
2,127,500.00
74,750.00
11,500.00
21,275.00
155,250.00
460,000.00
97,750.00
103,500.00
51,750.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
65,000
130,000
80,000
9,500
8,900
500,000
600,000
700,000
800,000
900,000
1,000,000
140,000
155,000
195,000
280,000
245,000
320,000
360,000
390,000
27,000
38,000
16,750
52,200
34,800
275,000
375,000
525,000
650,000
950,000
350,000
175,000
225,000
7,554
856,900
6,325
4,800
28,000
27,000
25,500
27,000
24,000
27,000

KENAIKAN 15 %

1,200,000
4,500
-

9,750.00
19,500.00
12,000.00
1,425.00
1,335.00
75,000.00
90,000.00
105,000.00
120,000.00
135,000.00
150,000.00
21,000.00
23,250.00
29,250.00
42,000.00
36,750.00
48,000.00
54,000.00
58,500.00
4,050.00
5,700.00
2,512.50
7,830.00
5,220.00
41,250.00
56,250.00
78,750.00
97,500.00
142,500.00
52,500.00
26,250.00
33,750.00
0.00
1,133.06
42,845.00
316.25
0.00
720.00
4,200.00
4,050.00
3,825.00
4,050.00
3,600.00
4,050.00
37

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
180,000.00
0.00
0.00
0.00
675.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUMLAH TOTAL
74,750.00
149,500.00
92,000.00
10,925.00
10,235.00
575,000.00
690,000.00
805,000.00
920,000.00
1,035,000.00
1,150,000.00
161,000.00
178,250.00
224,250.00
322,000.00
281,750.00
368,000.00
414,000.00
448,500.00
31,050.00
43,700.00
19,262.50
60,030.00
40,020.00
316,250.00
431,250.00
603,750.00
747,500.00
1,092,500.00
402,500.00
201,250.00
258,750.00
0.00
8,686.83
899,745.00
6,641.25
0.00
5,520.00
32,200.00
31,050.00
29,325.00
31,050.00
27,600.00
31,050.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
24,000
35,000
4,500
8,000
195,000

175,000
4,500
10,000
50,000
10,000
8,000
122,000
160,000
900,000
25,000
875,000
122,000
115,000
37,000
10,000
10,000
12,000
7000
4500
11500
110000
6000
5500
22000
42000
13000
2,500.00
8,500.00
7,000.00
9,000.00
60,000.00
600,000.00
400,000.00

KENAIKAN 15 %
6,500
-

3,600.00
5,250.00
675.00
1,200.00
0.00
29,250.00
0.00
0.00
26,250.00
675.00
1,500.00
7,500.00
1,500.00
1,200.00
18,300.00
24,000.00
135,000.00
3,750.00
0.00
131,250.00
18,300.00
17,250.00
5,550.00
0.00
1,500.00
1,500.00
1,800.00
1,050.00
675.00
1,725.00
16,500.00
900.00
825.00
0.00
3,300.00
6,300.00
1,950.00
375.00
1,275.00
1,050.00
1,350.00
9,000.00
90,000.00
60,000.00
38

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
975.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

JUMLAH TOTAL
27,600.00
40,250.00
5,175.00
9,200.00
0.00
224,250.00
0.00
0.00
201,250.00
5,175.00
11,500.00
57,500.00
11,500.00
9,200.00
140,300.00
184,000.00
1,035,000.00
28,750.00
0.00
1,006,250.00
140,300.00
132,250.00
42,550.00
0.00
11,500.00
11,500.00
13,800.00
8,050.00
5,175.00
13,225.00
126,500.00
6,900.00
6,325.00
0.00
25,300.00
48,300.00
14,950.00
2,875.00
9,775.00
8,050.00
10,350.00
69,000.00
690,000.00
460,000.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
80,000.00
80.00
35,000.00
10,750.00
8,000.00
8,500.00
9,000.00
250,000.00
50,000.00
11,000.00
4,500.00
6,000.00
3,000.00
26,200.00
29,500.00
70,000.00
5,500.00
7,500.00
3,500.00
143150
25000
35000

KENAIKAN 15 %
-

12,000.00
12.00
5,250.00
0.00
0.00
0.00
1,612.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,200.00
1,275.00
1,350.00
37,500.00
7,500.00
1,650.00
0.00
675.00
900.00
450.00
3,930.00
4,425.00
10,500.00
825.00
1,125.00
525.00
21,472.50
3,750.00
5,250.00
39

JUMLAH TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

92,000.00
92.00
40,250.00
0.00
0.00
0.00
12,362.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,200.00
9,775.00
10,350.00
287,500.00
5,227.27
12,650.00
0.00
5,175.00
6,900.00
3,450.00
30,130.00
33,925.00
80,500.00
6,325.00
8,625.00
4,025.00
164,622.50
28,750.00
40,250.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU
1500
30000
6,900.00
9,200.00
4,025.00
3,450.00
1,725.00
5,750.00
2,300.00
2,300.00
1,725.00
1,725.00
23,000.00
2,300.00
5,750.00
2,300.00
2,300.00
8,625.00
1,725.00
2,300.00
2,300.00
2,300.00
13,800.00
3,450.00
5,750.00
17,250.00
8,625.00
6,900.00
23,000.00
11,500.00
3,450.00
46,000.00
3,450.00
23,000.00
5,750.00
17,250.00
5,750.00
23,000.00
11,500.00
11,500.00
11,500.00
172,500.00
172,500.00
28,750.00

KENAIKAN 15 %
-

225.00
4,500.00
345.00
460.00
201.25
172.50
86.25
287.50
115.00
115.00
86.25
86.25
1,150.00
115.00
287.50
115.00
115.00
431.25
86.25
115.00
115.00
115.00
690.00
172.50
287.50
862.50
431.25
345.00
1,150.00
575.00
172.50
2,300.00
172.50
1,150.00
287.50
862.50
287.50
1,150.00
575.00
575.00
575.00
8,625.00
8,625.00
1,437.50
40

JUMLAH TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1,725.00
34,500.00
7,245.00
9,660.00
4,226.25
3,622.50
1,811.25
6,037.50
2,415.00
2,415.00
1,811.25
1,811.25
24,150.00
2,415.00
6,037.50
2,415.00
2,415.00
9,056.25
1,811.25
2,415.00
2,415.00
2,415.00
14,490.00
3,622.50
6,037.50
18,112.50
9,056.25
7,245.00
24,150.00
12,075.00
3,622.50
48,300.00
3,622.50
24,150.00
6,037.50
18,112.50
6,037.50
24,150.00
12,075.00
12,075.00
12,075.00
181,125.00
181,125.00
30,187.50

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU

KENAIKAN 15 %

57,500.00
172,500.00
172,500.00
287,500.00

2,875.00
8,625.00
8,625.00
14,375.00

41

JUMLAH TOTAL
60,375.00
181,125.00
181,125.00
301,875.00

Dinas Pekerjaan Umum Kota Surakarta

37100
ASLI BARU

KENAIKAN 15 %

JUMLAH TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

42

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
-

43

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
44

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
48,300.00
45

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
46,000.00
????
????
???
46

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
???
51,750.00
120,750.00
17,250.00
34,500.00
51,750.00
45,045.00
316,250.00
747,500.00
86,250.00
##########
178,250.00
316,250.00
230,000.00
47

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
34,500.00
805,000.00
18,975.00
48

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
64,400.00
73,600.00
92,000.00
49

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
-

##############

50

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
74,750.00
-

51

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
##########
5,175.00
52

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
7,475.00
53

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
-

27,750.00
5,175.00
6,900.00

54

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
-

########

6,500.00
7,000.00
########
########
5,750.00
########
########
########
27,750.00
86,250.00
3,250.00
1,500.00
92,000.00
63,250.00
46,000.00
4,600.00
6,612.50
4,150.00
4,600.00
6,200.00
9,800.00
########
6,200.00
46,000.00
14,800.00
########
4,600.00
########
1,725.00
########
55

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
-

51,750.00

56

Dinas Pekerjaan Umum Kota Surakarta

JUMLAH TOTAL
-

57

Dinas Pekerjaan Umum Kota Surakarta

DAFTAR ANALISA
PEKERJAAN : PEMELIHARAAN GEDUNG DAN BANGUNAN BERUPA : PERBAIKAN GEDUNG KANTOR PUSAT
DAN PONDOK ASI
TAHUN ANGGARAN : 2011
A PEKERJAAN PERSIAPAN :
1 1 m2 Pembuatan Stegger dari bambu uk (40 x 50 x 20) cm
Upah
0.017 Oh Tukang Kayu
@ Rp.
0.002 Oh Kepala Tukang Kayu
@ Rp.
0.250 Oh Pekerja
@ Rp.
0.013 Oh Mandor
@ Rp.
Bahan
1.000 btg Bambu ori pj 6 m'
0.250 Kg Tali ijuk

@ Rp.
@ Rp.

49,140.00
52,080.00
31,815.00
49,140.00

7,475.00
11,500.00

B. PEKERJAAN TANAH :
1. Menggali 1 m tanah biasa sedalam 1 meter
Upah
0.750 Oh Pekerja
@ Rp.
0.025 Oh Mandor
@ Rp.

31,815.00
49,140.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

= Rp.
= Rp.

835.38
104.16
7,953.75
638.82
Rp.

9,532.11

7,475.00
2,875.00
Rp.

10,350.00

Rp.

19,882.11

Rp.

25,089.75

Rp.

Rp.

25,089.75

Rp.

30,844.80

Rp.

Rp.

30,844.80

Rp.

10,990.35

Rp.

Rp.

10,990.35

Rp.

8,363.25

23,861.25
1,228.50

Bahan

2. Menggali 1 m tanah biasa sedalam 2 meter


Upah
0.900 Oh Pekerja
@ Rp.
0.045 Oh Mandor
@ Rp.

31,815.00
49,140.00

= Rp.
= Rp.

28,633.50
2,211.30

Bahan

3 Membuang kembali 1 m tanah sejauh 30 meter


Upah
0.330 Oh Pekerja
0.010 Oh Mandor

@ Rp.
@ Rp.

31,815.00
49,140.00

= Rp.
= Rp.

10,498.95
491.40

Bahan

4 Mengurug kembali 1 m galian


Mengurug kembali 1 m galian dihitung dari kali dari indeks pekerjaan galian
Upah
0.250 Oh Pekerja
@ Rp.
31,815.00 = Rp.
0.008 Oh Mandor
@ Rp.
49,140.00 = Rp.

7,953.75
409.50

Bahan
Rp.

Rp.

8,363.25

Rp.

10,035.90

5 Mengurug 1 m pasir urug


Upah
0.300 Oh Pekerja
0.010 Oh Mandor

@ Rp.
@ Rp.

31,815.00
49,140.00

Bahan
27

= Rp.
= Rp.

9,544.50
491.40

Dinas Pekerjaan Umum Kota Surakarta

1.200 m Pasir urug

@ Rp.

70,000.00

= Rp.

84,000.00
Rp.

84,000.00

Rp.

94,035.90

Rp.

9,182.25

Rp.

108,000.00

Rp.

117,182.25

Rp.

80,375.40

Rp.

374,950.00

Rp.

455,325.40

Rp.

45,560.97

Rp.

182,040.00

Rp.

227,600.97

6 Mengurug 1 m sirtu padat untuk peninggian lantai bangunan


Upah
0.250 Oh Pekerja
0.025 Oh Mandor

Bahan
1.200 m Sirtu

@ Rp.
@ Rp.

31,815.00
49,140.00

@ Rp.

90,000.00

= Rp.
= Rp.

= Rp.

7,953.75
1,228.50

108,000.00

C. PEKERJAAN PONDASI :
1 Memasang 1 m pondasi batu belah, campuran 1 PC :4 PP
Upah
1.500
0.600
0.060
0.075

Bahan
1.200
163.000
0.520

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

m Batu belah 15 cm/20 cm @ Rp.


Kg PC
@ Rp.
m Pasir Pasang
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

126,500.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

47,722.50
26,019.00
2,948.40
3,685.50

151,800.00
171,150.00
52,000.00

2 Memasang 1 m batu kosong ( aanstamping )


Upah
0.780
0.390
0.039
0.039

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Bahan
1.200 m Batu belah 15 cm/20 cm @ Rp.
0.432 m Pasir Urug
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

126,500.00
70,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

24,815.70
16,912.35
1,916.46
1,916.46

151,800.00
30,240.00

D. PEKERJAAN DINDING
1 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Upah
0.600
0.200
0.020
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
140.000 bh Bata merah
39.950 Kg Portland Cement
0.091 m Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

19,089.00
8,673.00
982.80
1,474.20
Rp.

30,219.00

Rp.

111,247.50

Rp.

141,466.50

60,200.00
41,947.50
9,100.00

2 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 PC : 4 PP


Upah
0.600
0.200
0.020
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00
28

=
=
=
=

Rp.
Rp.
Rp.
Rp.

19,089.00
8,673.00
982.80
1,474.20
Rp.

30,219.00

Dinas Pekerjaan Umum Kota Surakarta

Bahan
140.000 bh Bata merah
26.550 Kg Portland Cement
0.093 m Pasir pasang

@ Rp.
@ Rp.
@ Rp.

430.00
1,050.00
100,000.00

= Rp.
= Rp.
= Rp.

60,200.00
27,877.50
9,300.00
Rp.

97,377.50

Rp.

127,596.50

3 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 PC : 5 PP


Upah
0.600
0.200
0.020
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
140.000 bh Bata merah
22.200 Kg Portland Cement
0.102 m Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

19,089.00
8,673.00
982.80
1,474.20
Rp.

30,219.00

Rp.

93,710.00

Rp.

123,929.00

60,200.00
23,310.00
10,200.00

4 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 PC : 6 PP


Upah
0.600
0.200
0.020
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
140.000 bh Bata merah
18.500 Kg Portland Cement
0.122 m Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

19,089.00
8,673.00
982.80
1,474.20
Rp.

30,219.00

Rp.

91,825.00

Rp.

122,044.00

60,200.00
19,425.00
12,200.00

5 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata, campuran spesi 1 PC : 3 PP


Upah
0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
70.000 bh Bata merah
14.370 Kg Portland Cement
0.0400 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

9,544.50
4,336.50
491.40
737.10
Rp.

15,109.50

Rp.

49,188.50

Rp.

64,298.00

30,100.00
15,088.50
4,000.00

6 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata, campuran spesi 1 PC : 4 PP


Upah
0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
70.000 bh Bata merah
11.500 Kg Portland Cement
0.0430 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

9,544.50
4,336.50
491.40
737.10
Rp.

15,109.50

Rp.

46,475.00

Rp.

61,584.50

30,100.00
12,075.00
4,300.00

7 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata, campuran spesi 1 PC : 5 PP


Upah
0.300

Oh Pekerja

@ Rp.

29

31,815.00

= Rp.

9,544.50

Dinas Pekerjaan Umum Kota Surakarta

0.100
0.010
0.015

Oh Tukang batu
Oh Kepala Tukang
Oh Mandor

Bahan
70.000 bh Bata merah
9.680 Kg Portland Cement
0.0450 m Pasir Pasang

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00

= Rp.
= Rp.
= Rp.

= Rp.
= Rp.
= Rp.

4,336.50
491.40
737.10
Rp.

15,109.50

Rp.

44,764.00

Rp.

59,873.50

30,100.00
10,164.00
4,500.00

8 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata, campuran spesi 1 PC : 6 PP


Upah
0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
70.000 bh Bata merah
8.320 Kg Portland Cement
0.049 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

9,544.50
4,336.50
491.40
737.10
Rp.

15,109.50

Rp.

43,736.00

Rp.

58,845.50

30,100.00
8,736.00
4,900.00

9 Memasang 1 m dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal bata, campuran spesi 1 PC : 8 PP


Upah
0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
70.000 bh Bata merah
6.500 Kg Portland Cement
0.050 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

9,544.50
4,336.50
491.40
737.10
Rp.

15,109.50

Rp.

41,925.00

Rp.

57,034.50

Rp.

18,566.52

Rp.

17,013.60

Rp.

35,580.12

Rp.

18,566.52

Rp.

13,986.40

Rp.

32,552.92

30,100.00
6,825.00
5,000.00

E. PEKERJAAN PLESTERAN :

1 Memasang 1 m plesteran 1 PC : 2 PP, tebal 20 mm


Upah
0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
13.632 kg Portland Cement
0.027 m Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

8,271.90
8,673.00
982.80
638.82

14,313.60
2,700.00

2 Memasang 1 m plesteran 1 PC : 3 PP, tebal 20 mm


Upah
0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
10.368 kg Portland Cement
0.031 m Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

30

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

8,271.90
8,673.00
982.80
638.82

10,886.40
3,100.00

Dinas Pekerjaan Umum Kota Surakarta

3 Memasang 1 m plesteran 1 PC : 4 PP, tebal 20 mm


Upah
0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
8.320 kg Portland Cement
0.032 m Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

8,271.90
8,673.00
982.80
638.82
Rp.

18,566.52

Rp.

11,936.00

Rp.

30,502.52

Rp.

18,566.52

Rp.

10,757.60

Rp.

29,324.12

Rp.

22,987.65

Rp.

16,149.00

Rp.

39,136.65

Rp.

8,544.90

Rp.

8,043.20

Rp.

16,588.10

Rp.

5,426.93

Rp.

725.00

Rp.

6,151.93

8,736.00
3,200.00

4 Memasang 1 m plesteran 1 PC : 5 PP, tebal 20 mm


Upah
0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
6.912 kg Portland Cement
0.035 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

8,271.90
8,673.00
982.80
638.82

7,257.60
3,500.00

5 Memasang 1 m plesteran 1 PC : 4 PP, tebal 30 mm


Upah
0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
11.380 kg Portland Cement
0.042 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

10,180.80
10,841.25
1,228.50
737.10

11,949.00
4,200.00

6 Memasang 1 m berapen 1 PC : 5 PP, tebal 15 mm


Upah
0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
5.184 kg Portland Cement
0.026 m Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

4,772.25
3,035.55
343.98
393.12

5,443.20
2,600.00

7 Memasang 1 m' plesteran skoning 1 PC : 2 PP


Upah
0.057
0.038
0.038
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
0.500 kg Portland Cement
0.002 m Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

8 Memasang 1 m plesteran ciprat 1 PC : 2 PP

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

31

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

1,813.46
1,647.87
1,867.32
98.28

525.00
200.00

Dinas Pekerjaan Umum Kota Surakarta

Upah
0.250
0.100
0.010
0.013

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
4.320 kg Portland Cement
0.006 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

7,953.75
4,336.50
491.40
638.82
Rp.

13,420.47

Rp.

5,136.00

Rp.

18,556.47

Rp.

17,040.66

Rp.

7,857.00

Rp.

24,897.66

Rp.

9,993.27

Rp.

3,412.50

Rp.

13,405.77

Rp.

1,292,592.00

Rp.

19,261,500.00

Rp.

20,554,092.00

Rp.

1,292,592.00

Rp.

8,891,500.00

Rp.

10,184,092.00

4,536.00
600.00

9 Memasang 1 m finishing siar pasangan batu kali adukan 1 PC : 2 PP


Upah
0.300
0.140
0.014
0.015

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
6.340 kg Portland Cement
0.012 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

9,544.50
6,071.10
687.96
737.10

6,657.00
1,200.00

10 Memasang 1 m acian
Upah
0.150
0.100
0.010
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
3.250 kg Portland Cement

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.

1,050.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

4,772.25
4,336.50
491.40
393.12

3,412.50

F. PEKERJAAN KAYU :
1. Membuat dan memasang 1 m kusen pintu dan kusen jendela, kayu jati
Upah
6.000
20.000
2.000
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.100 m Balok kayu jati
1.250 kg Bahan paku 10 cm
1.000 kg Lem kayu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

17,500,000.00
11,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

190,890.00
982,800.00
104,160.00
14,742.00

19,250,000.00
11,500.00

2. Membuat dan memasang 1 m kusen pintu dan kusen jendela, kayu kamper
Upah
6.000
20.000
2.000
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.200 m Balok kayu kamper
1.250 kg Bahan paku 10 cm
1.000 kg Lem kayu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

7,400,000.00
11,500.00

32

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

190,890.00
982,800.00
104,160.00
14,742.00

8,880,000.00
11,500.00

Dinas Pekerjaan Umum Kota Surakarta

3 Membuat dan memasang 1 m daun pintu panil, kayu jati


Upah
1.000
2.500
0.250
0.050

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.040 m Papan kayu jati
0.500 kg Lem kayu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
11,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

31,815.00
122,850.00
13,020.00
2,457.00
Rp.

170,142.00

Rp.

825,750.00

Rp.

995,892.00

Rp.

136,113.60

Rp.

495,450.00

Rp.

631,563.60

820,000.00
5,750.00

4 Membuat dan memasang 1 m pintu dan jendela kaca, kayu jati


Upah
0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.024 m Papan kayu jati
0.300 kg Lem kayu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
11,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

25,452.00
98,280.00
10,416.00
1,965.60

492,000.00
3,450.00

5 Membuat 1 m daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper (lebar sampai 90 cm)
Upah
0.600
2.000
0.200
0.030

Bahan
0.025
0.030
0.500
1.000

Oh
Oh
Oh
Oh

m
kg
kg
lbr

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Papan kayu
@ Rp.
Paku 1 cm - 2,5 cm
@ Rp.
Lem kayu
@ Rp.
Plywood tb.4 mm uk.(90x220)
@ Rp.
cm

31,815.00
49,140.00
52,080.00
49,140.00

9,890,000.00
11,500.00
11,500.00
46,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,089.00
98,280.00
10,416.00
1,474.20
Rp.

129,259.20

Rp.

299,345.00

Rp.

428,604.20

Rp.

136,113.60

Rp.

576,895.00

Rp.

713,008.60

Rp.

136,113.60

247,250.00
345.00
5,750.00
46,000.00

6 Membuat 1 m pintu plywood rangkap, rangka expose kayu jati


Upah
0.800
2.000
0.200
0.040

Bahan
0.0256
0.030
0.500
1.000

Oh
Oh
Oh
Oh

m
kg
kg
lbr

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Papan kayu jati


@ Rp.
Paku 1 cm - 2,5 cm
@ Rp.
Lem kayu
@ Rp.
Plywood tb.4 mm uk.(90x220)
@ Rp.
cm

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
11,500.00
11,500.00
46,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

25,452.00
98,280.00
10,416.00
1,965.60

524,800.00
345.00
5,750.00
46,000.00

7 Memasang 1 m teakwood rangkap, rangka expose kayu jati


Upah
0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.025 m Papan kayu kamper
0.030 kg Paku 1 cm - 2,5 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
11,500.00
33

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

25,452.00
98,280.00
10,416.00
1,965.60

512,500.00
345.00

Dinas Pekerjaan Umum Kota Surakarta

0.300 kg Lem kayu


@ Rp.
1.000 lbr Plywood tb.4 mm uk.(90x220)
@ Rp.
cm

11,500.00
46,000.00

= Rp.
= Rp.

3,450.00
46,000.00
Rp.

562,295.00

Rp.

698,408.60

Rp.

163,287.60

Rp.

302,795.00

Rp.

466,082.60

Rp.

1,292,592.00

Rp.

10,422,950.00

Rp.

11,715,542.00

Rp.

22,044.75

Rp.

103,450.00

Rp.

125,494.75

Rp.

473,558.40

Rp.

9,535,250.00

Rp.

10,008,808.40

8 Memasang 1 m teakwood rangkap lapis formika, rangka expose kayu kamper


Upah
0.800
2.500
0.250
0.040

Bahan
0.025
0.030
0.800
1.000

Oh
Oh
Oh
Oh

m
kg
kg
lbr

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Papan kayu
@ Rp.
Paku 1 cm - 2,5 cm
@ Rp.
Lem kayu
@ Rp.
Plywood tb.4 mm uk.(90x220)
@ Rp.
cm

31,815.00
49,140.00
52,080.00
49,140.00

9,890,000.00
11,500.00
11,500.00
46,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

25,452.00
122,850.00
13,020.00
1,965.60

247,250.00
345.00
9,200.00
46,000.00

9 Memasang 1 m konstruksi kuda-kuda konvensional, kayu Bangkirai


Upah
6.000
20.000
2.000
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.200 m Balok kayu bangkirai
15.000 kg Besi strip tebal 5 mm
5.600 kg Paku 12 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

8,500,000.00
9,450.00
14,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

190,890.00
982,800.00
104,160.00
14,742.00

10,200,000.00
141,750.00
81,200.00

10 Memasang 1 m konstruksi rangka plafond, kayu Bangkirai


Upah
0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.012 m Balok kayu bangkirai
0.100 kg Paku 12 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

8,500,000.00
14,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

4,772.25
12,285.00
1,302.00
3,685.50

102,000.00
1,450.00

11 Memasang 1 m konstruksi gordeng, kayu bangkirai


Upah
2.400
7.200
0.720
0.120

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.100 m Balok kayu bangkirai
15.000 kg Besi strip tebal 5 mm
3.000 kg Paku 12 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

8,500,000.00
9,450.00
14,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

76,356.00
353,808.00
37,497.60
5,896.80

9,350,000.00
141,750.00
43,500.00

12 Memasang 1 m rangka atap genteng keramik, kaso kayu kruing + reng kayu jati
Upah
0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

34

31,815.00
49,140.00
52,080.00
49,140.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

3,181.50
4,914.00
520.80
245.70

Dinas Pekerjaan Umum Kota Surakarta

Bahan
0.014 m Kaso-kaso ( 5 x 7 ) cm, kruing
@ Rp.
5.000 m' Reng ( 2 x 3 ) cm, jati
0.250 kg Paku 5 cm dan 10 cm

3,996,250.00

= Rp.

55,947.50

2,500.00
14,500.00

= Rp.
= Rp.

12,500.00
3,625.00

@ Rp.
@ Rp.

Rp.

8,862.00

Rp.

72,072.50

Rp.

80,934.50

Rp.

8,862.00

Rp.
Rp.

119,725.00
128,587.00

Rp.

14,557.20

Rp.
Rp.

104,536.00
119,093.20

Rp.

14,296.80

Rp.
Rp.

226,190.00
240,486.80

Rp.

29,621.97

Rp.
Rp.
Rp.

209,270.00
238,891.97
338,891.97

13 Memasang 1 m rangka atap genteng beton, kaso kayu kruing + reng kayu jati
Upah
0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Bahan
0.014 m Kaso-kaso ( 5 x 7 ) cm,kruing
@ Rp.
5.000 m' Reng ( 3 x 4 ) cm, jati
0.250 kg Paku 5 cm dan 10 cm

31,815.00
49,140.00
52,080.00
49,140.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

3,181.50
4,914.00
520.80
245.70

7,400,000.00

= Rp.

103,600.00

2,500.00
14,500.00

= Rp.
= Rp.

12,500.00
3,625.00

@ Rp.
@ Rp.

14 Memasang 1 m lysplank ukuran ( 3 x 20 ) cm, kayu kamper


Upah
0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.0108 m Papan kayu kamper
0.100 kg Paku biasa 2" - 5"

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

9,545,000.00
14,500.000

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

3,181.50
9,828.00
1,302.00
245.70

103,086.00
1,450.00

15 Memasang 1 m lysplank ukuran ( 3 x 30 ) cm, kayu jati


Upah
0.100
0.200
0.020
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.011 m Papan kayu jati
0.050 kg Paku 5 cm dan 7 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

20,500,000.00
13,800.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

3,181.50
9,828.00
1,041.60
245.70

225,500.00
690.00

16 Memasang 1 m rangka dinding pemisah ( 60 x 120 ) cm kayu kamper


Upah
0.150
0.450
0.045
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.028 m Balok kayu kamper
0.150 kg Paku 5 cm dan 7 cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

7,400,000.00
13,800.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

4,772.25
22,113.00
2,343.60
393.12

207,200.00
2,070.00

PENUTUP MULTIPLEK 18 MM 1 SISI


17 Memasang 1 m dinding pemisah teakwood rangkap, rangka kayu kamper
Upah
0.150 Oh Pekerja
0.450 Oh Tukang kayu

@ Rp.
@ Rp.

31,815.00
35 49,140.00

= Rp.
= Rp.

4,772.25
22,113.00

Dinas Pekerjaan Umum Kota Surakarta

0.045 Oh Kepala Tukang


0.008 Oh Mandor

Bahan
0.028
0.150
0.860
0.560

m
kg
lbr
kg

@ Rp.
@ Rp.

Balok kayu uk. (6x12) cm@ Rp.


Paku 5 cm dan 10 cm
@ Rp.
Teakwood tb.4 mm uk.120x240
@ Rp.
Lem kayu
@ Rp.

52,080.00
49,140.00

7,400,000.00
14,500.00
46,000.00
11,500.00

= Rp.
= Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,343.60
393.12
Rp.

29,621.97

Rp.
Rp.

255,375.00
284,996.97

Rp.

39,463.20

Rp.

255,375.00

Rp.

294,838.20

Rp.

68,495.70

Rp.

563,951.19

Rp.

632,446.89

Rp.

68,495.70

Rp.

576,240.87

Rp.

644,736.57

Rp.

68,495.70

207,200.00
2,175.00
39,560.00
6,440.00

18 Memasang 1 m dinding pemisah plywood rangkap, rangka kayu kamper


Upah
0.200
0.600
0.060
0.010

Bahan
0.028
0.150
0.860
0.560

Oh
Oh
Oh
Oh

m
kg
lbr
kg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Balok kayu uk. (6x12) cm@ Rp.


Paku 5 cm dan 10 cm
@ Rp.
Plywood tb.4 mm uk.120x240
@ Rp.
Lem kayu
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

7,400,000.00
14,500.00
46,000.00
11,500.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

6,363.00
29,484.00
3,124.80
491.40

207,200.00
2,175.00
39,560.00
6,440.00

G. PEKERJAAN BETON :
1 Membuat 1 m beton mutu f'c = 19,3 MPa ( K.225 ), slump ( 12 2 ) cm, w/c = 0,58
Upah
1.650
0.250
0.025
0.080

Bahan
371.000
698
1,047
215

Oh
Oh
Oh
Oh

kg
kg
kg
ltr

Pekerja
Tukang batu
Kepala Tukang
Mandor

Portland Cement
Pasir Beton
Kerikil (Mak. 30 mm)
Air

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

1,050.00
78.57
111.11
15.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

52,494.75
10,841.25
1,228.50
3,931.20

389,550.00
54,842.86
116,333.33
3,225.00

2 Membuat 1 m beton mutu f'c = 21,7 MPa ( K.250 ), slump ( 12 2 ) cm, w/c = 0,56
Upah
1.650
0.250
0.025
0.080

Bahan
384.000
692
1,039
215

Oh
Oh
Oh
Oh

kg
kg
kg
ltr

Pekerja
Tukang batu
Kepala Tukang
Mandor

Portland Cement
Pasir Beton
Kerikil (Mak. 30 mm)
Air

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

1,050.00
78.57
111.11
15.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

52,494.75
10,841.25
1,228.50
3,931.20

403,200.00
54,371.43
115,444.44
3,225.00

3 Membuat 1 m beton mutu f'c = 24,0 MPa ( K.275 ), slump ( 12 2 ) cm, w/c = 0,53
Upah
1.650
0.250
0.025
0.080

Bahan
406.000
684
1,026
215

Oh
Oh
Oh
Oh

kg
kg
kg
ltr

Pekerja
Tukang batu
Kepala Tukang
Mandor

Portland Cement
Pasir Beton
Kerikil (Mak. 30 mm)
Air

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

36

1,050.00
78.57
111.11
15.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

52,494.75
10,841.25
1,228.50
3,931.20

426,300.00
53,742.86
114,000.00
3,225.00

Dinas Pekerjaan Umum Kota Surakarta

Rp.

597,267.86

Rp.

665,763.56

Rp.

68,495.70

Rp.

603,826.59

Rp.

672,322.29

Rp.

88,868.85

Rp.

628,595.63

Rp.

717,464.48

Rp.

88,868.85

Rp.

637,143.25

Rp.

726,012.10

Rp.

5,803.14

Rp.

101,130.00

Rp.

106,933.14

4 Membuat 1 m beton mutu f'c = 26,4 MPa ( K.300 ), slump ( 12 2 ) cm, w/c = 0,52
Upah
1.650
0.250
0.025
0.080

Bahan
413.000
681
1,021
215

Oh
Oh
Oh
Oh

kg
kg
kg
ltr

Pekerja
Tukang batu
Kepala Tukang
Mandor

Portland Cement
Pasir Beton
Kerikil (Mak. 30 mm)
Air

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

1,050.00
78.57
111.11
15.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

52,494.75
10,841.25
1,228.50
3,931.20

433,650.00
53,507.14
113,444.44
3,225.00

5 Membuat 1 m beton mutu f'c = 28,8 MPa ( K.325 ), slump ( 12 2 ) cm, w/c = 0,49
Upah
2.100
0.350
0.035
0.105

Bahan
439.000
670
1,006
215

Oh
Oh
Oh
Oh

kg
kg
kg
ltr

Pekerja
Tukang batu
Kepala Tukang
Mandor

Portland Cement
Pasir Beton
Kerikil (Mak. 30 mm)
Air

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

1,050.00
78.57
111.11
15.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

66,811.50
15,177.75
1,719.90
5,159.70

460,950.00
52,642.86
111,777.78
3,225.00

6 Membuat 1 m beton mutu f'c = 31,2 MPa ( K.325 ), slump ( 12 2 ) cm, w/c = 0,48
Upah
2.100
0.350
0.035
0.105

Bahan
448.000
667
1,000
215

Oh
Oh
Oh
Oh

kg
kg
kg
ltr

Pekerja
Tukang batu
Kepala Tukang
Mandor

Portland Cement
Pasir Beton
Kerikil (Mak. 30 mm)
Air

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

1,050.00
78.57
111.11
15.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

66,811.50
15,177.75
1,719.90
5,159.70

470,400.00
52,407.14
111,111.11
3,225.00

7 Pembesian per 10 kg polos atau besi ulir


Upah
0.070
0.070
0.007
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
10.500 kg Besi beton (polos/ulir)
0.150 kg Kawat beton

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

9,450.00
12,700.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

2,227.05
3,035.55
343.98
196.56

99,225.00
1,905.00

8 Memasang 1 m bekisting untuk pondasi


Upah
0.520
0.260
0.026
0.026

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

37

31,815.00
49,140.00
52,080.00
49,140.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

16,543.80
12,776.40
1,354.08
1,277.64

Dinas Pekerjaan Umum Kota Surakarta

Bahan
0.040 m Kayu sengon
0.300 kg Paku 5 cm - 10 cm
0.100 ltr Minyak bekisting

@ Rp.
@ Rp.
@ Rp.

2,127,500.00
13,800.00
9,200.00

= Rp.
= Rp.
= Rp.

Rp.

31,951.92

Rp.

90,160.00

Rp.

122,111.92

Rp.

31,951.92

Rp.

100,797.50

Rp.

132,749.42

Rp.

40,554.36

Rp.

213,785.00

Rp.

254,339.36

Rp.

40,554.36

Rp.

226,205.00

Rp.

266,759.36

Rp.

40,554.36

85,100.00
4,140.00
920.00

9 Memasang 1 m bekisting untuk sloof


Upah
0.520
0.260
0.026
0.026

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.045 m Kayu sengon
0.300 kg Paku 5 cm - 10 cm
0.100 ltr Minyak bekisting

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

2,127,500.00
13,800.00
9,200.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

16,543.80
12,776.40
1,354.08
1,277.64

95,737.50
4,140.00
920.00

10 Memasang 1 m bekisting untuk kolom


Upah
0.660
0.330
0.033
0.033

Bahan
0.040
0.400
0.200
0.015
0.350
2.000

Oh
Oh
Oh
Oh

m
kg
ltr
m
lbr
btg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu meranti
Plywood tebal 9 mm
Bambu ori

@
@
@
@

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

2,127,500.00
13,800.00
9,200.00
4,140,000.00
126,500.00
7,475.00

=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

20,997.90
16,216.20
1,718.64
1,621.62

85,100.00
5,520.00
1,840.00
62,100.00
44,275.00
14,950.00

11 Memasang 1 m bekisting untuk balok


Upah
0.660
0.330
0.033
0.033

Bahan
0.040
0.400
0.200
0.018
0.350
2.000

Oh
Oh
Oh
Oh

m
kg
ltr
m
lbr
btg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu meranti
Plywood tebal 9 mm
Bambu ori

@
@
@
@

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

2,127,500.00
13,800.00
9,200.00
4,140,000.00
126,500.00
7,475.00

=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

20,997.90
16,216.20
1,718.64
1,621.62

85,100.00
5,520.00
1,840.00
74,520.00
44,275.00
14,950.00

12 Memasang 1 m bekisting untuk lantai


Upah
0.660
0.330
0.033
0.033

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala tukang
Mandor

Bahan
0.040 m Kayu sengon
0.400 kg Paku 5 cm - 12 cm
0.200 ltr Minyak bekisting

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

2,127,500.00
13,800.00
9,200.00
38

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

20,997.90
16,216.20
1,718.64
1,621.62

85,100.00
5,520.00
1,840.00

Dinas Pekerjaan Umum Kota Surakarta

0.015 m Balok kayu meranti


0.350 lbr Plywood tebal 9 mm
6.000 btg Bambu ori

@ Rp.
@ Rp.
@ Rp.

4,140,000.00
126,500.00
7,475.00

= Rp.
= Rp.
= Rp.

62,100.00
44,275.00
44,850.00
Rp.

243,685.00

Rp.

284,239.36

Rp.

40,554.36

Rp.

246,265.00

Rp.

286,819.36

Rp.

40,554.36

Rp.

14,950.00

Rp.

55,504.36

Rp.

316,627.19

Rp.

2,501,580.00

Rp.

2,818,207.19

13 Memasang 1 m bekisting untuk dinding


Upah
0.660
0.330
0.033
0.033

Bahan
0.030
0.400
0.200
0.020
0.350
3.000
4.000

Oh
Oh
Oh
Oh

m
kg
ltr
m
lbr
btg
bh

Pekerja
Tukang kayu
Kepala tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu meranti
Plywood tebal 9 mm
Bambu ori
Formite/penjaga jarak
bekisting/spacer

@
@
@
@

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

2,127,500.00
14,500.00
9,200.00
4,140,000.00
126,500.00
7,475.00
6,325.00

=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

20,997.90
16,216.20
1,718.64
1,621.62

63,825.00
5,800.00
1,840.00
82,800.00
44,275.00
22,425.00
25,300.00

14 Memasang 1 m bekisting untuk tangga


Upah
0.660
0.330
0.033
0.033

Bahan
0.030
0.400
0.150
0.015
0.350
2.000

Oh
Oh
Oh
Oh

m
kg
ltr
m
lbr
btg

Pekerja
Tukang kayu
Kepala tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Balok kayu meranti
Plywood tebal 9 mm
Bambu ori

@
@
@
@

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

2,127,500.00
14,500.00
9,200.00
4,140,000.00
126,500.00
7,475.00

=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

20,997.90
16,216.20
1,718.64
1,621.62

63,825.00
5,800.00
1,380.00
62,100.00
44,275.00
14,950.00

15 Memasang 1 m pondasi beton betulang ( 150 kg besi + bekisting )


Upah
5.300
0.275
1.300
1.050
0.262
0.265

Bahan
0.200
1.500
0.400
157.500
2.250
336.000
0.540
0.810

Oh
Oh
Oh
Oh
Oh
Oh

m
kg
ltr
kg
kg
kg
m
m

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat Beton
Portland Cement
Pasir Beton
Kerikil

@
@
@
@
@
@

@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
43,365.00
52,080.00
49,140.00

2,127,500.00
14,500.00
9,200.00
9,450.00
12,700.00
1,050.00
110,000.00
150,000.00

=
=
=
=
=
=

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

168,619.50
11,925.38
63,882.00
45,533.25
13,644.96
13,022.10

425,500.00
21,750.00
3,680.00
1,488,375.00
28,575.00
352,800.00
59,400.00
121,500.00

16 Memasang 1 m sloof beton betulang ( 200 kg besi + bekisting )


Upah
5.650 Oh Pekerja
0.275 Oh Tukang batu

@ Rp.
@ Rp.

39

31,815.00
43,365.00

= Rp.
= Rp.

179,754.75
11,925.38

Dinas Pekerjaan Umum Kota Surakarta

1.560
1.400
0.323
0.283

Bahan
0.270
2.000
0.600
210.000
3.000
336.000
0.540
0.810

Oh
Oh
Oh
Oh

m
kg
ltr
kg
kg
kg
m
m

Tukang kayu
Tukang besi
Kepala tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat Beton
Portland Cement
Pasir Beton
Kerikil

@
@
@
@

@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

49,140.00
43,365.00
52,080.00
49,140.00

2,127,500.00
14,500.00
9,200.00
9,450.00
12,700.00
1,050.00
110,000.00
150,000.00

=
=
=
=

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

76,658.40
60,711.00
16,821.84
13,906.62
Rp.

359,777.99

Rp.

3,165,245.00

Rp.

3,525,022.99

Rp.

388,711.79

Rp.

4,351,620.00

Rp.

4,740,331.79

Rp.

316,783.43

Rp.

3,882,770.00

Rp.

4,199,553.43

574,425.00
29,000.00
5,520.00
1,984,500.00
38,100.00
352,800.00
59,400.00
121,500.00

17 Memasang 1 m balok beton betulang ( 200 kg besi + bekisting )


Upah
6.350
0.275
1.650
1.400
0.333
0.318

Bahan
0.320
3.200
1.600
210.000
3.000
336.000
0.540
0.810
0.140
2.800
16.000

Oh
Oh
Oh
Oh
Oh
Oh

m
kg
ltr
kg
kg
kg
m
m
m
lbr
btg

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat Beton
Portland Cement
Pasir Beton
Kerikil
Balok kayu meranti
Plywood 9 mm
Bambu ori

@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
43,365.00
52,080.00
49,140.00

2,127,500.00
14,500.00
9,200.00
9,450.00
12,700.00
1,050.00
110,000.00
150,000.00
4,140,000.00
126,500.00
7,475.00

=
=
=
=
=
=

=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

202,025.25
11,925.38
81,081.00
60,711.00
17,342.64
15,626.52

680,800.00
46,400.00
14,720.00
1,984,500.00
38,100.00
352,800.00
59,400.00
121,500.00
579,600.00
354,200.00
119,600.00

18 Memasang 1 m kolom beton betulang ( 150 kg besi + bekisting )


Upah
5.300
0.275
1.300
1.050
0.265
0.265

Bahan
0.320
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.120
2.800
32.000

Oh
Oh
Oh
Oh
Oh
Oh

m
kg
ltr
kg
kg
kg
m
m
m
lbr
btg

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat Beton
Portland Cement
Pasir Beton
Kerikil
Balok kayu meranti
Plywood 9 mm
Bambu ori

@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
43,365.00
52,080.00
49,140.00

2,127,500.00
14,500.00
9,200.00
9,450.00
12,700.00
1,050.00
110,000.00
150,000.00
4,140,000.00
126,500.00
7,475.00

=
=
=
=
=
=

=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

168,619.50
11,925.38
63,882.00
45,533.25
13,801.20
13,022.10

680,800.00
46,400.00
14,720.00
1,488,375.00
28,575.00
352,800.00
59,400.00
121,500.00
496,800.00
354,200.00
239,200.00

19 Memasang 1 m dinding beton betulang ( 150 kg besi + bekisting )


Upah
5.300
0.275
1.300
1.050
0.262

Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

40

31,815.00
43,365.00
49,140.00
43,365.00
52,080.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

168,619.50
11,925.38
63,882.00
45,533.25
13,644.96

Dinas Pekerjaan Umum Kota Surakarta

0.265 Oh Mandor

Bahan
0.240
3.200
1.600
157.500
2.250
336.000
0.540
0.810
0.160
2.800
24.000

m
kg
ltr
kg
kg
kg
m
m
m
lbr
btg

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat Beton
Portland Cement
Pasir Beton
Kerikil
Balok Kayu meranti
Plywood 9 mm
Bambu ori

@ Rp.

@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

49,140.00

2,127,500.00
14,500.00
9,200.00
9,450.00
12,700.00
1,050.00
110,000.00
150,000.00
4,140,000.00
126,500.00
7,475.00

= Rp.

=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,022.10
Rp.

316,627.19

Rp.

3,818,370.00

Rp.

4,134,997.19

Rp.

364,200.59

Rp.

3,998,315.00

Rp.

4,362,515.59

Rp.

9,198.84

Rp.

44,675.00

Rp.

53,873.84

Rp.

15,190.67

510,600.00
46,400.00
14,720.00
1,488,375.00
28,575.00
352,800.00
59,400.00
121,500.00
662,400.00
354,200.00
179,400.00

20 Memasang 1 m dinding beton betulang ( 200 kg besi + bekisting )


Upah
5.650
0.275
1.650
1.400
0.323
0.283

Bahan
0.250
3.000
1.200
210.000
3.000
336.000
0.540
0.810
0.105
2.500
14.000

Oh
Oh
Oh
Oh
Oh
Oh

m
kg
ltr
kg
kg
kg
m
m
m
lbr
btg

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Minyak bekisting
Besi beton polos
Kawat Beton
Portland Cement
Pasir Beton
Kerikil
Balok Kayu meranti
Plywood 9 mm
Bambu ori

@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
43,365.00
52,080.00
49,140.00

2,127,500.00
14,500.00
9,200.00
9,450.00
12,700.00
1,050.00
110,000.00
150,000.00
4,140,000.00
126,500.00
7,475.00

=
=
=
=
=
=

=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

179,754.75
11,925.38
81,081.00
60,711.00
16,821.84
13,906.62

531,875.00
43,500.00
11,040.00
1,984,500.00
38,100.00
352,800.00
59,400.00
121,500.00
434,700.00
316,250.00
104,650.00

21 Memasang 1 m' kolom praktis beton betulang ( 11 x 11 ) cm


Upah
0.180
0.020
0.020
0.020
0.006
0.009

Bahan
0.002
0.010
3.000
0.450
4.000
0.006
0.009

Oh
Oh
Oh
Oh
Oh
Oh

m
kg
kg
kg
kg
m
m

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Kayu sengon
Paku 5 cm - 12 cm
Besi beton polos
Kawat Beton
Portland Cement
Pasir Beton
Kerikil

@
@
@
@
@
@

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
43,365.00
52,080.00
49,140.00

2,127,500.00
14,500.00
9,450.00
12,700.00
1,050.00
110,000.00
150,000.00

=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,726.70
867.30
982.80
867.30
312.48
442.26

4,255.00
145.00
28,350.00
5,715.00
4,200.00
660.00
1,350.00

22 Memasang 1 m' ring balok beton betulang ( 10 x 15 ) cm


Upah
0.297
0.033
0.033
0.033
0.010
0.015

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor

Bahan
0.003 m Kayu sengon

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.

31,815.00
43,365.00
49,140.00
43,365.00
52,080.00
49,140.00

2,127,500.00
41

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.

9,449.06
1,431.05
1,621.62
1,431.05
520.80
737.10

6,382.50

Dinas Pekerjaan Umum Kota Surakarta

0.020
3.600
0.050
5.500
0.009
0.015

kg
kg
kg
kg
m
m

Paku 5 cm - 12 cm
Besi beton polos
Kawat Beton
Portland Cement
Pasir Beton
Kerikil

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,500.00
9,450.00
12,700.00
1,050.00
110,000.00
150,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

290.00
34,020.00
635.00
5,775.00
990.00
2,250.00
Rp.

50,342.50

Rp.

65,533.17

Rp.

68,495.70

Rp.

529,100.00

Rp.

597,595.70

Rp.

68,495.70

Rp.

403,100.00

Rp.

471,595.70

Rp.

6,462.96

Rp.

64,866.00

Rp.

71,328.96

Rp.

9,267.51

Rp.

35,000.00

Rp.

44,267.51

23 Memasang 1 m beton dengan spesi 1 PC : 2 Ps : 3 Kr


Upah
1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan
338.000 kg Semen Portland
0.520 m Pasir beton
0.780 m Koral beton

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
110,000.00
150,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

52,494.75
10,841.25
1,228.50
3,931.20

354,900.00
57,200.00
117,000.00

24 Memasang 1 m beton dengan spesi 1 PC : 3 Ps : 5 Kr


Upah
1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala tukang
Mandor

Bahan
218.000 kg Semen Portland
0.520 m Pasir beton
0.780 m Koral beton

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,050.00
110,000.00
150,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

52,494.75
10,841.25
1,228.50
3,931.20

228,900.00
57,200.00
117,000.00

25 1 m' Pasang begesting untuk plat beton penutup saluran


Upah
0.1240
0.0410
0.0040
0.0060

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala tukang
Mandor

Bahan
0.0264 m Kayu sengon
0.6000 m Paku biasa 2" - 5"

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

2,127,500.00
14,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

3,945.06
2,014.74
208.32
294.84

56,166.00
8,700.00

H. PEKERJAAN PENUTUP ATAP


1. 1 m2 Pasang atap genteng pelentong kecil
Upah
0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
25.0000 bh Genteng Plentong

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.

1,400.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

4,772.25
3,685.50
416.64
393.12

35,000.00

2. 1 m2 Pasang atap genteng pres lokal


Upah
0.150 Oh Pekerja
0.075 Oh Tukang kayu
0.008 Oh Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

42

31,815.00
49,140.00
52,080.00

= Rp.
= Rp.
= Rp.

4,772.25
3,685.50
416.64

Dinas Pekerjaan Umum Kota Surakarta

0.008 Oh Mandor

Bahan
25.0000 bh Genteng Pres lokal

@ Rp.

49,140.00

@ Rp.

900.00

= Rp.

= Rp.

393.12
Rp.

9,267.51

Rp.

22,500.00

Rp.

31,767.51

Rp.

8,426.25

Rp.

25,200.00

Rp.

33,626.25

Rp.

23,693.88

Rp.

41,600.00

Rp.

65,293.88

Rp.

23,693.88

Rp.

35,600.00

Rp.

59,293.88

Rp.

8,455.02

Rp.

27,700.00

Rp.

36,155.02

Rp.

8,455.02

22,500.00

3. 1 m2 Pasang atap genteng pelentong besar


Upah
0.150
0.060
0.006
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan
12.0000 bh Genteng plentong besar @ Rp.

2,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

4,772.25
2,948.40
312.48
393.12

25,200.00

4. 1 m' Pasang genteng bubung plentong kecil


Upah
0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
5.000 bh Genteng bubung
8.000 Kg Semen Portland
0.032 m3 Pasir pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

6,000.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

12,726.00
9,828.00
1,041.60
98.28

30,000.00
8,400.00
3,200.00

5. 1 m' Pasang bubung genteng Plentong besar


Upah
0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan
4.000 bh Genteng bubung plentong@ Rp.
8.000 kg Portland Cement
@ Rp.
0.032 m3 Pasir pasang
@ Rp.

6,000.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

12,726.00
9,828.00
1,041.60
98.28

24,000.00
8,400.00
3,200.00

6. 1 m2 Pasang Atap Asbes gelombang mini ( 2,40 x 1,05 m)


Upah
0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.440 lb Asbes gelombang
0.120 Kg Paku Pancing

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

57,500.00
20,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

4,454.10
3,292.38
364.56
343.98

25,300.00
2,400.00

7. 1 m' Pasang atap asbes gelombang besar ( 2,40 x 1,08)


Upah
0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00
43

=
=
=
=

Rp.
Rp.
Rp.
Rp.

4,454.10
3,292.38
364.56
343.98

Dinas Pekerjaan Umum Kota Surakarta

Bahan
0.460 Lbr Asbes gelombang
0.120 Kg Paku Pancing

@ Rp.
@ Rp.

78,200.00
20,000.00

= Rp.
= Rp.

35,972
2,400
Rp.

38,372.00

Rp.

46,827.02

Rp.

8,455.02

Rp.

40,419.00

Rp.

48,874.02

Rp.

15,781.92

Rp.

175,545.00

Rp.

191,326.92

Rp.

15,781.92

Rp.

211,942.50

Rp.

227,724.42

Rp.

9,688.56

Rp.

147,600.00

Rp.

157,288.56

Rp.

9,688.56

8. 1 m' Pasang atap asbes gelombang besar ( 1,80 x 1,08)


Upah
0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.570 Lbr Asbes gelombang
0.120 Kg Paku Pancing

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

66,700.00
20,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

4,454.10
3,292.38
364.56
343.98

38,019
2,400

9. 1 m' Pasang Nok stel gelombang 1,05 m


Upah
0.084
0.125
0.130
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
2.100 Lbr Nok Stel gelombang
6.000 bh Paku Sekrup 3,5"

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

26,450.00
20,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

2,672.46
6,142.50
6,770.40
196.56

55,545.00
120,000.00

10. 1 m' Pasang Nok stel gelombang 1,08 m


Upah
0.084
0.125
0.130
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
2.050 Lbr Nok Stel gelombang
6.000 bh Paku Sekrup 3,5"

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

44,850.00
20,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

2,672.46
6,142.50
6,770.40
196.56

91,942.50
120,000.00

11. 1 m2 Pasang Nok Paten 1,05 m


Upah
0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.200 lbr Nok paten
6.000 bh Paku sekrup 3,5"

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

23,000.00
20,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

2,672.46
6,142.50
677.04
196.56

27,600.00
120,000.00

12. 1 m2 Pasang Nok Paten 1,08 m


Upah
0.084
0.125
0.013
0.004

Bahan

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

44

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,672.46
6,142.50
677.04
196.56

Dinas Pekerjaan Umum Kota Surakarta

1.200 lbr Nok paten


6.000 bh Paku sekrup 3,5"

@ Rp.
@ Rp.

38,525.00
20,000.00

= Rp.
= Rp.

46,230.00
120,000.00
Rp.

166,230.00

Rp.

175,918.56

Rp.

12,289.20

Rp.

61,341.00

Rp.

73,630.20

Rp.

24,578.40

Rp.

33,115.00

Rp.

57,693.40

Rp.

7,373.52

Rp.

46,980.00

Rp.

54,353.52

Rp.

8,923.53

Rp.

20,590.00

Rp.

29,513.53

Rp.

7,882.77

13. 1 m Pasang atap genteng beton warna


Upah
0.200
0.100
0.010
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang
Kepala Tukang
Mandor

Bahan
11.000 Bh Genteng beton warna
0.030 kg Paku payung

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

5,520.00
20,700.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

6,363.00
4,914.00
520.80
491.40

60,720.00
621.00

14. 1 m' Pasang Nok Genteng Beton


Upah
0.400
0.200
0.020
0.020

Bahan
3.500
0.050
10.800
0.032
1.000

Oh
Oh
Oh
Oh

bh
kg
kg
m3
kg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Nok genteng beton


Paku biasa 2"- 5"
Semen abu-abu
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

4,600.00
14,500.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

12,726.00
9,828.00
1,041.60
982.80

16,100.00
725.00
11,340.00
3,200.00
1,750.00

15. 1 m Pasang atap seng gelombang


Upah
0.120
0.060
0.006
0.006

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan
0.700 Lbr Seng gelb 3" x 6"bjls 28 @ Rp.
0.020 kg Paku biasa 1/2" - 1"
@ Rp.

66,700.00
14,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

3,817.80
2,948.40
312.48
294.84

46,690.00
290.00

16. 1 m' Pasang Atap Nok Seng


Upah
0.150
0.070
0.008
0.006

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan
0.300 lbr Seng plat 3" x 6" bjls 26 @ Rp.
0.040 kg Paku biasa 1/2"- 1"
@ Rp.

66,700.00
14,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

4,772.25
3,439.80
416.64
294.84

20,010.00
580.00

17 1 m2 Pasang Aluminium foil


Upah
0.150
0.050
0.005
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00
45

=
=
=
=

Rp.
Rp.
Rp.
Rp.

4,772.25
2,457.00
260.40
393.12

Dinas Pekerjaan Umum Kota Surakarta

Bahan
1.050 m2 Aluminium foil

@ Rp.

4,600.00

= Rp.

4,830.00
Rp.

4,830.00

Rp.

12,712.77

Rp.

4,832.52

Rp.

16,386.00

Rp.

21,218.52

Rp.

7,858.41

Rp.

15,576.75

Rp.

23,435.16

Rp.

6,144.60

Rp.

23,956.80

Rp.

30,101.40

Rp.

4,455.57

Rp.

22,499.75

Rp.

26,955.32

I PEKERJAAN LANGIT-LANGIT
1. Memasang 1 m langit-langit harflek
Upah
0.030
0.070
0.007
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.100 m harflek
0.010 kg Paku tripleks

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

14,750.00
16,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

954.45
3,439.80
364.56
73.71

16,225.00
161.00

2 Memasang 1 m langit-langit tripleks ukuran (120 x 240) cm tebal 3 mm , 4 mm dan 6 mm


Upah
0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.375 lbr Tripleks
0.030 kg Paku tripleks

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

40,250.00
16,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

2,227.05
4,914.00
520.80
196.56

15,094
483

3 Memasang 1 m langit-langit gypsum board ukuran ( 120 x 240 x 9 ) mm, tb. 9 mm


Upah
0.100
0.050
0.005
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
0.364 lbr Gypsum board
0.110 kg Paku tripleks

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

60,950.00
16,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

3,181.50
2,457.00
260.40
245.70

22,185.80
1,771.00

4 Memasang 1 m' list langit-langit gipsum


Upah
0.050
0.050
0.005
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.050 m' List gipsum
0.010 kg Paku

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

21,275.00
16,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

1,590.75
2,457.00
260.40
147.42

22,338.75
161.00

J. PEKERJAAN SANITASI :
1. Memasang 1 buah kloset duduk/monoblok sekelas INA
Upah
3.300 Oh Pekerja
1.100 Oh Tukang batu
0.001 Oh Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

46

31,815.00
43,365.00
49,140.00

= Rp.
= Rp.
= Rp.

104,989.50
47,701.50
49.14

Dinas Pekerjaan Umum Kota Surakarta

0.160 Oh Mandor

@ Rp.

Bahan
1.000 bh Kloset duduk/monoblok @ Rp.
6%
Perlengkapan
@ Rp.

49,140.00

1,581,250.00
1,581,250.00

= Rp.

= Rp.
= Rp.

7,862.40
Rp.

160,602.54

Rp.

1,676,125.00

Rp.

1,836,727.54

Rp.

178,434.90

Rp.

185,550.00

Rp.

363,984.90

Rp.

85,008.00

Rp.

1,490,782.00

Rp.

1,575,790.00

Rp.

113,342.25

Rp.

361,500.00

Rp.

474,842.25

Rp.

350,469.00

Rp.

393,900.00

Rp.

744,369.00

1,581,250.00
94,875.00

2 Memasang 1 buah kloset jongkok Porselin sekelas INA


Upah
1.000
1.500
1.500
0.160

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Bahan
1.000 bh Kloset jongkok porselin @ Rp.
6.000 kg Semen Portland
@ Rp.
0.010 m3 Pasir pasang
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

178,250.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

31,815.00
65,047.50
73,710.00
7,862.40

178,250.00
6,300.00
1,000.00

3 Memasng 1 buah urinoir sekelas INA


Upah
1.000
1.000
0.100
0.100

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Urionir
30 %
Perlengkapan
6.000 Kg Semen Portland
0.010 m3 Pasir pasang

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,141,140.00
1,141,140.00
1,050.00
100,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
4,914.00
4,914.00

1,141,140.00
342,342.00
6,300.00
1,000.00

4 Memasang 1 buah wastafel sekelas INA


Upah
1.200
1.450
0.150
0.100

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Wastafel
12 %
Perlengkapan
6.000 Kg Semen Portland
0.010 m3 Pasir pasang

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

316,250.00
316,250.00
1,050.00
100,000.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

38,178.00
62,879.25
7,371.00
4,914.00

316,250.00
37,950.00
6,300.00
1,000.00

5 Memasang 1 buah bakmandi batubata volume 0,30 m3


Upah
6.000
3.000
0.300
0.300

Bahan
0.400
120.000
0.300
360.000
6.000

Oh
Oh
Oh
Oh

m3
Kg
m3
bh
Kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Batu bata
Semen Portland
Pasir pasang
Porselen ( 11 x 11 ) cm
Semen Nat

@
@
@
@

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

258,000.00
1,050.00
100,000.00
345.00
1,750.00

47

=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

190,890.00
130,095.00
14,742.00
14,742.00

103,200.00
126,000.00
30,000.00
124,200.00
10,500.00

Dinas Pekerjaan Umum Kota Surakarta

6 Memasang 1 buah bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
Upah
1.420
0.473
0.047
0.071

Bahan
80.000
44.000
0.070
0.070
1.600
0.060

Oh
Oh
Oh
Oh

bh
Kg
m3
m3
kg
m3

Pekerja
Tukang batu
Kepala Tukang
Mandor

Batu bata
Semen portland
Pasir pasang
Koral Beton
Besi beton
Pasir beton

@
@
@
@

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00
150,000.00
9,450.00
110,000.00

=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,177.30
20,511.65
2,309.58
3,488.94
Rp.

71,487.47

Rp.

119,820.00

Rp.

191,307.47

Rp.

146,683.43

Rp.

190,660.00

Rp.

337,343.43

Rp.

112,418.40

Rp.

289,802.50

Rp.

402,220.90

Rp.

4,130.53

Rp.

6,520.50

Rp.

10,651.03

34,400.00
46,200.00
7,000.00
10,500.00
15,120.00
6,600.00

7 Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Upah
3.200
1.015
0.0015
0.016

Bahan
138.000
77.000
0.130
0.020
2.600
0.090

Oh
Oh
Oh
Oh

bh
Kg
m3
m3
kg
m3

Pekerja
Tukang batu
Kepala Tukang
Mandor

Batu bata
Semen portland
Pasir pasang
Koral Beton
Besi beton
Pasir beton

@
@
@
@

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

430.00
1,050.00
100,000.00
150,000.00
9,450.00
110,000.00

=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

101,808.00
44,015.48
73.71
786.24

59,340.00
80,850.00
13,000.00
3,000.00
24,570.00
9,900.00

8 Memasang 1 buah bak kontrol pasangan batu bata ukuran (60 x 60) cm, tinggi 65 cm
Upah
2.160
0.720
0.072
0.108
0.100

Bahan
204.000
114.000
0.184
0.033
4.850
0.120

Oh
Oh
Oh
Oh
Oh

bh
Kg
m3
m3
kg
m3

Pekerja
Tukang batu
Kepala Tukang
Mandor
Tukang gali

Batu bata
Semen portland
Pasir pasang
Koral Beton
Besi beton
Pasir beton

@
@
@
@
@

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00
36,300.00

430.00
1,050.00
100,000.00
150,000.00
9,450.00
110,000.00

=
=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,720.40
31,222.80
3,538.08
5,307.12
3,630.00

87,720.00
119,700.00
18,400.00
4,950.00
45,832.50
13,200.00

9 Memasang 1 m' pipa PVC tipe AW diameter 1/2 "


Upah
0.036
0.060
0.006
0.0018

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.200 m' Pipa PVC
35 %
perlengkapan

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

4,025.00
4,830.00

10 Memasang 1 m' pipa PVC tipe AW diameter 3/4 "


Upah

48

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

1,145.34
2,601.90
294.84
88.45

4,830.00
1,690.50

Dinas Pekerjaan Umum Kota Surakarta

0.036
0.060
0.006
0.0018

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.200 m' Pipa PVC
35 %
perlengkapan

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

5,462.50
6,555.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

1,145.34
2,601.90
294.84
88.45
Rp.

4,130.53

Rp.

8,849.25

Rp.

12,979.78

Rp.

15,511.86

Rp.

235,750.00

Rp.

251,261.86

Rp.

5,391.75

Rp.

34,543.13

Rp.

39,934.88

Rp.

5,391.75

Rp.

55,000.00

Rp.

60,391.75

Rp.

4,788.72

Rp.

13,512.50

Rp.

18,301.22

6,555.00
2,294.25

11 Memasang 1 buah bak cuci piring staninless steel


Upah
0.030
0.300
0.030
0.0015

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Bak cuci staniless steel
1.000 set Water drain + asesories

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

195,500.00
40,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

954.45
13,009.50
1,474.20
73.71

195,500.00
40,250.00

12 Memasang 1 buah kran SAN EI diameter 3/4 " atau 1/2 "
Upah
0.010
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Kran air
0.025 bh Seal tape

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

34,500.00
1,725.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

318.15
4,336.50
491.40
245.70

34,500.00
43.13

13 Memasang 1 buah Floor drain


Upah
0.010
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Floor drain

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.

55,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

318.15
4,336.50
491.40
245.70

55,000.00

K. PEKERJAAN BESI DAN ALUMUNIUM :


1. Memasang 1 kg besi profil
Upah
0.060
0.060
0.006
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang las
Kepala Tukang
Mandor

Bahan
1.150 kg Besi profil

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
40,700.00
48,400.00
49,140.00

@ Rp.

11,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

1,908.90
2,442.00
290.40
147.42

13,512.50

2. Memasang 1 kg rangka kuda-kuda baja IWF


Upah
0.060 Oh Pekerja
0.060 Oh Tukang las
0.006 Oh Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

49

31,815.00
40,700.00
48,400.00

= Rp.
= Rp.
= Rp.

1,908.90
2,442.00
290.40

Dinas Pekerjaan Umum Kota Surakarta

0.003 Oh Mandor

Bahan
1.150 kg Besi baja IWF

@ Rp.

49,140.00

@ Rp.

15,000.00

= Rp.

= Rp.

147.42
Rp.

4,788.72

Rp.

17,250.00

Rp.

22,038.72

Rp.

86,653.98

Rp.

565,100.00

Rp.

651,753.98

Rp.

96,407.64

Rp.

218,500.00

Rp.

314,907.64

Rp.

36,322.44

Rp.

690,000.00

Rp.

726,322.44

Rp.

3,547.24

Rp.

70,255.00

Rp.

73,802.24

Rp.

7,014.38

17,250.00

3. Membuat 1 m pintu besi plat baja tebal 2 mm rnagkap, rangka baja siku
Upah
1.050
1.050
0.105
0.052

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
15.000 kg Besi siku L.30.30.3
32.800 kg Besi plat baja
0.050 kg Kawat las

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

11,750.00
11,750.00
69,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

33,405.75
45,533.25
5,159.70
2,555.28

176,250.00
385,400.00
3,450.00

4. Memasang 1 m pintu rolling door besi


Upah
1.200
1.200
0.120
0.006

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
1.000 m Pintu gulung besi

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

218,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

38,178.00
52,038.00
5,896.80
294.84

218,500.00

5. Memasang 1 m pintu lipat (folding door)


Upah
0.440
0.440
0.044
0.022

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
1.000 m Pintu lipat

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

690,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

13,998.60
19,080.60
2,162.16
1,081.08

690,000.00

6 Memasang 1 m' kusen pintu alluminium


Upah
0.043
0.043
0.0043
0.0021

Oh
Oh
Oh
Oh

Pekerja
Tukang besi konstruksi
Kepala Tukang
Mandor

Bahan
1.100 m' Profil alluminium
2.000 bh Skrup fixer
0.060 tube Sealant

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

61,500.00
95.00
40,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

1,368.05
1,864.70
211.30
103.19

67,650.00
190.00
2,415.00

7 Memasang 1 m pintu alluminium strip lebar 8 cm


Upah
0.085
0.085
0.0085
0.0042

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00
50

=
=
=
=

Rp.
Rp.
Rp.
Rp.

2,704.28
3,686.03
417.69
206.39

Dinas Pekerjaan Umum Kota Surakarta

Bahan
4.400 m' Profil alluminium
14.600 m' Alluminium strip

@ Rp.
@ Rp.

61,500.00
2,650.00

= Rp.
= Rp.

270,600.00
38,690.00
Rp.

309,290.00

Rp.

316,304.38

Rp.

6,979.98

Rp.

4,323,792.50

Rp.

4,330,772.48

Rp.

16,067.94

Rp.

155,998.70

Rp.

172,066.64

Rp.

25,428.90

Rp.

124,932.50

Rp.

150,361.40

Rp.

19,599.93

Rp.

30,197.50

Rp.

49,797.43

8 Memasang 1 m pintu kaca rangka alluminium


Upah
0.085
0.085
0.008
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
4.400 m' Pintu alluminium
4.500 m' Profil kaca
0.270 tube Sealant

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

977,500.00
2,650.00
40,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

2,704.28
3,686.03
393.12
196.56

4,301,000.00
11,925.00
10,867.50

9 Memasang 1 m jendela nako & tralis


Upah
0.200
0.200
0.020
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Bahan
1.100 m Jendela nako (rk.+kaca 5mm)
@ Rp.
11.110 bh Paku skrup 1 cm - 2,5 cm @ Rp.
1.716 m' Besi strip
@ Rp.

10,925.00
11,500.00
9,450.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

6,363.00
8,673.00
982.80
49.14

12,017.50
127,765.00
16,216.20

10 Memasang 1 m' talang datar / jurai seng bjls 28 lebar 90 cm


Upah
0.200
0.400
0.025
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Bahan
1.050 m' Seng plat
@ Rp.
0.015 kg Paku 1 cm - 2,5 cm
@ Rp.
0.019 m Papan kayu kelas II atau III
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

33,500.00
11,500.00
4,715,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

6,363.00
17,346.00
1,228.50
491.40

35,175.00
172.50
89,585.00

11 Memasang 1 m' talang lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Upah
0.150
0.300
0.030
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang besi
Kepala Tukang
Mandor

Bahan
1.050 m' Seng plat
0.010 kg Paku 1 cm - 2,5 cm
0.500 kg Besi strip

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

24,150.00
11,500.00
9,450.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

4,772.25
13,009.50
1,474.20
343.98

25,357.50
115.00
4,725.00

L. PEKERJAAN KUNCI DAN KACA :


1. 1 buah pasang kunci tanam Union
Upah
0.060 Oh Pekerja

@ Rp.

51

31,815.00

= Rp.

1,908.90

Dinas Pekerjaan Umum Kota Surakarta

0.600 Oh Tukang kayu


0.060 Oh Kepala Tukang
0.003 Oh Mandor

Bahan
1.000 bh Kunci tanam UNION

@ Rp.
@ Rp.
@ Rp.

49,140.00
52,080.00
49,140.00

@ Rp.

115,000.00

= Rp.
= Rp.
= Rp.

= Rp.

29,484.00
3,124.80
147.42
Rp.

34,665.12

Rp.

115,000.00

Rp.

149,665.12

Rp.

25,654.65

Rp.

63,250.00

Rp.

88,904.65

Rp.

25,112.33

Rp.

34,500.00

Rp.

59,612.33

Rp.

25,001.76

Rp.

80,500.00

Rp.

105,501.76

Rp.

8,666.28

Rp.

8,050.00

Rp.

16,716.28

Rp.

5,777.52

115,000.00

2. 1 buah pasang kunci tanam kuda terbang besar 2 kali putar


Upah
0.010
0.500
0.010
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan
1.000 bh Kunci tanam 2 kali putar @ Rp.

63,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

318.15
24,570.00
520.80
245.70

63,250.00

3. 1 buah pasang kunci tanam kamar mandi


Upah
0.005
0.500
0.005
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

Bahan
1.000 bh Kunci tanam kmr mandi @ Rp.

34,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

159.08
24,570.00
260.40
122.85

34,500.00

4. 1 buah pasang kunci silinder Merk Konggo


Upah
0.005
0.500
0.005
0.00025

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.000 bh Kunci silinder

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.

80,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

159.08
24,570.00
260.40
12.29

80,500.00

5. 1 buah pasang engsel pintu


Upah
0.015
0.150
0.015
0.0008

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.000 bh Engsel pintu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.

8,050.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

477.23
7,371.00
781.20
36.86

8,050.00

6 1 buah pasang engsel jendela kupu-kupu


Upah
0.010
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.000 bh Engsel jendela

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

52

8,050.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

318.15
4,914.00
520.80
24.57

8,050.00

Dinas Pekerjaan Umum Kota Surakarta

Rp.

8,050.00

Rp.

13,827.52

Rp.

11,997.30

Rp.

23,000.00

Rp.

34,997.30

Rp.

8,666.28

Rp.

7,475.00

Rp.

16,141.28

Rp.

28,887.60

Rp.

120,000.00

Rp.

148,887.60

Rp.

5,777.52

Rp.

5,750.00

Rp.

11,527.52

Rp.

34,665.12

Rp.

172,500.00

Rp.

207,165.12

7 1 buah pasang engsel angin


Upah
0.020
0.200
0.020
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.000 bh Engsel angin

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.

23,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

636.30
9,828.00
1,041.60
491.40

23,000.00

8 1 buah pasang kait angin


Upah
0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.000 bh Kait angin

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.

7,475.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

477.23
7,371.00
781.20
36.86

7,475.00

9 1 buah pasang door closer


Upah
0.05
0.500
0.05
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.000 bh Door closer

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

120,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

1,590.75
24,570.00
2,604.00
122.85

120,000.00

10 1 buah pasang door stop


Upah
0.010
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.000 bh Door stop

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.

5,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

318.15
4,914.00
520.80
24.57

5,750.00

11 1 buah pasang rel pintu dorong


Upah
0.060
0.600
0.060
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.000 bh Rel pintu dorong

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

172,500.00

12 1 buah pasang kunci lemari


53

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

1,908.90
29,484.00
3,124.80
147.42

172,500.00

Dinas Pekerjaan Umum Kota Surakarta

Upah
0.025
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.000 bh Kunci lemari

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.

32,200.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

795.38
12,285.00
1,302.00
61.43
Rp.

14,443.80

Rp.

32,200.00

Rp.

46,643.80

Rp.

8,666.28

Rp.

82,225.00

Rp.

90,891.28

Rp.

8,666.28

Rp.

170,775.00

Rp.

179,441.28

Rp.

14,386.05

Rp.

167,065.00

Rp.

181,451.05

Rp.

14,970.17

Rp.

213,125.00

Rp.

228,095.17

32,200.00

13 1 m2 pasang kaca bening, tebal 5 mm


Upah
0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.100 m2 Kaca

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.

74,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

477.23
7,371.00
781.20
36.86

82,225.00

14 1 m2 pasang kaca cermin, tebal 5 mm


Upah
0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.100 m2 Kaca cermin

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

155,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

477.23
7,371.00
781.20
36.86

170,775.00

M. PEKERJAAN PENUTUP LANTAI DAN DINDING


7. Memasang 1 m lantai keramik esensa ukuran ( 60 x 60 ) cm
Upah
0.250
0.120
0.012
0.013

Bahan
1.000
9.800
0.045
1.300

Oh
Oh
Oh
Oh

dos
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Keramik esensa 60x60 cm@


Portland Cement
@
Pasir pasang
@
Semen warna
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

150,000.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

7,953.75
5,203.80
589.68
638.82

150,000.00
10,290.00
4,500.00
2,275.00

8. Memasang 1 m lantai ubin granit ukuran ( 30 x 30 ) cm


Upah
0.260
0.125
0.013
0.013

Bahan
11.870
10.000
0.045
1.500

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin granit 30x30 cm


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

16,470.09
1,050.00
100,000.00
1,750.00

54

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

8,271.90
5,420.63
638.82
638.82

195,500.00
10,500.00
4,500.00
2,625.00

Dinas Pekerjaan Umum Kota Surakarta

16. Memasang 1 m' plin ubin PC warna ukuran ( 10 x 30 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
3.530
1.140
0.003
0.100

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint ubin PC warna


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

Rp.
Rp.
Rp.
Rp.

13,225.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
442.26
245.70
Rp.

7,454.16

Rp.

48,356.25

Rp.

55,810.41

Rp.

7,454.16

Rp.

36,718.25

Rp.

44,172.41

Rp.

7,402.19

Rp.

38,242.00

Rp.

45,644.19

Rp.

7,454.16

Rp.

32,147.00

Rp.

39,601.16

46,684.25
1,197.00
300.00
175.00

17. Memasang 1 m' plin ubin PC warna ukuran ( 10 x 40 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
2.650
1.140
0.003
0.100

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint ubin PC warna


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

13,225.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
442.26
245.70

35,046.25
1,197.00
300.00
175.00

18. Memasang 1 m' plin ubin granit ukuran ( 10 x 40 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
2.650
1.140
0.003
0.100

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint ubin granit


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
43,365.00
49,140.00

13,800.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
390.29
245.70

36,570.00
1,197.00
300.00
175.00

19. Memasang 1 m' plin ubin granit ukuran ( 10 x 30 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
2.650
1.140
0.003
0.100

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint ubin granit


Portland Cement
Pasir pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

11,500.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
442.26
245.70

30,475.00
1,197.00
300.00
175.00

22. Memasang 1 m lantai keramik ukuran ( 33 x 33 ) cm


Upah
0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

55

31,815.00
43,365.00
49,140.00
49,140.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

19,725.30
15,177.75
1,719.90
1,474.20

Dinas Pekerjaan Umum Kota Surakarta

Bahan
10.000
8.190
0.045
1.620

bh
kg
m
kg

Ubin keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

Rp.
Rp.
Rp.
Rp.

4,830.00
1,050.00
100,000.00
1,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.

38,097.15

Rp.

64,234.50

Rp.

102,331.65

Rp.

38,097.15

Rp.

63,625.00

Rp.

101,722.15

Rp.

38,097.15

Rp.

64,255.00

Rp.

102,352.15

Rp.

57,268.58

Rp.

591,687.50

Rp.

648,956.08

Rp.

38,097.15

Rp.

82,257.50

Rp.

120,354.65

48,300.00
8,599.50
4,500.00
2,835.00

23. Memasang 1 m lantai keramik ukuran ( 30 x 30 ) cm


Upah
0.620
0.350
0.035
0.030

Bahan
11.870
10.000
0.045
1.500

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

3,875.32
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,725.30
15,177.75
1,719.90
1,474.20

46,000.00
10,500.00
4,500.00
2,625.00

24. Memasang 1 m lantai keramik ukuran ( 20 x 20 ) cm


Upah
0.620
0.350
0.035
0.030

Bahan
26.500
10.400
0.045
1.620

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

1,735.85
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,725.30
15,177.75
1,719.90
1,474.20

46,000.00
10,920.00
4,500.00
2,835.00

25. Memasang 1 m lantai keramik ukuran ( 10 x 33 ) cm, variasi / border


Upah
0.930
0.525
0.053
0.047

Bahan
33.000
9.800
0.045
4.370

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Ubin keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

17,250.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

29,587.95
22,766.63
2,604.42
2,309.58

569,250.00
10,290.00
4,500.00
7,647.50

26. Memasang 1 m lantai keramik Roman ukuran ( 20 x 20 ) cm


Upah
0.620
0.350
0.035
0.030

Bahan
26.500
14.150
0.039
2.000

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

2,264.15
1,050.00
100,000.00
1,750.00

56

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,725.30
15,177.75
1,719.90
1,474.20

60,000.00
14,857.50
3,900.00
3,500.00

Dinas Pekerjaan Umum Kota Surakarta

27. Memasang 1 m plint keramik ukuran ( 10 x 20 ) cm


Upah
0.090
0.090
0.009
0.005

Bahan
5.300
1.140
0.003
0.025

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Plint keramik artistik


Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

9,200.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,863.35
3,902.85
442.26
245.70
Rp.

7,454.16

Rp.

50,300.75

Rp.

57,754.91

Rp.

15,089.97

Rp.

91,770.00

Rp.

106,859.97

Rp.

41,323.17

Rp.

203,895.00

Rp.

245,218.17

Rp.

42,288.75

Rp.

61,480.50

Rp.

103,769.25

Rp.

42,288.75

48,760.00
1,197.00
300.00
43.75

31. Memasang 1 m lantai karpet


Upah
0.170
0.170
0.017
0.009

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.050 m Karpet
0.350 kg Lem

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

@ Rp.
@ Rp.

74,750.00
37,950.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

5,408.55
8,353.80
885.36
442.26

78,487.50
13,282.50

32. Memasang 1 m lantai parquet


Upah
0.650
0.350
0.035
0.033

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Bahan
1.050 m Parquet
0.600 kg Lem

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
49,140.00
52,080.00
49,140.00

172,500.00
37,950.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

20,679.75
17,199.00
1,822.80
1,621.62

181,125.00
22,770.00

36. Memasang 1 m dinding keramik ukuran ( 10 x 20 ) cm


Upah
0.600
0.450
0.045
0.030

Bahan
53.000
9.300
0.018
2.750

Oh
Oh
Oh
Oh

bh
kg
m
kg

Pekerja
Tukang batu
Kepala Tukang
Mandor

Keramik
Portland Cement
Pasir Pasang
Semen warna

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

851.00
1,050.00
100,000.00
1,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

19,089.00
19,514.25
2,211.30
1,474.20

45,103.00
9,765.00
1,800.00
4,812.50

37. Memasang 1 m dinding keramik ukuran ( 20 x 25 ) cm


Upah
0.600
0.450
0.045
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
20.000 bh Keramik

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

57

2,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.

19,089.00
19,514.25
2,211.30
1,474.20

45,000.00

Dinas Pekerjaan Umum Kota Surakarta

9.300 kg Portland Cement


0.018 m Pasir Pasang
1.940 kg Semen warna

@ Rp.
@ Rp.
@ Rp.

1,050.00
100,000.00
1,750.00

= Rp.
= Rp.
= Rp.

9,765.00
1,800.00
3,395.00
Rp.

59,960.00

Rp.

102,248.75

Rp.

38,097.15

Rp.

110,712.50

Rp.

148,809.65

Rp.

38,097.15

Rp.

107,550.00

Rp.

145,647.15

Rp.

32,265.24

Rp.

57,787.50

Rp.

90,052.74

Rp.

3,314.19

Rp.

2,697.50

Rp.

6,011.69

39. Memasang 1 m dinding batu paras


Upah
0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.100 m Batu paras
11.750 kg Portland Cement
0.035 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

86,250.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

19,725.30
15,177.75
1,719.90
1,474.20

94,875.00
12,337.50
3,500.00

40. Memasang 1 m dinding batu tempel hitam


Upah
0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.100 m Batu tempel hitam
11.750 kg Portland Cement
0.035 m Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

83,375.00
1,050.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

19,725.30
15,177.75
1,719.90
1,474.20

91,712.50
12,337.50
3,500.00

42. Memasang 1 m wall paper, lebar 50 cm


Upah
0.750
0.170
0.017
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
2.200 m' Wallpaper
0.250 kg Lem

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
49,140.00
49,140.00

@ Rp.
@ Rp.

23,000.00
28,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

23,861.25
7,372.05
835.38
196.56

50,600.00
7,187.50

N. PEKERJAAN CAT / PLITUR :


1. 1 m2 Mendempul dan menggosok kayu
Upah
0.0400
0.0400
0.0040
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Bahan
0.0800 kg Dempul jadi
0.0200 kg Minyak cat
0.0100 kg Batu apung

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

28,750.00
17,250.00
5,250.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

1,272.60
1,734.60
184.14
122.85

2,300.00
345.00
52.50

2. 1 m Pengecatan bidang kayu merk Bee Brand baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Upah

58

Dinas Pekerjaan Umum Kota Surakarta

0.0700
0.0090
0.0060
0.0025

Bahan
0.2000
0.1500
0.1700
0.2600

Oh
Oh
Oh
Oh

kg
kg
kg
kg

Pekerja
Tukang cat
Kepala Tukang
Mandor

Cat meni
Plamir
Cat dasar
Cat penutup 2 kali

@
@
@
@

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

Rp.
Rp.
Rp.
Rp.

18,500.00
18,375.00
51,750.00
51,750.00

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

2,227.05
390.29
276.21
122.85
Rp.

3,016.40

Rp.

28,708.75

Rp.

31,725.15

Rp.

5,947.54

Rp.

20,351.25

Rp.

26,298.79

Rp.

3,461.31

Rp.

31,900.00

Rp.
Rp.

35,361.31
28,289.05

Rp.

3,476.34

Rp.

2,324.00

Rp.

5,800.34

Rp.

3,781.17

Rp.

7,965.00

Rp.

11,746.17

3,700.00
2,756.25
8,797.50
13,455.00

3 1 m Pengecatan bidang kayu lama Merk Bee Brand


Upah
0.0700
0.0750
0.0075
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Bahan
0.1500 kg Plamir kayu
0.1700 kg Cat dasar
0.1700 kg Cat penutup

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

18,375.00
51,750.00
51,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

2,227.05
3,252.38
345.26
122.85

2,756.25
8,797.50
8,797.50

4. 1 m Pelaburan bidang kayu dengan politur


Upah
0.0600 Oh Tukang cat
0.0160 Oh Kepala Tukang
0.0025 Oh Mandor

Bahan
0.1500 ltr Politur
0.3720 ltr Politur jadi
2.0000 lbr Amplas

@ Rp.
@ Rp.
@ Rp.

43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

50,000.00
50,000.00
2,900.00

= Rp.
= Rp.
= Rp.

= Rp.
= Rp.
= Rp.

2,601.90
736.56
122.85

7,500.00
18,600.00
5,800.00

POLITUR ULANG
5. 1 m Pelaburan bidang kayu dengan cat residu dan ter
Upah
0.1000 Oh Pekerja
0.0060 Oh Mandor

Bahan
0.3500 ltr Residu atau ter

@ Rp.
@ Rp.

31,815.00
49,140.00

@ Rp.

6,640.00

= Rp.
= Rp.

= Rp.

3,181.50
294.84

2,324.00

6. 1 m Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Upah
0.0200
0.0630
0.0063
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Bahan
0.1000 kg Plamir
0.1000 kg Cat dasar
0.2600 kg Cat penutup 2 x

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.
@ Rp.

14,850.00
18,000.00
18,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

636.30
2,732.00
290.02
122.85

1,485.00
1,800.00
4,680.00

7 1 m Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )


Upah
0.0280 Oh Pekerja

@ Rp.

59

31,815.00

= Rp.

890.82

Dinas Pekerjaan Umum Kota Surakarta

0.0420 Oh Tukang cat


0.0042 Oh Kepala Tukang
0.0025 Oh Mandor

Bahan
0.1200 kg Cat dasar
0.1800 kg Cat penutup 2 x

@ Rp.
@ Rp.
@ Rp.

43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.

18,000.00
18,000.00

= Rp.
= Rp.
= Rp.

= Rp.
= Rp.

1,821.33
193.35
122.85
Rp.

3,028.35

Rp.

5,400.00

Rp.

8,428.35

Rp.

3,028.35

Rp.

21,669.00

Rp.
Rp.

24,697.35
20,992.74

Rp.

46,412.12

Rp.

102,611.92

Rp.

149,024.04

Rp.

57,885.43

Rp.

109,611.92

Rp.

167,497.35

Rp.

68,231.43

2,160.00
3,240.00

8 1 m Pengecatan dinding Mowilex


Upah
0.0280
0.0420
0.0042
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

Bahan
0.3600 kg Mowilek
0.0100 bh Kuas

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

@ Rp.
@ Rp.

60,000.00
6,900.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

890.82
1,821.33
193.35
122.85

21,600.00
69.00

CAT ULANG
O. PEKERJAAN KANSTEEN DAN PASANGAN BUIS BETON :
1 1 m' Pasang Buis beton 20 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Upah
Galian tanah : 0,70 x 0,90 x 1
Urug kembali : 1/3 x 0,7 x 0,9 x 1
Urug pasir : 0,10 x 0,70 x 0,90
Pas Bt 1 : 4 : 3,143 x 0,45 x 1
Pas. Buis beton 20 cm : 1 bh x 1
Buang tanah : 2/3 x 0,70 x 0,9 x1

Bahan
Pasir Urug : 0,10 x 0,70 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,45 x 1
Buis beton 20 cm : 1 bh x 1,00

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
2,800.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
31,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

15,806.54
1,756.28
63.23
21,370.12
2,800.00
4,615.95

5,880.00
65,731.92
31,000.00

2 1 m' Pasang Buis beton 30 cm dengan Rolag Bata 1 : 4 (Rolag penuh)


Upah
Galian tanah : 0,80 x 1,00 x 1,0
Urug Kembali : 1/3 x 0,8 x 1,00 x 1
Urug pasir : 0,10 x 0,80 x 1,0
Pasangan bata 1 : 4 : 3,143 x 0,55 x 1
Pas. Buis beton 30 cm : 1 bh x 1
Buang tanah : 2/3 x 0,8 x 1, x 1

Bahan
Pasir Urug : 0,10 x 0,80 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,55 x 1
Buis beton 30 cm : 1 bh x 1,00

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
2,800.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
38,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

20,071.80
2,230.20
802.87
26,119.04
2,800.00
5,861.52

5,880.00
65,731.92
38,000.00

3 1 m' Pasang Buis beton 40 cm dengan Rolag Bata 1 : 4 (Rolag penuh)


Upah
Galian tanah : 0,90 x 1,10 x 1,0
Urug Kembali : 1/3 x 0,9 x 1,10 x 1
Urug pasir : 0,10 x 0,90 x 1,0
Pasangan bata 1 : 4 : 3,143 x 0,65 x 1
Pas. Buis beton 40 cm : 1 bh x 1
Buang tanah : 2/3 x 0,9 x 1,00 x 1

Bahan
Pasir Urug : 0,10 x 0,90 x 1,00

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.

25,089.75
8,363.25
10,035.90
15,109.50
3,000.00
10,990.35

60

84,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.

24,838.85
2,759.87
903.23
30,867.95
3,000.00
5,861.52

7,560.00

Dinas Pekerjaan Umum Kota Surakarta

Pasangan bata 1 : 4 : 3,143 x 0,65 x 1


Buis beton 40 cm : 1 bh x 1,00

@ Rp.
@ Rp.

46,475.00
66,500.00

= Rp.
= Rp.

94,946.10
66,500.00
Rp.

169,006.10

Rp.

237,237.53

Rp.

79,667.67

Rp.

200,653.19

Rp.

280,320.86

Rp.

96,312.03

Rp.

208,106.10

Rp.

304,418.13

Rp.

119,740.29

Rp.

356,294.47

Rp.

476,034.76

Rp.

18,529.11

Rp.

55,759.57

Rp.

74,288.68

4 1 m' Pasang Buis beton 50 cm dengan Rolag Bata 1 : 4 (Rolag penuh)


Upah
Galian tanah : 1,00 x 1,20 x 1,0
Urug Kembali : 1/3 x 1 x 1,20 x 1
Urug pasir : 0,10 x 1 x 1,0
Pasangan bata 1 : 4 : 3,143 x 0,75 x 1
Pas. Buis beton 50 cm : 1 bh x 1
Buang tanah : 2/3 x 0,9 x 1,00 x 1

Bahan
Pasir Urug : 0,10 x 1,00 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,75 x 1
Buis beton 50 cm : 1 bh x 1,00

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
3,000.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
82,700.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

30,107.70
3,345.30
1,003.59
35,616.87
3,000.00
6,594.21

8,400.00
109,553.19
82,700.00

5 1 m' Pasang Buis beton 60 cm dengan Rolag Bata 1 : 4 (Rolag penuh)


Upah
Galian tanah : 1,10 x 1,30 x 1,0
Urug Kembali : 1/3 x 1,10 x 1,30 x 1
Urug pasir : 0,10 x 1,10 x 1,0
Pasangan bata 1 : 4 : 3,143 x 0,85 x 1
Pas. Buis beton 60 cm : 1 bh x 1
Buang tanah : 2/3 x 1,10 x 1,30 x 1

Bahan
Pasir Urug : 0,10 x 1,10 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,85 x 1
Buis beton 60 cm : 1 bh x 1,00

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
4,500.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
105,600.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

35,878.34
3,986.48
1,103.95
40,365.78
4,500.00
10,477.47

7,560.00
94,946.10
105,600.00

6 1 m' Pasang Buis beton 80 cm dengan Rolag Bata 1 : 4 (Rolag penuh)


Upah
Galian tanah : 1,30 x 1,40 x 1,0
Urug Kembali : 1/3 x 1,30 x 1,40 x 1
Urug pasir : 0,10 x 1,30 x 1,0
Pasangan bata 1 : 4 : 3,143 x 1,05 x 1
Pas. Buis beton 80 cm : 1 bh x 1
Buang tanah : 2/3 x 1,30 x 1,40 x 1

Bahan
Pasir Urug : 0,10 x 1,30 x 1,00
Pasangan bata 1 : 4 : 3,143 x 1,05 x 1
Buis beton 80 cm : 1 bh x 1,00

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
4,500.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
192,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

45,663.35
5,073.71
1,304.67
49,863.62
4,500.00
13,334.96

10,920.00
153,374.47
192,000.00

7 1 m' Pasang Buis beton 20 cm dengan Cincin bata 1 : 4


Upah
Galian tanah : 0,60 x 0,70 x 1 x
@
Urug Kembali : 1/3 x 0,6 x 0,7 x 1 x
@
Urug pasir : 0,10 x 0,60 x 1
@
Pasangan bata 1 : 4 : 3,143 x 0,45 x 0,30 x 1@
Pas. Buis beton 20 cm : 1 bh x 1 x
@
Buang tanah : 2/3 x 0,60 x 0,7 x 1
@

Bahan
Pasir Urug : 0,10 x 0,60 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,45 x 0,3
Buis beton 20 cm : 1 bh x 1,00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
2,500.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
31,000.00

61

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

10,537.70
1,170.86
602.15
641.10
2,500.00
3,077.30

5,040.00
19,719.57
31,000.00

Dinas Pekerjaan Umum Kota Surakarta

8 1 m' Pasang Buis beton 30 cm dengan Cincin bata 1 : 4


Upah
Galian tanah : 0,70 x 0,80 x 1 x
@
Urug Kembali : 1/3 x 0,6 x 0,7 x 1 x
@
Urug pasir : 0,10 x 0,70 x 1
@
Pasangan bata 1 : 4 : 3,143 x 0,55 x 0,30 x 1@
Pas. Buis beton 30 cm : 1 bh x 1 x
@
Buang tanah : 2/3 x 0,70 x 0,8 x 1
@

Bahan
Pasir Urug : 0,10 x 0,70 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,55 x 0,3
Buis beton 30 cm : 1 bh x 1,00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
2,800.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
38,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

14,050.26
1,170.86
702.51
7,835.71
2,800.00
4,103.06
Rp.

30,662.40

Rp.

67,981.70

Rp.

98,644.11

Rp.

38,410.43

Rp.

101,703.83

Rp.

140,114.26

Rp.

46,772.25

Rp.

123,125.96

Rp.

169,898.21

Rp.

56,338.17

Rp.

146,025.96

Rp.

202,364.12

5,880.00
24,101.70
38,000.00

9 1 m' Pasang Buis beton 40 cm dengan Cincin bata 1 : 4


Upah
Galian tanah : 0,80 x 0,90 x 1 x
@
Urug Kembali : 1/3 x 0,80 x 0,90 x 1 x
@
Urug pasir : 0,10 x 0,80 x 1,0
@
Pasangan bata 1 : 4 : 3,143 x 0,65 x 0,30 x 1@
Pas. Buis beton 40 cm : 1 bh x 1 x
@
Buang tanah : 2/3 x 0,80 x 0,9 x 1
@

Bahan
Pasir Urug : 0,10 x 0,80 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,65 x 0,3
Buis beton 40 cm : 1 bh x 1,00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
3,000.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
66,500.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

18,064.62
2,007.18
802.87
9,260.39
3,000.00
5,275.37

6,720.00
28,483.83
66,500.00

10 1 m' Pasang Buis beton 50 cm dengan Cincin bata 1 : 4


Upah
Galian tanah : 0,90 x 1,00 x 1,0 x
@
Urug Kembali : 1/3 x 0,90 x 1,00 x 1 x
@
Urug pasir : 0,10 x 0,90 x 1,0 x 1
@
Pasangan bata 1 : 4 : 3,143 x 0,75 x 0,3 x 1 @
Pas. Buis beton 50 cm : 1 bh x 1 x
@
Buang tanah : 2/3 x 0,90 x 1 x 1
@

Bahan
Pasir Urug : 0,10 x 0,90 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,75 x 0,3
Buis beton 50 cm : 1 bh x 1,00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
8,363.25
10,035.90
15,109.50
3,500.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
82,700.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

22,580.78
2,508.98
903.23
10,685.06
3,500.00
6,594.21

7,560.00
32,865.96
82,700.00

11 1 m' Pasang Buis beton 60 cm dengan Cincin bata 1 : 4


Upah
Galian tanah : 1,00 x 1,10 x 1,0 x
@
Urug Kembali : 1/3 x 1,00 x 1,10 x 1 x
@
Urug pasir : 0,10 x 1,00 x 1,00 x 1
@
Pasangan bata 1 : 4 : 3,143 x 0,85 x 0,3 x 1 @
Pas. Buis beton 60 cm : 1 bh x 1 x
@
Buang tanah : 2/3 x 1 x 1,10 x 1
@

Bahan
Pasir Urug : 0,10 x 1,00 x 1,00
Pasangan bata 1 : 4 : 3,143 x 0,85 x 0,3
Buis beton 60 cm : 1 bh x 1,00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

25,089.75
8,363.25
10,035.90
15,109.50
4,500.00
10,990.35

84,000.00
46,475.00
105,600.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

27,598.73
3,066.53
1,003.59
12,109.74
4,500.00
8,059.59

7,560.00
32,865.96
105,600.00

12 1 m' Pasang Buis beton U 20 cm lengkap dengan Cincin bata 1 : 4


Upah
Galian tanah : 0,60 x 0,40 x 1 x
Urug Kembali : 1/3 x 0,60 x 0,40 x 1 x
Urug pasir : 0,10 x 0,60 x 1,0 x 1

@ Rp.
@ Rp.
@ Rp.

62

25,089.75
8,363.25
10,035.90

= Rp.
= Rp.
= Rp.

6,021.54
669.06
602.15

Dinas Pekerjaan Umum Kota Surakarta

Pasangan bata 1 : 4 : 1,58 x 0,45 x 0,3 x


Pas. Buis beton U 20 cm : 1 bh x 1 x
Buang tanah : 2/3 x 0,60 x 0,40 x 1

Bahan
Pasir Urug : 0,10 x 0,60 x 1,00
Pasangan bata 1 : 4 : 1,58 x 0,45 x 0,3
Buis beton U 20 cm : 1 bh x 1,00

@ Rp.
@ Rp.
@ Rp.

15,109.50
2,000.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
19,550.00

= Rp.
= Rp.
= Rp.

= Rp.
= Rp.
= Rp.

3,222.86
2,000.00
1,758.46
Rp.

14,274.07

Rp.

34,503.12

Rp.

48,777.18

Rp.

15,749.46

Rp.

40,996.03

Rp.

56,745.49

Rp.

12,087.60

Rp.

70,327.50

Rp.

82,415.10

Rp.

12,087.60

Rp.

86,261.25

Rp.

98,348.85

Rp.

12,087.60

Rp.

88,665.00

Rp.

100,752.60

5,040.00
9,913.12
19,550.00

13 1 m' Pasang Buis beton U 30 cm lengkap dengan Cincin bata 1 : 4


Upah
Galian tanah : 0,70 x 0,45 x 1 x
@
Urug Kembali : 1/3 x 0,70 x 0,45 x 1 x
@
Urug pasir : 0,10 x 0,70 x 1,0 x 1
@
Pasangan bata 1 : 4 : 1,58 x 0,55 x 0,15 x 0,3
@
Pas. Buis beton U 30 cm : 1 bh x 1 x
@
Buang tanah : 2/3 x 0,70 x 0,45 x 1
@

Bahan
Pasir Urug : 0,10 x 0,70 x 1,00
Pasangan bata 1 : 4 : 1,58 x 0,55 x 0,3
Buis beton U 30 cm : 1 bh x 1,00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,089.75
10,990.35
10,035.90
30,219.00
2,500.00
10,990.35

@ Rp.
@ Rp.
@ Rp.

84,000.00
46,475.00
23,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

7,903.27
1,153.99
702.51
1,181.71
2,500.00
2,307.97

5,880.00
12,116.03
23,000.00

14 1 m2 Pasang paving kawung lokal tebal 6 cm


Upah
0.2400
0.0800
0.0080
0.0120

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.0500 m2 Paving kawung t 6 cm
0.1200 m3 Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

55,550.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

7,635.60
3,469.20
393.12
589.68

58,327.50
12,000.00

15 1 m2 Pasang paving kawung lokal tebal 8 cm


Upah
0.2400
0.0800
0.0080
0.0120

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.0500 m2 Paving kawung t 8 cm
0.1200 m3 Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

70,725.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

7,635.60
3,469.20
393.12
589.68

74,261.25
12,000.00

16 1 m2 Pasang paving kawung tebal 6 cm SNI


Upah
0.2400
0.0800
0.0080
0.0120

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.0500 m2 Paving kawung SNI
0.0120 m3 Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

83,300.00
100,000.00

17 1 m2 Pasang Paving kawung tebal 8 cm SNI


63

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

7,635.60
3,469.20
393.12
589.68

87,465.00
1,200.00

Dinas Pekerjaan Umum Kota Surakarta

Upah
0.2400
0.0800
0.0080
0.0120

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

Bahan
1.0500 m2 Paving kawung SNI
0.0120 m3 Pasir Pasang

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

31,815.00
43,365.00
49,140.00
49,140.00

79,800.00
100,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

7,635.60
3,469.20
393.12
589.68
Rp.

12,087.60

Rp.

84,990.00

Rp.

97,077.60

83,790.00
1,200.00

SURAKARTA, 13 APRIL 2011

CV FANI SOLO RAYA


SUDARMAN,SPd,ST,MT
DIREKTUR

64

DAFTAR ANALISA
PEKERJAAN : PEMELIHARAAN GEDUNG DAN BANGUNAN BERUPA : PERBAIKAN GEDUNG KANTOR PUSAT
DAN PONDOK ASI
TAHUN ANGGARAN : 2011

Memasang 1 m langit-langit harflek


Upah
0.030
0.070
0.007
0.002

Bahan
1.100
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

m harflek
kg Paku tripleks

@
@
@
@

@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

31,815.00
49,140.00
52,080.00
49,140.00

14,950.00
16,100.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

954.45
3,439.80
364.56
73.71
Rp.

4,832.52

Rp.

16,606.00

Rp.

21,438.52

Rp.

5,947.54

Rp.

20,355.00

Rp.

26,302.54

Rp.

3,781.17

Rp.

7,965.00

Rp.

11,746.17

16,445.00
161.00

1 m Pengecatan bidang kayu lama Merk Bee Brand


Upah
0.0700
0.0750
0.0075
0.0025

Bahan
0.1500
0.1700
0.1700

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

kg Plamir kayu
kg Cat dasar
kg Cat penutup

@
@
@
@

@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

31,815.00
43,365.00
46,035.00
49,140.00

18,400.00
51,750.00
51,750.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.

2,227.05
3,252.38
345.26
122.85

2,760.00
8,797.50
8,797.50

1 m Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Upah
0.02
0.063
0.0063
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31815
43365
46035
49140

=
=
=
=

Rp.
Rp.
Rp.
Rp.

636.3
2731.995
290.0205
122.85

Bahan
0.1 kg
0.1 kg
0.26 kg

Plamir
Cat dasar
Cat penutup 2 x

@
@
@

Rp.
Rp.
Rp.

14850 =
18000 =
18000 =

Rp.
Rp.
Rp.

1485
1800
4680

1 m Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )


Upah
0.028
0.042
0.0042
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31815
43365
46035
49140

=
=
=
=

Rp.
Rp.
Rp.
Rp.

890.82
1821.33
193.347
122.85
Rp.

3,028.35

Rp.

5,400.00

Rp.

8,428.35

Rp.

22,044.75

Rp.

103,380.00

Rp.

125,424.75

Rp.

14,386.05

Rp.

168,326.75

Rp.

182,712.80

Rp.

29,621.97

Rp.
Rp.
Rp.

209,270.00
238,891.97
338,891.97

Bahan
0.12 kg
0.18 kg

Cat dasar
Cat penutup 2 x

@
@

Rp.
Rp.

18000 =
18000 =

Rp.
Rp.

2160
3240

Memasang 1 m konstruksi rangka plafond, kayu Bangkirai


Upah
0.15
0.25
0.025
0.075

Oh
Oh
Oh
Oh

Bahan
0.012 m
0.1 kg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Balok kayu bangkirai


Paku 12 cm

@
@
@
@

@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

31815
49140
52080
49140

=
=
=
=

8500000 =
13800 =

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

4772.25
12285
1302
3685.5

102000
1380

Memasang 1 m lantai keramik esensa ukuran ( 60 x 60 ) cm


Upah
0.25
0.12
0.012
0.013

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31815
43365
49140
49140

=
=
=
=

Rp.
Rp.
Rp.
Rp.

7953.75
5203.8
589.68
638.82

Bahan
1
9.8
0.045
1.3

dos
kg
m
kg

Keramik esensa 60x60 cm


@
Portland Cement
@
Pasir pasang
@
Semen warna
@

Rp.
Rp.
Rp.
Rp.

150000
1178.75
100000
1750

=
=
=
=

Rp.
Rp.
Rp.
Rp.

150000
11551.75
4500
2275

Memasang 1 m rangka dinding pemisah ( 60 x 120 ) cm kayu kamper


Upah
0.15
0.45
0.045
0.008

Oh
Oh
Oh
Oh

Bahan
0.028 m
0.15 kg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Balok kayu kamper


Paku 5 cm dan 7 cm

PENUTUP MULTIPLEK 18 MM 1 SISI

@
@
@
@

@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

31815
49140
52080
49140

=
=
=
=

7400000 =
13800 =

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

4772.25
22113
2343.6
393.12

207200
2070

Memasang 1 m' list langit-langit gipsum


Upah
0.05
0.05
0.005
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31815
49140
52080
49140

=
=
=
=

Rp.
Rp.
Rp.
Rp.

1590.75
2457
260.4
147.42
Rp.

4,455.57

Rp.

22,499.75

Rp.

26,955.32

Rp.

6,144.60

Rp.

23,956.80

Rp.

30,101.40

Rp.

3,028.35

Rp.

21,669.00

Rp.

24,697.35

Bahan
1.05 m'
0.01 kg

List gipsum
Paku

@
@

Rp.
Rp.

21275 =
16100 =

Rp.
Rp.

22338.75
161

Memasang 1 m langit-langit gypsum board ukuran ( 120 x 240 x 9 ) mm, tb. 9 mm


Upah
0.1
0.05
0.005
0.005

Oh
Oh
Oh
Oh

Bahan
0.364 lbr
0.11 kg

Pekerja
Tukang kayu
Kepala Tukang
Mandor

Gypsum board
Paku tripleks

@
@
@
@

@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

31815
49140
52080
49140

=
=
=
=

60950 =
16100 =

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

3181.5
2457
260.4
245.7

22185.8
1771

1 m Pengecatan dinding Mowilex


Upah
0.028
0.042
0.0042
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

31815
43365
46035
49140

=
=
=
=

Rp.
Rp.
Rp.
Rp.

890.82
1821.33
193.347
122.85

Bahan
0.36 kg
0.01 bh

Mowilek
Kuas

@
@

Rp.
Rp.

60000 =
6900 =

Rp.
Rp.

21600
69

Menetapkan
Pejabat Pembuat Komitmen

Dra. Kartini Hariyati


NIP. 19570421 198403 2 002

Você também pode gostar